34
MYANMAR CONSTRUCTION SUMMIT - 11 th – 12 th MARCH 2014 ENG | BYMA MYANMAR CONSTRUCTION SUMMIT MYANMAR CONSTRUCTION SUMMIT TECHNIQUES IN HERITAGE BUILDINGS RESTORATION THAT CAN BE ADOPTED IN MYANMAR

BYMA

Embed Size (px)

DESCRIPTION

Heritage Building Conservation and Restoration in Myanmar

Citation preview

  • MYANMAR CONSTRUCTION SUMMIT

    -11th 12th MARCH 2014

    ENG | BYMA

    MYANMAR CONSTRUCTION SUMMIT

    MYANMAR CONSTRUCTION SUMMIT

    TECHNIQUES IN HERITAGE BUILDINGS RESTORATION THAT CAN BE ADOPTED

    IN MYANMAR

  • 1 - ABOUT BYMA D&B CONTRACTOR

    2 - HERITAGE BUILDINGS RENOVATION

    3 - CONCLUSION

    TABLE OF CONTENT

    MYANMAR CONSTRUCTION SUMMIT

    -11th 12th MARCH 2014

    ENG | BYMA

  • p.3

    MYANMAR CONSTRUCTION SUMMIT

    ABOUT BYMA D&B CONTRACTORMARCH 2014

    ABOUT BYMA

    D&B CONTRACTOR

  • p.4

    SPA-PM DSPL

    YOMA BOUYGUES

    MYANMAR CONSTRUCTION SUMMIT

    ABOUT BYMA D&B CONTRACTORMARCH 2014

  • p.5

    Bring together the local expertise and knowledge of SPA Project Management Ltd. and the large-scale international construction experience of Dragages Singapore, delivering

    high quality homes to buyers.

    MYANMAR CONSTRUCTION SUMMIT

    ABOUT BYMA D&B CONTRACTORMARH 2014

  • p.6

    o SPA PM is member of YomaStrategic Holding Ltd (SGX listedCompany).

    o The Project Management andDesign division is responsible forall planning, design anddevelopment works in supportof the Group's real estatebusiness.

    Yoma Strategic Holdings Ltd is a

    leading business corporation with

    real estate, agriculture, tourism

    and automobile dealership

    businesses in Myanmar and the

    Peoples Republic of China.

    MYANMAR CONSTRUCTION SUMMIT

    ABOUT BYMA D&B CONTRACTORMARCH 2014

  • p.7

    DSPL

    o Incorporated in Singapore,Dragages Singapore Pte Ltd is amember of the French BouyguesConstruction Group.

    o Dragages Singapore is a leadingengineering and construction firmin Southeast Asia.

    Sales (2012): 10.6bn (+9%)

    including 47% overseas

    Active in 80 countries

    55,400 employees worldwide

    Order book (2012): 17.1bn (+12%)

    DSPL

    MYANMAR CONSTRUCTION SUMMIT

    ABOUT BYMA D&B CONTRACTORMARCH 2014

  • p.8

    STARCITY ZONE B1,043 RESIDENTIAL UNITS

    YANGONBy

    MYANMAR CONSTRUCTION SUMMIT

    ABOUT BYMA D&B CONTRACTORMARCH 2014

  • p.9

    HERITAGE BUILDING RENOVATION

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.10

    OUR EXPERIENCE

    Over 30 years of experience in heavy renovation works and in luxury interior decoration for prestigious heritage buildings.

    A team of 200 sites superintendants and 1,500 tradesmen.

    A record of over 2 million renovated square meters in Paris region and prestigious landmarks all over the world.

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

    THE FULLERTON HOTEL - SINGAPORE

    THE INTERCONTINENTAL - PARIS

  • THE FULLERTON HOTELSINGAPORE

    BEFORE

  • THE FULLERTON HOTEL SINGAPORE

    AFTER

  • p.13

    AMONG OUR CUSTOMERS

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

    SHANGRI -LA HOTEL - PARIS

    PRINCE DE GALLES HOTEL - PARIS

  • p.14

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

    Yangons urban heritage

  • p.15

    THE SITUATION

    Yangon boasts one of the mostspectacular early-20th centuryurban landscapes in Asia.

    The Yangon City DevelopmentCommittee (the Yangon municipalauthority) currently has a list of189 listed buildings.

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.16

    THE SITUATION

    By protecting and promotingYangons heritage, Yangon couldbecome known as one of the mostattractive modern cities in South-East Asia.

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.17

    THE SITUATION

    Urgent action is required, overhundred old buildings mightdisappear after long decades ofneglect and this matchless andoutstanding cityscape could be lostforever.

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.18

    Complexity of the work to becarried out in a zone categorizedas seismic 2B.

    Limited regulations to frame therenovation of heritage building

    Modern leading edge technologiesnot available in the country

    No or limited success stories ofheritage building renovation inYangon.

    RENOVATION OF HERITAGE BUILDINGTHE ENVIRONMENT

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.19

    Renovate but keeping thearchitectural features ( preservingthe original look).

    Repair, salvage, re-use and up-cycling of historical elements.

    Convert them to commercial use ofmodern buildings (basement carpark, use of space, serviceability,infrastructure).

    Upgrade them to internationalstandards.

    THE MISSIONTO CREATE A LASTING LEGACY

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.22

    THE CHALLENGE

    Design the structures to regainunderpinning facades andallow the excavation andconstruction of basements.

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.23

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.24

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.25

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • EXAMPLE OF FAADE UNDERPINNING WORKS

  • EXAMPLE OF FAADE UNDERPINNING WORKS

  • EXAMPLE OF FAADE UNDERPINNING WORKS

  • EXAMPLE OF FAADE UNDERPINNING WORKS

  • p.30

    THE CHALLENGE

    Define the structures necessaryto ensure the stability of thefaade during the phases ofdemolition, excavation,reconstruction.

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.31

    CONCLUSION

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONDECEMBER 2013

  • p.32

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

    EXAMPLE OF FAADE TEMPORARY BRACING AND STABILIZATION

  • p.33

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

    EXAMPLE OF FAADE TEMPORARY BRACING AND STABILIZATION

  • p.34

    CONCLUSION

    MYANMAR CONSTRUCTION SUMMIT

    HERITAGE BUILDING RENOVATIONMARCH 2014

  • p.36

    MYANMAR CONSTRUCTION SUMMIT

    Q&AMARCH 2014

    Q&A

    Mr. Jean-Jacques LARGENT,

    General Manager

    BYMA