www.cdg.ws 1
CABS CIRCUIT BILLING AND DISCOUNT PLAN ENHANCEMENTSMissy Parson & Sally Magsamen
DISCOUNT PLAN OVERVIEWMissy Parson
3www.cdg.ws
Advantages of the Enhanced Discount Plan
Unlimited number of USOCs per discount plan
Date sensitive rates
Unique TET line numbers for USOCs by Discount Plan Rate ID
Multiple company numbers with the same User ID can use the same discount information
Multiple discount plans can share the same set of rates by using the same discount rate IDs
A discount plan can have multiple rate IDs
Penalties
DISCOUNT PLAN OVERVIEW
4www.cdg.ws
3 Levels of Discount Screens by User ID
ADTI – Discount Tariff Information
Your company discount plan offerings
i.e. 3 year plan, 10% discount, etc.
ADAI – Discount Agreement Information
The agreement between you and your customer
i.e. different Required Quantity
ADRI – Discount Rate ID Information
Reference to a set of rates (AUSO) or Master % discount
DISCOUNT PLAN OVERVIEW
5www.cdg.ws
DISCOUNT PLAN OVERVIEW
6www.cdg.ws
DISCOUNT PLAN OVERVIEW
7www.cdg.ws
DISCOUNT PLAN OVERVIEW
www.cdg.ws 8
www.cdg.ws 9
FINDING USOC RATE IDSally Magsamen
www.cdg.ws 10
HOW DOES THE DISCOUNT PLAN FIND THE USOC RATE ID IT WILL USE?
11www.cdg.ws
DISCOUNT PLAN (EXAMPLE 1)
12www.cdg.ws
DISCOUNT PLAN (EXAMPLE 1)
13www.cdg.ws
DISCOUNT PLAN (EXAMPLE 1)
14www.cdg.ws
ADRI – Rate ID is blank
ADRI – Percent field is populated
Circuit uses ALEC Rate ID and applies discount % populated within ADRI
DISCOUNT PLAN (EXAMPLE 1)
15www.cdg.ws
Within ADRI, enter your unique Rate ID
When Rate ID is populated, the Percent field is ignored
DISCOUNT PLAN (EXAMPLE 2)
16www.cdg.ws
DISCOUNT PLAN (EXAMPLE 2)
17www.cdg.ws
DISCOUNT PLAN (EXAMPLE 2)
18www.cdg.ws
ADRI – Rate ID is populated
ADRI – Percent Field is blank (ignored)
AUSO – Discount % is not populated
AUSO – Apply Discount % Only is set to N
Circuit uses ADRI Rate ID
No additional discount % is applied
DISCOUNT PLAN (EXAMPLE 2)
19www.cdg.ws
Within ADRI, enter your unique Rate ID
DISCOUNT PLAN (EXAMPLE 3)
20www.cdg.ws
DISCOUNT PLAN (EXAMPLE 3)
21www.cdg.ws
DISCOUNT PLAN (EXAMPLE 3)
22www.cdg.ws
ADRI – Rate ID is populated
ADRI – Percent field is blank (ignored)
AUSO – Discount % is populated
AUSO – Apply Discount % Only is set to N
Circuit uses ADRI Rate ID
AUSO Discount % is applied to the ADRI Rate ID
DISCOUNT PLAN (EXAMPLE 3)
23www.cdg.ws
Within ADRI, enter your unique Rate ID
DISCOUNT PLAN (EXAMPLE 4)
24www.cdg.ws
DISCOUNT PLAN (EXAMPLE 4)
25www.cdg.ws
DISCOUNT PLAN (EXAMPLE 4)
26www.cdg.ws
ADRI – Rate ID is populated
ADRI – Percent field is blank (ignored)
AUSO – Discount % is populated
AUSO – Apply Discount % Only is set to Y
Circuit uses ALEC Rate ID
AUSO Discount % populated within the ADRI Rate ID is applied to the ALEC Rate ID
DISCOUNT PLAN (EXAMPLE 4)
27www.cdg.ws
Within ADRI, enter your ALEC Rate ID
DISCOUNT PLAN (EXAMPLE 5)
28www.cdg.ws
DISCOUNT PLAN (EXAMPLE 5)
29www.cdg.ws
DISCOUNT PLAN (EXAMPLE 5)
30www.cdg.ws
DISCOUNT PLAN (EXAMPLE 5)
31www.cdg.ws
DISCOUNT PLAN (EXAMPLE 5)
32www.cdg.ws
ADRI – Rate ID is populated
ADRI – Percent field is blank (ignored)
AUSO – Discount % is populated
AUSO – Apply Discount % Only is set to N
Circuit uses ADRI Rate ID
AUSO Discount % populated within AUSO is applied to the ADRI Rate ID
DISCOUNT PLAN (EXAMPLE 5)
www.cdg.ws 33
FACILITY ACCESS UPDATESMissy Parson
DISCOUNT PLAN PRODUCTIVITYAbility to easily move between discount screens
36www.cdg.ws
Want to find customer agreements for a specific tariff offering?
