Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Sl.No Year
Present
Status
O/Cl/Y
PCB ID
Name of the Industry Address Area
Type of
Organa
zation
Product
Manufacture as per
consent
Capital
investme
nt in
Lakh Rs
Revised
Category
No.
Industry
Sector
Classific
ation
Cate
gory
Date of
Establisment
DD/MM/YY
WPC
/APC/
B.A
Consent
ValidityWhether covered
under HWM
Y/N
HWM
Authorisation
Validity
Whether
covered under
BMW Y/N
BMW
authorisation
validity
Whether
covered under
Plastics Y/N
Plastic
Registration
Validity
Whether
covered under
Battery Y/N
Validity under
Battery Rules
Whether
covered under e-
Waste Y/N
e-Waste
authorisation and
Registration validity
Sewage in
KLD Trade effluent
Perticulars of
Treatment units
ETP/STP /ST &SP
ETP / STP
under
operation Y/N
Whether
Connected to
UGD Y/N
Whether
Connected to
CETP Y/N Defaultor
APC System
under
operation
12009-10 O
10287ABB Ltd,
No.4A, 5 & 6, II Phase, PIA, Bangalore- 560 058,
II PhaseI
Engineering with pre treatment 20834.41 R-44
Industry or process involving metal
Large Red 1992BA
30.06.2021Y 30.06.2021 Y 31.12.2100 N N N NA NA NA 228 0.003 STP Y N Y NA Yes
22009-10 CL
-Forging & Allied Products,
No.B-123, 3rd cross, I Stage, PIE, Banglaore-58
I StageI
Steel Forging activity6.63 O-32
Forging of ferrous and non- ferrous metals
Medium Orange 1975BA
30.06.2017CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
32009-10 YTC
75778
Precission Sheet Metal works (P) Ltd
Unit-2, Plot No. a-149(a) & A-150(a), 5th Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacture of Sheet metal components 310 G-78
Switches without
electroplatinSmall Green 2013
BANA
Y 30.06.2017 N N N N N NA NA NA 0 NA NA NA NA N NA Yes
42009-10 CL
-
Precission Sheet Metal works (P) Ltd
No.21, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Electrical Portable power Tools 17568 G-78
Switches without
electroplatinLarge Green 1998
BA30.06.2010
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
52009-10 CL
-H.Dasappa & Sons,
No.47, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Brewarage808.68 R-60
molasses / grain /
yeast based) Medium Red 1990
BA30.06.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
62009-10 O
10718High Temp Furnaces Ltd,
No.1-C, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Brewarage2448.827 O-36
Heat treatment using oil fired furnace
Large Orange 1992BA
30.09.2030Y 30.06.2024 N N N N N NA NA NA 3.2 0.1 N N Y Y NA Yes
72009-10 O
24121Hittco Tools Ltd.,
No.78, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Manufcture of Drills and taps 734.16 G-91
Manufacture of Adhesives andadhesive
Medium Green 2000BA
31.12.2021Y 30.06.2015 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
82009-10 O
11202
KDDL Ltd (formerly know as Kamala Dials & Devices),
No.296 & 297 IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Wrist Watch Hands with brass strap stapping, reviting,degreasing,
2120.95 R-44Industry or process involving metal
Large Red 1992BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 3.8 5.5 ETP Y Y N NA Yes
92009-10 CL
11202Kongovi Electronics Pvt Ltd ,
No.377,10th cross, PIA, IV Phase, Bengaluru-560 058
IV PhaseI
Engineering with Electroplating 442 R-44
Industry or process involving metal
Small Red 1989BA
30.06.2018Y 30.06.2019 N N N N N NA NA NA 1.6 12 ST & SP ETP Y N N NA Yes
102009-10 O
10513
Karnataka Antibiotic & Pharmaceutical Ltd,
No.14, II Phase, PIA, Bengaluru-560 058
II PhaseI
Formulation of Pharmaceuticals 9895 O-74
Pharmaceutical formulation
Large Orange 1984BA
30.09.2030Y 30.06.2020 N N N N N NA NA NA 45 94.2 ETP Y Y N NA Yes
112009-10 CL
-Kirloskar Electrical Co,
II Phase, PIA, Bengaluru-560 058 II PhaseI
Electric motorsG-78
and electronic
itemLarge Green Closed
BA31.12.2014
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
122009-10 O
11432
Naptha Resins & Chemicals Pvt Ltd,
No.492, IV Phase, PIA, Bangalore-560058
IV PhaseI
unsaturated Polyester Resin and Phenolic Resin
875 R-22Organic Chemicals manufacturing
Medium Red 1975BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 4
3.35 (inceneration) ST & SP N N N NA Yes
132009-10 O
11139
Eurofins Advinus Limited (Formertly Advinus
Therapeutics Private Ltd), Unit -1,
Unit -1, No 21/ 22, II Phase, PIA, Bengaluru-560 058
II PhaseI
R & D activity on toxycology, biological efficiency on residue of pesticides & R & D
11674.02 R-58Pharmaceutical (Bulk drug &Active
Large Red 1980BA
30.06.2021Y 30.06.2021 Y 30.06.2100 N N N NA NA NA 70 37 STP & ETP Y N N NA Yes
142009-10 O
11155
Rewdale Precission Tools Pvt Ltd.,
No.484 B & C, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Precision turned components with pre treatment
1222.57 R-44Industry or process involvingmetal
Large Red 1983BA
30.06.2020Y 30.06.2025 N N N N N NA NA NA 3 0.25 ST & SP N N Y NA Yes
152009-10 O
20885Ace Designers Ltd (Unit-II),
No.533, 10th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit1407 G-10
Carpentry & wooden furnituremanufacturi
Large Green 2007BA
31.12.2026Y 31.12.2023 N N N N N NA NA NA 8 N N N Y N NA Yes
162009-10 O
11411Anglo French Drug & Co,
No.4, II Phase, PIA, Bengaluru-560 058
II PhaseI
Formulation of Pharmaceuticals 1862 O-74
Pharmaceutical formulation
Large Orange 1980BA
30.09.2021Y 30.09.2021 N N N N N NA NA NA 18 31.5 STP & ETP Y N N NA Yes
172009-10 O
10855Micro Labs Ltd,
No.67/68-A, III Phase, PIA, Bangalore-560058
III PhaseI
Formulation of Pharmaceuticals 4524.34 O-74
Pharmaceutical formulation
Large Orange 1978BA
30.09.2021Y 30.09.2021 N N N N N NA NA NA 13 6 ETP Y Y N NA Yes
182009-10 O
11251Integrated Electric Co Pvt Ltd,
No. 497/A, IV Phase, Bengaluru-560 058
IV PhaseI
Engineering with spary painting 1684 O-62
Spray painting, paint baking, paint
Large Orange 1989BA
30.09.2030N N N N N N N NA NA NA 6.4 N ST & SP N N N NA Yes
192009-10 O
10508Sami Labs Ltd,
No.19/1 & 19/2, 1st Main, II Phase, PIA, Bangalore-560058
II PhaseI
R & D activity on Herbal productes 4673 R-58
Pharmaceutical (Bulk drug &Active
Large Red 2000BA
05.08.2025Y 30.06.2025 N N N N N NA N NA 7 5 STP & ETP Y N N NA Yes
202009-10 CL
-Vijaya Steels Ltd,
No.37, II Phase, PIA, Bengaluru-560 058
II PhaseI
non Ferrou alloys casting 1968 O-66
Non- ferrous metal
extraction Large Orange 1972
BA30.09.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
212009-10 O
10286Ace Designers Ltd,
No.7 & 8, II Phase, PIA, Bengaluru-560 058
II PhaseI
CNC Machinery with surface treatment such as Degreasing, Derusting,
8286.19 R-44Industry or process involving metal
Large Red 7/11/2001BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 40 10 STP & ETP Y N N NA Yes
22 Site No.19 & 20,Sy No.467, 468 & IV Phase Engineering with Spray 222009-10 O
11925Pragathi Automation Pvt Ltd,
Site No.19 & 20,Sy No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering with spary painting 4899 O-62
Spray painting, paint baking, paint
Large Orange 2006BA
30.09.2028Y 30.09.2025 N N N N N NA NA NA 4 N STP Y N N NA Yes
232009-10 O
11217Auma (India) Ltd,
No.39-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering with spary painting (Manufacture of Gear Boxes and Actuators)
7088 O-62Spray painting, paint baking, paint
Large Orange 1986BA
30.09.2022Y 30.09.2018 N N N N N NA NA NA 10.8 N NA N Y N NA Yes
242009-10 CL
11417Shashikar Enterprises ,
No.188, 11th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Readymade Garment894 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2003BA
31.12.2026N N N N N N N NA NA NA 29.52 N STP Y N N NA Yes
252009-10 O
11428Bata India Ltd,
No.474, 475,476, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Foot wear2192 G-26
Leather foot wear and leatherproducts
Large Green 1988BA
31.12.2022Y 31.12.2023 N N N N N NA NA NA 30 N STP Y N N NA Yes
262009-10 CL
-
KPIT Communis Infosystem Private Limited ( Old name C.G.Smith Soft Ware Pvt
Ltd).,
No.1-A, II Phase, PIA Bengaluru-560 058
II PhaseI
Softwere Techonology 809 G-78
Switches without
electroplatinMedium Green 1994
BA31.12.2004
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
272009-10 CL
-
Turbomeca Turbochargers Industrial Indaia Pvt Ltd
No.385 & 386 IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of Turbines 786 G-78
Switches without
electroplatinMedium Green 2006
BA31.12.2015
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
282009-10 O
27009
Ace Manufacturing Systems Ltd,
No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
CNC Vertical with SPRAY painting 5533 O-62
Spray painting, paint baking, paint
Large Orange 2006BA
30.09.2023Y 30.06.2023 Y 31.12.2100 N N N NA NA NA 15 3.5 STP Y N Y NA Yes
292009-10 O
10288
Fouress Engineering India Ltd, N
No.2, II Phase, PIA, Bengaluru-560 058
II PhaseI
Valves Isolators & Fabrication works 3983 R-44
shippingLarge Red 20/8/74
BA30.06.2021
Y 30.06.2021 N N N N N NA NA NA 25 2.6 STP & ETP Y N N NA Yes
302009-10 O
40236Champion Extrusion,
Unit-II, No.A-21, III Stage, PIE, Bengaluru-560 058
III StageI
Electroplating179.7 R-44
Industry or process involving metal
Small Red 2012BA
30.06.2022N N N N N N N NA NA NA 1.2 0.05 N N Y Y NA Yes
312009-10 CL
-Krone Communications Ltd,
No.30C, II Phase, PIA, Bengaluru-560 058
II PhaseI
Elctronic components asembly C1 G-78
Switches without
electroplatinMedium Green Closed
BA31.12.2008
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
322009-10 O
87408
A D C India Communication (P) Ltd.,
No.10/C, II Phase, PIA, Bengaluru-560 058
II PhaseI
Assembling of various tele communication equipment
2088.38 G-78Switches without
electroplatinLarge Green 1989
BA31.12.2034
Y 31.12.2024 N N N N N N N N 1.8 N N N Y N N Yes
332009-10 O
24905Leo Isro,
No.16, I Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Electro Optical Systems required for stallite
1800 G-53ng of optical
lenses(using
Large Green 2002BA
31.12.2022N N N N N N N N N N 14 N STP N N N N Yes
342009-10 CL
-NTTF Industries Ltd,
No.23/24, II Phase, PIA, Bengaluru-560 058
II PhaseI
Automotive Componenets 6953 G-78
Switches without
electroplatinLarge Green 1994
BA31.12.2014
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
352009-10 CL
22154
Pearl Insulations Pvt Ltd, Unit-1,
Unit-1, No.505-507, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Insulated copper and alluminium conductor 577.96 G-96
Manufacturing of insulatedconductors
Medium Green 1991BA
31.12.2015Y 31.12.2019 N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes
362009-10 CL
-Sonal Garments - II,
No.254, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment347 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2000BA
31.12.2001CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
372009-10 CL
11625Supertex Labels Pvt Ltd,
No.488D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
woven polysters labels 2473 G-91
Manufacture of Adhesives andadhesive
Large Green 1997BA
31.12.2017CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
382009-10 O
40263Auto Cnc Machining Pvt Ltd,
No.282, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
General Engg. CNC Machinery Components
893 G-10Carpentry & wooden furnituremanufacturi
Medium Green 2003BA
31.12.2022Y 31.12.2024 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
392009-10 CL
11177Indus Fila Pvt Ltd,
No.21-D-2, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment5297.27 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2005BA
31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
402009-10 CL
-J.J.Exports Ltd,
No.21-D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Weaving 556 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2005BA
31.12.2009CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
412009-10 O
11213Jeans Knit Pvt Ltd,
No.485/2,13th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Readymade Garments3711.65 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2005BA
31.12.2024N N Y 31.12.2100 CL CL CL CL CL CL 0.12 N ST & SP N N N CL Yes
422009-10 CL
10648Jeans Knit Pvt Ltd,
No.34/A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Readymade Garments1430 O-12
Silk screen printing, sari printing bywooden
Large Orange 1995BA
30.09.2022Y 30.09.2020 N N N N N NA NA NA 16 0.02 ETP Y Y N NA Yes
432009-10 CL
11520Agro Extracts Ltd,
No.16, II Phase, PIA, Bengaluru-560 058
II PhaseI
Vegetable Oil, De Oil Cake, DAP and Belnding of Lubricating Oil
471 R-4Manufacturing of lubricatingoils ,grease
Small Red 1975BA
30.06.2022Y 30.06.2020 N N N N N NA NA NA 2 6 ST & SP N N Y NA Yes
442009-10 CL
-
Anz Tyres International (Unit-III),
Unit-III, No.480/D, PIA, IV Phase, Bangalore
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2007
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
452009-10 CL
15886Asian Fab tech Ltd,
No.15, II Phase, PIA, Bangalore-560058
II PhaseI
Engineering with zinc spraying 1159.96 R-44
Industry or process involving metal
Large Red 2002BA
30.06.2015Y 30.06.2015 N N N N N NA NA NA 2 0.6 ST & SP N N Y NA Yes
462009-10 CL
-
Momentive Performace Materials India (P) Ltd., (
No.275, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Silicon Sealant1960 G-98
Tyre &Tubes/rubbe Large Green 1998 31.12.20042009-10 CL
-
Materials India (P) Ltd., ( formerlyGe Bayer Silicon
(India) Pvt Ltd,)
058 I 1960 G-98 Tubes/rubber tubes only
Large Green 1998BA
31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
472009-10 O
10679
Glastronix LLP (Formerly known as Glastronix),
No.21-E2, II Phase, PIA, Bengaluru-560 058
II PhaseI
Electrical & Electronics Components
3336 R-44Industry or process involving metal
Large Red 1987BA
30.06.2021Y 30.06.2020 N N N N N NA NA NA 4.8 0.1 Combined ETP Y N N NA Yes
482009-10 O
13301
Twivi Technologies Pvt Ltd., ( Formerly known as Hi-Tech
Pneumatics Treaters Pvt Ltd,)
No.V-34(A), 7th Main, II Stage,PIE, Bengaluru-560 058
II StageI
Heat Treatment540 O-36
Heat treatment using oil fired furnace
Small Orange 1999BA
30.09.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
492009-10 CL
-
Hindustan Eletcro Technology Pvt Ltd,
No. SB-57, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit89 G-78
Switches without
electroplatinSmall Green 1972
BA31.12.2014
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
502009-10 O
19677Kamalam Handlooms Pvt Ltd,
No.266, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Silk yarn dyeing688.36 R-40
Yarn / Textile processinginvolving
Medium Red 2003BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 2 40 ST & SP ETP Y N N NA Yes
512009-10 O
11421Kotak Urja Pvt Ltd,
No.378, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Photovoltaic system (solar power generating system, solar street lighting
1545 G-114Solar power generation throughsolar
Large Green 1997BA
31.12.2021Y 31.12.2025 N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
522009-10 CL
-
Mag Engineering (P) Ltd, Unit -1,
Unit -1, No.1A/1, 1st main road, II Phase, PIA, Bengaluru-560 058
II PhaseI
All types of sheet metal Fabrication with pretreatment
2355.59 R-44process
involvingmetal
Large Red 2007BA
30.06.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
532009-10 CL
13216
Organica Aromatics (Bangalore) Pvt Ltd,
No.407, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Aromatic compound 374.03 R-84
metal surface
treatment orSmall Red 2004
BA30.06.2018
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
542009-10 CL
-Peenya Alloys Pvt Ltd,
No.248, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Steel rerollingC1 O-63
steel products
usingSmall Orange Closed
BA30.09.2004
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
552009-10 O
10522
Beckman Coulter India Pvt Ltd.,(Formerly known as Rea
Matrix India Pvt Ltd),
No.50 B, II Phase, PIA, Bangalore-560058,
II PhaseI
R & D activity1535 R-58
Pharmaceutical (Bulk drug &Active
Large Red 2003BA
30.06.2021Y 30.06.2021 Y 31.12.2100 N N N NA NA NA 3.5 1 Combined ETP N N N NA Yes
562009-10 O
12053
Radiall India (P) Ltd (formerly Known as Radial Protection
(P) Ltd),
Plot No 25D II Phase, PIA, Bengaluru-560 058,
II PhaseI
Manufacture of RF Connectors with Cable assembly
12.23 G-78Engineering and fabricationunits (dry
Small Green 1994BA
31.12.2022Y 31.12.2022 N N N N N NA NA NA 0.01 N NA N Y N NA Yes
572009-10 CL
-Saritorius Bio-Tech Pvt Ltd,
No 10 , III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering with Electroplating 1202 R-44
process involving
metal Large Red 1999
BA30.06.2010
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
582009-10 CL
-
Shiltron Electronics & Engineering,
No.10C, II Phase, PIA, Bengaluru-560 058
II PhaseI
PCB manufacture C1 R-44
process involving
metal Small Red Closed
BA30.06.2010
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
592009-10 CL
-Shyam Steel Rolling Mills,
No.5C, I Phase, PIA, Bengaluru-560 058
I PhaseI
Steel rerollingC1 O-63
steel products
usingSmall Orange Closed
BA30.09.2010
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
602009-10 CL
-Sutures India Pvt Ltd,
No.118, III Phase, PIA, Bengaluru-560 058
III PhaseI
SuturesC1 R-44
process involving
metal Small Red Closed
BA30.06.2007
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
612009-10 CL
11700Swan Silk Ltd,
No.107-108, III Phase, PIA, Bangalore-560058
III PhaseI
Silk yarn dyeing213 R-40
Yarn / Textile processinginvolving
Small Red 1993BA
30.06.2022Y 30.06.2020 N N N N N NA NA NA 0.8 5 ST & SP ETP Y N N NA Yes
622009-10 CL
-Hi-tech pneumatics
No.V-34(B) II Stage,PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2002
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
632009-10 O
15896The Southern Gas Pvt Ltd,
No.10F, II Phase, PIA, Bangalore-560058
II PhaseI
Oxygen Gas & Nitrous Oxide 600 G-109
Refilling, Repacking andblending of
Medium Green 1985BA
31.12.2024Y 30.06.2008 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
642009-10 O
24302Therelek Engineers Pvt Ltd,
No.70/71, III Phase, PIA, Bangalore-560058
III PhaseI
1.Manufacture of Furnaces, Ovens & Incinerators 2.Heat Treatment Activity
1321.55 O-36Heat treatment using oil fired furnace
Large Orange 1981BA
30.09.2022Y 30.09.2021 N N N N N NA NA NA 4 N ST & SP N N N NA Yes
652009-10 O
20194
Advinus Therapeutics Pvt Ltd, unit - 2,
unit -2 No.203, III Phase, PIA, Bangalore-560058
III PhaseI
R & D activity on Pharmaceuticals, Bulk drug & Bio technology
909.1 R-58Pharmaceutical (Bulk drug &Active
Medium Red 2005BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 1 1 NA N Y Y NA Yes
662009-10 O
11615Alufit (India) Pvt Ltd,
No.17-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Aluminium anodizing570 R-44
Industry or process involving metal
Medium Red 2002BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 3.6 0.6 NA N Y Y NA Yes
672009-10 CL
-
Armstrong Acmite India Mfg (P) Ltd,
No.33B II Phase, PIA, Bengaluru-560 058,
II PhaseI
Non Ferrou alloys casting 220 O-66
Non- ferrous metal
extraction Small Orange 2005
BA30.09.2011
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
682009-10 O
11412
Mag Engineering Pvt Ltd (A unit of Sandhar Technologies),
No.46-A, 3rd Main road, Unit -2 , II Phase, PIA, Bengaluru-560 058,
II PhaseI
Mild Steel Cabinets, Control Panels, Switch Boards, Elevating
5438 R-44Industry or process involving metal
Large Red 2004BA
30.06.2024Y 30.06.2020 N N N N N NA NA NA 10 10.5 STP & ETP Y N N NA Yes
692009-10 O
17763
Mysore Thermo Electric Pvt Ltd,
No.62, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Lead Acid Battery manufacture 1396.56 R-7
Lead acid batterymanufacturing(excluding
Large Red 1974BA
30.06.2021Y 30.06.2020 N N N N Y NA NA NA 2 0.5
ST & SP ETP(trt in Unit-II) Y N N NA Yes
702009-10 CL
33278Nash Industry,
No.393, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering with powder caoting 376 R-44
Industry or process involving
Small Red 1/8/2004BA
30.06.2010CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL33278 involving
metal BA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
712009-10 CL
-
Seenu Precission Tooling Systems (P) Ltd Unit-II,
Unit-II, No.484, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering with Heat treatment 267 O-63
Industries with Heat
Treatment, Small Orange 1/7/2006
BA30.06.2011
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
722009-10 O
32065Alutop,
No.P 26C, 10th Main, III Stage, PIE, Bengaluru-560 058
III StageI
Aluminium pilfers proof caps 258 G-1
utensils fromaluminum circles by
Small Green 2010BA
31.12.2026N NA N N N N N NA NA NA 2.5 NA ST & SP N N N NA Yes
732009-10 O
10964
Mysore Thermo Electric Pvt Ltd,
No.36, III Phase, PIA, Bengaluru-560 058,
III PhaseI
manufacture of Formed plates 88.02 R-7
Lead acid batterymanufacturing(excluding
Small Red 1974BA
30.06.2023Y 30.06.2023 N N N N N NA NA NA 0.62 2 ST & SP ETP Y N N NA Yes
742009-10 O
11496Ador Fontech Ltd, Unit-I
No.486, B -1, 14th Cross, 3rd Main, IV Phase, PIA, Bangalore - 58,
IV PhaseI
Welding electrodes376 O-4
Coated electrode manufacturing
Medium Orange 2003BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 1.2 0.2 NA N Y Y NA Yes
752009-10 O
19593Ador Multiproducts Limited.,
No.A-13 & 14, III Stage,PIE, Bengaluru-560 058
III StageI
Cosmetics 360 O-10
Manufacturing of tooth powder,toothpaste,
Small Orange 1996BA
30.09.2023N N N N N N N NA NA NA 0.64 0.1 NA N Y Y NA Yes
762009-10 CL
-Advani Overlikon Ltd,
No.A-288, II Stage,PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
772009-10 CL
-Amc Cook Ware (I) Ltd,
No.21A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Cookware utensils895 G-1
utensils fromaluminum circles by
Medium Green 2001BA
31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
782009-10 CL
-Bleach Lakier,
No.260, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Auto part6.5 G-78
Switches without
electroplatinMedium Green 2006
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
792009-10 O
39610Ceramed Engineers Pvt Ltd,
No.B-67 & 68, III Stage,PIE, Bengaluru-560 058
III StageI
Vibro polishing184 O-96
Gold and Silver smithy (purification
Small Orange 1988BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 2.4 0.11 NA N Y Y NA Yes
802009-10 CL
11591Bombay Royon Fashions Ltd,
No.58, 4th Main, 2nd cross, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment 1229 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 1997BA
31.12.2020Y 30.09.2018 N N N N N NA NA NA 30 N STP Y N N NA Yes
812009-10 O
10696
Jeans Knit Pvt Ltd,(Fibres & Fabrics International),
No.21-E, 20/A, II Phase, PIA, Bangalore-560058,
II PhaseI
Garment Washing15553.73 O-50
Mechanized laundry using oil fired
Large Orange 2005BA
30.09.2022Y 30.09.2022 Y 31.12.2100 N N N NA NA NA 36 1599 ETP Y Y N NA Yes
822009-10 O
16488
Gemini Dyeing & Printing MIIl Ltd Division -I (formerly AG Exports unit-I,( Formerly
Gemini Fashios Pvt. Ltd., )
No.1-E, 1st Main, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Stitching of ready made Garments 592.19 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2006BA
31.12.2022N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes
832009-10 O
11729
Gerb Vibration Control Systems Pvt Ltd.,
No.27/A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering with painting 2666 O-62
Readymade leather garments
Large Orange 1993BA
30.09.2021Y 30.09.2020 N N N N N NA NA NA 3 0.02 ST & SP N N Y NA Yes
842009-10 CL
12854Greys Exim Pvt Ltd,
No.477-B, IV Phase, PIA, Bangalore-5600588,
IV PhaseI
Stitching of Garments & Garment Washing 876 O-50
Mechanized laundry using oil fired
Medium Orange 2003BA
30.09.2022N N N N N N N NA NA NA 1.2 1.4 ST & SP ETP Y N N NA Yes
852009-10 CL
-H & R Flavours & Fregrances,
No. , II Stage,PIE, Bengaluru-560 058 II StageI
Perfumery items C1 O-10
ng of tooth powder,
toothpaste, Small Orange Closed
BA30.09.2004
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
862009-10 CL
-
Indus youth Engineering Pvt Ltd,
No.1A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Machinery & spances for Rubber 167 G-78
Switches without
electroplatinSmall Green 1996
BA31.12.2009
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
872009-10 CL
-Kashyap Coated Sands,
No.477, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2005
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
882009-10 CL
-Kaveri Steels Ltd,
Plot No 20, I Phase, PIA, Bengaluru-560 058,
I PhaseI
Engineering Unit322.5 G-78
Switches without
electroplatinSmall Green 1989
BA31.12.2000
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
892009-10 O
10925
Meyer Organics Pvt. Ltd.,(Old Name Meyer Health Care),
No.10-D, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Formulation of Pharmaceuticals 1900 O-74
Pharmaceutical formulation
Large Orange 1996BA
30.09.2022Y 30.09.2018 N N N N N NA NA NA 16 42 ETP Y Y N NA Yes
902009-10 O
16680
Nash Industries (I) Pvt Ltd. (E.O.U.),
No.236-237/2, 8th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Fabrication of Sheet metal 1688 G-78
Panel Board, Switches withoutelectroplatin
Large Green 2003BA
