39
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SAN DIEGO REGION 2375 Northside Drive, Suite.100, San Diego, CA 92108 Phone (619) 516-1990 • Fax (619) 516-1994 http://www.waterboards.ca.gov/sandiego/ Clean Water Act Section 401 Water Quality Certification and Waste Discharge Requirements for Discharge of Dredged and/or Fill Materials PROJECT: Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification Number R9-2018-0024 WDID: 9 000003262 APPLICANT: General Dynamics NASSCO 2798 Harbor Drive San Diego, CA 92113 ACTION: Order for Low Impact Certification Order for Denial of Certification Order for Technically-conditioned Certification Enrollment in Isolated Waters Order No. 2004-004-DWQ Enrollment in SWRCB GWDR Order No. 2003-017-DWQ PROJECT DESCRIPTION An application dated January 24, 2018 was submitted by the General Dynamics NASSCO (hereinafter Applicant), for Water Quality Certification pursuant to section 401 of the Clean Water Act (United States Code (USC) Title 33, section 1341) for the proposed Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project (Project). The California Regional Water Quality Control Board, San Diego Region (San Diego Water Board) deemed the application to be complete on May 16, 2018. The Applicant proposes to discharge dredged or fill material to waters of the United States and/or State associated with construction activity at the Project site. The Applicant has also applied for a Rivers and Harbors Act section 10 Letter of Permission from the United States Army Corps of Engineers (USACE) for the Project (USACE File No. SPL-2018-00051-RRS). The Project is located within the City of San Diego, San Diego County, California at 2798 Harbor Drive. The center reading coordinates of the proposed dredging areas are located at: Reg. Meas. ID: 419066 Place ID: 844159 Party ID: 531893 Person ID: 562952

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SAN … · 2018-07-26 · E 32º 41.3791 -117º 08.4366 F 32º 41.3854 -117º 08.3755 G 32º 41.10758 -117º 08.2008 H 32º 41.1670

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SAN DIEGO REGION

2375 Northside Drive, Suite.100, San Diego, CA 92108

Phone (619) 516-1990 • Fax (619) 516-1994 http://www.waterboards.ca.gov/sandiego/

Clean Water Act Section 401 Water Quality Certification and Waste Discharge Requirements

for Discharge of Dredged and/or Fill Materials PROJECT: Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V

Project Certification Number R9-2018-0024 WDID: 9 000003262 APPLICANT: General Dynamics NASSCO 2798 Harbor Drive San Diego, CA 92113 ACTION: Order for Low Impact Certification

Order for Denial of Certification

Order for Technically-conditioned Certification

Enrollment in Isolated Waters Order No. 2004-004-DWQ

Enrollment in SWRCB GWDR Order No. 2003-017-DWQ

PROJECT DESCRIPTION An application dated January 24, 2018 was submitted by the General Dynamics NASSCO (hereinafter Applicant), for Water Quality Certification pursuant to section 401 of the Clean Water Act (United States Code (USC) Title 33, section 1341) for the proposed Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project (Project). The California Regional Water Quality Control Board, San Diego Region (San Diego Water Board) deemed the application to be complete on May 16, 2018. The Applicant proposes to discharge dredged or fill material to waters of the United States and/or State associated with construction activity at the Project site. The Applicant has also applied for a Rivers and Harbors Act section 10 Letter of Permission from the United States Army Corps of Engineers (USACE) for the Project (USACE File No. SPL-2018-00051-RRS). The Project is located within the City of San Diego, San Diego County, California at 2798 Harbor Drive. The center reading coordinates of the proposed dredging areas are located at:

Reg. Meas. ID: 419066 Place ID: 844159 Party ID: 531893 Person ID: 562952

General Dynamics NASSCO - 2 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

Dredge Area Latitude

WGS84 (dd°mm.mmm')

Longitude WGS84

(dd°mm.mmm') A 32º 41.3167 -117º 08.4939 B 32º 41.3243 -117º 08.4649 C 32º 41.3080 -117º 08.4756 D 32º 41.3842 -117º 08.4571 E 32º 41.3791 -117º 08.4366 F 32º 41.3854 -117º 08.3755 G 32º 41.10758 -117º 08.2008 H 32º 41.1670 -117º 08.1682 J 32º 41.2328 -117º 08.1164 K 32º 41.2222 -117º 08.1863 L 32º 41.2132 -117º 08.1414 M 32º 41.2437 -117º 08.1227

Notes: WGS84 = World Geodetic System, 1984; ddd/dd°mm.mmm' = degrees decimal minutes

The Applicant has paid all required application fees for this Certification in the amount of $1,500.00. On an annual basis, the Applicant must also pay all dredging discharge fees. On May 16, 2018, the San Diego Water Board provided public notice of the Project application pursuant to California Code of Regulations, title 23, section 3858 by posting information describing the Project on the San Diego Water Board’s web site and providing a period of twenty-one days for public review and comment. No comments were received. The Applicant proposes to perform maintenance dredging of bay bottom sediment as part of maintenance necessary for vessels to access the berthing areas at Pier 12 and Berths IV and V and for safe submergence of the dry dock (Figure 2). The proposed Project would dredge sediment to various design and overdredge (OD) depths listed in Table 1. The total proposed dredge volume is 11,200 cubic yards (cy) to design depths and 22,000 cy to the proposed OD depths. The majority of the dredging (approximately 60 percent) would occur in the Approach to Berths IV/V. Areas A through E, H, J and K (see Table 1; Attachment 3, Figure 2) are designed to accommodate for specific needs at each berthing location for specific height and draft information from vessels utilized by the United States Navy. Area L is a high spot currently affecting keel draft on some vessels entering Berths IV and V. The sediment below the NASSCO dry dock is also in critical need of maintenance dredging because the vessel comes in contact with the bay bottom when submerged during docking and undocking evolutions.

General Dynamics NASSCO - 3 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

Table 1. Dredging Locations, Design Depths, and Approximate Dredge Volumes

Location Dredge Area

Purpose for

Dredge Area

Approx. Start Date

Design Depth

(ft. MLLW)

Depth to 2-ft OD

Allowance (ft. MLLW)

Dredge Volume

to Design Depth (cy)

Dredge Volume with 2-ft

OD Allowance

(cy)

Depth Ranges of Sediment Removal (to OD

Allowance) (ft)

Pier 12 Berth X

A

CG & DDG Sonar Dome

2019 -37 -39 900 1,300 6-8

D DDG Sonar Dome

2019 -34 -36 100 300 4

Pier 12 Berth IX

B CG

Sonar Dome

2019 -37 -39 800 1,200 8

C CG Propeller 2019 -37 -39 1,300 1,600 10-12

E CG Propeller 2019 -34 -36 300 600 5

Dry Dock Sump F Dry Dock

Sump Sept. 2018 -53 -55 700 2,100 3-5

Approach to Berths IV/V

G Approach Area

Sept. 2018 -32 -34 5,600 12,300 2-9

Berth V H

CG Sonar Dome

2020 -37 -39 600 900 5-8

J CG Propeller 2020 -34 -36 100 200 2-5

Berth IV K CG

Propeller 2020 -34 -36 100 400 6-7

Berth V

L Matson 2020 -31 -33 300 600 3

M T-AO

Starboard propeller

2020 -34 -36 400 500 5-8

Total NA NA NA Various Various 11,200 22,000 Various

Notes: CG = guided missile cruiser; DDG = guided missile destroyer; T-AO = fleet replenishment oiler; ft = feet; MLLW = mean lower low water; OD = overdredge, cy = cubic yards, NA = not applicable

Dredging at five areas around Pier 12 would remove up to 5,000 cy; dredging at the Dry Dock sump would remove up to 2,100 cy; and dredging at the five areas between Berths IV/V would remove up to 2,600 cy; dredging at the approach area to Berths IV/V would remove up to 12,300 cy. In total, the Project would dredge no more than 22,000 cy (including 2 feet of overdredge) of marine sediment to approximate depths of -33 to -39 feet mean lower low water

General Dynamics NASSCO - 4 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

(MLLW) at Pier 12, between Berths IV/V, and the approach at Berths IV/V, and -55 feet MLLW at the Dry Dock Sump (see specific design and OD on Table 1). These depths are designed to include 2 feet of OD allowance. The five proposed dredge areas at Pier 12 totals to approximately 7,630 square feet (0.18 acres). The dredge area at the Dry Dock Sump is approximately 14,875 square feet (0.34 acres). The five proposed dredge areas between Berths IV/V total to approximately 5,350 square feet (0.12 acres). Lastly, the dredge area at the approach to Berths IV and V is approximately 72,700 square feet (1.67 acres). In total, an area of 2.31 acres are planned to be dredged. Prior to dredging, a pre-dredge eelgrass survey will be conducted. If eelgrass is found within the project footprint, a post-dredging survey will also be conducted. Silt curtains will be placed around the dredge areas and the eelgrass bed that had been previously located along the quay wall (including an eelgrass transplant site); the nearest bed is located approximately 100 feet from the northeastern most dredge area (Dredge Area D) at Pier 12 (Berth X). A dredged material characterization study was conducted in January 2018 to evaluate sediments and determine appropriate disposal. Sediments were determined to be non-hazardous and acceptable for upland disposal. All dredged material will be disposed of at an appropriately permitted upland disposal facility. The dredging will be performed using a clamshell dredge by a barge-mounted crane. During dredging activities, standard construction BMPs will be utilized. While material is still on the scow barge, some decanting of water will be conducted while moored within the silt curtains. Prior to transfer to an upland disposal facility (Otay Landfill), sediment will be sufficiently dewatered. This will be completed by either treating the sediment directly within the barges (potentially with a cementitious additive) prior to transfer onto dump trucks, and/or stockpiling and dewatering the sediment at temporary designated areas within NASSCO’s facility. For transfer to dump trucks and/or the designated stockpile areas, scow barges will berth along the adjacent shoreline of the designated area (Figure 4). Two areas are proposed as the designated dewatering and stockpiling areas (S-Lane and the base of Pier 12; see Figure 4). The sediment dewatering and stockpiling area(s) will be fully enclosed by a suitable and watertight barrier (i.e., Ecology Blocks, K-rails, or similar raised perimeter), to contain all free water and prevent any loss of water to adjoining land, into the underlying ground, or into San Diego Bay. A similarly equipped spill apron will be in place at the point of barge offloading to keep stray materials contained and out of the bay. Once the dredge materials are placed in the stockpiling area, any remaining decanted water will be moved into a Baker Tank. A water management system will be designed and operated by the contractor to meet project and permit requirements, and will be designed to have sufficient capacity to accommodate water generated by dredging and sediment dewatering activities. Freestanding water will first be removed from the sediment-filled barges by pumping into one or more holding tanks. In the holding tank(s), water will be allowed sufficient time to settle for the removal of suspended solids, and treated further as necessary to meet City of San Diego’s testing requirements for discharge into the City’s receiving system under the

General Dynamics NASSCO - 5 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

Project Batch Permit. Water within the dewatering and stockpiling area will be managed in the same manner. Once dewatered, all dredged material will be loaded directly onto trucks for transport to the approved upland disposal site. Trucking and decontamination will be the responsibility of the selected dredging contractor, who will be required to adhere to all permit conditions for housekeeping, decontamination, BMP maintenance, road cleanliness, and truck routing, subject to ongoing monitoring by NASSCO’s construction management and oversight team. Dredging activities are scheduled to begin in September of 2018. All dredging activities will be performed between September 16 and March 30 to avoid the California Least Tern nesting season. Project construction will permanently impact 2.31 acre (up to 22,000 cubic yards) of San Diego Bay waters of the United States and/or State. The Applicant reports that the Project purpose cannot be practically accomplished in a manner that would avoid or result in less adverse impacts to aquatic resources considering all potential practicable alternatives, such as the potential for alternate available locations, designs, reductions in size, configuration or density. No impact to eelgrass is anticipated; however, in the event that any eelgrass is impacted during the Project, compensatory mitigation will be provided in accordance with the terms of the California Eelgrass Mitigation Policy. Additional Project details are provided in Attachments 2 through 3 of this Certification.

General Dynamics NASSCO - 6 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

TABLE OF CONTENTS

I. STANDARD CONDITIONS .............................................................................................. 7

II. GENERAL CONDITIONS ................................................................................................. 7

III. CONSTRUCTION BEST MANAGEMENT PRACTICES ................................................ 11

IV. POST-CONSTRUCTION BEST MANAGEMENT PRACTICES ..................................... 15

V. PROJECT IMPACTS AND COMPENSATORY MITIGATION ....................................... 15

VI. MONITORING AND REPORTING REQUIREMENTS .................................................... 18

VII. NOTIFICATION REQUIREMENTS ................................................................................ 27

VIII. CALIFORNIA ENVIRONMENTAL QUALITY ACT COMPLIANCE ............................... 29

IX. SAN DIEGO WATER BOARD CONTACT PERSON ..................................................... 29

X. WATER QUALITY CERTIFICATION ............................................................................. 30

Attachments: 1. Definitions 2. Project Location Maps 3. Project Site Plans

General Dynamics NASSCO - 7 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

The San Diego Water Board has independently reviewed the record of the Project to analyze the extent and nature of proposed Project impacts to the water quality and beneficial uses of waters of the United States and/or State and associated compensatory mitigation required to offset impacts attributed to the Project. In accordance with this Certification, the Applicant may proceed with the Project under the following terms and conditions:

I. STANDARD CONDITIONS

Pursuant to section 3860 of title 23 of the California Code of Regulations, the following three standard conditions apply to all water quality certification actions:

A. This Certification action is subject to modification or revocation upon administrative or

judicial review, including review and amendment pursuant to section 13330 of the Water Code and chapter 28, article 6 (commencing with title 23, section 3867), of the California Code of Regulations.

