Upload
others
View
20
Download
1
Embed Size (px)
Citation preview
CADANGAN KERJA-KERJA KONSERVASI BANGUNAN RUMAH NO. 69, BANDAR BAHARU
LEPAT LABU, KUALA LUMPUR NO. KONTRAK: T/KPKKW/JWN/P0/05/2010
LAPORAN KONSERVASI BULANAN
JANUARI 2010
(01HB JANUARI – 31HB JANUARI 2010)
DISEDIAKAN UNTUK :
JABATAN WARISAN NEGARA KEMENTERIAN PELANCONGAN, SENI DAN BUDAYA
BANGUNAN SULTAN ABDUL SAMAD JALAN RAJA
50450 KUALA LUMPUR
DISEDIAKAN OLEH :
ARAS MAJU CONSTRUCTION BANDAR TASIK PERMAISURI
50450 KUALA LUMPUR
Commented [jwn1]: Font Style = Arial + Bold + Huruf Besar Font Size = 20
Commented [jwn2]: Font Style = Arial + Bold + Huruf Besar Font Size = 16
Commented [jwn3]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [jwn4]: 8.8cm x 12.6cm (Foto 3R)
Commented [jwn5]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [jwn6]: Font Style = Arial + Bold + Huruf Besar Font Size = 14
Commented [jwn7]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [jwn8]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
ISI KANDUNGAN MUKA SURAT
1.0 Ringkasan Projek 1 - 5 2.0 Carta Organisasi 6 - 7 3.0 Kemajuan Program Kerja Keseluruhan 8
3.1 Jadual Kemajuan Kerja 9 - 10 3.2 Ringkasan Kemajuan Kerja 11 - 13
4.0 Bahan Binaan Di Tapak 14 - 15 5.0 Tatacara Kerja 16 - 17 6.0 Jadual Tenaga Kerja 18 - 19 7.0 Jadual Catatan Cuaca 20 - 21 8.0 Kemajuan Bayaran Interim 22 - 23 9.0 Semakan Surat 24
9.1 Senarai Semak Surat Menyurat Keluar 25 9.2 Senarai Semak Surat Menyurat Masuk 26
10.0 Dokumentasi Bergambar 27 - 35
10.1 Gambar Sebelum, Semasa Dan Selepas 10.2 Gambar Aktiviti Kerja Di Tapak
11.0 Pelan 36 - 37 12.0 Lampiran 38 - 48
Commented [jwn9]: Font Style = Arial + Bold + Huruf Besar Font Size = 16
Commented [jwn10]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 14
No.
Butiran Catatan
1.0 Ringkasan Projek
Sila sertakan :-
Nama :
Alamat :
No. Tel :
1.1 Pemilik
1.2 Agensi Perlaksana
1.3 Arkitek
1.4 Juru Ukur Bahan
1.5 Jurutera Sivil dan Struktur
1.6 Jurutera Mekanikal dan Elektrikal
1.7 Kontraktor
1.8 Tarikh Milik Tapak
1.9 Tarikh Siap Kerja
1.10Jumlah Kontrak
1.11No. Kontrak
1.12Polisi Insurans
2.0
Carta Organisasi
Sila sertakan :- Nama : Jawatan : Alamat : No. Tel :
Gam. Pasport Terkini (Warna) :
2.1 Pengarah Projek
2.2 Penasihat/ Penyelidik/Konservator
2.3 Pengurus Projek
2.4 Arkitek
2.5 QS
2.6 C & S
2.7 M & E
2.8 Eksekutif Projek
2.9 Co-Ordinator Projek
2.10 Pentadbiran
2.11 Sub-Kontraktor
3.0
Kemajuan Program Kerja Keseluruhan
3.1 Jadual Kemajuan Kerja
I. Menggunakan kertas A3
II. Mempunyai muka surat
3.1.1 Perkara
3.1.2 Huraian
3.1.2.1 Persediaan Awal
3.1.2.2 Jumlah Kecil
3.1.2.3 Jumlah Keseluruhan
1
Commented [j11]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 12
No.
