1 California Regional Water Quality Control Board San Diego Region David Gibson, Executive Officer Executive Officer’s Report August 14, 2013 Table of Contents Part A – San Diego Region Staff Activities............................................................2 1. Personnel Report ...............................................................................................................2 Part B – Significant Regional Water Quality Issues.............................................2 1. Southern California Bight Regional Monitoring Program ................................................2 2. Border 2020 Environmental Enforcement Workshop .......................................................3 3. Conclusion of South Bay International Wastewater Treatment Plant Lawsuit .................4 4. 2011 Basin Plan Triennial Review Update: REC-1 in Areas Affected by Wildlife Wastes................................................................................................................................5 5. Salt and Nutrient Management Planning Workshop (Attachment B-5) ............................7 6. Enforcement Actions for June 2013 ..................................................................................9 7. Sanitary Sewer Overflows (SSOs) May – June 2013 (Attachment B-7) .........................10 8. Clean Water Act Section 401 Water Quality Certification Actions Taken from April to June 2013 (Attachment B-8) ........................................................................................12 9. Completion of Las Pulgas Landfill Phase II Waste Management Unit...........................13

California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

1

California Regional Water Quality Control Board San Diego Region

David Gibson, Executive Officer

Executive Officer’s Report

August 14, 2013

Table of Contents

Part A – San Diego Region Staff Activities ............................................................ 2

1. Personnel Report ...............................................................................................................2

Part B – Significant Regional Water Quality Issues ............................................. 2

1. Southern California Bight Regional Monitoring Program ................................................2 2. Border 2020 Environmental Enforcement Workshop .......................................................3 3. Conclusion of South Bay International Wastewater Treatment Plant Lawsuit .................4 4. 2011 Basin Plan Triennial Review Update: REC-1 in Areas Affected by Wildlife

Wastes ................................................................................................................................5 5. Salt and Nutrient Management Planning Workshop (Attachment B-5) ............................7 6. Enforcement Actions for June 2013 ..................................................................................9 7. Sanitary Sewer Overflows (SSOs) May – June 2013 (Attachment B-7) .........................10 8. Clean Water Act Section 401 Water Quality Certification Actions Taken from April

to June 2013 (Attachment B-8) ........................................................................................12 9. Completion of Las Pulgas Landfill Phase II Waste Management Unit ...........................13

Page 2: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

2

The August report for the Tentative Schedule of Significant NPDES Permits, WDRs, and Actions, and the attachments noted on page 1 are included at the end of the report.

Part A – San Diego Region Staff Activities

1. Personnel Report Staff Contact: Lori Costa The Organizational Chart of the San Diego Water Board can be viewed at http://www.waterboards.ca.gov/sandiego/about_us/org_charts/orgchart.pdf Departures Tyler Kirkendall, Scientific Aid, worked in our Land Discharge Unit reviewing reports, studies, and plans. He also assisted with the processing of applications for waste discharge requirements. Tyler was accepted to Oregon State University where he will pursue a Master’s Degree in Environmental Engineering. He will continue his research on anaerobic digestion and the anaerobic treatment of wastewater. Tyler hopes to return to the San Diego Water Board in the future. Recruitment Hiring interviews to fill a Water Resource Control Engineer position in the Northern Cleanup Unit are complete and an offer of employment has been made. Hiring interviews to fill an Associate Governmental Program Analyst position in the Mission Support Services Unit are under way. We are currently recruiting to fill positions for a Sr. Water Resource Control Engineer and an Engineering Student Assistant. We have begun the process to fill positions for a Staff Services Analyst and a Scientific Aid.

Part B – Significant Regional Water Quality Issues

1. Southern California Bight Regional Monitoring Program Staff Contact: Bruce Posthumus

The Southern California Bight Regional Monitoring Program (Bight Program) periodically assesses status and trends of water quality and related conditions in the coastal ocean waters and embayments of southern California, from Point Conception to the Mexican Border. It also conducts special studies aimed at improving monitoring, assessment, and understanding of those waters. Bight Program fact sheets, as well as full assessment reports, are now available at: http://www.sccwrp.org/Documents/BightDocuments/Bight08Documents/Bight08AssessmentReports.aspx. The fact sheets provide one-page summaries of the significance, goals, approach, and most recent findings of various components of the Bight Program, i.e.:

Page 3: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

3

1. Coastal Ecology 2. Shoreline Microbiology 3. Offshore Water Quality 4. Areas of Special Biological Significance 5. Rocky Reef 6. Estuarine Eutrophication

The Bight Program is a collaborative undertaking of a number of organizations, coordinated by the Southern California Coastal Water Research Project (SCCWRP). Participants in the Bight Program include regulated entities, research groups, laboratories, public health agencies, and natural resource management agencies, among others. Participating organizations conduct planning, provide funding, and/or provide in-kind services. The Bight Program was initiated in 1994, with subsequent iterations in 1998, 2003, and 2008. San Diego Water Board staff has been participating in planning for the next iteration of the Bight Program; field work begins this summer. Ken Schiff, Deputy Director of SCCWRP, provided an overview of the results of the Bight Program at the August 8, 2012 meeting of the San Diego Water Board. (See Executive Officer Summary Report at: http://www.waterboards.ca.gov/sandiego/board_info/agendas/2012/Aug/item5/EOSR_item5.pdf.) SCCWRP is a public agency formed to conduct coastal environmental research and suggest management strategies. The San Diego Water Board is one of the SCCWRP member agencies. David Gibson represents the San Diego Water Board on the SCCWRP Commission, which is SCCWRP’s governing board. David Barker is the alternate. More information about SCCWRP is available at: http://www.sccwrp.org/AboutSCCWRP.aspx.

2. Border 2020 Environmental Enforcement Workshop Staff Contact: Ben Neill San Diego Water Board staff engineer Ben Neill attended a Border 2020 environmental enforcement workshop directed towards improving enforcement and compliance assurance in the U.S.-Mexico border region through better case development and enforcement tools. The June 13 -14, 2013 workshop objective was to strengthen information sharing and build capacity of environmental enforcement professionals working in the border region pursuant to Border 2020 Goal 5, “Enhance Compliance Assurance and Environmental Stewardship.” The workshop facilitated dialogue among federal and state agencies from the United States, Canada, and Mexico representing multiple environmental disciplines including air quality, toxic substances, waste management, and water quality. The workshop opened with remarks by Jose Mario Sanchez Soledad, the Border Environment Cooperation Commission Deputy General Manager. Participants shared database sources for environmental information including the California Environmental Data Exchange Network and the Surface Water Ambient Monitoring Program.

Page 4: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

4

In the afternoon, the participants discussed some pilot project proposals for enhanced collaborative enforcement. The workshop presentations can be accessed on the U.S. Environmental Protection Agency (USEPA) website at: http://www2.epa.gov/border2020/border-2020-enforcement-webinar The Border 2020 Program is the latest environmental program implemented under the 1983 La Paz Agreement. The program builds on the previous Border 2012 Environmental Program, emphasizing regional, bottom-up approaches for decision making, priority setting, and project implementation to address the environmental and public health problems in the border region. Additional information on the Border 2020 Program can be accessed on the USEPA website at: http://www2.epa.gov/border2020 The 1983 La Paz Agreement referenced above established a framework for cooperation on environmental problems in Mexico and the U.S. The USEPA and Mexico's Ministry of Environment and Natural Resources are jointly charged with searching for and implementing solutions to problems related to air, water and land pollution along the border. The commitment made in La Paz has led to the Border 2020 Program to protect the environment and the public's health in the U.S. - Mexico border region. This effort brings together virtually all U.S. and Mexican Federal, state and local entities that are responsible for environmental and natural resource management. It places particular emphasis on public inputs, decentralization of environmental management and improved communication and cooperation among officials at all levels. The La Paz Agreement defines the U.S.-Mexico border region as extending more than 3,100 kilometers (approximately 2,000 miles) from the Gulf of Mexico to the Pacific Ocean, and 100 kilometers (approximately 62.5 miles) on either side of the border. Additional information on the La Paz Agreement can be accessed at the USEPA website at: http://www.epa.gov/Border2012/framework/background.html

3. Conclusion of South Bay International Wastewater Treatment Plant Lawsuit

Staff Contact: Ben Neill On June 20, 2013, the San Diego Water Board reached an agreement with the United States Section of the International Boundary and Water Commission (USIBWC) to conclude long-standing litigation over compliance with federal Clean Water Act secondary treatment requirements at the South Bay International Wastewater Treatment Plant (SBIWTP). The agreement was reached based on evidence showing year-to-year improvements in the quality of the effluent discharged from the treatment facility. The SBIWTP, an international wastewater treatment plant located in San Diego County at the US/Mexico international border, treats an average daily flow of 25 million gallons per day of sewage wastewater originating from Tijuana, Baja California, Mexico and then discharges the secondary treated effluent approximately 3.5 miles out into the Pacific Ocean through the South Bay Ocean Outfall. The SBIWTP is

