Capital Improvement Program for2014-15

September 9, 2014

Page 2: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District2

2014-15 Capital Improvement Program

How were projects identified?•Facilities Assessment performed to identify systems at the end of their life cycle.Also queried Work order system – sorted on repeated repair issues

•Principals submitted their 3 highest priority projects.•Reviewed historical data on district-wide repair/upgrade contracts for both facilities and technology. (HVAC, technology, flooring, roofing, operable walls, floor replacement, etc.)

Page 3: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District3

2014-15 Capital Improvement Program

What is a Facilities Assessment?Each supervisor and lead mechanic assessed the condition of the system in which they maintain and assigned a condition code: red, yellow, or green:Red means it needs to be replaced within 1 year.Yellow means it needs to be replaced within 2-4 yearsGreen means the system is good for 5 or more years.•Cost estimates were completed on all red items and some of the yellow items which could be completed with in-house work force.(Biggest bang for $ using in-house work force).

Page 4: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District4

2014-15 Capital Improvement Program

What school systems were assessed?Building Envelope Roofing HVACElectrical Systems Fire Alarm LightingPlumbing Painting Boilers/hot waterElevator Pavement FloorsKitchen Equipment Outside Lighting Athletic Fields

* Note – this does not include safety/security items such as access/control features, cameras, panic buttons, etc.

Page 5: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District

2014-15 Capital Improvement Program- Facilites Assessment

Page 6: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District6

2014-15 Capital Improvement Program- Facilites Assessment

Page 7: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District7

2014-15 Capital Improvement ProgramWhat does the Facilities Assessment tell us?•Systems needing to be replaced or upgraded are shown in red and yellow.• Since many schools have had additions built at different times, the block is an average condition and may contain some red and greens and averages to a yellow. •Due to age and system conditions (the most red and yellow systems)- we need to start planning for school-wide renovations at:•Sedgefield Intermediate •Sangaree Elementary and Intermediate Schools•Devon Forest Elementary School

Page 8: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District8

2014-15 Capital Improvement Program

Page 9: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District9

2014-15 Capital Improvement Program- Other Funding Sources

QZAB funding available for two RED projects:

Upgrade Fire alarm system at SHS - $250,000Upgrade Fire alarm system at MNE - $170,000

Page 10: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District10

HE Bonner ES Exterior Doors need replacement

Rusted out, decayed areas

2014-15 Capital Improvement Program

Original 1980 doors.

Page 11: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District11

SHS Upgrade Original Group Restrooms-phase 1

2014-15 Capital Improvement Program

Cannot obtain parts on these sinks any longer

Partitions are showing age and graffiti removal has mar them and plumbing fixtures are 30 years old.

Original 1983 restrooms

Page 12: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District12

BHS Roof: Repair leaks at 6’ high parapet where coating has failed

2014-15 Capital Improvement Program

Another nuance to consider: Although the BHS roofing has yellow block. There are multiple roofs at BHS and this particular roof is red while the remaining roofs are green.

Page 13: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District13

Cross ES – HVAC equipment and controls have passed its useful life and needs replacement. This is only a portion of the work needed.

2014-15 Capital Improvement Program

Page 14: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District14

2014-15 Capital Improvement ProgramWhat are the Principal’s highest priority projects? Page 1 of 2

Page 15: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District15

2014-15 Capital Improvement ProgramWhat are the Principal’s highest priority projects? Page 2 of 2

Page 16: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District

Cainhoy ES/MS Gym Locker Room Renovations

16

2014-15 Capital Improvement Program

Before Picture: Fixtures are in bad shape or missing, paint is peeling, windows leak, holes in floors, improve lighting, renovate HVAC and exhaust fans, etc.

Page 17: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District17

Boulder Bluff Elementary floor tile replacement for 2nd and 3rd Grade

2014-15 Capital Improvement Program

Existing tile floors have glue coming up through seams and many tiles are discolored, chipped and worn out.

Page 18: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District18

2014-15 Capital Improvement ProgramWestview ES - Add screen wall at front of cafeteria door where the trash is stored. Loading dock is unsightly and the parking area creates a traffic jam. We have closed the parking lots with cones, however a brick wall would have curb appeal and create a safer store front.

Page 19: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District19

Berkeley Middle School – Connect sidewalk from bus loop to the 200 hallway; Difficult transition for wheel chairs.

2014-15 Capital Improvement Program

Page 20: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District20

District-Wide Facilities & Technology contracts for emergency and recurring costs.

2014-15 Capital Improvement Program

Note: This money also supports other facilities within the district such as: Transportation, Food Services, Men-Riv, District office, Executive Board room, Airport, Oakley, etc.

Page 21: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District21

2014-15 Capital Improvement Program

How much funding is available?•Approximately $3.4 millionHow should we allocate the funding?•Facilities Assessment Red/Yellow items - $1.0 million of the $6,259,452.oo and defer the remaining.•Principal’s #1 priority - $1. 0 million•District wide maintenance and repair contracts for facilities and technology (emergencies)- $1.4 million

Page 23: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District23

ADDENDUM Info

Page 24: Capital Improvement Program for 2014-15 September 9, 2014

Berkeley County School District24

2014-15 Capital Improvement ProgramADDENDUM Info