61
California Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program Total Amount Funded: $63,445,178 Total Funded Projects: 448 Alameda County City of Oakland Oakland Waterfront Bay Trail 2005/06 $450,000 A waterfront rehabilitation project in the City of Oakland of three segments of the Oakland Waterfront Bay Trail: Segment 1. 10th Ave. Marina @ Embarcadero rehab tread & add facilities inc. signs & lights. Segment 2. Livingston Pier @Dennison & Embarcadero rehab trail and trailside erosion control, signs & lights. Segment 3. Derby Street Trail: Develop brand new Bay Trail linkage (trail tread & signage). Oakland Waterfront Bay Trail 2005/06 $450,000 A waterfront rehabilitation project in the City of Oakland of three segments of the Oakland Waterfront Bay Trail: Segment 1. 10th Ave. Marina @ Embarcadero rehab tread & add facilities inc. signs & lights. Segment 2. Livingston Pier @Dennison & Embarcadero rehab trail and trailside erosion control, signs & lights. Segment 3. Derby Street Trail: Develop brand new Bay Trail linkage (trail tread & signage). Bay Trail Linkage 1997/98 $100,000 Develop approximately 1.2 mile multiuse trail from Lake Merritt through Estruary Park. Bay Trail Linkage 1997/98 $100,000 Develop approximately 1.2 mile multiuse trail from Lake Merritt through Estruary Park. Historic Cryer Boathouse Bay Trail Gap Closure, Oa 2007/08 $600,000 A development project in the County of Alameda to include the construction of 450 ft long, 18 foot wide Class one multi use trail, ADA ramps, landscaping, interpretive exhibit, open area for picnicking, and ADA parking and passenger drop-off area. Historic Cryer Boathouse Bay Trail Gap Closure, Oa 2007/08 $600,000 A development project in the County of Alameda to include the construction of 450 ft long, 18 foot wide Class one multi use trail, ADA ramps, landscaping, interpretive exhibit, open area for picnicking, and ADA parking and passenger drop-off area. De Anza Historic Core Linkage 2006/07 $792,000 Develop an ADA accessible trail and public amenities in Peralta Hacienda Historical Park.. Page 1

California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Embed Size (px)

Citation preview

Page 1: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

California Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program Total Amount Funded: $63,445,178

Total Funded Projects: 448 Alameda County City of Oakland Oakland Waterfront Bay Trail 2005/06 $450,000 A waterfront rehabilitation project in the City of Oakland of three segments of the Oakland Waterfront Bay Trail: Segment 1. 10th Ave. Marina @ Embarcadero rehab tread & add facilities inc. signs & lights. Segment 2. Livingston Pier @Dennison & Embarcadero rehab trail and trailside erosion control, signs & lights. Segment 3. Derby Street Trail: Develop brand new Bay Trail linkage (trail tread & signage).

Oakland Waterfront Bay Trail 2005/06 $450,000 A waterfront rehabilitation project in the City of Oakland of three segments of the Oakland Waterfront Bay Trail: Segment 1. 10th Ave. Marina @ Embarcadero rehab tread & add facilities inc. signs & lights. Segment 2. Livingston Pier @Dennison & Embarcadero rehab trail and trailside erosion control, signs & lights. Segment 3. Derby Street Trail: Develop brand new Bay Trail linkage (trail tread & signage).

Bay Trail Linkage 1997/98 $100,000 Develop approximately 1.2 mile multiuse trail from Lake Merritt through Estruary Park.

Bay Trail Linkage 1997/98 $100,000 Develop approximately 1.2 mile multiuse trail from Lake Merritt through Estruary Park.

Historic Cryer Boathouse Bay Trail Gap Closure, Oa 2007/08 $600,000 A development project in the County of Alameda to include the construction of 450 ft long, 18 foot wide Class one multi use trail, ADA ramps, landscaping, interpretive exhibit, open area for picnicking, and ADA parking and passenger drop-off area.

Historic Cryer Boathouse Bay Trail Gap Closure, Oa 2007/08 $600,000 A development project in the County of Alameda to include the construction of 450 ft long, 18 foot wide Class one multi use trail, ADA ramps, landscaping, interpretive exhibit, open area for picnicking, and ADA parking and passenger drop-off area.

De Anza Historic Core Linkage 2006/07 $792,000 Develop an ADA accessible trail and public amenities in Peralta Hacienda Historical Park.. Page 1

Page 2: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

De Anza Historic Core Linkage 2006/07 $792,000 Develop an ADA accessible trail and public amenities in Peralta Hacienda Historical Park..

Oakland Waterfront Bay Trail 2004/05 $450,000 A development project to construct two sections of trail, totalling approximately 1,000 feet.

Oakland Waterfront Bay Trail 2004/05 $450,000 A development project to construct two sections of trail, totalling approximately 1,000 feet.

City of San Leandro San Leandro Slough Bridge 2007/08 $395,000 A development project in the County of Alameda to construct a bridge approximately 10 foot wide by 300 foot long .

San Leandro Slough Bridge 2007/08 $395,000 A development project in the County of Alameda to construct a bridge approximately 10 foot wide by 300 foot long .

Department of Parks and Recreation Diablo Trail System 1997/98 $62,000 Relocation, reconstruction & rehabilatation of 3 trailsDan Cook area, Oyster Point, Sycamore creek

Diablo Trail System 1997/98 $62,000 Relocation, reconstruction & rehabilatation of 3 trailsDan Cook area, Oyster Point, Sycamore creek

East Bay R.P.D. Del Valle Lakeside Trail 1993/94 $25,000 Develop approximately 5 miles of recreational shoreline trail. Del Valle Lakeside Trail 1993/94 $25,000 Develop approximately 5 miles of recreational shoreline trail. Temescal Regional Recreation Area 2004/05 $125,000 A development project in the County of Alameda to provide a barrier-free trail loop linking exisiting ADA facilities with the Eastshore Trail and Landvale Station Trails around the lake.

Temescal Regional Recreation Area 2004/05 $125,000 A development project in the County of Alameda to provide a barrier-free trail loop linking exisiting ADA facilities with the Eastshore Trail and Landvale Station Trails around the lake.

Page 2

Page 3: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Roberts Regional Rec. Area Trail Improvements 2004/05 $90,000 A development project in the County of Alameda to build a new barrier-free loop trail linking existing ADA accessible facilities.

Roberts Regional Rec. Area Trail Improvements 2004/05 $90,000 A development project in the County of Alameda to build a new barrier-free loop trail linking existing ADA accessible facilities.

Livermore Area R.P.D. Livermore Area RPD Trail Segments H2 and F 2008/09 $584,517 A development project in the City of Livermore to construct approximately 4200 feet of multi-use trail with signage.

Livermore Area RPD Trail Segments H2 and F 2008/09 $584,517 A development project in the City of Livermore to construct approximately 4200 feet of multi-use trail with signage.

Page 3

Page 4: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Butte County City of Chico Bidwell Park Middle Trail Rehabilitation Project 2008/09 $175,802 A development project in the city of Chico's Bidwell Park to install interpretive signs in two parking lots, to rehabilitate and upgrade 710 linear feet of an existing "accessibility" trail with interpretive and informational signs, and rehabilitate 6,040 linear feet of the Middle Trail.

Bidwell Park Middle Trail Rehabilitation Project 2008/09 $175,802 A development project in the city of Chico's Bidwell Park to install interpretive signs in two parking lots, to rehabilitate and upgrade 710 linear feet of an existing "accessibility" trail with interpretive and informational signs, and rehabilitate 6,040 linear feet of the Middle Trail.

Department of Parks and Recreation North Fork Trail Extension 2008/09 $90,574 A development project in the County of Butte to construct approximately four miles of additional trail along the North Fork Arm of Lake Oroville in the Lake Oroville State Recreation Area.

North Fork Trail Extension 2008/09 $90,574 A development project in the County of Butte to construct approximately four miles of additional trail along the North Fork Arm of Lake Oroville in the Lake Oroville State Recreation Area.

Kelly Ridge Trail 1999/00 $158,000 5 mile non motorized trail from Oroville Dam area to Bidwell Canyon recreation area.

Kelly Ridge Trail 1999/00 $158,000 5 mile non motorized trail from Oroville Dam area to Bidwell Canyon recreation area.

North Fork Trail 2000/01 $139,600 Construct a non-motorized trail approximately two and a half miles along the north fork of Lake Oroville, as an accessible trail to the Potter Ravine and North Fork Overlook.

North Fork Trail 2000/01 $139,600 Construct a non-motorized trail approximately two and a half miles along the north fork of Lake Oroville, as an accessible trail to the Potter Ravine and North Fork Overlook.

North Fork Trail Extension 2006/07 $46,226 A development project in the County of Butte to construct approximately four miles of additional trail along the North Fork Arm of Lake Oroville in the Lake Oroville State Recreation Area.

Page 4

Page 5: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

North Fork Trail Extension 2006/07 $46,226 A development project in the County of Butte to construct approximately four miles of additional trail along the North Fork Arm of Lake Oroville in the Lake Oroville State Recreation Area.

Page 5

Page 6: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Calaveras County Department of Parks and Recreation North Grove Trail/3 Senses 1998/99 $73,385 Rehabilitate and made accessible North Grove (1.1 miles) and 3 Senses (600 feet) through the redwood grove.

North Grove Trail/3 Senses 1998/99 $73,385 Rehabilitate and made accessible North Grove (1.1 miles) and 3 Senses (600 feet) through the redwood grove.

Page 6

Page 7: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Contra Costa County City of Richmond Richmond Parkway Bay Trail 2002/03 $189,000 Develop a Class I multi-purpose trail, approximately 1 mile, with retaining walls, fencing and lighting.

Richmond Parkway Bay Trail 2002/03 $189,000 Develop a Class I multi-purpose trail, approximately 1 mile, with retaining walls, fencing and lighting.

City of San Pablo Wildcat Creek Trail 1997/98 $25,000 Develop an 800 foot multiuse trail along Wildcat Creek. Wildcat Creek Trail 1997/98 $25,000 Develop an 800 foot multiuse trail along Wildcat Creek. County of Contra Costa Rodeo Creek Trail 1997/98 $129,000 Develop 2.5 miles of trail with related support facilities. Rodeo Creek Trail 1997/98 $129,000 Develop 2.5 miles of trail with related support facilities. East Bay R.P.D. Bay Trail 1999/00 $80,000 Develop a trail, approximately 6000 lf, to extend the Bay Trail between Central Avenue and Point Isabel Regional Shoreline.

Bay Trail 1999/00 $80,000 Develop a trail, approximately 6000 lf, to extend the Bay Trail between Central Avenue and Point Isabel Regional Shoreline.