Page 5: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

5

administered by the USIBWC and is operated and maintained by Veolia Water North America, under contract with the USIBWC. In February 2001, California’s Office of the Attorney General, on behalf of the San Diego Water Board, filed a complaint in U.S. District Court, Southern District of California (Court), alleging violations of the federal Clean Water Act and the California Porter-Cologne Water Quality Control Act (People of the State of California ex rel. The Regional Water Quality Control Board, San Diego Region v. Edward Drusina, an individual in his capacity as Commissioner of the International Boundary and Water Commission, United States Section, et al., Case No. 01 CV 0270 BTM (BLM)). The complaint alleged USIBWC’s discharge from the SBIWTP violated the terms of the 1996 NPDES Permit (Order No. 96-50) issued by the San Diego Water Board by failing to treat the effluent to secondary treatment standards and for violating other effluent limitations. Nearly a decade ago on December 6, 2004, the Court issued a final judgment setting a compliance schedule for the USIBWC to meet federal and state requirements for secondary treatment standards through construction of an activated sludge secondary treatment process at the SBIWTP to improve effluent quality. Construction of the facility upgrade was completed in late 2010 and secondary treatment of the discharge commenced shortly thereafter. Since that time, the SBIWTP facility had significant operational difficulties in attaining consistent compliance with the NPDES Permit secondary treatment effluent limitations. The Court approved several extensions to the compliance schedule, to give the USIBWC additional time to consistently comply with the effluent limitations. On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied with the Court’s 2004 judgment. USIBWC’s effluent monitoring reports indicate that SBIWTP’s discharge has greatly improved and is substantially in compliance with NPDES Permit effluent limitations at this time. In addition, the USIBWC has retained a wastewater treatment plant consultant that has made operational recommendations to help ensure the SBIWTP discharge continues to comply with NPDES Permit effluent limitations. The San Diego Water Board is pleased with the marked progress of USIBWC in addressing SBIWTP compliance issues and will continue to work closely with USIBWC on these and other matters in moving forward towards developing a new and updated NPDES permit for the SBIWTP in the coming year.

4. 2011 Basin Plan Triennial Review Update: REC-1 in Areas Affected by Wildlife Wastes

Staff Contact: Deborah Woodward

The San Diego Water Board (Water Board) received numerous suggestions for revisions to the Water Quality Control Plan for the San Diego Basin (Basin Plan) during its 2011 Basin Plan Triennial Review. One suggestion that was highly ranked in a stakeholder prioritization process and, ultimately, among those adopted by the Water Board for further investigation was to

Page 6: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

6

consider the appropriateness of water quality objectives for fecal indicator bacteria (FIB) in areas designated with the Contact Water Recreation beneficial use (REC-1) but affected by wildlife wastes. Wildlife wastes are natural sources of FIB (fecal coliform, E. coli, and enterococcus) that can make it difficult to meet FIB water quality objectives, and they may pose a different, possibly lower risk to human health than the human waste (sewage) on which existing FIB objectives are based. Staff is pursuing the wildlife issue through participation in statewide and local risk assessment projects intended to inform the development of site-specific FIB water quality objectives in areas affected by wildlife wastes. Quantitative Microbial Risk Assessment (QMRA). A QMRA is a process used to estimate the risk to human health associated with wildlife wastes. A QMRA is analogous to a chemical risk assessment and can be used in both marine and freshwaters. USEPA’s recently released 2012 Recreational Water Quality Criteria provides for the use of QMRA in developing site-specific FIB objectives for areas where human sources have been controlled or are inconsequential. If a QMRA demonstrates that wildlife wastes in a given area pose less risk to human health than human wastes, then site-specific FIB objectives for that area could be proposed.

1. Marine Waters: Southern California Beach QMRA. To date, there is no QMRA example from a California beach, so the Southern California Water Research Project (SCCWRP) has proposed to conduct one with funding from the State Water Board. This QMRA is intended to (a) serve as a case study to test and demonstrate the applicability of QMRA at a California beach, and (b) develop a protocol for use by Water Board staff in establishing site-specific objectives based on QMRA. Since April 2013, San Diego Water Board staff has been in discussions with the State Water Board regarding beach selection for the case study and has proposed candidate beaches in the region. A candidate beach is one with some FIB contamination from primarily wildlife sources. If a beach in the region is selected for the QMRA case study, San Diego Water Board staff will serve on the Technical Advisory Committee to provide technical and policy perspective throughout the QMRA process.

2. Freshwater Creek: Tecolote Creek QMRA. The City of San Diego is in the early stages of conducting a QMRA in the Tecolote Creek watershed. The City’s QMRA is designed to (a) identify the dominant FIB sources, (b) characterize the risks of gastrointestinal illness associated with those sources and, if appropriate, (c) develop and propose site-specific water quality objectives that would be protective of water contact beneficial uses in the creek. Since June 2013, San Diego Water Board staff has been participating in the study by serving on the Regulatory Oversight Committee. The City’s QMRA is expected to be complete in March 2016. Depending upon its results, a proposed Basin Plan amendment to establish site-specific objectives in Tecolote Creek could be developed and considered.

Page 7: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

7

Existing Total Maximum Daily Load (TMDL) provision to account for natural sources of FIB. The issue of wildlife-impacted recreation was initially raised during the 2004 Basin Plan Triennial Review. In 2008 the San Diego Water Board formally recognized that bacteria loading from natural uncontrollable sources alone, such as wildlife feces, can sometimes cause exceedance of FIB water quality objectives. The Board adopted a Basin Plan amendment to incorporate implementation provisions for FIB within the context of a bacteria total maximum daily load (TMDL). In brief, the amendment authorizes the San Diego Water Board to allow some exceedances of FIB water quality objectives in areas with an adopted bacteria TMDL if anthropogenic sources of FIB have been controlled, and if dischargers can demonstrate that (a) FIB densities are consistent with those of a reference system, or (b) all anthropogenic FIB sources have been controlled and residual FIB densities do not pose a human health risk. The implementation provisions, referred to as the “Reference System and Antidegradation Approach” and the “Natural Sources Exclusion Approach” are described in more detail in the Basin Plan (page 4-104) at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/basin_plan/index.shtml or at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/basin_plan/issue_7.shtml QMRA provides an important method by which human health risk can be assessed. Future statewide provision to account for natural sources of FIB. The State Water Board is considering updating its REC-1 water quality standards based, in part, on its review of the 2012 USEPA Recreational Water Quality Criteria. The updated standards may include a provision to account for natural sources of FIB. The State Water Board’s updated standards will be the subject of a future executive officer report. Staff continues to work on other suggestions identified during the 2011 Basin Plan Triennial Review. 2011 Basin Plan Triennial Review: http://www.waterboards.ca.gov/sandiego/water_issues/programs/basin_plan/tri_review.shtml 2012 USEPA Recreational Water Quality Criteria fact sheet: http://water.epa.gov/scitech/swguidance/standards/criteria/health/recreation/upload/factsheet2012.pdf

5. Salt and Nutrient Management Planning Workshop (Attachment B-5) Staff Contacts: Fisayo Osibodu and John Odermatt The State Water Board’s 2009 Recycled Water Policy (Policy) requires local stakeholders to develop salt and nutrient management plans (SNMPs) for each groundwater basin across the State by May 2014. The San Diego Water Board hosted a salt and nutrient management planning workshop at the San Diego County Water Authority Office on Thursday, July 18, 2013.

Page 8: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

8

The workshop was attended by representatives from municipal water and wastewater agencies in the San Diego Region, San Diego County Water Authority staff, Fisayo Osibodu and John Odermatt of the San Diego Water Board, and Diane Barclay of the State Water Board. The highlight of the workshop was the updates on the development of salt and nutrient management planning efforts for the following basins (see map below): Lead Agency Basin City of San Diego San Pasqual Valley United States Marine Corps Camp Pendleton Lower Santa Margarita Padre Dam Municipal Water District Santee Rincon Del Diablo Municipal Water District Escondido Ramona Municipal Water District Gower Rancho California Water District Temecula South Orange County Wastewater Authority San Juan The agency presentations included preliminary information on the following topics:

• major sources of salts and nutrients in the basins, • salt and nutrient mass balance results, • general approach used to calculate assimilative capacity including key assumptions, • key implementation measures needed to meet water quality objectives in the basin, • key monitoring plan elements, • recommended basin plan amendments, and • plan completion date.

All of the agencies listed above are on schedule to complete their SNMPs before the May 2014 deadline. During the workshop the San Diego Water Board discussed the process for amending the Basin Plan once the SNMPs are completed. The Policy requires Regional Water Boards to revise their Basin Plan implementation plans (Chapter 4)1 based on SNMPs for those groundwater basins “where water quality objectives for salts and nutrients are being, or are threatening to be, exceeded.” SNMPs might also recommend modification of beneficial uses (Chapter 2), and/or water quality objectives (Chapter 3) in the Basin Plan. The scientific foundations of Basin Plan amendments must undergo scientific peer review. The State Water Board staff outlined the Basin Plan approval process at the State level and discussed the peer review process during the workshop. The Basin Plan amendments which will be based on the SNMPs will be considered for adoption at a future scheduled San Diego Water Board meeting. The workshop also provided San Diego Water Board staff with an opportunity to discuss with lead agencies their

1 On line at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/basin_plan/index.shtml

Page 9: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

9

progress to date on SNMPs, and to get preliminary information to estimate the Basin Planning workload following completion of the SNMPs.