31.12.2021Y 31.12.2025 N N N N N NA NA NA 7.2 N ST & SP N N N NA Yes
912009-10 O
11635Pragathi Automation Pvt Ltd.,
No.413, 11th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
General Engineering activity with spray Painting: Components for tool Turrets,
4168 O-62Automobile servicing,repairing and painting
Large Orange 1986BA
30.09.2021Y 30.09.2021 N N N N N NA NA NA 4.8
0.5 (inceneration) NA N Y Y NA Yes
922009-10 O
10663Prerana Motors Pvt Ltd,
No 28D/29, II Phase, PIA, Bangalore-560058,
II PhaseI
Automobile Servicing1022 O-62
Automobile servicing,repairing and painting
Large Orange 1993BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 4.8 N STP Y N N NA Yes
932009-10 O
11209Remidex Pharma Pvt Ltd,
No.B-249, II Stage,PIE, Bangalore-560058
II StageI
Formulation of Pharmaceuticals: Tablets, Capsules & Syrups/ liquids
2535 O-74Pharmaceutical formulation
Large Orange 1983BA
30.09.2021Y 30.09.2021 Y 31.12.2100 N N N NA NA NA 6.5 4.7 ETP Y Y N NA Yes
942009-10 O
16604S.R.K. Products Pvt Ltd,
No.228 & 233, 11th main, III Phase, PIA, Bangalore - 560058,
III PhaseI
Soap nut powder turmeric powder and cofffe poder
211 G-47Re-packing of finishedproducts (Dry
Small Green 1994BA
31.12.2026N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes
95 No.Sb-57, I Stage, PIA, Bengaluru-560 I Stage Engineering Unit Switches 952009-10 CL
-Searock Precission Products,
No.Sb-57, I Stage, PIA, Bengaluru-560 058,
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
962009-10 CL
-
Singarama Roller Flour Mills Ltd, IV Phase, PIA, Bengaluru-
560 058,
IV Phase, PIA, Bengaluru-560 058, IV PhaseI
Pulverizing C1 O-26
processing, mineral
processing, Medium Orange Closed
BA30.09.2007
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
972009-10 O
12892Stanzen Links,
No.473, A-2, IV Phase, PIA, Bangalore-560058,
IV PhaseI
Electrical stamping, Automobile components
882 G-77Manufacture of Motor & Pumpswithout
Medium Green 1980BA
31.12.2021N N N N N N N NA NA NA 2.6 N ST & SP N N N NA Yes
982009-10 CL
-
The India Thermit Corporation Ltd,
No.366, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Lutting sand242 G-99
sand reclamation
unit/Small Green 1997
BA31.12.2007
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
992009-10 O
27522Navami Engineering (P) Ltd,
No.461, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Diesel Filters142 W-14
Engineering and fabricationunits (dry
Small White 2005BA
31.12.2025N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
1002009-10 CL
21655New Arya Bhavana,
No.3, III Phase, PIA, Bangalore-560058,
III PhaseI
Confectionery items (sweet & kara) 144 O-2
confectionery units withproduction
Small Orange 2004BA
30.09.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1012009-10 CL
-Abb Ltd,
No. 1 & 2 , III Stage,PIE, Bengaluru-560 058
III StageI
Assembling of integration 599 G-78
Switches without
electroplatinMedium Green 1996
BA31.12.2009
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1022009-10 CL
-Acc Ready Mix Concrete,
No.34B, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Ready mix concreate981 G-37
Ready mix cement
concreteMedium Green 2000
BA31.12.2011
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1032009-10 CL
10286Ace Designers Ltd (Unit-I),
No.282, IV Phase, PIA Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinMedium Green Closed
BA31.12.2007
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1042009-10 O
27008
AMS Bhargava Machining Pvt., Ltd.,
No.A-153 & 154, 2nd C Main Road, II Stage,PIE, Bangalore-E1450560058
II StageI
Machining Components 255 O-63
Engineering Industries with HeatTreatment,
Small Orange 2007BA
30.09.2027N N N N N N N NA NA NA 0.04 0.84 NA N Y Y NA Yes
1052009-10 O
12033Ace Multi Axes Ltd,
No.A-50/49, II Stage,PIE, Bengaluru-560 058
II StageI
CNC Machining and Manufacture of Machine Components
1257 G-78Panel Board, Switches withoutelectroplatin
Large Green 1996BA
31.12.2022Y 31.12.2026 N N N N N NA NA NA 1.6 N NA N Y N NA Yes
1062009-10 O
25854Neumtica Technogies Pvt Ltd
No.9/F, 3rd Main Road, 10th Cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Garment2331.566 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 15/1/03BA
31.12.2026Y 31.12.2017 N N N N N NA NA NA 0.32 N NA N Y N NA Yes
1072009-10 CL
-Apeego Ltd,
No.498, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1082009-10 CL
-Argee Exports,
No.296, IV Phase, PIA, Bangalore, IV PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2002CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1092009-10 CL Balaji Garments Pvt Ltd,
No.B-13 & 14, 2nd "B" Main road, II Stage,PIE, Bengaluru-560 058
II StageI
Garment156 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1998BA
31.12.2022N N N N N N N NA NA NA 2.88 N NA N Y N NA Yes
1102009-10 O
12035Bangalore Shirt Co,
No.12/B, 6th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Readymade Garment782.35 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2005BA
31.12.2024Y 31.12.2020 N N N N N NA NA NA 24 N NA N Y N NA Yes
1112009-10 CL
-Buildmet Fibres Pvt Ltd,
No.A9, I Stage, PIE, Bengaluru-560 058,
I StageI
Woven sacks40 G-79
Plastic sack bags, woven
sackSmall Green 1999
BA31.12.2010
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1122009-10 CL
-
Consolidated Engineering Construction Co,
No.244, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit56.8 G-78
Switches without
electroplatinSmall Green 1997
WA31.12.2013
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1132009-10 O
11117
Healthium Medtech Pvt Ltd (Formerly Sutures India Pvt
Ltd,
No.472/D, IV Phase, PIA, Bengaluru-560058
IV PhaseI
Manf of catgut sutures, silk sutures, nulon sutures PGA,
acid sutures
5584 R-44Industry or process involving
Large Red 2003BA
30.06.2021Y 30.6.2021 Y 31.12.2100 N N N NA NA NA 9.6 20 Combined ETP N Y N NA Yes
1142009-10 CL
13311Debeers India Surveys Pvt Ltd,
No.36A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Mineral Processing312 O-26
processing, mineral
processing, Small Orange 2002
BA30.09.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1152009-10 CL
11529Foretel Cables Pvt Ltd.,
No.116, 7th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Manu of wire and cable 371.64 G-96
Manufacturing of insulatedconductors
Small Green 2002WA
31.12.2012CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1162009-10 CL
-Dudani Exports Pvt Ltd,
No.473/A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green ClosedBA
31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1172009-10 CL
12765Elastrex Polymers Pvt Ltd,
No.397, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Rubber Foot wear709 G-26
wear and leather
products Medium Green 2001
BA31.12.2006
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1182009-10 CL
-
Emfoam Power Project (P) Ltd, I
II Phase, PIA, Bengaluru-560 058, II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinMedium Green Closed
BA31.12.2009
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1192009-10 CL
-Eternit Exist Ltd ,
II Phase, PIA, Bengaluru-560 058, II PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching of
Medium Green ClosedBA
31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL- Stitching of
shoe uppers/ BA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1202009-10 CL
-Euro Clothing Co,
No.38/A, III Phase, PIA, Bengaluru-560 058,
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green ClosedBA
31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1212009-10 CL
-Foretel Cables Pvt Ltd.,
No.403, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2007
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1222009-10 CL
-G.C.L India Pvt Ltd,
No.A-415, II Stage,PIE, Bengaluru-560 058
II StageI
Engineering with painting 55.71 O-62
spray painting Small Orange 1993
BA30.09.2017
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
1232009-10 CL
-G.C.L. India Pvt Ltd,
No.A-419 & 420, II Stage,PIE, Bengaluru-560 058
II StageI
Weaving Machine462 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1993BA
31.12.2013N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes
1242009-10 CL
12045
BOMBAY RAYON FASHIONS LTD., Uint-2A,
No.57/A, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment631 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 1/10/2013BA
31.12.2021Y 30.09.2010 N N N N N NA NA NA 4.8 N NA N Y N NA Yes
1252009-10 CL
-pre¥ÀgÉ
No.8-1D, I Stage, PIE, Bangalore, I StageI
Garment306 G-77
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003BA
31.12.2017CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1262009-10 O
30065Grantools,
No.A-30 & B-31, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit103 G-78
Switches without
electroplatinSmall Green 1990
BA31.12.2025
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
1272009-10 CL
-Grantools Pvt Ltd,
No.A-53, II Stage,PIE, Bengaluru-560 058
II StageI
Engineering Unit150 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1994WA
31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1282009-10 CL
-H.M.T Ltd,
H.M.T Ltd, No.30C, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2008
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1292009-10 CL
-Hind High Vaccum Pvt Ltd,
No.472, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1302009-10 O
25726Hydrolines India,
No.M-4, I Stage, PIA, Bengaluru-560 058,
I StageI
Hydraulic hose assembles 943 G-77
of Motor & Pumpswithout
Medium Green 1999BA
31.12.2023Y 31.12.2023 N N N N N NA NA NA 1.3 N NA N Y N NA Yes
1312009-10 CL
-Innova Polypack Pvt Ltd,
No.A-7 & 8, I Stage, PIE, Banglaore-58
I StageI
HDPP/PP Woven Fabrics 544 G-79
Plastic sack bags, woven
sackMedium Green 1998
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1322009-10 O
22836IPA Pvt Ltd,
No.472/B2, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit1183 G-78
Switches without
electroplatinMedium Green 1978
BA31.12.2034
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
1332009-10 CL
-
John Crane Flexibox (India) Pvt Ltd,
No.10-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1342009-10 CL
-K.K. Nag Ltd,
No.484, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1352009-10 CL
-K.R.M.International,
No.9, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2008
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1362009-10 CL
-Kongovi Electronics,
No.30/C, II Phase, PIA, Bengaluru-560 058
II PhaseI
Electroplating1100 R-44
Industry or process involvingmetal
Large Red 2006BA
30.06.2021Y 30.06.2020 N N N N N NA NA NA 1 29 ST & SP ETP Y N N NA Yes
1372009-10 CL
-Kumbhukaram Machine Tools,
II Phase, PIA, Bengaluru-560 058 II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1382009-10 CL
11636L.T.Karle & Co,
No.V-77 & 78, II Stage,PIE, Bangalor-58
II StageI
Garment1699.83 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2001BA
31.12.2024N N N N N N N NA NA NA 8.8 N STP Y N N NA Yes
1392009-10 CL
-L.V.Exports,
No.152, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1402009-10 CL
-L.V.K. Investments Pvt Ltd,
No.112, I Stage, PIE, Banglaore-58 I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2006CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1412009-10 O
11628
Bombay Royon Fashions Ltd, Unit-10,
unit -10, No.2, 4th Cross, I Stage, PIA, Bengaluru-560 058,
I StageI
Garment667 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 1996BA
31.12.2022N N N N N N N NA NA NA 10 N NA N Y N NA Yes
1422009-10 O
11193MPP Technologies Pvt Ltd,
No.487/C, 14th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Control panel cabins with spray painting 1286.95 O-62
Spray painting, paint baking, paint
Large Orange 1982BA
30.09.2021Y 30.09.2021 N N N N N NA NA NA 1.5 N STP Y N N NA Yes
1432009-10 CL
11593
Avery Dennsion India private limited (Formerly Paxar Air
Pvt Ltd,)
No.90/91, 7th Main, III Phase, PIA, Bangalore-560058,
III PhaseI
Manufacture of Woven labels & heat transfer tags with printing on clothes
3280 R-40Yarn / Textile processinginvolving
Large Red 1997BA
30.06.2017Y 30.06.2019 N N N N N NA NA NA 15 6.5 STP & ETP Y N N NA Yes
144 No.28, II Phase, PIA, Bengaluru-560 II Phase Garment Garment 1442009-10 CL
-Manipal Apparels,
No.28, II Phase, PIA, Bengaluru-560 058,
II PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2007CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1452009-10 CL
11917Mapal India,
No.307 & 308, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit1379 G-10
Carpentry & wooden furnituremanufacturi
Large Green 2001BA
31.12.2018N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
1462009-10 O
31626Quality Profiles (P) Ltd
C-215, 4th Cross, I Stage, PIE, Bengaluru-560058.
I StageI
Manufacturing of Nozzles, Blades 497 G-78
Switches without
electroplatinSmall Green 2016
WA31.12.2026
N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
1472009-10 O
10555
Merck Life Science Pvt Ltd., (Formerly known as Millipore
(India) Pvt Ltd),
No. 50-A/51, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering with lab testing (Medical Equipment)
3095 R-83Research and Analytical laboratories
Large Red 1989BA
30.06.2021Y 30.06.2021 Y 31.12.2100 N N N NA NA NA 14 4.6 Combined ETP N Y N NA Yes
1482009-10 CL
-Multilink,
No.497-B, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Moulding with painting 427 O-92
moulding, Fiber Glassreinforced
Small Orange 1992BA
30.09.2010CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1492009-10 CL
20896
Texport Syndicate India Pvt., Ltd.,
No.296-297, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment178 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1992BA
31.12.2017Y 31.12.2021 N N N N N NA NA NA 12 N STP Y N N NA Yes
1502009-10 O
11598
Nagel Special Machines Pvt Ltd.,
No.26C/27-A, II Phase, PIA, Bangalore-560058.
II PhaseI
Honing machines (Vertical, Horizontal & special urpose) with spray paiting
1990.17 O-62Spray painting, paint baking, paint
Large Orange 1993BA
30.09.2021Y 30.09.2020 N N N N N NA NA NA 2 0.75 ST & SP N N Y NA Yes
1512009-10 O
22907Narang Plastics Pvt Ltd,
No.303, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
(Feeding bottles n nipples) Plastic 688.1 G-32
Polythene and plastic processedproducts
Medium Green 1982BA
31.12.2023N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
1522009-10 CL
16681
Nash Industry, No.B-226, I Stage, PIE, Bengaluru-560 058,
No.B-226, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2011
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1532009-10 CL
26488Neri Machine Tools Pvt Ltd.,
No.C-199, 4th Cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit (Manufcturing of CNC Manchines and Accessories)
69.45 G-10Carpentry & wooden furnituremanufacturi
Small Green 2004BA
31.12.2024N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
1542009-10 CL
-New Generation Apparels,
No.28E, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Garment517 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 10/1/1994BA
31.12.2012CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1552009-10 O
24127
The News Line Printers Bangalore,
No.A-356, I Stage, PIA, Bengaluru-560 058,
I StageI
Printing press181 O-59
Printing press &/or Screen Printing
Small Orange 1999BA
30.09.2028N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes
1562009-10 CL
22773Nisha Designs,
No.485/11, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment171 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003BA
31.12.2023Y 31.12.2021 Y 31.12.2013 N N N NA NA NA 25 N STP - BWSSB Y N N NA Yes
1572009-10 CL
21650OEN India Ltd,
No.487-A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit254 G-110
Diesel Generator sets (250 KVA
Small Green 1986BA
31.12.2016CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1582009-10 O
10646Out Door Clothing, N
No.30/C, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Garment2220 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2000BA
31.12.2022Y 31.12.2017 N N N N N NA NA NA 40 N STP Y N N NA Yes
1592009-10 CL
22153Pearl Metal Products,
No.527, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Manufacture of bars insulated aluminium wires
245 G-96Manufacturing of insulatedconductors
Small Green 1991BA
31.12.2015Y 30.09.2018 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
1602009-10 CL
-
Pepprel+Fluchs (India) Pvt Ltd (Software Unit),
No.C-10, I Stage, PIE, Bengaluru-560 058,
I StageI
Softwere Techonology 146 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1612009-10 CL
-Power Gear Pvt Ltdq,
No.15 & 16, III Phase, PIA, Bangalore-560058,
III PhaseI
Electrical Goods with Spray paiting 740 O-62
Spray painting, paint baking, paint
Medium Orange 1980BA
30.09.2019CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1622009-10 CL
-Precission Moulding Pvt Ltd,
No.473/D, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1632009-10 O Prime Lables Pvt Ltd,
No.59, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Lables Manufacturing486 G-91
Manufacture of Adhesives andadhesive
Small Green 1995BA
31.12.2024N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
1642009-10 O
Prime Lables Pvt Ltd, (Unit-II) N
(Unit-II) No.B-164, II Stage,PIE, Bengaluru-560 058
II StageI
polyster woven garment labels 424 G-91
Manufacture of Adhesives andadhesive
Small Green 2002BA
31.12.2024N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
1652009-10 CL
-Primex Plastics Pvt Ltd,
No.A-317/318, 7th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic injection moulded components and moulds
748 G-32Polythene and plastic processedproducts
Medium Green 1990BA
31.12.2014CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1662009-10 O
15378Process Pumps (I) Pvt Ltd,
No.86, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit349 G-77
Manufacture of Motor & Pumpswithout
Small Green 1986BA
31.12.2022N Y N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
1672009-10 CL Reliance Engineers Ltd,
No.84/85, III Phase, PIA, Bengaluru-560 058
III PhaseI
Cable manufacturing 491 G-78
Switches without
electroplatinSmall Green 15/8/81
BA31.12.2016
N Y N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes
1682009-10 CL
-
Rewadale Precission Tools Pvt Ltd,
No.28-A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering Unit477 G-78
Switches without
electroplatinSmall Green 2003
BAC1
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL- electroplatin BA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1692009-10 O
28510Sagittarius Metals Pvt Ltd,
No.509, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
steel processing 344 G-46
Steel furniture without spray
Small Green 2002BA
31.12.2026N Y N N N N N NA NA NA 1.4 N NA N Y N NA Yes
1702009-10 CL
-Sai Security Printers Pvt Ltd.,
No.256, 8th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Offset printing 889 O-59
Printing press &/or Screen Printing
Medium Orange 1996BA
31.12.2015Y 31.12.2016 N N N N N NA NA NA 4.8 N ST & SP N N N NA Yes
1712009-10 CL
11333
Scotts Garments, No.V-27, 7th Main, II Stage,PIE, Bengaluru-
560 058
No.V-27, 7th Main, II Stage,PIE, Bengaluru-560 058
II StageI
Garment536 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2000BA
31.12.2022Y 31.12.2018 N N N N N NA NA NA 11 N STP - BWSSB Y N N NA Yes
1722009-10 CL
-Scorpio Engineering,
No.55, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1732009-10 O
18131
Seenu Precissions Toolings Systems (P) Ltd,
No.28-A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Manufacture of Tool Holders & Checks (Engineering Unit)
487 G-78Switches without
electroplatinSmall Green 1992
WA31.12.2022
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
1742009-10 CL
-Shankala Industries,
No.147, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2014
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1752009-10 O Sigma Punch Forms (P) Ltd,
No.C-299/300, I Stage, PIE, Banglaore-58
I StageI
Engineering Unit631 G-10
Carpentry & wooden furnituremanufacturi
Medium Green 1991BA
31.12.2024N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
1762009-10 O
33170
Creative Design and Manufacturing
Site No.1, 1A and 3, Plot No.491, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Mine benification components etc 1100 O-62
Spray painting, paint baking, paint
Large Orange 2017BA
30.09.2030N N N N N N N NA NA NA 3 N NA N Y N NA Yes
1772009-10 CL
-Span Global Pvt Ltd, Unit-II,
Unit-II, No.97/98, 8th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment298 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003BA
31.12.2014CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1782009-10 O
13314Steer Engineering Pvt Ltd,
No.290,4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Egineering industry with heat treatment: Twin screw compounding
2687 R-58Pharmaceutical (Bulk drug &Active
Large Red 8/11/1994BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 12.8 0.23 NA N Y Y NA Yes
1792009-10 CL
-Super Star Garments,
No.323, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1802009-10 O
33803Intech Dmis Pvt Ltd
B117, 3rd Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Additive manufactured /3D printed metal components
1248 G-7Brass and bell metal utensilsmanufacturi
Large Green 2014BA
31.12.2026Y 31.12.2022 N N N N N NA NA NA 8 N NA N Y N NA Yes
1812009-10 O
11179Surhennings Pvt Ltd,
No.1-B, II Phase, PIA, Bangalore-560058
II PhaseI
Engineering with surface treatment and powder caoting
1487 R-44Industry or process involvingmetal
Large Red 1980BA
30.06.2021Y 30.06.2015 N N N N N NA NA NA 8 1 STP Y N Y NA Yes
1822009-10 CL
-Surya Designers,
No.A-313 & 314, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit109 G-78
Switches without
electroplatinSmall Green 2003
BA31.12.2004
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1832009-10 O
11605Synthetic Packers Pvt Ltd,
No.262/263, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Polythene Rolls and Bags of thicknes more than 40 microns
2012 G-79Plastic sack bags, woven sack -- 10 10 15 -- 15 10
Large Green 1981BA
31.12.2022N N N N Y 29.01.2021 N NA NA NA 2.4 N ST & SP N N N NA Yes
1842009-10 O
26312
Texport Industries pvt ltd,unit-4,
No.459/B, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment709.5 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2002BA
31.12.2023Y 31.12.2016 N N N N N NA NA NA 16 N STP - BWSSB Y N N NA Yes
1852009-10 CL
-Texport International,
No.119, III Phase, PIA, Bengaluru-560 058,
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1862009-10 CL
-Texport Overseas,
No.102, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment640 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2005BA
31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1872009-10 O Textronics (I) Ltd,
II Phase, PIA, Bengaluru-560 058 II PhaseI
Electronic Components 3 W-13
Electrical and electronic item
Small White 2005WA
31.12.2022N N N N N N N NA NA NA NA N NA N N N NA NA
1882009-10 CL
-Thermal Transfer Products,
No.A-153, I Stage, PIE, Banglaore-58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2003
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1892009-10 CL
-Towler Enterprises Solutions,
No.17, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1902009-10 CL
-Transpack Asia Pvt Ltd,
No.489, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
PP oven fabrics 430 G-79
covered underPlastic
Small Green 2003BA
31.12.2014CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1912009-10 O
37738
BPREX Pharma Packaging India Pvt Ltd (Rexam Pharma
India Pvt Ltd),
No.485, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
plastic container (PHARMA) 5908 O-25
DG set of capacity >1MVA but <
Large Orange 1997BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 10 N NA N Y N NA Yes
1922009-10 CL
-Tulip Labels,
No.17D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment364 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003BA
31.12.2012CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
193 No.1-2, I Stage, PIE, Banglaore -58 I StageHospital
Hotel Hotels/Resor1932009-10 CL
-Ujwala Hotel International,
No.1-2, I Stage, PIE, Banglaore -58 I StageHospital
ity
Hotel256 G-52
Hotels/Resorts having
more than 20 Small Green 2001
BA31.12.2023
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1942009-10 O
22830Unique Punch Systems,
No.485/7, 14th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Activies with CNC Sheet Metal Fabrication.
713 G-7Brass and bell metal utensilsmanufacturi
Medium Green 2001BA
31.12.2023Y 31.12.2016 N N N N N NA NA NA 3.2 N STP Y N N NA Yes
1952009-10 CL
-Vardana Banda Ltd,
No.81/82, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit243 G-78
Switches without
electroplatinSmall Green 1986
BA30.09.2016
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
1962009-10 O
13307Vinayaka Cnc Centre Pvt Ltd,
No.347, II Stage,PIE, Bengaluru-560 058
II StageI
Manufacutre of Engineering components (Flange, Drive flange.