Iron Horse Trail 1998/99 $100,000 Develop approximately 100 feet of trail for bicycle and pedestrian. Iron Horse Trail 1998/99 $100,000 Develop approximately 100 feet of trail for bicycle and pedestrian. Delta De Anza Trail 1997/98 $100,000 Develop approximately 1.1 miles of multiuse regional trail. Delta De Anza Trail 1997/98 $100,000 Develop approximately 1.1 miles of multiuse regional trail. Big Break Shoreline Trail Gap Closure 2006/07 $200,000 A development project to construct approximately 1/2 mile of trail. Big Break Shoreline Trail Gap Closure 2006/07 $200,000 A development project to construct approximately 1/2 mile of trail.

Page 7

Page 8: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Town of Danville Freitas Road Trail Bridge 1997/98 $39,000 Replace existing Freitas Road Trail Bridge with a new prefabricated bridge for multi use trail.

Freitas Road Trail Bridge 1997/98 $39,000 Replace existing Freitas Road Trail Bridge with a new prefabricated bridge for multi use trail.

Page 8

Page 9: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

El Dorado County County of El Dorado Colma-Lotus Link Trail 2000/01 $35,000 Construct a trail between the towns of Coloma and Lotus. Colma-Lotus Link Trail 2000/01 $35,000 Construct a trail between the towns of Coloma and Lotus. Department of Parks and Recreation D.L. Bliss State Park: Rubicon Trail 2008/09 $21,726 Reconstruction of approximately 1 mile of the Rubicon Trail to Barrier Free Design and State Park Hiking Trail Standards, will include interpretive panels and trailhead improvements to accommodate public transit route stops.

D.L. Bliss State Park: Rubicon Trail 2008/09 $21,726 Reconstruction of approximately 1 mile of the Rubicon Trail to Barrier Free Design and State Park Hiking Trail Standards, will include interpretive panels and trailhead improvements to accommodate public transit route stops.

Emerald Bay Trail 1997/98 $79,000 Rehabilitate trails in Vikingholm area of Emerald Bay and overlook. Emerald Bay Trail 1997/98 $79,000 Rehabilitate trails in Vikingholm area of Emerald Bay and overlook. Rubicon-Lighthouse Trail 1999/00 $120,000 Reconstruction of the Rubicon and Lighthouse hiking trail at D. L. Bliss State Park.

Rubicon-Lighthouse Trail 1999/00 $120,000 Reconstruction of the Rubicon and Lighthouse hiking trail at D. L. Bliss State Park.

Rubicon Trail-Whisky Cove Rehab 2001/02 $140,622 Rehabilitation of the Rubicon hiking trail- Whisky Cove Section at D.L. Bliss State Park.

Rubicon Trail-Whisky Cove Rehab 2001/02 $140,622 Rehabilitation of the Rubicon hiking trail- Whisky Cove Section at D.L. Bliss State Park.

D.L. Bliss State Park: Rubicon Trail 2005/06 $122,274 Reconstruction of approximately 1 mile of the Rubicon Trail to Barrier Free Design and State Park Hiking Trail Standards, will include interpretive panels and trailhead improvements to accommodate public transit route stops.

D.L. Bliss State Park: Rubicon Trail 2005/06 $122,274 Reconstruction of approximately 1 mile of the Rubicon Trail to Barrier Free Design and State Park Hiking Trail Standards, will include interpretive panels and trailhead improvements to accommodate public transit route stops. Page 9

Page 10: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

El Dorado Irrigation Dist. Sly Park Multi-Use Trail Access 2001/02 $215,045 Development of a ¼ mile multi-use trail, construction of bridge and approaches, enhancement of existing trailhead, road, parking area, and gates. Purchase and install restroom facilities, signage and informational kiosk with picnic tables, benches and bike rack.

Sly Park Multi-Use Trail Access 2001/02 $215,045 Development of a ¼ mile multi-use trail, construction of bridge and approaches, enhancement of existing trailhead, road, parking area, and gates. Purchase and install restroom facilities, signage and informational kiosk with picnic tables, benches and bike rack.

Page 10

Page 11: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Fresno County San Joaquin River Conservancy Macmichael Loop Section 2002/03 $124,720 Develop approximately 1.5 mile loop trail. Macmichael Loop Section 2002/03 $124,720 Develop approximately 1.5 mile loop trail.

Page 11

Page 12: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Humboldt County Department of Parks and Recreation Burlington Nature Trail Improvement 2008/09 $16,336 Rehabilitate and improve the Burlington Nature Trail at Humboldt Redwoods State Park. This project will improve and upgrade the entire trail so it will comply with current accessibility standards.

Burlington Nature Trail Improvement 2008/09 $16,336 Rehabilitate and improve the Burlington Nature Trail at Humboldt Redwoods State Park. This project will improve and upgrade the entire trail so it will comply with current accessibility standards.

Foothill & Prairie Creek Trail 1998/99 $166,825 Upgrade two trails Foothill Trail 1.2 miles and Praire Creek Trail < 1 mile Foothill & Prairie Creek Trail 1998/99 $166,825 Upgrade two trails Foothill Trail 1.2 miles and Praire Creek Trail < 1 mile Elk-Prairie, Foothill Catheral 1999/00 $123,000 Three mile trail rehabilition to make accessible, circles prairie, connects to campground and Foothill trail.

Elk-Prairie, Foothill Catheral 1999/00 $123,000 Three mile trail rehabilition to make accessible, circles prairie, connects to campground and Foothill trail.

Foothill Trail Bridge Replacement 2006/07 $192,844 A development project in the County of Humboldt to replace a 90-foot wood footbridge with a steel and redwood bridge and rehabilitate approximately 4,000 feet on the Foothill Trail in Prairie Creek State Park.

Foothill Trail Bridge Replacement 2006/07 $192,844 A development project in the County of Humboldt to replace a 90-foot wood footbridge with a steel and redwood bridge and rehabilitate approximately 4,000 feet on the Foothill Trail in Prairie Creek State Park.

Johnson Camp Trail Improvement 2001/02 $234,922 Improvements to 2 miles of Johnson Camp Trail to protect park resources, improve public access, create additional equestrian riding opportunities and provide increased outdoor recreational opportunities.

Johnson Camp Trail Improvement 2001/02 $234,922 Improvements to 2 miles of Johnson Camp Trail to protect park resources, improve public access, create additional equestrian riding opportunities and provide increased outdoor recreational opportunities.

Prairie Creek Trail Improvements 2002/03 $187,960 Develop a trail with ADA improvements, approximately 1.25 miles, at Prarie Creek Redwoods State Park.

Page 12

Page 13: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Prairie Creek Trail Improvements 2002/03 $187,960 Develop a trail with ADA improvements, approximately 1.25 miles, at Prarie Creek Redwoods State Park.

Burlington Nature Trail Improvement 2006/07 $174,064 Rehabilitate and improve the Burlington Nature Trail at Humboldt Redwoods State Park. This project will improve and upgrade the entire trail so it will comply with current accessibility standards.

Burlington Nature Trail Improvement 2006/07 $174,064 Rehabilitate and improve the Burlington Nature Trail at Humboldt Redwoods State Park. This project will improve and upgrade the entire trail so it will comply with current accessibility standards.

Manila CSD Manila Dunes Trail 1999/00 $50,000 Improve trailhead and develop a barrier-free trail including a temporary seasonal bridge.

Manila Dunes Trail 1999/00 $50,000 Improve trailhead and develop a barrier-free trail including a temporary seasonal bridge.

Willow Creek CSD Creekside Park Loop Trail 2004/05 $20,000 A project to construct a loop trail to include vegetation planting, irrigation, interpretive signage and trash storage/recycling sites.

Creekside Park Loop Trail 2004/05 $20,000 A project to construct a loop trail to include vegetation planting, irrigation, interpretive signage and trash storage/recycling sites.

Creekside Park Loop Trail 2009/10 $5,000 A project to construct a loop trail to include vegetation planting, irrigation, interpretive signage and trash storage/recycling sites.

Creekside Park Loop Trail 2009/10 $5,000 A project to construct a loop trail to include vegetation planting, irrigation, interpretive signage and trash storage/recycling sites.

Page 13

Page 14: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Imperial County City of Holtville Alamo River Recreational Trail, Phase I 2009/10 $430,468 Construction of trail of approximately 0.53 miles and staging areas which will include ADA compliant restrooms, parking area, lighting and landscaping in the City of Holtville.

Alamo River Recreational Trail, Phase I 2009/10 $430,468 Construction of trail of approximately 0.53 miles and staging areas which will include ADA compliant restrooms, parking area, lighting and landscaping in the City of Holtville.

Page 14

Page 15: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Kern County County of Kern PANORAMA DRIVE 1999/00 $78,804 Develop 6 acres with a 3200 ft. walkway and additional paved walkway in existing 29 acre park, all with landscaping and irrigation.

PANORAMA DRIVE 1999/00 $78,804 Develop 6 acres with a 3200 ft. walkway and additional paved walkway in existing 29 acre park, all with landscaping and irrigation.

Page 15

Page 16: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Lake County City of Lakeport Forbes Creek Trail W/Side Park 2005/06 $96,800 Construction of 2+ mile perimeter trail for hiking, walking, running, and cycling. Forbes Creek Trail W/Side Park 2005/06 $96,800 Construction of 2+ mile perimeter trail for hiking, walking, running, and cycling. County of Lake Middletown Nature Trail 2000/01 $80,000 Improve existing multi use non motorized trail by adding interpretive signs, benches, picnic tables and waterless sanitation restrooms and wood chips.

Middletown Nature Trail 2000/01 $80,000 Improve existing multi use non motorized trail by adding interpretive signs, benches, picnic tables and waterless sanitation restrooms and wood chips.

Page 16

Page 17: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Lassen County County of Lassen Homestead Connector Trail 2006/07 $25,000 Develop a trail, about 1/2 mile, and a bridge in Susanville Ranch Park. Homestead Connector Trail 2006/07 $25,000 Develop a trail, about 1/2 mile, and a bridge in Susanville Ranch Park. Susanville Ranch Trails 1997/98 $72,000 Develop a trailhead parking area, bridges, gates/stiles and wet area crossings/boardwalks.

Susanville Ranch Trails 1997/98 $72,000 Develop a trailhead parking area, bridges, gates/stiles and wet area crossings/boardwalks.

Page 17

Page 18: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Los Angeles County Baldwin Hills Reg Conservation Authority Ballona Creek Trail 1999/00 $194,097 Develop staging area, access points, safety lighting, and signage along Ballona Creek Trail.

Ballona Creek Trail 1999/00 $194,097 Develop staging area, access points, safety lighting, and signage along Ballona Creek Trail.