6. Enforcement Actions for June 2013 Staff Contact: Chiara Clemente During the month of June 2013, the San Diego Water Board issued the following enforcement actions:

June 2013 Enforcement Actions Number Administrative Civil Liability Complaint 1 Notices of Violations 2 Staff Enforcement Letters 1 Total 4 A summary of recent regional enforcement actions is provided below. Additional information on violations, enforcement actions, and mandatory minimum penalties is available to the public from the following on-line sources: State Water Board Office of Enforcement webpage: http://www.waterboards.ca.gov/water_issues/programs/enforcement/ California Integrated Water Quality System (CIWQS): http://www.waterboards.ca.gov/water_issues/programs/ciwqs/publicreports.shtml State Water Board GeoTracker database: https://geotracker.waterboards.ca.gov/ Administrative Civil Liability Complaint Enniss Inc., Lakeside On June 14, 2013, the San Diego Water Board issued Complaint No. R9-2013-0051 to Enniss Inc. in the amount of $5,950 for violations resulting from Enniss Inc.’s failure to submit the Fiscal Year 2010-2011 annual monitoring report, as required by the Statewide Industrial Storm Water Permit, Order No. 97-03-DWQ, National Pollutant Discharge Elimination System (NPDES) General Permit No. CAS000001, Waste Discharge Requirements (WDRs) for Discharges of Storm Water Associated with Industrial Activities Excluding Construction Activities. The San Diego Water Board will hold a hearing on the complaint on August 14, 2013.

Page 10: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

10

Notices of Violation Jim and Dan Pike, Riverside County Notice of Violation (NOV) No. R9-2013-0089 was issued to Messrs. Jim and Dan Pike on June 3, 2013 for violation of Water Code sections 13260 and 13264, and provisions of the Water Quality Control Plan for the San Diego Basin (Basin Plan). The NOV alleges that the two parties failed to submit a Report of Waste Discharge prior to initiating a new discharge of waste. The discharge resulted in an estimated 432,720 cubic yards of green waste material being improperly disposed on 162 acres of land in Riverside County. AIM Inc. Ranch, Temecula Notice of Violation No. R9-2013-0114 was issued to Mr. Martin Wildgoose of AIM Inc. Ranch on June 19, 2013 for violation of Water Code sections 13260 and 13264. The NOV alleges that Mr. Wildgoose failed to submit a report of waste discharge or obtain Waste Discharge Requirements, or Waiver(s) thereof, for discharges from agricultural and nursery operations from his 35-acre avocado grove. Staff Enforcement Letters (SEL) University of California San Diego, Scripps Institution of Oceanography An SEL was issued to University of California San Diego, Scripps Institution of Oceanography on June 17, 2013 for a reporting violation of NPDES Order No. R9-2005-0008. Effluent flow from Outfall No. 1 was not monitored on a continuous basis from January 25-29, 2013 because the flow meter failed as a result of a power outage.

7. Sanitary Sewer Overflows (SSOs) May – June 2013 (Attachment B-7) Staff Contact: Chris Means The following is a summary of the sewage spills occurring during May through June 2013 and reported and certified by June 30, 2013. Sewage collection agencies report Sanitary Sewer Overflows (SSOs) on-line using the State Water Board’s CIWQS database pursuant to the requirements of State Water Board Order No. 2006-0003-DWQ (General Statewide Waste Discharge Requirements for Sewage Collection Agencies). Reports on sewage spills are available on a real-time basis to the public from the State Water Board's webpage at: https://ciwqs.waterboards.ca.gov/. Public Spills: During May 2013, there were 13 SSOs from public systems in the San Diego Region reported in the CIWQS database. These SSOs included 2 spills of 1,000 gallons or more and 3 spills reaching surface waters, including storm drains. The combined total volume of reported sewage spilled from all publicly-owned collection systems for the month of May 2013 was 36,507 gallons.

Page 11: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

11

During June 2013, there were 8 SSOs from public systems in the San Diego Region reported in the CIWQS database. These SSOs included 1 spill of 1,000 gallons or more and 5 spills that reached surface waters including storm drains. The combined total volume of sewage spills reported from all publicly-owned collection systems for the month of June 2013 was 3,905 gallons. Reported Private Spills: Eighteen discharges of untreated sewage from private laterals were reported during May through June 2013 by the collection agencies pursuant to San Diego Water Board Order No. R9-2007-0005 (Waste Discharge Requirements for Sewage Collection Agencies in the San Diego Region). These private lateral spills included no spills of 1,000 gallons or more and 5 spills that reached surface waters, including storm drains. The combined total volume of reported sewage discharges from private lateral systems for the months of May through June 2013 was 1,367 gallons. May – June 2012 and 2013 Rainfall Comparison:

Month Rainfall Total (In.) Public SSOs Private SSOs

May 2012 0.02 8 13 May 2013 0.26 13 12 June 2012 Trace 12 4 June 2013 0.0 8 6

Attached are three tables titled: 1. “May 2013 Summary of Public Sanitary Sewer Overflows in Region 9” 2. “June 2013 Summary of Public Sanitary Sewer Overflows in Region 9” 3. “May - Jun 2013 Summary of Private Lateral Sewage Discharges in Region 9” Additional information about the San Diego Water Board SSO regulatory program is available at: http://www.waterboards.ca.gov/sandiego/programs/sso.html.

Page 12: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

12

8. Clean Water Act Section 401 Water Quality Certification Actions Taken from April to June 2013 (Attachment B-8)

Staff Contact: Kelly Dorsey

Section 401 of the Clean Water Act (CWA) requires that any person applying for a federal permit, which may result in a discharge of pollutants into waters of the United States, obtain a water quality certification (401 Certification) that the specific activity complies with all applicable state water quality standards, limitations, requirements, and restrictions. The most common federal permit that requires a 401 Certification is a CWA Section 404 permit, most often issued by the Army Corps of Engineers, for the placing of fill (sediment, rip rap, concrete, pipes, etc.) in waters of the U.S. (i.e. ocean, bays, lagoons, rivers and streams). Upon receipt of a complete 401 Certification application, the San Diego Water Board may either certify the project or deny certification, with or without prejudice. In cases where there are impacts to waters of the U.S., the San Diego Water Board may issue a conditional certification. The certification can be either in the form of a conditional certification document approved by the Executive Officer, or Waste Discharge Requirements (WDRs) adopted by the San Diego Water Board. In the case where a federal permit is not required because impacts have been determined to be only to waters of the State, the San Diego Water Board may adopt WDRs. Table B-7 (attached) contains a list of actions taken during the months of April, May, and June 2013. The first page of the Table summarizes the total impacts to jurisdictional waters, and proposed mitigation, for the individual months and quarter. This information is an imprecise measure of the actual conditions. For example, the data can be skewed depending on what is considered “self-mitigating” and how mitigation is categorized (i.e. establishment, restoration, or enhancement). Another limitation is that the data relies on the assumption that all the mitigation required is implemented and successful, and does not take into consideration any additional impacts resulting from illegal fill activities. In July 2013 the San Diego Water Board’s 401 Certification web site was revised and updated to make the available information more organized and user friendly. Enhancements to the web site include an updated 401 Certification Application Form, a revised 401 Certification Public Notice that lists all Certification applications that are available for public comment, an updated 401 Certification Program staff contact list, and the ability to sign up for the San Diego Water Board 401 Certification Program email subscription list. Public notices for 401 Certification applications can be found on the San Diego Water Board 401 Certification web site at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/401_certification/index.shtml .

Page 13: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

13

401 Certifications issued since January 2008 can also be found on the San Diego Water Board web site at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/401_certification/401projects.shtml . For a complete list of State Water Board issued general orders, please refer to http://www.waterboards.ca.gov/water_issues/programs/cwa401/generalorders.shtml .

9. Completion of Las Pulgas Landfill Phase II Waste Management Unit Staff Contact: Amy Grove The U.S. Marine Corps (USMC) recently completed constructing the Phase II waste management unit (Unit) of the Las Pulgas Landfill which added approximately 13 acres of air space and allows for an additional 512,000 tons of capacity for waste disposal. The newly constructed unit is shown in the photograph below. The San Diego Water Board completed its review of the final construction quality assurance report and the certification inspection for the Phase II Unit of the landfill, and deemed the unit ready to receive wastes.