Butiran Catatan
3.1.3 Kemajuan
3.1.3.1 Dirancang
3.1.3.2 Sebenar
3.1.4.2 Dirancang
3.1.4.3 Sebenar
3.1.4.4 Perbezaan
3.2 Ringkasan Kemajuan Kerja
3.2.1 Nombor
3.2.2 Perkara
3.2.3 Kerja Dirancang (%)
3.2.4 Kerja Terlaksana (%)
3.2.5 Beza Kerja Terlaksana & Dirancang
4.0 Bahan Binaan Di Tapak
4.1 Bilangan Nombor
4.2 Jenis Bahan
4.3 Kuantiti
5.0 Tatacara Kerja
5.1 Jenis Kerja
5.2 Keterangan Kerja
5.2.1 Komponen
5.2.2 Lokasi
6.0 Jadual Tenaga Kerja
6.1 Tarikh
6.2 Bilangan (Nombor)
6.3 Jenis Pekerjaan
6.4 Bilangan Mengikut Hari
7.0 Jadual Catatan Cuaca - Hendaklah dibuat mengikut bulan
8.0 Kemajuan Bayaran Interim
8.1 Tajuk
8.2 No. Kontrak
8.3 Harga
8.4 Bilangan
8.5 Tuntutan Bayaran No.
8.6 Tuntutan
8.6.1 Tarikh
8.6.2 Jumlah
8.7 Jumlah Pembayaran
8.7.1 Tarikh
8.7.2 Diperakui (RM)
8.7.3 Wang Tahanan
8.7.4 Diterima (RM)
8.7.5 Jumlah Diperakui
2
Commented [j12]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 12
No.
Butiran Catatan
8.7.6 Peratus Siap Kerja Mengikut Bayaran (%)
8.7.7 Jumlah Wang Tahanan
8.7.8 Jumlah Penerimaan
9.0 Semakan Surat
9.1 Senarai Semak Surat Menyurat Keluar
9.1.1 Bilangan (Nombor)
9.1.2 Perkara
9.1.3 Rujukan Pejabat
9.1.4 Kepada
9.1.5 Tarikh
9.1.6 Tindakan
9.2 Senarai Semak Surat Menyurat Masuk
9.2.1 Bilangan (Nombor)
9.2.2 Perkara
9.2.3 Rujukan Pejabat
9.2.4 Daripada
9.2.5 Tarikh
9.2.6 Tindakan
10 Dokumentasi Bergambar
I. Sila sertakan gambar pada 4 tampak dan perspektif
II. Tarikh III. Sertakan kapsyen pada setiap gambar
Gambar mesti selari dengan kerja di tapak
IV. Sediakan key lokasi V. Tetapkan 5 lokasi gambar yang boleh
menggambarkan progress kerja
10.1 Gambar Sebelum Dan Semasa
10.2 Gambar Aktiviti Kerja Di Tapak
11 Pelan
12 Lampiran I. Architect Instruction II. Surat-surat analisis dan
III. Surat-menyurat daripada agensi pelaksana mahupun pemilik
IV. Teknikal dan dokumentasi
3
Commented [j13]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 12
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
1.0 Ringkasan Projek
4
Commented [jwn14]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur _______________________________________________________________________
RINGKASAN PROJEK PEMILIK : Tuan Marban bin Tuan Londeh No. Tel : 03 21671234 Lot 888, Jalan Huru Hara No. Fax : 03 2167 2345 50000 Bandar Baru Lepat Labu Kuala Lumpur AGENSI PELAKSANA : Jabatan Warisan Negara No. Tel : 03 2167 5100 Tingkat 1, 2 dan 10, Menara Chulan No. Fax : 03 2171 6028 Jalan Conlay Off Jalan Raja Chulan 50450 Kuala Lumpur ARKITEK : Luncai Arkitek Sdn. Sdn. No. Tel : 03 2166 4567 55A, Jalan Lebuh Mat Labuh No. Fax : 03 2166 5678 Bukit Uda dan Dara
43200 Cheras Kuala Lumpur JURUUKUR BAHAN : Marban Konsultant No. Tel : 03 2166 1567 Jalan 1/108B, Jalan Haru Biru No. Fax : 03 2166 2567 50001 Bandar Cinta Berahi Kuala Lumpur JURUUKUR SIVIL DAN `: Faizal Naem Constultant No. Tel : 03 2188 6998 STRUKTUR 133A, Jalan 10/42A No. Fax : 03 2188 6969 Taman Sejahtera 50400 Segambut Kuala Lumpur JURUTERA MEKANIKAL : Jiwa Merdeka Consultant Sdn. Bhd. No. Tel : 03 2178 6688 DAN ELEKTRIKAL Lot 99B, Jalan Bulan Gerhana No. Fax : 03 2178 8989 50002 Bandar Baru Batu Belah Kuala Lumpur KONTRAKTOR : Sigaibuluh Construction No. Tel : 03 2160 4577 Lot 7377, Jalan Marban 1 No. Fax : 03 2160 7577 50450 Bandar Baru Buluh Minyak