City of Agoura Hills Agoura Hills Open Sp & Rec Trail 2003/04 $150,000 An acquisition project in the County of Los Angeles of approximately 15 acres of open space lands to provide for recreational trails.

Agoura Hills Open Sp & Rec Trail 2003/04 $150,000 An acquisition project in the County of Los Angeles of approximately 15 acres of open space lands to provide for recreational trails.

City of Calabasas Headwater Corners 2002/03 $150,000 Acquire approximately 2.2 acres that will provide for a trails within Headwater Corners.

Headwater Corners 2002/03 $150,000 Acquire approximately 2.2 acres that will provide for a trails within Headwater Corners.

Calabasas Trail 2002/03 $150,000 Development of a 1.5 mile multi-use trail connecting the east and west sides of Calabasas.

Calabasas Trail 2002/03 $150,000 Development of a 1.5 mile multi-use trail connecting the east and west sides of Calabasas.

City of Covina Jalapa Park Trail Improvement 2002/03 $104,996 Develop an approximately 1,500 linear foot trail including bridges, signage and erosion control.

Jalapa Park Trail Improvement 2002/03 $104,996 Develop an approximately 1,500 linear foot trail including bridges, signage and erosion control.

City of Culver City Ballona Creek Bridge 2000/01 $150,000 Replacement of the existing wooden Culver City Pedestrian Bridge.

Page 18

Page 19: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Ballona Creek Bridge 2000/01 $150,000 Replacement of the existing wooden Culver City Pedestrian Bridge. City of Diamond Bar Sycamore Canyon Park Trail Phase IV 2006/07 $304,920 A development project in the City of Diamond Bar to include a decomposed granite trail, a par course, benches, trash receptacles and interpretive signs.

Sycamore Canyon Park Trail Phase IV 2006/07 $304,920 A development project in the City of Diamond Bar to include a decomposed granite trail, a par course, benches, trash receptacles and interpretive signs.

City of El Monte Rio Hondo River Park 2008/09 $222,500 A development project in the City of El Monte in a trail and recreation area along 6 acres of river channel edge to install landscaping, trees and shrubs, picnic and viewing areas and educational displays.

Rio Hondo River Park 2008/09 $222,500 A development project in the City of El Monte in a trail and recreation area along 6 acres of river channel edge to install landscaping, trees and shrubs, picnic and viewing areas and educational displays.

City of Glendale San Rafael Hills "Mountain Do" Trail 2008/09 $172,570 A development project in the City of Glendale to construct an approximately 1825-foot ADA-accessible trail, including wellness stations and rest areas, adjacent to the Glendale Sports Complex in the San Rafael Hills above the City of Glendale.

San Rafael Hills "Mountain Do" Trail 2008/09 $172,570 A development project in the City of Glendale to construct an approximately 1825-foot ADA-accessible trail, including wellness stations and rest areas, adjacent to the Glendale Sports Complex in the San Rafael Hills above the City of Glendale.

City of La Cañada Flintridge Indiana Overcrossing Link Trail 2003/04 $236,000 A development project in the City of La Cañada Flintridge to construct a trail on an existing flume structure that goes over the 210 freeway.

Indiana Overcrossing Link Trail 2003/04 $236,000 A development project in the City of La Cañada Flintridge to construct a trail on an existing flume structure that goes over the 210 freeway.

Page 19

Page 20: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

City of Lancaster Prime Desert Woodlands Trails, Phase II 2005/06 $294,000 A development project in the City of Lancaster to design and develop trails including post and cables, bridges, interpretive signage and entry gates for the remaining 48 acres in the 102 acre Prime Desert Woodland Preserve.

Prime Desert Woodlands Trails, Phase II 2005/06 $294,000 A development project in the City of Lancaster to design and develop trails including post and cables, bridges, interpretive signage and entry gates for the remaining 48 acres in the 102 acre Prime Desert Woodland Preserve.

City of Los Angeles Peck Bandini 2008/09 $120,000 A development project in the City of Los Angeles to rehabilitate approximately 8,588 linear feet of trail including signage (PH. 1)

Peck Bandini 2008/09 $120,000 A development project in the City of Los Angeles to rehabilitate approximately 8,588 linear feet of trail including signage (PH. 1)

Griffith Park Hogback Trail 2000/01 $136,886 Installation/construction of a prefabricated steel bridge along the Hogback trail. Griffith Park Hogback Trail 2000/01 $136,886 Installation/construction of a prefabricated steel bridge along the Hogback trail. City of Norwalk Foster Greenbelt 1993/94 $38,000 Rehabilitate trailhead and rest area. Foster Greenbelt 1993/94 $38,000 Rehabilitate trailhead and rest area. City of Pasadena Flint Wash Trail 1999/00 $200,000 Construction of a bridge across Flint Wash. Flint Wash Trail 1999/00 $200,000 Construction of a bridge across Flint Wash. Reconstruction of Eastside Neighborhood & JPL Conn $175,000 A development project in the City of Pasadena to reconstruct the approximately 1619-foot Eastside Neighborhood and JPL (Altadena) Connector Trail in Hahamongna Watershed Park.

Reconstruction of Eastside Neighborhood & JPL Conn $175,000 A development project in the City of Pasadena to reconstruct the approximately 1619-foot Eastside Neighborhood and JPL (Altadena) Connector Trail in Hahamongna Watershed Park.

Page 20

Page 21: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Lower Arroyo Seco Trail/Trailhead Improvements 2007/08 $196,700 A restoration/rehabilitation project in the City of Pasadena in the Lower Arroyo Seco park that includes restoration and rehab of deteriorated trails, adding and improving trail amenities (signage, water fountains, benches, equestrian furnishings, gate, handrail and block/stone wall improvements).

Lower Arroyo Seco Trail/Trailhead Improvements 2007/08 $196,700 A restoration/rehabilitation project in the City of Pasadena in the Lower Arroyo Seco park that includes restoration and rehab of deteriorated trails, adding and improving trail amenities (signage, water fountains, benches, equestrian furnishings, gate, handrail and block/stone wall improvements).

Sunset Overlook Trailhead Area/Hahamongna Watershe $201,600 2006/07 A development project in the County of Los Angeles to improve a major trailhead for the eastside entrance trails to Hahamongna Watershed Park to include clearing, grading, paving, trail construction, slope stabilization and erosion control.

Sunset Overlook Trailhead Area/Hahamongna Watershe $201,600 2006/07 A development project in the County of Los Angeles to improve a major trailhead for the eastside entrance trails to Hahamongna Watershed Park to include clearing, grading, paving, trail construction, slope stabilization and erosion control.

City of Signal Hill Panorama Segment Of Loop Trail 1998/99 $200,000 Development of a one mile loop trail around the Signal Hill hilltop. Panorama Segment Of Loop Trail 1998/99 $200,000 Development of a one mile loop trail around the Signal Hill hilltop. County of Los Angeles Altadena Crest Trails 1997/98 $47,000 Re-establish closed trail in 3 locations by building retaining walls to support a replacement trail and various other repairs.

Altadena Crest Trails 1997/98 $47,000 Re-establish closed trail in 3 locations by building retaining walls to support a replacement trail and various other repairs.

Placerita Canyon 1997/98 $11,000 Replace and reconstruct various sections of the Placerita Creek, Waterfall, and Ecology Trails.

Placerita Canyon 1997/98 $11,000 Replace and reconstruct various sections of the Placerita Creek, Waterfall, and Ecology Trails. Page 21

Page 22: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Department of Parks and Recreation Ann Skage Trail 2000/01 $25,502 Rehabilitate two trails to improve tread access and repair damaged tracking for the visually impaired.

Ann Skage Trail 2000/01 $25,502 Rehabilitate two trails to improve tread access and repair damaged tracking for the visually impaired.

Mountains Restoration Trust Top Of The World/Lois Ewen Sc 2001/02 $45,000 The improvement of a often-used mountain-top overlook site will provide enjoyment to an under-served recreation population.

Top Of The World/Lois Ewen Sc 2001/02 $45,000 The improvement of a often-used mountain-top overlook site will provide enjoyment to an under-served recreation population.

Calabasas/Cold Creek Trail 1999/00 $80,000 Acquisition of a 40 acre parcel as part of the continuing effort to place the entire trail in public ownership.

Calabasas/Cold Creek Trail 1999/00 $80,000 Acquisition of a 40 acre parcel as part of the continuing effort to place the entire trail in public ownership.

Topanga Lookout Trail 1999/00 $3,965 Acquisition of a 11.82 acre inholding on the 1.5 mile ridge trail to the Topanga Lookout.

Topanga Lookout Trail 1999/00 $3,965 Acquisition of a 11.82 acre inholding on the 1.5 mile ridge trail to the Topanga Lookout.

Page 22

Page 23: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Madera County County of Madera Ahwahnee Hills Park Recreational Trail 2007/08 $410,246 A development project in the County of Madera to include approximately 2 miles of multi-use trail for pedestrian and bike use, and parallel equestrian trail.

Ahwahnee Hills Park Recreational Trail 2007/08 $410,246 A development project in the County of Madera to include approximately 2 miles of multi-use trail for pedestrian and bike use, and parallel equestrian trail.

Page 23

Page 24: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Marin County City of San Rafael Starkweather Shoreline Park 2003/04 $132,050 A development project in the City of San Rafael to improve approx. 1000 linear ft. of the South Pond section of the S.F. Bay Trail along San Rafael's Starkweather Shoreline Park to include grading and paving, planting and irrigating native trees, and additional trail ammenities.

Starkweather Shoreline Park 2003/04 $132,050 A development project in the City of San Rafael to improve approx. 1000 linear ft. of the South Pond section of the S.F. Bay Trail along San Rafael's Starkweather Shoreline Park to include grading and paving, planting and irrigating native trees, and additional trail ammenities.

County of Marin Inkwells Bridge 2002/03 $19,474 Construct a pedestrian, bike and equestrian bridge to connect two existing Inkwells Bridge 2002/03 $19,474 Construct a pedestrian, bike and equestrian bridge to connect two existing Corte Madera Creek Multi-Use Path Improvements 2009/10 $404,100 Rehabilitate approximately 1300 feet of paved trail. The project includes installing an irrigation system, landscaping, drainage improvements, and the removal of a wooden ramp, the installing of a concrete ramp, signing, and striping, in the County of Marin.

Corte Madera Creek Multi-Use Path Improvements 2009/10 $404,100 Rehabilitate approximately 1300 feet of paved trail. The project includes installing an irrigation system, landscaping, drainage improvements, and the removal of a wooden ramp, the installing of a concrete ramp, signing, and striping, in the County of Marin.