B. This Certification action is not intended and shall not be construed to apply to any

discharge from any activity involving a hydroelectric facility and requiring a Federal Energy Regulatory Commission (FERC) license or an amendment to a FERC license unless the pertinent Certification application was filed pursuant to California Code of Regulations title 23, section 3855 subdivision (b), and that application specifically identified that a FERC license or amendment to a FERC license for a hydroelectric facility was being sought.

C. This Certification action is conditioned upon total payment of any fee required under title

23, chapter 28 (commencing with section 3830) of California Code of Regulations and owed by the applicant.

II. GENERAL CONDITIONS

A. Term of Certification. Water Quality Certification No. R9-2018-0024 (Certification) shall expire upon a) the expiration or retraction of the Clean Water Act section 404 (33 USC Title 33, section 1344) permit issued by the USACE for this Project, or b) five (5) years from the date of issuance of this Certification, whichever occurs first.

B. Duty to Comply. The Applicant must comply with all conditions and requirements of this Certification. Any Certification noncompliance constitutes a violation of the Water Code and is grounds for enforcement action or Certification termination, revocation and reissuance, or modification.

C. General Waste Discharge Requirements. The requirements of this Certification are

enforceable through Water Quality Order No. 2003-0017-DWQ, Statewide General Waste Discharge Requirements for Discharges of Dredged or Fill Material that have Received State Water Quality Certification (Water Quality Order No. 2003-0017-DWQ). This provision shall apply irrespective of whether a) the federal permit for which the Certification was obtained is subsequently retracted or is expired, or b) the Certification is expired. Water Quality Order No. 2003-0017-DWQ is accessible at:

General Dynamics NASSCO - 8 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

http://www.waterboards.ca.gov/water_issues/programs/cwa401/docs/generalorders/go_wdr401regulated_projects.pdf.

D. Project Conformance with Application. All water quality protection measures and

BMPs described in the application and supplemental information for water quality certification are incorporated by reference into this Certification as if fully stated herein. Notwithstanding any more specific conditions in this Certification, the Applicant shall construct, implement and comply with all water quality protection measures and BMPs described in the application and supplemental information. The conditions within this Certification shall supersede conflicting provisions within the application and supplemental information submitted as part of this Certification action.

E. Project Conformance with Water Quality Control Plans or Policies. Notwithstanding any more specific conditions in this Certification, the Project shall be constructed in a manner consistent with the Water Quality Control Plan for the San Diego Basin (Basin Plan), the California Ocean Plan, and any other applicable water quality control plans or policies adopted or approved pursuant to the Porter Cologne Water Quality Act (Division 7, commencing with Water Code Section 13000) or section 303 of the Clean Water Act (33 USC section 1313). The Basin Plan accessible at: http://www.waterboards.ca.gov/sandiego/water_issues/programs/basin_plan/index.shtml The receiving water limitations set forth below for San Diego Bay are based on applicable water quality standards contained in the Basin Plan, policies and federal regulations and are a required part of this Certification. Project activities shall not cause or contribute to exceedances of these receiving water limitations in the San Diego Bay. Compliance with these limitations shall be determined from samples collected at the points of compliance described in the Monitoring Requirements in section VI of this Certification. Relevant water quality objectives from the Basin Plan are as follows: 1. Visual. Floating particulates and grease and oil shall not be visible.

2. Color. Waters shall be free of coloration that causes nuisance or adversely affects

beneficial uses.

3. Hydrogen Ion Concentration. The pH shall not be changed at any time more than 0.2 units from that which occurs naturally.

4. Hydrogen Ion Concentration. The pH shall not be depressed below 7.0 nor raised above 9.0.

5. Turbidity. If natural turbidity is between 0 to 50 nephelometric turbidity units (NTUs), the maximum increase from dredge activities must not exceed 20 percent of the measured natural turbidity. If natural turbidity is between 51 to 100 NTUs, the maximum increase from dredge activities must not exceed 10 NTUs. If natural turbidity is greater than 100 NTUs, the maximum increase from dredge activities

General Dynamics NASSCO - 9 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

must not exceed 10% above natural background levels.

6. Dissolved Oxygen. The dissolved oxygen concentration shall not at any time be depressed more than 10 percent from that which occurs naturally.

7. Benthic Communities. Pollutants in sediments shall not be present in quantities that, alone or in combination, are toxic to benthic communities.

8. Human Health. Pollutants shall not be present in sediments at levels that will bioaccumulate in aquatic life to levels that are harmful to human health.

9. Water Quality Objectives. Water quality objectives applicable to San Diego Bay established in Chapter 3 of the San Diego Water Board's Water Quality Control Plan for the San Diego Basin (Basin Plan) shall not be exceeded.

10. Priority Pollutant Criteria. Priority pollutant criteria applicable to San Diego Bay promulgated by the USEPA through the a) National Toxics Rule (NTR) (40 CFR 131.36 promulgated on December 22, 1992 and amended on May 4, 1995) and b) California Toxics Rule (CTR) (40 CFR 131.38, (65 Fed. Register 31682-31719), adding Section 131.38 to Title 40 of the Code of Federal Regulations, on May 18, 2000) shall not be exceeded.

F. Project Modification. The Applicant must submit any changes to the Project, including Project operation, which would have a significant or material effect on the findings, conclusions, or conditions of this Certification, to the San Diego Water Board for prior review and written approval. If the San Diego Water Board is not notified of a significant change to the Project, it will be considered a violation of this Certification.

G. Certification Distribution Posting. During Project construction, the Applicant must maintain a copy of this Certification at the Project site. This Certification must be available at all times to site personnel and agencies. A copy of this Certification shall also be provided to any contractor or subcontractor performing construction work, and the copy shall remain in their possession at the Project site.

H. Inspection and Entry. The Applicant must allow the San Diego Water Board or the

State Water Resources Control Board, and/or their authorized representative(s) (including an authorized contractor acting as their representative), upon the presentation of credentials and other documents as may be required under law, to:

1. Enter upon the Project or Compensatory Mitigation site(s) premises where a

regulated facility or activity is located or conducted, or where records must be kept under the conditions of this Certification;

2. Have access to and copy, at reasonable times, any records that must be kept under

the conditions of this Certification;

General Dynamics NASSCO - 10 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

3. Inspect, at reasonable times, any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this Certification; and

4. Sample or monitor, at reasonable times, for the purposes of assuring Certification

compliance, or as otherwise authorized by the Clean Water Act or Water Code, any substances or parameters at any location.

I. Enforcement Notification. In the event of any violation or threatened violation of the

conditions of this Certification, the violation or threatened violation shall be subject to any remedies, penalties, process or sanctions as provided for under State law. For purposes of section 401(d) of the Clean Water Act, the applicability of any State law authorizing remedies, penalties, process or sanctions for the violation or threatened violation constitutes a limitation necessary to assure compliance with the water quality standards and other pertinent requirements incorporated into this Certification.

J. Certification Actions. This Certification may be modified, revoked and reissued, or

terminated for cause including but not limited to the following: 1. Violation of any term or condition of this Certification;

2. Monitoring results indicate that continued Project activities could violate water quality

objectives or impair the beneficial uses of San Diego Bay;

3. Obtaining this Certification by misrepresentation or failure to disclose fully all relevant facts;

4. A change in any condition that requires either a temporary or permanent reduction or elimination of the authorized discharge; and

5. Incorporation of any new or revised water quality standards and implementation plans adopted or approved pursuant to the Porter-Cologne Water Quality Control Act or section 303 of the Clean Water Act.

The filing of a request by the Applicant for modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any Certification condition.

K. Duty to Provide Information. The Applicant shall furnish to the San Diego Water Board, within a reasonable time, any information which the San Diego Water Board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this Certification or to determine compliance with this Certification.

L. Property Rights. This Certification does not convey any property rights of any sort, or any exclusive privilege.

General Dynamics NASSCO - 11 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

M. Petitions. Any person aggrieved by this action of the San Diego Water Board may petition the State Water Resources Control Board (State Water Board) to review the action in accordance with the California Code of Regulations, title 23, sections 3867 and following. The State Water Board must receive the petition by 5:00 p.m., 30 days after the date of this Certification. Copies of the law and regulations applicable to filing petitions may be found on the Internet at: http://www.waterboards.ca.gov/public_notices/petitions/water_quality or will be provided upon request.

III. CONSTRUCTION BEST MANAGEMENT PRACTICES

A. Approvals to Commence Construction. The Applicant shall not commence Project construction until all necessary federal, State, and local approvals are obtained.

B. Personnel Education. Prior to the start of the Project, and annually thereafter, the Applicant must educate all personnel on the requirements in this Certification, pollution prevention measures, spill response measures, and BMP implementation and maintenance measures.

C. Spill Containment Materials. The Applicant must, at all times, maintain appropriate types and sufficient quantities of materials on-site to contain any spill or inadvertent release of materials that may cause a condition of pollution or nuisance if the materials reach waters of the United States and/or State.

D. General Construction Storm Water Permit. Prior to start of Project construction, the Applicant must, as applicable, obtain coverage under, and comply with, the requirements of State Water Resources Control Board Water Quality Order No. 2009-0009-DWQ, the General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activity, (General Construction Storm Water Permit) and any reissuance. If Project construction activities do not require coverage under the General Construction Storm Water Permit, the Applicant must develop and implement a runoff management plan (or equivalent construction BMP plan) to prevent the discharge of sediment and other pollutants during construction activities.

E. Waste Management. The Applicant must properly manage, store, treat, and dispose of wastes in accordance with applicable federal, state, and local laws and regulations. Waste management shall be implemented to avoid or minimize exposure of wastes to precipitation or storm water runoff. The storage, handling, treatment, or disposal of waste shall not create conditions of pollution, contamination or nuisance as defined in Water Code section 13050. Upon Project completion, all Project generated debris, building materials, excess material, waste, and trash shall be removed from the Project site(s) for disposal at an authorized landfill or other disposal site in compliance with federal, state and local laws and regulations.

General Dynamics NASSCO - 12 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

F. Waste Management. Except for a discharge permitted under this Certification, the dumping, deposition, or discharge of trash, rubbish, unset cement or asphalt, concrete, grout, damaged concrete or asphalt, concrete or asphalt spoils, wash water, organic or earthen material, steel, sawdust or other construction debris waste from Project activities directly into waters of the United States and or State, or adjacent to such waters in any manner which may permit its being transported into the waters, is prohibited.

G. Construction Equipment. All equipment must be washed prior to transport to the Project site and must be free of sediment, debris, and foreign matter. All equipment using gas, oil, hydraulic fluid, or other petroleum products shall be inspected for leaks prior to use and shall be monitored for leakage. Stationary equipment (e.g., motors, pumps, generator, etc.) shall be positioned over drip pans or other types of containment.

H. Process Water. Water containing mud, silt, or other pollutants from equipment washing or other activities, must not be discharged to waters of the United States and/or State or placed in locations that may be subjected to storm water runoff flows.

I. Hazardous Materials. Except as authorized by this Certification, substances hazardous to aquatic life including, but not limited to, petroleum products, unused cement/concrete, asphalt, and coating materials, must be prevented from contaminating the soil and/or entering waters of the United States and/or State. BMPs must be implemented to prevent such discharges during each Project activity involving hazardous materials.

J. Limits of Disturbance. The Applicant shall clearly define the limits of Project disturbance to waters of the United States and/or State using highly visible markers such as flag markers, construction fencing, or silt barriers prior to commencement of Project construction activities within those areas.

K. Dredge Volume Limit – Upland Disposal. The volume of dredged sediment designated for Upland disposal must not exceed 22,000 cubic yards of sediment.

L. Sediment Dredging. The Applicant shall conduct dredging in accordance with, but not limited to, the following best management practices: 1. Dredging must be conducted to remove dredge material and not stockpile material

on the floor of San Diego Bay or level the bottom surface with the clamshell bucket; 2. The clamshell bucket must not be overfilled in order to prevent and minimize the

spillage of dredged material back in to San Diego Bay waters; 3. The swing radius of unloading equipment must be controlled to prevent spillage of

dredged sediments back into the water;

General Dynamics NASSCO - 13 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

4. The drop height from a clamshell bucket onto the scow must be controlled to prevent splashing or sloshing of dredged material back into San Diego Bay waters;

5. Excess water from dredged sediment classified as nonhazardous may be decanted

and discharged back into San Diego Bay within the confines of the silt curtains; 6. Dredged material scows must not be filled to a point that overflow or spillage could

occur. Each material scow must be marked in such a way to allow the operator to visually identify the maximum load point;

7. Load-controlled boat movement, line attachment, and/or horsepower requirements

of tugs and support boats at the Project site must be specified to avoid resuspension of sediment. Such measures may include speed restrictions, establishment of off-limit areas, and use of shallow draft vessels;

8. Dredged sediments may be mixed with a cement-based reagent or cementitious

additive (e.g., pozzolans) to facilitate drying and to bind the sediments; 9. The on-shore dredged sediment truck loading area must be designed as a no-

discharge facility to prevent dredge water from flowing back into San Diego Bay. The design must also prevent storm water run-on or run-off from adjacent areas from entering the offloading area;

10. At all times during Project construction, storm water in contact with sediment and

decant water at the stockpiling area shall be collected in closed-top tanks to prevent infiltration and overflow during a storm event. This would involve the decant and/or storm water being collected in a sump in the operation area, pumped to aboveground tanks, and disposed of either within the sanitary sewer or off site. The storage areas shall be surrounded by a curb, dike, berm, or some other type of secondary containment system. All paved storage areas shall be free of cracks and gaps, and shall be able to contain leaks and overflows until they can be addressed; and

11. Prior to discharge to the sanitary sewer system, the dredge sediment decant water

must meet the City of San Diego’s requirements for discharge of wastewater to the sanitary sewer system. The discharge must comply with any limits on pollutant concentrations, discharge times and flow rates required by the City of San Diego. If the decanted water does not meet City of San Diego’s requirements for discharge of wastewater to the sanitary sewer, it must be removed by a licensed waste hauler for treatment and disposal at an authorized site.

