3
Dear Resident CITYLINK TULLA WIDENING: INSTALLATION OF ADDITIONAL NOISE WALL PANELS NEAR THE ALBION STREET BRIDGE, MOONEE PONDS, AUGUST 2016 – OCTOBER 2016 We are writing to update you on upcoming changes to the noise wall near the Albion Street bridge, as part of the CityLink Tulla Widening project. We will be installing new noise wall panels to extend the existing noise wall as a result of adding a new outbound lane on the CityLink Tulla Freeway. We thank you for your patience and understanding while we complete these important works. Where we will be We will be working near the Albion Street bridge, as shown in red on the map below.

citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/word_doc…  · Web viewWe will be installing new noise wall panels to extend the existing noise wall

  • Upload
    vancong

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Dear Resident

CITYLINK TULLA WIDENING: INSTALLATION OF ADDITIONAL NOISE WALL PANELS NEAR THE ALBION STREET BRIDGE, MOONEE PONDS, AUGUST 2016 – OCTOBER 2016

We are writing to update you on upcoming changes to the noise wall near the Albion Street bridge, as part of the CityLink Tulla Widening project. We will be installing new noise wall panels to extend the existing noise wall as a result of adding a new outbound lane on the CityLink Tulla Freeway.

We thank you for your patience and understanding while we complete these important works.

Where we will beWe will be working near the Albion Street bridge, as shown in red on the map below.

When works will occurWorks to install the new noise wall panels will occur from August to October 2016. Installation of the new noise wall panels will occur during normal construction hours of 7am to 6pm Monday to Saturday. These works are expected to be completed by October 2016.

CityLink

Albion Street

Yarrabin Street

What we are doing Building foundations and installing the new concrete panels to extend the existing noise wall towards the bridge.

What you may notice during constructionWhile these works will not impact your property you may notice: Noise from heavy equipment when in use, such as excavators, cranes, trucks and site

vehicles Changed traffic conditions and an increase in traffic when heading over the Albion Street

bridge, we advise you to plan your journey Construction personnel working in the area

About the projectAs you may be aware, work on the CityLink Tulla Widening project is underway and involves adding lanes and other measures to improve the flow of traffic across the 24 kilometre section of freeway from the CityLink tunnels to Melbourne Airport. The project will also provide travel time savings per trip between Melbourne Airport and the West Gate Freeway during peak periods.

The project will deliver a safer, more reliable freeway. Generally, an additional lane is being added in each direction, as well as upgrades at key interchanges including Bell Street, Mount Alexander Road/Flemington Road and on the Bolte Bridge to West Gate Freeway entry ramp.

CPB Contractors is the construction contractor for the Bulla Road to Power Street section of the project.

We are committed to keeping residents informed and minimising the inconvenience during construction, while keeping the community and our workers safe at all times. Managing and protecting the environment is also important to us and we are working with local and state government adhering to environmental laws to ensure any impact to the natural ecosystem is minimised.

If you have any questions or concerns regarding this notification, please phone 1300 783 947 and select 1 or email us at [email protected]

Yours sincerely,

Community Relations TeamCPB ContractorsCityLink Tulla Widening: Bulla Road to Power Street

29/07/2016, Ref: 0116 F01

131 450