C-111 GENERAL REEVALUATION REPORT Appendix A Hydrology and Hydraulic Analysis

C-111 Appendix A Hydrology and Hydraulic · PDF fileOverland flow is computed using Manning's equation with Manning's "n ... A detailed documentation of the model is contained in SFWMD's

Embed Size (px)

Citation preview

  • C-111

    GENERAL REEVALUATION REPORT

    Appendix A

    Hydrology and Hydraulic Analysis

  • Appendix A Hydrology and Hydraulic Analysis

    Table of Contents

    Paragraph No.

    1. General .......................................... .

    2. Ba . Descnp. ti"on . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . sin 3. Soils .......................................... .

    4. Modeling ....................................... .

    5. Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6. Rainfall Frequency .................................. .

    7. Data.. . ......................................... .

    8. Skew Factors ..................................... .

    9. Rainfall Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10. Design Storms ..................................... .

    11. Antecedent Moisture Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . 12. Seasonal Flood Occurrence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 14. Structure Operating Levels ............................. .

    15. Base Condition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16. Alternative Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... 1 7. Model Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    a. General ....................................

    b. Operational Plan ............................... .

    c. Sensitivity Analyses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . d. Structure 197 (S-197) ............................ .

    e. Operational Plan-Studies . . . . . . . . . . . . . . . . . . . . . . . . . .

    18. Plan For Water Control, ENP-South Dade Conveyance System . . . . . . . a. South Dade County . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . b. Water Supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    19. Overall Plan For Water Control - Everglades National Park ........ .

    a. Authorization History ............................ .

    b. Taylor Slough Demonstration Project .................. .

    (1) General . . . . . . . . . . . . . . . . . . . . . . . . . . .... . (2) Test Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    c. Water Deliveries to the Eastern Panhandle of ENP via C-111 . . . .

    d. Modified Water Deliveries General Design Memorandum (GDM) .

    20. Hydraulic Design Criteria ............................

    a. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....... .

    b. Existing Hydraulic Conditions ...................... .

    c. Post-Project Hydraulic Conditions. . ................. .

    Page No.

    A-1

    A-1

    A-1

    A-I A-2

    A-2

    A-3

    A-3

    A-3

    A-3

    A-4

    A-4

    A-4

    A-4

    A-4

    A-5

    A-5

    A-5

    A-6

    A-6

    A-6

    A-7

    A-7

    A-7

    A-7

    A-7

    A.-7

    A-10

    A-10

    A-10

    A-12

    A-12

    A-13

    A-13

    A-13

    A-14

    A-i

  • d. Canal Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . A-14

    (1) Design water surface in canals . . . . . . . . . . . . . . . . . . A-14

    (2) Maximum permissible velocities . . . . . . . . . . . . . . . . . A-15

    (3) Side slopes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-15

    ( 4) Cross-sections . . . . . . . . . . . . . . . . . . . . . . . . . . . A-15

    (5) Transitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-15

    (6) Roughness coefficients . . . . . . . . . . . . . . . . . . . . . . . A-15

    (7) Sensitivity Analyses . . . . . . . . . . . . . . . . . . . . . . . . . A-15

    (8) Freeboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-16

    e. levee:s ........................................... A-16

    f. Water Control Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . A-16

    (1) Optimum and Design Water Levels . . . . . . . . . . . . . . . A-16

    (2) Salinity Control . . . . . . . . . . . . . . . . . . . . . . . . . . A-16

    g. Bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-17

    h. Disposal Mound Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-17

    i. Sediment Potential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-17

    21. Hydraulic designs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-17

    a. Alternatives ............... ; . . . . . . . . . . . . . . . . . . . A-17

    b. Proposed Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-18

    c. Pump Stations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-20

    d. Canals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-20

    {l) Pump Stations S-332A & S-332B Discharge Canals . . . . . A-20

    (2) Pump Station S-332C Discharge Canal . . . . . . . . . . . . . A-20

    {3) Pump Station S-332D Discharge Canal . . . . . . . . . . . . . A-21

    (4) Pump Station S-332 Connector Canal . . . . . . . . . . . . . . A-21

    (5) Canal 111 North (spreader canal) . . . . . . . . . . . . . . . . A-21

    (6) Existing Canals C-109 and C-110 . . . . . . . . . . . . . . . . A-21

    e. levees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-21

    (1) levee 31 West Tieback . . . . . . . . . . . . . . . . . . . . . . A-21

    (2) S-332D Tieback . . . . . . . . . . . . . . . . . . . . . . . . . . . A-22

    {4) Modifications to Existing Berms . . . . . . . . . . . . . . . . . A-22

    f. Culvert/Riser Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . A-23

    (1) Culverts through L-31W Tieback . . . . . . . . . . . . . . . . A-23

    (2) Culvert from C-111 Connector Canal to S-332 . . . . . . . . A-23

    g. Overflow Spillway on L-31W Tieback . . . . . . . . . . . . . . . . . . A-23

    h. Bridges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-23

    i. Existing Canals and Water Control Structures . . . . . . . . . . . . . . A-24

    j. Performance/water surface profiles . . . . . . . . . . . . . . . . . . . . . A-27