M. Upland Disposal of Dredged Sediments. Dewatered dredged sediments for upland

landfill disposal, classified as nonhazardous, must be transported for disposal at a landfill permitted for accepting this material. It is anticipated that the Otay Sanitary Landfill at 1700 Maxwell Road in Chula Vista, California 91911 will be utilized for disposal of dredged sediments classified as nonhazardous. Dredged sediments classified as hazardous must be transported to a hazardous waste landfill permitted for

General Dynamics NASSCO - 14 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

accepting this material, such as the Buttonwillow Hazardous Waste Landfill at 2500 West Lokem Road in Buttonwillow, California 93206. Alternative disposal of dredge materials at non-permitted disposal facilities is not authorized by this Certification.

N. Silt Curtain Deployment for Sediment Dredging. The Applicant shall deploy and maintain a continuous length of double silt curtains, installed and maintained fully surrounding the active dredging (including any dredge equipment), loading, and/or desilting discharges in conformance with the following requirements: 1. The silt curtains must be comprised of Type III geotextile material;

2. The silt curtains must restrict the surface visible turbidity plume or surface debris to

the area of construction and dredging and must control and contain the migration of re-suspended sediments or debris at the water surface and at depth;

3. The silt curtain must be maintained as a full turbidity enclosure. The silt curtains must be supported by floating debris booms in open water areas such as along the bayward side of the dredging areas. Along pier edges the silt curtains may be connected to the pier structure;

4. The bottom of the silt curtains must be weighted with ballast weights or rods affixed

to the base of the fabric to resist the natural buoyancy of the silt curtain fabric and lessen its tendency to move in response to currents. The silt curtains shall extend from the bay surface to at least 20 feet into the water column. Where feasible and applicable, the floating silt curtains shall be anchored and deployed from the surface of the water to just above the substrate;

5. If necessary, silt curtains with tidal flaps must be installed to facilitate curtain deployment in areas of higher flow. Air curtains may be used in conjunction with silt curtains to contain re-suspended sediment, enhance worker safety, and allow barges to transit into and out of the work area without the need to open and close silt curtain gates.

6. Silt curtains must be monitored for damage, dislocation or gaps and must be immediately repaired where it is no longer continuous or where it has loosened; and

7. Silt curtain must not be removed until the visible turbidity plume has dissipated and/or surface debris is skimmed and removed.

O. On-site Qualified Biologist. The Applicant shall designate an on-site qualified

biologist to monitor Project construction activities within or adjacent to waters of the United States and/or State to ensure compliance with the Certification requirements. The biologist shall be given the authority to stop all work on-site if a violation of this Certification occurs or has the potential to occur. Records and field notes of the biologist’s activities shall be kept on-site and made available for review upon request by the San Diego Water Board.

General Dynamics NASSCO - 15 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

P. Protection of Eelgrass Beds at the Project Site. The Applicant shall comply with the following requirements to protect existing eelgrass beds: 1. Prior to construction, the boundaries of adjacent eelgrass beds must be staked with

ridged PVC markers or self-centering buoys visible at all tide heights. The PVC markers or self-centering buoys must be protected, replaced, and maintained as needed to ensure that they remain in place and properly stake at the boundaries of the eelgrass beds.

2. Any silt curtains must be kept a minimum of 30 feet away from staked eelgrass beds in order to prevent damage to eelgrass beds from curtain drag or movement.

3. During project construction and regardless of the timing of the dredging, the eelgrass

beds must be protected with silt curtains deployed in a manner to protect eelgrass from excessive dredge or fill generated turbidity or sediment deposition.

Q. Beneficial Use Protection. The Applicant must take all necessary measures to protect

the beneficial uses of waters of the San Diego Bay. This Certification requires compliance with all applicable requirements of the Basin Plan. If at any time, an unauthorized discharge to surface waters occurs or monitoring indicates that the Project is violating, or threatens to violate, water quality objectives, the associated Project activities shall cease immediately and the San Diego Water Board shall be notified in accordance with Notification Requirement VII.B of this Certification. Associated Project activities may not resume without approval from the San Diego Water Board.

IV. POST-CONSTRUCTION BEST MANAGEMENT PRACTICES

A. Post-Construction Discharges. The Applicant shall not allow post-construction discharges from the Project site to cause or contribute to on-site or off-site erosion or damage to properties or Bay habitats.

V. PROJECT IMPACTS AND COMPENSATORY MITIGATION

A. Project Impact Avoidance and Minimization. The Project must avoid and minimize adverse impacts to waters of the United States and/or State to the maximum extent practicable.

B. Project Impacts and Compensatory Mitigation. Unavoidable Project impacts to the San Diego Bay must not exceed the type and magnitude of impacts described in the table below. At a minimum, compensatory mitigation required to offset unavoidable temporary and permanent Project impacts to waters of the United States and/or State must be achieved as described in the table below:

General Dynamics NASSCO - 16 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

Impacts (acres) Impacts (linear

ft.)

Mitigation for Impacts

(acres)

Mitigation Ratio (area

mitigated :area

impacted)

Mitigation for Impacts (linear ft.)

Mitigation Ratio

(linear feet mitigated

:linear feet impacted)

Permanent Impacts

San Diego Bay

2.31a

a b b b b

a. Permanent impacts attributable to dredging up to approximately 22,000 cubic yards of unvegetated sediment from the bay floor to the design and overdredge depths listed in Table 1 of this Certification representing a short-term degradation of ecological function. Length of impact was not calculated as the maintenance areas are best described as a total area of affected bay floor.

b. The impacts associated with dredging the bay floor will include temporary and localized increases in suspended sediment (i.e., turbidity) along with a potential for reduced dissolved oxygen levels associated with disturbance of anoxic sediment compounds. Deployment of silt curtains to contain the plume will reduce this impact to a less than significant level. Additionally, the Project will have temporary effects on marine life of varying degrees. Mobile aquatic organisms will most likely vacate the area of disturbance during the short duration of the Project. Impacts to benthic organisms and the soft-bottom habitat through direct removal or indirect disturbance of existing bottom sediments is less than significant as benthic communities are anticipated to recolonize the disturbed sediment areas within 2 to 6 months. Based on all of these considerations, compensatory mitigation for the above-described impacts is not required. However, any eelgrass observed during a pre-dredge survey will be protected in place. In the event that the eelgrass is impacted by the Project, the Applicant will provide compensatory mitigation in accordance with the terms of the California Eelgrass Mitigation Policy.

C. Eelgrass. A pre-dredging eelgrass survey must be completed in accordance with the requirements of the California Eelgrass Mitigation Policy (CEMP)1 by a qualified biologist, prior to initiation of dredging activities at the site. This survey must include both aerial and density characterization of the beds. If eelgrass is found during the pre-dredging survey, a post-dredging survey must be performed by a qualified biologist within 30 days following project completion to quantify any unanticipated losses to eelgrass habitat. Impacts must then be determined from a comparison of pre- and post-dredging survey results. Impacts to eelgrass, if any, must be mitigated through conformance with the CEMP, which defines the mitigation ratio and other requirements to achieve mitigation for significant eelgrass impacts. If required following the post-dredging survey, the CEMP defined mitigation plan must be developed; submitted and approved by the San Diego Water Board, USACE, and National Marine Fisheries Service; and implemented to offset losses to eelgrass.

1 National Oceanic and Atmospheric Administration, National Marine Fisheries, West Coast Region. California Eelgrass Mitigation Policy and Implementing Guidelines, October 2014. An electronic copy can be found at the following web page: http://www.westcoast.fisheries.noaa.gov/publications/habitat/california_eelgrass_mitigation/Final%20CEMP%20October%202014/cemp_oct_2014_final.pdf

General Dynamics NASSCO - 17 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

D. Compensatory Mitigation Site Design. If compensatory mitigation for eelgrass impacts is required, the compensatory mitigation site(s) shall be designed to be self-sustaining once performance standards have been achieved. This includes minimization of active engineering features (e.g., pumps) and appropriate siting to ensure that natural hydrology and landscape context support long-term sustainability.

E. Temporary Project Impact Areas. The Applicant must restore all areas of temporary

impacts and all other areas of temporary disturbance which could result in a discharge or a threatened discharge of pollutants to waters of the United States and/or State. Restoration must include grading of disturbed areas to pre-project contours and re-vegetation with native species. The Applicant must implement all necessary BMPs to control erosion and runoff from areas associated with the Project.

F. Long-Term Management and Maintenance. If compensatory mitigation for eelgrass

impacts is required, the compensatory mitigation site(s) must be managed, protected, and maintained, in perpetuity, in conformance with the long-term management plan and the final ecological success performance standards identified in the approved CEMP defined mitigation plan. The aquatic habitats that comprise the mitigation site(s) must be protected in perpetuity from activities that may threaten water quality or beneficial uses within the mitigation area(s) in a manner consistent with the following requirements: a. Any maintenance activities on the mitigation site(s) that do not contribute to the

success of the mitigation site(s) and enhancement of beneficial uses and ecological functions and services are prohibited;

b. Maintenance activities must be limited to the removal of trash and debris, removal of exotic plant species, replacement of dead native plant species, and remedial measures deemed necessary for the success of the compensatory mitigation project; and

c. If at any time a catastrophic natural event causes damage(s) to the mitigation site(s) or other deficiencies in the compensatory mitigation project, the Applicant must take prompt and appropriate action to repair the damage(s) including replanting the affected area(s) and address any other deficiencies. The San Diego Water Board may require additional monitoring by the Applicant to assess how the compensatory mitigation site(s) or project is responding to a catastrophic natural event.

G. Timing of Mitigation Site Construction. If compensatory mitigation for eelgrass

impacts is required, the construction of proposed mitigation must be completed no later than 9 months following the earliest time of either the direct impact to eelgrass beds or as directed in accordance with CEMP. Delays in implementing mitigation must be compensated for by an increased mitigation implementation of 10% of the cumulative compensatory mitigation for each month of delay.

General Dynamics NASSCO - 18 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

H. Mitigation Site(s) Preservation Mechanism. If compensatory mitigation for eelgrass impacts is required, the Applicant must provide the San Diego Water Board with a draft preservation mechanism (e.g. deed restriction, conservation easement, etc.) within 90 days from the dredging completion date that will protect all mitigation areas and their buffers in perpetuity. The Applicant must submit proof of a completed final preservation mechanism that will protect all mitigation areas and their buffers in perpetuity before the Project certification can be terminated. The conservation easement, deed restriction, or other legal limitation on the mitigation properties must be adequate to demonstrate that the sites will be maintained without future development or encroachment on the sites which could otherwise reduce the functions and values of the sites for the variety of beneficial uses of waters of the United States and/ or State that it supports. The legal limitation must prohibit, without exception, all residential, commercial, industrial, institutional, and transportation development, and any other infrastructure development that would not maintain or enhance the wetland and streambed functions and values of the sites. The preservation mechanism must clearly prohibit activities that would result in soil disturbance or vegetation removal, other than the removal of non-native vegetation. Other infrastructure development to be prohibited includes, but is not limited to, additional utility lines, maintenance roads, and areas of maintained landscaping for recreation.

VI. MONITORING AND REPORTING REQUIREMENTS

A. Representative Monitoring. Samples and measurements taken for the purpose of monitoring under this Certification shall be representative of the monitored activity.

B. USEPA Test Procedures. Monitoring must be conducted according to USEPA test procedures approved under Title 40, Code of Federal Regulations (CFR), Part 136, Guidelines Establishing Test Procedures for Analysis of Pollutants Under the Clean Water Act as amended, unless other test procedures have been specified in this Certification.

C. Monitoring Instruments. All monitoring instruments and devices, which are used by the Applicant to fulfill the prescribed monitoring program, must be properly maintained and calibrated as necessary to ensure their continued accuracy.

D. Certified Laboratory. All laboratory analyses must be performed in a laboratory certified to perform such analyses under the State Water Resources Control Board's Environmental Laboratory Accreditation Program or a laboratory approved by the San Diego Water Board.

E. Monitoring Reports. Monitoring results shall be reported to the San Diego Water Board at the intervals specified in section VI of this Certification.

F. Monitoring and Reporting Revisions. The San Diego Water Board may make revisions to the monitoring program at any time during the term of this Certification and may reduce or increase the number of parameters to be monitored, locations monitored, the frequency of monitoring, or the number and size of samples collected.

General Dynamics NASSCO - 19 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

G. Retain Records. The Applicant must retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this Certification, and records of all data used to complete the application for this Certification. Records must be maintained for a minimum of five years from the date of the sample, measurement, report, or application. This period may be extended during the course of any unresolved litigation regarding this Project or when requested by the San Diego Water Board.