Kuala lumpur TARIKH MILIK TAPAK : TEMPOH KONTRAK : TARIKH SIAP KERJA : JUMLAH KONTRAK : NO. KONTRAK : POLISI INSURAN :
5
Commented [jwn15]: Font Style = Arial + Bold + Huruf Besar dan Underline Font Size = 12
Commented [jwn16]: Font Style = Arial + Bold + Huruf Besar Font Size = 10
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
2.0 Carta Organisasi
6
Commented [jwn17]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
CARTA ORGANISASI
SIGAIBULUH CONSTRUCTION
Gambar Pasport
PENGARAH PROJEK
Nama : No. Tel :
Gambar Pasport
PENGURUS PROJEK
Nama :
No. Tel :
Gambar Pasport
EKSEKUTIF PROJEK
Nama :
No. Tel :
Co-Ordinator Projek
Nama :
No. Tel :
Gambar Pasport
Gambar Pasport
PENTADBIRAN
Nama : No. Tel :
Gambar Pasport
ARKITEK
Nama : No. Tel :
Gambar Pasport
C & S
Nama : No. Tel :
QS
Nama : No. Tel :
Gambar Pasport
Gambar Pasport
M & E
Nama : No. Tel :
SUB- KONTRAKTOR
Nama : No. Tel :
Gambar Pasport
Gambar Pasport
PENASIHAT
Nama : No. Tel :
Commented [jwn18]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [jwn19]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
3.0 Kemajuan Program Kerja Keseluruhan
3.1 Jadual Kemajuan Kerja
3.2 Ringkasan Kemajuan Kerja
8
Commented [j20]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Commented [j21]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 20
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
3.1 Jadual Kemajuan Kerja
9
Commented [jwn22]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
3.1 JADUAL KEMAJUAN KERJA
Item
Description
Progress
Overall
Planned
Actual
Weightage
%
Planned
Actual
%
Diff. %
A 1.
PRELIMINARIES Contract Requirement & Management
Sub Total
B 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Pembersihan Keseluruhan Tapak dan Bangunan Kerja-kerja Meroboh Baikpulih Struktur Banguan Lantai, kaki Lima dan Longkang Kerja-kerja Meroboh Dinding Pintu dan tingkap Tangga Luar dan Dalam Bangunan Bumbung Siling Tiang dan Alas Tiang Mekanikal dan Elektrikal Infrastruktur dan Pagar Rawatan Anai-Anai Mengikis dan Mengecat Jalan Masuk dan Parking Kerja-kerja Arkitektual
Sub Total
TOTAL
KERJA DIRANCANG : KERJA TERLARANG : BEZA PERLAKSANA KERJA ( % ) : BEZA PERLAKSANA KERJA ( HARI ) : DISAHKAN OLEH : …………………………….. (PERUNDING)
10
Commented [j23]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [j24]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
3.2 Ringkasan Kemajuan Kerja
11
Commented [jwn25]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
3.2 RINGKASAN KEMAJUAN KERJA
NO.
PERKARA
KERJA
DIRANCANG (%)
KERJA
TERLAKSANA (%)
BEZA KERJA TERLAKSANA
DAN DIRANCANG (%)
NAMA PROJEK…..
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.
