Page 1: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st

Capacity on GRTgaz’ gridInterconnection and fluidity

5th SG meeting of S-GRI in Madrid

Transparency (point IV.1 of the agenda)

Page 2: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 2 -

Unrestrictive entry-exit system

GRTgaz has an unrestrictive entry-exit system: all consumers are supplied in every scenario. When interconnection capacities are created, GRTgaz invests in the heart of the grid

Page 3: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 3 -

Capacity development at PIR TIGF

Page 4: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 4 -

South

North

Capacity development at PIR TIGF and fluidity

TIGF

Congestion West to East when gas entry from the East is low (limitation of cumulated gas flows from Montoir and from TIGF)

Page 5: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 5 -

South

North

Capacity development at PIR TIGF and fluidity

TIGF

If capacity at PIR TIGF is developed, GRTgaz has a need for a new pipe in the heart of the grid(1) in order to increase fluidity

(1) To be defined in the 10 year indicative development plan (publication date: June 2008)

Page 6: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 6 -

Capacity development at PIR Midcat

Page 7: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 7 -

South

North

Capacity development at PIR Midcat

TIGF

Congestion South to North inside GRTgaz South Zone (limitation of gas flows from the South of France)

Page 8: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 8 -

South

North

Capacity development at PIR Midcat

TIGF

A need for investments in the heart of the grid(1) in order to increase entry capacity in the South of France. No capacity increase from South Zone to North Zone

(1) Artère du Rhône

Page 9: Capacity on GRTgaz’ grid Interconnection and fluidity

2008, April 1st- 9 -

Thank you for your attention