H. Records of Monitoring Information. Records of monitoring information shall include: 1. The date, exact place, and time of sampling or measurements;

2. The individual(s) who performed the sampling or measurements;

3. The date(s) analyses were performed;

4. The individual(s) who performed the analyses;

5. The analytical techniques or methods used; and

6. The results of such analyses.

I. Receiving Water Visual Observation Monitoring. The Applicant must conduct visual

observation monitoring of the Project activities in the San Diego Bay prior to, during, and after each period of Project implementation. The visual observation monitoring documentation must be included in the Receiving Water and Visual Observation Monitoring Report(s). 1. Parameters. The following parameters, at a minimum, shall be recorded and

visually monitored immediately outside of the construction area and in the vicinity of the nearshore sand placement:

a. Tidal stage;

b. Speed and direction of currents;

c. Appearance of floating particulates, rubbish, refuse, garbage, trash or any other

solid waste, suspended materials, grease, or oil;

d. Discoloration of the water surface, extent of turbidity plume, and any observable sediment movement; and

e. Presence of nuisance odors attributable to the dredge activity.

General Dynamics NASSCO - 20 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

2. Field Documentation. All visual observations shall be recorded throughout Project construction activities (e.g., field log, data sheets, etc.). Field logs shall also include observations of sensitive biological resources and weather conditions, such as wind speed/direction and cloud cover. Photo documentation should be used in support of visual observations of water quality conditions and be conducted in accordance with guidelines posted at http://www.waterboards.ca.gov/sandiego/water_issues/programs/401_certification/docs/401c/401PhotoDocRB9V713.pdf. In addition, photo documentation should include Global Positioning System (GPS) coordinates for each of the photo points referenced; and,

3. Response Actions. If the condition of the silt curtain is observed to be damaged, has become dislocated, or has gaps where a visible turbidity plume is forming outside of the silt curtain at the Project Site, a response action shall be taken immediately to correct the situation. Response actions may include, but are not limited to, work stoppage until silt curtain repair is completed, implementation of operational modifications, and/or implementation of additional BMPs (e.g., a second silt curtain). Response actions, if needed, shall be documented in the monitoring field log.

J. Receiving Water Quality Monitoring. The Applicant shall conduct receiving water

monitoring during construction activities at the Project Site to verify that applicable water quality standards for pH, dissolved oxygen and turbidity are not violated outside of the construction areas. The monitoring plan shall contain the following elements: 1. Monitoring Stations. During each monitoring event, water quality parameters

including turbidity, dissolved oxygen, and pH shall be measured at five stations at the Project Site. Monitored water quality measurements shall be compared to “ambient” water quality reference measurements outside of the respective construction in San Diego Bay. Four stations shall be compliance stations and one station shall be a reference station. Monitoring station positions shall be located using a Global Position System (GPS) accurate to within ±3 meters. Station descriptions are as follows: a. Compliance Stations. Four monitoring stations at the Project Site shall be

located evenly along an arc located 200 feet from the edge of each of the construction area to capture all tidal and current conditions at the time of dredging at each area. The locations shall be adjusted in the field to better target a visible turbidity plume, if a visible plume is observed; and

b. Reference Station. One reference station shall be located at least 1,000 feet from the construction activity in the direction of the head of San Diego Bay and beyond the influence of construction activities.

General Dynamics NASSCO - 21 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

Natural turbidity, dissolved oxygen, and pH shall be determined through measurements at the reference stations. A reference station shall be monitored during every event, because the turbidity water quality objective is based on an acceptably small increase in the vicinity of the construction activity relative to ambient reference levels. The location of the reference station shall remain the same for all monitoring events;

2. Water Quality Measurements. Monitored water quality measurements for turbidity,

dissolved oxygen, and pH at the Compliance Stations shall be compared to Reference Station measurements outside the construction area. Water quality measurements shall be collected from a depth of 10 feet below the water surface at each of the stations. Monitoring depths shall be determined using a depth finder with an accuracy of ±0.5 feet. Water quality shall be monitored using instrumentation capable of measuring dissolved oxygen (DO), pH, and turbidity (in nephelometric turbidity units (NTU’s));

3. Monitoring Frequency. During dredging, manual water quality samples shall be collected once daily after dredging operations have been underway for a minimum of one hour. The reference station outside the influence of dredging shall also be sampled at similar depths and frequency for comparison to the samples collected from the dredge area. Sampling may be reduced to weekly sampling if no water quality exceedances of the Receiving Water Limitations described in section II.E of this Certification are observed or measured after 3 consecutive days of monitoring. If after 3 consecutive days without an exceedance the monitoring frequency is reduced to weekly, all water quality parameters may be measured during one monitoring event per week. The monitoring frequency must return to daily if an exceedance of the Receiving Water Limitations described in section II.E of this Certification is observed or measured. The monitoring frequency can again be reduced to weekly sampling if 3 consecutive days of monitoring show there are no exceedances of Receiving Water Limitations.

4. Sample Integrity. The integrity of each water sample collected shall be maintained from the time of collection to the point of data reporting. Proper record keeping and chain of custody (COC) procedures shall be implemented to allow samples to be traced from collection to final disposition. After collection of water samples, documentation on various logs and forms shall be required to adequately identify and catalog sample information; and

5. Compliance Criteria. Receiving Water Limitations are provided in section II.E of

this Certification. The point of compliance with these receiving water limitations shall be located at the compliance monitoring stations described above. The Project construction area is defined as the area(s) occupied by the dredging barge(s), the scow(s), silt curtains, and other associated work activities.

General Dynamics NASSCO - 22 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

K. Response Actions to Monitoring Results. In the event that visual observations or water quality monitoring described in Section VI.I and VI.J of this Certification indicate an exceedance of an applicable Receiving Water Limitation described in Section II.E of this Certification, the Applicant shall implement the additional or enhanced operational or engineering BMPs described below: 1. Evaluate the concurrent measurements at background and compliance monitoring

stations and supporting visual evidence to determine whether the exceedance is caused by construction activities or by other ambient conditions in the San Diego Bay (e.g., wind waves, boat wakes, barge/ship traffic, and storm inflow).

2. Immediately re-take measurements at reference and compliance stations. 3. If the exceedance is confirmed, immediately notify the dredge contractor to

immediately modify operations or implement additional BMPs to mitigate the exceedance. Operational modifications may include, but are not limited to the following modifications implemented individually or in combination: a. Adjust the sequence and/or speed of dredging and disposal operations;

b. Reposition dredge operations in such a way as to ensure future exceedances do

not occur;

c. Fix, maintain, and/or upgrade floating silt curtains; and

d. Modify, either on a temporary or permanent basis, dredge equipment (such as the dredging bucket size or type).

4. Re-evaluate field measurements at all relevant stations 30 minutes later, after additional BMPs or operational modifications are implemented.

5. If the receiving water limitation exceedance continues to persist, even with additional BMPs, determine and implement more aggressive BMPs or operational modifications that resolve the exceedance or stop work to further assess the source of the exceedance, identify effective mitigation measures, and allow the water column to recover.

L. Geographic Information System Data. The Applicant must submit Geographic

Information System (GIS) shape files of the Project impact sites within 30 days of the start of project construction and GIS shape files of the Project mitigation sites within 30 days of mitigation installation. All impact and mitigation site shape files must be polygons. Two GPS readings (points) must be taken on each line of the polygon and the polygon must have a minimum of 10 points. GIS metadata must also be submitted.

General Dynamics NASSCO - 23 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

M. Receiving Water and Visual Observation Monitoring Report. The Applicant shall prepare monthly monitoring reports that contain the results of receiving water quality and visual observation monitoring activities for each week of that month. The reports must be submitted no later than 30 days following each calendar month of in-water construction and must include:

1. The following identification numbers included at the end of the header or subject

line: Certification No. R9-2018-0024:844159:lhonma;

2. The names, qualifications, and affiliations of the persons contributing to the report;

3. A summary table of the monitoring results with a comparison to receiving water limitation compliance criteria;

4. An evaluation, interpretation, and tabulation of the visual observations required under section VI.I and water quality data required under section VI.J including interpretations and conclusions as to whether applicable receiving water limitations were attained at each monitoring station;

5. A description of each incident of non-compliance and its cause, the period of the noncompliance including exact dates and times, and actions taken to reduce, eliminate, and prevent reoccurrence of the noncompliance; and

6. For any weekly monitoring period in which no dredging or disposal activities were conducted, the reporting must include a statement certifying that dredging activities or in-water work occurred during the monitoring period.

N. Annual Project Progress Reports. The Applicant must submit annual Project

Progress Reports until this certification has expired or been terminated. The Project Progress Reports must describe the status of BMP implementation, compensatory mitigation (as required by CEMP), and compliance with all requirements of this Certification to the San Diego Water Board prior to March 1 of each year following the issuance of this Certification, until the Project has reached completion. If compensatory mitigation for eelgrass impacts is necessary, the Annual Project Progress Reports must contain compensatory mitigation monitoring information sufficient to demonstrate how the compensatory mitigation project is progressing towards accomplishing its objectives and meeting its performance standards. Annual Project Progress Reports must be submitted even if Project construction has not begun. The monitoring period for each Annual Project Progress Report shall be January 1st through December 31st of each year. Annual Project Progress Reports must include, at a minimum, the following: 1. Project Status and Compliance Reporting. The Annual Project Progress Report

must include the following Project status and compliance information:

a. The names, qualifications, and affiliations of the persons contributing to the report;

General Dynamics NASSCO - 24 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

b. The status, progress, and anticipated schedule for completion of Project construction activities including the installation and operational status of best management practices project features for erosion and storm water quality treatment;

c. A description of Project construction delays encountered or anticipated that may affect the schedule for construction completion;

d. A description of each incident of noncompliance during the annual monitoring period and its cause, the period of the noncompliance including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and the steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance;

e. The total volume of dredged material (in cubic yards) for the monitoring period; and

f. The pre- and post- construction eelgrass surveys, as applicable, required under

section V.C of this Certification, including a description of any additional actions that will be taken by the Applicant to mitigate for impact to eelgrass habitat beyond what is expected.

2. Compensatory Mitigation Monitoring Reporting. If compensatory mitigation for eelgrass impacts is required, mitigation monitoring information must be submitted as part of the Annual Project Progress Report for a period of not less than five years, sufficient to demonstrate that the compensatory mitigation project has accomplished its objectives and met ecological success performance standards contained in the Mitigation Plan. Monitoring shall be conducted in accordance with the standards of the CEMP. Following Project implementation, the San Diego Water Board may reduce or waive compensatory mitigation monitoring requirements upon a determination that performance standards have been achieved. Conversely, the San Diego Water Board may extend the monitoring period beyond five years upon a determination that the performance standards have not been met or the compensatory mitigation project is not on track to meet them. The Annual Project Progress Report must include the following compensatory mitigation monitoring information: a. Names, qualifications, and affiliations of the persons contributing to the report;

b. An evaluation, interpretation, and tabulation of the parameters being monitored,

including the results of the Mitigation Plan monitoring program, and all quantitative and qualitative data collected in the field;

c. Monitoring data interpretations and conclusions as to how the compensatory mitigation project(s) is progressing towards meeting performance standards and whether the performance standards have been met;

General Dynamics NASSCO - 25 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

d. A description of the progress toward implementing a plan to manage the compensatory mitigation project after performance standards have been achieved to ensure the long term sustainability of the resource in perpetuity, including a discussion of long term financing mechanisms, the party responsible for long term management, and a timetable for future steps;

e. Qualitative and quantitative comparisons of current mitigation conditions with pre-construction conditions and previous mitigation monitoring results;

f. As-built drawings of the compensatory mitigation project site(s), no bigger than

11”X17”; and

g. A survey report documenting boundaries of the compensatory mitigation site(s).

O. Final Project Construction Completion Report. The Applicant must submit a Final Project Construction Completion Report to the San Diego Water Board within 30 days of completion of the Project construction. The final report must include the following information, at a minimum: 1. Date of construction initiation;

2. Date of construction completion; and

3. The total volume of dredged material (in cubic yards) for the Project.

P. Reporting Authority. The submittal of information required under this Certification, or in response to a suspected violation of any condition of this Certification, is required pursuant to Water Code section 13267 and 13383. Civil liability may be administratively imposed by the San Diego Water Board for failure to submit information pursuant to Water Code sections 13268 or 13385.

Q. Electronic Document Submittal. The Applicant must submit all reports and information required under this Certification in electronic format via e-mail to [email protected]. Documents over 50 megabytes will not be accepted via e-mail and must be placed on a disc and delivered to: California Regional Water Quality Control Board San Diego Region Attn: 401 Certification No. R9-2018-0024:844159:lhonma 2375 Northside Drive, Suite 100 San Diego, California 92108

General Dynamics NASSCO - 26 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

Each electronic document must be submitted as a single file, in Portable Document Format (PDF), converted to text searchable format using Optical Character Recognition (OCR), and not be password protected. All electronic documents must include scanned copies of all signature pages; electronic signatures will not be accepted. Electronic documents submitted to the San Diego Water Board must include the following identification numbers in the header or subject line: Certification No. R9-2018-0024:844159:lhonma.

R. Document Signatory Requirements. All applications, reports, or information submitted to the San Diego Water Board must be signed as follows:

1. For a corporation, by a responsible corporate officer of at least the level of vice

president. 2. For a partnership or sole proprietorship, by a general partner or proprietor,

respectively. 3. For a municipality, or a state, federal, or other public agency, by either a principal

executive officer or ranking elected official. 4. A duly authorized representative may sign applications, reports, or information if:

a. The authorization is made in writing by a person described above. b. The authorization specifies either an individual or position having responsibility

for the overall operation of the regulated activity.

c. The written authorization is submitted to the San Diego Water Board Executive Officer.

If such authorization is no longer accurate because a different individual or position has responsibility for the overall operation of the Project, a new authorization satisfying the above requirements must be submitted to the San Diego Water Board prior to or together with any reports, information, or applications, to be signed by an authorized representative.

S. Document Certification Requirements. All applications, reports, or information submitted to the San Diego Water Board must be certified as follows:

"I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment."