KERJA-KERJA AWALAN PENYELIDIKAN DAN DOKUMENTASI MENANGGAL DAN MEROBOH DINDING SILING BUMBUNG LANTAI PINTU TINGKAP ANTI-TERMITE KERJA LUAR BANGUNAN WANG PERUNTUKAN SEMENTARA
TARIKH BERAKHIR : KERJ DIRANCANG : BEZA TERLAKSANA : BEZA PERLAKSANA KERJA ( % ) : BEZA PERLAKSANA KERJA ( HARI ) : DISAHKAN OLEH : ……………………………. (PENYELIA PROJEK)
12
Commented [jwn26]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [j27]: Font Style = Arial + Huruf Besar Font Size = 12
Commented [j28]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
13
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
4.0 Bahan Binaan Di Tapak
14
Commented [j29]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
4.0 BAHAN BINAAN DI TAPAK
BIL.
JENIS BAHAN
KUANTITI
15
Commented [j30]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [j31]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
5.0 Tatacara Kerja
16
Commented [jwn32]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
5.0 TATACARA KERJA JENIS KERJA : KETERANGAN KERJA :- Kompenan : Seluruh permukaan kayu sediada Lokasi : 1. Tebar Layar ( Bahagian kanan dan kiri ) TATACARA KERJA : 1. 2. 3.
17
Commented [jwn33]: Font Style = Arial + Bold + Huruf besar Font Size = 12
Commented [jwn34]: Font Style = Arial + Bold + Huruf besar Font Size = 12
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
6.0 Jadual Tenaga Kerja
18
Commented [jwn35]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baharu Lepat Labu, Kuala Lumpur
6.0 JADUAL TENAGA KERJA TARIKH : HINGGA
NO.
JENIS
PEKERJAAN
BILANGAN MENGIKUT HARI
1 2 3 4 5 6 7 8 9 10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1 Pegawai Projek
2 Eksekutif Projek
3 Pentadbiran
4 Ejen Tapak
5 Tukang Kayu
6 Pekerja Am
7 Mandur 8 Tukang
Paip
9 Tukang Cat
10 Tukang Kikir
11 Tukang Lepa
12 Arkeologi 13 Kawalan
Serangga
JUMLAH
19
Commented [jwn36]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
7.0 Jadual Catatan Cuaca
20
Commented [jwn37]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
REKOD CUACA BULANAN DI TAPAK PROJEK
NAMA PROJEK : Kerja-kerja Baikpulih Tugu Negara Kuching, Kuching, Sarawak KONTRAKTOR : Kelapa Laut Enterprise, Jalan Mata Kucing, 12300 Sarikei, Sarawak BULAN : Januari 2009
PETUNJUK:
Cuaca Baik
Hujan JUMLAH JAM YANG TERGENDALA AKIBAT HUJAN: Dari 1 Jan 2009 hingga 30 Jan 2009 jam.
21
1 Jan 2009 2 Jan 2009 3 Jan 2009 5 Jan 2009 5 Jan 2009
6 Jan 2009 7 Jan 2009 8 Jan 2009 9 Jan 2009 10 Jan 2009
11 Jan 2009 12 Jan 2009 13 Jan 2009 14 Jan 2009 15 Jan 2009
16 Jan 2009 17 Jan 2009 18 Jan 2009 19 Jan 2009
24 Jan 2009 23 Jan 2009 22 Jan 2009 21 Jan 2009
20 Jan 2009
25 Jan 2009
27 Jan 2009 26 Jan 2009 30 Jan 2009 29 Jan 2009 28 Jan 2009
Commented [j38]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
8.0 Kemajuan Bayaran Interim
22
Commented [jwn39]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
8.0 KEMAJUAN BAYARAN INTERIM
TAJUK : No. KONTRAK : HARGA :
BIL. TUNTUTAN
BAYARAN NO.
TUNTUTAN TUNTUTAN
TARIKH JUMLAH TARIKH DIPERAKUI
(RM) WANG
TAHANAN DITERIMA
(RM)
JUMLAH DIPERAKUI
PERATUS SIAP KERJA MENGIKUT BAYARAN (%)
JUMLAH WANG TAHANAN
JUMLAH PENERIMAAN
23
Commented [j40]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [j41]: Font Style = Arial + Bold + Huruf Besar Font Size = 10
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
9. 0 Semakan Surat
9.1 Senarai Semak Surat Menyurat Keluar
9.2 Senarai Semak Surat Menyurat Masuk
24
Commented [j42]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Commented [j43]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 20
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
9.0 LAMPIRAN
9.1 SENARAI SEMAK SURAT MENYURAT (KELUAR)
Bil.
