1 Installed Generation Capacity of CSPGCL and Central sector shares as on 31.01.2020.

Ownership Thermal Hydel Solar Biomass/Others Total

State 3080.00 138.70 --- 6.00 3224.70

Central Allocation

(WR+ER+NR)1880.54 100.00 --- --- 1980.54

Total 4960.54 238.70 0.00 6.00 5205.24

STATION NAME UNIT NO. Unit CapacityInstalled

Capacity

Year of

Commissioning

THERMAL MW MW YEAR

5 120 27/04/1976

6 120 05/04/1981

1 210 21/06/1983

2 210 31/03/1984

3 210 26/03/1985

4 210 13/03/1986

KORBA WEST EXTN 5 500 500 05/09/2013

1 250 250 27/01/2008

2 250 250 30/11/2008

1 500 500 31/03/2016

2 500 500 31/07/2016

3080

STATION NAME UNIT NO. Unit CapacityInstalled

Capacity

Year of

Commissioning

HYDEL MW MW YEAR

1 40 21/03/1994

2 40 21/11/1994

3 40 11/01/1995

1 2.5 22/04/2004

2 2.5 29/06/2004

3 2.5 17/10/2004

4 2.5 05/11/2004

1 3.5 03/09/2006

2 3.5 03/09/2006

CSPGCL HYDEL 137 137

MINI/MICRO

1 0.85 12/01/2003

2 0.85 29/05/2007

TOTAL HYDEL

including Mini/Micro138.7

CO-GEN PLANT,

KAWARDHA1 6.00 6.00 04/09/2006

3224.70

DSPM.

ABVTPS

CSEB THERMAL.

INSTALLED CAPACITY : HYDEL : CSPGCL

BANGO 120

INSTALLED CAPACITY : THERMAL : CSPGCL

KORBA EAST

KORBA WEST

KORBA WEST

TOTAL CSPGCL THERMAL + HYDEL +

CO-GEN

240

420

420

GANGREL 10

SIKASAR 7

KORBA WEST 1.7

Page 5: CamScanner 05-11-2020 17.19 - SLDCCG

S.NO. POWER

STATIONUnit Capacity

Total Capacity

[MW]

Total Allocated

Share [MW]

1 KSTPS 3x200 + 3x500 2100 210.00

2 KSTPS-7 1X500 500 75.00

6x210 1260.00 0.00

2x500 1000 0.00

2X500 1000 105.00

2X500 1000 62.55

4 1X500 500 40.20

5 TAPP - 3 & 4 2x540 540 48.00

6 SIPAT-I 3x660 1980 313

7 SIPAT-II 2X500 1000 158.00

8 NSPCL 2x250 500 50.00

9 MSTPS-I 2x500 1000 62.55

10 MSTPS-II 2x500 1000 87.70

11 SSTPS 2x660 1320 158.89

12 GSTPP 1x800 800 77.83

13 LSTPP 1x800 800 400.00

11120 1848.72

1KhSTPP

840 31.82

840 31.82

1Kishanganga

HEP330 100.00

100.00

1 1848.72

2 31.82

3 100.00

1980.54

ER

NR

TOTAL

TOTAL

III. Share Of Chhattisgarh State From Central Sector Generating Stations In Northern Region In

Mw. (As On 31.01.2020)

TOTAL

IV. Total Share Of C.G. State

WR

I. Share Of Chhattisgarh State From Central Sector Generating Stations In Western

Region In Mw. (As On31.01.2020)

3VSTPS

TOTAL

II. Share Of Chhattisgarh State From Central Sector Generating Stations In Eastern Region In

Mw. (As On 31.01.2020)

Page 6: CamScanner 05-11-2020 17.19 - SLDCCG

2 CSPGCL generation (Ex-Bus) in Mus.

KTPS

HTPS

DSPMTPS

KWB Extn.

ABVTPS

Total Thermal

3 Water Level of Major Reservoirs for last day of the month in Mtrs.

Hasdeo Bango

Gangrel

Sikaser

Dec-19

Jan-20

Jan-19

Figure-3: Water level of reserviors of CSPGCL in Jan-2020

Figure-1: Thermal generation [Ex-Bus] of CSPGCL in Jan-2020

Figure-2: Hydel generation [Ex-Bus] of CSPGCL in Jan-2020

KTPS HTPS DSPMTPS KWB Extn. ABVTPS Total Thermal

Dec-19 113.78 395.55 310.53 306.29 444.97 1571.12

Jan-20 108.62 439.78 296.38 222.60 276.52 1343.90

Jan-19 91.60 423.32 185.91 312.50 254.51 1267.84

113.78

395.55

310.53306.29

444.97

1571.12

108.62

439.78

296.38222.60

276.52

1343.90

91.60

423.32

185.91312.50

254.51

1267.84

50.00

250.00

450.00

650.00

850.00

1050.00

1250.00

1450.00

1650.00

Mu

sThermal Generation in Jan 2020

.

Hasdeo Bango Gangrel Sikaser

Dec-19 357.49 347.69 406.26

Jan-20 357.49 347.49 405.74

Jan-19 353.75 345.6 404.01

357.49

347.69

406.26

357.49

347.49

405.74

353.75

345.6

404.01

310

330

350

370

390

410

MU

s

BANGO GANGREL SIKASER Total Hydel

Dec-19 3.85 0.00 0.00 3.85

Jan-20 15.041478 2.385014 0.34637 17.77

Jan-19 7.42 1.75 0.00 9.17

3.85

0.000.00

3.85

15.041478

2.3850140.34637

17.77

7.42

1.75

0.00

9.17

0.00

5.00

10.00

15.00

20.00

25.00

Mus

Hydel Generation in Jan-2020

Page 7: CamScanner 05-11-2020 17.19 - SLDCCG

4 Demand Pattern.

4.1 MonthMaximum

Demand Met

(MW)

Date Time Frequency

January-20 3860 30.01.2020 8:30 50.03

4.2 Month

Maximum Unrestricted Demand Met

(MW)

Date Time Frequency

January-20 3856 26.01.2020 2:15 49.99

4.3 MonthMinimum

Demand Met (MW)

Date Time Frequency

January-20 2194 02.01.2020 23:45 50.03

4.4 Availability during monthly peak demand met.

MW %

1586 41.1%

85 2.2%

91 2.4%

1671 43.3%

266 6.9%

160 4.1%

3860

Net Import(+) / Export (-)

OD(+) / UD(-)

Demand Met (MW)

Particulars

CSPGCL Thermal (Ex-bus)

CSPGCL Hydel

Injection (Solar,Biomass,unscheduled

power,open access,small hydro)

CS Share including BSP share in NSPCL

Page 8: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-4: Load Curve on Peak Demand day.

3860 MW

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

MW

Time (hh:mm)

LOAD CURVE ON PEAK DEMAND DAY : 30.01.2020

Page 9: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-5: Load Curve on Minimum Demand day.

2194 MW

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

MW

Time (hh:mm)

LOAD CURVE ON MINIMUM DEMAND DAY : 02.01.2020[ Reason for demand drop is widespread rainfall and bad weather. ]

Page 10: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-6: Daily Maximum Demand Met in Dec-19, Jan-20 & Jan-19.

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MW

Date

Daily Max Demand met in the month of Dec-19,Jan-20 & Jan-19. MAX 3860 MW on 30.01.2020 at 08:30 hrs.

JAN-

2020

DEC-

2019

JAN

2019

3858 on

17.01.2019

3860 on

30.01.2020

Page 11: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-7: Daywise Maximum & Minimum Demand Met in Jan-20.

2000

2200

2400

2600

2800

3000

3200

3400

3600

3800

4000

4200

4400

4600

MW

Date

Daywise Min and Max Demand met in the month of Jan- 20 [ Difference : Max 1305 MW on 02.01.20 & Min 757 MW on 19.01.20

1305 MW

Page 12: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-8: Daywise Maximum Restricted Vs Unrestricted Demand Met in Jan-20.

3300

3350

3400

3450

3500

3550

3600

3650

3700

3750

3800

3850

3900

MW

Date

Daywise Maximum Resrticted Vs Unrestricted Demand in the month of Jan-20

UNRESTRICTED DEMAND

RESTRICTEDDEMAND

Page 13: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-9: Load Duration Curve for the month of April-19.