647 O-96Gold and Silver smithy (purification
Medium Orange 1985BA
30.09.2021Y 30.09.2021 N N N N N NA NA NA 3.2 N NA N Y N NA Yes
1972009-10 O
11902Waters (India) Pvt Ltd,
No.36A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Assembly of Liquid Chromatography System.
1607 G-78Switches without
electroplatinLarge Green 1986
BA31.12.2022
N N N N N N N NA NA NA 3.8 N ST & SP N N N NA Yes
1982009-10 CL
15090Welflex Polymers (P) Ltd,
No.26-E, II Phase, PIA, Bengaluru-560 058
II PhaseI
Rubber moulded190 G-86
Tread rubber including pre-curedrubber
Small Green 1983BA
31.12.2011N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes
1992009-10 CL
-
Bombay Royon Fashions Ltd, P
Unit -15, Plot No 40, 4th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment243 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1995BA
31.12.2022N N N N N N N NA NA NA 9 N CL N Y N NA Yes
2002009-10 CL
-Abb Ltd,
No.543, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Assembly low voltage switch gear 646 G-78
Switches without
electroplatinMedium Green 2005
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2012009-10 CL
-Ace Super Auto Forge Pvt Ltd,
Site No.15,Sy No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit846 G-78
Switches without
electroplatinMedium Green 2007
BA31.12.2014
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2022009-10 CL
-Navalagunda Auto Park,
No.323, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment421 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2006BA
31.12.2022CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2032009-10 O
12812
Auto Cnc Machining Pvt Ltd, Site
Site No.16,Sy No.467, 468 & 469, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
CNC Machinising Components 1351 G-10
Carpentry & wooden furnituremanufacturi
Large Green 2006BA
31.12.2022Y 31.12.2020 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
2042009-10 O
22622Control Infotech Pvt Ltd,
No.426, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Control panel cabins195 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1995BA
31.12.2023N N N N N N N NA NA NA 0.82 N ST & SP N N N NA Yes
2052009-10 CL
-Debeers India Pvt Ltd,
No.Sb-14, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2062009-10 CL
-Dhakshini Appareals Pvt Ltd,
No.374-A, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment315 G-72
Stitching/ Stitching ofshoe uppers/
Small Green 2005BA
31.12.2008CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2072009-10 O
14980
Electronics & Controls Power Systems (P) Ltd, Unit-II,
Unit-II, No.29-A, II Phase, PIA Bengaluru-560 058,
II PhaseI
UPS System521.65 G-78
Switches without
electroplatinMedium Green 1998
BA31.12.2021
N N N N N N N NA NA NA 3 N ST & SP N N N NA Yes
2082009-10 CL
24110Gokuldas Images (P) Ltd,
Ltd, No.81/ 82, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment193 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2004BA
31.12.2010CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2092009-10 CL
-Hoshi Tools (P) Ltd,
No.B-166, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit153 G-78
Switches without
electroplatinSmall Green 1994
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2102009-10 O
31213Heatronix, Unit-2
No.341, 9th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Aluminium melting and making billets 24.35 O-28
Non- ferrous metal
extraction Small Orange 2016
BA30.09.2021
N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
2112009-10 CL
-
Kinematic Transmissions (P) Ltd,
No.A-274, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit150 G-78
Switches without
electroplatinSmall Green 2004
BA31.12.2022
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2122009-10 O
11404
Leitz Tooling Systems India (P) Ltd,
No.486/C, 14th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
wood working tool1665 G-10
Carpentry & wooden furnituremanufacturi
Large Green 1999BA
31.12.2022N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
2132009-10 CL
-Motherson Sumi Systems Ltd,
No.471D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
General Engineering895 G-78
Switches without
electroplatinMedium Green 2004
WA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2142009-10 O
Research Development & Manufacturing Corporation,
No.A-490-K, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit1167 G-78
Switches without
electroplatinLarge Green 2010
BA31.12.2028
N N N N N N N NA NA NA 0.83 N ST & SP N N N NA Yes
2152009-10 CL
31649
Sartorius Mechatronics India (P) Ltd,
No.17, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit525 G-78
Switches without
electroplatinMedium Green 2005
BA31.12.2012
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2162009-10 O
11622
Sealed Air Packaging Materials (India) LLP (Formerly Sealed
Air (India) Pvt Ltd,,
No.245, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of plastic carryr bags 1007 G-32
Polythene and plastic processedproducts
Large Green 23/6/2005BA
31.12.2022Y 31.12.2022 N N Y 18.12.2020 N NA NA NA 2 N ST & SP N N N NA Yes
2172009-10 YTC Synthetic Packers Pvt Ltd,
Unit.3, A-360, 8th Cross, I stage, PIE, Bengaluru-560 058
I StageI
Plastic rolls 596 G-32
Polythene and plastic processed
Medium Green 2015BA Y 30.06.2019 N N N N N NA NA NA 0 NA NA NA NA N NA Yesprocessed
products BA Y 30.06.2019 N N N N N NA NA NA 0 NA NA NA NA N NA Yes
2182009-10 CL
-Spice Islands Apparels Ltd,
No.193B, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2013CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2192009-10 CL
-Sri Sai International,
No.392/1, IV Phase, PIA, Banglaore-58
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2007
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2202009-10 O
24909Slider Bags Bengaluru (P) Ltd
No.A-367, 6th Main, I State, PIE, Bengalore-58
I StageI
Plastic process products 107 G-32
Polythene and plastic processedproducts
Small Green 2013WA
31.12.2023N N N N N N N NA NA NA 0.16 NA N N Y N NA NA
2212009-10 CL
-Unuique Appareals (P) Ltd, N
Unuique Appareals (P) Ltd, No.V-40, II Stage, PIE, Bengaluru-560 058,
II StageI
Garment139 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2005BA
C1CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2222009-10 CL
-Vijaya Engineering Pvt Ltd,
, No.379/380, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit175 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2023
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2232009-10 O
22989Vipra Machine Tools Pvt Ltd,
Vipra Machine Tools Pvt Ltd, No.29/30, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit1075 G-110
Diesel Generator sets (250 KVA
Large Green 1991BA
31.12.2023Y 31.12.2023 N N N N N NA NA NA 1.08 N ST & SP N N N NA Yes
2242009-10 CL
-
Rewdale Precision Tools Pvt Ltd (Unit-II),
No.28-A, II Phase, PIA, Banglaore-58 II PhaseI
High precision Tool477 G-78
Switches without
electroplatinSmall Green 2003
BA31.12.2021
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2252009-10 O
12433
Weir Minerals India Pvt. Ltd., (FormerlyWarman
International (India) Pvt Ltd, )
No.471/D-1, IV Phase, PIA Bengaluru-560 058
IV PhaseI
Engineering 1277 G-77
Manufacture of Motor & Pumpswithout
Large Green 2002BA
31.12.2021Y 31.12.2022 N N N N N NA NA NA 8 N N N Y N NA Yes
2262009-10 CL
-3 M Batteries,
3 M Batteries, No.B-135, II Stage, PIE, Bengaluru-560 058
II StageI
Lead Acid BatteriesC1 R-7
batterymanufacturing(excluding
Small Red ClosedBA
30.06.2007CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2272009-10 O
33384A.P.S Industires,
No.B-213, II Stage, PIE, Bangalore-560058
II StageI
Lead suboxide 22.52 R-7
Lead acid batterymanufacturing(excluding
Small Red 1997BA
30.06.2022Y 30.06.2013 N N N N N NA NA NA 0.5 N NA N Y N NA Yes
2282009-10 CL
-Abhirami Industries,
No.C-59, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2017
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2292009-10 O
20600Ace Carbo Nitrades,
No.A-145, 3rd Cross, I Stage, PIA, Bangalore-560058,
I StageI
Engineering with Heat treatment 356 O-63
Engineering Industries with HeatTreatment,
Small Orange 1974BA
30.09.2022Y 30.06.2018 N N N N N NA NA NA 1.7 0.13 NA N Y Y NA Yes
2302009-10 O
24119Accura Die Casters,
No.19, Ist Main Road, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Manufacturing of Alluminium Pressure Die Casting
198 O-41Aluminium pressure die casting
Small Orange 2002BA
30.09.2030N N N N N N N NA NA NA 0.5 N N N Y N NA Yes
2312009-10 CL
-Adept Engineers,
No.162, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2018
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
2322009-10 O
15058Adpro System India (P) Ltd
318, 8th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electroplating (Hardchrome) 173.4 R-44
Industry or process involvingmetal
Small Red 2003BA
30.06.2023N N N N N N N NA NA NA 0.3 0.5 ST & SP N N Y NA Yes
2332009-10 CL
-Agrochem Industries,
No.A-320, II Stage, PIE, Bengaluru-560 058
II StageI
Formulation of Pesticides & Insecticides.
25 R-37(technical)(excluding
formulation)Small Red 1987
BA30.06.2005
N N N N N N N NA NA NA 0 N NA N N N NA NA
2342009-10 CL
-Aldec Castings,
No.B-116, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2352009-10 CL
-Alisons Electroplating,
No.C-78, III Stage,PIE, Bengaluru-560 058
III StageI
ElctroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2362009-10 O
33580All Cast Industries,
No.B-31/32, I Stage, PIE, Bangalore-560058
I StageI
Aluminium alloy and stainless steel 46.81 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 1974BA
30.09.2022N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes
2372009-10 O
13783Ammonia Marketing Co,
No.125, III Phase, PIA, Bengaluru-560 058
III PhaseI
Bottling/ Refilling of Anhydrous Liquid AmmoniaLiquid Ammonia
506 R-22Organic Chemicalsmanufacturing
Medium Red 1988BA
30.06.2024N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes
2382009-10 CL
11439Ananda Metal Corporation,
No.C-81, III Stage,PIE, Bengaluru-560 058
III StageI
Lead smelting 25.5 R-7
Lead acid batterymanufacturing(excluding
Small Red 1998BA
30.06.2018Y 30.06.2015 N N N N Y NA NA NA 0.2 N NA N Y N NA Yes
2392009-10 CL
-Anapsons Chemicals Lab Ltd,
I Stage, PIE, Bengaluru-560 058 I StageI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2402009-10 CL
-Anita Fluxes Alloy Speciality,
No.24, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Wleding rodsC1 R-44
process involving
metal Small Red 1982
BA30.06.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2412009-10 CL
-
Annapurna Chemicals Lab, No. ,
No. , I Stage, PIE, Banglaore -58 I StageI
Chemical23 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
242 No.A-357, I Stage, PIE, Bengaluru- I Stage Engineering Unit Switches 2422009-10 CL
-Annapurna Enterprises,
No.A-357, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2432009-10 CL
-Annapurna Heat Treaters,
No.B-95, I Stage, PIE, Banglaore-58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2442009-10 CL
17237Anoop Ceramics,
No.C-246, 5th cross, I Stage, PIE, Banglaore - 58
I StageI
Technical Ceramics160.22 O-22
Ceramics and Refractories
Small Orange 1991BA
30.06.2017N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes
2452009-10 CL
-Anz International,
No.519, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2462009-10 CL
-Anz Tyres International,
No.A-322, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Compnent with Heat treatment
11 O-36treatment using oil
fired furnaceMedium Orange 2004
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2472009-10 CL
-
Apollo Lubricants, Next Ton Bmtc Depot, ,
Next Ton Bmtc Depot, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2003C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2482009-10 CL
-Appollo Industries,
No.B-222, I Stage, PIE, Banglaore-58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2492009-10 O
13590Apollo Paints Pvt Ltd,
No.51, 4th Main, III Phase, PIA, Bangalore-560058,
III PhaseI
Paint303 O-54
Paint blending and mixing (Ball mill)
Small Orange 1984BA
30.09.2021Y 30.06.2021 N N N N N NA NA NA 1.6 N N N Y N NA Yes
2502009-10 CL
-Aravind Alloys Pvt Ltd,
No.SB-44, I Stage, PIE, Banglaore I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2512009-10 O
12520Arun Industries,
No.B-64, III Stage,PIE, Bengaluru-560 058
III StageI
Waste oil reprocessing 14.93 O-81
Industries engaged in recycling /reprocessing
Small Orange 2004BA
20.09.2030Y 30.09.2025 N N N N N NA NA NA 0.12 N NA N Y N NA Yes
2522009-10 CL
-Ash Coat,
No.477, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Resin coated sand 33.77 G-57
powder ( fine dust of
sand) Small Green 16/8/2002
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2532009-10 CL
-Ashish Metal Ltd,
No.A-2, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2542009-10 CL
-Ashoka Industries,
No.B-232, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2552009-10 O
15066
Associated Chemicals & Engineering Company,
No.B-301, 5th Main , IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Refilling of industrial chemicals and HW reprocessing
48.16 R-72Solvent Recycling Small Red 1984
BA30.06.2021
Y 30.06.2021 N N N N N N N N 1.2 1.9 ST & SP N N Y NA Yes
2562009-10 CL
-Associated Electro Ceramics,
No.B-104, I Stage, PIE, Bangalore -58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2572009-10 CL
-
Associated Oxides & Chemicals,
No.368, IV Phase, PI A, Bengaluru-560 058,
IV PhaseI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2582009-10 CL
-Auditya Industries,
No.S-25, III Stage,PIE, Bengaluru-560 058
III StageI
Poultry feeds15.86 O-30
poultry feed and cattle
feedSmall Orange 1990
BA30.09.2010
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
2592009-10 CL
-Balaji Castings,
No. 114, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.09.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2602009-10 CL
-Balaji Coaters, N
No.120, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Powder coating18 R-44
Industry or process involving metal
Small Red 2001BA
30.06.2019C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2612009-10 O Sree Balaji Enterprises,
No.A-302(a), 7th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Aluminium anodizing & powder coating 26.1 R-44
Industry or process involvingmetal
Small Red 2003BA
30.06.2019N N N N N N N NA NA NA 0.08 0.4 NA N Y Y NA Yes
2622009-10 O
14182Sri Balaji Enterprises,
No.333, 9th cross , 4th Main, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit with Electroplating (Zinc Electroplating)
23.45 R-44Industry or process involvingmetal
Small Red 27.06.2005BA
30.06.2024N N N N N N N NA NA NA 0.1 0.05 N N Y Y NA Yes
2632009-10 CL
-Balaji Foams,
Balaji Foams, No.485, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2642009-10 CL
-Balaji Hard Chrome,
No.C-185, II Stage, PIE, Bengaluru-560 058
II StageI
24.45 R-44
process involving
metal Small Red 2003
BA30.06.2007
N N N N N N N NA NA NA 0 N NA N N N NA NA
2652009-10 O
15270Balambiga Metal Finishers,
No.C-435, I Stage, PIE, Bengaluru-560 058,
I StageI
Electroplating Zinc Plating 129 R-44
Industry or process involvingmetal
Small Red 2003BA
30.06.2022N N N N N N N NA NA NA 2.3 1.5 NA N Y Y NA Yes
2662009-10 O Bangalore Acids & Chemicals,
No.SB-42/1, I Stage, PIE, Bengaluru-560 058,
I StageI
Refilling and Trading of Chemicals 139.84 R-22
Organic Chemicalsmanufacturi
Small Red 2000BA
30.06.2024N NA N N N N N NA NA NA 0.19 N NA N Y N NA Yesmanufacturi
ngBA N NA N N N N N NA NA NA 0.19 N NA N Y N NA Yes
2672009-10 CL
-Bangalore Cable Industries,
, No.B-230, I Stage, PIE, Banglaore -58
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2682009-10 O
14727
Asiaan Metals and Aluminium Castings Pvt Ltd., (Formerly
Bangalore Die castings)
No.257/258, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Aluinium Ingots from scrap and aluminium die casting of automobile
302.55 O-28Ferrous and Non- ferrous metalextraction
Small Orange 2006BA
30.09.2022Y 30.06.2019 N N N N N NA NA NA 1 N N N Y N NA Yes
2692009-10 O
33543Bangalore Chemical Industry,
No.93, III Phase, PIA, Bangalore-560058,
III PhaseI
Cement mould oil6.95 G-27
Lubricating oil, greases orpetroleum
Small Green 1974BA
31.12.2026N NA N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes
2702009-10 CL
-Bangalore Dye Stuff,
No.B-381, I Stage, PIE, Banglaore-58 I StageI
Food StuffC1 G-19
handling, storage and
transportatioSmall Green Closed
BA31.12.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2712009-10 O
0
Bangalore Electroplating Industry
No.C-75, II Stage, PIE, Bengaluru-560 058
II StageI
electroplating ( ZINC PLATING) 2.86 R-44
Industry or process involvingmetal
Small Red 1998BA
30.06.2022N N N N N N N NA NA NA 0.08 0.06 NA N Y Y NA Yes
2722009-10 CL
-Bangalore Forge,
No.C-283, I Stage, PIE, Banglaore-58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2002
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2732009-10 CL
-
Bangalore Heat Treaters Pvt Ltd,
No.A-147, I Stage, PIE, Banglaore-58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2742009-10 CL
-Bangalore Liquid Oxygen Co,
No.83, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Oxygen refilling C1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2752009-10 O
15889Bangalore Oxygen (P) Ltd,
No.10E, II Phase, PIA, Bengaluru-560 058.
II PhaseI
Acetylene gas104.11 R-6
Industrial carbon includingelectrodes
Small Red 8.5.1984BA
30.06.2023Y 30.06.2010 N N N N N NA NA NA 0.5 0(Recycle) ST & SP Y N N NA Yes
2762009-10 CL
-Bangalore Polyresins Pvt Ltd,
No.B-228, I Stage, PIE, Bangalore I StageI
ResinsC1 O-75 Synthetic
resinsSmall Orange Closed
BA30.09.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2772009-10 CL
-Bangalore Refinery,
No.A-18, III Stage,PIE, Bengaluru-560 058
III StageI
ElectroplatingC1 R-44
process involving
metal Medium Red Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2782009-10 CL
12064
Bangalore Technomet Pvt Ltd (Formerly Known as Heat Treatment Service Centre),
No.B-223, II Stage, PIE, Bangalore-560058,
II StageI
Heat Treatment97.79 O-63
Engineering Industries with HeatTreatment,
Small Orange 1987BA
30.06.2018N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
2792009-10 CL
12745
Basrur Universal Gaskets Pvt Ltd,
No.19/1-A, II Phase, PIA, Bangalore-560058.
