Cambridge Street Bicycle Safety Demonstration Project Community Presentation | April 25, 2017

Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

Cambridge Street Bicycle Safety Demonstration Project

Community Presentation | April 25, 2017

Page 2: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

Cambridge Street

Agenda

• Project Background

• Project Information

• Design Overview

• Next Steps

2

Page 3: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Project LimitsHarvard Square to Inman Square

from Quincy Street to Antrim Street

3

Page 4: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT BACKGROUND

Municipal PoliciesVision Zero, Complete Streets, & Safe Routes to School

Complete Streets are designed and operated to enable safe access for all users – regardless of age, ability, or mode of transportation.

Vision Zero calls for the elimination of fatalities and serious injuries resulting from traffic crashes, and emphasizes that they can, and should be prevented.

Safe Routes to School aims to increase the number of students who get to and from school safely by walking or biking.

4

Page 5: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT BACKGROUND

Municipal PoliciesReported Bicycle Crashes, 2004-2012

5

Page 6: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT BACKGROUND

Separated Bicycle FacilitiesExamples

6

Vancouver, Canada Mass. Ave., Boston, MA

Page 7: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT BACKGROUND

Separated Bicycle FacilitiesMass Ave Protected Bike Lane DemonstrationDecember 2016

7

Northbound from Sidney Street to

Douglass Street (shown: Lafayette Square)

Northbound (east/odd side of the street)

from Waterhouse Street to Everett Street

Page 8: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Implementation Steps

PLANNING IMPLEMENTATION OPERATION EVALUATION

• Identify measures

of effectiveness

• Develop detailed

plan

• Community

engagement

• Develop mitigation

measures

• Procure materials

• Issue regulations

• Remove / reinstall

pavement markings

• Install delineators

• Street cleaning

• Snow clearance

• Enforcement

• Communications

strategy

• After data

collection and

analysis

• Community

engagement

• Decisions on

next steps

8

Page 9: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Design Considerations

Cyclist safety & comfort

Crosswalks/curb extensions

Bus stops

School pick-up/drop-off

Accessible parking

Loading & deliveries

Street maintenance

On-street parking 9

Page 10: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Design Considerations

Cyclist safety & comfort

10

Page 11: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Design Considerations

Crosswalks/curb extensions

11

Page 12: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Design Considerations

Bus stops

12

Page 13: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Design Considerations

School pick-up and drop-off

13

Page 14: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Design Considerations

Accessible parking

Loading & deliveries

14

Page 16: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Design Considerations

On-street Parking

16

Page 17: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Bicycle and Pedestrian Counts

17

Conduct bicycle and

pedestrian counts

Page 18: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Motor Vehicle Parking Study

• Goals

• Methodology

• Inventory

• Preliminary Results

• Additional analysis ongoing

18

Page 19: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Motor Vehicle Parking Study

Determine existing

curbside uses by type

and number

Determine existing on-

street parking demands

on various days and at

various times

Determine methods to

address Cambridge

Street’s curbside

activity needs

Goals

19

Page 20: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Motor Vehicle Parking StudyMethodology

20

Inventoried existing on-street

parking spaces

Inventoried public streets only

Determined occupancy on:

• Tuesday, April 4th

• Thursday, April 6th

• Saturday, April 8th

Times observed each day:

• 10AM

• 3PM• Midnight

Page 21: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Motor Vehicle Parking StudyInventory of Parking Regulations

21

Page 22: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Motor Vehicle Parking Study

Street/Area Time of Day Weekday Weekend

Cambridge Street

AM 82% 68%

PM 75% 68%

Midnight 42% 53%

North Neighborhood

Streets

AM 76% 74%

PM 72% 64%

Midnight 76% 67%

South Neighborhood

Streets

AM 77% 68%

PM 70% 71%

Midnight 83% 75%

Preliminary Results – Occupancy Rates

22

(Total of 1180 on-street parking spaces within study area)

Page 23: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Bus Boarding and Alighting

23

Cambridge St Bus Data (Inman Sq to Quincy St)

Fall 2015 composite day APC data, MBTA.

Measurements from Google Maps

Page 24: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Project Elements

1. Create one-way separated bike lane on each side of the roadway using existing pavement and curb-to-curb width

2. Narrow travel and parking lanes, and remove some parking

3. Delineate lane with pavement markings, signs, and flexible delineator posts

24

Page 25: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Existing Conditions Cambridge Street Cross-Section (Quincy St to Inman Sq)

44’ wide

No existing bike

facility

Parking on both sides

Mix of meters and

resident parking

Bus stops and bus

pullouts

Curb extensions at

multiple locations

25

8’Sidewalk

4’ 9’Parking

13’Travel

13’Travel

9’Parking

4’ 8’Sidewalk

Page 26: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

PROJECT INFORMATION

Possible OutcomesCambridge Street Cross-Section (Quincy St to Inman Sq)

44’ wide

Separated bike lanes

on both sides

Parking on one side

(could alternate)

Bus stops remain

Curb extensions

remain

26

8’Sidewalk

4’ 5’Bike

Lane

10½’Travel

7’Parking

3’ 8’Sidewalk

3’ 10½’Travel

4’5’Bike

Lane

Page 27: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Sample Block – Line St to Highland AveExisting Condition

27

CAMBRIDGE STREET

Page 28: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Sample Block – Line St to Highland AveProposed Design

28

CAMBRIDGE STREET

Page 29: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

Bus Stops

29

DESIGN OVERVIEW

Page 30: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Sample Block – Line St to Highland AveProposed Design

30

CAMBRIDGE STREET

View

Page 31: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Sample Block – Line St to Highland AveExisting Condition

31

Page 32: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

DESIGN OVERVIEW

Sample Block – Line St to Highland AveProposed Design

32

Page 33: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

NEXT STEPS

Schedule

Bicycle and

pedestrian counts

April/Early May

Refine design

May

Public meeting #2

- present design

May

Continue parking

study analysis

April/Early May

33

Implementation

June

Evaluation

Page 34: Cambridge Street Bicycle Safety Demonstration Project/media/Files/CDD/... · DESIGN OVERVIEW Motor Vehicle Parking Study Street/Area Time of Day Weekday Weekend Cambridge Street AM

COMMENTS & QUESTIONS?