Figure-09: Load Duration Curve for the month of Jan-2020.

3860 MW

3260 MW

2194 MW

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

LOAD DURATION CURVE : JAN-2020

[ For 50% of time, Demand was 3065 MW ]

% OF TIME

DEM

AN

D(M

W)

Page 14: CamScanner 05-11-2020 17.19 - SLDCCG

[i] [ii] [iii]

Date <49.9

Hz 49.9 to

50.05 Hz>50.05

Hz

Frequency Variation

Index [FVI]

% of time Frequency

remained out of IEGC band.

No of hours during which frequency was out of range during

the day. {([i]/100)x24 Hrs}

Daily FDI=[ii]/

24

Max Min Average

% % % % Hours Hz Hz Hz

1-Jan-20 4.17 77.08 18.75 0.03 22.92 5.50 0.23 50.14 49.86 50.01

2-Jan-20 4.17 80.21 15.63 0.03 19.79 4.75 0.20 50.14 49.81 50.00

3-Jan-20 4.17 89.58 6.25 0.03 10.42 2.50 0.10 50.08 49.80 49.99

4-Jan-20 3.13 89.58 7.29 0.02 10.42 2.50 0.10 50.07 49.82 50.00

5-Jan-20 2.08 93.75 4.17 0.02 6.25 1.50 0.06 50.15 49.86 50.00

6-Jan-20 6.25 88.54 5.21 0.04 11.46 2.75 0.11 50.12 49.75 49.98

7-Jan-20 4.17 92.71 3.13 0.02 7.29 1.75 0.07 50.07 49.81 49.99

8-Jan-20 4.17 89.58 6.25 0.02 10.42 2.50 0.10 50.13 49.81 50.01

9-Jan-20 0.00 86.46 13.54 0.01 13.54 3.25 0.14 50.09 49.91 50.02

10-Jan-20 2.08 84.38 13.54 0.02 15.63 3.75 0.16 50.14 49.84 50.02

11-Jan-20 1.04 84.38 14.58 0.02 15.63 3.75 0.16 50.16 49.89 50.02

12-Jan-20 1.04 93.75 5.21 0.01 6.25 1.50 0.06 50.10 49.88 50.01

13-Jan-20 2.08 89.58 8.33 0.02 10.42 2.50 0.10 50.09 49.86 50.01

14-Jan-20 2.08 95.83 2.08 0.02 4.17 1.00 0.04 50.07 49.84 50.01

15-Jan-20 0.00 83.33 16.67 0.01 16.67 4.00 0.17 50.10 49.95 50.02

16-Jan-20 4.17 84.38 11.46 0.02 15.63 3.75 0.16 50.10 49.86 50.00

17-Jan-20 3.13 92.71 4.17 0.02 7.29 1.75 0.07 50.08 49.81 49.99

18-Jan-20 0.00 90.63 9.38 0.01 9.38 2.25 0.09 50.09 49.93 50.01

19-Jan-20 0.00 87.50 12.50 0.02 12.50 3.00 0.13 50.11 49.90 50.01

20-Jan-20 0.00 90.63 9.38 0.02 9.38 2.25 0.09 50.08 49.90 50.01

21-Jan-20 1.04 84.38 14.58 0.02 15.63 3.75 0.16 50.10 49.83 50.02

22-Jan-20 0.00 80.21 19.79 0.02 19.79 4.75 0.20 50.12 49.96 50.03

23-Jan-20 0.00 87.50 12.50 0.02 12.50 3.00 0.13 50.09 49.90 50.01

24-Jan-20 0.00 98.96 1.04 0.01 1.04 0.25 0.01 50.07 49.90 50.00

25-Jan-20 5.21 90.63 4.17 0.02 9.38 2.25 0.09 50.06 49.85 50.00

26-Jan-20 2.08 85.42 12.50 0.03 14.58 3.50 0.15 50.15 49.84 50.00

27-Jan-20 4.17 85.42 10.42 0.02 14.58 3.50 0.15 50.10 49.85 50.01

28-Jan-20 1.04 94.79 4.17 0.02 5.21 1.25 0.05 50.09 49.88 50.00

29-Jan-20 2.08 93.75 4.17 0.02 6.25 1.50 0.06 50.09 49.86 50.00

30-Jan-20 1.04 96.88 2.08 0.01 3.13 0.75 0.03 50.06 49.87 50.00

31-Jan-20 1.04 88.54 10.42 0.00 11.46 2.75 0.11 50.30 49.89 50.02

FREQUENCY (in % time) FREQUENCY (Hz)

5. Frequency Profile.

(As per block wise frequency recorded in SLDC Raipur)

Page 15: CamScanner 05-11-2020 17.19 - SLDCCG

FREQUENCY PROFILE FOR JAN-2020

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

Figure-10: Frequency Profile for the month of Jan-2020.

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

55%

60%

65%

70%

75%

80%

85%

90%

95%

100%

January

1, 2020

January

2, 2020

January

3, 2020

January

4, 2020

January

5, 2020

January

6, 2020

January

7, 2020

January

8, 2020

January

9, 2020

January

10, 2020

January

11, 2020

January

12, 2020

January

13, 2020

January

14, 2020

January

15, 2020

January

16, 2020

January

17, 2020

January

18, 2020

January

19, 2020

January

20, 2020

January

21, 2020

January

22, 2020

January

23, 2020

January

24, 2020

January

25, 2020

January

26, 2020

January

27, 2020

January

28, 2020

January

29, 2020

January

30, 2020

January

31, 2020

<49.9 Hz 49.9 to 50.05 Hz >50.05 Hz

Page 16: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-11: Frequency Duration Curve for the month of Jan-2020.

49.70

49.75

49.80

49.85

49.90

49.95

50.00

50.05

50.10

50.15

50.20

50.25

50.30

50.35

50.40

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

FREQUENCY DURATION CURVE : JAN-2020

% OF TIME

DEM

AN

D(M

W)

Page 17: CamScanner 05-11-2020 17.19 - SLDCCG

6. Voltage Profile.

6.1 Voltage Deviation Index [VDI] - 400 KV Substations for the month Jan-2020.

Maximum Minimum < 380 KV 380-420 KV > 420 KVNo. of hours

below IEGC < 380 KV [i]

No. of hours above IEGC > 420 KV [ii]

KV KV % % % Hours Hours Hours

1 Khedamara 423.02 409.82 0.00 87.57 12.43 0 92.50 92.50 0.12

2 Korba West 431.79 403.69 0.00 74.90 25.10 0 186.75 186.75 0.25

3 Marwa 434.48 423.37 0.00 0.00 100.00 0 744.00 744.00 1.00

4 Raita 430.24 416.7 0.00 11.19 88.81 0 660.75 660.75 0.89

5 Jagdalpur 433.41 412.43 2.15 21.47 76.38 16.00 568.25 584.25 0.79

6.2 Voltage Deviation Index [VDI] - 220 KV Substations for the month Jan-2020.

Maximum Minimum < 198 KV 198-245 KV > 245 KVNo. of hours

below IEGC < 198 KV [i]

No. of hours above IEGC > 245 KV [ii]

KV KV % % % Hours Hours Hours

1 Banari 241.07 231.46 0.00 100.00 0.00 0 0 0 0.000

2 Barsoor 241.23 226.22 0.00 100.00 0.00 0 0 0 0.000

3 Bhilai 237.17 227.61 0.00 100.00 0.00 0 0 0 0.000

4 Bhatapara 234.06 223.15 0.00 100.00 0.00 0 0 0 0.000

5 BEMETARA 236.32 223.35 0.00 100.00 0.00 0 0 0 0.000

6 Doma 238.21 228.51 0.00 100.00 0.00 0 0 0 0.000

7 DSPM 238.33 232.89 0.00 100.00 0.00 0 0 0 0.000

8 Gurur 236.14 223.34 0.00 100.00 0.00 0 0 0 0.000

9 Korba East 235.97 200.2 1.95 98.05 0.00 14.50 0 14.50 0.019

10 Korba West 239.78 233.86 0.00 100.00 0.00 0 0 0 0.000

11 MARWA 238.79 232.7 0.00 100.00 0.00 0 0 0 0.000

12 Mopka 243.28 233.31 0.00 100.00 0.00 0 0 0 0.000

13 Paraswani 235.86 221.92 0.00 100.00 0.00 0 0 0 0.000

14 RAIPUR 234.6 225.22 0.00 100.00 0.00 0 0 0 0.000

15 Raita 237.28 228.02 0.00 100.00 0.00 0 0 0 0.000

16 JAGDALPUR 241.91 209.98 1.58 98.42 0.00 11.75 0 11.75 0.016

NOTE :- 1 . (a)

(b)

2 .