II PhaseI
Gasket Mfg1412.85 R-24
and asbestos based
industriesLarge Red 10/7/2001
BA30.06.2010
CL 30.09.2014 N N N N N NA NA NA 0 N NA N N N NA NA
2802009-10 CL
-Beltron India Ltd,
No.B-38, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2812009-10 CL
-Best Coats,
No.458/C, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2822009-10 CL
-Best India Anodisers,
No.458, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2832009-10 O
14720Bhagyalakshmi Metal Works,
No.121, III Phase, PIA, Bangalore-560058,
III PhaseI
Foundry (cast iron Rough Casting) 9.89 O-42
Industry or processes involvingfoundry
Small Orange 1992BA
30.06.2017Y 30.06.2013 N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
2842009-10 CL
-Bhakta Maruthi Enterprises,
No.B-18, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2852009-10 O
40659Shcub Laboratories
Plot No.473, D5, II Floor, 13th Cross, 4th Phase, PIA, Bengalore-58
IV PhaseI
Ink concentrate and get fuel 44 O-58
Printing ink manufacturing
Medium Orange 2014WA
30.09.2023Y 30.06.2017 N N N N N NA NA NA 0.16 NA NA NA Y N NA NA
2862009-10 CL
-Bhargava Refractories,
No.B-104, I Stage, PIE, Banglaore-58 I StageI
Refractory materialsC1 O-22
Ceramics and
RefractoriesSmall Orange Closed
WA30.09.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2872009-10 O
Aeromech Technologies Pvt Ltd.,
No.362, 10th Cross, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit153 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2008BA
31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
2882009-10 CL
-Bhavani Metal Finishers,
No.121, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2892009-10 CL
-Bio-Culture Mfg Laboratories,
No.259, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2902009-10 CL
-Bonn Polymers,
No.194, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Plastic bagsC1 G-32
Polythene and plastic processedproducts
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
291 IV Phase, PIA, Bengaluru-560 058, IV Phase Resins2912009-10 CL
-Bonn Polymers Pvt Ltd, I
IV Phase, PIA, Bengaluru-560 058, IV PhaseI
ResinsC1 O-75 Synthetic
resinsSmall Orange Closed
BA30.06.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2922009-10 O Bright Services,
No.B-142, 3rd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Bright Bars33.53 G-78
Industry or process involving metal
Small Green 1991BA
31.12.2026N NA N N N N N NA NA NA 0.1 N NA N Y N NA Yes
2932009-10 CL
-C.B.S Industrial Equipment,
No.160, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
2942009-10 CL Cables & Conductors,
No.A-15, III Stage,PIE, Bangalore -58 III StageI
Manufacture of copper/ aluminum conductors for electrical machinery
37.84 R-44Industry or process involving metal
Small Red 1987BA
NAN N N N N N N NA NA NA NA N NA N N N NA NA
2952009-10 CL Canara Agro Chemicals,
No.443/A,IV Phase,PIA, Bengaluru-560 058,
IV PhaseI
Micro Nutrients45 R-25
Formulation Organic Nutrientwithout the
Small Red 1994WA
30.06.2019Y 30.06.2008 N N N N N NA NA NA 0 N NA N Y N NA Yes
2962009-10 O
11519Celtek Batteries,
No.471/B, IV Phase, PIA, Bangalore-560058,
IV PhaseI
Battery manufacture 260 R-7
Lead acid batterymanufacturing(excluding
Small Red 1989BA
30.06.2024Y 30.06.2024 N N N N Y NA NA NA 1.2 N NA N Y N NA Yes
2972009-10 CL
15255Chemitals Pvt Ltd,
No.A-156, 3rd cross, I Stage, PIE, Banglaore-58
I StageI
Zinc oxide 286 R-55
Zinc SmelterSmall Red 1973
BA30.06.2017
Y 30.06.2018 N N N N N NA NA NA 1.4 N NA N Y N NA Yes
2982009-10 CL
13016Chevur Chemicals Pvt Ltd,
No.B-304, II Stage, PIE, Bangalore-560058
II StageI
Copper oxychloride57.92 R-44
Industry or process involving metal
Small Red 1982BA
30.06.2014Y 30.06.2015 N N N N N NA NA NA 0.16 2 NA N Y N NA NA
2992009-10 CL
-Chirag Polymers,
No.B-42, III Stage,PIE, Bengaluru-560 058
III StageI
Polymer resinsC1 O-75
Synthetic resins Small Orange 1982
BA30.09.2002
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3002009-10 CL Chitra Granite Works,
No.141, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Granite cutting and polishing 10 G-56
Cutting, sizing and polishing ofmarble
Small Green 1999WA
30.09.2011N N N N N N N NA NA NA 0.5 N ST & SP N N N NA NA
3012009-10 O
24205City Coats,
No.B-318, I Stage, PIE, Banglore-560058
I StageI
Blending &mixing of polyester resin putty, solvent thinners
16.85 O-55Paints and varnishes (mixing and blending
Small Orange 1994BA
30.09.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
3022009-10 CL
-Colloids Impex Pvt Ltd,
No.B-42, III Stage, PIE, Bengaluru-560 058,
III StageI
Chemical refiling and trading 40 R-25
chemicals and electrochemicals
Small Red 2002BA
30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA NA
3032009-10 CL
-Colour Inks Pvt Ltd,
No.123, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Printing inkC1 O-58
Printing ink manufacturi
ngSmall Orange Closed
BA30.09.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3042009-10 CL
-Colour Pack,
No.216, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Offset printing 37.7 O-59
press &/or Screen
PrintingSmall Orange 24/11/98
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.2 N ST & SP N N N NA NA
3052009-10 CL
-
Composite Technologies Pvt Ltd,
No.A-151, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2015
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3062009-10 CL
15225Data Cast Malleable,
No.A-370, I Stage, PIE, Banglaore-58 I StageI
Ferrous casting 4.49 O-28
Non- ferrous metal
extraction Small Orange 1978
BA30.06.2015
Y 30.06.2010 N N N N N NA NA NA 0.2 N NA N Y N NA NA
3072009-10 CL Deepak Industrial Chemicals,
No.SB-116, I Stage, PIA, Bangalore-560058,
I StageI
Rust Preventive Compounds 25.54 R-44
Industry or process involvingmetal
Small Red 1989BA
30.06.2014N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
3082009-10 O
14190Deepak Tools Heat Treaters,
No.B-257, II Stage, PIE, Bengaluru-560 058
II StageI
Heat Treatment46.11 O-36
Heat treatment using oil fired furnace
Small Orange 1999BA
30.06.2014N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
3092009-10 O
11697Deepthy Labs Pvt Ltd,
No.23, III Stage,PIE, Bengaluru-560 058
III StageI
Acid purification86 R-25
Basic chemicals and electrochemicals
Small Red 1999BA
30.06.2023N N N N N N N NA NA NA 1 N NA N Y N NA Yes
3102009-10 CL
-Deepu Batteries,
No.C-73, II Stage, PIE, Bengaluru-560 058
II StageI
Battery manufacture 35 R-7
batterymanufacturing(excluding
Small Red 1997BA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3112009-10 CL
-Demink Engineering,
No.A-325, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3122009-10 O
Dwaraka Industries Enterprises,
No.A-358/1, 9th cross, I Stage, PIE, Banglaore-58
I StageI
Assembly of Bicycle Dynamo lighting set without electroplating
43 W-2Assembly of bicycles ,babycarriages and
Small White 1980BA
31.12.2020N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
3132009-10 CL
-
Sutures India (Old name : Easy Stitch Needles) Pvt Ltd,
No.B-260, II Stage, PIE, Bengaluru-560 058
II StageI
Suture needles manufacture with electroless polishing
165 R-44process
involvingmetal
Small Red 1998BA
30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA
3142009-10 CL
-Electrochemical Industry,
No.537, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
electroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3152009-10 O
24057
Elheat Ceramics Engineering Pvt Ltd,
No.B-93, 2nd cross, I Stage, PIE, Bangalore-560058,
I StageI
Ceramics refactory bricks with celeminite Al & Clay
55.38 O-64Ceramics and Refractories
Small Orange 2001BA
30.06.2028N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes24057 Al & Clay Refractories BA N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
3162009-10 CL
-Eshwari Paper Mill Pvt Ltd,
No.253, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Kraft Paper3.36 R-18
Paper ( waste paper
based Medium Red 1973
BA30.09.2008
N N N N N N N NA NA NA 0 N NA N N N NA NA
3172009-10 O
74256
Eskay Heat transformers Pvt. Ltd. (Eskay Industries),
No.444-445, 12th cross, IV Phase, PIA, Bangalore-560058,
IV PhaseI
Heat exchangers, fabrication & Engineering products with spray painting
379.33 O-63Engineering Industries with HeatTreatment,
Small Orange 2007BA
30.09.2028Y 30.06.2015 N N N N N NA NA NA 2.1 N NA N Y N NA Yes
3182009-10 CL
24111Essem Powder Coatings,
No.B-215, II Stage, PIE, Bengaluru-560 058,
II StageI
Powder coating 42.95 R-44
Industry or process involvingmetal
Small Red 1/6/2001BA
30.06.2018N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
3192009-10 CL
-
Essen Engineers & Heat Treatment,
No.B-208, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3202009-10 CL
-Essen Powder Coaters,
No.C-91, III Stage,PIE, Bengaluru-560 058
III StageI
Powder coatingC1 R-44
Industry or process involving metal
Small Red ClosedBA
30.09.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3212009-10 O
12760ETA Technology Pvt Ltd,
No.484/D, IV Phase, PIA, Bangalore-560058,
IV PhaseI
Special purpose machines with spray painting activity with job work
1039 O-63Engineering Industries with HeatTreatment,
Large Orange 2004BA
30.09.2021Y 30.06.2023 N N N N N NA NA NA 5.2 0.01 NA N Y Y NA Yes
3222009-10 O
15064Excel Process Pvt Ltd,
No.278, 4th Main, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Printed name plates, fabrication, anodization & spray painting
86.81 R-44Industry or process involvingmetal
Small Red 1992BA
30.06.2022N N N N N N N NA NA NA 0.64 0.16 ST & SP N N Y NA Yes
3232009-10 O
21033
Excel Metal Engineering Pvt Ltd,
No.340, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
General Engineering for pressed & turned component manufacturing
1531 G-7Brass and bell metal utensilsmanufacturi
Large Green 2000BA
31.12.2024Y 31.12.2024 N N N N N NA NA NA 10.8 N STP Y N N NA Yes
3242009-10 CL
-Forge Craft,
No.108, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2002
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3252009-10 O
82479Universal Heat Treaters,
No. V-44, 8th Main Road, II State, PIE, Bengalore-58
II StageI
Heat Treatment108 O-36
Heat treatment using oil fired furnace
Small Orange 1975BA
30.09.2019N N N N N N N NA NA NA 1 NA ST & SP N NA n NA Yes
3262009-10 CL
-G.N.Industries,
No.490-D, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Lead smelting 47.09 R-7
Lead acid batterymanufacturing(excluding
Small Red 9/12/2002BA
30.06.2017Y 30.06.2015 N N N N Y NA NA NA 0.3 0.2 NA N Y Y NA Yes
3272009-10 CL
-G.R.Lubricants,
No.22, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Grease manufacturingC1 R-4
ng of lubricatingoils ,grease
Small Red ClosedBA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3282009-10 O
15893G.V.Enterprises,
No.17F, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Alluminum anodizing93.12 R-44
Industry or process involvingmetal
Small Red 2003BA
30.06.2022Y
30.06.2022N N N N N NA NA NA 0.4 1.5 ST & SP ETP Y N N NA Yes
3292009-10 CL
12523Ganapathi Metal Finishers,
, No.C-212, I Stage, PIE, Banglaore-58
I StageI
Electroplating19.9 R-44
Industry or process involvingmetal
Small Red 2001BA
30.06.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3302009-10 O
15071Ganesh Engineering,
17(1), II Phase, PIA, Bangalore-58 II PhaseI
Electroplating (Hardchrome) 345.12 R-44
Industry or process involvingmetal
Small Red 1988BA
13.11.2024Y 30.06.2024 N N N N N NA NA NA 0.15 0.14 NA N Y Y NA Yes
3312009-10 CL
-Gayathri Colour Coats,
No.B-291, II Stage, PIE, Banglaore-58, II StageI
Powder coatingC1 R-44
Industry or process involving metal
Small Red ClosedBA
30.06.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3322009-10 CL
-Gayathri Metal Finishers,
No.C-151, I Stage, PIE, Banglaore -58 I StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3332009-10 CL
15411Geethashree Forge,
No.B-88, 2nd cross, I Stage, PIE, Banglaore-58
I StageI
Forging9.25 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 1997BA
30.06.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes
3342009-10 O
15443Geeyem Refractories,
No.SB-114, 3rd Cross, I Stage, PIE, Banglaore-560058
I StageI
Refractory materials11.4 O-22
Ceramics and Refractories
Small Orange 2000BA
30.06.2029N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes
3352009-10 O
14739Gem Paints,
No.B-266, II Stage, PIE, Bangalore-560058
II StageI
Paint 9.25 O-52
Paint blending and mixing (Ball mill)
Small Orange 1982BA
30.09.2022N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
3362009-10 O
17691Gem Paints Ltd, Unit II
No.281, IV Phase,PIA, Bengaluru-560 058 ,
IV PhaseI
Paint , Primers, enamel, varnish , thinners & alkyd resins
34.9 O-52Paint blending and mixing (Ball mill)
Small Orange 1986BA
30.09.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
3372009-10 O
14739Gem Paints Ltd,
No.490-H, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Paint 48.75 O-52
Paint blending and mixing (Ball mill)
Small Orange 2000BA
30.09.2022N N N N N N N NA NA NA 3.6 0.7 (recycled) ST & SP N N N NA Yes
3382009-10 CL
-Gemini Die Chem
No.B-382, I Stage, PIE, Banglaore-58 I StageI
Garment dyeingC1 R-40
Textile processinginvolving
Medium Red 2010BA
30.06.2017C1 C1 C1 C1 C1 C1 C1 NA NA NA NA N NA N N N NA Yes
3392009-10 CL
-Goyal Mg Gases,
No.439, 12th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
refilling of industrial gases, Oxygen & Argon
44.51 R-84Production
ofIndustrial
Small Red 1988BA
30.06.2007N N N N N N N NA NA NA 0.08 N ST & SP N N N NA NA
340 No.B-137, I Stage, PIE, Banglaore -58 I Stage Casting Non- ferrous 3402009-10 CL
-Gravi Castings,
No.B-137, I Stage, PIE, Banglaore -58 I StageI
Casting C1 O-28
Non- ferrous metal
extraction Small Orange Closed
BA30.06.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3412009-10 CL
-Hanashree Treaters,
No.C-252, I Stage, PIE, Banglaore -58 I StageI
Heat Treatment75 O-63
Engineering Industries with HeatTreatment,
Small Orange 2002BA
30.06.2011N N N N N N N NA NA NA 0 N NA N N N NA Yes
3422009-10 O
29861Hanu Heat Treaters,
No.C-330, 3rd Main, I Stage, PIE, Bengaluru-560 058,
I StageI
Heat Treatment96.93 O-63
Engineering Industries with HeatTreatment,
Small Orange 2002BA
30.09.2029N N N N N N N NA NA NA 0.72 N NA N Y N NA Yes
3432009-10 CL
-Haseen Glass Marbles,
No.525, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Glass art workC1 O-34
ceramics, earthen
potteries andSmall Orange Closed
BA30.09.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3442009-10 CL
-Heat Chem Industries,
No.B-73, I Stage, PIE, Bengaluru-560 058
I StageI
Heat TreatmentC1 O-63
Engineering Industries with HeatTreatment,
Small Orange ClosedBA
30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3452009-10 CL
-Hebran Coats,
No.B-168, I Stage, PIE, Bengaluru-560 058
I StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3462009-10 CL
-Hemalatha Metal Mart,
No.B-65, III Stage,PIE, Bengaluru-560 058
III StageI
Lead smelting C1 R-7
batterymanufacturing(excluding
Small Red ClosedBA
30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3472009-10 O
33521
Ganesh Forge Tech, ( Formerly Known as M/s Hi-
Tech Forge),
No.C-259, 5th cross, I Stage, PIE, Banglaore-58
I StageI
Steel Forging 199.77 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 1995BA
30.09.2022N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes
3482009-10 O
39954
Hi-Tech Forgings (Bangalore) Pvt Ltd,
No.V-1(A), 3rd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Steel & Copper Forging 361.9 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2003BA
30.09.2021N N N N N N N NA NA NA 1 N NA N Y N NA Yes
3492009-10 O
24388
Hind Forge Tech (Formerly Known as M/s.D F Forging),
No.B-353, I Stage, PIE, Banglaore-58 I StageI
Steel Forging activity24.01 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 1998BA
30.09.2029N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
3502009-10 CL
-
Hindal Industrial Oil & Lubricants, IV Phase, PIA,
Bengaluru-560 058,
Iv Phase, PIA, Bengaluru-560 058, IV PhaseI
grease manufacturingC1 R-4
ng of lubricatingoils ,grease
Small Red ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3512009-10 O
16277
I.E.E Engineering Enterprises Pvt Ltd,
No.B-94, 2nd cross. I Stage, PIE, Banglaore-58
I StageI
Al/Polypropylene electrical capacitor for AC motors
216 O-62Spray painting,paint baking, paint
Small Orange 1986BA
30.09.2027Y 30.06.2015 N N N N N NA NA NA 1.8 N NA N Y N NA Yes
3522009-10 CL
-Incap Paints,
, No.536, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
PaintC1 R-21
ng of paintsvarnishes, pigments
Small Red ClosedBA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3532009-10 O
77120
EYE-M-EYE MACHINES PVT LTD.,
No.170, 10th Main, III Phase, PIA, Bangalore-5600058,
III PhaseI
Tyre Retreading machinery 189 G-48
Tyres and tube retreading(without
Small Green 1/1/1996BA
31.12.2035N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes
3542009-10 CL
-Indian Metal Industries,
No.170, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Electroplating43 R-44
process involving
metal Small Red 1985
BA30.06.2014
N C1 N C1 N C1 N NA NA NA 0 N NA N N N NA NA
3552009-10 O
24116Indian Oxide
No.C-141, II Stage, PIE, Bengaluru-560 058
II StageI
Lead suboxide 16.35 R-7
Lead acid batterymanufacturing(excluding
Small Red 1998BA
30.06.2024N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
3562009-10 CL
-
Indian Silk Printing & Processing,
No.25-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Dyeing & Printing of silk fabric 67 R-40
Textile processinginvolving
Small Red 1982BA
30.06.2008Y 30.06.2013 C1 C1 C1 N C1 NA NA NA 0 N NA N N N NA NA
3572009-10 CL
-Indo Lubes & Solvents,
No.185, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Waste oil reprocessing C1 R-3
engaged inrecycling/rep
rocessing/Small Red Closed
BA30.06.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3582009-10 CL
-Indo Lubes & Solvents,
No.352, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Calcium Salt & grees58.28 R-4
Manufacturing of lubricatingoils ,grease
Small Red 2002BA
30.06.2017Y 30.06.2019 N N N N N NA NA NA NA N NA N N N NA Yes
3592009-10 O
86466Indo Metal Lubricants,
No.B-35/P, III Stage,PIE, Bengaluru-560 058
III StageI
Manufacture of lubricanting Compound & Lubricating Oils
84.87 O-75Synthetic resins Small Orange 1998
BA30.09.2029
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
3602009-10 O
81388Indrajit Industries,
No.42/43, III Phase, PIA, Bangalore-560058,
III PhaseI
Dyeing & Printing of silk fabric 127 G-109
Refilling, Repacking and blending of chemicals
Small Green 1973BA
31.12.2033N NA N N N N N NA NA NA 0.16 N NA N Y N NA Yes
3612009-10 CL
-Industrial Alloy Casting ,
No.33B, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Casting C1 O-28
Non- ferrous metal
extraction Small Orange Closed
BA30.06.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3622009-10 CL
-Industrial Metalic Painting Co,
No.198, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Powder coating 12 R-44
Industry or process involving metal
Small Red 2004BA
30.06.2011N N N N N N N NA NA NA NA N NA N N N NA Yes
3632009-10 CL
-Intigrated Metal Coats,
No.464, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electroplating Electro less nickel platers 8.9 R-44
process involving
metal Small Red 2006
BA30.06.2005
N N N N N N N NA NA NA 0 N NA N N N NA NA
3642009-10 CL
-Jagan Mirror,
No.P-21, III Stage,PIE, Bengaluru-560 058
III StageI
Mirror processingC1 O-34
ceramics, earthen
potteries andSmall Orange Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- potteries and BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3652009-10 O
17223Jaymech Ultra Coaters,
No.B-232, 6th Cross, I Stage, PIE, Bangalore
I StageI
Powder coating with De-rusting degreasing, zinc phosphating
45.82 R-44Industry or process involvingmetal
Small Red 2002BA
30.06.2024Y 30.06.2010 N N N N N NA NA NA 0.4 0.11 NA N Y Y NA Yes
3662009-10 CL
-Jaylac Paints & Varnishes,
No.171, III Phase, PIA, Bengaluru-560 058,
III PhaseI
paint8 R-21
Manufacturing of paintsvarnishes, pigments
Small Red 2003BA
30.06.2008N N N N N N N NA NA NA 0 N NA N N N NA NA
3672009-10 CL
-JIT Lubricants,
No.486, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
oil blendingC1 R-3
engaged inrecycling/rep
rocessing/Small Red Closed
BA30.06.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3682009-10 CL
-K.K.Systems,
No.171, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3692009-10 CL K.S.N. Enterprises,
No.39, III Phase, PIA, Bangalroe-560058,
III PhaseI
Non ferrous casting22.34 O-66
Ferrous and Non- ferrous metalextraction
Small Orange 1992BA
30.06.2012N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes
3702009-10 O
23048
Asiaan Metals & Aluminium Casting Private limited
(formerly known as Asian Metals & Aluminium Casting (
No.26-B, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Foundry696 O-66
Ferrous and Non- ferrous metalextraction
Medium Orange 2003BA
30.09.2030Y 30.09.2024 N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
3712009-10 CL
-Karnataka Chemical Indsutry,
No.A-3 & 4, II Stage, PIE, Bengaluru-560 058
II StageI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3722009-10 CL
-
Karnataka State Co-Op Marketing Federation,
No.39/A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Formulation of Pesticides & Insecticides.
58 R-37(technical)(excluding
formulation)Small Red 1984
BA30.06.2010
Y 30.06.2010 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
3732009-10 O
19705
Karnataka Insecticide & Fungascide,
No.27- B, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Insecticides & Fungicides formulation
67.94 O-29Formulation of Pesticide,insecticide, & fungicide
Small Orange 1986BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 1 N ST & SP N N N NA Yes
3742009-10 CL
-
Karnataka Insecticides & Fungacides ,
No.A-149, I Stage, PIE, Banglaore-58 I StageI
Pesticide formulation C1 R-37
(technical)(excluding
formulation)Small Red Closed
WA30.06.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3752009-10 O
24163Karnataka Metal Products,
No.A-16, III Stage,PIE, Bengaluru-560 058
III StageI
Winding conductors (Paper covered/ cotton covered- Copper/ Aluminium
24.8 G-78Switches without
electroplatinSmall Green 1977
WA31.12.2023
N N N N N N N NA NA NA 0.5 N NA N Y N NA NA
3762009-10 CL
-
Karnataka Chemicals Industries Ltd,
No.A-151, I Stage, PIE, Banglaore-58 I StageI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3772009-10 O
13834
Karnataka Thermal Engineering Co,
No.B-220, 5th Man, II Stage, PIE, Bengaluru-560 058
II StageI
Heat Treatment19.73 O-36
Heat treatment using oil fired furnace
Small Orange 1984BA
30.09.2028N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
3782009-10 CL
-Karnataka Welding Products,
No.485, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3792009-10 O
24136Kasturi Heat Carbo,
No.B-21, I Stage, PIE, Bangalore-560058
I StageI
Heat Treatment16.55 O-63
Engineering Industries with HeatTreatment,
Small Orange 1996BA
30.09.2029N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
3802009-10 CL
-Kaviraj Appliances Pvt Ltd,
No.234, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3812009-10 CL
-Kaviraj Housewares,
No.13/C, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3822009-10 O
14296Kaviraj Incorporation,
No.99, III Phase, PIA, Bangalore-560058
III PhaseI
Alluminium utensils & Non stick utensils with Coating
53 G-1Aluminium utensils from Al circles
Small Green 26-4-01BA
31.12.2034N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
3832009-10 CL
-
Kayanathu Surface Finishing Pvt Ltd,
No.470, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Elctroplating34.37 R-44
process involving
metal Small Red 1987
BA30.06.2002
CL CL C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
3842009-10 CL
-Keerthi Containers (P) Ltd,
IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3852009-10 CL
-Kyes Industries,
No.B-43, I Stage, PIE, Banglaore-58 I StageI
Heat Treatment8.27 O-63
Engineering Industries with HeatTreatment,
Small Orange 1974WA
30.09.2012C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
3862009-10 O
11471
Monarch Paints (Kincha Paints & Colour) Co,
No.422, 11th cross , IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Paint 36.5 O-54
Paint blending and mixing (Ball mill)
Small Orange 2005BA
30.09.2022N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
3872009-10 CL
-
Kodiyal Rubber Works Pvt Ltd,
No.245, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Silicon Rubber Compounds 13.8 G-41
goods industry (with gas
Small Green 18/7/02BA
31.12.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3882009-10 CL
-Kongavi Electronics Pvt Ltd,
No.B-172, Il Stage, PIE, Bengaluru-560 058
II StageI
Nickel and chrome plating onl 95.54 R-44
process involving
metal Small Red 1997
BA30.06.2006
Y 30.06.2010 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
389 No.Sb-105, I Stage, PIE, Banglaore- I Stage plastic injection Polythene 3892009-10 CL
-Kongavi Plastics,
No.Sb-105, I Stage, PIE, Banglaore-58
I StageI
plastic injection moulding and electro plating
65.34 G-32Polythene and plastic processedproducts
Small Green 1990BA
31.12.2000N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
3902009-10 CL
-Kripa Industries,
No.79/80, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3912009-10 CL
-Krishna Balarama Industries,
No.143(B), I Stage, PIE, Bengaluru-560 058,
I StageI
Electroplating Zinc Plating 22.14 R-44
process involving
metal Small Red 2000
BA30.06.2011
N N N N N N N NA NA NA 0 N NA N N N NA NA
3922009-10 CL
-Krishna Polymers,
No.C-22, II Stage, PIE, Bengaluru-560 058
II StageI
Synthetic resinC1 O-75 Synthetic
resinsSmall Orange Closed
BA30.06.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3932009-10 O
17784Lach Products,
, No.B-278, 7th Main, II Stage, PIE, Bangalore-560058
II StageI
Electroplating of Lead, Zinc & Nickel 8.27 R-44
Industry or process involvingmetal
Small Red 2000BA
30.06.2022Y 30.06.2013 N N N N N NA NA NA 0.18 0.075 NA N Y Y NA Yes
3942009-10 O
14179Sri Luxmi Electroplating,
No.79/80, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Electroplating34.53 R-44
Industry or process involvingmetal
Small Red 1993BA
30.06.2025N N N N N N N NA NA NA 0.1 0.2 NA N Y Y NA Yes
3952009-10 CL
23898Lakshmi Electroplaters,
No.455,IV Phase, PIA,Bengaluru-560 058,
IV PhaseI
Electro Plating20 R-44
process involving
metal Small Red 2001
BA30.06.2021
N N N N N N N NA NA NA 0.96 0.05 NA N Y Y NA Yes
3962009-10 CL
-Lakshmi Industries,
No.C-260, I Stage, PIE, Bengaluru-560 058,
I StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3972009-10 CL
-Lakshmi Metal Works,
No.B-294, II Stage, PIE, Bengaluru-560 058
II StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
3982009-10 CL
-Lakshmi Powder Coating,
No.B-160, I Stage, PIE, Banglaore-58 I StageI
Powder coating 21 R-44
Industry or process involving metal
Small Red 1993BA
30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA
3992009-10 O
24142
Vintech Surface coaters (Formerly Lalan Enterprises)
No.B-226, 5th Main, II Stage, PIE, Bangalore-560058
II StageI
Powder coating with pre-surface treatment activity
49.72 R-44Industry or process involvingmetal
Small Red 1984BA
30.06.2024N N N N N N N NA NA NA 0.72 0.2 NA N Y Y NA Yes
4002009-10 O
15278Leo Hard Chrome ,
No.B-73, I Stage, 2nd cross, PIE, Banglaore-58
I StageI
Machine of Hydraulics with Electroplating (Hardchrome)
22.62 R-44Industry or process involvingmetal
Small Red 2000BA
30.06.2024N N N N N N N NA NA NA 0.24 0.2 NA N Y Y NA Yes
4012009-10 O
11617Leo Engineering,
No.108, I Stage, PIE, Banglaore-58 I StageI
Electroplating (Hardchrome) 12.69 R-44
Industry or process involvingmetal
Small Red 1994BA
30.06.2023Y 12.06.2007 N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes
4022009-10 CL
-Leonid Chemicals Pvt Ltd, N
No.V-31, II Stage, PIE, Bengaluru-560 058,
II StageI
Pharma DistributorsC1 O-74
Pharmaceutical
formulationSmall Orange Closed
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4032009-10 CL
-Maatha Industries,
No.490, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2000
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4042009-10 O
24167Mehar Metals India Pvt Ltd,
No.A-346, 9th Main, II Stage, PIE, Bengaluru-560 058
II StageI
wire drawing with pickling 81.34 R-44
Industry or process involvingmetal
Small Red 1985BA
30.06.2024N N N N N N N NA NA NA 0.4 0.1 NA N Y Y NA Yes
4052009-10 CL
-Mahat Power Systems (P) Ltd,
No.409, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4062009-10 CL
-Mahaveera Mineral ,
No.417, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2019
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4072009-10 CL
12171Makam Agrochem Pvt Ltd,
No.A-280, II Stage, PIE, Bengaluru-560 058
II StageI
Formulation of Pesticides & Insecticides.