Perkara
Rujukan Pejabat
Kepada
Tarikh
Tindakan
1.
2.
3.
4.
5.
6.
7.
25
Commented [jwn44]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [j45]: Font Style = Arial + Bold + Huruf Besar Font Size = 10
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
9.0 LAMPIRAN 9.2 SENARAI SEMAK SURAT MENYURAT (MASUK)
Bil.
Perkara
Rujukan Pejabat
Kepada
Tarikh
Tindakan
1.
2.
3.
4.
5.
6.
7.
26
Commented [jwn46]: Font Style = Arial + Bold + Huruf Besar Font Size = 12
Commented [j47]: Font Style = Arial + Bold + Huruf Besar Font Size = 10
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
10.0 Dokumentasi Bergambar
10.1 Gambar Sebelum, Semasa dan Selepas
10.2 Gambar Aktiviti Kerja Di Tapak
27
Commented [j48]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
Commented [j49]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 20
28
29
30
31
32
33
34
35
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
11. Pelan
36
Commented [jwn50]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
37
Cadangan Kerja-kerja Konservasi Bangunan Rumah No. 69, Bandar Baru Lepat Labu, Kuala Lumpur
12. Lampiran
38
Commented [jwn51]: Font Style = Arial + Bold + Setiap pangkal perkataan menggunakan huruf besar Font Size = 24
39
40
41
42
43
44
45
46
47
DIARI TAPAK BINA
NAMA SYARIKAT (Alamat Lengkap/No. Tel/Fax)
No. Dokumen:
No. Rujukan:
Nama Projek: No. Tender:
Hari: Tarikh:
PERKERJA DI TAPAK:
JAWATAN BIL. MASA
JAWATAN BIL. MASA
AM PM AM PM
Pengarah Projek Operator Mesin Pengorek
Pengurus Projek Operator Jengkaut
Jurutera Tapak Operator Jentolak
Pegawai Keselamatan Operator Mesin Penggiling
Penyelia Tapak Pemandu Lori
Juru Ukur Tanah Tukang Cerucuk
Juru Ukur Bahan Penarik Rantai
Arkitek Tukang Cat
Jurutera Mekanikal/Elektrikal Tukang Atap
Kerani Am Tukang Jubin
Tukang Lepa Tukang Kayu/ Tukanng Ukir
Tukang Paip Tukang Batu
Juruelektrik Tukang Besi
Jurukimpal Tukang Bata
Tukang Kaca Tukang Kayu
Mekanik Am Pengawal Keselamatan
Operator Kren Pekerja Am
JUMLAH PEKERJA DI
TAPAK:
JUMLAH PEKERJA DI
TAPAK:
PERALATAN ATAU MESIN DI TAPAK:
PERALATAN BIL. MASA
PERALATAN BIL. MASA
AM PM AM PM
Kren Menara Mesin Pembentuk Besi
Mesin Pengorek Mesin Pemotong/Pencanai
Temdem Roller Generator
Jengkaut Penyembur Air
Jentolak Kompresor
Trak Penyendat Pam Air
Trak Pengangkut DLL
Mesin Penggaul Konkrit DLL
JUMLAH PERALATAN DI
TAPAK:
JUMLAH PERALATAN DI
TAPAK:
AKTIVITI/ KERJA DI TAPAK
BIL. AKTIVITI YANG DIJALANKAN
ULASAN: DARIPADA: PEGAWAI PENGUASA/PEGAWAI PROJEK/PERUNDING
DISEDIAKAN OLEH:
(COP T/TANGAN
KONTRAKTOR)
DISAHKAN OLEH:
(COP T/TANGAN
PERUNDING)
DISEMAK OLEH:
(T/TANGAN PEGAWAI
PENGUSA/WAKIL)
CARTA CUACA:
HUJAN PANAS
48