3 .

Voltage of 400KV bus & 220KV bus at 400KV S/S JAGDALPUR was "0" on 30-01-2020 during shutdown period for LILO of 400KV RATIA - JAGDALPUR CKT at KURUD S/S. Hence voltage during the above period was below the IEGC range of <380 KV & < 198 KV respectively.

Constant voltage for span of certain period was observed on 220KV bus at 220KV S/S BANARI , 220KV S/S PARASWANI & 400KV S/S JAGDALPUR and 400 KV Bus at 400KV S/S JAGDALPUR i.e.data was out for this period.

Shutdown on 1P bus at 220KV KEB from 10:30 TO 21:02 hence voltage during the above peroid at 220KV bus was "0'. Hence voltage during the above period was below the IEGC range of <198 KV.

Total No. of hours out of IEGC range (HH:MM) [iii = I + ii]

VDI = [iii] / Total No. of hours in a

week.

Constant voltage of 227.77 on 220KV bus at 220KV S/S GURUR from 27-01-2020 time 1:30 to 31-01-2020 i.e.data was out for this period.

S.No.Sub station

name

Voltage (in Volts) Voltage (in % time) Voltage (in time)

Total No. of hours out of IEGC range (HH:MM) [iii = I + ii]

VDI = [iii] / Total No. of hours in a

month.

Sub station name

S.No.

Voltage (in Volts) Voltage (in % time) Voltage (in time)

Page 18: CamScanner 05-11-2020 17.19 - SLDCCG

400

JAGDALPUR

Figure-12: Voltage Profile of 400 KV Substations for the month of JAN-20.

Figure-13: Voltage Profile of 220 KV Substations for the month of JAN-20.

410

415

420

425

430

435

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Chart Title

Khedamara Marwa Raita Jagdalpur

Voltage Profile of 400 KV S/s : JAN-2020

DATE

VO

LTA

GE

(KV

)

190

200

210

220

230

240

250

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Chart Title

Doma DSPM Gurur Korba East

Voltage Profile of 220 KV S/s : JAN-2020

DATE

VO

LTA

GE

(KV

)

Page 19: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-15: Voltage Profile of 220 KV Substations for the month of JAN-20.

190

200

210

220

230

240

250

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Chart Title

Korba West Mopka Parasawani Jagdalpur

Voltage Profile of 220 KV S/s : : JAN-2020

DATE

VO

LTA

GE

(KV

)

190

200

210

220

230

240

250

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Chart Title

Banari Barsoor Khedamara Bhatapara

Voltage Profile of 220 KV S/s : JAN-2020

DATE

VO

LTA

GE

(KV

)

Page 20: CamScanner 05-11-2020 17.19 - SLDCCG

Figure-16: Voltage Profile of 220 KV Substations for the month of JAN-20.

190

200

210

220

230

240

250

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Bemeatara Marwa Raita

Voltage Profile of 220 KV S/s : : JAN-2020

DATE

VO

LTA

GE

(KV

)

Page 21: CamScanner 05-11-2020 17.19 - SLDCCG

7. Addition of new grid elements during Jan-2020

DATE TIME [Hrs:Min] NAME OF SUB STATION NAME OF CHARGED EQUIPMENTS & LINES REMARKS

30-Jan-20 22:27 First time charged from Raita end.

30-Jan-20 22:30Synchronized from Kurud

[Dhamtari] end.

30-Jan-20 22:30 400 KV Main Bus-II First time charged.

30-Jan-20 23:02 400 KV Kurud [Dhamtari]-Jagdalpur Ckt along with 50 MVAR Reactor.

First time charged from Kurud [Dhamtari] end.

30-Jan-20 23:05 400 KV Kurud [Dhamtari]-Jagdalpur Ckt along with 80 MVAR Reactor [At Jagdalpur end].

Synchronized from Jagdalpur end.

31-Jan-20 14:30 400/220 KV, 315 MVA , ICT-IIFirst time charged from 400 KV

side.

31-Jan-20 16:02 400 KV Main Bus-I First time charged.

8. Units Decommissioned.

Capacity [MW] Withdrawn fromUnit

NIL

400 KV S/s Kurud [Dhamtari] [New S/stn]

400 KV Raita-Kurud Ckt

Page 22: CamScanner 05-11-2020 17.19 - SLDCCG

Station Unit #Installed

Capacity (In MW)

No. of Outages Outage Date & Time Syn. Date & Time Outage (HH:MM)Generation Loss

(In Mu)Reason

5 120 0 NIL NIL - -

6 120 0 NIL NIL - -

1 210 0 NIL NIL - -

2 210 0 NIL NIL - -

3 210 0 NIL NIL - -

4 210 0 NIL NIL - -

5 500 1 22/01/20 00:00 CONTD - -AOH

1 250 0 NIL NIL - -

2 250 0 NIL NIL - -

1 500 0 NIL NIL - -

2 500 0 NIL NIL - -

Total 3080 1 -

Station Unit #Installed

Capacity (In MW)

No. of Outages Outage Date & Time Syn. Date & Time Outage (hh::mm:ss)Generation Loss

(In Mu)Reason

5 120 122/01/20 00:39 23/01/20 18:56

42:17:00 5.074MILL 5A & 5C OUT

6 120

1 210 127/01/20 12:37 28/01/20 10:08

21:31:00 4.519AIR HEATER

PROBLAM

1 20/01/2020 19:02 22/01/20 05:48 34:46:00 7.301 BTL

1 28/01/20 12:43 30/01/20 11:08 46:25:00 9.747 BTL

3 210 1 31/01/20 15:45 - - BTL

4 210 1 14/01/20 16:40 15/01/20 11:14 18:34:00 3.899 BTL

5 500 0 NIL NIL NIL NIL

1 250 1 17/01/20 17:15 19/01/20 09:25 40:10:00 10.042 BTL

2 250 128/01/20 13:10 29/01/20 11:03

21:53:00 5.471 BTL

1 500 0 NIL NIL NIL NIL

1 08/01/20 11:54 08/01/20 16:58 5:04:00 2.5333GENERATOR TEMP.

HIGH

1 30/12/2019 18:20 04/01/2020 12:06 113:46:00 56.8833ASH EVACUATION

PROBLEM

1 09/01/20 17:02 - - -CASING TEMP.

GETTING HIGH

Total 3080 11 230:40 105.469

5002

ABVTPS

DSPM TPS

9. Planned Outages Of Generating Stations For The Month Of JAN-2020.

HTPS

KTPS

KTPS

DSPM TPS

ABVTPS

10. Forced Outages Of State Generating Stations For The Month Of Jan-2020

HTPS

2 210

Page 23: CamScanner 05-11-2020 17.19 - SLDCCG

11. Shutdown of Transmission Elements in JAN-2020.

S. No. DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy)

hh:mm ]

Outage Hours

(hh:mm)