New Phase II Unit at the Las Pulgas Landfill

Page 14: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

14

Completion of the Phase II Unit is an essential component of the USMC’s corrective action plan for the liner system in the Phase I Unit that was damaged in 2003. The San Diego Water Board issued a Cleanup and Abatement Order in 2006, requiring the USMC to submit a corrective action plan and then implement the preferred alternative. The corrective action plan calls for the complete removal of approximately 171,750 tons of wastes from of the Phase I Unit to the Phase II Unit in order to expose the damaged liner system so it can be removed. The defective liner system components and any underlying contaminated soils will also be disposed of in the Phase II Unit. In 2003 the Phase I Unit experienced a slope failure that compromised its composite liner system. The USMC voluntarily shut down operation of the Phase I Unit and shifted waste disposal operations to the legacy, or unlined portion of the landfill. The removal of wastes from the Phase I Unit commenced on July 8, 2013, and the USMC anticipates that it will take approximately six to twelve months to complete corrective actions for the Phase I Unit. These corrective actions will include the removal of wastes and the damaged liner system, excavation of contaminated soils (if applicable), and confirmation sampling. The USMC plans to re-construct the Phase I Unit at the Las Pulgas Landfill upon completion of corrective actions.

Page 15: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Executive Officer’s Report August 14, 2013

15

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD

SAN DIEGO REGION

Significant NPDES Permits, WDRs, and Actions of the San Diego Water Board

August 14, 2013

APPENDED TO EXECUTIVE OFFICER’S REPORT

Page 16: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

DATE OF REPORTAugust 8, 2013

TENTATIVE SCHEDULESIGNIFICANT NPDES PERMITS, WDRS, AND ACTIONS

OF THE SAN DIEGO WATER BOARD

16 8/8/2013 11:51 AM

Action Agenda Item Action Type Draft Complete

Written Comments Due

Consent Item

September 2013

No Meeting Scheduled

October 2013

No Meeting Scheduled

November 13, 2013

San Diego Water Board Office*

Tentative Resolution Endorsing the San Diego Water Board Practical Vision (Gibson) Tentative Resolution 50% NA NA

Marine Corps Base Camp Pendleton, Southern Regional Teritary Treatment Plant, Order No. R9-2013-0112 (Lim) NPDES Reissuance 85% TBD Maybe

Assessment of Civil Liability for Eniss, Inc, San Diego County (Rodriguez)

Administrative Civil Liability 100% TBD Yes

December 11, 2013

San Diego Water Board Office*

Revision to WDRs for Former Omar Rendering Class I Landfill Order No. 97-40 (Tamaki ) WDR Addendum 0% TBD No

Administrative Civil Liability against the City of La Mesa, Sanitary Sewer Overflows to San Diego Bay via Chollas

Creek, and to the Pacific Ocean via Alvarado Creek and the San Diego River (Griffey)

Administrative Civil Liability 50% TBD No

*As of September 30, 2013, the San Diego Water Board will be located at 2375 Northside Drive, Suite 100, San Diego, CA 92108.

Page 17: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Attachment B-5

17

Map Showing Location of Groundwater Basins1

1 The above map can be found on line at: http://www.water.ca.gov/groundwater/bulletin118/south_coast.cfm

Temecula

Escondido

San Pasqual valley

San Juan

Santee

Santa Margarita

Page 18: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Attachment B-7a

18

Responsible Agency

Collection System

Total Number of SSO

locations

Total Vol of SSOs (gal)

Total Vol Recovered

(gal)

Total Vol Reaching Surface Water

Percent Recovered

Percent Reaching Surface Water

Miles of Pressure

Sewer

Miles of Gravity Sewer

Miles of Laterals

El Toro Water District

El Toro Water District R9 CS 1 180 0 180 0 100 5 142 36

Fallbrook Public Utility Dist

Fallbrook Plant 1, Oceanside

CS 1 33,000 0 33,000 0 100 4.6 76.8 0

San Diego City San Diego City CS 1 1,025 425 600 41 58 145 3,002 2,000

Carlsbad MWD Carlsbad MWD CS 1 100 80 0 80 0 4.8 282 0

Eastern Municipal Water District

Temecula Valley RCS 1 200 0 0 0 0 22 457 0

La Mesa City City of La Mesa CS 1 12 12 0 100 0 0 155 0

Laguna Beach City City Of Laguna Beach CS 2 300 20 0 6 0 4.5 95 0

Moulton Niguel Water District

Moulton Niguel Water District

CS 2 325 325 0 100 0 20 510 0

Rancho Santa Fe Community

Services District

Santa Fe Valley CS 1 250 250 0 100 0 2 14.2 0

San Diego City San Diego City CS 1 240 240 0 100 0 145 3,002 2,000

San Diego County Public Works

County Of San Diego CS 1 875 875 0 100 0 4 371 64

TOTALS 13 36507 2227 33780 356.9 8107 4100

CS = Collection System

Category 1 SSO = All discharges of sewage from a sanitary sewer system that exceed 1000 gallons, or result in a discharge to a surface water, or discharge to a storm drainpipe that was not fully captured and returned to the sanitary sewer system.

Category 2 SSO = All other discharges of sewage resulting from a failure in the sanitary sewer system

May 2013 - Summary of Public Sanitary Sewer Overflows in Region 9

Category 1 SSO

Category 2 SSO

Page 19: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Attachment B-7b

19

Responsible Agency

Collection System

Total Number of SSO

locations

Total Vol of SSOs (gal)

Total Vol Recovered

(gal)

Total Vol Reaching Surface Water

Percent Recovered

Percent Reaching Surface Water

Miles of Pressure

Sewer

Miles of Gravity Sewer

Miles of Laterals

Laguna Beach City

City Of Laguna Beach CS 1 30 30 1 100 3 4.5 95 0

San Diego City San Diego City CS 2 2,650 2,110 315 79 11 145 3,002 2,000

UC San Diego University Of

California, San Diego CS

1 100 0 25 0 25 1 25 3

Vista City City Of Vista CS 1 85 0 85 0 100 0.2 215.1 0

La Mesa City City Of La Mesa CS 2 290 200 0 68 0 155 0 1

Marine Corps Base, Camp Pendleton

Usmc Base, Camp

Pendleton CS 1 750 750 0 100 0 63.4 108.3 80

TOTALS 8 3905 3090 426 368.6 3445.4 2084

CS = Collection System

Category 1 SSO = All discharges of sewage from a sanitary sewer system that exceed 1000 gallons, or result in a discharge to a surface water, or discharge to a storm drainpipe that was not fully captured and returned to the sanitary sewer system.

Category 2 SSO = All other discharges of sewage resulting from a failure in the sanitary sewer system

June 2013 - Summary of Public Sanitary Sewer Overflows in Region 9

Category 1 SSO

Category 2 SSO

Page 20: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Attachment B-7c

20

Reporting Agency

Collection System

Total Number of PLSD locations

Total Vol of PLSDs (gal)

Total Vol Recovered

(gal)

Total Vol Reaching

Surface WaterPercent

Recovered

Percent Reaching Surface Water

Miles of Private Lateral

Imperial Beach City

City Of Imperial Beach CS 1 300 100 200 33 66 103

Leucadia Wastewater

District

Leucadia Wastewater District CS

2 23 10 13 43 56 300

San Clemente City

City of San Clemente CS 1 65 0 65 0 100 0

San Diego City San Diego City CS 1 50 50 1 100 2 4,049

Carlsbad MWD Carlsbad MWD CS 3 86 0 0 0 0 NA.0

Chula Vista City City of Chula Vista CS 2 50 0 0 0 0 0

El Cajon City City of El Cajon CS 2 20 20 0 100 0 226

Escondido City Harrf Disch To San Elijo CS 2 220 220 0 100 0 83.2

Leucadia Wastewater

District

Leucadia Wastewater District CS

1 3 0 0 0 0 300

Ramona MWD San Vicente Treatment Plant CS

1 200 200 0 100 0 57

San Diego City San Diego City CS 1 300 300 0 100 0 4,049.00

Solana Beach City

City of Solana Beach CS 1 50 50 0 100 0 28

TOTAL 18 1367 950 279 9195.2

PLSD = Private Lateral Sewage Discharge

Category 1 PLSD = All discharges of sewage from a private sewer lateral that exceed 1000 gallons, or result in a discharge to a surface water, or discharge to a storm drainpipe that was not fully captured and returned to the sanitary sewer system.

Category 2 PLSD= All other discharges of sewage resulting from a failure of a private sewer lateral

May - Jun 2013 Summary of Private Lateral Sewage Discharges in Region 9

Category 1 PLSD

Category 2 PLSD

Page 21: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 21

-

Rep

ortin

g Pe

riod

Perm

anen

t Im

pact

s7 (A

cres

) Te

mpo

rary

Impa

cts7

(Acr

es)

Esta

blis

hmen

t M

itiga

tion8

(Acr

es)

Res

tora

tion

Miti

gatio

n9 (A

cres

)

Enha

ncem

ent

Miti

gatio

n10

(Acr

es)

Pres

erva

tion

Miti

gatio

n11

(Acr

es)

Apr

il 0.

39

1.08

1.

3 0.

57

0.74

0

May

0.

172

1.39

7 0.

106

1.38

8 0.

24

0 Ju

ne

0.13

3 4.

236

0.5

4.19

4 0

38.9

4 Q

uart

erly

To

tal

0.69

5 6.

713

1.90

6 6.

152

0.98

38

.94

YTD

TO

TAL

1.93

8 8.

979

5.86

5 8.

502

2.63

2 39

.43

1.

C

ertif

icat

ions

can

be

low

impa

ct, c

ondi

tiona

l, or

pro

gram

mat

ic.