    A-ii

  • Appendix A

    Hydrology and Hydraulic Analysis

    TAB~

    A-1. Depth-Area in percent of Point Rainfall for lXl Model for Storm Centered Over C-111

    A-2. 2-yr & 10-yr Storm - Area.Uy Reduced Rainfall for 13 Rain Gage Basins A-3. 50-yr & 100-yr Stonn - Areally Reduced Rainfall for 13 Rain Gage Basins A-4. Storm Categories - Homestead Experiment Station A-5. Structures Managed in Route Subroutine A-6. C-111 Alternatives - Percent Chance Exceedance/1965-1989 Simulations A-7. C-111 Alternatives - Flood Event Peak Stages vs. Exceedance Frequency A-8. Optimum Stages in BNP-South Dade Conveyance System A-9. Minimum Monthly Delivery Schedule to Taylor Slough at S-332 A-10. Minimum Monthly Delivery Schedule to :Eastern Panhandle at S-18C A-11. Hydraulic Design Data - Pump Station S-332A A-12. Hydraulic Design Data - Pump Station S-3328 A-13. Hydraulic Design Data - Pump Station S-332C A-14. Hydraulic Design Data - Pump Station S-332D A-15. Hydraulic Design Data - Pump Station S-332E A-16. Hydraulic Design Data - Canal 111 North A-17. Hydraulic Design Data - Levee 31 West Tieback A-18. Hyaraulic Design Data - S-332D Tieback A-19. Hydraulic Design Data - Retention/Detention Area Culverts A-20. Hydraulic Design Data - Culvert from C-111 connector canal to S-332 A-21. Existing Channel Dimensions A-22. Existing Structure Hydraulic Data

    PHOTOGRAPHS

    A-1. S-332 A-2. S-332 A-3. State Road 9336 Bridge Across Taylor Slough A-4. Old Ingraham Highway Across Taylor Slough A-5. L-31N Borrow Canal North of S-176 A-6. Looking West into Everglades National Park from L-31W

    A-iii

  • Appendix A

    Hydrology and Hydraulic Analysis

    PHOTOGRAPHS - (continued)

    A-7. Spoil Mound and Gap on South Bank C-111 A-8. S-174 A-9. S-175 A-10. S-176 A-11. S-177 A-12. S-178 A-13. S-18C A-14. S-197

    FIGURES

    A-1. Homestead Experiment Station - Annual Rainfall, Expected Probability A-2. One by One Grid A-3. Stage Hydrographs at Various Grid Cells A-4. Sensitivity Analyses Stage Hydrographs A-5. Structure 197 - Flow versus Percent Chance Exceedance A-6. Hydraulic Profile - Typical from Pump Station across Retention/Detention Area,

    through Culvert/Riser A-7. Schematic Plan Layout - Connector canal, controlled culverts, and tee-connection for

    S-332 &. S-175, Alternative 6, Recommended Plan A-8. Schematic Profile - Canal 111 North, Alternative 6, Recommended Plan A-9. Cut A - Canal 111 North, Alternative 6, Recommended Plan A-10. Overflow Spillway - L-31W Tieback

    PLATES

    A-1. Alternative 1 A-2. Alternative IA A-3. Alternative 2 A-4. Alternative 3 A-5. Alternative 4 A-6. Alternative 5 A-7. Alternative 6 A-8. Alternative 6A, Recommended Plan A-9. Schematic Plan & Profile - Pump Station Discharge Canals and Culvert/Risers A-10. Hydraulic Profile - C-111 from S-18C to S-176 A-11. Hydraulic Profile - C-lllE A-12. Hydraulic Profile - L-31 N from S-176 to S-173 (S-331)

    A-iv

  • Appendix A

    Hydrology and Hydraulic Analysis

    1. General. This appendix addresses the hydrologic modeling and hydraulic design efforts for providing a more natural distribution of runoff into Everglades National Park while providing 40% SPF protection for the C