Marin County Open Space Dist Indian Tree Trail 1997/98 $65,000 Rehabilitate 2 miles of trail and construct one mile of new trail. Indian Tree Trail 1997/98 $65,000 Rehabilitate 2 miles of trail and construct one mile of new trail. Marin Municipal Water District Carson Falls Trail Restoration 2005/06 $155,329 Construct and renovate portions of the Carson Falls Trail in the City of Fairfax including minor support amenities.

Carson Falls Trail Restoration 2005/06 $155,329 Construct and renovate portions of the Carson Falls Trail in the City of Fairfax including minor support amenities.

Page 24

Page 25: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Sky Oaks Meadow Restoration 2001/02 $87,180 Abandon and revegetate about 3,700' of existing road/trail; construct about 187' of boardwalk for horses; construct about 1,200' of new hiking/equestrian trail in uplands to connect to boardwalk; improve drainage crossings on Center

Sky Oaks Meadow Restoration 2001/02 $87,180 Abandon and revegetate about 3,700' of existing road/trail; construct about 187' of boardwalk for horses; construct about 1,200' of new hiking/equestrian trail in uplands to connect to boardwalk; improve drainage crossings on Center

Lower Cataract Trail Ii 1998/99 $75,000 Installation of RR tie stairs, rail fence, signs, bridge railing, RR tie retaining wall, bridge, staircase, and rehab of trail and stairs.

Lower Cataract Trail Ii 1998/99 $75,000 Installation of RR tie stairs, rail fence, signs, bridge railing, RR tie retaining wall, bridge, staircase, and rehab of trail and stairs.

Lower Cataract Trail 1997/98 $32,529 Reroute and rehab trail, install bridge, stairs, fences, signs, retaining wall, replace bridge railing and repair rock staircases.

Lower Cataract Trail 1997/98 $32,529 Reroute and rehab trail, install bridge, stairs, fences, signs, retaining wall, replace bridge railing and repair rock staircases.

Page 25

Page 26: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Mono County Town of Mammoth Lakes Meridian Blvd Undercrossing 1997/98 $73,930 Develop undercrossing for a bicycle trail. Meridian Blvd Undercrossing 1997/98 $73,930 Develop undercrossing for a bicycle trail.

Page 26

Page 27: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Monterey County City of Carmel-by-the-Sea Carmel Beach Bluff Pathway 2001/02 $50,000 Restoration of the Carmel Beach Bluff Pathway. Carmel Beach Bluff Pathway 2001/02 $50,000 Restoration of the Carmel Beach Bluff Pathway. City of Monterey Presidio Curve Trail 1999/00 $60,000 Reconstruct the Monterey Bay Coastal Trail to widen for bicycle and pedestrian use.

Presidio Curve Trail 1999/00 $60,000 Reconstruct the Monterey Bay Coastal Trail to widen for bicycle and pedestrian use.

Page 27

Page 28: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Napa County City of Napa Napa River Trail 2000/01 $165,042 Phase I improvements to an existing .8 mile trail along the Napa River between the Riverpointe Resort on Lincoln Ave. & Trancas St. at Soscol ave 8 to 10 wide asphaltic concrete trail with 2' wide gravel shoulders.

Napa River Trail 2000/01 $165,042 Phase I improvements to an existing .8 mile trail along the Napa River between the Riverpointe Resort on Lincoln Ave. & Trancas St. at Soscol ave 8 to 10 wide asphaltic concrete trail with 2' wide gravel shoulders.

Skyline Park Citizen's Association Skyline Trail 1999/00 $10,000 Rehabilitate and reconstruct 2+ mile multi-use trail on a part of the Bay Area Trail System at Skyline Park.

Skyline Trail 1999/00 $10,000 Rehabilitate and reconstruct 2+ mile multi-use trail on a part of the Bay Area Trail System at Skyline Park.

Page 28

Page 29: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Nevada County City of Nevada City Hirschman's Trail 2008/09 $195,360 A development project in the City of Nevada City to construct 13,000 LF of trail, widen 150' of access road, crushed rock parking lot, bridges, boardwalks or puncheons, culverts, interpretive, informational and regulatory signs.

Hirschman's Trail 2008/09 $195,360 A development project in the City of Nevada City to construct 13,000 LF of trail, widen 150' of access road, crushed rock parking lot, bridges, boardwalks or puncheons, culverts, interpretive, informational and regulatory signs.

Town of Truckee Truckee River Trail Phase II 2007/08 $290,200 A development project in the Town of Truckee to pave approximately eight thousand (8,000) to ten thousand (10,000) LF of existing trail.

Truckee River Trail Phase II 2007/08 $290,200 A development project in the Town of Truckee to pave approximately eight thousand (8,000) to ten thousand (10,000) LF of existing trail.

Page 29

Page 30: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Orange County City of Anaheim Lincoln Avenue Multi-use Trail Staging Area 2008/09 $415,024 A development project in the city of Anaheim to develop a multi-use trail staging facility.

Lincoln Avenue Multi-use Trail Staging Area 2008/09 $415,024 A development project in the city of Anaheim to develop a multi-use trail staging facility.

City of Costa Mesa Fairview Park Bicycle Trail Project 2005/06 $256,000 A project to construct a bicycle trail. Fairview Park Bicycle Trail Project 2005/06 $256,000 A project to construct a bicycle trail. City of Dana Point Sea Terrace Park 2003/04 $150,000 A development project in the City of Dana Point to construct a trail linking Salt Creek Trail, Salt Creek Beach, the St. Regis Monarch Resort and Spa, and the Dana Point Public Library.

Sea Terrace Park 2003/04 $150,000 A development project in the City of Dana Point to construct a trail linking Salt Creek Trail, Salt Creek Beach, the St. Regis Monarch Resort and Spa, and the Dana Point Public Library.

City of Fullerton Laguna Lake Park Regional Trail Project 2006/07 $400,000 A project to construct a multi-purpose trail. Laguna Lake Park Regional Trail Project 2006/07 $400,000 A project to construct a multi-purpose trail. Union Pacific Trail 1999/00 $200,000 Develop a .8 mile recreational trail along the abandoned Union Pacific Right-of- Way.

Union Pacific Trail 1999/00 $200,000 Develop a .8 mile recreational trail along the abandoned Union Pacific Right-of- Way.

City of La Habra Coyote Creek Bikeway 2006/07 $472,560 A development project in the City of La Habra and La Mirada to construct an approximatley .8 mile trail from Imperial Highway to Hillsborough Street.

Page 30

Page 31: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Coyote Creek Bikeway 2006/07 $472,560 A development project in the City of La Habra and La Mirada to construct an approximatley .8 mile trail from Imperial Highway to Hillsborough Street.

City of Laguna Niguel Salt Creek Trail Enhancement Project 2008/09 $560,000 A development project in the city of Laguna Niguel to develop approximately 5,015 linear feet of trail.

Salt Creek Trail Enhancement Project 2008/09 $560,000 A development project in the city of Laguna Niguel to develop approximately 5,015 linear feet of trail.

City of Mission Viejo Oso Creek Trail Comprehensive Sign Program 2006/07 $285,120 Development of trailhead kiosks and signs along approximately 5.5 miles of Oso Creek Trail Comprehensive Sign Program 2006/07 $285,120 Development of trailhead kiosks and signs along approximately 5.5 miles of Oso Creek Trail Bridge 1998/99 $250,000 Develop a pedestrian/bicycle bridge and 900 foot trail link for the Oso Creek Trail.

Oso Creek Trail Bridge 1998/99 $250,000 Develop a pedestrian/bicycle bridge and 900 foot trail link for the Oso Creek Trail.

City of Placentia Tri-City Park Trails 2002/03 $110,000 Development of a 1+- mile trail by replacing approximately 6/10ths of a mile of asphalt trails, and develop a new 1+- mile trail around Tri-City Lake.

Tri-City Park Trails 2002/03 $110,000 Development of a 1+- mile trail by replacing approximately 6/10ths of a mile of asphalt trails, and develop a new 1+- mile trail around Tri-City Lake.

City of Santa Ana Flower Street Park 1997/98 $5,404 Renovate existing trail surfacing. Flower Street Park 1997/98 $5,404 Renovate existing trail surfacing. Pacific Electric Bike Trail 1998/99 $27,353 Resurface existing trail for the Pacific Electric Bike Trail. Pacific Electric Bike Trail 1998/99 $27,353 Resurface existing trail for the Pacific Electric Bike Trail.

Page 31

Page 32: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Flower Street Bike Trail Gap Closure 2009/10 $550,000 Construction of approximately one-half mile bike trail. Flower Street Bike Trail Gap Closure 2009/10 $550,000 Construction of approximately one-half mile bike trail. Thornton Park Recreational Trail Refurbishment 2007/08 $102,752 A development project in the City of Santa Ana to refurbish Thornton Park Recreational Trail by re-grading, replacing asphalt and installing edging along the sides of the trail.

Thornton Park Recreational Trail Refurbishment 2007/08 $102,752 A development project in the City of Santa Ana to refurbish Thornton Park Recreational Trail by re-grading, replacing asphalt and installing edging along the sides of the trail.

Bear St Bike Trail Resurfacing 2001/02 $20,000 Resurface existing bike trail. Bear St Bike Trail Resurfacing 2001/02 $20,000 Resurface existing bike trail. Pacific Electric Trail 1997/98 $50,000 Renovate existing trail surfacing. Pacific Electric Trail 1997/98 $50,000 Renovate existing trail surfacing. Santa Ana Golden Loop Trail Rehabilitation 2010/11 $253,440 A development project in the city of Santa Ana to rehabilitate approximately 19,000 linear feet of trail.

Santa Ana Golden Loop Trail Rehabilitation 2010/11 $253,440 A development project in the city of Santa Ana to rehabilitate approximately 19,000 linear feet of trail.

Fairview Triangle Habitat Restoration 2005/06 $132,000 A development project to develop an approximately 20,250 sq ft portion alongside the Santa Ana River Trail into a trailside rest area to include landscaping and irrigation system, grading, concrete paving, seating, bicycle racks, a drinking fountain and interpretive signage.

Fairview Triangle Habitat Restoration 2005/06 $132,000 A development project to develop an approximately 20,250 sq ft portion alongside the Santa Ana River Trail into a trailside rest area to include landscaping and irrigation system, grading, concrete paving, seating, bicycle racks, a drinking fountain and interpretive signage.

Santiago Creek Bike Trail Enhancement 2005/06 $240,000 A project to develop and rehabilitate a trail.

Page 32

Page 33: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Santiago Creek Bike Trail Enhancement 2005/06 $240,000 A project to develop and rehabilitate a trail. City of Villa Park Lemon Hill Recreation Trail 2008/09 $666,300 A development project in the City of Villa Park to develop approximately 3,600 linear feet of recreational trail.