Low

impa

ct c

ertif

icat

ions

are

issu

ed to

pro

ject

s th

at h

ave

min

imal

pot

entia

l to

adve

rsel

y im

pact

w

ater

qua

lity.

Con

ditio

nal c

ertif

icat

ions

are

issu

ed to

pro

ject

s th

at h

ave

the

pote

ntia

l to

adve

rsel

y im

pact

wat

er q

ualit

y, b

ut b

y co

mpl

ying

with

tech

nica

l co

nditi

ons,

will

hav

e m

inim

al im

pact

s. P

rogr

amm

atic

cer

tific

atio

ns a

re c

ondi

tiona

l cer

tific

atio

ns is

sued

to p

roje

cts

with

like

, rec

urrin

g, o

r lon

g-te

rm im

pact

s,

ther

eby

requ

iring

con

tinuo

us o

vers

ight

. 2.

In

cas

es w

here

the

Sta

te W

ater

Res

ourc

es C

ontro

l Boa

rd h

as is

sued

a p

rogr

amm

atic

cer

tific

atio

n (S

tate

Cer

tific

atio

n), t

he R

egio

nal W

ater

Boa

rds

are

resp

onsi

ble

for r

evie

win

g pr

ojec

ts in

thei

r are

a to

con

firm

whe

ther

they

qua

lify

for e

nrol

lmen

t in

the

prog

ram

mat

ic c

ertif

icat

ions

.

3.

Tim

e E

xpire

d re

fers

to p

roje

cts

that

may

pro

ceed

due

to th

e la

ck o

f an

actio

n by

the

San

Die

go W

ater

Boa

rd w

ithin

spe

cifie

d re

gula

tory

tim

elin

es.

4.

Am

endm

ents

are

revi

sion

s to

cer

tific

atio

ns th

at h

ave

been

issu

ed.

5.

W

ithdr

awn

refe

rs to

pro

ject

s th

at th

e ap

plic

ant o

r San

Die

go W

ater

Boa

rd h

ave

with

draw

n du

e to

pro

cedu

ral i

ssue

s no

t cor

rect

ed w

ithin

one

yea

r. 6.

D

enia

ls a

re is

sued

whe

n a

proj

ect w

ill a

dver

sely

impa

ct w

ater

qua

lity

and

suita

ble

miti

gatio

n m

easu

res

are

not p

ropo

sed

or p

ossi

ble.

7.

P

erm

anen

t im

pact

s (P

) res

ult i

n a

perm

anen

t fill

or l

oss

of w

etla

nd fu

nctio

n an

d va

lue.

Tem

pora

ry im

pact

s (T

) are

exp

ecte

d to

retu

rn to

thei

r orig

inal

con

ditio

n w

ithin

one

yea

r. 8.

E

stab

lishm

ent i

s de

fined

as

the

crea

tion

of v

eget

ated

or u

nveg

etat

ed w

ater

s of

the

Uni

ted

Sta

tes

and/

or S

tate

whe

re th

e re

sour

ce h

as n

ever

pre

viou

sly

exis

ted

(e.g

. con

vers

ion

of n

onna

tive

gras

slan

d to

a fr

eshw

ater

mar

sh).

9.

R

esto

ratio

n is

div

ided

into

two

activ

ities

, re-

esta

blis

hmen

t and

reha

bilit

atio

n. R

e-es

tabl

ishm

ent i

s de

fined

as

the

retu

rn o

f nat

ural

/his

toric

func

tions

to a

site

w

here

veg

etat

ed o

r unv

eget

ated

wat

ers

of th

e U

nite

d S

tate

s an

d/or

Sta

te p

revi

ousl

y ex

iste

d (e

.g.,

rem

oval

of f

ill m

ater

ial t

o re

stor

e a

drai

nage

). R

ehab

ilita

tion

is d

efin

ed a

s th

e im

prov

emen

t of t

he g

ener

al s

uite

of f

unct

ions

of d

egra

ded

vege

tate

d or

unv

eget

ated

wat

ers

of th

e U

nite

d S

tate

s an

d/or

Sta

te (e

.g.,

rem

oval

of

a h

eavy

infe

stat

ion

or m

onoc

ultu

re o

f exo

tic p

lant

spe

cies

from

juris

dict

iona

l are

as a

nd re

plac

ing

with

nat

ive

spec

ies)

.

10.

Enh

ance

men

t is

defin

ed a

s th

e im

prov

emen

t to

one

or tw

o fu

nctio

ns o

f exi

stin

g ve

geta

ted

or u

nveg

etat

ed w

ater

s of

the

Uni

ted

Sta

tes

and/

or S

tate

(e.g

., re

mov

al o

f sm

all p

atch

es o

f exo

tic p

lant

spe

cies

from

an

area

con

tain

ing

pred

omin

antly

nat

ural

pla

nt s

peci

es).

11

. P

rese

rvat

ion

is d

efin

ed a

s th

e ac

quis

ition

and

lega

l pro

tect

ion

from

futu

re im

pact

s in

per

petu

ity o

f exi

stin

g ve

geta

ted

or u

nveg

etat

ed w

ater

s of

the

Uni

ted

Sta

tes

and/

or S

tate

(e.g

., co

nser

vatio

n ea

sem

ent).

Rep

ortin

g Pe

riod

Cer

tific

atio

n A

pplic

atio

ns

Rec

eive

d C

ertif

icat

ions

Is

sued

1 En

rollm

ent I

n St

ate

Cer

tific

atio

ns2

Cer

tific

atio

ns

Tim

e Ex

pire

d3 C

ertif

icat

ion

Am

endm

ents

4 C

ertif

icat

ion

With

draw

als5

Cer

tific

atio

n an

d W

DR

D

enia

ls Is

sued

6 A

pril

15

0 2

1 2

0 0

May

7

1 0

3 1

0 0

June

10

2

1 3

1 1

1 Q

uart

erly

To

tal

32

3 3

7 4

1 1

YTD

TO

TAL

50

9 4

14

8 1

1

Page 22: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 22

-

DAT

E A

PPLI

CA

NT

PRO

JEC

T TI

TLE

PRO

JEC

T D

ESC

RIP

TIO

N

WAT

ERB

OD

Y IM

PAC

T

(Acr

es)1

MIT

IGAT

ION

(A

cres

)1 C

ERTI

FIC

ATIO

N

AC

TIO

N2

4/5/

2013

M

r. Ke

ith R

hode

s

(Kei

th B

. Rho

des

Livi

ng T

rust

)

Rho

des

Cro

ssin

g Pr

ojec

t

The

147-

acre

pro

pose

d pr

ojec

t is

the

deve

lopm

ent o

f 112

sin

gle-

fam

ily re

side

ntia

l lot

s, 6

24 m

ulti-

fam

ily re

side

ntia

l uni

ts, s

elf-s

tora

ge

units

and

com

mer

cial

dev

elop

men

t.

Dee

r Can

yon

Cre

ek, t

ribut

ary

to M

cGon

igle

C

anyo

n C

reek

an

d an

un

nam

ed

tribu

tary

to L

os

Pena

squi

tos

Can

yon

Cre

ek

(P):

An

addi

tiona

l 0.0

2 ac

re W

etla

nd

impa

cts

for a

to

tal o

f 0.0

5 ac

re

(P):

A re

duct

ion

of 0

.02

acre

St

ream

bed

impa

cts

for a

to

tal o

f 0.1

7 ac

re

En

hanc

emen

t: M

itiga

tion

chan

ged

from

0.1

9 ac

re o

f st

ream

bed

to 0

.74

acre

of v

erna

l poo

ls

Res

tora

tion:

M

itiga

tion

chan

ged

from

0.0

3 ac

re o

f w

etla

nd to

0.3

0 ac

re o

f ve

rnal

poo

ls

04C

-082

Amen

dmen

t No.

1

Ord

er fo

r Te

chni

cally

-co

nditi

oned

C

ertif

icat

ion

Wai

ver o

f Was

te

Dis

char

ge

Req

uire

men

ts

4/22

/201

3 C

OM

PAC

FLT

Com

man

der U

S Pa

cific

Fle

et

(CO

MPA

CFL

T)

Activ

ities

#38

, 39,

41

, 42

and

Per

iodi

c Be

ach

Mai

nten

ance

The

activ

ities

pro

pose

d ar

e co

mpo

nent

s th

at s

uppo

rt lo

gist

ics-

over

-the-

shor

e tra

inin

g ac

tiviti

es.

The

train

ing

crea

tes

faci

litie

s or

op

erat

es fa

cilit

ies

on s

hore

, br

ingi

ng s

uppl

ies

and

mat

eria

ls

from

shi

p to

sho

re s

tagi

ng

poin

ts. T

he a

ctiv

ities

incl

ude

pile

dr

ivin

g, c

reat

ing

caus

eway

s, o

r the

us

e of

bul

ldoz

ers

on th

e be

ach

to a

ssem

ble

float

ing

pier

s.

San

Die

go B

ay,

Paci

fic

Oce

an

(T):

0.63

acr

e O

cean

Esta

blis

hmen

t: 1.