DISCOUNT PLAN PRODUCTIVITY
37www.cdg.ws
F16 transfers to ADAX
DISCOUNT PLAN PRODUCTIVITY
38www.cdg.ws
Want to lookup tariff information from any agreement screen?
DISCOUNT PLAN PRODUCTIVITY
39www.cdg.ws
F16 transfers to ADTB
DISCOUNT PLAN PRODUCTIVITY
40www.cdg.ws
Want to find the USOCs for a specific Rate-ID?
DISCOUNT PLAN PRODUCTIVITY
41www.cdg.ws
Want to find the USOCs for a specific Rate ID?
Position cursor within the Rate-ID field
DISCOUNT PLAN PRODUCTIVITY
42www.cdg.ws
F16 transfers to AUSB
DISCOUNT PLAN PRODUCTIVITY
43www.cdg.ws
Want to return to ADRI?
DISCOUNT PLAN PRODUCTIVITY
44www.cdg.ws
F16 returns to ADRI*
* If you did not start from ADRI, then F16 will take you to the the discount agreement
browse (ADAB).
DISCOUNT PLAN PRODUCTIVITY
45www.cdg.ws
SummaryFrom ADTB, F16 to ADAX
From ADTI, F16 to ADAX
From ADAB, F16 to ADTB
From ADAX, F16 to ADTB
From ADAI, F16 to ADTB
From ADRI, when the cursor is within the Rate-ID field, F16 to AUSB
From AUSB or AUSO, F16 to ADRI when coming from ADRI. If not originally from ADRI, F16 to ADAB.
DISCOUNT PLAN PRODUCTIVITY
www.cdg.ws 46
TERMINATION PENALTYAbility to apply a penalty OC&C when a circuit is terminated early
www.cdg.ws 48
This is not new functionalityCalc Rate displayed with V53, but hard coded at ‘50.00’
Ability to specify the Calc Rate is new & licensees will have with V54
TERMINATION PENALTY
ADTI (discount tariff screen)
Termination Calc MethodN = no early termination penalty
1 = create termination penalty based on current amount billed
Calc RateWhen Method = 1, Calc Rate is a percentage and must be 0 – 100
Method ‘1’Penalty = (current ACKU amount / 30) x number of days remaining in plan x rate%
360 day (1 year) limit when in Renew status
49www.cdg.ws
When are early termination penalties created?
TERMINATION PENALTY
50www.cdg.ws
When are early termination penalties created?
TERMINATION PENALTY
51www.cdg.ws
When are early termination penalties created?
Outing or Deleting a circuit
ASPL’s Create OCC is P
ASPL’s Plan ID must be populated
ASPL’s Plan End Date has changed More current than the original Plan End Date
Termination Penalties are calculated after Minimum Billing Charges, as discussed in 2013
ACKU must be applicable to the plan (Plan Level)
Only applicable to ASPL & ACFEDSPL
TERMINATION PENALTY
www.cdg.ws 52
TERMINATION PENALTY
Example
Func = O
Create OCC = P
Eff Date = 04/01/2014
Change Plan End date from 12/31/2015 to 04/01/2014
www.cdg.ws 53
TERMINATION PENALTY
Results
ACKP Billed Thru & End dates are updated with the new plan End Date
ASPL-2 Status set to ‘P’
ASPL-2 Status Date set to Effective Date
www.cdg.ws 54
TERMINATION PENALTY
Results (continued)
OC&C entries
55www.cdg.ws
Results (continued)
OC&C entries
#3: fractional amount for prior billing month (AUSOC)
#2: fractional amount for prior billing month (ABC123)
#1: termination penalty (ABC123)Phrase Code is ‘388’, ‘Charge For Termination Liability’
Indicator is ‘1’ for a non-recurring charge
Billed Amount is $945 ($90 x 21 months x 50%)
Note:
Spl/Wat service from/thru dates
04/01/2014 04/30/2014
TERMINATION PENALTY
www.cdg.ws 56
SHORTAGE PENALTYAbility to apply a penalty OC&C when the minimum quantity of circuits are not present
www.cdg.ws 58
SHORTAGE PENALTY
ADTI (discount tariff screen)
Maximum Threshold%Number of circuits allowed on plan
Minimum Threshold%Number of circuits that must be present for the plan to remain active
Grace PeriodThe number of days the discount will continue to apply once it has fallen out of compliance
Shortage Calc MethodN = no shortage penalty
1 = create shortage penalty based on current amount billed
M = create shortage penalty based on a monthly flat rated amount
Calc RateWhen Method = 1, Calc Rate is a percentage and must be 0 – 100
When Method = M, Calc Rate is a dollar amount
59www.cdg.ws
ADAI (discount agreement screen)
SHORTAGE PENALTY
60www.cdg.ws
Required QuantityNumber necessary for plan to be active
Used in conjunction with Equivalent
Applicable to volume related plans (ADTI Plan Type V & B)
EquivalentTells how circuits are counted
Q(uantity), V(oice Grade), (DS)1, DS(3)
Example: If Required Quantity = 1 and Equivalent = 1, then a count of 24 voice grade circuits is needed. This could be one DS1 circuit or 24 Voice Grade circuits.