94.51 R-37Pesticides (technical)(excluding formulation
Small Red 1978BA
30.06.2014Y 30.06.2019 N N N N N NA NA NA 0 N NA N N N NA Yes
4082009-10 CL
-Mani Industries,
No.235, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Casting Iron rough casting 22 R-53
(involvingprocessing from ore/
Small Red 1995BA
30.06.2011C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
4092009-10 CL
-Maruthi Industrial Enterprises,
No.198, III Phase, PIA, Bangalore-560058,
III PhaseI
Powder coating 32 R-44
Industry or process involvingmetal
Small Red 2002BA
30.06.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes
4102009-10 CL
-Mascot Agrochemicals Pvt Ltd,
III Phase, PIA, Bengaluru-560 058, III PhaseI
Pesticide & Insecticide formulation
C1 R-37Pesticides (technical)(excluding formulation
Small Red ClosedBA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4112009-10 CL
-Mascot Chemicals Works,
No.B-81, I Stage, PIE, Banglaore-58 I StageI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4122009-10 CL
-Myur Polymers,
No.333, IV Phase, PIA, Bengaluru-560 058 ,
IV PhaseI
Synthetic resin28 O-75 Synthetic
resinsSmall Orange 1998
BA30.09.2012
N N N N N N N NA NA NA 0 N NA N N N NA NA
4132009-10 CL
-Mayurka Instruments Pvt Ltd,
No.A-181, I Stage, PIE, Banglaore-58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4142009-10 CL
15257Mekala Metal Works,
No.B-152, II Stage, PIE, Bengaluru-560 058
II StageI
Lead smelting 155 R-7
Lead acid batterymanufacturing(excluding
Small Red 1993BA
30.06.2019Y 30.06.2020 N N N N Y NA NA NA 0.2 N NA N Y N NA Yes
4152009-10 O
21284Metal Coats,
No.B-180, II Stage, PIE, Bangalore -58
II StageI
Aluminium anodizing25.61 R-44
Industry or process involvingmetal
Small Red 1999BA
30.06.2024Y 30.06.2020 N N N N N NA NA NA 0.4 0.6 NA N Y Y NA Yes
4162009-10 CL
-Metal Nitrides,
No.M-14, I Stage, PIE, Banglaore-58 I StageI
Bright BarsC1 R-44
Industry or process involvingmetal
Small Red ClosedBA
30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4172009-10 O
24140Metal Process,
No.C-249, I Stage, PIE, Banglaore-58 I StageI
Heat Treatment11.64 O-36
Heat treatment using oil fired furnace
Small Orange 1992BA
30.09.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
4182009-10 CL
-Metco Metalizers Pvt Ltd,
Ltd, No.C-200, I Stage, PIE, Banglaore-58
I StageI
Sand BlastingC1 G-99
sand reclamation
unit/Small Green Closed
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4192009-10 O
15157Metreat Chem Enterprises,
, No.C-76, III Stage,PIE, Bengaluru-560 058
III StageI
Electroplating Glod & Silver Plating 6.5 R-44
Industry or process involvingmetal
Small Red 1988BA
30.06.2023Y 30.06.2023 N N N N N NA NA NA 0.16 0.5 ETP N Y N NA Yes
4202009-10 CL
-Metro Batteries,
, No.172, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Lead Acid BatteriesC1 R-7
Lead acid batterymanufacturing(excluding
Small Red ClosedBA
30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4212009-10 CL
-Micast,
No.B-147, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2016
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4222009-10 O
11150Microtex Energy Pvt Ltd.,
No.42 & 43,2nd Main, II Phase, PIA, Bangalore-560058,
II PhaseI
Battery manufacture 4815 R-7
Lead acid batterymanufacturing(excluding
Large Red 2001BA
30.06.2021Y 30.06.2021 N N N N Y N NA NA 2.5 3 ST & SP ETP N N N NA Yes
4232009-10 O
16510Mineral Processing Ltd,
No.180, 11 Main, III Phase, PIA, Bangalore-560058,
III PhaseI
Mineral Grinding/ crushing 28.01 O-26
Dry coal processing, mineralprocessing,
Small Orange 1993BA
30.06.2018N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
4242009-10 O Modern Light Industries,
No.B-103, 2nd cross, I Stage, PIE, Banglaore-58
I StageI
Manufacture of Aluminium, Stainless Steel & Brass name plates
27.2 R-44Industry or process involvingmetal
Small Red 1980BA
30.06.2024N N N N N N N NA NA NA 0.36 0.16 NA N Y Y NA Yes
4252009-10 CL
24055Mohan Metal Crafts,
No.122, 7th Main, 2nd cross, III Phase, PIA, Bangalore-560058,
III PhaseI
Foundry75.27 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 1987BA
30.06.2019N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
4262009-10 CL
-Mora Metal Industies,
Mora Metal Industies, No.SB-47, I Stage, PIE, Banglaore-58
I StageI
Heat TreatmentC1 O-63
Engineering Industries with HeatTreatment,
Small Orange ClosedBA
30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4272009-10 CL
-Multi Heat Treaters,
No.B-385, I Stage, PIE, Banglaore-58 I StageI
Heat TreatmentC1 O-63
Engineering Industries with HeatTreatment,
Small Orange ClosedBA
30.06.2018C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4282009-10 O
13570Multimin Agro Chemicals,
No.443-A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Formulation of Pesticides & Insecticides.
17.57 O-29 Formulation of Pesticide,insecticide, & fungicide
Small Orange 2004BA
30.09.2023N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
4292009-10 O
34676Multiplex Agricare Pvt Ltd,
No.454, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Zinc Sulphate84 O-32
Zinc SmelterSmall Orange 1998
BA30.09.2021
Y 30.09.2021 N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
4302009-10 O
34133Multiplex Bio-Tech Pvt Ltd,
No.C-428, I Stage, PIE, Bengaluru-560 058,
I StageI
Sterilization of Carboys & Manufacturing of micronutrients
24.44 R-58Pharmaceutical (Bulk drug &Active
Small Red 2009BA
30.06.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
4312009-10 CL
-Mysore Alkaline Batteries,
No.A-12, II Stage, PIE, Bengaluru-560 058
II StageI
Battery manufacture C1 R-7
batterymanufacturing(excluding
Small Red ClosedBA
30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4322009-10 CL
-N.C.Bhandari Forging,
No.108-C, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4332009-10 CL
12428Navkar Metals,
No.B-32, III Stage, PIE, Bengaluru-560 058,
III StageI
Casting of Ferrous & non ferrous alloys 36.61 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 2003BA
30.06.2018N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
4342009-10 CL
-New Long Wires,
No.305, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Cable manufacturing C1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4352009-10 CL
-Nathanial Engineering Co,
No. III Stage,PIE, Bengaluru-560 058 III StageI
electroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4362009-10 CL
-Nordon Laboratories,
No.19-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
chemical laboratoryC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4372009-10 O Odochem Indsutries,
No.C-71, II Stage, PIE, Bangalore-560058
II StageI
Manufacture of Aldehyde 22.17 G-112
Fragrance, flavours essence etc.for food
Small Green 1991BA
30.12.2099N NA N N N N N NA NA NA 0.015 N NA N Y N NA Yes
438Om Shiva Shakthi Metal
No.B-196, II Stage, PIE, Bangalore- II Stage Lead in guards by Industries 4382009-10 CL
17082
Om Shiva Shakthi Metal Industries,
No.B-196, II Stage, PIE, Bangalore-560058,
II StageI
Lead in guards by recycling of lead acid batteries
99 R-32Industries engaged in recycling/
Small Red 2005BA
30.06.2017Y 30.06.2018 N N N N Y NA NA NA 0.4 N NA N Y N NA Yes
4392009-10 CL
-Om Steel Industries,
No.112, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4402009-10 CL
-Oorja Udyog,
No.B-32, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4412009-10 CL
-Oxide India,
No.C-31, II Stage, PIE, Bangalore -560058
II StageI
Lead suboxide 12.38 R-7
Lead acid batterymanufacturing(excluding
Small Red 1984BA
30.06.2018Y N N N N N Y NA NA 0.3 N NA N Y N NA Yes
4422009-10 CL
-P & S Chemicals,
No.B-223, I Stage, PIE, Banglaore-58 I StageI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4432009-10 O
14945P & S Galvasols,
No.490-1, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electroplating169 R-44
Industry or process involvingmetal
Small Red 1996BA
30.06.2022N NA N N N N N NA NA NA 0.4 0.5 ST & SP N N Y NA Yes
4442009-10 CL
23857P & S Precitech,
No.A-174, 4th cross, I Stage, PIE, Banglaore-58
I StageI
Plating Chemicals103.4 R-25
Basic chemicals and electrochemicals
Small Red 1996BA
30.06.2017N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
4452009-10 O
33732P.C.Process Pvt Ltd,
No.V-3(C), 14th cross, II Stage, PIE, Bangalore-560058
II StageI
Printed Circuit Board manufacture 260 R-74
Printed circuit boardmanufacturing units
Small Red 1999BA
30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.08 0.23 NA N Y Y NA Yes
4462009-10 O
24056Panch Dhatu,
No.B-47, III Stage,PIE, Bengaluru-560 058
III StageI
Aluminium alloy casting & copper alloy casting
56.69 O-28Ferrous and Non- ferrous metalextraction
Small Orange 1991BA
30.09.2029N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
4472009-10 CL
-Parachem Agrochem Ltd,
No.B-196, II Stage, PIE, Bengaluru-560 058
II StageI
Bio Fertlizer C1 O-29
(granulation /
formulation / Small Orange Closed
WA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4482009-10 CL
23030Pearl Coatings & Chemicals,
No.B-248, 6th Main, II Stage, PIA, Bangalore-560058
II StageI
Distemper, Primers, Putty & Emulsion 21.58 R-21
Manufacturing of paintsvarnishes, pigments
Small Red 2002BA
30.06.2019N NA N N N N N NA NA NA 0.5 0.05 NA N Y Y NA Yes
4492009-10 CL
-Peenya Heat Treatment Co,
No.424,11th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Heat Treatment21 O-63
Engineering Industries with HeatTreatment,
Small Orange 2003BA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4502009-10 CL
16595Perfect Profiles,
No.B-233, 6th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Carryingout drawing and polishing of Iron and steel bass & coils
222.6 R-44Industry or process involvingmetal
Small Red 1997BA
30.06.2018N N N N N N N NA NA NA 0.3 0.1 ST & SP N N Y NA Yes
4512009-10 CL
24138Pest Control (India) Pvt Ltd,
No.B-384, I Stage, PIE, Bengaluru-560 058
I StageI
Sterilization of Surgical Gloves, Medical Disposables, Spices, Raw Herbs,
32.33 O-65Surgical and medical productsincluding
Small Orange 2000BA
30.06.2018N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes
4522009-10 CL
-Phosphate Plasticizers (P) Ltd,
II Phase, PIA, Bengaluru-560 058 II PhaseI
Bio Fertlizer O-29
(granulation /
formulation / Small Orange Closed
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4532009-10 CL
-Pioneer Petro Chemicals,
No.B-212, II Stage, PIE, Bengaluru-560 058
II StageI
grease manufacturingC1 R-4
ng of lubricatingoils ,grease
Small Red ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4542009-10 CL
-Pollite Batteries,
No.B-226, I Stage, PIE, Banglaore-58 I StageI
Lead Acid BatteriesC1 R-7
Lead acid batterymanufacturing(excluding
Small Red ClosedBA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4552009-10 O
11614
Toyo Paints Pvt Ltd (Formerly Polo Paints Pvt Ltd),
No.B-225, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacturing of paints by blending & mixing
29.57 O-55Paints and varnishes (mixing andblending)
Small Orange 1996BA
30.09.2028N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
4562009-10 CL
-Polymer & Allied Products,
No.C-77, III Stage,PIE, Bengaluru-560 058
III StageI
Synthetic resinC1 O-75 Synthetic
resinsSmall Orange Closed
BA30.09.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4572009-10 CL
-Pooja Chemicals,
No.Sb-46, I Stage, PIE, Bengaluru-560 058
I StageI
ChemicalC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4582009-10 CL
-Power Build Batteries Pvt Ltd,
No.B-52, III Stage,PIE, Bengaluru-560 058
III StageI
Battery manufacture C1 R-7
batterymanufacturing(excluding
Small Red ClosedBA
30.06.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4592009-10 CL
-Power Build Batteries Unit - II,
No.B-54, III Stage,PIE, Bengaluru-560 058
III StageI
Lead Acid BatteriesC1 R-7
Lead acid batterymanufacturing(excluding
Small Red ClosedBA
30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4602009-10 CL
-Pradeepthi Power Products,
No.251, III Phase, PIA, Bengaluru-560 058
III PhaseI
Lead Acid BatteriesC1 R-7
Lead acid batterymanufacturing(excluding
Small Red ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4612009-10 CL
-Praveen Electroplaters,
No.C-288, I Stage, PIE, Banglaore-58 I StageI
ElctroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4622009-10 CL
-Precission Pattern Pvt Ltd,
No.C-248, I Stage, PIE, Banglaore-58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4632009-10 CL
-Premadasa Process,
No.A-266, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4642009-10 CL
-
Premier Alloy Foundry, No.172, III Phase, PIA,
Bengaluru-560 058,
No.172, III Phase, PIA, Bengaluru-560 058,
III PhaseI
ferrous castingC1 O-28
Non- ferrous metal
extraction Small Orange Closed
BA30.09.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4652009-10 CL
-
Premier Metal Finishers, No.C-260, I Stage, PIE, Banglaore-58
No.C-260, I Stage, PIE, Banglaore-58 I StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4662009-10 CL
-
Prince Auto Batteries, No.C-92, II Stage, PIE, Bengaluru-
560 058
No.C-92, II Stage, PIE,Bengaluru-560 058
II StageI
Battery manufacture C1 R-7
batterymanufacturing(excluding
Small Red ClosedBA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4672009-10 CL
11708Prithvi Fabrications Pvt Ltd,
No.189, 11th Main,2nd Cross, III Phase, PIA, Bangalore-560058
III PhaseI
Alluminum cans with degrasing 48.44 R-44
Industry or process involvingmetal
Small Red 1979BA
30.06.2019Y 30.06.2019 N N N N N NA NA NA 0.3 1 ST & SP ETP Y N N NA Yes
4682009-10 CL
12041
Priyadarshini Textile Process House, (Unit of Karnatka
handloom development corp ltd)
No.A-9 & 10, II Stage, PIE, Bangalore -560058
II StageI
Bleeching, dyeing and printing fabric and silk yarn dyeing
305 R-40Yarn / Textile processinginvolving
Small Red 1980BA
30.06.2017Y 30.06.2017 N N N N N NA NA NA 4.8 72 ETP Y Y N NA Yes
4692009-10 CL
-Process Pumps (I) Pvt Ltd,
No.B-32, I Stage, PIE, Bengaluru-560 058
I StageI
Pumps manufacturingC1 G-77
of Motor & Pumpswithout
Small Green ClosedBA
30.06.2017C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4702009-10 CL
34603
Anode tech (Formerly Profal Coters),
No.342, 9th cross, IV Phase, PIA, Bangalore-560058
IV PhaseI
Aluminium anodizing66 R-44
Industry or process involving metal
Small Red 2001BA
30.06.2017N N N N N N N NA NA NA 0.4 0.5 ST & SP N N Y NA Yes
4712009-10 CL
-Project Consultant,
No.160, III Phase, PIA, Bengaluru-560 058
III PhaseI
Enginerring with electroplating 47.43 R-44
Industry or process involving metal
Small Red 1997BA
30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4722009-10 CL
-Prominent Power Systems,
No.C-98, III Stage,PIE, Bengaluru-560 058
III StageI
UPS System78 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2005BA
30.06.2002N N N N N N Y NA NA NA 0 N NA N N N NA Yes
4732009-10 CL
-Protech Systems,
No.427, 12th cross, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Hot Dip Galvanizing17.93 O-41
Hot dip GalvanizersSLAB,, Zinc
Small Orange 1990BA
30.06.2008Y N N N N N NA NA NA 0 N NA N N N NA NA
4742009-10 O
14976Protective Coatings Pvt Ltd,
No.B-264, II Stage, PIE, Bengaluru-560 058
II StageI
Protective Coating17.41 R-44
Industry or process involvingmetal
Small Red 1997BA
30.06.2023Y 30.06.2017 N N N N N NA NA NA 1.04 1 NA N Y Y NA Yes
4752009-10 CL
14960Pushpagiri Forgings Pvt Ltd,
No.516, 10th Main IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Forging with heat treatment 176 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 1989BA
30.06.2017N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes
4762009-10 O Qualidels,
No.C-88, 3rd cross, III Stage, PIE, Bengaluru-560 058,
III StageI
General Engineering39.34 G-78
Switches without
electroplatinSmall Green 2004
WA31.12.2021
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA
4772009-10 CL
-Quality Casting,
No.B-77, I Stage, PIE, Bengaluru-560 058
I StageI
ferrous castingO-28
Non- ferrous metal
extraction Small Orange Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4782009-10 CL
-
Super Bond Industries ( R.D Industries),
No.B-297, II Stage, PIE, Bengaluru-560 058
II StageI
Adhesives 27.68 O-51
synthetic adhesive resin, wooden box
Small Orange 1993BA
30.09.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes
4792009-10 CL
-R.J.Hitech Pvt Ltd,
No.477-C, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitG-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4802009-10 CL
-Raga Industries,
No.A-359, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitG-78
Switches without
electroplatinSmall Green Closed
BA30.06.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4812009-10 CL
15192Rainbow Powder Coaters,
No.425, 11 th Cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Powder coating with pre-surface treatment activity
45.84 R-44Industry or process involvingmetal
Small Red 1/3/1994BA
30.06.2013N N N N N N N NA NA NA 0.14 0.1 ST & SP N N Y NA Yes
4822009-10 CL
-Raj Interior Designers ,
No.142, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Alluminum Fabrication with anodising
R-44process
involvingmetal
Small Red ClosedBA
30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4832009-10 CL
-Raja Rajeshwari Metals,
No.C-307, I Stage, PIE, Bengaluru-560 058
I StageI
Non ferrous castingO-32
Forging of ferrous and non- ferrousmetals (
Small Orange ClosedBA
30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4842009-10 CL
-Rakhi Heat Treaters,
No.B-385, I Stage, PIE, Bengaluru-560 058
I StageI
Heat TreatmentO-63
Engineering Industries with HeatTreatment,
Small Orange ClosedBA
30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4852009-10 CL
-Rapalano Enterprises,
No.D-432, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitG-78
Switches without
electroplatinSmall Green Closed
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4862009-10 CL
-Rare Alloys And Castings,
No.B-34, III Phase,PIE, Bengaluru-560 058
III PhaseI
Non ferrous castingO-32
Forging of ferrous and non- ferrousmetals (
Small Orange ClosedBA
30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
487 No.C-147, II Stage, PIE, Bengaluru- II Stage Ammonia & Industries 4872009-10 O
17642Rare Metal Manufacturers,
No.C-147, II Stage, PIE, Bengaluru-560 058
II StageI
Ammonia & paratungstate, Cobalt Oxide
30.16 R-10Industries engaged in recycling/
Small Red 1983BA
30.06.2024N N N N N N N NA NA NA 0.12 0.24 NA N Y Y NA Yes
4882009-10 CL
-Rasayana,
No.A-353, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering UnitG-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4892009-10 CL
-Rathod Rubber Products,
No.B-231, I Stage, PIE, Bengaluru-560 058
I StageI
Rubber componenentG-41
Rubber goods industry (with gas
Small Green ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4902009-10 CL
-Reinforced Plastics,
No.B-167, II Stage, PIE, Bengaluru-560 058,
II StageI
Helmet9.6 O-92
Helmet Manufacturi
ngSmall Orange 2002
BA30.06.2007
N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
4912009-10 CL
15664Rhodium Ferro Alloys ,
No.73, III Phase, PIA, Bangalore-560058,
III PhaseI
Mineral crushing116 O-26
Dry coal processing, mineralprocessing,
Small Orange 24.10.2001BA
30.06.2017N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
4922009-10 CL
-Roxy Metal Finishers,
No.A-158, I Stage, PIE, Bengaluru-560 058
I StageI
Electro plating chemicals by formulation
8.47 R-44Industry or process involvingmetal
Small Red 1976BA
30.06.2007N N N N N N N NA NA NA 0 0 NA N N N NA Yes
4932009-10 CL
-
Rubber Extrusions & Moulding Co,
No.C-336, II Stage, PIE, Banglaore-58,
II StageI
Rubber componenent20 G-41
Rubber goods industry (with gas
Small Green 1984BA
31.12.2004N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
4942009-10 CL
-S.L.Industries,
No.251, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Assembling and wiring of electrical control panel
19.8 W-14Engineering and fabricationunits (dry
Small White ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4952009-10 CL
-S.M.Powder Coaters,
No.B-215, II Stage, PIE, Bengaluru-560 058
II StageI
Powder coating C1 R-44
Industry or process involving metal
Small Red ClosedBA
30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
4962009-10 O
14723S.P.Engineering Enterprises,
No.50, III Phase, PIA, Bangalore-560058,
III PhaseI
M.S.General structural fabrication & Stress reliving m/c
44.65 O-63Engineering Industries with HeatTreatment,
Small Orange 1990BA
30.09.2028N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
4972009-10 CL
-S.R.Industries,
No.C-140, II Stage, PIE, Bangalore -560058
II StageI
Lead suboxide 12.65 R-7
Lead acid batterymanufacturing(excluding
Small Red 1992BA
30.06.2017Y N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
4982009-10 O
14951S.S.Industries,
No.57-C, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Battery manufacture 33.32 R-7
Lead acid batterymanufacturing(excluding
Small Red 2001BA
30.06.2017Y 30.06.2014 N N N N Y NA NA NA 0.25 0.2 ST & SP N N Y NA Yes
4992009-10 CL
-S.S.Engineering,
No.B-186, II Stage, PIE, Bangalore-560058
II StageI
ferrous & non ferrous casting 28 O-28
Non- ferrous metal
extraction Small Orange 1993
BA30.06.2011
N N N N N N N NA NA NA 0 N ST & SP N N N NA Yes
5002009-10 CL
15474Sabari forgings,
No.1-A, III Phase, PIA, Bangalore-560058,
III PhaseI
Forging42.1 O-32
ferrous and non- ferrous
metals ( Small Orange 1989
BA30.06.2017
N N N N N N NA NA NA 0 N NA N N N NA NA
5012009-10 O
33725Sagar Art Glasses,
No.A-10, III Stage,PIE, Bengaluru-560 058
III StageI
Glass painting11.23 O-34
Glass ceramics, earthen potteries and
Small Orange 2000BA
30.09.2022N N N N N N N NA NA NA 0.2 0.05 NA N Y Y NA Yes
5022009-10 O
14711
Sahayadri Starch & Chemicals Pvt Ltd,
No. 60-61. 4th Main, III Phase, PIA, Bangalore-560058,
III PhaseI
(Starch)Dextrine & Liquid Adhesives through Blending activity of capacity
53.64 O-72Synthetic resins Small Orange 1976
BA30.09.2022
N NA N N N N N NA NA NA 0.5 0.15 ST & SP N N Y NA Yes
5032009-10 CL
-Sai Quality Casting,
No.C-470, I Stage, PIE, Bengaluru-560 058
I StageI
ferrous castingC1 O-28
Non- ferrous metal
extraction Small Orange Closed
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5042009-10 CL
-Sandilya Tubes,
No.B-180, II Stage, PIE, Bengaluru-560 058
II StageI
PVC PipesC1 G-79
covered underPlastic
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5052009-10 CL
-Sangeeta Dyes & Chemicals,
No.439, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Chemical tradingC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
YTCC1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5062009-10 CL
-Sanjaya Minerals (P) Ltd,
No.30-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Garment Washing900 O-50
Mechanized laundry using oil fired
Medium Orange ClosedBA
30.06.2013N N N N N N N NA NA NA 0 N NA N N N NA NA
5072009-10 CL
-Sarvana Electroplaters,
No.199, 12th Main, III Phase, PIA, Bangalore-560058,
III PhaseI
Electroplating2.53 R-44
process involving
metal Small Red 1993
BA30.06.2013
Y 30.06.2010 N N N N N NA NA NA 0.25 0.2 ST & SP N N Y NA NA
5082009-10 CL
-Servo Batteries Pvt Ltd,
No.502-1, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Lead Acid Batteries26 R-7
Lead acid batterymanufacturing(excluding
Small Red 1999BA
30.06.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5092009-10 CL
-
Shakthi Prakash Metal Finishers ,
No.C-341, II Stage, PIE, Bengaluru-560 058
II StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5102009-10 O
13813Shakti Treads,
No.B-292(a), 7th Main, II Stage, PIE, Bangalore-560058
II StageI
Tread rubber 76.85 O-70
Automobile Tyre & tube / RubberTubes
Small Orange 1990BA
30.09.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
5112009-10 O
12425Shalini Enterprises,
No.A-6, III Stage, PIE, Bengaluru-560 058
III StageI
Solvent reprocessor and used barrels washing
155 R-72Solvent RecyclingAcid
Small Red 1995BA
30.06.2023Y 30.06.2023 N N N N N NA NA NA 0.8 8.9 NA N Y Y NA Yes12425 washing Acid
