7
Copyright 2021, BWR Owners’ Group, All Rights Reserved BWR Expertise Proven Solutions BWR Owners’ Group Overview Denver Atwood (Southern Nuclear Co.) – BWROG Chairman LWRS Spring Program Review Meeting April 7, 2021

BWR Owners’ Group Overview

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BWR Owners’ Group Overview

Copyright 2021, BWR Owners’ Group, All Rights Reserved

BWR Expertise

Proven Solutions

BWR Owners’ Group Overview

Denver Atwood (Southern Nuclear Co.) – BWROG Chairman

LWRS Spring Program Review MeetingApril 7, 2021

Page 2: BWR Owners’ Group Overview

Copyright 2021, BWR Owners’ Group, All Rights Reserved

BWROG Mission

◇ The mission of the Boiling Water Reactor Owners’ Group (BWROG) is to provide a forum, in the spirit of partnership with GE-Hitachi Nuclear Energy, which allows its member utilities to maintain and improve plant safety, achieve higher plant reliability, minimize and share costs, facilitate regulatory interaction, and effectively apply limited technical resources for mutual resolution of issues applicable to two or more members. (Ref. BWROG Charter Sec. II)

■ The BWROG is a utility lead organization designed to benefit the utility members. The member utilities decide what activities get worked and the timeline for those activities.

2

Page 3: BWR Owners’ Group Overview

Copyright 2021, BWR Owners’ Group, All Rights Reserved

BWROG Org Structure

3

Executive CommitteeExecutive Oversight

Committee

General CommitteeAdvisory Committee

Non-Generic Committees

Generic Committees

• Executive Chairman & Executives

• Approval authority for the Generic Invoice Limit (GIL) & strategic direction

• Chairman & Prime Reps• Approval authority for

Generic & Non-Generic scope & budget

• Committee Members & Project Managers

• Execute project scope and issue products

Page 4: BWR Owners’ Group Overview

Copyright 2021, BWR Owners’ Group, All Rights Reserved

BWROG Leadership

4

Tim Hanley Executive Chair

Paul Davison Executive Vice Chair

Denver Atwood General Chair

Greg Holmes Program Director

Page 5: BWR Owners’ Group Overview

Copyright 2021, BWR Owners’ Group, All Rights Reserved

BWROG Membership

5

Domestic (Members)DTE Energy NPPDDuke Energy PSEGEnergy Northwest Southern NuclearEntergy Talen EnergyExelon TVAFirstEnergy Xcel Energy

International (Members)CFE JAPCChubu KKLChugoku TohokuHokuriku TEPCOIberdrola

Conditional (Members)J-Power

Page 6: BWR Owners’ Group Overview

Copyright 2021, BWR Owners’ Group, All Rights Reserved

BWROG Committees (2021)

6

Core

Co

mm

ittee

Plan

t Pe

rform

anc

e

Syst

em

Impr

ovem

ent

Spec

ial

Topi

c

• Emergency Procedures• Integrated Risk-Informed Regulation• Licensing• Reactivity Controls Review

• Reload Analysis & Core Management

• BWR Water Chemistry• I&C Maintenance• Operations Significant Event Review*• Outage Management

• Rad Pro / ALARA• Refueling Performance• Valve Technical Resolution Group• Reactor Recirc ASD/VFD Performance*

• Control Rod Drive• ECCS• Feedwater• Offgas*

• Reactor Recirc• Reactor Water Clean Up• Turbine Generator & Aux*

• 50.69 Programs & Process• 50.69 Supply Chain• BWR6 Rod Control & Info System*• BWR Parts Obsolescence*

• RCIC Expanded Ops• Target Rock 2-Stage SRV Performance*

Core

Co

mm

ittee

Plan

t Pe

rform

anc

e

Syst

em

Impr

ovem

ent

Spec

ial

Topi

cCo

re

Com

mitt

eePl

ant

Perfo

rman

ceSy

stem

Im

prov

emen

t* Non-Generic Committees

Page 7: BWR Owners’ Group Overview

Copyright 2021, BWR Owners’ Group, All Rights Reserved7

Thanks! Any Questions