13

acre

s Ee

l Gra

ss

miti

gatio

n ba

nk c

redi

ts

purc

hase

d

R9-

2013

-001

9

Tim

e Ex

pire

d

4/25

/201

3 R

anch

o G

uejit

o C

orpo

ratio

n

Ran

cho

Gue

jito

Evap

otra

nspi

ratio

n St

udy

The

purp

ose

of th

is p

roje

ct is

to

inst

all t

empo

rary

trap

ezoi

dal f

lum

es

in G

uejit

o C

reek

to a

id in

an

evap

otra

nspi

ratio

n st

udy.

One

flu

me

will

be u

pstre

am a

nd th

e ot

her d

owns

tream

in o

rder

to

capt

ure

stre

am fl

ow lo

sses

or

diur

nal p

atte

rns

that

may

be

resu

ltant

of r

ipar

ian

evap

otra

nspi

ratio

n.

Gue

jito

Cre

ek

Not

app

licab

le

Not

app

licab

le

St

ate

Wat

er

Res

ourc

e C

ontro

l Bo

ard

401

Wat

er Q

ualit

y C

ertif

icat

ion

of 2

012

Nat

ionw

ide

Perm

its

Page 23: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 23

-

DAT

E A

PPLI

CA

NT

PRO

JEC

T TI

TLE

PRO

JEC

T D

ESC

RIP

TIO

N

WAT

ERB

OD

Y IM

PAC

T

(Acr

es)1

MIT

IGAT

ION

(A

cres

)1 C

ERTI

FIC

ATIO

N

AC

TIO

N2

4/25

/201

3 R

anch

o G

uejit

o C

orpo

ratio

n R

anch

o G

uejit

o Lo

w F

low

Stu

dy

The

purp

ose

of th

is p

roje

ct is

to

inst

all t

empo

rary

trap

ezoi

dal f

lum

es

in G

uejit

o C

reek

to a

id in

an

evap

otra

nspi

ratio

n st

udy.

One

flu

me

will

be u

pstre

am a

nd th

e ot

her d

owns

tream

in o

rder

to

capt

ure

stre

am fl

ow lo

sses

or

diur

nal p

atte

rns

that

may

be

resu

ltant

of r

ipar

ian

evap

otra

nspi

ratio

n. T

he fl

umes

will

be u

sed

to c

aptu

re lo

w fl

ow e

vent

s (<

1.5c

fs) f

or c

ompa

rison

to

cont

inuo

us s

tream

sta

ge

mea

sure

men

ts.

Gue

jito

Cre

ek

Not

app

licab

le

Not

app

licab

le

Stat

e W

ater

R

esou

rce

Con

trol

Boar

d

40

1 W

ater

Qua

lity

Cer

tific

atio

n O

f 201

2 N

atio

nwid

e Pe

rmits

4/29

/201

3

San

Die

go

Cou

nty

Dep

artm

ent o

f Pu

blic

Wor

ks

Woo

dsid

e A

venu

e D

rain

age

Impr

ovem

ent

Proj

ect

Amen

ded

to u

pdat

e th

e im

pact

and

m

itiga

tion

requ

irem

ents

. Th

e pr

ojec

t pro

pose

s to

repl

ace

the

exis

ting

parti

ally

und

ergr

ound

sto

rm

wat

er d

rain

age

syst

em p

aral

lel t

o W

oods

ide

Ave

nue

with

an

upgr

aded

und

ergr

ound

dra

inag

e sy

stem

for a

ppro

xim

atel

y 1,

800

feet

an

d co

nstru

ct tw

o 14

' x 5

' box

cu

lver

ts th

at w

ould

tran

spor

t su

rface

wat

er fl

ows

unde

r Sta

te

Rou

te 6

7 (S

R 6

7) fo

r a d

ista

nce

of

appr

oxim

atel

y 34

0 fe

et.

Unn

amed

tri

buta

ry to

the

San

Die

go R

iver

(P):

Adde

d 0.

17

acre

of W

etla

nd

Impa

cts

for a

to

tal o

f 0.2

4 ac

re

(T

): Ad

ded

0.45

ac

re o

f wet

land

im

pact

s fo

r a

tota

l of 0

.53

acre

Es

tabl

ishm

ent:

Adde

d 0.

17 a

cre

of

fresh

wat

er m

arsh

(o

nsite

) for

a to

tal o

f 0.

24 a

cre

Res

tora

tion:

Add

ed

0.27

acr

e of

wet

land

s (o

ffsite

) for

a to

tal o

f 0.

48 a

cre

10C

-114

Amen

dmen

t No.

2

Ord

er fo

r Te

chni

cally

-co

nditi

oned

C

ertif

icat

ion

Enro

llmen

t in

SWR

CB

GW

DR

O

rder

No.

200

3-17

D

WQ

5/14

/201

3 O

rang

e C

ount

y Pu

blic

Wor

ks

Brid

ge N

o. 5

5C-

0008

Mai

nten

ance

Pr

ojec

t

The

purp

ose

of th

is p

roje

ct is

to

repa

ir da

mag

e to

the

brid

ge in

or

der t

o ex

tend

its

long

evity

. Brid

ge

55C

-000

8 is

loca

ted

alon

g Tr

abuc

o C

anyo

n R

oad

and

is th

e m

ain

road

th

at c

onne

cts

the

cany

on re

side

nts

to th

e C

ity o

f Ran

cho

Sant

a M

arga

rita.

Trab

uco

Cre

ek

(P):

0.01

acr

e of

St

ream

bed

No

miti

gatio

n pr

opos

ed

R9-

2013

-003

7

Tim

e Ex

pire

d

Page 24: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 24

-

DAT

E A

PPLI

CA

NT

PRO

JEC

T TI

TLE

PRO

JEC

T D

ESC

RIP

TIO

N

WAT

ERB

OD

Y IM

PAC

T

(Acr

es)1

MIT

IGAT

ION

(A

cres

)1 C

ERTI

FIC

ATIO

N

AC

TIO

N2

5/16

/201

3 R

anch

o M

issi

on

Viej

o

Cow

Cam

p R

oad,

Tr

ail,

and

Asso

ciat

ed U

tiliti

es

Con

stru

ctio

n of

Cow

Cam

p R

oad,

an

eas

t-wes

t arte

rial h

ighw

ay

loca

ted

on th

e no

rth s

ide

of S

an

Juan

Cre

ek. T

he P

roje

ct w

ill c

onsi

st

of th

ree

com

pone

nts:

Cow

Cam

p R

oad,

incl

udin

g tw

o br

idge

s; a

C

lass

I B

ikew

ay (C

ow C

amp

Trai

l);

and

asso

ciat

ed w

et a

nd d

ry u

tiliti

es.

The

Cow

Cam

p R

oad

alig

nmen

t will

incl

ude

four

"T" s

igna

lized

in

ters

ectio

ns a

nd tw

o br

idge

s at

C

hiqu

ita C

reek

(Chi

quita

Brid

ges)

.

San

Juan

C

reek

, Chi

quita

C

reek

(P):

0.01

acr

e of

W

etla

nd

(P):

0.09

acr

e of

R

ipar

ian

(P):

0.05

7 ac

re

of S

tream

bed

(T):

0.86

9 ac

re

of W

etla

nd

(T):

0.50

0 ac

re

of R

ipar

ian

(T):

0.01

9 ac

re

of S

tream

bed

Esta

blis

hmen

t: 0.

01

acre

s of

Wet

land

an

d 0.

096

acre

s of

W

etla

nd/R

ipar

ian

Enha

ncem

ent:

0.24

ac

re a

rund

o re

mov

al

Res

tora

tion:

0.8

69

acre

of W

etla

nd, 0

.500

ac

re o

f Rip

aria

n, 0

.019

ac

re o

f Stre

ambe

d

12C

-067

Ord

er fo

r Te

chni

cally

-co

nditi

oned

C

ertif

icat

ion

Enro

llmen

t in

SWR

CB

GW

DR

O

rder

No.

200

3-17

D

WQ

5/26

/201

3 C

ity o

f San

C

lem

ente

Aven

ida

Col

umbo

St

orm

Dra

in

Exte

nsio

n

The

prop

osed

pro

ject

inte

nds

to

impr

ove

the

rout

ing

of s

torm

wat

er

flow

and

will

exte

nd a

n ex

istin

g st

orm

dra

in li

ne. A

new

abo

ve-

grou

nd 2

4'' H

DP

E pi

pe w

ill b

e co

nnec

ted

to e

xist

ing

pipe

s.

Unn

amed

tri

buta

ry to

Se

gund

a D

eshe

cha

Can

ada

(P):

0.00

1464

ac

re o

f Wet

land

(T):

0.00

924

acre

of W

etla

nd

No

miti

gatio

n pr

opos

ed

R9-

2013

-004

6

Tim

e Ex

pire

d

5/30

/201

3

Dou

glas

E.

Barn

hart,

M

aken

a M

edic

al

Build

ings

Te

mec

ula,

LLC

Hal

con

Roj

o M

edic

al

The

purp

ose

of th

e pr

ojec

t is

to

deve

lop

a gr

aded

, vac

ant s

ite in

to

med

ical

offi

ces.