1 01-Jan-20 220 220 KV RAITA - SILTARA CKT 11:32 16:54 5:22

2 01-Jan-20 220 220 KV CHHURI - BISHRAMPUR CKT NO. II 30/12/2019 10:27 01/01/2020 14:23 51:56

302-Jan-20

220220/132KV 100MVA Xmer NO. I AT 220KV S/S

KOTMIKALA12:42 17:56 5:14

4 02-Jan-20 132 132KV PATHALGAON - KANSABEL CKT. 10:04 11:15 1:11

5 02-Jan-20 132 132KV PATHALGAON - BATOULI CKT. 12:40 13:48 1:08

6 02-Jan-20 132 132KV AMBIKAPUR - PATHALGAON CKT. 13:56 15:15 1:19

7 02-Jan-20 132 132KV PATHALGAON - GHARGHODA CKT. 15:23 17:13 1:50

802-Jan-20

132 132KV LAFARJ BAY AT 132KV LAFARJ POOLING S/S 16:29 17:25 0:56

9 02-Jan-20 132 20MVA Xmer AT 132KV S/S PATHALGAON 15:30 17:45 2:15

10 03-Jan-20 400 400KV S/S MARWA MAIN BUS II 12:41 16:36 3:55

1103-Jan-20

132132/33KV 40MVA Xmer NO. II AT URLA (HEERA

POOLING )10:42 15:09 4:27

12 03-Jan-20 132 132/33KV 40MVA Xmer NO. II AT S/S NAWAGARH 12:47 16:02 3:15

13 04-Jan-20 220 220 KV SUHELA - BANARI CKT 14:20 17:15 2:55

14 04-Jan-20 220 220 KV DSPM - BANARI CKT 14:21 17:12 2:51

15 04-Jan-20 220 20 MVA XMER No.I AT 220 KV S/S KOTMIKALA 14:08 15:54 1:46

16 04-Jan-20 220 220 KV CHHURI - KOTMIKALA CKT No.I 16:08 18:50 2:42

17 04-Jan-20 220 220 KV CHHURI - KOTMIKALA CKT No.II 18:56 21:27 2:31

18 04-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT No.I 09:56 12:08 2:12

19 04-Jan-20 132 132 KV DOMA - MANA CKT No.II 12:42 17:35 4:53

20 04-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT No.II 12:13 14:01 1:48

21 05-Jan-20 132 40 MVA XMER No.I AT 132 KV S/S AMBIKAPUR 10:27 12:16 1:49

22 05-Jan-20 132 40 MVA XMER No.II AT 132 KV S/S AMBIKAPUR 12:18 13:28 1:10

23 05-Jan-20 132 40 MVA XMER No.III AT 132 KV S/S AMBIKAPUR 13:30 14:36 1:06

24 06-Jan-20 400 400 KV MARWA - KHEDAMARA CKT 09:32 18:02 8:30

25 06-Jan-20 400 400 KV RAITA - KHEDAMARA BKR 15:21 17:26 2:05

26 06-Jan-20 220 125 MVA X-MER AT 220 KV S/S BHATAPARA 14:42 14:56 0:14

27 06-Jan-20 220 220 KV CHHURI - MOPKA CKT -I 06/01/2020 12:25 07/01/2020 13:58 25:33

28 06-Jan-20 220 220 KV MOPKA - DHARDEHI CKT 12:00 12:18 0:18

29 06-Jan-20 132 132 KV SIMGA - CHAKARBHATA CKT 10:30 19:16 8:46

30 07-Jan-20 220 220 KV BANARI - MARWA CKT NO . I 08:54 11:22 2:28

31 07-Jan-20 220 220 KV MARWA - BANARI CKT NO. II 11:26 13:17 1:51

32 07-Jan-20 220 220 KV CHHURI - MOPKA CKT NO .I 06/01/2020 12:25 07/01/2020 13:58 25:33

33 07-Jan-20 220 160 MVA Xmer NO . I AT 220 S/S BANARI 13:21 16:02 2:41

34 07-Jan-20 220 160 MVA Xmer NO . II AT 220 S/S BANARI 16:06 18:33 2:27

35 07-Jan-20 132 63 MVA X mer AT 132/33 KV S/S BIRGAON 08:42 17:50 9:08

36 07-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT . NO I 10:55 13:10 2:15

37 07-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT . NO II 13:15 15:10 1:55

38 07-Jan-20 132 132 KV AMBIKAPUR - PATHALGAON CKT NO . I 10:36 17:48 7:12

39 07-Jan-20 132 33 KV MAIN BUS AT 132 KV S/S BISHRAMPUR 15:30 18:35 3:05

40 07-Jan-20 132 132 KV KACHANA - URLA CKT NO . I 08:10 09:25 1:15

41 07-Jan-20 132 132 KV URLA - HIRAPOOLING CKT 12:32 17:40 5:08

42 07-Jan-20 132 132KV PARASWANI - RAJIM CKT. 07/01/2020 10:43 09/01/2020 18:08 55:25

43 07-Jan-20 132 132KV PARASWANI - MAHASAMUND CKT. 07/01/2020 18:09 09/01/2020 18:09 48:00

44 08-Jan-20 400 400 KV MARWA - BANARI CKT NO. I 08/01/2020 8:51 09/01/2020 18:11 33:20

45 08-Jan-20 220 220 KV KEB - KWB I/C NO. II 08/01/2020 9:01 09/01/2020 13:24 28:23

46 08-Jan-20 220 40 MVA X-MER NO. I AT 220 KV S/S SILTARA 10:13 16:50 6:37

4708-Jan-20

132 40 MVA X-MER NO. I AT 132 KV S/S MANENDRAGARH 10:36 12:50 2:14

4808-Jan-20

132 40 MVA X-MER NO. I AT 132 KV S/S WADRAFNAGAR 11:48 14:56 3:08

4908-Jan-20

132 40 MVA X-MER NO. II AT 132 KV S/S MANENDRAGARH 12:55 14:47 1:52

50 08-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT NO. I 14:53 16:35 1:42

51 08-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT NO. II 16:39 17:41 1:02

52 08-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT NO. II 16:40 17:20 0:40

53 08-Jan-20 132 132 KV MANENDRAGARH RLY TRACTION NO. I 17:48 18:59 1:11

54 08-Jan-20 132 132 KV MANENDRAGARH RLY TRACTION NO. II 19:32 20:32 1:00

55 09-Jan-20 220 220 KV KEB - KWB I/C NO. II 08/01/2020 9:01 09/01/2020 13:24 28:23

56 09-Jan-20 220 220 KV BANARI - SUHELA CKT 15:16 17:17 2:01

57 09-Jan-20 132 132 KV BANARI - AKALTARA CKT 14:07 15:38 1:31

58 09-Jan-20 132 40 MVA X-MER NO. I AT 132 KV S/S SARANGARH 10:58 11:14 0:16

59 09-Jan-20 132 132 KV BANARI - CHAMPA CKT 10:09 11:53 1:44

60 09-Jan-20 132 132 KV HEERA POOLING - BIRGAON CKT 10:26 16:02 5:36

61 09-Jan-20 132 132 KV BANGO - MANENDRAGARH CKT 15:25 19:18 3:53

62 09-Jan-20 132 KV PARASWANI - RAJIM CKT 07/01/2020 10:43 09/01/2020 18:08 55:25

63 09-Jan-20 132 KV PARASWANI - MAHASAMUND CKT 07/01/2020 18:09 09/01/2020 18:09 48:00

64 09-Jan-20 132 132 KV MANENDRAGARH - BAIKUNTHPUR CKT 19:25 20:45 1:20

65 10-Jan-20 132 220KV KHEDAMARA - BSP CKT. NO. I 10:02 18:02 8:00

66 10-Jan-20 220 160MVA Xmer NO. II AT 220/132KV S/S SILTARA 13:05 14:26 1:21

67 10-Jan-20 220 160MVA Xmer NO. III AT220KV S/S GURUR 14:22 17:42 3:20

68 10-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S BHILAI 09:20 15:47 6:27

69 10-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S KURUD 10:07 15:18 5:11

70 10-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S BAIKUNTH PUR 10:10 12:52 2:42

71 10-Jan-20 132 132KV KORBA - CHAMPA CKT. NO. I 10:44 12:44 2:00

72 10-Jan-20 132 40MVA Xmer NO. II AT 132KV S/S BAIKUNTH PUR 13:02 14:30 1:28

73 10-Jan-20 132 132KV KORBA - CHAMPA CKT. NO. II 12:48 14:49 2:01

74 10-Jan-20 132 132KV BAIKUNTHPUR - BISHRAMPUR CKT. 14:46 16:05 1:19

75 10-Jan-20 132 132KV BAIKUNTHPUR - MANENDRAGARH CKT. 16:14 17:25 1:11

76 11-Jan-20 220 100MVA Xmer NO. I AT 220KV S/S KOTMIKALA 09:32 13:53 4:21

Page 24: CamScanner 05-11-2020 17.19 - SLDCCG

11. Shutdown of Transmission Elements in JAN-2020.

S. No. DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy)

hh:mm ]