Actual QuantityUpdated by ACPLN100 for volume related plans
SHORTAGE PENALTY
61www.cdg.ws
Max% & Min%Displayed from ADTI
Overage Qty & Shortage QtyCalculated based on Required Quantity and Max% & Min%
Auto Decrease Upon PenaltyY to automatically update the Required Quantity after shortage penalties are generated.
New Required Quantity = Actual Quantity x inverse of Minimum Threshold%
Example: Required Quantity = 100, Min% = 90, Actual Quantity = 89
89 x 110% = 97.9 (round up) 98 is the new Required Quantity
N to not automatically update the Required Quantity
Applicable to volume related plans (ADTI Plan Type V & B)
Updated in ACPLN200
SHORTAGE PENALTY
62www.cdg.ws
How are shortage liability penalties created?
Find Actual Quantity
ACPLN100 – Listing of Volume Related Plans
Finds all volume related plans (ADTI Plan Type = V or B)
Finds all non-disconnected circuits with a volume related plan
Accumulates ASPL-2 VG Equivalent values
Updates ADAI Actual Quantity by using accumulated VG equivalents
When ADAI Equivalent = Q, set to circuit count
When ADAI Equivalent = V, set to actual count
When ADAI Equivalent = 1, set to actual count/24
When ADAI Equivalent = 3, set to actual count/672
Generates text and csv outputs
SHORTAGE PENALTY
63www.cdg.ws
How are shortage liability penalties created?
Find the circuits the caused the shortage
ACPLN110 – Circuit Listing for Volume Related Plans
Finds all volume related plans that have not terminated
ADTI Plan Type = V or B
ADAI Termination Date = 00/00/0000
Finds all circuits with a volume related plan
Shows plans that are out of compliance and all circuits associated with the plan ID
ASPL-2 Status is set to ‘S’ and Status Date set to the report run date
Generates text and csv outputs
SHORTAGE PENALTY
64www.cdg.ws
How are shortage liability penalties created?Create the shortage penalties
ACPLN200 – Shortage Penalty OC&C Report
Utilize the information gathered from ACPLN110
When Method = ‘1’ Process the number of disconnected circuits until you reach the Shortage Quantity
Create AOCC with circuit level details
Penalty = current ACKU amount x rate%
This is not new functionality
Calc Rate was previously hard coded at ‘50.00’
Ability to specify the Calc Rate was new with V53
When Method = ‘M’Create ATRN
Penalty = number of lines short x rate
New functionality with V53
SHORTAGE PENALTY
www.cdg.ws 65
SHORTAGE PENALTY
Example 1 Example 2
Examples of shortage liability penalties
www.cdg.ws 66
Examples of shortage liability penaltiesRun ACPLN100
SHORTAGE PENALTY
Example 1 Example 2
www.cdg.ws 67
SHORTAGE PENALTY
Examples of shortage liability penaltiesRun ACPLN110
www.cdg.ws 68
SHORTAGE PENALTY
Examples of shortage liability penaltiesRun ACPLN200
www.cdg.ws 69
SHORTAGE PENALTY
Example 1 Example 2
Examples of shortage liability penalties
70www.cdg.ws
Compliance Package
ACPLN100 – List volume plans with circuits counts
ACPLN110 – List circuits by volume plan
ACPLN120 – List plans past grace period
ACPLN130 – Update ASPL end date from ADAI
ACPLN140 – Update ASPL end date for termination renewal
ACPLN200 – Shortage penalties
AC09005 – Compliance Letter (overage, shortage, expiration)
SHORTAGE PENALTY
www.cdg.ws 71