General Dynamics NASSCO - 27 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

VII. NOTIFICATION REQUIREMENTS

A. Commencement of Construction Notification. The Applicant must notify the San Diego Water Board in writing at least 5 days prior to the commencement of dredge and disposal activities. Please include the scheduled start and stop dates for dredge and disposal activities.

B. Twenty-Four Hour Non-Compliance Reporting. The Applicant shall report any noncompliance which may endanger health or the environment. Any such information shall be provided orally to the San Diego Water Board within 24 hours from the time the Applicant becomes aware of the circumstances. A written submission shall also be provided within five days of the time the Applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance and its cause; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected; the anticipated time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent recurrence of the noncompliance. The San Diego Water Board, or an authorized representative, may waive the written report on a case-by-case basis if the oral report has been received within 24 hours.

C. Caulerpa Taxifolia. The Applicant must conduct a surveillance-level survey for Caulerpa taxifolia, in accordance with the requirements in the National Marine Fisheries Service’s Caulerpa Control Protocol (version 4), dated February 25, 2008, not more than 90 days before the initiation of construction to determine presence/absence of this species within the immediate vicinity of the project. If Caulerpa taxifolia is identified during a survey, or at any other time before, during, or within 120 days following completion of authorized activities, both National Marine Fisheries Service and California Department of Fish and Wildlife must be contacted within 24 hours of first noting the occurrence. In the event Caulerpa taxifolia is detected, all disturbing activity must cease until such time as the infestation has been isolated and treated, or the risk of spread from the disturbing activity is eliminated in accordance with the Caulerpa Control Protocol.

D. Hazardous Substance Discharge. Except as provided in Water Code section 13271(b), any person who, without regard to intent or negligence, causes or permits any hazardous substance or sewage to be discharged in or on any waters of the State, shall as soon as (a) that person has knowledge of the discharge, (b) notification is possible, and (c) notification can be provided without substantially impeding cleanup or other emergency measures, immediately notify the County of San Diego, in accordance with California Health and Safety Code section 5411.5 and the California Office of Emergency Services of the discharge in accordance with the spill reporting provision of the State toxic disaster contingency plan adopted pursuant to Government Code Title 2, Division 1, Chapter 7, Article 3.7 (commencing with section 8574.17), and immediately notify the State Water Board or the San Diego Water Board of the discharge. This provision does not require reporting of any discharge of less than a reportable quantity as provided for under subdivisions (f) and (g) of section 13271 of the Water Code unless the Applicant is in violation of a Basin Plan prohibition.

General Dynamics NASSCO - 28 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

E. Oil or Petroleum Product Discharge. Except as provided in Water Code section 13272(b), any person who without regard to intent or negligence, causes or permits any oil or petroleum product to be discharged in or on any waters of the State, or discharged or deposited where it is, or probably will be, discharged in or on any waters of the State, shall, as soon as (a) such person has knowledge of the discharge, (b) notification is possible, and (c) notification can be provided without substantially impeding cleanup or other emergency measures, immediately notify the California Office of Emergency Services of the discharge in accordance with the spill reporting provision of the State oil spill contingency plan adopted pursuant to Government Code Title 2, Division 1, Chapter 7, Article 3.7 (commencing with section 8574.1). This requirement does not require reporting of any discharge of less than 42 gallons unless the discharge is also required to be reported pursuant to Clean Water Act section 311, or the discharge is in violation of a Basin Plan prohibition.

F. Anticipated Noncompliance. The Applicant shall give advance notice to the San Diego Water Board of any planned changes in the Project or the Compensatory Mitigation project which may result in noncompliance with Certification conditions or requirements.

G. Transfers. This Certification is not transferable in its entirety or in part to any person or organization except after notice to the San Diego Water Board in accordance with the following terms: 1. Transfer of Property Ownership: The Applicant must notify the San Diego Water

Board of any change in ownership of the Project area. Notification of change in ownership must include, but not be limited to, a statement that the Applicant has provided the purchaser with a copy of the Section 401 Water Quality Certification and that the purchaser understands and accepts the certification requirements and the obligation to implement them or be subject to liability for failure to do so; the seller and purchaser must sign and date the notification and provide such notification to the San Diego Water Board within 10 days of the transfer of ownership.

2. Transfer of Mitigation Responsibility: Any notification of transfer of responsibilities to satisfy the mitigation requirements set forth in this Certification must include a signed statement from an authorized representative of the new party (transferee) demonstrating acceptance and understanding of the responsibility to comply with and fully satisfy the mitigation conditions and agreement that failure to comply with the mitigation conditions and associated requirements may subject the transferee to enforcement by the San Diego Water Board under Water Code section 13385, subdivision (a). Notification of transfer of responsibilities meeting the above conditions must be provided to the San Diego Water Board within 10 days of the transfer date.

General Dynamics NASSCO - 29 - July 26, 2018 Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

3. Transfer of Post-Construction BMP Maintenance Responsibility: The Applicant assumes responsibility for the inspection and maintenance of all post-construction structural BMPs until such responsibility is legally transferred to another entity. At the time maintenance responsibility for post-construction BMPs is legally transferred the Applicant must submit to the San Diego Water Board a copy of such documentation and must provide the transferee with a copy of a long-term BMP maintenance plan that complies with manufacturer specifications. The Applicant must provide such notification to the San Diego Water Board within 10 days of the transfer of BMP maintenance responsibility.

Upon properly noticed transfers of responsibility, the transferee assumes responsibility for compliance with this Certification and references in this Certification to the Applicant will be interpreted to refer to the transferee as appropriate. Transfer of responsibility does not necessarily relieve the Applicant of responsibility for compliance with this Certification in the event that a transferee fails to comply.

VIII. CALIFORNIA ENVIRONMENTAL QUALITY ACT COMPLIANCE

A. The San Diego Unified Port District is the Lead Agency under the California Environmental Quality Act (CEQA) (Public Resources Code section 21000, et seq.) section 21067, and CEQA Guidelines (California Code of Regulations, title 14, section 15000 et seq.) section 15367 and has determined that the Project is categorically exempt.2

B. The San Diego Water Board is a Responsible Agency under CEQA (Public Resources Code section 21069; CEQA Guidelines section 15381). The San Diego Water Board has independently determined that the project is categorically exempt because the Project consists of maintenance of an existing facility, does not expand the existing use of facilities and structures, and consists of maintenance dredging where the spoil is deposited in a spoil area authorized by all applicable state and federal regulatory agencies.3

C. As a Responsible Agency under CEQA, the San Diego Water Board will file a Notice of Exemption in accordance with CEQA Guidelines section 15062.

IX. SAN DIEGO WATER BOARD CONTACT PERSON

Lisa Honma, Environmental Scientist Telephone: 619-521-3367 Email: [email protected]

2 14 CCR section 15301 and 15304 3 14 CCR section 15301 and 15304

General Dynamics NASSCO Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IVN Project Certification No. R9-2018-0024

X. WATER QUALITY CERTIFICATION

- 30 - July 26, 2018

I hereby certify that the proposed discharge from the Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IVN Project (Certification No. R9-2018-0024) will comply with the applicable provisions of sections 301 ("Effluent Limitations"), 302 ("Water Quality Related Effluent Limitations"), 303 ("Water Quality Standards and Implementation Plans"), 306 ("National Standards of Performance"), and 307 ("Toxic and Pretreatment Effluent Standards") of the Clean Water Act. This discharge is also regulated under State Water Board Order No. 2003-0017-DWQ, "Statewide General Waste Discharge Requirements for Dredged or Fill Discharges that have Received State Water Quality Certification (General WDRs)," which requires compliance with all conditions of this Water Quality Certification. Please note that enrollment under Order No. 2003-017-DWQ is conditional and, should new information come to our attention that indicates a water quality problem, the San Diego Water Board may issue individual waste discharge requirements at that time.

Except insofar as may be modified by any preceding conditions, all Certification actions are contingent on (a) the discharge being limited to, and all proposed mitigation being completed in strict compliance with, the applicants' Project description and/or the description in this Certification, and (b) compliance with all applicable requirements of the Basin Plan.

I, David W. Gibson, Executive Officer, do hereby certify the forgoing is a full, true, and correct copy of Certification No. R9-2018-0024 issued on July 26, 2018.

Executive Officer San Diego Water Board

JC, -30\-y 201~ Date

General Dynamics NASSCO Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

1

ATTACHMENT 1 DEFINITIONS

Activity - when used in reference to a permit means any action, undertaking, or project including, but not limited to, construction, operation, maintenance, repair, modification, and restoration which may result in any discharge to waters of the state. Buffer - means an upland, wetland, and/or riparian area that protects and/or enhances aquatic resource functions associated with wetlands, rivers, streams, lakes, marine, and estuarine systems from disturbances associated with adjacent land uses. California Rapid Assessment Method (CRAM) - is a wetland assessment method intended to provide a rapid, scientifically-defensible and repeatable assessment methodology to monitor status and trends in the conditions of wetlands for applications throughout the state. It can also be used to assess the performance of compensatory mitigation projects and restoration projects. CRAM provides an assessment of overall ecological condition in terms of four attributes: landscape context and buffer, hydrology, physical structure and biotic structure. CRAM also includes an assessment of key stressors that may be affecting wetland condition and a "field to PC" data management tool (eCRAM) to ensure consistency and quality of data produced with the method. Compensatory Mitigation Project - means compensatory mitigation implemented by the Applicant as a requirement of this Certification (i.e., applicant -responsible mitigation), or by a mitigation bank or an in-lieu fee program. Discharge of dredged material – means any addition of dredged material into, including redeposit of dredged material other than incidental fallback within, the waters of the United States and/or State. Discharge of fill material – means the addition of fill material into waters of the United States and/or State. Dredged material – means material that is excavated or dredged from waters of the United States and/or State. Ecological Success Performance Standards – means observable or measurable physical (including hydrological), chemical, and/or biological attributes that are used to determine if a compensatory mitigation project meets its objectives. Enhancement – means the manipulation of the physical, chemical, or biological characteristics of an aquatic resource to improve a specific aquatic resource function(s). Enhancement results in the gain of selected aquatic resource function(s), but may also lead to a decline in other aquatic resource function(s). Enhancement does not result in a gain in aquatic resource area.

General Dynamics NASSCO Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

2

Establishment – means the manipulation of the physical, chemical, or biological characteristics present to develop an aquatic resource that did not previously exist. Creation results in a gain in aquatic resource area. Fill material – means any material used for the primary purpose of replacing an aquatic area with dry land or of changing the bottom elevation of a water body. Isolated wetland – means a wetland with no surface water connection to other aquatic resources. Mitigation Bank – means a site, or suite of sites, where resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing mitigation for impacts authorized by this Certification. Preservation - means the removal of a threat to, or preventing the decline of, aquatic resources by an action in or near those aquatic resources. This term includes activities commonly associated with the protection and maintenance of aquatic resources through the implementation of appropriate legal and physical mechanisms. Preservation does not result in a gain of aquatic resource area or functions. Re-establishment - means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/ historic functions to a former aquatic resource. Re-establishment results in rebuilding a former aquatic resource and results in a gain in aquatic resource area and functions. Rehabilitation - means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural/ historic functions to a degraded aquatic resource. Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in aquatic resource area. Restoration - means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former or degraded aquatic resource. For the purpose of tracking net gains in aquatic resource area, restoration is divided into two categories: re-establishment and rehabilitation. Start of Project Construction - For the purpose of this Certification, "start of Project construction" means to engage in a program of on-site construction, including site clearing, grading, dredging, landfilling, changing equipment, substituting equipment, or even moving the location of equipment specifically designed for a stationary source in preparation for the fabrication, erection or installation of the building components of the stationary source within waters of the United States and/or State.

General Dynamics NASSCO Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

3

Uplands - means non-wetland areas that lack any field-based indicators of wetlands or other aquatic conditions. Uplands are generally well-drained and occur above (i.e., up-slope) from nearby aquatic areas. Wetlands can, however, be entirely surrounded by uplands. For example, some natural seeps and constructed stock ponds lack aboveground hydrological connection to other aquatic areas. In the watershed context, uplands comprise the landscape matrix in which aquatic areas form. They are the primary sources of sediment, surface runoff, and associated chemicals that are deposited in aquatic areas or transported through them. Water quality objectives and other appropriate requirements of state law – means the water quality objectives and beneficial uses as specified in the appropriate water quality control plan(s); the applicable provisions of sections 301, 302, 303, 306, and 307 of the Clean Water Act; and any other appropriate requirement of state law. Waters of the State - means any surface water or groundwater, including saline waters, within the boundaries of the State. [Water Code section13050, subd. (e)].

General Dynamics NASSCO Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

ATTACHMENT 2

PROJECT LOCATION MAPS

Figure 1 – Location Map

Figure 1

c., t Ser-..ce l ayerCredls: Sources: E~ ERE, De'G:trme, USGS,~rmap. incremmt P Corp .. NRCAN. Esl'iJapan. MET I. Esri ~i\_(Hong Kong) . Esri (~and).Mapmylndia. 0 OpenStreetMap contributors, and the GIS User Commun~

Encinitas

Solaria Beach

Del Ma\

Rancho Sa'nta Fe

Riverside County

Map Locatio

Sanlll!e

~\ .,:;

\ -t',11>

Imperial County

; ,..,rt• L~ke ,ide .--;..---1 / Win ter La Joi la

Nonh I I nd N alAo St loon

..,. z • d> , ..

"~ ~ a.