Outage Hours

(hh:mm)

77 11-Jan-20 220 100MVA Xmer NO. II AT 220KV S/S KOTMIKALA 15:48 21:42 5:54

78 11-Jan-20 220 220KV KHEDAMARA - BSP CKT. NO. II 09:50 16:49 6:59

79 11-Jan-20 220 63MVA Xmer AT 220KV S/S URLA 10:10 15:28 5:18

80 11-Jan-20 220 220KV CHHURI - MOPKA CKT. NO. I 11:30 12:25 0:55

81 11-Jan-20 220 20MVA Xmer NO. II AT 220KV S/S KOTMIKALA 13:55 15:40 1:45

82 11-Jan-20 132 132KV PARASWANI - BAGBAHRA CKT. 08:15 19:05 10:50

8311-Jan-20

132132KVPARASWANI - MAHASAMUNDTAP - KUHERA

CKT. 08:25 19:1310:48

84 11-Jan-20 132 MAIN BUS AT 132KV S/S AMBIKAPUR 09:26 12:42 3:16

85 11-Jan-20 132 132KV PATHALGAON - KASABEL CKT. 14:29 15:42 1:13

86 12-Jan-20 220 RLY TRACTION No.I AT 220 KV S/S KOTMIKALA 10:30 14:08 3:38

87 12-Jan-20 220 RLY TRACTION No.II AT 220 KV S/S KOTMIKALA 14:32 17:45 3:13

88 12-Jan-20 132 132 KV RAJPUR - BALRAMPUR CKT 10:05 13:49 3:44

89 13-Jan-20 220 220 KV MARWA - BANARI CKT No.II 13/01/2020 8:37 14/01/2020 17:31 8:54

90 13-Jan-20 220 40 MVA XMER No.I AT 220 KV S/S BHATAPARA 13/01/2020 10:11 31/01/2020 20:05 441:54

91 13-Jan-20 220 40 MVA XMER No.II AT 220 KV S/S THELKADIH 12:38 17:24 4:46

92 13-Jan-20 132 132 KV KACHNA - MAHASAMUND CKT 10:33 15:40 5:07

93 14-Jan-20 400 ICT - I AT 400 KV S/S KHEDAMARA 17:16 18:56 1:40

94 14-Jan-20 220 220 KV DSPM - KE LINE 10:30 13:30 3:00

95 14-Jan-20 220 160 MVA X-mer NO. II AT 220 KV S/S KUTHREL 11:15 19:27 8:12

96 14-Jan-20 220 220 KV KW - DSPM 14:47 16:33 1:46

97 14-Jan-20 220 220 KV DSPM - KWB 14:47 16:33 1:46

98 14-Jan-20 220 160 MVA X-mer NO . I AT 220 KV S/S SUHELA 11:46 16:25 4:39

99 14-Jan-20 220 220 MVA X-mer AT 132 KV BISHRAMPUR 17:36 19:20 1:44

100 14-Jan-20 132 132 KV SIMGA - CENTURY FDR 09:00 13:05 4:05

101 14-Jan-20 132 132 KV I/C NO - I AT BISHRAMPUR 09:28 13:02 3:34

102 14-Jan-20 132 40 MVA X-mer AT 132 KV S/S BISHRAMPUR 09:16 11:15 1:59

103 14-Jan-20 132 132/33 KV 40 MVA Xmer AT BARSOOR 10:19 15:44 5:25

104 14-Jan-20 132 132 KV CHAPLE - MONET CKT - I 10:35 17:40 7:05

105 14-Jan-20 132 132 KV BIRGAON - SECTOR (A) - HIRAPOOLING 10:48 17:21 6:33

106 14-Jan-20 132 132 KV INCOMING II AT 132 KV S/S BISHRAMPUR 13:07 15:12 2:05

107 14-Jan-20 132 132 KV BISHRAMPUR - AMBIKAPUR CKT NO. II 14:27 16:05 1:38

108 14-Jan-20 132132 KV RLY TRACTION NO . II AT 132 KV S/S

BISHRAMPUR16:23 17:00 0:37

109 14-Jan-20 132132 KV RLY TRACTION NO . I AT 132 KV S/S

BISHRAMPUR17:08 19:35 2:27

110 14-Jan-20 132 132 KV AMBIKAPUR - BISHRAMPUR CKT - II 16:07 17:33 1:26

111 15-Jan-20 400 ICT NO. III AT 400 KV S/S KHEDAMARA 09:35 17:13 7:38

112 15-Jan-20 220 160MVA X-mer AT 220 KV S/S BARSOOR 10:27 15:45 5:18

113 15-Jan-20 220 220 KV KW - CHHURI CKT - I 11:31 13:52 2:21

114 15-Jan-20 220 160 MVA X-mer NO. II AT 220 KV S/S BISHRAMPUR 14:34 17:03 2:29

115 15-Jan-20 220 220 KV CHHURI - BISHRAMPUR CKT NO. II 17:08 20:29 3:21

116 15-Jan-20 132 132 KV CHHURI - BISHRAMPUR CKT - I 10:45 13:22 2:37

117 15-Jan-20 132 132 KV SILTAR - KACHNA CKT - I 11:05 16:36 5:31

118 15-Jan-20 132 132 KV RAIGARH - SALASAR 15/01/2020 15:02 16/01/2020 15:40 24:38

119 16-Jan-20400

400/220 KV BHILAI ICT NO. III AT 400 KV S/S

KHEDAMARA09:30 16:27 6:57

120 16-Jan-20 220 40 MVA X-mer AT 220 KV S/S BISHRAMPUR 08:08 09:46 1:38

121 16-Jan-20 220 160 MVA X-mar NO . I AT 220 KV S/S BISHRAMPUR 14:22 16:53 2:31

122 16-Jan-20 132 132 KV BISHRAMPUR - WADRAFNAGAR CKT 10:13 11:36 1:23

123 16-Jan-20 132 132 KV SIMGA - BHILAI CKT 10:05 15:14 5:09

124 16-Jan-20 132 132 KV BANGO - BISHRAMPUR CKT 10:56 13:56 3:00

125 16-Jan-20 132 132 KV BISHRAMPUR - BAIKUNTHPUR CKT 16:56 17:58 1:02

126 17-Jan-20 220 132 KV MAIN BUS AT 220 KV S/S BANARI 13:15 15:48 2:33

127 17-Jan-20 220 220 KV KHEDAMARA - BHILAI CKT NO. II 13:23 16:06 2:43

128 17-Jan-20 132 40 MVA X-MER AT 132 KV S/S PRATAPPUR 10:10 12:00 1:50

129 17-Jan-20 132 132 KV SIMGA - CHAKARBHATA CKT 10:20 14:30 4:10

130 17-Jan-20 132 40 MVA X-MER NO. II AT 132 KV S/S DHAMTARI 11:10 12:08 0:58

131 17-Jan-20 132 132 KV PRATAPPUR - WADRAFNAGAR CKT 12:10 14:20 2:10

132 18-Jan-20 220 220KV KEB - DSPM CKT. 07:45 13:55 6:10

133 18-Jan-20 220 220KV KWB - DSPM CKT. 7:49 13:55 6:06

134 18-Jan-20 220 2P BUS AT 220KV KEB 09:52 13:30 3:38

135 18-Jan-20 220 40MVA Xmer NO. II AT 220KV S/S URLA 10:17 16:57 6:40

136 18-Jan-20 220 40MVA Xmer AT 220KV S/S DOMA 10:30 17:10 6:40

137 18-Jan-20 132 132KV RRVL CKT. AT 220KV S/S BISRAMPUR 13:20 14:35 1:15

138 18-Jan-20 132 132KV RAJIM - MAHASAMUND CKT. 08:32 19:21 10:49

139 18-Jan-20 132 132KV RAJIM - PARASWANI CKT. 08:57 19:28 10:31

140 18-Jan-20 132 132KV URLA-SECTOR A - HEERAPOOLING CKT. 10:42 16:54 6:12

141 19-Jan-20 132132KV BISHRAMPUR - RAJPUR CKT. AT S/S

BISHRAMPUR 09:08 10:301:22

142 20-Jan-20 132 40 MVA XMER No.I AT 132 KV S/S AMBIKAPUR 13:08 14:15 1:07

143 20-Jan-20 132 132 KV DHAMDHA - PARAMPUJAYA CKT No.I 17:42 19:59 2:17

144 21-Jan-20 132 132 KV SILTARA - KACHNA CKT No.II 11:32 13:36 2:04

145 21-Jan-20 132 132 KV DHAMDHA - PARAMPUJYA CKT No.II 17:06 20:46 3:40

146 21-Jan-20 132 40 MVA XMER No.I AT 132 KV S/S KAWARDHA 14/01/2020 11:18 21/01/2020 18:38 175:20

147 22-Jan-20 220 40 MVA X-MER - II AT 220 KV S/S SILTARA 12:29 15:34 3:05

148 22-Jan-20 132 40 MVA X-MER - II AT 132 KV S/S KAWARDHA 15:43 16:25 0:42

149 22-Jan-20 132 20 MVA X-MER- II AT 132 KV S/S JASHPUR 12:54 14:30 1:36

150 23-Jan-20 220 220 KV SUHELA - PARASWANI CKT - I 09:27 16:28 7:01

151 23-Jan-20 220 220KV 1 P BUS AT 220 KV KEB 12:25 15:40 3:15

152 23-Jan-20 132 132 KB MAIN BUS AT S/S JAIJAIPUR 09:35 10:30 0:55

Page 25: CamScanner 05-11-2020 17.19 - SLDCCG

11. Shutdown of Transmission Elements in JAN-2020.

S. No. DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy)

hh:mm ]

Outage Hours

(hh:mm)