Lemon Hill Recreation Trail 2008/09 $666,300 A development project in the City of Villa Park to develop approximately 3,600 linear feet of recreational trail.

County of Orange Trail Bridges Aliso & Wood Parks 1997/98 $22,520 Develop four trail bridges at Aliso and Wood Canyons Regional Park. Trail Bridges Aliso & Wood Parks 1997/98 $22,520 Develop four trail bridges at Aliso and Wood Canyons Regional Park. Upper Newport Bay Trail 1993/94 $57,325 Develop interpretive trail with interpretive nodes and interpretive signs. Upper Newport Bay Trail 1993/94 $57,325 Develop interpretive trail with interpretive nodes and interpretive signs. Department of Parks and Recreation San Clemente Coastal Trails 2000/01 $15,089 A development project in the county of Orange to construct a new trail at San Clemente State Beach and reconstruction of two trails at San Onofre State Beach.

San Clemente Coastal Trails 2000/01 $15,089 A development project in the county of Orange to construct a new trail at San Clemente State Beach and reconstruction of two trails at San Onofre State Beach.

Page 33

Page 34: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Placer County City of Roseville Harding to Royer Bike Trail - Phase I 2009/10 $263,836 A development project to construct approximately 1/4 mile of trail. Harding to Royer Bike Trail - Phase I 2009/10 $263,836 A development project to construct approximately 1/4 mile of trail. County of Placer Coon Creek Regional Park Trail 2006/07 $93,500 Develop Coon Creek Regional Park Trail in the County of Placer to improve trail, build a pedestrian/bicycle bridge over creek and onsite interpretive

Coon Creek Regional Park Trail 2006/07 $93,500 Develop Coon Creek Regional Park Trail in the County of Placer to improve trail, build a pedestrian/bicycle bridge over creek and onsite interpretive

Department of Parks and Recreation Burton Creek Trail 1997/98 $59,000 Rehabilitate and restoration of hiking,mountain bike, equestrian and cross country ski trails. Clear vegetation, remove roads, convert roads to trails.

Burton Creek Trail 1997/98 $59,000 Rehabilitate and restoration of hiking,mountain bike, equestrian and cross country ski trails. Clear vegetation, remove roads, convert roads to trails.

Tahoe City P.U.D. Tahoe City Lakeside Trail 2003/04 $200,000 Contruction of a 1.1 mile Class I bicycle trail connecting three existing Class I trails.

Tahoe City Lakeside Trail 2003/04 $200,000 Contruction of a 1.1 mile Class I bicycle trail connecting three existing Class I trails.

Quail Creek Trail 1993/94 $23,800 Develop paved parking area at trailhead. Quail Creek Trail 1993/94 $23,800 Develop paved parking area at trailhead.

Page 34

Page 35: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Riverside County City of Norco Crestview Trail 1998/99 $96,847 Develop a 1.5 mile, multi-use trail for the Crestview Trail. Crestview Trail 1998/99 $96,847 Develop a 1.5 mile, multi-use trail for the Crestview Trail. City of Riverside Sycamore Canyon Wilderness Pk 2005/06 $108,233 A development project in the city of Riverside to develop 7,920 linear feet of interpretive trail including a trailhead with parking stalls, bus loading and parking area; shade structure and seating, interpretive panels and drinking

Sycamore Canyon Wilderness Pk 2005/06 $108,233 A development project in the city of Riverside to develop 7,920 linear feet of interpretive trail including a trailhead with parking stalls, bus loading and parking area; shade structure and seating, interpretive panels and drinking

Sycamore Canyon Wilderness Pk 2000/01 $27,058 A development project in the city of Riverside to develop 7,920 linear feet of interpretive trail including a trailhead with parking stalls, bus loading and parking area; shade structure and seating, interpretive panels and drinking

Sycamore Canyon Wilderness Pk 2000/01 $27,058 A development project in the city of Riverside to develop 7,920 linear feet of interpretive trail including a trailhead with parking stalls, bus loading and parking area; shade structure and seating, interpretive panels and drinking

Department of Parks and Recreation Big Rock Trail 1999/00 $109,358 1/4 mile trail at Lake Perris SRA, reconstruction will make the trail accessable. Big Rock Trail 1999/00 $109,358 1/4 mile trail at Lake Perris SRA, reconstruction will make the trail accessable.

Page 35

Page 36: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Sacramento County Arcade Creek R.P.D. ARCADE CREEK TRAIL IMPROVEMENT 2002/03 $87,452 Construct approximately 2,000 linear feet of trail, construct a low flow bridge and install interpretive signage along Arcade Creek and Verde Cruz Creek at the Arcade Creek Nature Area and Arcade Creek Park.

ARCADE CREEK TRAIL IMPROVEMENT 2002/03 $87,452 Construct approximately 2,000 linear feet of trail, construct a low flow bridge and install interpretive signage along Arcade Creek and Verde Cruz Creek at the Arcade Creek Nature Area and Arcade Creek Park.

City of Folsom Oak Parkway Open Space Corridor 2001/02 $154,500 Install trail along Oak Parkway Open Space Corridor, including 10' wide paved Class I bike trail with parallel separated 4' walking trail between B.T. Collins Park at Willow Spring Drive to East Natoma Street.

Oak Parkway Open Space Corridor 2001/02 $154,500 Install trail along Oak Parkway Open Space Corridor, including 10' wide paved Class I bike trail with parallel separated 4' walking trail between B.T. Collins Park at Willow Spring Drive to East Natoma Street.

Humbug-Willow Creek Trail 2000/01 $139,000 Install bicycle-pedestrian bridge over Humbug-Willow Creek, with 1600 linear feet of Class I trail to make connections between bridge and existing trail sections.

Humbug-Willow Creek Trail 2000/01 $139,000 Install bicycle-pedestrian bridge over Humbug-Willow Creek, with 1600 linear feet of Class I trail to make connections between bridge and existing trail sections.

Humbug-Willow Creek/Levy Pk Trail Connection Proj. 2009/10 $179,000 Construct approximately 200-linear foot Class I bike trail, bridge, and interpretive signage in the City of Folsom.

Humbug-Willow Creek/Levy Pk Trail Connection Proj. 2009/10 $179,000 Construct approximately 200-linear foot Class I bike trail, bridge, and interpretive signage in the City of Folsom.

Humbug-Willow Creek Trail - Final Gap Closure 2005/06 $259,000 A development project to construct approximately 2,500 l.f. of trail along Willow Creek to include a bridge, bench and kiosk.

Humbug-Willow Creek Trail - Final Gap Closure 2005/06 $259,000 A development project to construct approximately 2,500 l.f. of trail along Willow Creek to include a bridge, bench and kiosk.

Page 36

Page 37: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Oak Parkway Open Space Corridor Trail - Phase II 2005/06 $155,200 A project to construct a Class 1 bike trail with a parallel walking trail. Oak Parkway Open Space Corridor Trail - Phase II 2005/06 $155,200 A project to construct a Class 1 bike trail with a parallel walking trail. Humbug-Willow Creek Trail III 2003/04 $157,500 A development project in the City of Folsom to construct approx. 1,400 linear feet of Class I paved bike trail, installation of a bike/pedestrian bridge approximately 90 feet long, and installation of trailside facilities including an information kiosk, interpretive signs, benches and bollards. This project will connect the Humbug Creek Trail to the Willow Creek Trail.

Humbug-Willow Creek Trail III 2003/04 $157,500 A development project in the City of Folsom to construct approx. 1,400 linear feet of Class I paved bike trail, installation of a bike/pedestrian bridge approximately 90 feet long, and installation of trailside facilities including an information kiosk, interpretive signs, benches and bollards. This project will connect the Humbug Creek Trail to the Willow Creek Trail.

City of Sacramento Ninos Parkway Biketrail 2004/05 $150,000 A development project to construct a trail in the Ninos Parkway, to include landscaping, irrigation, benches, bollards and an unpaved access road.

Ninos Parkway Biketrail 2004/05 $150,000 A development project to construct a trail in the Ninos Parkway, to include landscaping, irrigation, benches, bollards and an unpaved access road.

No. Laguna Creek Wildlife Walking Trail 2001/02 $120,000 Develop a 1000' walking trail on the south side of the North Laguna Creek Wildlife Area, with trail enhancements including trees, interpretive signs, benches, and replacement post and cable fencing.

No. Laguna Creek Wildlife Walking Trail 2001/02 $120,000 Develop a 1000' walking trail on the south side of the North Laguna Creek Wildlife Area, with trail enhancements including trees, interpretive signs, benches, and replacement post and cable fencing.

Improving Del Paso Regional Park's Trails 2010/11 $300,000 A development project in the City of Sacramento to include the rehabilitation of an existing trail and construction of picnic areas, trailhead amenities and interpretive signage.

Improving Del Paso Regional Park's Trails 2010/11 $300,000 A development project in the City of Sacramento to include the rehabilitation of an existing trail and construction of picnic areas, trailhead amenities and interpretive signage.

Page 37

Page 38: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Ninos Parkway Trail, Phase III 2006/07 $200,000 A development project to construct approximately 3,500 l.f. of trail with a par course, benches, trash receptacles, signage, landscaping and irrigation.

Ninos Parkway Trail, Phase III 2006/07 $200,000 A development project to construct approximately 3,500 l.f. of trail with a par course, benches, trash receptacles, signage, landscaping and irrigation.

North Laguna Wildlife Bike Trail II 2003/04 $119,341 A development project in the City of Sacramento to rehabilitate approx. 2,500 linear feet of bike trail within the North Laguna Creek Wildlife Area.

North Laguna Wildlife Bike Trail II 2003/04 $119,341 A development project in the City of Sacramento to rehabilitate approx. 2,500 linear feet of bike trail within the North Laguna Creek Wildlife Area.

Cordova R.P.D. Hagan Park American River Access Trail 2007/08 $152,000 A development project in the City of Rancho Cordova to include the removal and replacement of an existing pedestrian/bike path, widen a bridge on the pathway, and upgrade dirt pathways to improve accessibility.

Hagan Park American River Access Trail 2007/08 $152,000 A development project in the City of Rancho Cordova to include the removal and replacement of an existing pedestrian/bike path, widen a bridge on the pathway, and upgrade dirt pathways to improve accessibility.

Cosumnes C.S.D. Laguna Creek Staging Area 2002/03 $133,320 Develop a trailhead staging area for Laguna Creek Parkway Trail with parking, trail access, hitching posts, drinking fountains, benches, fire ring, gate, signage and environmentally compatible landscaping.