recovery BA Y 30.06.2023 N N N N N NA NA NA 0.8 8.9 NA N Y Y NA Yes
5122009-10 CL
12422Shet Electricals Pvt Ltd,
No.49-B, III Phase, PIA, Bangalore-560058
III PhaseI
Engineering with pickling 658 R-44
Industry or process involving metal
Medium Red 2004WA
30.06.2006Y 30.06.2018 N N N N N NA NA NA 0 N NA N N N NA NA
5132009-10 CL
-Dr. Shet Magnetics (P) Ltd,
No.SB-48, I Stage, PIE, Bengaluru-560 058
I StageI
Megnatic Products29 R-3
Industries engaged inrecycling/reprocessing/
Small Red 1980BA
30.06.2012N N N N N N N NA NA NA 1 N NA N Y N NA Yes
5142009-10 CL
-Shobha Enterprises,
No.C-178, II Stage, PIE, Bengaluru-560 058
II StageI
Heat TreatmentC1 O-63
Engineering Industries with HeatTreatment,
Small Orange ClosedBA
30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5152009-10 CL
-Sri Siddeshwara Coaters,
No.A-275, II Stage, PIE, Bengaluru-560 058
II StageI
Powder coating 19 R-44
Industry or process involving metal
Small Red 2002BA
30.06.2014N N N N N N N NA NA NA 0 N NA N N N NA NA
5162009-10 O
17992Solux Smelting Pvt Ltd,
No.B-247, II Stage, PIE, Bangalore -560058
II StageI
Solder Wires & Solder Stics 9 O-72
Wire drawing and wire netting
Small Orange 1982BA
30.09.2021N NA N N N N N NA NA NA 0.16 N NA N Y N NA Yes
5172009-10 CL
-Sonit Aromatic Chemicals Ltd,
No.257, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Aromatic compoundC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5182009-10 O
26926South India Wire Products,
No.435, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Bright steel Bars (General Engg) 85 G-40
Rolling mill ( gas fired) and coldrolling mill
Small Green 1988BA
31.12.2034Y 31.12.2024 N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
5192009-10 O
11731
Laboratory for Electro Optics System
No.A1 to A6, I cross, I Stage, PIE, Bengaluru-560 058
I StageI
optic lenses106 G-53
Manufacturing of optical lenses(using
Small Green 2016BA
31.12.2026N N N N N N N NA NA NA 2.4 NA NA N Y N NA Yes
5202009-10 CL
-Southern Enterprises,
No.A-18, I Stage, PIE, Bangalore -58 I StageI
Heat TreatmentC1 O-63
Engineering Industries with HeatTreatment,
Small Orange ClosedBA
30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5212009-10 CL
-Southern Enterprises,
No.D-422, II Stage, PIE, Bengaluru-560 058
II StageI
Heat TreatmentC1 O-63
Engineering Industries with HeatTreatment,
Small Orange ClosedBA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5222009-10 CL Southern Founders,
No.308, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Foundry22 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 1999BA
30.06.2012N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
5232009-10 CL
-Southern Mineral Agencies,
No.150, III Phase, PIA, Bengaluru-560 058
III PhaseI
Mineral crushingC1 O-26
processing, mineral
processing, Small Orange Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5242009-10 CL
Space Age Electro Technology India Pvt Ltd,
No.36-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Solar thermal obserbar by using ultra sonic and laser beam welding
97.9 G-114generation
throughsolar
Small Green 1993WA
31.12.2015N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
5252009-10 CL
-Spectrum Powder Coaters,
No.B-121, I Stage, PIE, Bengaluru-560 058
I StageI
Powder coating C1 R-44
Industry or process involving metal
Small Red ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5262009-10 CL
-
Sphoorthi Machine Tools Pvt Ltd,
No.B-55, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5272009-10 CL
-Sree Associates,
No.B-187, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5282016-17 O
28672Synpack slide N zip Pvt Ltd
No.118/1, 3rd cross, 1st stage, Peenya industrial eestate, bengaluru-560058
I StageI
Polythene & polyprpolyne products
60 G-32Polythene & polyprpolyne products
Small Green 2016WA
-N N N N Y N N NA NA NA NA N ST & SP N N N NA NA
5292009-10 CL
-
Sri Mangalam Chrome Platers Pvt Ltd,
No.412, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5302009-10 CL
-Sri Ram Hot Dip Galvanizers,
No.537A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Zinc galvanizing43.3 R-44
Industry or process involvingmetal
Small Red 1/7/2004BA
30.06.2007C1 30.06.2008 N N N N N NA NA NA 0 N NA N N N NA NA
5312009-10 CL
-Sri Rathna Industries,
No.A-320, II Stage, PIE, Bengaluru-560 058
II StageI
Zinc Sulphate45 R-44
Industry or process involvingmetal
Small Red 1990BA
30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5322009-10 CL
-Sri Sai Krishna Industries,
No.332, Iv Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2002
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5332009-10 CL
-Sri Saibaba Industries,
No.332, Iv Phase, PIA, Bengaluru-560 058
IV PhaseI
pickling10 R-44
Industry or process involvingmetal
Small Red 1998BA
30.06.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5342009-10 O
23860Sri Shankar Enterprises,
No M-2/1, 5th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Grit blasting15.48 G -92
Shot blasting operation Small Green 2003
BA30.06.2019
N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
5352009-10 CL
-
Sri Srikanteshwara Eneterprises,
No.M-2, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
536 No.B-95, I Stage, PIE, Bangalore -58 I Stage Engineering Unit Switches 5362009-10 CL
-Sri Varadaraju Industries,
No.B-95, I Stage, PIE, Bangalore -58 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2019
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5372009-10 CL
14912Sri Varu Acid & Chemicals,
No. 134, III Phase, PIA, Bengaluru-560 058
III PhaseI
Copper Oxide from reprocessing of PCB etchant and copper scapt
37.41 R-3Industries engaged in Small Red 2002
BA30.06.2019
Y 30.06.2020 N N N N N NA NA NA 0.5 0.3 ST & SP N N Y NA Yes
5382009-10 CL
-Sri Venkateshwara Industries,
No.283, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5392009-10 O
15222Srinivasa Industrial Chemicals,
No.C-333, 3rd Main road, I Stage, PIE, Bangalore-560058
I StageI
Phospating Chemicals & Chromating Chemicals by formulation process
7.56 R-25recovery/reuse of Hazardous
Small Red 1980BA
30.06.2024Y 30.06.2024 N N N N N NA NA NA 0.2 0.1 NA N Y Y NA Yes
5402009-10 CL
-Standard Engineers,
No.284, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5412009-10 O
11508Standard Screws Industries,
No.471-C, 13th Cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Bright steel bars & Pickling 60.31 R-44
Industry or process involvingmetal
Small Red 1994BA
14.10.2024Y 30.06.2013 N N N N N NA NA NA 1.2 1 NA N Y Y NA Yes
5422009-10 CL
-
Steel Storage & Retrivales Systems Pvt Ltd,
No.A-23 & 24, III, Stage,PIE, Bengaluru-560 058,
III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5432009-10 CL
-Strayfield Heating Pvt Ltd,
No.B-17, 1st cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Assembly of heating equipments 45.05 W-13
Electrical and electronic item
Small White 1992BA
31.12.2016N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes
5442009-10 CL
-Sudarshan Tubes,
No.490-E, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
PVC PipesC1 G-79
covered underPlastic
Small Green ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5452009-10 O
15504Sudha Minechem Industry,
No.201, 12th Main, IIIPhase, PIA, Bangalore-560058,
III PhaseI
pulverizing of Soap stone, Lime stone, Feldspar, Dolomite
20.93 R- Small Red 1977BA
30.06.2020N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
5462009-10 O
15275Sumuka Electroplaters,
No.B-70, 3rd Stage, PIE, Bengaluru-560 058
III StageI
Electroplating47.45 R-44
Industry or process involvingmetal
Small Red 2001BA
30.06.2025N N N N N N N NA NA NA 1.2 0.25 NA N Y Y NA Yes
5472009-10 CL
-Sunchrome Industries,
No.466, IV Phase, PIA, Bangalore, IV PhaseI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2003
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5482009-10 CL
23553
Suntrac Energy Systems Pvt Ltd,
No.C-214, I Stage, PIA, Bengaluru-560 058,
I StageI
Assembly of batteries20.06 O-73
Dry cell battery ( excludingmanufacturi
Small Orange 2004WA
31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA NA
5492009-10 CL
-Super Bond Adhesives,
No.C-272, I Stage, PIE, Bengaluru-560 058
I StageI
Adhesives C1 O-51
adhesive resin,
wooden boxSmall Orange Closed
WA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5502009-10 O
15053Super Bright Steels Pvt Ltd,
No.A-172, 4th Cross, I Stage, PIE, Banglaore-58,
I StageI
Bright Bars120.65 R-44
Industry or process involvingmetal
Small Red 2002BA
30.06.2022N N N N N N N NA NA NA 0.8 0.12 NA N Y Y NA Yes
5512009-10 O
39352Superceram,
No.C-258, I Stage, PIE, Bengaluru-560 058,
I StageI
Ceramic products25.63 O-22
Ceramics and Refractories
Small Orange 1978BA
30.09.2029N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
5522009-10 CL
-Super Power System,
No.B-136, II Stage, PIE, Bangalore -58 II StageI
Battery asemblyC1 R-7
batterymanufacturing(excluding
Small Red 2001BA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5532009-10 CL
-Super Power Systems,
No.C-90, III Stage,PIE, Bengaluru-560 058
III StageI
Battery manufacture 23 R-7
batterymanufacturing(excluding
Small Red 1990BA
30.06.2009C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
5542009-10 CL
-Supraja Sriram & Co Pvt Ltd,
No.B-70, III Stage,PIE, Bengaluru-560 058
III StageI
Chemical tradingC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5552009-10 CL
-Supreme Industries,
No.446, IV Phase, PIA, Bengaluru-560 058.,
IV PhaseI
electroplating11 R-44
process involving
metal Small Red 2010
BA30.06.2011
Y 30.06.2014 N N N N N NA NA NA 0 N NA N N N NA NA
5562009-10 CL
-Suraj Enterprises,
No.557, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5572009-10 CL
-Surchem Finishers,
No.B-41, III Stage,PIE, Bengaluru-560 058
III StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5582009-10 O
17650Surfa Coats (India) Pvt Ltd,
487/B-2, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Maufacutre of Paints: Water based paints & oil based paints
499.59 O-55Paints and varnishes (mixing and blending
Small Orange 1/11/2000BA
30.09.2022N N N N N N N NA NA NA 1.28 0.7 ST & SP N N Y NA Yes
5592009-10 O
33199Surfa Coats (Bangalore ) Ltd,
No.A-107, II Stage, PIE, Bangalore-560058
II StageI
Manufacture of Paint102 W-14
GowdownSmall White 1994
BA30.09.2022
N N N N N N N NA NA NA 2 N NA N Y N NA Yes
5602009-10 O
17650
Surfa Coats (Bangalore) Ltd - II,
No.A-55, II Stage, PIE, Bangalore-560058
II StageI
paint87.14 O-54
Paint blending and mixing (Ball
Small Orange 1994BA
30.09.2021N NA N N N N N NA NA NA 1.76 N NA N Y N NA Yes17650 mixing (Ball
mill)BA N NA N N N N N NA NA NA 1.76 N NA N Y N NA Yes
5612009-10 CL
15057Surya Hard Chrome Industries,
No.S-10, I Stage, PIE, Bengaluru-560 058
I StageI
Electroplating (Hardchrome) 59.85 R-44
Industry or process involvingmetal
Small Red 2000BA
30.06.2015Y 30.06.2018 N N N N N NA NA NA 0.5 0.25 NA N Y Y NA Yes
5622009-10 CL
-Synthetic Resin Products,
No.A-364, I Stage, PIE, Bengaluru-560 058
I StageI
Synthetic resinC1 O-75 Synthetic
resinsSmall Orange Closed
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5632009-10 CL
-Systems & Services,
No.C-304, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5642009-10 CL
-Technical Think Tank,
No.L17/18, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5652009-10 O Technomet Indsutries,
No.V-28, II Stage, PIE, Bangalore -58 II StageI
Sand Blasting10.25 G-99
Foundry sand reclamation unit/
Small Green 2001BA
31.12.2021N N N N N N N NA NA NA 0.23 N NA N Y N NA Yes
5662009-10 O
12527Technomet Services,
No.B-58, III Stage,PIE, Bengaluru-560 058
III StageI
Heat Treatment39.73 O-63
Engineering Industries with HeatTreatment,
Small Orange 1992BA
30.09.2023N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
5672009-10 CL
-Tejus Engineering ,
No.B-38, III Stage,PIE, Bengaluru-560 058
III StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
WA30.06.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5682009-10 CL Texell Engineers,
No.C-91, III Stage, PIE, Bengaluru-560 058 ,
III StageI
Engineering Unit20.41 W-14
Engineering and fabricationunits (dry
Small White 2003BA
31.12.2012N N N N N N N NA NA NA NA N NA N N N NA Yes
5692009-10 CL
-
Thermal Transfer Products Pvt Ltd,
No.487-C, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
N N N N N N N NA NA NA 0 N NA N N N NA NA
5702009-10 CL
-Thiwari Alloys Pvt Ltd,
No.B-64, III Stage,PIE, Bengaluru-560 058
III StageI
Non Ferrous castingC1 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange ClosedBA
30.09.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5712009-10 CL
-Torkari,
No.B-183, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5722009-10 O
40669Tube Style Interiors Pvt Ltd,
Ltd, No.244, 11th Main, III Phase, PIA, Bangalore-560058,
III PhaseI
Wood/MDS/MS house hold furniture 405.24 O-51
Modular wooden furniture from particle
Small Orange 1987BA
30.09.2027N N N N N N N NA NA NA 1 N NA N Y N NA Yes
5732009-10 CL
39548Tulip Engineers Bangalore,
No.143, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Electroplating (HardChrome) 34 R-44
Industry or process involvingmetal
Small Red ClosedBA
30.06.2011N N N N N N N NA NA NA 0 N NA N N N NA NA
5742009-10 CL
-Tulsi Paints & Allied Products,
, No.283, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
PaintC1 R-21
Manufacturing of paintsvarnishes, pigments
Small Red ClosedBA
30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5752009-10 O
29888Newcast Die casting,
No.120, III Phase, PIA, Bangalore-560058,
III PhaseI
Aluminium Die Casting 168.08 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 2002BA
30.09.2022N N N N N N N NA NA NA 2.8 N NA N Y N NA Yes
5762009-10 CL United Forgings,
No.465, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Bolts,Wires and birght bars with pickling 18 R-44
Industry or process involvingmetal
Small Red 1992BA
30.06.2012N N N N N N N NA NA NA 0.72 0.05 ST & SP N N Y NA Yes
5772009-10 CL
R.N. Industries (Bansal Oxides),
No.C-138, II Stage, PIE, Bengaluru-560 058
II StageI
Lead suboxide 24 R-7
Lead acid batterymanufacturing(excluding
Small Red 2001BA
30.06.2015N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
5782009-10 O
15464Vaishnavi Industries,
No.133, III Phase, PIA, Bangalore-560058,
III PhaseI
Repacking and trading of poly Al Chloride & Sodium Hyphochloride
20 O-41 Storage Terminals-Storage and handling of
Small Orange 1/4/1999BA
30.9.2029N NA N N N N N NA NA NA 0.16 N NA N Y N NA Yes
5792009-10 CL
-Valley Paints Pvt Ltd,
No.536 & 537, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Paint74.98 R-21
Manufacturing of paintsvarnishes, pigments
Small Red 1/4/2002BA
30.06.2010N N N N N N N NA NA NA 0 N NA N N N NA Yes
5802009-10 CL
-Varalakshmi Enterprises,
No.A-370, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5812009-10 CL
-Vashishta Engineering,
No.B-231, I Stage, PIE, Bengaluru-560 058,
I StageI
Bright bars54 R-44
process involving
metal Small Red 2001
BA30.06.2008
N N N N N N N NA NA NA 0 N NA N N N NA NA
5822009-10 CL
11488Newcast Die casting,
No.C-27, II Stage, PIE, Bengaluru-560 058,
II StageI
Aromatic chemicals21.17 R-22
Organic Chemicalsmanufacturing
Small Red 2006BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
5832009-10 CL
-Veeyer Formulators,
No.C-87, II Stage, PIE, Bengaluru-560 058
II StageI
Pharmacuitical formulation C1 O-74
Pharmaceutical
formulationSmall Orange Closed
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5842009-10 CL
-Venkateshwara Industries,
No.283, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
585 No.B-107, III Stage,PIE, Bengaluru- III Stage Wire drawing Wire 5852009-10 CL
-Vensions Wires,
No.B-107, III Stage,PIE, Bengaluru-560 058
III StageI
Wire drawing 17.54 O-72
Wire drawing and wire netting
Small Orange 2.5.1993BA
30.06.2008N N N N N N N NA NA NA 0 N NA N N N NA NA
5862009-10 CL
14971Ventech Foundries,
No.SB-42, 1st cross, I Stage, PIE, Bengaluru-560 058
I StageI
Non ferrous casting4.2 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 1973BA
30.06.2018N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
5872009-10 O
Vibromech Engineers & Services Ltd,
No.A-321, II Stage, PIE, Bengaluru-560 058,
II StageI
Vibromation dumpers & Automobile Engine components only without spray
82.9 G-78Switches without
electroplatinSmall Green 1995
BA31.12.2015
N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes
5882009-10 CL
-Vijaya Chemical Industries,
No.A-272, II Stage, PIE, Bengaluru-560 058
II StageI
Chemical refiling and trading C1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5892009-10 O
14214Vijaya Metal Finishers,
No.365, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electroplating149.3 R-44
Industry or process involvingmetal
Medium Red 1985BA
30.06.2023Y 30.09.2023 N N N N N NA NA NA 0.4 0.35 NA N Y Y NA Yes
5902009-10 CL
11701
Vijaya Seamless Containers (P) Ltd,
No.189, 11th Main, III Phase, PIA, Bangalore-560058,
III PhaseI
Aluminium Containers/Bottles, shades and plastic components with
107 R-44Industry or process involvingmetal
Small Red 1985BA
30.06.2022Y 30.06.2015 N N N N N NA NA NA 0.6 0.5 ST & SP ETP Y N N NA Yes
5912009-10 O
15901
Vijay Spheroidals Private Limited.,
No.17-B, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Cast Iron Casting (Foundry) SG iron castings
302.711 O-66Ferrous and Non- ferrous metalextraction
Small Orange 1988BA
30.09.2022Y 30.06.2015 N N N N N NA NA NA 1.5 N NA N Y N NA Yes
5922009-10 O
15178A.S.Surface Finishers,
No.P-27, 10th Main, III Stage, PIE, Bengaluru-560 058,
III StageI
Electroplating (Hardchrome) 11.35 R-44
Industry or process involvingmetal
Small Red 2004BA
30.06.2024N N N N N N N NA NA NA 0.4 0.1 NA N Y Y NA Yes
5932009-10 CL
15109Alchemist Processors, ,
No.A-150, II Stage, PIE, Bengaluru-560 058,
II StageI
Metal recover11.8 R-3
engaged inrecycling/rep
rocessing/Small Red 2006
BA30.06.2008
Y 30.06.2010 N N N N N NA NA NA 0 N NA N N N NA NA
5942009-10 O
23050Allianz Trans Alloys (P) Ltd,
No.B-279(A), I Stage, PIE, Bangalore-560058,
I StageI
Non ferrous machine components for automobile & other engineering machines
16.16 O-66Ferrous and Non- ferrous metalextraction
Small Orange 2004BA
30.09.2028N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
5952009-10 CL
-
Allied Metallurgical Products Pvt Ltd,
No.293, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Non Ferrous CastingC1 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange ClosedBA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
5962009-10 CL Hermes Chem Impex (P) Ltd,
No.A-29, III Stage, PIE, Bengaluru-560 058,
III StageI
Engineering Unit89.03 G-78
Switches without
electroplatinSmall Green 2004
BA30.06.2006
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
5972009-10 O
12526Jain Wire Industries,
No.C-94, III Stage, PIE, Bengaluru-560 058,
III StageI
Wire drawing ( Brazing and Welding rods)
14.55 O-32ferrous and non- ferrous
metals ( Small Orange 1995
BA30.09.2023
N N N N N N N NA NA NA 0.4 0.02 NA N Y Y NA Yes
5982009-10 O
14831Jaya Vijaya Industries,
No.C-205, 4th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Battery manufacture 122.17 R-7
Lead acid batterymanufacturing(excluding
Small Red 2003BA
30.06.2024Y 30.06.2014 N N N N Y NA NA NA 0.48 0.3 NA N Y Y NA Yes
5992009-10 O
14752
Bright India Steel Industry (Formerly known as Laxmi
Industries),
No.280/3, IV Phase, PIA, Bengaluru-560 058,
IV Phase IBright Steel Bars
167.01 R-44Industry or process involvingmetal
Small Red 1/4/2002BA
30.06.2023N NA N N N N N NA NA NA 1.2 0.27 ST & SP N N Y NA Yes
6002009-10 CL
24740M.M. Heat Treaters,
No.SB-47, I Stage, Peenya Industrial Estate, Bangalore,
I StageI
Heat Treatment20 O-36
treatment using oil
fired furnaceSmall Orange 2004
BA30.06.2008
N N N N N N N NA NA NA 0 N NA N N N NA NA
6012009-10 CL
-M.S.Heat Treaters,
No.B-256, II Stage, PIE, Bengaluru-560 058,
II StageI
Short Blasting activity13.36 G-92
Shot blasting operation Small Green 2003
BA31.12.2006
N N N N N N N NA NA NA 0 N NA N N N NA Yes
6022009-10 CL
-Micast,
B-300, 7th Main Road, II Stage, PIE, Bengaluru-560 058,
II StageI
C.I. casting49 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 2004BA
30.06.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes
6032009-10 O
77681Micro Sharp Needles Pvt Ltd,
.B-242, 6th Main, II Stage, PIA, Bangalore-560058,
II StageI
Surgical Sutre needles39.17 O-63
Engineering Industries with HeatTreatment,
Small Orange 2004BA
30.06.2023Y 30.06.2023 N N N N N NA NA NA 1 0.25 NA N Y Y NA Yes
6042009-10 O
32222Multi Carbo,
No.B-303, II Stage, PIE, Bengaluru-560 058,
II StageI
Heat Treatment20.73 O-63
Engineering Industries with HeatTreatment,
Small Orange 1/6/2002BA
30.09.2023N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes
6052009-10 CL
-Pals Industry,
No.20-B, II Phase, PIA, Bangalore, II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6062009-10 O
11537Pragathi Coaters,
No.C-102, III Stage, PIE, Bengaluru-560 058,
III StageI
Powder coating 37 R-44
Industry or process involving metal
Small Red 2004BA
30.06.2023N N N N N N N NA NA NA 0.12 0.15 NA N Y Y NA Yes
6072009-10 O
11493Protective Coatings Pvt Ltd,
No.B-210, II Stage, PIE, Bangalore-560058,
II StageI
Powder coating on job work 59.06 R-44
Industry or process
involving metal
Small Red 2003BA
30.06.2023Y 30.06.2016 N N N N N NA NA NA 0.22 N NA N Y N NA Yes
6082009-10 O
11494R.R.Forgings pvt ltd,
No.332-B, 4th Main 9th cross , IV Phase, PIE, Bengaluru-560 058,
IV PhaseI
Engineering with Forging 292 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2004BA
30.06.2029N N N N N N N NA NA NA 1.72 N NA N Y N NA Yes
6092009-10 O
13931Ring Forgings Pvt Ltd,
No.A-283/284, 6th Mian, II stage, PIE, Bangalore-560058,
II StageI
Forging and Heat Treatment activity 721.41 O-32
Forging of ferrous and non- ferrous
Medium Orange 2005BA
30.09.2022N N N N N N N NA NA NA 1 N NA N Y N NA Yes13931 non- ferrous
metals ( BA N N N N N N N NA NA NA 1 N NA N Y N NA Yes
6102009-10 CL
-S.S.Coating Systems,
No.450-A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Powder coating 20.47 R-44
Industry or process involving metal
Small Red 1/1/2003WA
30.06.2004Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA
6112009-10 CL
16609Sarda Alloy Steels,
No.A-367, 2nd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Bright bars
329.56 R-44process
involvingmetal
Small Red 2006BA
30.06.2007N N N N N N N NA NA NA 1 0.01 NA N Y Y NA NA
6122009-10 CL
-Sil Mirror Pvt Ltd,
No.45-B, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Mirror ManufacturingC1 O-34
ceramics, earthen
potteries andSmall Orange Closed
BA31.12.2015
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6132009-10 O
26992South India Wire Products,
No.A-44(A), II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit86.29 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1999BA
31.12.2024Y 31.12.2018 N N N N N NA NA NA 0.4 N NA N Y N NA Yes
6142009-10 O
14820
Spraymet Surface Technologies (P) Ltd,
No.A-413, II Stage, PIE, Bengaluru-560 058,
II StageI
Grit blasting and plasma spray cooling 46.83 O-62
Spray painting, paint baking, paint
Small Orange 2000BA
30.06.2022N N N N N N N NA NA NA 0.83 N NA N Y N NA Yes
6152009-10 O Varalaxmi Enterprises,
No.A-195, 4th cross. I Stage, PIE, Bengaluru-560 058,
I StageI
Powder coating 85 R-44
Industry or process involving metal
Small Red 1991BA
30.06.2020Y 30.06.2015 N N N N N NA NA NA 0 N NA N Y N NA Yes
6162009-10 O Benz-O-Chem,
No.389, 10th cross, IV Phase, PIA, Banglaore-58,
IV PhaseI
chemical distillation7 R-25
chemicals and electrochemicals
Small Red 1/12/2001BA
30.06.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
6172009-10 O
15407A.B.Engineering Works,
No.N-1/3, 4th cross, I Stage, PIE, Bangalore-560058,
I StageI
Forging 87.65 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 1989BA
30.06.2029N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
6182009-10 CL
23553Suntrac Energy System .