153 23-Jan-20 132 63 MVA X-mer AT 132 KV S/S RUABANDHA 11:05 13:22 2:17

154 23-Jan-20 132 132 KV CHAMPA- JAIJAIPUR CKT 09:45 11:40 1:55

155 23-Jan-20 132 132 KV MAIN BUS AT 132 KV S/S GHARGHODA 12:03 14:02 1:59

156 24-Jan-20 220 220 KV MOPKA - CHHURI CKT NO. I 08:27 10:56 2:29

157 24-Jan-20 220 20 MVA X-MER NO. II AT 220 KV S/Y KEB 12:26 14:20 1:54

158 24-Jan-20 220 220 KV PGCIL RAIPUR - BHATAPARA CKT 11:46 16:49 5:03

159 24-Jan-20 220 160 MVA X-MER NO. I AT 220 KV S/S MOPKA 12:05 13:53 1:48

160 24-Jan-20 220 160 MVA X-MER NO. II AT 220 KV S/S SUHELA 13:47 15:04 1:17

161 24-Jan-20 220 220 KV BHILAI - GURUR CKT 15:30 20:16 4:46

162 24-Jan-20 132 132 KV MOPKA - BILASPUR CKT 10:34 11:45 1:11

163 24-Jan-20 132 132 KV BILASPUR - SILPAHRI CKT 11:59 12:59 1:00

164 24-Jan-20 132 132 KV BILASPUR - CHAKARBHATA CKT 13:03 14:18 1:15

165 24-Jan-20 132 40 MVA X-mer - I AT BILASPUR 14:50 15:59 1:09

166 24-Jan-20 132 132 KV WADRAFNAGAR - PRATAPPUR CKT 15:25 16:22 0:57

167 24-Jan-20 132 132 KV BILASPUR - PATHARIYA CKT 15:56 17:21 1:25

168 25-Jan-20 220 160 MVA X-MER NO. II AT 220 KV S/S URLA 10:19 17:14 6:55

169 25-Jan-20 220 220 KV KHEDAMARA - BSP CKT NO. II 11:15 11:52 0:37

170 25-Jan-20 132 132 KV BILASPUR RLY TRACTION NO. II 09:28 11:03 1:35

171 25-Jan-20 132 132 KV BILASPUR RLY TRACTION NO. I 11:23 12:44 1:21

172 25-Jan-20 132 132 KV CHAKARBHATA - BILASPUR CKT 13:05 14:21 1:16

173 25-Jan-20 132 132 KV CHAKARBHATA - SIMGA CKT 14:37 15:43 1:06

174 25-Jan-20 132 132 KV CHAKARBHATA - KOTA CKT NO. I 15:17 16:10 0:53

175 25-Jan-20 132 132 KV CHAKARBHATA - KOTA CKT NO. II 16:14 17:35 1:21

176 27-Jan-20 132 132KV RLY. TRECTION NO. I AT S/S BILASPUR 09:06 09:27 0:21

177 27-Jan-20 132 132KV MOPKA - BILASPUR CKT. 09:09 14:38 5:29

178 27-Jan-20 132 132KV SILPAHRI - BILASPUR CKT. 10:02 11:45 1:43

179 27-Jan-20 132 132KV RLY. TRECTION NO. II AT S/S BILASPUR 11:31 13:35 2:04

180 27-Jan-20 132 132KV BHATAPARA - BALODA BAZAR CKT. 10:30 12:28 1:58

181 27-Jan-20 132 132KV SILPAHRI - VANDNA CKT. 12:00 14:16 2:16

182 27-Jan-20 132 40MVA Xmer NO. I AT 132KV S/S SILPAHRI 13:26 17:50 4:24

183 28-Jan-20 220 160 MVA XMER No.I AT 220 KV S/S RAIGARH 10:51 15:00 4:09

184 28-Jan-20 220 220 KV KW - CHHURI CKT No.I 13:46 17:37 3:51

185 28-Jan-20 220 220 KV MAIN BUS No.II AT 220 KV S/S SUHELA 12:52 15:44 2:52

186 28-Jan-20 132 132 KV RAJIM - KURUD CKT 08:35 10:28 1:53

187 28-Jan-20 132 132 KV AKALTARA - BANARI CKT 10:08 11:24 1:16

188 28-Jan-20 132 40 MVA XMER No.II AT 132 KV S/S PANDARIYA 10:29 12:44 2:15

189 28-Jan-20 132 132 KV RAJIM - MAGARLOD CKT 10:36 12:50 2:14

190 28-Jan-20 132 132 KV AKALTARA - LAFARZE CKT 11:26 13:05 1:39

191 28-Jan-20 132 RLY TRACTION No.I AT 132 KV S/S AKALTARA 13:07 14:12 1:05

192 28-Jan-20 132 RLY TRACTION No.II AT 132 KV S/S AKALTARA 14:22 15:16 0:54

19328-Jan-20

132 40 MVA XMER No.II AT 132 KV S/S BHANUPRATAPPUR 14:15 15:25

1:10

194 28-Jan-20 132 132 KV AKALTARA - ARASMETA CKT 17:40 18:54 1:14

195 28-Jan-20 132 132 KV AKALTARA - KVK CKT 17:41 18:55 1:14

196 29-Jan-20 400 315 MVA ICT AT 400 KV S/S MARWA 29/01/2020 9:08 02/02/2020 12:39 99:31

197 29-Jan-20 220 1P BUS AT 220 KV SWITCH YARD AT KEB 10:30 21:05 10:35

198 29-Jan-20 220 40 MVA XMER No.II AT 220 KV S/S MOPKA 12:10 14:25 2:15

199 29-Jan-20 220 40 MVA XMER AT 220 KV S/S BANARI 14:11 15:50 1:39

200 29-Jan-20 220 40 MVA XMER No.I AT 220 KV S/S MOPKA 14:28 16:41 2:13

201 29-Jan-20 220 40 MVA XMER No.III AT 220 KV S/S MOPKA 16:45 18:05 1:20

202 29-Jan-20 132 132 KV KURUD - MAGARLOD CKT 08:05 10:25 2:20

203 29-Jan-20 132 132 KV BARSOOR - KIRANDUL CKT No.I 09:24 17:53 8:29

20429-Jan-20

132 132 KV KONI - MOPKA CKT AT 220 KV S/S MOPKA09:28 16:11

6:43

205 29-Jan-20 132 132 KV MOPKA - SWASTIK CKT 10:50 16:15 5:25

206 29-Jan-20 132 132 KV MOPKA - SILPAHARI CKT 12:40 13:50 1:10

207 30-Jan-20 400 400KV RAITA - JAGDALPUR CKT 9:36 23:05 13:29

208 30-Jan-20 220 220 KV CHHURI - KORBA EAST CKT NO.II 08:14 18:25 10:11

209 30-Jan-20 220 220 KV 2P BUS AT KEB 10:40 17:33 6:53

210 30-Jan-20 220 220 KV BY PASS BUS (BAY) AT KEB 09:40 17:50 8:10

211 30-Jan-20 220 160 MVA ICT- I AT 220 KV S/S MOPKA 09:40 11:35 1:55

212 30-Jan-20 220 160 MVA X-MER NO. III AT 220 KV S/S MOPKA 12:38 14:13 1:35

213 30-Jan-20 220 160 MVA X-MER NO. II AT 220 KV S/S MOPKA 14:14 17:30 3:16

214 30-Jan-20 220 220 KV CHHURI - MOPKA CKT- I 17:41 19:18 1:37

215 30-Jan-20 132 63 MVA X-MER NO. I AT 132 KV S/S KACHNA 10:26 17:48 7:22

216 31-Jan-20 220 160 MVA XMER No.II AT 220 KV S/S BEMETARA 11:10 17:30 6:20

217 31-Jan-20 220 220 KV BUS No.II AT BEMETARA 11:20 17:18 5:58

218 31-Jan-20 220 40 MVA XMER No.I AT 220 KV S/S BHATAPARA 13/01/2020 10:11 31/01/2020 20:05 441:54

219 31-Jan-20 132 132 KV AKALTARA - KVK CKT 10:17 11:20 1:03

220 31-Jan-20 132 40 MVA XMER AT 132 KV S/S KACHNA 10:05 16:05 6:00

221 31-Jan-20 132 132 KV AKALTARA - BANARI CKT 10:36 14:14 3:38

222 31-Jan-20 132 132 KV AKALTARA - ARASMETA CKT 11:23 12:17 0:54

223 31-Jan-20 132 132 KV KOTMIKALA - MANENDRAGARH CKT No.II 13:09 14:17 1:08

Page 26: CamScanner 05-11-2020 17.19 - SLDCCG

S. No. DateVoltage

Level [KV]Name of the Transmission Elements

From [ (mm/dd/yy) hh:mm ]

To [ (mm/dd/yy)

hh:mm ]

Outage Hours

(hh:mm)1

02-Jan-20220

160MVA Xmer AT 220KV S/S

JAGDALPUR13:54 18:00 4:06

2 02-Jan-20 220 220KV BHILAI - GURUR CKT. 14:40 20:00 5:20

3 02-Jan-20 220 220KV KHEDAMARA - BHILAI CKT. 14:41 16:05 1:24

402-Jan-20

132132KV SIMGA - CENTURY CEMENT

CKT.14:17 14:35 0:18

502-Jan-20

132 132KV PIL CKT. AT 220KV S/S BANARI 15:42 15:50 0:08

602-Jan-20

132132KV URLA - BAJRANG POWER

CKT.16:05 19:47 3:42

702-Jan-20

132132KV NARAYANPUR - KONDAGAON

CKT.16:45 17:03 0:18

802-Jan-20

132132KV BALODA BAZAR - AMBUJA

CEMENT CKT.02/01/2020 18:40 03/01/2020 18:56 24:16

902-Jan-20

132132KV SIMGA - CENTURI CEMENT

CKT.18:47 20:00 1:13

10 02-Jan-20 132 132KV RAIGARH - ADBHAR CKT. 19:08 19:20 0:12

1103-Jan-20

220220KV SUHELA - BEMETARA CKT.