To

com

plet

e th

e pr

ojec

t, st

orm

wat

er ru

noff

impr

ovem

ents

are

nee

ded

to

cont

rol r

unof

f fro

m th

e ad

jace

nt

prop

erty

to th

e ea

st a

nd th

e pr

opos

ed d

evel

opm

ent,

and

to

cont

inue

to d

irect

it to

the

flood

co

ntro

l cha

nnel

dis

char

ge p

oint

in

the

sout

hwes

tern

cor

ner o

f the

site

.

Tem

ecul

a C

reek

, trib

utar

y to

San

ta

Mar

garit

a R

iver

(P):

0.00

4 ac

re

of S

tream

bed

No

prop

osed

m

itiga

tion

R9-

2013

-005

3

Tim

e Ex

pire

d

Page 25: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 25

-

DAT

E A

PPLI

CA

NT

PRO

JEC

T TI

TLE

PRO

JEC

T D

ESC

RIP

TIO

N

WAT

ERB

OD

Y IM

PAC

T

(Acr

es)1

MIT

IGAT

ION

(A

cres

)1 C

ERTI

FIC

ATIO

N

AC

TIO

N2

5/31

/201

3 BA

E S

yste

ms

San

Die

go S

hip

Rep

air,

Inc.

BAE

Sys

tem

s Sa

n D

iego

Shi

p R

epai

r Pi

er 4

R

epla

cem

ent

This

Cer

tific

atio

n w

as a

men

ded

to

addr

ess

two

sepa

rate

item

s, o

ne is

an

incr

ease

to th

e es

timat

ed

volu

me

to b

e dr

edge

d an

d th

e se

cond

is to

cha

nge

the

met

hod

of

dred

ging

. The

Pie

r 4 R

epla

cem

ent

Proj

ect p

ropo

ses

to d

emol

ish

the

exis

ting

obso

lete

Pie

r 4 a

nd P

ier 5

st

ruct

ures

, rem

ove

five

dry-

dock

m

oorin

g do

lphi

ns, c

onst

ruct

thre

e ne

w b

ulkh

ead

sect

ions

, rel

ocat

e sh

orel

ine

infra

stru

ctur

e, c

ondu

ct

unde

rwat

er d

redg

ing,

and

con

stru

ct

a ne

w re

plac

emen

t pie

r and

a

moo

ring

dolp

hin.

San

Die

go B

ay

(P):

An in

crea

se

in d

redg

e vo

lum

e of

ap

prox

imat

ely

5,74

9 cu

bic

yard

fo

r a n

ew to

tal

of a

ppro

xim

atel

y 47

,657

cub

ic

yard

s

Miti

gatio

n w

ill in

crea

se

prop

ortio

nally

to

incr

ease

d dr

edge

vo

lum

e

11C

-026

Amen

dmen

t No.

1

Ord

er fo

r Te

chni

cally

-co

nditi

oned

C

ertif

icat

ion

En

rollm

ent i

n SW

RC

B G

WD

R

Ord

er N

o. 2

003-

17

DW

Q

6/7/

2013

C

a. D

ept.

of

Tran

spor

tatio

n D

istri

ct 1

2

Stat

e R

oute

74

Orte

ga H

ighw

ay

Stor

m D

rain

Rep

air

Proj

ect

The

proj

ect p

ropo

ses

to re

pair

and

prev

ent r

oadw

ay lo

sses

due

to

eros

ion.

Thi

s w

ill be

acc

ompl

ishe

d th

roug

h: 1

) Rem

oval

of e

xces

s sl

ide

debr

is m

ater

ial a

nd re

-gra

de

road

way

sho

ulde

r are

as to

its

orig

inal

con

ditio

n. 2

) The

pla

cem

ent

of 1

/4 to

n ro

ck b

etw

een

exis

ting

slop

e an

d ro

ck.

3) T

he p

lace

men

t of

Rei

nfor

ced

conc

rete

pip

e in

thre

e lo

catio

ns.

San

Juan

Cre

ek (P

): 0.

0025

acr

e of

Stre

ambe

d

(T):

0.04

2 ac

re

of S

tream

bed

Enha

ncem

ent:

Pr

ovid

ing

fund

s fo

r the

er

adic

atio

n of

inva

sive

aq

uatic

spe

cies

in S

an

Juan

Cre

ek

10C

-053

Ord

er fo

r Te

chni

cally

-co

nditi

oned

C

ertif

icat

ion

Enro

llmen

t in

SWR

CB

GW

DR

O

rder

No.

200

3-17

D

WQ

6/7/

2013

Pa

lom

ar

Com

mun

ity

Col

lege

Dis

trict

PCC

D S

an M

arco

s C

ampu

s Fa

cilit

ies

Mas

ter P

lan

The

over

all p

urpo

se o

f the

Mas

ter

Plan

is to

incr

ease

the

on-c

ampu

s ca

paci

ty to

acc

omm

odat

e th

e an

ticip

ated

gro

wth

in s

tude

nt

enro

llmen

t up

to a

max

imum

of

25,0

00 s

tude

nts

thro

ugh

the

year

20

22.

Con

stru

ctio

n w

ill in

clud

e a

Chi

ld D

evel

opm

ent C

ente

r, R

eloc

atio

n of

PE/

Athl

etic

Fie

lds,

San

Mar

cos

Cre

ek

(P):

0.03

acr

e of

St

ream

bed

Esta

blis

hmen

t: 0.

30

acre

s W

etla

nd/R

ipar

ian

miti

gatio

n cr

edits

from

th

e N

orth

Cou

nty

Hab

itat B

ank

(NC

HB)

Pr

eser

vatio

n:

Pres

erva

tion

and

mai

nten

ance

, in

10C

-013

Ord

er fo

r Te

chni

cally

-co

nditi

oned

C

ertif

icat

ion

Enro

llmen

t in

SWR

CB

GW

DR

Page 26: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 26

-

DAT

E A

PPLI

CA

NT

PRO

JEC

T TI

TLE

PRO

JEC

T D

ESC

RIP

TIO

N

WAT

ERB

OD

Y IM

PAC

T

(Acr

es)1

MIT

IGAT

ION

(A

cres

)1 C

ERTI

FIC

ATIO

N

AC

TIO

N2

and

Arbo

retu

m Im

prov

emen

ts.

perp

etui

ty, o

f 38.

94

acre

s of

coa

stal

sag

e sc

rub

Ord

er N

o. 2

003-

17

DW

Q

6/10

/201

3 U

SMC

En

viro

nmen

tal

Secu

rity

Nor

ther

n R

egio

nal

Terti

ary

Trea

tmen

t Pl

ant

The

purp

ose

of th

e pr

opos

ed

proj

ect i

s to

allo

w M

CBC

P to

pr

ovid

e ne

w a

nd u

pgra

ded

relia

ble

recl

aim

ed w

ater

and

was

tew

ater

sy

stem

s, a

nd w

aste

wat

er

conv

eyan

ce to

the

NR

TTP

and

treat

ed e

fflue

nt c

onve

yanc

e to

the

San

Ono

fre a

nd S

ierr

a O

ne

Perc

olat

ion

Basi

ns in

the

north

ern

porti

ons

of M

CB

CP.

Unn

amed

tri

buta

ry to

San

M

ateo

Cre

ek,

and

San

Mat

eo

Cre

ek

(T):

3.07

4 ac

res

of W

etla

nd

Res

tora

tion:

3.0

74

acre

s of

Wet

land

R

9-20

13-0

068

Ti

me

Expi

red

6/10

/201

3 U

SMC

En

viro

nmen

tal

Secu

rity

P-10

43 S

EA

proj

ect t

est w

ell

The

P-10

43 S

EA p

roje

ct p

ropo

ses

to c

onst

ruct

a te

st w

ell f

or th

e N

RTT

P, 4

milli

on g

allo

n pe

r day

se

wer

and

slu

dge

treat

men

t fac

ility.

Th

is te

st w

ell i

s re

quire

d to

co

mpl

ete

the

NPD

ES G

roun

dwat

er

disc

harg

e Pe

rmit

Ord

er R

9-20

08-

0002

.

San

Mat

eo

Cre

ek

(P):

0.00

0004

6 ac

re o

f St

ream

bed

No

miti

gatio

n pr

opos

ed

St

ate

Wat

er

Res

ourc

e C

ontro

l Bo

ard

401

Wat

er Q

ualit

y C

ertif

icat

ion

of 2

012

Nat

ionw

ide

Perm

its

6/11

/201

3 Th

e C

ity o

f San

M

arco

s Bo

rden

Roa

d an

d Br

idge

Pro

ject

Cha

nges

wer

e m

ade

to th

e C

ertif

icat

ion

to a

ddre

ss th

e U

.S.