Imperial Beach

Los_ - srnta-Lauretes R<mi

El Corte z

Tijll),lha c'al'ete

dt Gardens

Harbison Canyon

...JA,.W..1.LE" El Cajon

Granite Hill s Crest

Jamul

0 ~5 S • -----====::::11.,, .. LL 1 lnch=Sml~ "W

Lop-ez '...J Las Rp hos

Pa lmaS" "-----------....--.... Path; O :\A. uabcs\POSD'IMXD\Re d F)Qutes\NASSCOFeidt>rs'll oca!!OnMa .mxd. rodielkl atucc.dlt 313112016

amec foster wheeler • Location Map General Dynamics NASSCO

San Diego Bay, CA

\l

General Dynamics NASSCO Maintenance Dredging at Pier 12, the Dry Dock Sump, and Berths IV/V Project Certification No. R9-2018-0024

ATTACHMENT 3

PROJECT SITE PLANS

Figure 2 – Proposed Dredge Areas Figure 3 – Current Bathymetry Figure 4 – Proposed Sediment Management Areas

F I G U R EProposed Dredge Areas

Sediment Characterization StudyGeneral Dynamics NASSCO Shipyard

San Diego, California1-2

Path: Q:\Aquatics\NASSCO\MaintenanceDredging2017\MXD\Review\NASSCO_DredgeSiteReview_11x17.mxd, corey.sheredy 1/5/2018

!.

!.

