Unrestrictive entry-exit system
GRTgaz has an unrestrictive entry-exit system: all consumers are supplied in every scenario. When interconnection capacities are created, GRTgaz invests in the heart of the grid
2008, April 1st- 3 -
Capacity development at PIR TIGF
2008, April 1st- 4 -
South
North
Capacity development at PIR TIGF and fluidity
TIGF
Congestion West to East when gas entry from the East is low (limitation of cumulated gas flows from Montoir and from TIGF)
2008, April 1st- 5 -
South
North
Capacity development at PIR TIGF and fluidity
TIGF
If capacity at PIR TIGF is developed, GRTgaz has a need for a new pipe in the heart of the grid(1) in order to increase fluidity
(1) To be defined in the 10 year indicative development plan (publication date: June 2008)
2008, April 1st- 6 -
Capacity development at PIR Midcat
2008, April 1st- 7 -
South
North
Capacity development at PIR Midcat
TIGF
Congestion South to North inside GRTgaz South Zone (limitation of gas flows from the South of France)
2008, April 1st- 8 -
South
North
Capacity development at PIR Midcat
TIGF
A need for investments in the heart of the grid(1) in order to increase entry capacity in the South of France. No capacity increase from South Zone to North Zone
(1) Artère du Rhône
2008, April 1st- 9 -