California High Speed Rail Downtown Alignment Issues Elevated Option - -Visual - -Noise - -Land Development Underground - -Cost - -Construction Risk

Embed Size (px)

Citation preview

California High Speed RailCalifornia High Speed Rail

Downtown Alignment IssuesDowntown Alignment Issues

Elevated Option- Visual

- Noise

- Land Development

Underground- Cost

- Construction Risk

- Statewide Equity

2Park Ave

San Carlos St

The Alam

eda

Alm

aden Blvd

San JoséConvention Center

HPPavilion

PROPOSED BART TUNNEL

DiridonStation

TamienStation

1

87

280

Coyote Valley/101/Bailey Coyote Valley/101/Bailey

Coyote Valley/101/BaileyCoyote Valley/101/Bailey

Monterey Road Corridor Monterey Road Corridor

Monterey Road Corridor Monterey Road Corridor

Monterey Road near Capitol Expressway Monterey Road near Capitol Expressway

Monterey Road near Capitol Expressway Monterey Road near Capitol Expressway

Communication Hill Communication Hill

Communication Hill Communication Hill

Alma Avenue Alma Avenue

Alma Avenue Alma Avenue

Tamien Station Tamien Station

Tamien Station Tamien Station

Bird Avenue at 280 Bird Avenue at 280

Bird Avenue at 280 Bird Avenue at 280

Bird Avenue at Auzerais Bird Avenue at Auzerais

Bird Avenue at Auzerais Bird Avenue at Auzerais

Bird Avenue at Auzerais Bird Avenue at Auzerais

Diridon Station Diridon Station

Diridon Station Diridon Station

The Alameda The Alameda

The Alameda The Alameda

Santa Clara Street Santa Clara Street

Santa Clara Street Santa Clara Street

Highway 880 Highway 880

Highway 880 Highway 880

California High Speed RailCalifornia High Speed Rail

I-280 Bridge I-280 Signature Bridge

I-280 Signature BridgeI-280 Signature Bridge

Process MilestonesProcess Milestones

Complete Visual Design GuidelinesComplete Visual Design Guidelines Oct 5Oct 5

Community Meeting Oct TBDOct TBD

City Council Meeting Nov 15Nov 15

CHSRA Board Meeting CHSRA Board Meeting Dec TBDDec TBD

California High Speed RailCalifornia High Speed Rail