Arm

y C

orps

of E

ngin

eers

’ req

uest

th

at th

e C

ertif

icat

ion

be a

men

ded

to

clar

ify th

e ne

ed fo

r a p

rese

rvat

ion

mec

hani

sm in

are

as n

ot u

nder

the

City

of S

an M

arco

s co

ntro

l. Th

e pr

opos

ed p

roje

ct is

the

cons

truct

ion

of a

brid

ge o

ver a

trib

utar

y to

San

M

arco

s C

reek

and

a s

hort

sect

ion

of ro

adw

ay o

n ei

ther

sid

e to

co

mpl

ete

Bord

en R

oad

betw

een

Twin

Oak

s Va

lley

Roa

d an

d W

oodw

ard

Stre

et (a

ppro

x. 7

00 fe

et

San

Mar

cos

Cre

ek, L

ake

San

Mar

cos,

Ba

tiqui

tos

Lago

on

No

chan

ges

to

Impa

cts

No

chan

ges

to

miti

gatio

n

09C

-041

Amen

dmen

t No.

1

Ord

er fo

r Te

chni

cally

-co

nditi

oned

C

ertif

icat

ion

Enro

llmen

t in

SWR

CB

GW

DR

O

rder

No.

200

3-17

D

WQ

Page 27: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 27

-

DAT

E A

PPLI

CA

NT

PRO

JEC

T TI

TLE

PRO

JEC

T D

ESC

RIP

TIO

N

WAT

ERB

OD

Y IM

PAC

T

(Acr

es)1

MIT

IGAT

ION

(A

cres

)1 C

ERTI

FIC

ATIO

N

AC

TIO

N2

tota

l).

6/19

/201

3 C

arls

bad

Can

tebu

ry H

OA

Car

lsba

d C

ante

rbur

y D

esilt

ing

Bas

in

Mai

nten

ance

Vege

tatio

n th

at is

han

ging

ove

r/int

o th

e de

silti

ng b

asin

will

be tr

imm

ed

back

, and

veg

etat

ion

that

is

grow

ing

with

in th

e ba

sin

itsel

f will

be c

ut d

own

to a

bove

gra

de le

vel

and

plac

ed in

to b

ins.

The

bas

in

botto

m w

ill be

exc

avat

ed fr

om th

e ac

cess

road

usi

ng a

bac

khoe

w

here

exc

ess

sedi

men

t will

be

lifte

d ou

t of t

he b

asin

and

pla

ced

into

bi

ns; a

ll ex

tract

ed m

ater

ial w

ill be

tra

nspo

rted

for d

ispo

sal a

t an

appr

oved

land

fill.

Agua

Hed

iond

a C

reek

N

ot a

pplic

able

. N

ot a

pplic

able

. 11

C-0

13

W

ithdr

awn

6/19

/201

3

Foot

hill/

Eas

tern

Tr

ansp

orta

tion

Cor

ridor

Age

ncy

(F/E

TCA)

Teso

ro E

xten

sion

This

is a

dre

dge

and

fill p

roje

ct th

at

wou

ld n

ot im

pact

wat

ers

of th

e U

nite

d St

ates

and

onl

y w

ater

s of

th

e St

ate;

ther

efor

e th

e ap

plic

ant

appl

ied

for W

aste

Dis

char

ge

Req

uire

men

ts.

The

Foot

hill/

Eas

tern

Tra

nspo

rtatio

n C

orrid

or A

genc

y (F

/ETC

A)

prop

osed

to c

onst

ruct

an

appr

oxim

ate

5.5

mile

long

ex

tens

ion

of th

e ex

istin

g St

ate

Rou

te (S

R) 2

41 (“

Teso

ro E

xten

sion

Pr

ojec

t”) fr

om it

s cu

rren

t ter

min

us

at O

so P

arkw

ay to

the

futu

re C

ow

Cam

p R

oad

imm

edia

tely

nor

th o

f SR

-74

in O

rang

e C

ount

y.

Unn

amed

tri

buta

ries

to

Chi

quita

Cre

ek

and

Gob

erna

dora

C

reek

Not

app

licab

le.

Not

app

licab

le.

R9-

2013

-000

7

Was

te D

isch

arge

R

equi

rem

ents

D

enie

d

Page 28: California Regional Water Quality Control Board€¦ · Baja California, Mexico and then ... On June 20, 2013, the San Diego Water Board informed the Court that USIBWC has complied

Atta

chm

ent B

-8

C

LE

AN

WA

TE

R A

CT

SE

CT

ION

401

WA

TE

R Q

UA

LIT

Y C

ER

TIF

ICA

TIO

N A

CT

ION

S FO

R T

HE

PE

RIO

D O

F A

PRIL

1, 2

013

TH

RO

UG

H J

UN

E 3

0, 2

013

- 28

-

DAT

E A

PPLI

CA

NT

PRO

JEC

T TI

TLE

PRO

JEC

T D

ESC

RIP

TIO

N

WAT

ERB

OD

Y IM

PAC

T

(Acr

es)1

MIT

IGAT

ION

(A

cres

)1 C

ERTI

FIC

ATIO

N

AC

TIO

N2

6/20

/201

3 U

SMC

, En

viro

nmen

tal

Secu

rity

BUI P

-109

4 C

ERS

3

The

purp

ose

of th

e pr

opos

ed a

ctio

n is

to (1

) pro

vide

new

and

upg

rade

re

liabl

e an

d co

mpl

iant

ele

ctric

al

dist

ribut

ion

syst

ems

to s

uppo

rt m

ilitar

y tra

inin

g an

d op

erat

ions

and

qu

ality

of l

ife s

ervi

ces

thro

ugho

ut

MC

BCP;

(2) p

rovi

de s

yste

m

redu

ndan

cy; (

3) re

plac

e ol

der a

nd

inad

equa

te d

istri

butio

n sy

stem

s.

Unn

amed

tri

buta

ry to

the

Sant

a M

arga

rita

Riv

er, P

ilgrim

C

reek

(P):

0.10

acr

es

of W

etla

nd

(T

): 1.

12 a

cres

of

Wet

land

Esta

blis

hmen

t: 0.

20

acre

s of

miti

gatio

n ba

nk c

redi

ts

Res

tora

tion:

1.1

2 ac

res

of W

etla

nd

R9-

2013

-007

0

Tim

e Ex

pire

d

6/27

/201

3 U

S N

avy

Poin

t Lo

ma

Publ

ic

Wor

ks

La P

laya

Are

a Em

erge

nt

Rem

edia

l Pip

elin

e

The

prop

osed

pro

ject

wou

ld p

rovi

de

tem

pora

ry c

over

ove

r are

as o

f the

M

iram

ar fu

el p

ipel

ine

that

hav

e be

com

e ex

pose

d du

e to

sig

nific

ant

eros

ion

from

land

war

d de

velo

pmen

t to

avo

id th

e po

tent

ial f

or a

fuel

spi

ll th

at c

ould

occ

ur v

ia c

orro

sion

of t

he

expo

sed

pipe

or e

xpos

ure

to o

ther

ex

tern

al fa

ctor

s. T

he p

ropo

sed

proj

ect i

s th

e te

mpo

rary

pla

cem

ent

of s

andb

ags

over

the

pipe

line

until

a

mor

e pe

rman

ent,

long

-term

so

lutio

n fo

r pip

elin

e pr

otec

tion

can

be im

plem

ente

d.

San

Die

go B

ay,

and

the

Paci

fic

Oce

an

(T):

1,32

0 lin

ear

feet

of A

CO

E Ju

risdi

ctio

nal

Wet

land

No

miti

gatio

n pr

opos

ed

R9-

2013

-006

9

Tim

e Ex

pire

d

1.

W

etla

nd re

fers

to v

eget

ated

wat

ers

of th

e U

nite

d S

tate

s an

d st

ream

bed

refe

rs to

unv

eget

ated

wat

ers

of th

e U

nite

d St

ates

(P) =

per

man

ent

impa

cts.

(T) =

tem

pora

ry im

pact

s.

2.

Lo

w im

pact

cer

tific

atio

n is

issu

ed to

pro

ject

s th

at h

ave

min

imal

pot

entia

l to

adve

rsel

y im

pact

wat

er q

ualit

y. C

ondi

tiona

l cer

tific

atio

n is

issu

ed to

pr

ojec

ts th

at h

ave

the

pote

ntia

l to

adve

rsel

y im

pact

wat

er q

ualit

y, b

ut b

y co

mpl

ying

with

tech

nica

l con

ditio

ns, w

ill ha

ve m

inim

al im

pact

s.

Den

ials

are

issu

ed w

hen

the

proj

ect w

ill ad

vers

ely

impa

ct w

ater

qua

lity

and

suita

ble

miti

gatio

n m

easu

res

are

not p

ropo

sed

or p

ossi

ble.

Tim

e Ex

pire

d re

fers

to p

roje

cts

that

may

pro

ceed

due

to th

e la

ck o

f an

actio

n by

the

San

Die

go W

ater

Boa

rd w

ithin

spe

cifie

d re

gula

tory

tim

elin

es.

With

draw

n re

fers

to p

roje

cts

that

the

appl

ican

t or S

an D

iego

Wat

er B

oard

hav

e w

ithdr

awn

due

to p

roce

dura

l iss

ues

that

hav

e no

t bee

n co

rrec

ted

with

in o

ne y

ear.