BA

G

F

C

DE

J

H

KL

M

SW-1

SW-2

o0 19095Feet

1 inch = 200 feet

Service Layer Credits: SANDAG Technical Services - GIS

P I E R 1 2 DR

Y D

OC

K

B E R T H X

B E R T H I X

B E R T H VB E R T H I V

L e g e n d

!. Stormwater Discharge Locations

Pier HeadLines

Proposed Dredge AreasComposite A

Composite B

Composite C

Composite D

2

lhonma
Text Box
Figure 2. Proposed Dredge Areas

2 of 2

105

105

315

327

313

317

321

313

364

292

324

283

320

292

378

285

313

317

517

522

321

241

385

518

9

325

380

312

376

283

367

341

347

357

300

240

313

324

51

253

324

202

274

324

304

316

322

297

296

372

222

317

310

264

545

246

386

325

379

319

369

212

372

365

303

308

352

280

324

328

308

354

307

361

294

358

152

306

321

373

224

310

313

539

377

376

316

551

355

374

331

329

276

359

349

333295

314

328

301

297

312

316

303

312

374

294

325

296

257

5

377

234

319

308

334

297

251

523

126

394

371 305

372

291

330

329

299

315

312310

312

294

7

204

292

321

252

318

415

292

327

274

320

348

321

285

312

438

379

327

39

319

374

298

376

291

377

314

315

275

323

317

306

318

307

360

293

316

283

95

326

368

224

310

312

311

396

317

339

83

332

284

368

367

330

303

304331

316

293

319

316

312

317

373

296

320

293

349

233

319

308

507

312

249

521

110

318

376

316

371

288

382

331

301

328

236

310

311

309

277

275

2

179

310

322

267

317

5

295

339

248

320

360

305

291

312

316

381

319

319

373

240

373

371

376

309

316

243

314317

304

317

313

359

307

310

294

361

369

230

306

310309

39

334

386

342

292

375

396

324

305

303

325

317

313

323

315

316

296

313

372

288

323

310

314

294

381

231

320

317

289

516

306

245

417

304

380

327

374

315

379

288

378

334

341

336

307

312

321

38

268

345

189

281

322

287

317

298

305

374

212

317

440

310

296547

334

380

323

380

319

366

217

365

366

303

320

75

316

316

316

312

366

309314

283

169

373

236

334

310

308

231

19

329

322

365

289

375

319

297

302

322

317

308

312

311

243

262

334

309

312

353

310

312

161

152

375

281

351

306

308

228

403

324

0

320

373

283

376

126

391

304

296319

293

325

313

312

318

313

369

291

323

282

326

307

370

294

311

315

477

287

318

238

531

516

376

323

382

311

372

97

371

303

313

491

308

219

281

352

363

313

314

262

247

320

308

324

319

296

228

370

220

316

280

309

262

544

299

388

369

378

318

378

174

371

362

304

302

345290

314

314

318

359

311

352

306

312

319

270

127

78

278

368

315

305

225

321

320

370

279

328

31

413

304

301

317

275

315

315

317

255

316

314

367

291

323

276

342

305

346

304

300

310

294280

313

266

533

513

376

321

384

307

372

149

373

298

319

314

314

58

304

330

316

317

314

274

223

361

310

327

316

306

230

369

218

310

309

255

537

290

367

378

379

190

370

360

385

305

309

335

141

324

315

311

252

315

363

311

350

304

312

313

26569

99

373

316

301

182

376

214

370319

365

276

358

451

303

300

315

266

321

317

316

347

315

381

290

355

155

304

303

323

312

303

322

307

275

310

275

539

506

378

320

393

309373

374

298

328

305

316

315

321

316

328

382

211

357

311

329

313

308

278

368

325

217

305

248529

286

367

377

278

382

203

388

338

311

315

307

306

71

359

309

313

367

311

348

304

321

93

203

89

192

378

317

319

207

181

384

308

364

370

64

380

306

322

309

291

320

317

315

104

320

314

382

300

331

76

303

301

316

308

325

311

271

305

263

547

494

383

319

359

322

374

237

385

297

333

305

312

155

319

319

315

327

381

215

353

313

330

307

295

294

367

78

328

205

306

244

473

278

380

336

376

262

364

353

299

319

299

304

316

447

315

316

230

7

375

321

339

302

323

123

358

108

198

310

319

317 213

286

171

409

315

364

159

368

94

379

309

320

306

256

318

319

311

200

320

313

305

337

300

342

365

1

323

305

407

254

366

257

527

405

389

350

384

213

382

227

376

23

341

311

309

313

324

315

309

325

372

229

336

315

332

346

293

366

74

315

501

379

237

304

271

379

335

380

250

364

281

373

279

321299

298

539

314

268

376

16

342

301

328

163

298

183

204

316

319

316

249

446

167

434

316

366

293

368

98

378

308

318

304

261

317

320

308

186

319

313

312

335

314

293

345

224

352

305

531

226

75

251

433

521

356

383

272

223

376

276

344

308

311

311

314

314

324

319

376

309

333

324

318

291

239

376

47

314

236

308

248

526269

378

333

382

245

376

257

369

248

298

301

357

341

314

309

212

379

379

-11

355

288

336

232

297

217

298

313

319

315

255

424

150

336

323

366

299

366

231

376

307

315

304

312

379

321

312

160

319

312

377

309

330

313

292

319

228

304

533

293

375

233

413

529

383

359

382

266

219

375

309

297

307

290

310

307

322

315

323

317

379

307

331304

314

325

285

234

318

17

314

233

304

234

525

373

378

371

382

229

376 370

214

310

316

365

349

380

313

306

288

364

277

354

298

310316

292

224

331

319

308

319

313

272

377

222

361

326

306

361

269

373

306

314

303

310

323

322

320

284

317

311

376

307327

313

296

302

227

314

304

525

254

73

228

385

203

383

363381

260

374

318

304

322

299

309

306

321

317

321

316

304

326

301

307

324

281

233

372

10

313 230

303

222

523

202

377

373

380

231

374

368

53

309304

305

331

310

285

290

333

363

273

350

306

304

321

296

269

242

303

318

312

287

309

290

362

359

384

330

379

329

382

273

375

303

305

308

309

311315

302

290

316

309

375

236

321

312

307

311

376

226

312

303

528

236

372

224

497

179

376

364

381

254

65

373

196

303

322

345

309

305

320

318

315

316

233

322

290

308

323

253

231

370

312

227

302

213

493

149

384

375

374

332

374

368

313

308

310

319

329

73

312

284

283

322

361

263

318

311

303

348

295

277

220

306

316

305 292

285

263

332

3

327

366

415

387

267

385

304

323

344

306

306

314

314

311

342

315

240

323

312

310

314

374

219

315

297

521

211

369

268

552

152

366

380

253

300

372

193

302

321

366

308

304

320

320

335

315

386

230

320

296

311

323

268

230

512

312 225

301

85

299

130

376

375

368

368

299

308

314

313

323

367

317

294

280

317

360

250

346

310

301

341

294

314

219

310

313

314

257

288

200

0

348

324

374

369

252

426

308

326

288

317

313

312

334

317

382

251

360

311

318

314

377

225

315

301

518

371

276

558

138

326

385

248

281

378

183

302

320

370

298

303

319

321

341

314

323

224

319

299

310

322

302

227

365

15

316

212

300

97

443

114

381

320

429

385

274

367

19

307

313

312

321

343

338

298

277

316

356

284

346

309

299

323

299

300

219

324

311

249

496

315

369

352

382

322

375

368

388

307

328

289

317

312 303

329

322

261

339

07

305

313

382

245

315

306

511

195

367

281

564

115

388

324

390

279

272

379

174

301

319

304

314

318

318

324

317

313

356

290

289

299

321

321

371

247

320

35

318

85

289

119

530

03

379

360

383

319

388

269

376

15

306

312

313

319

355

273

381

337

282

345

308

298

287

301

297

218

320

345

309

244518

121

367

356

379

317

76

93

367

369

306

303

358

291

315

310

311 327

344

385

312

330

269

303

319

224

314306

505

375

284

572

322

370

323

114

380

163

301

318

313

318

318

322

338

310

329

366

287

285

308

328

300

383

258

321

82

321

481

311

303

531

-11

378

352

38

307

372

258

370

314

321

315

303

363

312

268

315

281

357

305

316

286

302

296

361

199

319

323

311

238

527

281

370

380

316

366

344

306

302

346

313

338

310

312

5

326

310

301

319

247

302

329

383

227

314

307

485

259

374

288

563

220

380

316

369

292

374

126

383

307

324

312

305

316

325

315

318

320

364

284

330

304

307

327

380

281

374

316

453

311

342

534

250

377

344

385

313

375

118

369

94

304

317

316

333

316

315

309

384

367

274

361

304

326

284

302

292

242

318

311

310

210

310

310

376

385

315

363 278

339

305

306

315

315

330

316

315

384

325

309

327

298

316

222

300

320

381

226

311308

531

275

365

294

559

239

379

321

362

290

176

375

201

308

325

310

303

314

346

292

317

318

363

281

337

302

300

329

380

262

48

315

425

310

410

536

275

376

378

314

374

238

368

119

300

316

299

337

317

315

315

310

206

199

321

277

321

283

304

287

327

256

317

309

310

192

311

572

384

331

331

376

161

364

281

333

305

308310

17

327

317

322

9

302

307

324

296

323

208

298

316

222

311

315

533

303

369

245

555

264

377

320

365

271

370 317

377

236

309325

308

302

310

350

294

316

316

362

341

301

298

338

379

237

520

313

396

310

235

529

218

375

298

370

314

373

236

357

309

301

315

289

340

316

314

316

306

239

190

334

306

321

312

308

318

286

314

305

316

311

528

381

329

347

375

271

370

283

434

310307

305

285

326

318

348

1

358

308

361

295

326

128

295

317

222

310

314

536

333

371

313

554

381

368

329

327

260

362

333

353

272

312

327

308

299

314

376

298

315

315

363

260

324

298

378

235

379

529

312

379

309

255

525

154

311

371

315

70

337

322

302

313

313

313

313

316

303

227

284

326

306

320

380

303

322

386

108

322

307318

272

311

496

378

327

389

320

375

284

371

287

331

307

377

323

324

138

258

324

201

274

320

304

316

324

297

296

372

222

317

376

310

265

545

326

386

324

380

319

369

214

372

365

303

322

354

259

312

315

287

349

310

312

355

310

307

156

74

281

343

305308

229

401

324

320

373

283

376

388

304

301

319

309

298

312

316

303

236

315

374

292

326

296

262

377

234

319

311

342289

252523

132

388

387

371

375

372

292

330

328

302

315

186

312

310

312

333

294

78

208

288

321

247

319

412

299

325

275

320

348

319

284

311

457

378

327

320374

291

376

289

314

315

378

277

323

318

307

318

307

360

293

317

281

310

325

371

224

310

312

311

394

317

548

345

382

331

283

367

365

330

312

304

330

315

296

319

316

312

273

317373 320

293

389

233

319

309

502

312

249

522

116

415

376

317

372

289

382

331

301

314

42

310

312

309

271273

176

303

322

261

317

294

331

262

320

352

336

290

312

369

381

326

392

319

374

172

374

327

310

316

242

314

317

305

317

315

359

305

310

35

298

359

368

229

306

311

304

475

337

386

335

166

375

382

325

306

299

323

317

312

321

316

316

296

311

373

289

322

307

312

294

383

232

320

318

309

514

308

246

435

268

380

327

375

315

380

288

378

333

339

331

244

309

312

320

289

280

350

186

283

322

317

5

298

243

369

229

319

486

310

296

532341

380

322380

319

366

218

365

366

6

303

319

382

316

316

316

312

366

308

315

290

180

372

233

326

310308

231

330

381

316

388

289

375

412

319

305

302

322

318

314

326

313

317

322

313

370

292

324

318

292

379

285

317

317

523 519

321

245

388

518

379

326

380

312

377

285

377

338

344

347

259

296

325

313

318

319

313

366

291

323

282

325

308

371

294

312

316

483

287

319

238

530

516

376

323

381

312

372

264

371

303

349

462

307

220

280

354

363

311

320

256

249

346

303

323

319

296

228

371

221

316

288

309

262

544

322

387

370

378

319

378

204

372

362

1

304

302

345

294

314

313

248

319

314

311

352

234

312

319

272

130

378

279

366

315

307

225487

323

320

370

280

103

402

304

301

317

272

304

313

317

261

317

314

367

291

323

278

334

306

353

302

305

310

291

285

317

262

533

513

376

321

383

306

372

149

373

299

318

314

312

58

294

333316

316

314

267

224

363

310

306

327

316

229

369

219

311

254

309

256

537

291

367

378

323

379

188

371

360

311

305

299

338

157

319

315

311

315

362

311

350

304

312

314

266

63

385

132

371

315

302

181

215

368

377

319

369

277

356

02

440

304

300

315

281

322

317

316

227

346

315

380

290

344

11

306

304

323

309

303

320

303

276

311

275

536

509

320

385

309

373

259374

298

327

313

315

315

321

316

318

383

210

358

311

328

313

308

276

368

110

325

221

303

250

532

288

367

377

285

379

198

384

329

312

308

307

314

345

318

312

315

366

311

349

304

318

183

232

85

189

375

317

317

196

202

382

319

365

273

370

63

380

303

322

309

292

320

317315

9

321

314

381

289

366

76

303

301

327

314

307

325

284272

307

248

547

496

383

319

398

321

374

239

384

297

332

305

312

318

319315

327

381

214

356

313

330

307

284

290

367

84

328

207

306

244

471

278

380

336

377

268

388

204

352

303

319

305

305

316

423

315

315

375

317

323

302

322

333

107

195

367

318

318

212

172

404315

364

369

379

309

320

304

290

319

319

311

206

320

313

380

303

330

300

341

364

320

323

299

400

256

308

259

534

458

388

349

384

329

382

228

378

296

340

305

311

295

324

318312

325

379

218

336

315

331

5

294

349

366

75

315

157

370

239

547

274

379

335

380

253

369

293

372

286

321

299

298

317

520

314

318

376

17

342

301

327

298

117

380

203

318

316

316

243

461

170

426

316

366

293

378

308

319

304

259

318

320

306

188

319

313

377

312

336

303

294

230

337

305

530

227

74

251

465

519

377

355

383

273

369

223

376

276

344

308

304

312

314

314

314

324

319

376

309

334

323

318

348

291

240

375

47

314 236

309

118

527

269

375

333

379

245

371

259

354

256

325301

543

339

314

300

377

-16

344

285

332

229

297

215

378

298

313

320

315

253

425

150

461

323

380

299

367

227

376

308

315

304

300

359

321

312

167

319

312

310

330

313

292

301

378

228

380

304

533

289

75

221

417

527

358

383

269

220

375

309

348

308

287

311

269

322

314

323

317

379

308

331

305

316

287

235

381

22

306

234

305

240

525

360

378

371

382

228

376

370

223

311

317

362

348

313

307

359

282

355

297

311315

293

222

336

318

308

319

314

266

386

66

362

325

304

361

256

372

307

314

303

310

331

321

319

318

311

307

327

313

296

301

377

227

304

536

374

229

402

204

383

362

381

260

217

374

316

304

324

298

310

306

321

317

322

316

378

305

327

301

306

324

282

233

12

313

230

303

223

524

-02

373

381

229

374

369

44

309

305

371

332

78

311

286

291

337

363

273

351

306

306

320

296

257

323

309

318

312

285

310

291

374

359

384

329

379

319

274

375

303

305

300

309

319

315

322

290

317

309

376

236

325

312

297

311

226

316

303

528

240

372

226

495

181

378

364

381

256

3

276

373

201

304

322

303

309

305

321

318

320

316

38

233322

286

308

324

254

232

371

313

227

302

215

511

377

375

374

328

374

368

308

303

319

330

312

284

284

322

361

264

342

309

303

345

295

273

220

304

317

307

291

285

277

373

334

327

385

269

384

303

307

314

307

319

314

314

307

330

309

374

239

323

312

309

312

226

312

297

522

212

369

516

163

381

365380

253

302

372

193

302

321

358

308

304

320

319

334

315

385

231

320

296

309

323

267

230

368

514

312

226

301

84

298

131

388

376

379

365

368

368

300

308

315

318

323

316

293

281

318

360

252

347

311

302

452

294

314

391

220

310

315

309

202

287

217

371

347

383

325

373

266

369

258427

309

324

314

287

318

314

313

334

316

251

355

311

315

314

376

225

315

298

518

203

371

273

557

140

382

326

385

248

283

371

183

302

320

369

298

304

319

320

339

315

323

227

319

298

310

322

302

229

14

316

216

300

96

450

115

384

380

417

384

367

27

307

313

312

323

344

334

297

278

312

357

346

309

297

335

299

300

219

324

311

312

255

495

164

363

350

3

323

375

369

390

307

327

6

289

317

312

305

388

330

320

272

340

311

305

314

237

315

306

516

196

281

562

123

324

390

278

273

379

178

302

319

379

313

315318

324

322

317

321

292

289

300

321

321

314

242

320

26

317

279

323

112

529

99

379

365

379

320

387

270

376

15

306

312

313

319

311

355

275

340

282

345

308

298

287

300

298

218

320

346

307

247

513

300

368

356

378

317376

73

367

373

306

310

290

315

310

301

327

343

385

312

333270

304

313

286

314

306

508

375

283

573

382

323

371380

301

318

313

317

318

315

328

307

331

366

288

285

306

325

320

383

256

321

319

487

311

282

531

-09

353

38

307

390

261

371

312

320

315

306

361

312

269

315

281

356

307

316

286

302

297

367

213

319

341

310

238523

16

367

370

379

316

366

345

299

302

349

313

337

310

312

385

326

310

387

302327

248

302

335

385

227

314

307

488

374

288565

216

380

318

370

293

374

381307

314

312

305

317

324

315

318

314

365

284

329

305

308

326

381

277

316

462

311

333

533

-21

377

344

385

313

372

123

370

304

317

316

314

317

313

306

366

275

360

304

322

285

302

286

349

176

318

312

310

310

306

375

384

315

363

277

339

306

306

316

314

323

316

311

325

310

364

293

311

223

301

321

382

226

311

308

531

266

372

293

560

234

379

322

361

291

372

176

385

144

308

324

310

304

314

336

313

317

318

363

282

336

303

302

329

380

266

375

50

315

447

310

393

536

284

376

379

313

374

241

369

300

316

300

334

318

315

315

374

366

293

330

283

304

288

327

250

317

310

310

199

310

538

384

326

386

329

370

164

364

280

334

305

308

311

317

327

317

322

2

323

303

324

296

318

213

299

314

221

311

313

533

291

368

247

555

257

378

321

365

271

370

312

378

231

309

325

309

302

310

349

294

316

317

362

278340

301

298

333

379

238

520

314

400

310

499

529

235

375

285

369

314

373

236

337

308

300

315

295

340

316

314

316

307

242

334

243

321

312

308

318

324

281

313

304

310

311

536

382

329

341

376

365

282

325

309

308

305

286

326

318

347

359

308

362

295

324

100

294

317

222

310

314

536

333

370

313

554

374

375

329

327

275

364

319

369

260

312

326

308

300

311

361

298

316

315

362

273

346

299

289

343

378

233

528

312

380

309

256

527

196

384

305

371

314

373

232

338

321

302

313

286

333

313

313

317

304

230

185

327

306

320

365

305

322

323

316

310

307318

271

311

514

373

327

315

375

284

371

286

314

307

377

281

325

324

309

356

308

361

294

354

146

306

319

223

310

313

538

366

371

316

551

355

372

331

329

275

357

347

333284

314

327

301

256

312

315

290

367

311

312

341

309

313

167

374

286

342

309

308

230

269