NO. I20:04 20:21 0:17

1203-Jan-20

132 132KV SIMGA - CHAKARBHATA CKT. 03:15 04:21 1:06

1304-Jan-20

220220 KV CHHURI - BISHRAMPUR CKT

No.I02:23 02:40 0:17

1404-Jan-20

132 132 KV KORBA - JAMNIPALI CKT No.II 04/01/2020 22:40 05-01-2020 09:51 11:11

1504-Jan-20

132132 KV BALODA BAZAR - KASDOL

CKT 04/01/2020 23:54 05/01/2020 0:10 0:16

16 07-Jan-20 132 132 KV BANGO - CHHURI CKT 13:45 14:31 0:46

1708-Jan-20

220220 KV SUHELA - PARASWANI CKT

NO. I16:58 19:05 2:07

1808-Jan-20

22040 MVA X-MER NO. I AT 220 KV S/S

URLA16:23 16:46 0:23

1908-Jan-20

22040 MVA X-MER NO. II AT 220 KV S/S

URLA16:23 16:40 0:17

2009-Jan-20

22020 MVA X-MER NO. II AT 220 KV S/S

KOTMIKALA11:18 15:35 4:17

2109-Jan-20

22020 MVA X-MER NO. I AT 220 KV S/S

KOTMIKALA11:18 11:31 0:13

2209-Jan-20

132132 KV BALODABAZAR - AMBUJA

CEMENT CKT01:55 03:00 1:05

2309-Jan-20

132132 KV DONGARGARH - KIRNAPUR

CKT03:55 04:19 0:24

24 09-Jan-20 132 132 KV SIMGA - BERLA CKT 05:15 05:35 0:20

25 09-Jan-20 132 132 KV CHAMPA - JAIJAIPUR CKT 07:44 07:56 0:12

26 09-Jan-20 132 132 KV SILTARA - VANDANA CKT 05:06 11:38 6:32

27 09-Jan-20 132 132 KV SILTARA - SKS CKT 05:05 12:48 7:43

28 11-Jan-20 400 400KV RAITA - JAGDALPUR CKT. 13:13 13:45 0:32

2911-Jan-20

132132KV SUHELA - BALODA BAZAR

CKT. NO. II22:17 22:35 0:18

3012-Jan-20

220100 MVA XMER No.II AT 220 KV S/S

KOTMIKALA 00:37 13:40 13:03

31 12-Jan-20 132 132 KV KANKER - NAGARI CKT 21:06 21:20 0:14

32 13-Jan-20 220 220 KV KE - KW I/C No.I 13/01/2020 21:43 14/01/2020 13:50 16:07

33 14-Jan-20 132 132 KV BANGO - BISHRAMPUR 02:43 03:26 0:43

34 16-Jan-20 132132 KV BANGO - MANENDRAGARH

CKT14/01/2020 2:42 16/01/2020 13:20 10:38

35 14-Jan-20 132132 KV SARANGARH - SARAIPALI

CKT - I14/01/2020 11:46 15/01/2020 2:32 14:46

36 16-Jan-20 400 400 KV KHEDAMARA - MARWA CKT 02:17 09:45 7:28

37 16-Jan-20 132 132 KV RAIGARH - MSP CKT 00:32 00:46 0:14

38 17-Jan-20 132132 KV BANGO - MANENDRAGARH

CKT16/01/2020 13:48 17/01/2020 0:35 10:47

12. Trippings in Transmission Elements in JAN-2020

Page 27: CamScanner 05-11-2020 17.19 - SLDCCG

12. Trippings in Transmission Elements in JAN-2020

39 17-Jan-20 132 132 KV KANKER - NAGRI CKT 22:30 22:45 0:15

40 18-Jan-20 220220KV SUHELA - PARASWANI

CKT.NO. I 02:53 04:501:57

41 18-Jan-20 220220KV SUHELA - PARASWANI

CKT.NO. II 21:31 21:500:19

42 18-Jan-20 220220KV SUHELA - PARASWANI

CKT.NO. II 22:35 22:590:24

43 18-Jan-20 132 40MVA Xmer NO. I AT S/S SILTARA 15:37 16:30 0:53

44 22-Jan-20 220220 KV PARASWANI - SUHELA CKT

NO . I19:57 20:22 0:25

45 22-Jan-20 13240 MVA X-MER NO - I & II AT 132 KV

S/S HIRAPOOLING09:20 10:02 0:42

46 23-Jan-20 220220 KV SUHELA - PARASWANI CKT

NO. II02:05 2:25 0:20

47 24-Jan-20 220 220 KV PGCIL RAIPUR - BHILAI CKT 15:47 20:10 4:23

48 24-Jan-20 132132 KV BHATAPARA - NAVAGARH

CKT15:56 16:22 0:26

4925-Jan-20

13240 MVA X-MER NO. II AT 132 KV S/S

KEB17:16 23:38 6:22

5026-Jan-20

220160MVA Xmer NO. II AT 220 KV S/S

DHARDEHI 10:45 11:050:20

51 26-Jan-20 220 220KV SARAIPALI CKT. NO. II 01:58 02:56 0:58

52 26-Jan-20 220 220KV GERWANI CKT. 01:58 03:00 1:02

53 26-Jan-20 220 220KV JSPL CKT. NO. I 01:58 03:04 1:06

54 26-Jan-20 220 220KV JSPL CKT. NO. II 01:58 03:05 1:07

55 26-Jan-20 220 220KV PGCIL CKT. NO. I 01:58 03:32 1:34

56 26-Jan-20 220 220KV PGCIL CKT. NO. II 01:58 03:34 1:36

57 26-Jan-20 220 220KV PGCIL CKT. NO. III 01:58 03:36 1:38

58 26-Jan-20 220 220KV JPL CKT. NO. I 01:58 03:49 1:51

59 26-Jan-20 220 220KV SARAIPALI CKT. NO. II 01:58 04:25 2:27

6026-Jan-20

220160MVA Xmer NO. I AT 220KV S/S

SARAIPALI 01:58 03:031:05

6126-Jan-20

220160MVA Xmer NO. II AT 220KV S/S

SARAIPALI 01:58 03:101:12

6226-Jan-20

22040MVA Xmer NO. I AT 220KV S/S

SARAIPALI 01:58 03:061:08

6326-Jan-20

22040MVA Xmer NO. II AT 220KV S/S

SARAIPALI 01:58 03:141:16