Laguna Creek Staging Area 2002/03 $133,320 Develop a trailhead staging area for Laguna Creek Parkway Trail with parking, trail access, hitching posts, drinking fountains, benches, fire ring, gate, signage and environmentally compatible landscaping.

Elk Grove Regional Park Trail 2005/06 $216,000 A development project in the City of Elk Grove to include construction of a multi-use trail around the perimeter of Elk Grove Regional Park.

Elk Grove Regional Park Trail 2005/06 $216,000 A development project in the City of Elk Grove to include construction of a multi-use trail around the perimeter of Elk Grove Regional Park.

Page 38

Page 39: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Department of Parks and Recreation Western States/Pioneer Express Trail Rehab. 2009/10 $56,689 A development project in the County of Sacramento to reroute and construct approximately 3000 feet of trail including three bridges, armored crossings, and retaining walls, and to rehabilitate the existing alignment within Folsom Lake State Recreation Area.

Western States/Pioneer Express Trail Rehab. 2009/10 $56,689 A development project in the County of Sacramento to reroute and construct approximately 3000 feet of trail including three bridges, armored crossings, and retaining walls, and to rehabilitate the existing alignment within Folsom Lake State Recreation Area.

Western States/Pioneer Express Trail Rehab. 2007/08 $117,111 A development project in the County of Sacramento to reroute and construct approximately 3000 feet of trail including three bridges, armored crossings, and retaining walls, and to rehabilitate the existing alignment within Folsom Lake State Recreation Area.

Western States/Pioneer Express Trail Rehab. 2007/08 $117,111 A development project in the County of Sacramento to reroute and construct approximately 3000 feet of trail including three bridges, armored crossings, and retaining walls, and to rehabilitate the existing alignment within Folsom Lake State Recreation Area.

Fulton-El Camino R.P.D. Strong Ranch Slough Trail 2001/02 $62,640 Rehabilitate pedestrian/bike path along Strong Ranch Slough through Cottage Park, including bridge, disabled-access drinking fountain, bike racks, bench renovation.

Strong Ranch Slough Trail 2001/02 $62,640 Rehabilitate pedestrian/bike path along Strong Ranch Slough through Cottage Park, including bridge, disabled-access drinking fountain, bike racks, bench renovation.

Southgate R.P.D. Tillotson Parkway Extension 2002/03 $134,565 Develop a 1.3 mile multi-use trail extending from Elk Grove Florin Road to Waterman Road. This trail will extend the existing 4-mile multi-use trail called the Tillotson Parkway.

Tillotson Parkway Extension 2002/03 $134,565 Develop a 1.3 mile multi-use trail extending from Elk Grove Florin Road to Waterman Road. This trail will extend the existing 4-mile multi-use trail called the Tillotson Parkway.

Page 39

Page 40: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

San Bernardino County City of Chino Hills Chino Hills Trails 2001/02 $54,721 Rehabilitation of various trails within the Chino Hills Trail System. Chino Hills Trails 2001/02 $54,721 Rehabilitation of various trails within the Chino Hills Trail System. City of Fontana Pacific Electric Trail Segment 6 2008/09 $250,000 A development project in the City of Fontana to construct approximately 1.25 miles of the Pacific Electric Inland Empire Trail including lighting and landscaping.

Pacific Electric Trail Segment 6 2008/09 $250,000 A development project in the City of Fontana to construct approximately 1.25 miles of the Pacific Electric Inland Empire Trail including lighting and landscaping.

County of San Bernardino Wilson Creek Trail 2002/03 $65,000 A development project in the County of San Bernardino to construct approximately 1 mile of multi-use trail including bollards, signage, concrete ramps and curbs and drainage.

Wilson Creek Trail 2002/03 $65,000 A development project in the County of San Bernardino to construct approximately 1 mile of multi-use trail including bollards, signage, concrete ramps and curbs and drainage.

Hesperia R.P.D. Hesperia Lake Park: Rec Trail 2001/02 $20,000 Develop trails at Hesperia Lake Park. Hesperia Lake Park: Rec Trail 2001/02 $20,000 Develop trails at Hesperia Lake Park. Rim of the World RPD Running Springs-Village Trail 2002/03 $34,541 Development of a trail approximately 4.5 miles in length, trailhead facilities and trail linkages including landscaping, signage and parking.

Running Springs-Village Trail 2002/03 $34,541 Development of a trail approximately 4.5 miles in length, trailhead facilities and trail linkages including landscaping, signage and parking.

Page 40

Page 41: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Running Springs-Village Trail 1998/99 $64,200 Development of a 6.6 mile trail, trailhead facilities and trail linkages including landscaping, signage and parking. A shortening to the trail to approximately 4 miles has been made due to easement issues.

Running Springs-Village Trail 1998/99 $64,200 Development of a 6.6 mile trail, trailhead facilities and trail linkages including landscaping, signage and parking. A shortening to the trail to approximately 4 miles has been made due to easement issues.

Page 41

Page 42: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

San Diego County City of Del Mar Riverpath Del Mar 2001/02 $104,800 Develop pedestrian trail and landscaping improvements including ADA accessible path and viewing areas.

Riverpath Del Mar 2001/02 $104,800 Develop pedestrian trail and landscaping improvements including ADA accessible path and viewing areas.

City of Encinitas Encinitas Recreational Trail 2009/10 $18,766 A development project in the City of Encinitas to include construction of approx. 380 linear feet of recreational trail linking the existing Brookside Trail

Encinitas Recreational Trail 2009/10 $18,766 A development project in the City of Encinitas to include construction of approx. 380 linear feet of recreational trail linking the existing Brookside Trail

Encinitas Rec. Trails Acq. 2001/02 $8,400 Acquisition of approximately 2.31 miles of the San Diego Gas & Electric's easement that bisects Encinitas for development of recreational trails under the City's Recreational Trails Master Plan-Segments 70, 72, and 73.

Encinitas Rec. Trails Acq. 2001/02 $8,400 Acquisition of approximately 2.31 miles of the San Diego Gas & Electric's easement that bisects Encinitas for development of recreational trails under the City's Recreational Trails Master Plan-Segments 70, 72, and 73.

City of San Diego Otay Valley Regional Park Trail Improvements 2003/04 $142,000 A development project in the City of San Diego to construct a staging area and improve approx. 3,000 linear feet of existing trail at Fenton Pond Trail in Otay Valley Regional Park.

Otay Valley Regional Park Trail Improvements 2003/04 $142,000 A development project in the City of San Diego to construct a staging area and improve approx. 3,000 linear feet of existing trail at Fenton Pond Trail in Otay Valley Regional Park.

City of San Marcos Borden Road Trail 1997/98 $39,681 Improve existing 1/2 mile trail for multiuse. Borden Road Trail 1997/98 $39,681 Improve existing 1/2 mile trail for multiuse.

Page 42

Page 43: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

City of Solana Beach Solana Beach Linear Park 2000/01 $100,000 Construct a 1.4 mile Class 1 bike pathway within the Solana Beach Linear Solana Beach Linear Park 2000/01 $100,000 Construct a 1.4 mile Class 1 bike pathway within the Solana Beach Linear County of San Diego Volcan Mt. Trail Improvements 1998/99 $17,037 Develop approximately 2.5 miles of trail. Volcan Mt. Trail Improvements 1998/99 $17,037 Develop approximately 2.5 miles of trail. Trans-County Trail 1997/98 $67,000 Develop 7 miles of multi-use trails in Sycamore Canyon Preserve, Oak Oasis Preserve and El Capitan Preserve for the Trans-County Trail.

Trans-County Trail 1997/98 $67,000 Develop 7 miles of multi-use trails in Sycamore Canyon Preserve, Oak Oasis Preserve and El Capitan Preserve for the Trans-County Trail.

William Heise Park Trails 2002/03 $11,475 Rehabilitation of five existing loop trails in Heise Park. William Heise Park Trails 2002/03 $11,475 Rehabilitation of five existing loop trails in Heise Park. Lake Morena Pk Pacific Crest Trail Staging Area 2004/05 $164,000 A development project in the County of San Diego to include renovation and expansion of two campsites used by hikers on the Pacific Crest Trail.

Lake Morena Pk Pacific Crest Trail Staging Area 2004/05 $164,000 A development project in the County of San Diego to include renovation and expansion of two campsites used by hikers on the Pacific Crest Trail.

Los Penasquitos Canyon Trail 2000/01 $73,110 Rehabilitate approximately 5 miles of heavily eroded muliti-use trail including replacing lighting and signage for visitor safety, resource protection and interpretive enhancement.

Los Penasquitos Canyon Trail 2000/01 $73,110 Rehabilitate approximately 5 miles of heavily eroded muliti-use trail including replacing lighting and signage for visitor safety, resource protection and interpretive enhancement.

Department of Parks and Recreation Torrey Pines Trail System 1997/98 $23,000 Rehabiliate and realign Beach Trail, Extension Trail and Yucca Point Overlook. Mitigate existing damage.

Page 43

Page 44: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Torrey Pines Trail System 1997/98 $23,000 Rehabiliate and realign Beach Trail, Extension Trail and Yucca Point Overlook. Mitigate existing damage.

Torrey Pines Discovery Trail 1997/98 $9,329 Rehabiliate trail around central lodge and parking to full accessible trail. Provide connections to other trails in park.

Torrey Pines Discovery Trail 1997/98 $9,329 Rehabiliate trail around central lodge and parking to full accessible trail. Provide connections to other trails in park.

Anza Borrego All-Access Trail 1997/98 $10,000 Addapt 2000' nature trail fully accessable. Anza Borrego All-Access Trail 1997/98 $10,000 Addapt 2000' nature trail fully accessable. Conejos Trail Cuyamaca Rancho 1998/99 $14,673 Reroute and rehabilitate the Conejos Trail within Cuyamaca Rancho State Conejos Trail Cuyamaca Rancho 1998/99 $14,673 Reroute and rehabilitate the Conejos Trail within Cuyamaca Rancho State Olivenhain MWD Elfin Forest Bridge 2003/04 $58,160 A development project in the City of Escondido to replace an existing trail bridge that serves as the main entrance over the Escondido Creek to the Elfin Forest Recreational Reserve.

Elfin Forest Bridge 2003/04 $58,160 A development project in the City of Escondido to replace an existing trail bridge that serves as the main entrance over the Escondido Creek to the Elfin Forest Recreational Reserve.

Padre Dam MWD Santee Lakes Obser. Tr. Phs. 3 2001/02 $100,000 Development of Phase 3, approx 2,500 linear foot section of trail involving lakes 4 and 5.

Santee Lakes Obser. Tr. Phs. 3 2001/02 $100,000 Development of Phase 3, approx 2,500 linear foot section of trail involving lakes 4 and 5.