324

321

375

284

376

131

386

304

302

320

309

296

332313

317

320

313

365

292

323

282

321

309

371

293

312

316

501

289

320

239

478

517

379

324

381

312

369

258

371

297

312

418

304

312

311

313

333

295

378

212

286

321

304

316

410

301

324

278

321

348

318

278

311

474

378

327320

375

286

366

289

362

315

277

324

317

307

318

307

361

294

317

280

309

323

371

224

310

312

312

386

317

549

347

374

331

9

281

367

360

331

306

303

329

314

297

312

316

312

268

318

373

310

324

292

347

385

233

319

308

501

312

250

522

118

382

399

373

317

372

290

373

330

301

315

23

310

309

309

263

273

4

175

298

321

261

318

461

294

331

265

320

352

325

286

312

420

381

326

319

374

305376

296

312

316

1

233

323

317

305

317

307

359

293

309

300

348

366

228

306

312

289

460

314

337

386

334

334

369

370

328

306

304

304

316

321

316

311

289

311

373

292

320

294

188

294

384

232

321

318

307

510

312

246

447

06

380

328

375

315

382

288

378

333

338

331

309

313

320

278

351

186

217

322

271

317

43

291

230

232

319

-23

309

294

312

344

380

316

380

319

222364

362

376

309

317

382

221

315

316

296

382

316

311

366

307

315

291

82

371

232

320

310

309

232

330

348

290

375

409

321

305

302

323

318

313

325

315

316

322

313

371

292

322

-09

318

293

379

276

318

317

526

519

321

245

398

519

326

373

314

378 287

377

337

342

343

258

319

323

262

338

200

278

322

304

317

325

297

299

373

216

317

384

310

19

546

327

385

324

380

319

365

214

366

365

303

322

301

229

277

354

360

311

323

254

269

340

303

322

320

296

224

372

221

317

329

309

263

545

325

387

371

379

319

377

205

372

363

304

311

346

302

315

313

291

332

314

312

353

312

312

321

264

131

376

280

365

315

307

226

483

323

320

370

281

383

118

401

304

301

318

272

303

313

318

266

317

314

368

291

323

280

334

306

364

300

305

315

291

286

317

261

533

513

376

306

383

306

372

148

372

299

314

315

311

209

286

343

317

316

314

266

232

364

310

325

317

295

229

370

219

311

309

256

539

295

3

368

378

315

378

179

371

360

352

304

301

339

171

314

314

316

361

311

351

304

312

316

266

382

273

371

315

304

216

320

378

319

370

277

330

06

430

304

300

315

281

322

317

317

247

306

315

379

290

341

03

298

305

335

307

303

313

297

277

311

272

536

510

377

321

384

308

373

266

374

298

324

314

318

51

314

323

316

318

314383

208

323

311

328

314

307

275

369

172

325

308

252

534

290

392

367

377

316

379

195

369

359

41

303

307

319

341

315

312

315

365

311

349

304

318

287

256

84

186

374

317

318

184

371

209

377

319

365

275

371

60

382

303

312

304

292

320

317

315

312

311

381

290

361

81

303

302

375

313

307

322

285

273

306

280

377

504

383

319

395

320

374

241

375

297

330

304

314316

319

315

327

212

356

312

329

308

310

283

367

85

327

207

306

245

525

283

380

336

77

271

383

201

345

309

318306

305

316

384

315

313

373

311

347

303

321

322

97

194

382

317

318

207

172

403

315

364

154

369

76

379

315

321

310

291

319

318

314

206

320

314

380

301

323

301

317

308

332

394

265

308

260

546

470

349

384

323

374

229

368

296

339

305

311

321

318

312

326

218

345

314

331

45

295

294

367

76

315

360

241

520 275

379

335

366

254

376

295

371

293

319299

300

317

480

314

317

226

388

376

18

342

301

325

264

111

199

318

320

317

234

469

170

410

316

359

293

368

378

307

319

305

258

318319

311

193

320

313

377

309

336

35299

364

226

333

305

530

236

372

252

464

355

383

274

384

225

376

280

342

309

304

312

284

315

311

324

315

371

309

335

320

306

292

242

374

49

314

237

301

528

269

379

333

387

247

358

268

355

269

322

299

297

337

314

301

377

06

344

285

331

229

298

202

314

320

316

251

427

158

444

323

378

296

367

187

377

308

315

304

298

357

320

309

178

319

312

377

310

331

313

293

350

228

379

304

531

222

375

248

425

523

358

383

270

221

375

348

308

281

311

310

318

314

323

318

308332

297

316

287

237

376

22

312

234

307

242

526

356

331

382

228

376

370

241

312

319

362

346

314

308

211

382

282

355

294

312313

264

221

343

317

308

319

314

265

392

362

324

82

303

361

256

371

307

314

303

310

333

321

319

318

311

377

308

328

313

296

317

377

227

384

304

535

295

374

230

408

207

383

359

381

263

218

374

311

305

323

297

310

307

321

315

322

314378

306

327

302

311

325

283

233

373

313

232

304

224

525

419

372

381

229

374

369

43

309

315

370

333

311

286

297

363

274

351

306

306

320

296

257

325

326

308

318

313 277

312

301

360

384

328

310

8

275

374

303

314

300

310

320316

321

289

317

306

376

236

325

312

297

310

226

317

303

528

246

373

227

483

187

379

363

381

256

383

276

373

16

304

322

302

309

305

321318

321

316

237

324

283

307

324

256

232

371

313

229

303

215

522

374

375

323

374

368

58

309

303

319

330

376

312

285

288

323

362

264348

308

304

332

295

273

220

304

317

311

291

284

279

373

329

383

327

371

271

374

303

307

310

308

349

315

315

305

316

309

238

323

312

309

312

375

226

311

300

523

228

367

222

510

166

3

365

381

254

305

373

194

302

321

357

308

305

320

319

329

315

385

231

322

296

308

323

251

230

369

19

312

226

301

84

298

133

386

376

379

347

372

368

91

308

304

318

325

315

265

272

319

361

257347

301

303

388295

315

220

310

315

323

294

287

226

340

326

373

361

262

320

294

323

335

305

318314

313

337

316

381

250

355

311

313

314

225

315

297

519

206

371

273557

144

326

384

249

283

372

186

302321

369

306

304

319

320

339

315

227

320

298

311

323

298

229

367

107

316

223

300

87

305 116

383

379

380

403

382

360

367

262

307

313

313

323

352

322

295

278

314

358

306

346

309

299

336

294

301

351

219

326

312

312

256

478

166

366

350

382

323

374

249

369

402

307

326

288

317

312

308

330

320

262

316

311

306

314

378

224

315

305

516

200

280560

133

325

387

277

273

379

302

319

373

313

301

319

323

324

314

320

290

300

309

322

305

226

319

24

317

276

310

108

529

108

366

379

320

386

271

367

18

306

312

313

320

326

353

313

276

380

347

282

346

308

299

318

299

298

218

321

347

306

247

506

304

368

358373

317

376

368

374

306

311

374

290

316

311

302

328

322

385

311

333

272

304

313

280

314

306

508

179

375

282

519

103

323

368

287

380

173

301

318

313

316

291

307

325

318

366

288

287

298

322

321

384

254

320

03

318

493

312

264

530

-07

378

355

384

319

390

261

371

05

312

330

315

306

358

312

270

334

281

355

308

314

286

302

297

370

216

319

343

309 239

522

240

367

370

379

317

384

366

346

306

302

312334

310

312

326

307

280

328

257

302

341

365

227

314

306

495

129

374

287

565

40

381

317

370

294

366

381

161

307

314

312 155

318

323

302

318

322

365

286

329

306

268

325

381

270

374

80

306

463

311

317

533

-17

377

347

313

371

141

370

306

317

316

314

317

313

303

384

366

277

359

305

319

286

302

292

351

190

318

315

311

218

299

271

373

384

316

362

339

306

301

322

314

346

298

311

326

310

365

289

312

228

301

322

382

226

307

307

530

263

373

292

562

226

379

322

367

292

372

171

384

307

324

311

304

314

326

314

317

320

363

283

335

303

302

328

380

272

59

316

450

310

364

535

291

376

370

313

374

242

369

103

300

317

42

334

318

315

315

318

384

370

246

366

293

327

284

304

288

329

246

317

310

310

203

310

326

384

377

385

318

363

279

336

305

308

315

317

329317

321

324

309

325

296

317

213

299

313

381

226

311

309

533

287

367

248

557

256

378

321

366

267

371

311

379

308

325

310

302

309

349

284

316

317

362

280

340

301

298

330

379

238

377

314

416

310

480

529

240

375

281

369

314

374

237

367

300

315

298

339

316

314

316

309

249

196

336

298

322

281

308

317

325

271

313

303

310

311

543

382

330

335

376

154

364

282

325

305

308

305

287

326318

343

378

354

308

362

296

324

90

293

312

222

310

314

535321

370

313

554

331

375

327

327

273

369

318

372

254

312

326

308

301

311

361

296

316

315

362

342

299

292

340

379

229

525

312

381

310

257

528

205

383

301

370

314

373

233

338

320

302

313

287

347

315

313

317

305

233

328

306

321

357

301

320

323

312

314

308

317

269

311

516

373

328

389

359

375

281

371

283

313

307

282

325

322

357

308

361

295

325

143

295

319

223

310

313

537

356

371

315

552

366

372

331

329

356

343

336

314

327

300

298

313

317

303

315

377

327

296

270

344

377

234

319

311

352

309

253

523

132

381

371

370

292

328

326

302

315

189

151

344

313

317

320

313

358

292

324

283

321

309

378

290

312

316

514

118

321

239

478

517

379

324

381

312

376

281

371

344

351

385

301

274

356

324

230

311

324

204

270

339

304

322

320

296

235

372

221

317

337

309

263

545

348

387

337

379

319

377

208

372

365

303

312

351

324

329

308

314

307

361

294

311

153

308

323

224

310

313

298

384

316

549

349

374

331

329

278

366

357

331

295

302

328

301

297

312

316

312

325

374

294

325

295

346

376

233

319

308

308

297

250

522

124

382

397

371

318

372

291

371

330

297

315

21

311

306

312

241

293

375

174

296

321

257

318

420

293

271

328

387

349

320

325

286

312

425

381

327

319

374

305

376

293

312

315

379

323

317

305

318

311

360

293

309

297

275

326

224

310

312

309

440

318

339

384

333

334

369

368

329

306

304332

316

319

316

311

281

316

373

293

320

294

192

294

381

233

321

318

307

508312

247

520

103

326

375

315

368

288

379

332

301

329

239

310

313

308

290

275

367

179

310

322

268

317

344

295

339

239

320

382

312

293

312

287

380

318

374

319

373

227

373

354

309

316

245

315316

300

382

316

307

359

307

311

0

292

365

370

231

306

310

309

232

334

346

291

375

400

323

305

303

323

317

313

325

315

316

321

313

371

292

323

311

315

293

380

230

319

317

528

518

322

245

408

62

80 326

374

314

379

287

377

337

342

336

306

312

321

35

268

342

200

280

322

304

317

325

298

301

373

214

317

413

310

296

547

330

380

323

380

319

365

215

369

366

303

321

252

312

316

290

311

312

366

309

314

278

168

373

95

337

309

308

230

15

326

321

376

288

375

383

298

302

320

310

308

315

312

266

333

313

312

353

311

312

328

136

376

280

355

315

308

227

432

323

379

320

373

282

121

396

304

301

318

323

313

318

276

317

313

368

291

323

281

331

306

368

296

311

315

473

286

318

237

532

514

376

323

382

311

372

144

372

299

313

310

309

286

351

316

313

314

263

235

367

309

325

317

296

229

370

220

316

280

309

260

540

298

369

378

309

378

175

371

362

354

304

302

339

178

314

314

317

359

311

351

305

312

317

270121

378

277

369

315

304

222

378

220

320

319

370

278

330

26

419

304

300

315

280

322

315

317

247

313

314

378

290

334

01

348

305

338

305

302

312

296

278313

267

534

512

377

321

384

308

373

213

373

298

324

314

314

54

314

329

316

318

314

146

361

311

328

315

306

272

369

14

322

225

309

253

535

290

392

367

378

319

79

190

369

360

299

307

335

333

315

312

315

364

311

349

304

312

300

260

181

373

317

301

184

372

211

372

319

365

276

377

303

297

315

292

321

317

316

210

353

315381

290

357

304

303

375

313

307

322

306

274

309

280

543

505

378

320

394

309

373 241

374

298

330

306

313

171

316

321

316

328

380

381

211

357

311

329

313

309

281

367

87

326

214

306

248

526

285

380

336

377

273

383

203

339

309

318

307

306

67

371

315

313

368

311

347

303

321

99

314

96

193

380

317

319

207

175

400

377

309

364

369

70

380

307

322

310

291

319

318

315

320

314

300

340

74

302

301

380

317

308

328

311

271

309

262

546

487

344

384

322

374

233

385

296

337

305

311

152

321

318

315

326

381

217

353

313

330

295

294

367

77

314

175

326

243

436

277

380

336365

262

378

327

371

299

319299

304

316

475

315

316

376

-09

341

302

324

143

363

109

199

317

319

317

216

470

171

409

316

363

292

368

379

305

319

306

257

318

319

311

197

320

313

378

305

337

299

42

364

367

324

305

410

250

381

255

458

385

351

384

276

383

226

376

284

341

309

305

312

326

315

309

325

371

309

336

319

333

293

214

374

61

314

39

1

128

529

271

379

334

380

248

363

278

375

271

322

299

297

321

553

314

312

377

11

343

301

330

162

298

198

379

206

314

320

316

250

443

162

442

323

367

295

367

377

308

317

304

262

355

320

309

5

319

312

377

236

334

313

293

226

304

531

224

375

250

427

522

358

383

271

222

376

275

344

308

203

311

310

314

314

323

318

308332

326

317

291

237

376

25

311

234

308

243

526

266

378

331

382

206

376

370

246

312

318

359

346

314

308

380

-02

347

290

298

250

296

219

358

309

312

319

315

258

393

127

367

324

301

366

247

371

307

314

303

312

355

321

312

318

312

377

309

328

313

292

318

228

381

304

533295

374

231

411

49

383

359

382

265

218

374

310

305

307

297

310

307

321

315

322

314

378

306

325

302

312

325

284

234

16

313

232

304

225

525

390

378

372

381

229

375

369

41

310

316

370

353

312

286

270

340

364

277

352306

298

316

296

252

326

322

308

318

313

274

374

264

360

384

327

80

309

373

306

314

300

310

323

309

320

287

317

311

376

302

325

312

296

310

227

317

303

529

253

373

227

378

196

363

381

259

210

373

318

304

322

300

309

306

321

318

321

316

378

242

325

301

307

324

256

232

372

10

313

230

303

222

523

156

77

374

375

231

374

368

56

309

304

320

330

310

285

289

324

363

272

349

308

304

328

295

270

375

221

302

317

312

290

308

289

359

384

316

379

361

271

375

303

306

310

309

310

315

315

303

316

309

236

322

312

308

312

226

311

303

524

230

366

224

509

168

380

364

381

254

306

373

196

303322

355

309

305

320

319

328

316

384

232

322

294

308

323

252

231

69

312

226

302

491

385

375

378

333

373

368

339

308

310

318

325

373

313

265

247

322

361

260347

312

303

365

295

222

220

311

316

323

294

285

256

371

329

383

326

362

440

387

265

387

304

323

338

306

319

314

313

341

315

374

249

350

311

310

315

74

225

315

297

520

206

371

271

552

151

318

380

253

298

372

186

302

321

368

308

304

320

320339

315

387

228

320

297

311

323

297

229

367

124

312

224

301

87

304

383

379

380

388

381

355

368

272

307

314

313

323

362

320

294

279

313

359

249

346

309

299

351

294

303

219

312

312

314

257

289

179

370

349

383

323

374

369

413

307

326

288

317

313

312

332

320

260

366

311

295

314

225

315

305

517

389

276

559

137

325

386

209

1

278

378

302

320

372

313

302

319

321317

314

322

318

300

309

322

304

227

318

24

317

206

300

106

529

108

380

374

379

314

386

271

367

18

306

313

313

320

329

350

317

277

316

350

284

346

309

299

320

299

300

384

218

322

306

305

248

501

312

368

356381

322

75

235

368

388

307

302

4

289

317

312

302

328

322

299

339

275

305

313

263

315

306

510

182

375

281

570

105

324

365

280

379

174

301

319

314

316

318

318

324

319

368

366

289

288

299

321

321

384

252

320

38

318

493

312

256

530

-01

378

356

319

388

265

328

11

306

311

315

311

356

313

270

336

281

344

308

298

287

301

297

378

217

319

344

309

239

521

367

367

379

317

376

366

347

306

301

353

291

315

310

312

327

305

312

330

258

302

342

365

227

314

306

495

375

287566

39

322

370

320

380

161

306

318

313

318

318

323

343

311

322

366

286

284

294

336

325

381

262

323

80

322

472

311

305

532

-13

378

351

312

358

130

370

300

318

315

298

384

286

313

268

4

365

279

359

305

319

286

302

294

190

319

318

311

234

308

275

371

380

316

366

341

306

301

324

314

346

310

311

4

326

310

328

289

318

240

301

327

382

227

316

307

530

260

373

291562

222

9

318

369

292

372 383

307

324

312

305

316

325

314

317

320

364

283

332

303

307

328

380

231

375

61

316

453

311

350

534

295

377

336

388

313

374

106

369

300

317

316

334

307

310

315

313

370

257

365

304

326

284

303

292

329

243

317

311

310

206

310

318

381

376

385

315

363

278

337

305

309

315

316

329316

321

325

309

326

297

317220

300

371

381

226

311308

533

282

366

313

558

252

379

321

328

267

380

308

325

310303

314

348

292

317

317

363

281

339

301

300

329

379

250

377

47

314

417

310

448

388

259

375

377

314

374

238

368

116

300

316

298

338

317314

315

309

253

338

298

322

282

306

287

326

266

313

308310

311

545

382

331

332

376

158

364

282

329

305

308

309

289

327

317

324

9

345

307

362

296

324

-01

292

316

222

310

314

534

313

369

313

554

265

375

320

327

271

370

317

375

239

312

326

308

302

311

353

296

316

316

362

341

300

293

379

229

525

312

395

310

258

528

206

371

298

370

314

373

233

353

317

303

315

288

344

315

313

316

306

233

332

306

321

313

309

319

323

288

314

305

317

268

311

527

381

328

348

375

274

370

283

448

310

307

305

283

326318

356

357

308

361

295

325

134

295

318

379

222

310

313

536

346

371

315

554

320

368

330

328362

341

347

279

313

327

307

298

313

313

298

315

315

377

231

328

297

344

378

235

318

311

365

309

254

524

154

387

312

371

315

373

292

328

322

302

314

190

313

311

313

314

295

5

219

285

321

305

309

386

301

323

287

322

306

318

276

311

478

378

327

320

375

285

373

288

339

307

6286500

6287500

6288000

6288500

6289000

6289500

6290000

6290500

6286500

6287000

6287500

6288000

6288500

6289000

6289500

6290000

6287000

1831500

1831000

1830500

1830000

1829500

1829000

1832000

1832500

1833000

1831500

18310001830500

1830000

1829500

1829000

1832000

1832500

1833000

N 32° 41' 30"

N 32° 41' 20"

N 32° 41' 30"

N 32° 41' 20"

N 32° 41' 10"

N 32° 41' 10"

N 32° 41' 00"

N 32° 41' 00"

W 117° 08' 30"

W 117° 08' 30"

W 117° 08' 40"

W 117° 08' 20"

W 117° 08' 20"

W 117° 08' 10"

W 117° 08' 10"

W 117° 08' 00"

Figure 3. Current Bathymetry.

Figure 4. Proposed Sediment Management Areas.