64 26-Jan-20 132 132KV CHAMPA - CSPL CKT. 08:30 08:35 0:05

65 26-Jan-20 132 132KV ADBHAR CKT. 01:58 03:02 1:04

66 26-Jan-20 132 132KV MSP CKT. 01:58 03:07 1:09

67 26-Jan-20 132 132KV GERWANI CKT. 01:58 03:41 1:43

68 26-Jan-20 132 132KV CHAPLE CKT. 01:58 03:46 1:48

69 26-Jan-20 132 132KV SALASAR CKT. 01:58 03:49 1:51

70 26-Jan-20 132 132KV S/S GHARGHODA 01:58 02:49 0:51

71 26-Jan-20 132 132KV S/S BARAMKELA 01:58 03:00 1:02

72 26-Jan-20 132 132KV S/S KONDATARAI 01:58 03:10 1:12

73 26-Jan-20 132 132KV S/S DABHRA 01:58 03:16 1:18

74 26-Jan-20 132 132KV S/S SARANGARH 01:58 03:16 1:18

75 26-Jan-20 132 132KV S/S BASNA 01:58 02:24 0:26

76 26-Jan-20 132 132KV S/S SANKRA 01:58 03:13 1:15

77 26-Jan-20 132 132KV SARANGARH CKT NO. I 01:58 04:27 2:29

78 26-Jan-20 132 132KV SARANGARH CKT NO. II 01:58 04:28 2:30

79 27-Jan-20 400 400KV JAGDALPUR - RAITA CKT. 14:01 14:37 0:36

80 27-Jan-20 400 400KV JAGDALPUR CKT. NO. I 14:01 14:37 0:36

8127-Jan-20 400

315MVA XmerNO. I AT 400 KV S/S

JAGDALPUR 14:01 14:530:52

82 27-Jan-20 220 220KV NAGARNAR CKT. NO. I 14:01 15:09 1:08

83 27-Jan-20 220 220KV NAGARNAR CKT. NO. II 14:01 15:10 1:09

8427-Jan-20 220

160MVA Xmer AT 220 KV S/S

JAGDALPUR 14:01 15:051:04

85 27-Jan-20 220 220KV GURUR - CKT. 14:01 15:12 1:11

86 27-Jan-20 220 220KV BARSOOR - CKT. NO. II 14:01 15:14 1:13

Page 28: CamScanner 05-11-2020 17.19 - SLDCCG

12. Trippings in Transmission Elements in JAN-2020

87 27-Jan-20 132 132KV RAIGARH - MSP CKT. 3:46 04:04 0:18

88 27-Jan-20 132 132KV RAIGARH - MSP CKT. 05:15 05:28 0:13

8927-Jan-20

13240MVA Xmer AT 132 KV S/S

JAGDALPUR 14:01 15:081:07

9028-Jan-20

13240 MVA XMER No.I AT 132 KV S/S

SILPAHARI 07:50 12:364:46

91 31-Jan-20 220 220 KV SUHELA - PARASWANI CKT 15:39 16:00 0:21

92 31-Jan-20 132 132 KV KANKER - NAGRI CKT 02:02 02:12 0:10

93 31-Jan-20 132 132 KV KANKER - NAGRI CKT 03:56 04:09 0:13

94 31-Jan-20 132 132 KV SIMGA - CHAKARBHATA CKT 09:16 09:24 0:08

Page 29: CamScanner 05-11-2020 17.19 - SLDCCG

S.N DATETIME OF

OCCURRENCE

CATEGORY GD-1 TO GD-5, GI-1 - GI -

2

BLACK OUT AT BUSRESTORATI

ON TIMEMW

AFFECTED

DURATION OF INTERUPTION (IN HRS: MIN)

ENERGY NOT SUPPLIED (MUs)

REMARKS

1 09-Jan-20 05:15 GD-1 132 KV S/S BERLA 05:35 8 0:20 0.0001TRIPPING AT 132 KV SIMGA

- BERLA CKT

2 22-Jan-20 09:20 GD-1 132 KV S/S HIRAPOOLING 10:02 42 0:42 0.001

TRIPPING AT 40 MVA X-

MER NO - I & II AT 132 KV

S/S HIRAPOOLING

3 26-Jan-20 01:58 GD-1 220KVS/S SARAIPALI 02:46 97.94 0:48 0.0033

TRIPPING AT 160MVA Xmer

NO. I & II AT 220KV S/S

SARAIPALI

4 26-Jan-20 01:58 GD-1 220KVS/SGERWANI 02:46 296.88 0:48 0.0099

TRIPPING AT 220 KV

RAIGARH-GERWANI CKT &

220KV GERWANI-JPL CKT.

5 26-Jan-20 01:58 GD-1 220KVS/SRAIGARH 02:46 32.04 0:48 0.0011TRIPPING OF FEEDERS AT

220KV S/SRAIGARH

13. Grid Disturbance in Jan-2020

DETAILS OF ENERGY NOT SERVED DUE TO GRID DISTURBANCE IN RESPECT OF CHHATTISGARH SYSTEM

Page 30: CamScanner 05-11-2020 17.19 - SLDCCG

DATE FROM TO GROUPAvg MW

ReliefDURATION

FREQUENCY

(Hz)

NIL

14. LOAD SHEDDING DONE IN JAN-2020

Page 31: CamScanner 05-11-2020 17.19 - SLDCCG

Sub Station ICT [MVA]N-1

Contingency

ICT

Overloaded

(% of time)

352 0.00

313.5 0.00

Barsoor 1 x 160+1X120 176 0.00

Bemetara 2 x 160 176 0.00

627 0.00

588.5 0.00

Borjhara 2 x 160 176 0.07

Gurur 3 x 160 352 0.00

Korba [East] 2 x 160 176 0.00

Mopka 3 x 160 352 0.00

Kotmikala 2 x 100 110 0.00

Paraswani 2 x 160 176 13.84

Raigarh 3 x 160 352 0.00

Siltara 3 x 160 352 0.00

Thelkadih 2 x 160 176 0.00

Urla 3 x 160 352 0.00

Suhela 2 x 160 176 0.00

Khedamara 3 x 315 693 0.00

Raita 2 x 315 347 19.29

1.Doma 2.Banari 3.Kuthrel

4.Dhardehi 5.Saraipalli 6.Bishrampur

Remarks :1. Data of following substations not available at SLDC SCADA:

15. Overloading of ICTs under N-1 Contingency.

Bhatapara 2 x 160+1X125

Bhilai 2x160+3x125