Santee Lakes Observation Trail 2000/01 $133,920 Phase II construction of a walking and hiking trail to comply with ADA requirements and provide for pedestrian safety.

Page 44

Page 45: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Santee Lakes Observation Trail 2000/01 $133,920 Phase II construction of a walking and hiking trail to comply with ADA requirements and provide for pedestrian safety.

Santee Lakes Observation Trail 1999/00 $74,000 Develop approximately 2 miles of hiking and bicycling trail at Santee Lakes. Santee Lakes Observation Trail 1999/00 $74,000 Develop approximately 2 miles of hiking and bicycling trail at Santee Lakes. San Dieguito River Park Joint Powers Auth Lake Hodges Dam Crossing Trail 2002/03 $236,250 Construct 0.16 miles of non-motorized trail in San Dieguito River Park, County of San Diego.

Lake Hodges Dam Crossing Trail 2002/03 $236,250 Construct 0.16 miles of non-motorized trail in San Dieguito River Park, County of San Diego.

Mule Hill/San Pasqual Trail 1999/00 $62,000 Develop a 9.4 mile multi-use trail. Mule Hill/San Pasqual Trail 1999/00 $62,000 Develop a 9.4 mile multi-use trail. Highland Valley Trail 1997/98 $7,000 Renovate existing staging area for the Highland Valley Trail. Highland Valley Trail 1997/98 $7,000 Renovate existing staging area for the Highland Valley Trail.

Page 45

Page 46: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

San Francisco County City & County of San Francisco Pine Lake Trail Improvement 2004/05 $220,000 Renovate the Pine Lake Trail in the City and County of San Francisco by rehabilitating a trail, constructing a lake overlook, revegetation and installing temporary fencing and interpretive signage.

Pine Lake Trail Improvement 2004/05 $220,000 Renovate the Pine Lake Trail in the City and County of San Francisco by rehabilitating a trail, constructing a lake overlook, revegetation and installing temporary fencing and interpretive signage.

Twin Peaks Trail 1998/99 $82,196 Restoration of a walking trail that transects Twin Peaks Park, and removal of social trails that are creating erosion and damaging habitat

Twin Peaks Trail 1998/99 $82,196 Restoration of a walking trail that transects Twin Peaks Park, and removal of social trails that are creating erosion and damaging habitat

Strawberry Hill Trail 1997/98 $24,920 Renovation of trail surfaces, handrails, erosion control, revegetation with native plants, retreading of stairs.

Strawberry Hill Trail 1997/98 $24,920 Renovation of trail surfaces, handrails, erosion control, revegetation with native plants, retreading of stairs.

Page 46

Page 47: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

San Luis Obispo County Cambria CSD Marine Terrace Trail 2003/04 $127,402 A development project in the City of Cambria to construct approx. 3800 ft. of multi-purpose Marine Terrace Trail.

Marine Terrace Trail 2003/04 $127,402 A development project in the City of Cambria to construct approx. 3800 ft. of multi-purpose Marine Terrace Trail.

City of Pismo Beach Dinosaur Caves Trail 2000/01 $85,000 Develop ocean front trail section. Dinosaur Caves Trail 2000/01 $85,000 Develop ocean front trail section. County of San Luis Obispo Bishop Peak Trail 1998/99 $25,000 Develop approximately 2 mile trail to the top of Bishop Peak. Bishop Peak Trail 1998/99 $25,000 Develop approximately 2 mile trail to the top of Bishop Peak. Bishop Peak Trail 1997/98 $10,000 Develop approximately 2 miles of hiking trail. Bishop Peak Trail 1997/98 $10,000 Develop approximately 2 miles of hiking trail. Department of Parks and Recreation Moonstone Beach Boardwalk 2003/04 $197,000 A development project in the County of San Luis Obispo to construct a trail, approximately 2/3 of a mile, to include an ADA boardwalk along the bluffs of Moonstone Beach within San Simeon State Park.

Moonstone Beach Boardwalk 2003/04 $197,000 A development project in the County of San Luis Obispo to construct a trail, approximately 2/3 of a mile, to include an ADA boardwalk along the bluffs of Moonstone Beach within San Simeon State Park.

Page 47

Page 48: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

San Mateo County City of Half Moon Bay Pilarcitos Creek Trail 1998/99 $200,000 Development of 3/4 mile of a total 1-1/2 mile accessible pedestrian/ bicycle/nature trail from downtown Half Moon Bay to the Pacific Coast.

Pilarcitos Creek Trail 1998/99 $200,000 Development of 3/4 mile of a total 1-1/2 mile accessible pedestrian/ bicycle/nature trail from downtown Half Moon Bay to the Pacific Coast.

County of San Mateo Mirada Surf Coastal Trail 2006/07 $220,590 Develop approximately one half mile of multi-use trail, a bridge, restroom, vegetation restoration, benches, and signage. In addition, avoidance, minimization and conservation measures established in the section 7 consult are federal aide eligible and include; fencing, redesign and relocation of the restroom, and improvements to the pond. These additional requirements are further defined in attachment "A" of the contract documents.

Mirada Surf Coastal Trail 2006/07 $220,590 Develop approximately one half mile of multi-use trail, a bridge, restroom, vegetation restoration, benches, and signage. In addition, avoidance, minimization and conservation measures established in the section 7 consult are federal aide eligible and include; fencing, redesign and relocation of the restroom, and improvements to the pond. These additional requirements are further defined in attachment "A" of the contract documents.

Crystal Springs Regional Trail South of Dam 2009/10 $350,000 Rehabilitate access road into approximately 4,480 feet paved trail. The trail project also includes fencing, benches, a restroom, signing, and a kiosk in the County of San Mateo.

Crystal Springs Regional Trail South of Dam 2009/10 $350,000 Rehabilitate access road into approximately 4,480 feet paved trail. The trail project also includes fencing, benches, a restroom, signing, and a kiosk in the County of San Mateo.

Midpeninsula R.O.S.D. Jacques Ridge Staging Area 1998/99 $72,000 Parking, restroom, and improvements to the Bay Area Trail including drainage improvements and a safe crossing at Hicks Road.

Jacques Ridge Staging Area 1998/99 $72,000 Parking, restroom, and improvements to the Bay Area Trail including drainage improvements and a safe crossing at Hicks Road.

Page 48

Page 49: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

El Corte De Madera Trail 1997/98 $73,000 Improvement of trail system with new connecting trails and elimination of resource problems.

El Corte De Madera Trail 1997/98 $73,000 Improvement of trail system with new connecting trails and elimination of resource problems.

Ridge Trail Connection 1993/94 $46,525 Acquire approximately 1/2 acre of land and construct approximately l mile trail including gates, fencing, signing and landscaping.

Ridge Trail Connection 1993/94 $46,525 Acquire approximately 1/2 acre of land and construct approximately l mile trail including gates, fencing, signing and landscaping.

Town of Atherton Atherton Channel Trail and Bridge 2004/05 $104,800 A development project in the City of Atherton to include the construction of a bridge and trail.

Atherton Channel Trail and Bridge 2004/05 $104,800 A development project in the City of Atherton to include the construction of a bridge and trail.

Page 49

Page 50: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Santa Barbara County City of Carpinteria Palm to Linden Trail 2009/10 $296,995 Construct an approximately 1,100’ trail with landscaping, interpretive, regulatory signage, trail head, and boardwalk over a wetland area at Carpinteria State Beach in the City of Carpinteria.

Palm to Linden Trail 2009/10 $296,995 Construct an approximately 1,100’ trail with landscaping, interpretive, regulatory signage, trail head, and boardwalk over a wetland area at Carpinteria State Beach in the City of Carpinteria.

City of Santa Maria Santa Maria River Nature Trail 2004/05 $209,382 An acquisition project in the City of Santa Maria including the purchase of approximately 152 acres of land for the creation of an interpretive trail and garden for a self guided river walk. APN's#: 090-401-001; 090-401-020; 090- 401-021; 090-401-030

Santa Maria River Nature Trail 2004/05 $209,382 An acquisition project in the City of Santa Maria including the purchase of approximately 152 acres of land for the creation of an interpretive trail and garden for a self guided river walk. APN's#: 090-401-001; 090-401-020; 090- 401-021; 090-401-030

Page 50

Page 51: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Santa Clara County City of San Jose Los Gatos Creek Trail 1999/00 $200,000 Acquisition of land for the Los Gatos Creek Trail. Acquisition of trail between Lonus Street and Auzerais Avenue.

Los Gatos Creek Trail 1999/00 $200,000 Acquisition of land for the Los Gatos Creek Trail. Acquisition of trail between Lonus Street and Auzerais Avenue.

County of Santa Clara Coyote Lake Phase II Trails Development 2005/06 $480,000 A development project to construct 14.35 miles of multi-use trail. Coyote Lake Phase II Trails Development 2005/06 $480,000 A development project to construct 14.35 miles of multi-use trail. Stevens Creek Trail Improvement 2003/04 $185,000 A development project in the City of Cupertino to construct approximately 1.5 miles of new trail adjacent to Rancho San Antonio County Park, which will become a segment of the County-wide Regional Trail system.

Stevens Creek Trail Improvement 2003/04 $185,000 A development project in the City of Cupertino to construct approximately 1.5 miles of new trail adjacent to Rancho San Antonio County Park, which will become a segment of the County-wide Regional Trail system.

Los Gatos Creek Trail Imp. 2002/03 $200,000 Development will include trail widening, drainage improvements for 1.59 miles of trail and access gates.

Los Gatos Creek Trail Imp. 2002/03 $200,000 Development will include trail widening, drainage improvements for 1.59 miles of trail and access gates.

Department of Parks and Recreation Henry Coe SP Jackson Trail 1997/98 $10,000 Develop 2 miles of trail Henry Coe SP Jackson Trail 1997/98 $10,000 Develop 2 miles of trail

Page 51

Page 52: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Santa Cruz County Department of Parks and Recreation A Bridge To The Past Old Growth Trail Loop 2008/09 $151,679 A development project in the County of Santa Cruz to include the installation of a bridge, the widenening and rehabilitation of existing trails, and the removal of unwanted trails in the Forest of Nisene Marks State Park.

A Bridge To The Past Old Growth Trail Loop 2008/09 $151,679 A development project in the County of Santa Cruz to include the installation of a bridge, the widenening and rehabilitation of existing trails, and the removal of unwanted trails in the Forest of Nisene Marks State Park.

Skyline To The Sea Trail - Big Basin State Park 2005/06 $96,689 Reconstruction of Skyline to the Sea/Hihn hammon connector trail to meet accessibility guidelines. The non-motorized trail (approximately 1000 lf of trail will be rerouted to meet ADA accessibility guidelines and approximately 1000 lf of existing trail will be decommissioned and rehabilitated.