. Plot No 321-A, 8th cross, IV Phase, PIA, Bagalore-58
IV PhaseI
Assembling of Polyprophylene heat sealed batteries (Battery manufacture)
51.68 O-73Dry cell battery ( excludingmanufacturi
Small Orange 2008BA
30.06.2014N N N N N N Y NA NA NA 0.25 N ST & SP N N N NA Yes
6192009-10 CL
-Abay Raj Food Products,
No.B-15, I Stage, PIE, Bengaluru-560 058
I StageI
Pulverizing C1 O-26
involving ore
sintering, Small Orange Closed
BA30.09.2017
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6202009-10 O
34822Shubamangala Industries,
No.A-416, 417& 418 II Stage, PIE, Bangalore-560058
II StageI
Cattle feed and poultry feed 145 O-30
Fish feed, poultry feed and cattle feed
Small Orange 1988BA
30.09.2022N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
6212009-10 CL
-Ajit Global Fashions,
No.119, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6222009-10 CL
-Alankar Enterprises,
No.150, III Phase, PIA, Bengaluru-560 058
III PhaseI
Silk yarn dyeingC1 R-40
Textile processinginvolving
Small Red ClosedBA
30.06.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6232009-10 CL
-Alminrock ,
No.17, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Stone carvingsC1 G-56
sizing and polishing of
marble Small Green Closed
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6242009-10 CL
-
Amaranarayana Grinding Industries,
No.154, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Agarbatti raw material7.79 W-37
Agarbathi Manufacturi
ngSmall White 1990
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6252009-10 CL
-Anitha Enterprises,
No. , II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.09.2017
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6262009-10 O
35318Arvind Motors Pvt Ltd,
No.65-B, III Phase, PIA, Bangalore-560058
III PhaseI
Automobile servicing327 O-18
Automobile servicing,repairing and painting
Small Orange 1992BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 3 N ST & SP N N N NA Yes
6272009-10 O
27249
Aries Tanks & Vessels Pvt Ltd,
No.156, 10th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit58.58 W-14
Engineering and fabricationunits (dry
Small White 1981BA
31.12.2025N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
6282009-10 O
13251
Rinse Top Tex Pvt Ltd, ( Armon Textile)
No.A-418(A), 9th Main, II Stage, PIE, Bangalore-560058,
II StageI
Washing of readymade garments 377 O-50
Mechanized laundry using oil fired
Small Orange 2004BA
30.09.2023N N N N N N N NA NA NA 1.1 22.36 ETP N Y N NA Yes
6292009-10 CL
-Arpee Electricals Pvt Ltd,
No.A-56, II Stage, PIE, Bengaluru-560 058
II StageI
Electrical Componentes 34 G-78
Switches without
electroplatinSmall Green 2001
WA31.12.2004
N N N N N N N NA NA NA 0 N NA N N N NA NA
6302009-10 O Arun Indsutries,
No.193, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit12.5 W-14
Engineering and fabricationunits (dry
Small White 1992BA
30.06.2017N N N N N N N NA NA NA NA N NA N N N NA Yes
6312009-10 O
17319Delta Abrasives,
No.C-257, 5th cross, I Stage, PIE, Bangalore-560058
I StageI
Ceramic products ( usingelectrical kiln)
32 O-22Ceramics and Refractories
Small Orange 1992BA
30.09.2022Y 30.06.2015 N N N N N NA NA NA 0.6 N NA N Y N NA Yes
6322009-10 CL
-Kiran Metal Finishers,
No.C-259, I Stage, PIE, Bengaluru-560 058
I StageI
electroplating8.68 R-44
process involving
metal Small Red 1996
WA30.06.2014
N N N N N N N NA NA NA 0 N NA N N N NA NA
6332009-10 O
23009Micro Paints,
No.SM-6, III Stage, PIE, Bengaluru-560 058
III StageI
Paints: ( water base primer, Distemper, Interior Emulsion, Exterior Emulsion,Oil
10.1 O-54Paint blending and mixing (Ball mill)
Small Orange 2005WA
31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
634Space Age Technology (India)
No.A-323, II Stage, PIE, Bengaluru- II Stage Elctroplating process 6342009-10 CL
-
Space Age Technology (India) Pvt Ltd,
No.A-323, II Stage, PIE, Bengaluru-560 058
II StageI
Elctroplating45 R-44
process involving
metal Small Red 2002
BA30.06.2007
N N N N N N N NA NA NA 0 N NA N N N NA NA
6352009-10 O
15133
Vishnu Hard Chrome Industries,
No.338,9th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electroplating (Hardchrome) 18.88 R-44
Industry or process involvingmetal
Small Red 2005BA
30.06.2022N N N N N N N NA NA NA 0.05 0.02 ST & SP N N Y NA Yes
6362009-10 CL
-
Dwaraka Industrial Enterprises,
No.Spl-11, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering with electroplating 130 R-44
Industry or process involving metal
Small Red 1980BA
30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6372009-10 O
13863
Nipra Industries Pvt Ltd.,(Formerly Aryes Graph O
Packs),
No.A-349, 9th Main Road, II Stage, PIE, Bangalore-560058,
II StageI
Manufacture P P caps172.67 O-35
Gravure printing, digital printing on
Small Orange 1986BA
30.09.2028N NA N N N N N NA NA NA 0.96 N NA N Y N NA Yes
6382009-10 CL
-Ganapa Industrial Enterprises,
No.185-B, III Phase, PIE, Bengaluru-560 058
III PhaseI
Power coating activity with degreasing & polishing
21.58 R-44Industry or process involving metal
Small Red 1998BA
30.06.2002N N N N N N N NA NA NA 0 N NA N N N NA NA
6392009-10 O
15276Industrial Metal Finishers,
No.118, III Phase, PIA, Bengaluru-560 058
III PhaseI
Electroplating88.78 R-44
Industry or process involvingmetal
Small Red 15/7/05BA
30.06.2025N N N N N N N NA NA NA 1 0.63 NA N Y Y NA Yes
6402009-10 CL
-Quality Wire Products,
No.485-5, IV Phase, PIA, Bangalore-560058
IV PhaseI
Wire drawing and pickling copper coated
81.2 R-51 Copper Smelter
Small Red ClosedBA
30.06.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N ST & SP N N N NA NA
6412009-10 CL
-Ashish Products,
No.A-18, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6422009-10 CL
-B.G.Deeps Chemicals Pvt Ltd,
No.47, III Phase, PIA, Bengaluru-560 058
III PhaseI
Chemical filling and trading C1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.09.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6432009-10 O
23694BMTC Depot-22,
No.481 to 483, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Bus Depot67.17 O-18
Automobile servicing, repairing and
Small Orange 2003BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 0.8 15 ST & SP ETP Y N N NA Yes
6442009-10 CL
-Balaji Foams,
No.B-122, II Stage, PIE, Bangalore -58
II StageI
Foam ProductsC1 O-80
Foam manufacturi
ngSmall Orange Closed
BA30.09.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6452009-10 CL
-Bangalore Drug Co,
No.419, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Pharmacuitical formulation C1 O-74
Pharmaceutical
formulationSmall Orange Closed
BA30.09.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6462009-10 O
21540Bentley & Remington,
No.473C, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Formulation of Pharmaceuticals- Tablets & Capsules
636.42 O-74Pharmaceutical formulation
Medium Orange 1990BA
30.09.2022N N N N N N N NA NA NA 1.6 1 ETP Y Y N NA Yes
6472009-10 CL
33160Bio Gen Extracts Pvt Ltd,
No.167/168, III Phase, PIA, Bengaluru-560 058
III PhaseI
R & D activityC1 R--58
Pharmaceutical (Bulk drug &Active
Small Red ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6482009-10 O
33269
BioOrganics & Applied Materials Pvt Ltd,
No.B-64/1, III Stage, PIE, Bengaluru-560 058
III StageI
R & D activity73.84 R-58
Pharmaceutical (Bulk drug &Active
Small Red 2002BA
30.06.2022N N N N N N N NA NA NA 0.1 0.01 ST & SP N N Y NA Yes
6492009-10 O
19912
Bio Pharma Drugs & Pharmaceuticals,
No.399, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Tablest & Syrups117.71 O-74
Pharmaceutical formulation
Small Orange 2000BA
30.09.2023N N N N N N N NA NA NA 0.3 0.05 ST & SP N N Y NA Yes
6502009-10 O
35239Biopharm Laboratories,
No.D-434, II Stage, PIE, Bangalore-560058
II StageI
Formulation of Pharmaceuticals 30.21 G-31
Pharmaceutical formulation
Small Green 1992BA
31.12.2027N NA N N N N N NA NA NA 0.1 N NA N Y N NA Yes
6512009-10 CL
12165Bisheshwar Galvanisers,
No.528, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Zinc galvanizing (Hot dip galvanizing) 62.59 R-44
Industry or process involvingmetal
Small Red 1994BA
30.06.2019Y 30.06.2015 N N N N N NA NA NA 0.4 0.02 ST & SP N N Y NA Yes
6522009-10 O
12867Ce-Chem Pharmaceuticals,
No.336, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Formulation of Pharmaceuticals 484.77 O-74
Pharmaceutical formulation
Small Orange 1988BA
30.09.2023Y 30.09.2023 N N N N N NA NA NA 2.4 0.4 NA N Y Y NA Yes
6532009-10 CL
-Chamundeshwari Chemicals ,
No.249, III Phase, PIA, Bengaluru-560 058
III PhaseI
Chemical tradingC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6542009-10 CL
-Aqua Carbons,
No.73, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Activated Carbon65 G-100 Activated
carbonSmall Green 2005
BA31.12.2013
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
6552009-10 O
21733
Dantal Hydraulics Pvt Ltd,No 221, 8th Main, 2nd Cross, III Phase, PIA,Bangalore – 560 058
III PhaseI
Assembling of Hydraulic power packs without generating trade
451 O-62Spray painting, paint baking, paint
Small Orange 2008BA
30.09.2029N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes
6562009-10 CL
-Dolar Equipments Pvt Ltd,
No.83, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Bakery equipment with spray painting 74 O-2
Bakery and confectionery units with
Small Orange 1/9/2000BA
30.06.2013C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
6572009-10 O
12522
Eshwari Textile Processing Pvt Ltd.,
No.109, 6th Main, III Phase, PIA, Bangalore-560058
III PhaseI
Textile processing Dyeing and washing 319.98 R-40
Yarn / Textile processinginvolving
Large Red 2005BA
30.06.2022Y 30.06.2018 N N N N N NA NA NA 2.5 34 ST & SP ETP Y N N NA Yes
6582009-10 O
15357Foam Products Polyurethane,
No.232, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering124.6 G-90
ovens / furnaces) Small Green 2007
BA31.12.2021
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes15357 BA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
6592009-10 O
24139Food Associates Bangalore,
No.B-448, I Stage, PIE, Bangalore-560058
I StageI
Tamrind powder73.15 G-55
Tamarind powder manufacturing
Small Green 1981BA
31.12.2027N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes
6602009-10 O
19520Forind Nutrients Pvt Ltd,
, No.V-53, II Stage, PIE, Bengaluru-560 058
II StageI
Animal feed / Poultry feeds 65.42 O-30
Fish feed, poultry feed and cattle feed
Small Orange 07.01.2004BA
30.09.2022N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes
6612009-10 CL
-Ganesh Pulvarisers,
No.C-20, II Stage, PIE, Bengaluru-560 058
II StageI
Pulverizing C1 O-26
involving ore
sintering, Small Orange Closed
BA30.09.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6622009-10 O
20810Giliyal Industries,
No.N-3, 5th cross, I Stage, PIE, Bangalore-560058
I StageI
Engineering with painting 37.09 O-62
Spray painting, paint baking, paint
Small Orange 1994BA
30.09.2029Y 30.06.2015 N N N N N NA NA NA 0.3 N NA N Y N NA Yes
6632009-10 CL Gram Mooliga Co Ltd,
No.V-51, II Stage, PIE, Bengaluru-560 058,
II StageI
Honey reprocessing37.56 W-51
Honey Processing Small White 2004
BA31.12.2015
N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes
6642009-10 CL
-Gurupriya Conductors,
No.B-64/2, III Stage,PIE, Bengaluru-560 058
III StageI
Hard rubber battery containers 19.59 O-73
Dry cell battery ( excludingmanufacturi
Small Orange 1983BA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes
6652009-10 O
-
Hi-Power Equipments (P) Ltd, ( formerly Text port
industries)
(P) Ltd, No.427, 12th Cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment stiching 906 G-72
Stitching/ Stitching ofshoe uppers/
Large Green 1988BA
31.12.2024N N N N N N N NA NA NA 16 N NA N Y N NA Yes
6662009-10 O
15666Hind Comp (P) Ltd,
No.6-A, III Phase, PIA, Bangalore-560058
III PhaseI
Alluminum cans with degrasing 79.62 O-17
Aluminium & copper extraction from
Small Orange 1978BA
30.09.2029Y 30.06.2014 N N N N N NA NA NA 0.45 0.5 ST & SP N N Y NA Yes
6672009-10 O
22818Hot Dip Galvanising,
No.B-305 & 306, II Stage, PIE, Bangalore-560058
II StageI
Zinc galvanizing61.01 R-41
Jelly filled Copper cables ,,Zinc Dross-
Small Red 1984BA
30.06.2024N NA N N N N N NA NA NA 0.3 0.1 NA N Y Y NA Yes
6682009-10 O
16976Industrial Rubber Products,
No.230, 11th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Rubber & Foot Wear Soles 54.87 G-41
Rubber goods industry (with gas
Small Green 2007BA
31.12.2020N N N N N N N NA NA NA 6.4 N ST & SP N N N NA Yes
6692009-10 CL
-Insulac Wires,
No.77, III Phase, PIA, Bangalore -58 III PhaseI
Cable manufacturing C1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6702009-10 CL
-International Machine Tools,
No.255, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitG-78
Switches without
electroplatinSmall Green Closed
BA30.09.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6712009-10 O
35204Johnson & Smith Co,
No.B-48, III Stage,PIE, Bengaluru-560 058
III StageI
Formulation of Pharmaceuticals 59.3 O-74
Pharmaceutical formulation
Small Orange 1992BA
30.09.2022N N N N N N N NA NA NA 0.3 0.02 NA N Y Y NA Yes
6722009-10 O
36827KHT Agencies Pvt Ltd,
No.305, IV Phase, PIA, Bangalore-560058,
IV PhaseI
Repair & Service station 64.32 O-18
Automobile servicing, repairing and
Small Orange 2001BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 2 2 ST & SP ETP Y N N NA Yes
6732009-10 CL
16766Kamath Transfermers Pvt Ltd,
No.B-124, 2nd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Transformer manufacturing with painting
148 O-69repairing/
manufacturing ( dry
Small Orange 1997BA
30.09.2008N N N N N N N NA NA NA 0 N NA N N N NA NA
6742009-10 CL
-Karnataka Consumer Products,
No.49, III Phase, PIA, Bengaluru-560 058
III PhaseI
Kitchen EquilmentsC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6752009-10 CL
-Karnataka Foods Corporation,
No.A-313, II Stage, PIE, Bangalore -58
II StageI
Confectionery items C1 O-2
confectionery units withproduction
Small Orange ClosedBA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6762009-10 CL
-
Kaveri Enamel & Allid Products,
No.B-113, II Stage, PIE, Bangalore II StageI
Powder coating 38 R-44
Industry or process involving metal
Small Red 1982BA
30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA NA
6772009-10 CL
-Kaveri Winery & Distilleries,
No.138, III Phase, PIA, Bengaluru-560 058
III PhaseI
DistilleryC1 R-60
molasses / grain /
yeast based) Small Red Closed
BA30.06.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6782009-10 CL
-Konica Mirror Co Pvt Ltd,
No.A-143, I Stage, PIE, Bengaluru-560 058
I StageI
Mirror ManufacturingC1 O-47
ng of mirror from sheet
glassSmall Orange Closed
BA30.09.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6792009-10 CL Lens Enterprises,
No.A-181, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering with painting 79 O-62
Spray painting, paint baking, paint
Small Orange 2003BA
30.09.2008N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
6802009-10 CL
11824
Turbotech Precision Engineering,
No.A-343, 9th Mian, II Stage, PIE, Bengaluru-560 058
II StageI
Turbains 1615 G-78
Switches without
electroplatinLarge Green 2007
BA31.12.2022
N C1 N C1 N C1 N NA NA NA 0 N NA N N N NA NA
6812009-10 O
25241
Madhur Pharma & Research Lab,
No.292-294, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Ayurvedic Formulation 319 O-19
Ayurvedic and homeopathicmedicines
Small Orange 1994BA
30.09.2022N N N N N N N NA NA NA 2.3 0.5 NA N Y Y NA Yes
6822009-10 O
20407Mahendra Labs Pvt Ltd,
No.371/372, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Formulation of Drugs335 O-74
Pharmaceutical formulation
Small Orange 1985BA
30.09.2023Y
30.09.2023N N N N N NA NA NA 0.8 0.1 NA N Y Y NA Yes
683 No.C-331, C-332, II Stage, PIE, II Stage Food colours Food and 6832009-10 CL
20150Mallya Fine Chem Pvt Ltd,
No.C-331, C-332, II Stage, PIE, Bengaluru-560 058
II StageI
Food colours 55.3 O-7
Food and food processingincluding
Small Orange 1986BA
30.09.2019N N N N N N N NA NA NA 0.8 2 NA N Y Y NA Yes
6842009-10 CL
-Mayer Industries,
No.C-307, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6852009-10 CL
-Mek Tek Engineers,
No.C-183, II Stage, PIE, Bengaluru-560 058
II StageI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
BA30.06.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6862009-10 O
27348Metal Storage Systems Pvt Ltd,
No.409, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering with spray painting and powder coating
841 G-97Powder coating on surface of furniture (3
Medium Green 2002BA
31.12.2025Y 30.06.2019 N N N N N NA NA NA 2.4 N NA N Y N NA Yes
6872009-10 CL
-Murthy & Co,
No.295, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6882009-10 CL
-Mysore Pharmaceuticals,
No.316, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Pharmacuitical formulation C1 O-74
Pharmaceutical
formulationSmall Orange Closed
BA30.09.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6892009-10 CL
-N.S.S. Engineering Pvt Ltd,
No.529, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit17.2 W-14
Engineering and fabricationunits (dry
Small White 2002BA
31.12.2010N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
6902009-10 CL
-Navahira Graphics,
No.C-305, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering Unit17.2 W-14
Engineering and fabricationunits (dry
Small White 2002BA
30.09.2017C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
6912009-10 O
32866Zonta Bauer Pvt Ltd
No.108/E1, 6th Main Road, 3rd Phase, PIA, Bengaluru-560058
III PhaseI
Waste Bins for municipal usage 115 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2016BA
31.12.2026N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
6922009-10 CL
-
Not-Con Fruit & Fodd Processing,
No.490, IV Phase,PIA,Bengaluru-560 058,
IV PhaseI
Food processingC1 O-7
food processingincluding
Small Orange ClosedBA
30.09.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6932009-10 CL
-Oceanic Engineering Co,
No.373, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6942009-10 CL
-
Pacific Pharmaceuticals Pvt Ltd,
No.309, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Ayurvedic Formulation 44.9 O-19
Ayurvedic and homeopathicmedicine
Small Orange 1985BA
30.09.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6952009-10 CL
-Peenya Polymers Pvt Ltd,
No.B-288, II Stage, PIE, Bangalore -58
II StageI
Synthetic resinC1 O-75 Synthetic
resinsSmall Orange Closed
BA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6962009-10 O Plasmix Limited,
No.404, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Plastic pellets46 G-32
Polythene and plastic processedproducts
Small Green 1997BA
31.12.2034N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes
6972009-10 CL
-Pranava Insulatators,
No.B-283, II Stage, PIE, Bengaluru-560 058
II StageI
Cable manufacturing C1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6982009-10 CL
-R.X Rubber Industries,
IV Phase, PIA, Bengaluru-560 058, IV PhaseI
Rubber ProductsC1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
6992009-10 CL
-Rakesh Foams,
No.B-23, I Stage, PIE, Bengaluru-560 058
I StageI
Foam ProductsC1 G-90
foam extrusion as
an allied Small Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7002009-10 CL
-Reliance Marketing,
No.198, III Phase, PIA, Bengaluru-560 058
III PhaseI
Cable manufacturing C1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7012009-10 CL
-Rhino Rubber Industries,
No.B-83, I Stage, PIE, Bengaluru-560 058
I StageI
Rubber ProductsC1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
30.06.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7022009-10 CL
13491
Rima Transformers and Conductors Pvt Ltd.,,
No.18-D, II Phase, PIA, Bangalore-560058,
II PhaseI
Transformers650.793 O-69
Transformer repairing/manufacturing ( dry
Medium Orange 1988BA
30.09.2021Y 30.06.2015 N N N N N NA NA NA 2.8 N NA N Y N NA Yes
7032009-10 CL
-S.N.Enterprises,
No.138, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7042009-10 CL
-Sameer Exports,
No.A-266, II Stage, PIE, Bengaluru-560 058
II StageI
GodownC1 G-72
Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2013N C1 N C1 N C1 N NA NA NA 0 N NA N N N NA NA
7052009-10 CL
-Sami Labs,
No.A-53, II Stage, PIE, Bengaluru-560 058
II StageI
Ayurvedic Formulation C1 O-19
Ayurvedic and homeopathicmedicine
Small Orange ClosedBA
30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7062009-10 O Sargur Ceramics Pvt Ltd,
No.B-119, I Stage, PIE, Bengaluru-560 058
I StageI
Ceramic products53.39 G-21
Ceramic colour manufacturing
Small Green 1990BA
30.09.2011N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
7072009-10 O
38731Selva Foods,
No.340-B, 9th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Manu of Redchilly,coriander,termaric powder
17.68 G-112Fragrance, flavours essence etc.
Small Green 1990BA
31.12.2100N N N N N N N NA NA NA 0.54 N ST & SP N N N NA Yes38731 rmaric powder essence etc.