Skyline To The Sea Trail - Big Basin State Park 2005/06 $96,689 Reconstruction of Skyline to the Sea/Hihn hammon connector trail to meet accessibility guidelines. The non-motorized trail (approximately 1000 lf of trail will be rerouted to meet ADA accessibility guidelines and approximately 1000 lf of existing trail will be decommissioned and rehabilitated.

Page 52

Page 53: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Shasta County Department of Parks and Recreation Vista Point Overlook Trail 2008/09 $80,720 Construct a trail at Castle Crags State Park in Castella. Vista Point Overlook Trail 2008/09 $80,720 Construct a trail at Castle Crags State Park in Castella. Vista Point Overlook Trail 2006/07 $46,000 Construct a trail at Castle Crags State Park in Castella. Vista Point Overlook Trail 2006/07 $46,000 Construct a trail at Castle Crags State Park in Castella.

Page 53

Page 54: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Siskiyou County Mount Shasta Trail Association Mount Shasta Gateway Trail 2010/11 $100,000 Construct a trail of approximately 7.2 miles, build a trailhead and informational kiosk, parking lot and install interpretive signage.

Mount Shasta Gateway Trail 2010/11 $100,000 Construct a trail of approximately 7.2 miles, build a trailhead and informational kiosk, parking lot and install interpretive signage.

Siskiyou Co. Flood Control WCD Lake Siskiyou Trail Improvements 2004/05 $263,040 Development of trails in the City of Mount Shasta. Lake Siskiyou Trail Improvements 2004/05 $263,040 Development of trails in the City of Mount Shasta. Lake Siskiyou Trail 2000/01 $181,208 A development project in the County of Siskiyou to include the construction of wide unpaved trail segments on the Lake Siskiyou Trail.

Lake Siskiyou Trail 2000/01 $181,208 A development project in the County of Siskiyou to include the construction of wide unpaved trail segments on the Lake Siskiyou Trail.

Lake Siskiyou Trail Improvements 2009/10 $65,760 Development of trails in the City of Mount Shasta. Lake Siskiyou Trail Improvements 2009/10 $65,760 Development of trails in the City of Mount Shasta.

Page 54

Page 55: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Solano County City of Fairfield Rockville Hills Regional Park Trail 2001/02 $38,400 Trail within Fairfield's largest park (610 acres) to be restored for better access, wider range of users, fire prevention resources, and signage to denote links to the Bay Area Ridge Trail.

Rockville Hills Regional Park Trail 2001/02 $38,400 Trail within Fairfield's largest park (610 acres) to be restored for better access, wider range of users, fire prevention resources, and signage to denote links to the Bay Area Ridge Trail.

City of Suisun City Central County Bikeway Gap Closure 2005/06 $160,000 Construct the Central County Bikeway in the City of Suisun by building a paved, multi-use recreational trail between Marina Boulevard and the Amtrak Train Station terminal.

Central County Bikeway Gap Closure 2005/06 $160,000 Construct the Central County Bikeway in the City of Suisun by building a paved, multi-use recreational trail between Marina Boulevard and the Amtrak Train Station terminal.

Central County Bikeway 1998/99 $120,000 Develop approximately 2 mile multi-use recreational trail. Central County Bikeway 1998/99 $120,000 Develop approximately 2 mile multi-use recreational trail. City of Vacaville Lagoon-Ridgecrest Trail 1997/98 $23,643 Develop a multiuse trail with related support facilities. Lagoon-Ridgecrest Trail 1997/98 $23,643 Develop a multiuse trail with related support facilities.

Page 55

Page 56: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Sonoma County City of Santa Rosa Santa Rosa Creek Trail 1999/00 $200,000 Develop a 750 foot long trail with site amenities along Santa Rosa Creek. Santa Rosa Creek Trail 1999/00 $200,000 Develop a 750 foot long trail with site amenities along Santa Rosa Creek. City of Sebastopol Railroad Forest Bike Path 2001/02 $80,500 Class 1 bike path. Railroad Forest Bike Path 2001/02 $80,500 Class 1 bike path. County of Sonoma Hood Mountain - Lower Johnson Ridge Trail 2008/09 $117,500 A development project in the County of Sonoma to include the construction of approximately 1,888 linear feet of trail and associated retaining walls.

Hood Mountain - Lower Johnson Ridge Trail 2008/09 $117,500 A development project in the County of Sonoma to include the construction of approximately 1,888 linear feet of trail and associated retaining walls.

West Sonoma County Trail 1997/98 $90,000 Develop approximately 3/4 mile multiuse trail. West Sonoma County Trail 1997/98 $90,000 Develop approximately 3/4 mile multiuse trail. Department of Parks and Recreation Annadel State Park 1997/98 $50,000 Realign and redesigned trails:Spring Creek & Rough Go Trail; Orchard Trail, Cobblestone Trail, North Burma Trail

Annadel State Park 1997/98 $50,000 Realign and redesigned trails:Spring Creek & Rough Go Trail; Orchard Trail, Cobblestone Trail, North Burma Trail

Annadel SP 1998/99 $118,780 Reroute of several trails and regrade 3 miles of access road to multiuse trail. Annadel SP 1998/99 $118,780 Reroute of several trails and regrade 3 miles of access road to multiuse trail. Fallen Bridge Trail Reconstruction 2005/06 $236,520 A development project within the County of Sonoma to improve and re-route approximately 3 miles of trail in Jack London State Park.

Page 56

Page 57: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Fallen Bridge Trail Reconstruction 2005/06 $236,520 A development project within the County of Sonoma to improve and re-route approximately 3 miles of trail in Jack London State Park.

South Burma Trail 2008/09 $116,000 A development project in Sonoma County that will provide for reconstruction, rerouting and upgrades to portions of approximately 1 mile of the South Burma Trail and its drainage system within Annadel State Park.

South Burma Trail 2008/09 $116,000 A development project in Sonoma County that will provide for reconstruction, rerouting and upgrades to portions of approximately 1 mile of the South Burma Trail and its drainage system within Annadel State Park.

Page 57

Page 58: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Stanislaus County City of Modesto Tuolumne River Regional Park Riverwalk Trail 2008/09 $125,000 A development project to construct approximately 1,500 feet of trail. Tuolumne River Regional Park Riverwalk Trail 2008/09 $125,000 A development project to construct approximately 1,500 feet of trail. City of Riverbank Jacob Myers Park Trail Development 2004/05 $105,477 A development project in the City of Riverbank to construct a trail, restroom, ADA parking spots and mitigation measures for elderberry beetle

Jacob Myers Park Trail Development 2004/05 $105,477 A development project in the City of Riverbank to construct a trail, restroom, ADA parking spots and mitigation measures for elderberry beetle

Page 58

Page 59: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Tulare County City of Tulare Tulare Rails To Trails 1998/99 $104,000 Develop a 1.4 mile multi use trail for equestrian, bicycle and pedestrian. Tulare Rails To Trails 1998/99 $104,000 Develop a 1.4 mile multi use trail for equestrian, bicycle and pedestrian. City of Visalia St. Johns River Parkway Trail - Phase IV 2007/08 $79,000 A development project in the City of Visalia to extend the St. John's River multi-purpose trail approx. 1/2 mile and restoration of approx 6.12 acres of adjacent habitat.

St. Johns River Parkway Trail - Phase IV 2007/08 $79,000 A development project in the City of Visalia to extend the St. John's River multi-purpose trail approx. 1/2 mile and restoration of approx 6.12 acres of adjacent habitat.

East Mill Creek Trail - Phase I 2007/08 $81,000 A development in the City of Visalia to construct approximately .5 miles of multipurpose trail on the north side of Mill Creek east from the existing path at Mill Creek Garden park to McAuliff Ave.

East Mill Creek Trail - Phase I 2007/08 $81,000 A development in the City of Visalia to construct approximately .5 miles of multipurpose trail on the north side of Mill Creek east from the existing path at Mill Creek Garden park to McAuliff Ave.

St. Johns River Parkway Trail 2000/01 $61,199 Construction of multi-purpose trail along the St. Johns River. St. Johns River Parkway Trail 2000/01 $61,199 Construction of multi-purpose trail along the St. Johns River. City of Woodlake Bravo Lake Trail 2000/01 $48,677 Acquisition of approximately 9.36 acres for a trail. Bravo Lake Trail 2000/01 $48,677 Acquisition of approximately 9.36 acres for a trail.

Page 59

Page 60: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Tuolumne County Department of Parks and Recreation Beaver Creek Accessibility and Connectivity Proj. 2008/09 $3,494 A development project in Calaveras Big Trees State Park to construct approximately 3,620 feet of trail.

Beaver Creek Accessibility and Connectivity Proj. 2008/09 $3,494 A development project in Calaveras Big Trees State Park to construct approximately 3,620 feet of trail.

Beaver Creek Accessibility and Connectivity Proj. 2005/06 $51,506 A development project in Calaveras Big Trees State Park to construct approximately 3,620 feet of trail.

Beaver Creek Accessibility and Connectivity Proj. 2005/06 $51,506 A development project in Calaveras Big Trees State Park to construct approximately 3,620 feet of trail.

Page 60

Page 61: California Department of Parks and Recreation Office of ... · PDF fileCalifornia Department of Parks and Recreation Office of Grants and Local Services Recreational Trails Program

Ventura County Conejo R.P.D. Wildwood Regional Park Trail 1999/00 $46,000 Renovate and realign two existing trails in Wildwood Regional Park. Wildwood Regional Park Trail 1999/00 $46,000 Renovate and realign two existing trails in Wildwood Regional Park. County of Ventura Ojai Valley Trail Repair 2001/02 $225,000 A bridge approximately 100 feet long and 11 feet wide will be built across the Devil's Gulch area of erosion along the Ojai Valley Equestrian and Bicycle Trail.

Ojai Valley Trail Repair 2001/02 $225,000 A bridge approximately 100 feet long and 11 feet wide will be built across the Devil's Gulch area of erosion along the Ojai Valley Equestrian and Bicycle Trail.

Rancho Simi R.P.D. Corriganville Park Trail 1997/98 $19,397 Rehab. existing and develop new trails, approximately 2 miles, at Corriganville Park.

Corriganville Park Trail 1997/98 $19,397 Rehab. existing and develop new trails, approximately 2 miles, at Corriganville Park.

Challenger Park Trail 1997/98 $71,000 Develop approximately 1.75 miles of trail. Challenger Park Trail 1997/98 $71,000 Develop approximately 1.75 miles of trail.

Page 61