for food BA N N N N N N N NA NA NA 0.54 N ST & SP N N N NA Yes
7082009-10 CL Serendip Associates Pvt Ltd,
No.B-111, III Stage, PIE, Bengaluru-560 058,
III StageI
Manufacture of defence Grade Shelter 137 O-62
Spray painting, paint baking, paint
Small Orange 2000BA
30.09.2017N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
7092009-10 CL
-
Sherief Paper & Pulp Products,
No.A-17, III Stage,PIE, Bengaluru-560 058
III StageI
pulp manufacturingC1 R-81
Paper ( waste paper
based Small Red Closed
BA30.09.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7102009-10 CL
-Shiva Extrusions (P) Ltd,
No.A-147, I Stage, PIE, Bengaluru-560 058
I StageI
Alluminum caps & Straps with degreasing
C1 R-44process
involvingmetal
Small Red ClosedBA
30.06.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7112009-10 CL
-Shrishma Chemicals Pvt Ltd,
No.349, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Chemical tradingC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.09.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7122009-10 CL
11640
Unitex Appearls Ltd. Unit-III,( formerly:,Snow White Hi-Tech
Laundrette)
Unit-III, No.252, 11th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment washing299.01 O-50
Mechanized laundry using oil fired
Small Orange 1998BA
30.09.2018Y 30.09.2017 N N N N N NA NA NA 10 50 ST & SP ETP Y N N NA Yes
7132009-10 CL
-Solar Automobiles,
No.135, III Phase, PIA, Bengaluru-560 058
III PhaseI
Automobile servicingC1 O-18
Automobile servicing, repairing and
Small Orange ClosedBA
30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7142009-10 CL
-Sona Garments & Processing,
No.22, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7152009-10 CL
-Sonarome Chemicals Pvt Ltd,
No.C-136, II Stage, PIE, Bengaluru-560 058
II StageI
Perfumery items C1 O-10
ng of tooth powder,
toothpaste, Small Orange Closed
BA30.09.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7162009-10 CL
-Southern Enterprises,
No.C-265, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7172009-10 CL Sree Raghavendra Spices,
No.166, 10th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Spice mfg21.6 G-44
Spice grinding (20 HP motor)
Small Green 1995BA
31.12.2014N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
7182009-10 CL
-Sri Ram Industries, N
No.B-33, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7192009-10 CL
-
Sri Rama Hot-Dip Galvanizers Pvt Ltd,
No.49a, III Phase, PIA, Bangalore -58 III PhaseI
galvanisingC1 R-44
process involving
metal Small Red Closed
BA30.06.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7202009-10 CL
-Sri Vasavi Traders,
No.14-A, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Wood Powder16 Closed Small Orange 2002
BA30.09.2009
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
7212009-10 CL
-Sri Vignesh Enterprises,
No.B-87, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.09.2017
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7222009-10 O
15658
Srushti Pharmaceuticals Pvt Ltd,
No.154, 10th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Formulation of Pharmaceuticals 180.26 O-74
Pharmaceutical formulation
Small Orange 1987BA
30.09.2022N N N N N N N NA NA NA 2.5 0.3 NA N Y Y NA Yes
7232009-10 CL
-Standard Engineering,
No.284, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.09.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7242009-10 CL
21078Stanmed Labs,
No.428, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Formulation of Pharmaceuticals 17.94 O-74
Pharmaceutical formulation
Small Orange 2001BA
30.09.2021N N N N N N N NA NA NA 1 0.1 ST & SP N N Y NA Yes
7252009-10 CL
21193Super Coat Paints Pvt Ltd,
No.A-51, 2nd Main raod, II Stage, PIE, Bangalore-560058
II StageI
Manufacture Paint 137 R-21
Manufacturing of paintsvarnishes, pigments
Small Red 1998BA
CLN N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
7262009-10 CL
-Suraj Enterprises,
No.557, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7272009-10 CL
-Swan Wash Tech,
No.9, I Stage, PIE, Bengaluru-560 058 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7282009-10 O
41914Teal Power Coatings,
No.49A, III Phase, PIA, Bangalore-560058,
III PhaseI
General Engineering with Powder coating 49.67 O-62
Spray painting, paint baking, paint
Small Orange 1993BA
30.09.2023Y 30.09.2015 N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
7292009-10 CL
-Tedimity Aeromatic Pvt Ltd,
No.B-377, I Stage, PIE, Bengaluru-560 058
I StageI
Aldehyde & Testers (Organic Chemicals) 25 R-25
chemicals and electrochemicals
Small Red 1996BA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7302009-10 CL
-Thumbe Engineering Services,
No.B-235, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering with painting 81.68 O-62
Spray painting, paint baking, paint
Small Orange 1999BA
30.09.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7312009-10 CL
-Tilrode Chemicals,
Tilrode Chemicals, No.A-288, II Stage, PIE, Bengaluru-560 058
II StageI
Chemical tradingC1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
732 No.B-293, II Stage, PIE, Bengaluru- II Stage kitchen cabinets Switches 7322009-10 CL
-Tuflan Interiors,
No.B-293, II Stage, PIE, Bengaluru-560 058,
II StageI
kitchen cabinetsC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7332009-10 CL
-Unicon Systems,
No.194/1, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering with spary painting 58.69 O-62
Spray painting, paint baking, paint
Small Orange 17/6/96BA
30.09.2010C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
7342009-10 CL
-United Technologies,
No.A-367, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7352009-10 CL
-Universal Special Abresvies ,
No.B-355, I Stage, PIE, Bengaluru-560 058
I StageI
abrasive materialsC1 G-91
of Adhesives and
adhesive Small Green Closed
BA30.09.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7362009-10 CL
15660Venkat Pharma,
No.220, 6th Main Raod, III Phase, PIA, Bangalore-560058
III PhaseI
Formulation of Ayurvedic Ointments (Pharmaceuticals)
56.67 O-19Ayurvedic and homeopathicmedicine
Small Orange 2001BA
30.09.2018N NA N N N N N NA NA NA 0.4 0.02 ST & SP N N Y NA Yes
7372009-10 CL
-
Vibromech Engineers & Services Ltd,
No.B-259, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit71.26 G-78
Switches without
electroplatinSmall Green 1/11/1996
BA31.12.2012
N N N N N N N NA NA NA 0 N NA N N N NA Yes
7382009-10 O Vyoma Switch Gear,
No.33 A/2 II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering Unit and Electroplating 91 R-44
process involving
metal Small Red 2007
BA30.06.2024
N N N N N N N NA NA NA 1.2 0.02 NA N Y Y NA Yes
7392009-10 CL
-Wash Well Processors,
No.17D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7402009-10 CL
-Washwell Processings,
No.143, III Phase, PIA, Bangalore -58 III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2000
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7412009-10 CL
17882Yaka International ,
No.B-69(A), II Stage, PIE, Bangalore-560058
II StageI
Perfume spray & after Shave 12.57 O-10
Manufacturing of tooth powder,toothpaste,
Small Orange 1994BA
30.06.2019N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
7422009-10 CL
-
A.B.Precission Toolings Pvt Ltd,
No.C-145, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7432009-10 CL
-
A K E Infra Structure Private Limited (Formerly Known as
A.K.Engineering),
No.424, II Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit339 G-78
Switches without
electroplatinSmall Green Closed
WA30.06.2002
N N N N N N N NA NA NA 0 N NA N N N NA NA
7442009-10 CL
-Aar Pee Electronics,
No.D-430, II Stage, PIE, Bengaluru-560 058
II StageI
Electronic componenets 9.14 W-14
Engineering and fabricationunits (dry
Small White 1992WA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA
7452009-10 O
32000Bioneeds India Pvt Ltd
No.3,I Main Road, I Stage, PIE, Bengaluru-560 058,
I StageI
R & D activity1115 R-83
Research and Analyticallaboratories
Large Red 2016BA
30.06.2021N N Y 31.12.2100 N N N NA NA NA 1.6 0.32 ST & SP N N Y NA Yes
7462009-10 O
-Accuspirals
No.D-425, 424, 423 II Stage, PIE, Bangalore -58
II StageI
Engineering Unit1118 G-78
Switches without
electroplatinLarge Green 1989
BA31.12.2034
N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
7472009-10 CL
-Accutech Enterprises,
No.450, 12th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit25 W-14
Engineering and fabricationunits (dry
Small White 2002WA
31.12.2012N N N N N N N NA NA NA 0.28 N ST & SP N N N NA NA
7482009-10 CL
10286Ace Designers Ltd,
No.A-49, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit39.3 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2001
N N N N N N N NA NA NA 0 N NA N N N NA Yes
7492009-10 O
12799Ace Multi Axes Pvt Ltd,
No 17 , Plot No, 467-469, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
General Engineering without Spray Painting
3090 G-10Carpentry & wooden furnituremanufacturi
Large Green 2006BA
31.12.2021Y
31.12.2025N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes
7502009-10 CL
-Active Microtek,
No.B-70(A), II Stage, PIE, Bengaluru-560 058,
II StageI
Sterilizing agent1078 R-58
Pharmaceutical (Bulk drug &Active
Small Red 2003BA
30.06.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7512009-10 CL
11718Adept Polymers,
No.B-121, 3rd Main, II Stage, PIE, Bengaluru-560 058
II StageI
Plastic injection moulding 1078 G-32
Polythene and plastic processedproducts
Large Green 1988BA
31.12.2022Y 31.12.2016 N N N N N NA NA NA 0.4 N NA N Y N NA Yes
7522009-10 CL
-Adit Sales & Services,
No.302, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7532009-10 O
34330Advith Industries,
No.B-150, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit18.7 W-14
Engineering and fabricationunits (dry
Small White 1995WA
31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
7542009-10 O
30833Aerosol Filters (P) Ltd,
No.B-200, II Stage, PIE, Bengaluru-560 058
II StageI
Air filters44.83 G-78
Switches without
electroplatinSmall Green 1982
BA31.12.2022
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
7552009-10 CL Agro Exports Inc,
No.C-77, III Stage,PIE, Bengaluru-560 058
III StageI
Bio pesticdites23 G-70
Formulation of Bio-Pesticides
Small Green 1998BA
31.12.2021N N N N N N N NA NA NA 0 N NA N Y N NA Yes
7562009-10 O
35189Airvent Pvt Ltd,
No.460, IV Phase, PIA, Bangalore-560058,
IV PhaseI
Engineering with spary painting 107.5 O-62
Spray painting, paint baking,
Small Orange 1983BA
30.09.2022N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes35189 paint baking,
paintBA N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes
7572009-10 CL
-Akshay Polypacks,
No.471-A2, IV Phase, PIA, Bangalore,
IV PhaseI
Corrugated BoxC1 G-9 Corrugated
BOXSmall Green Closed
BA31.12.2020
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7582009-10 O
15695Akshaya Enterprises,
No.C-59, 2nd Main, 2nd Cross, II Stage, PIE, Bengaluru-560 058
II StageI
Rubber Products11.9 G-41
Rubber goods industry (with gas
Small Green 1996BA
31.12.2020N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
7592009-10 O
40900Alfa Engineers,
No.C-275, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit41.42 G-78
Panel Board, Switches without electroplatin
Small Green 1995BA
31.12.2025N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
7602009-10 CL
-Allied Polymers,
No.407, IV Phase, PIA, Bangalore, IV PhaseI
Synthetic polymersC1 O-75 Synthetic
resinsSmall Orange Closed
BA31.12.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7612009-10 O
77285Allweld Engineering,
No.B-312, 7th Main, II Stage, PIE, Bangalore -58
II StageI
Hydraulic cylinders & Eng Equip 210 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1995BA
31.12.2033N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes
7622009-10 CL Alman Plastics Pvt Ltd,
No.A-196, 4th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Plastic injection moulding 121 G-32
Polythene and plastic processedproducts
Small Green 1997BA
31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes
7632009-10 O
29397Alufit (India) Pvt Ltd,
No.A-369, I Stage, PIE, Bangalore-560058
I StageI
Alluminum Fabrication and anodizing
285 R-44Industry or process involvingmetal
Small Red 2014BA
30.06.2021N Y N N N N N NA NA NA 0.8 0.6 NA N Y Y NA Yes
7642009-10 CL
32065Alutop,
No.A-146, I Stage,PIE, Bengaluru-560 058
I StageI
Alluminum caps & Straps 16.1 G-1
utensils fromaluminum circles by
Small Green 1990WA
31.12.2013N N N N N N N NA NA NA 1.4 N NA N Y N NA NA
7652009-10 O Amar Engineering,
No.B-245, II Stage, PIE, Bangalore -58
II StageI
Engineering Unit (Sheet metal fabrication)
44 G-46Steel furniture without spray
Small Green 1999BA
31.12.2023N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes
7662009-10 CL
-Amar Jyothi Plastics,
No.B-245, II Stage, PIE, Bangalore -58 II StageI
plastic injection Moulding C1 G-32
Polythene and plastic processedproducts
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7672009-10 CL
-Amarjyothi Plast,
No.B-189, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic injection moulding C1 G-32
Polythene and plastic processedproducts
Small Green ClosedBA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7682009-10 CL
-Anil Asbestos,
No.34-B, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Gasket MfgC1 G-86
including pre-cured
rubberSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7692009-10 CL
-Anil Gears
No.B-229, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit25.1 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1997WA
31.12.2015N N N N N N N NA NA NA 0.18 N NA N Y N NA NA
7702009-10 O
17157Animode Exports,
No.V-24(B), 6th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Stitching of ready made Garments 112 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2009BA
31.12.2022N N N N N N N NA NA NA 4.8 N NA N Y N NA Yes
7712009-10 O
27824Anssons Rubbers Pvt Ltd,
No.A-358, I Stage, PIE, Bengaluru-560 058
I StageI
Rubber componenent36.21 G-98
Automobile Tyre &Tubes/rubber tubes only
Small Green 1987BA
31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
7722009-10 O
23859
Anugraha Electronic Indsutries,
No.C-269, I Stage, PIE, Bengaluru-560 058
I StageI
Alluminium Fabricators (Aluminium Doors and Partition, fall
14.18 G-1Aluminum utensils fromaluminum circles by
Small Green 1988BA
31.12.2022N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
7732009-10 O
17033APD Exports,
No.B-291, II Stage, PIE, Bangalore -58
II StageI
Garment177.31 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2000BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
7742009-10 CL
-Apex Corporations,
Apex Corporations, No.28E, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2001
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7752009-10 CL
-Apex Textiles,
No.233, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2022C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7762009-10 O Arasu Enterprises,
No.B-241, 6th main, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit56 W-14
Engineering and fabricationunits (dry
Small White 2003WA
31.12.2012N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
7772009-10 CL
-Arfa Industries,
No. 103 , II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit23.8 W-14
Engineering and fabricationunits (dry
Small White 1996BA
31.12.2006N N N N N N N NA NA NA 0 N NA N N N NA Yes
7782009-10 O
21204Asian Paints Ltd,
No.B-32, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Paint Godown1008 G-32
Storage & distribution of paint & its products
Large Green 1998BA
31.12.2026Y 31.12.2019 N N N N N NA NA NA 5 N NA N Y N NA Yes
7792009-10 O
23026Asmet Industries,
No.503, IV Phase, PIA, Bangalore-560058,
IV PhaseI
General Engineering (Steel fabrication such as heat exchangers, cabins and
202 O-62Spray painting, paint baking, paint
Small Orange 1981BA
30.09.2023Y 30.09.2023
N
NA N N N NA NA NA 1.2 N ST & SP N N N NA Yes
7802009-10 CL
-Astra Engineering Pvt Ltd,
No.B-253, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
781 No.A-322, II Stage, PIE, Bengaluru- II Stage Engineering Unit Switches 7812009-10 CL
-Atec International,
No.A-322, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.09.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7822009-10 O
39868Atlanta Pumps,
No.487, D1-D2, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Manufacture of pumps 176 O-62
Spray painting, paint baking, paint
Small Orange 1986BA
30.09.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
7832009-10 CL
-Aumac Mounts & Accessories,
No.17A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7842009-10 CL
-Auto Tech Industries,
No.C-289, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7852009-10 O
25663Autograph,
No.C-84, III Stage, PIE, Bengaluru-560 058,
III StageI
Engineering Unit63.5 G-78
Switches without
electroplatinSmall Green 08.04.1986
BA31.12.2025
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
7862009-10 CL
-B.G.K. Precission Products,
No.C-89, III Stage,PIE, Bengaluru-560 058
III StageI
Precision Products48.88 G-78
Switches without
electroplatinSmall Green 2000
WA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7872009-10 CL
-B.P.Products,
No.B-28-A, 1st cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit32.16 G-78
Switches without
electroplatinSmall Green 2002
WA31.12.2013
N N N N N N N NA NA NA 0 N NA N N N NA NA
7882009-10 O B.P.Timber Products,
No.A-315, II Stage, PIE, Bangalore -58 II StageI
Timber products22.16 W-14
Engineering and fabricationunits (dry
Small White 1996BA
30.06.2018N N N N N N N NA NA NA NA N NA N N N NA Yes
7892009-10 O B.R.Industries,
No.B-122, 3rd Cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Silver and gold articles 61.53 O-96
Gold and Silver smithy (purification
Small Orange 2001BA
30.09.2029N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
7902009-10 O
24606Bajaj Packlines,
No.A-351, 8th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic carry bags and laminated pouches 195.65 O- 65
Silk screen printing, sari printing bywooden
Small Orange 2009BA
30.09.2030N N N N Y 31.12.2017 N NA NA NA 0.6 N NA N Y N NA Yes
7912009-10 O Balaji Footwear Pvt Ltd,
No.B-153, II Stage, PIE, Bengaluru-560 058
II StageI
Foot wear103.82 G-26
Leather foot wear and leatherproducts
Small Green 1999BA
31.12.2024N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
7922009-10 O Balaji Rubbers,
No.A-154, II Stage, PIE, Bengaluru-560 058
II StageI
Rubber componenent77 G-41
Rubber goods industry (with gas
Small Green 2001BA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
7932009-10 CL
Banashankari Engineering Pvt Ltd,
No.29-A-1, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Assembling of Havai Footwears 26.8 G-26
Leather foot wear and leatherproducts
Small Green 2004BA
31.12.2015N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes
7942009-10 O Banashankari Industries,
No.B-226, I Stage,PIE, Bengaluru-560 058
I StageI
Assembling of Havai Footwears 22.31 G-26
Leather foot wear and leatherproducts
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
7952009-10 CL
-Banavatty & Company,
No.238, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2016
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7962009-10 O
76186Banchalis Prints Pvt Ltd,
No.A-324, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic liner to bp,plastic sheets, roll 110 O-60
Polythene and plastic processedproducts
Small Orange 1999BA
15.1.2024N N N N Y 31.03.2017 N NA NA NA 0.9 N NA N Y N NA Yes
7972009-10 O
28121Bangalore Tool Room,
No.B-445, I Stage, PIE, Bengaluru-560 058,
I StageI
Tool punch99.05 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2002BA
31.12.2025N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
7982009-10 CL
-Bangalore Valves Pvt Ltd,
No.A-252, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit41.75 G-78
Switches without
electroplatinSmall Green 1984
BA31.12.2020
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
7992009-10 O
Bhanu Scientific Instruments Co,
No C-251, 5th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication of Laboratory Glass ware
188.08 G-21Glass , ceramic, earthenpotteries, tile
Small Green 1987BA
31.12.2020N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
8002009-10 CL
-Becmaco Company,
No.C-282, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit7 W-14
Engineering and fabricationunits (dry
Small White 2005BA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8012009-10 CL
-Beedi & Beedi Pvt Ltd,
No.A-285, II Stage, PIE, Bangalore -58 II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2020
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8022009-10 O Bell Scales Pvt Ltd,
No.B-190,5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Weighing scales120 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1980BA
31.12.2035N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
8032009-10 O
41527Bharath Printing & Packaging,
No.B-221 & 222 , II Stage, PIE, Bengaluru-560 058
II StageI
Corrugated Box27.95 G-9
Cardboard or corrugated box and
Small Green 1983BA
31.12.2025N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
8042009-10 CL
-Bharathi Conductors,
No.116, III Phase, PIA, Bengaluru-560 058
III PhaseI
Cable manufacturing 10 W-14
Engineering and fabricationunits (dry
Small White 1995BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
8052009-10 CL
-Bharathi Industries,
No.155, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit13 W-14
Engineering and fabrication
Small White 1995BA
31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- fabrication
units (dry BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8062009-10 O
Bharti Airtel Limited., (Formerly known as Bharathi
Telenet Ltd,)
No.335, IV Phase, PIA, Bengaluru-560 058,
IV PhaseTT
Telephone towerDG SET W-52
Diesel Generator sets (15KVA to 250
Small White 1999AA
31.12.2024N N N N N N N NA NA NA 0 N NA N N N NA Yes
8072009-10 O
12037Bhargava Rotopack Pvt Ltd,
No.79 & 80, III Phase, PIA, Bengaluru-560 058
III PhaseI
Printing lamination and corrugation of packing material
131 O-79Printing press &/or Screen Printing
Small Orange 1990BA
30.09.2029Y 30.9.2024 N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
8082009-10 O Bihani Containers,
No.C-132, II Stage, PIE, Bangalore -58 II StageI
Plastic container 8.27 G-32
nSmall Green 1982
BA31.12.2020
N N N N Y 16.06.2012 N NA NA NA 0.8 N NA N Y N NA Yes
8092009-10 O Bihani Plastics,
No.C-F(A), II Stage, PIE, Bangalore -58
II StageI
Plastic container 15 G-32
Polythene and plastic processedproducts
Small Green 1976BA
31.12.2020N N N N Y 16.06.2012 N NA NA NA 0.8 N NA N Y N NA Yes
8102009-10 O
15602Biyar Rubbers Pvt Ltd,
No.212, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of Tyre retreading material 323 O-70
Tyres and tubes vulcanization/ hot
Small Orange 1986BA
30.09.2029N NA N N N N N NA NA NA 0.8 N NA N Y N NA Yes
8112009-10 CL
-Blue Match Toolings,
No.SM-8, III Stage, PIE, Bengaluru-560 058,
III StageI
Engineering Unit9.19 W-14
Engineering and fabricationunits (dry
Small White 2004BA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8122009-10 CL
39605Bombay Engineering Indusry,
No.A-186, I Stage, PIE, Bengaluru-560 058
I StageI
Manufactures of inudstrial valves operators, bearing bushes, rotary
44 G-7Brass and bell metal utensilsmanufacturi
Small Green 1977BA
31.12.2027N N N N N N N NA NA NA 1 N NA N Y N NA Yes
8132009-10 O
11539Brahad Elastomers Pvt Ltd,
No.A-102(a), II Stage,PIE, Bengaluru-560 058
II StageI
Synthetic rubber moulded components 121.46 G-98
Automobile Tyre &Tubes/rubber tubes only
Small Green 1996BA
31.12.2021N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
8142009-10 O
24471Bremels Rubber Pvt Ltd,
No.128 & 129, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of Tyre retreading material & solid Tyre
1136.98 O-70Tyres and tubes vulcanization/ hot
Large Orange 1984BA
30.9.2021N NA N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
8152009-10 CL
14334Brilliant Electricals,
No.B-118, 3rd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Electrical control pannels 14.05 W-14
Engineering and fabricationunits (dry
Small White 1995BA
31.12.2013N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
8162009-10 CL
-Brilliant Packs,
No.C-77, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic sheet 16 G-32
Polythene and plastic processedproducts
Small Green 1998BA
31.12.2013Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA
8172009-10 O
36587Bulk Packaging Liners Pvt Ltd,
No.485/3, 24th Cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Plastic Liners356 G-79
Plastic sack bags, woven sack -- 10 10 15 -- 15 10
Small Green 2006BA
31.12.2027N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes
8182009-10 CL
-
C.D.Instrumentations Pvt Ltd, No.B-
No.B-254, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8192009-10 O C.K.Engineering Works,
No.69, 6th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit142.31 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1987BA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
8202009-10 CL
-
C.M.Equipments & Instruments (India) Pvt Ltd,
No.B-194, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit61.01 G-78
Switches without
electroplatinSmall Green 4/6/1981
BA31.12.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8212009-10 CL
-Campro Technologies Pvt Ltd,
No.Sb-117, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit21.3 W-14
Engineering and fabricationunits (dry
Small White 1997BA
31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes
8222009-10 CL
-Canara Pipes Pvt Ltd,
No.A-278, 6th Main, II Stage, PIE, Bengaluru-560 058
II StageI
PVC Pipes287 G-79
covered underPlastic
Small Green 1994WA
31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA NA
8232009-10 CL
-Cashwyn Corporation,
No.477, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8242009-10 O
24827Cauvery Enterprises,
No.C-274, I Stage, PIE, Bengaluru-560 058
I StageI
Wood packing4.69 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1994WA
31.12.2024N N N N N N N NA NA NA 0.03 N NA N Y N NA NA
8252009-10 CL
25251Ceebros Automation Pvt Ltd,
No.B-23, 1st cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Precision components 34.1 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2003BA
31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
8262009-10 O
Centraline Lubro Tech Engg Pvt Ltd,
No.A-173, IV cross, I Stage, PIE, Bengaluru-560 058
I StageI
Manfacture of Micro fog lubrication system, mist cool spray lube system and
70.39 W-1Assembly of air coolers/conditioners /repairing
Small White 1990BA
31.12.2021N N N N N N N NA NA NA 0.47 N NA N Y N NA Yes
8272009-10 CL
-Chamundi Creations,
No.A-149, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8282009-10 CL
-Chandru Engineering Works,
No.337, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit56.7 G-78
Switches without
electroplatinSmall Green 2005
BA31.12.2020
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8292009-10 O
31751
Chhaperia Electro Components,
No.270, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Assembling of electrocomponents 56.7 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1994BA
31.12.2026N N N N N N N NA NA NA 1 N NA N Y N NA Yes
830 No.A175 & 176, 4th Cross, I Stage, I Stage Kitchen Equipments furniture 8302009-10 O
33283Kargil Equipment
No.A175 & 176, 4th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Kitchen Equipments1014 G-46
furniture without spray
Large Green 2017BA
31.12.2026N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes
8312009-10 CL
-Chitra Rubbers Pvt Ltd,
No.B-241, II Stage, PIE, Bengaluru-560 058
II StageI
Rubber productsC1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8322009-10 CL
-Circuit Technologies,
No.B-168, II Stage, PIE, Bengaluru-560 058
II StageI
PCB manufacture 48 G-78
Switches without
electroplatinSmall Green 1993
BA31.12.2000
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
8332009-10 CL
-Comsta Forms Pvt Ltd,
No.A-268, II Stage, PIE, Bangalore -58 II StageI
Foam ProductsC1 G-90
foam extrusion as
an allied Small Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8342009-10 CL
-Concerned Tools ,
No.C-97, III Stage,PIE, Bangalore III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8352009-10 CL
-Corinthia Packaging,
No.B-85, I Stage, PIA, Bengaluru-560 058,
I StageI
Corrugated Box25.5 G-9
corrugated BOX Small Green 1993
BA31.12.2012
N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
8362009-10 O Cosmos Engineering,
No.B-246, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit61.44 G-78
Switches without
electroplatinSmall Green 2003
BA31.12.2025
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
8372009-10 CL
-Cosmos Tools,
No.C-338, I Stage, PIE, Bangalore, I StageI
Engineering Unit19 W-14
Engineering and fabricationunits (dry
Small White 2004BA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes
8382009-10 CL
-Crystal Home Care Products,
No.B-90, I Stage, PIE, Bangalore I StageI
Kitchen EquilmentsC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8392009-10 O Danam Electronics,
No.Sb-106, I Stage, PIE, Bengaluru-560 058,
I StageI
Sheet metal pressed componenets 11.61 W-14
Engineering and fabricationunits (dry
Small White 1977BA
31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
8402009-10 O
32744Thacker Sales Corporation
No.271, 8th Cross, 3 Main, IV phase, PIA, Bengaluru-560058
IV PhaseI
Cashew kernal processing and packing
770 O-77Cashew nut processing Medium Orange 2016
BA30.09.2022
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
8412009-10 CL Dash Hydraulines Pvt Ltd,
No.Sb-162, I Stage, PIE, Bangalore I StageI
Manufacture of Lubricants pumps, hydralic equipments
4.45 G-77Manufacture of Motor & Pumpswithout
Small Green 1980BA
31.12.2010N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
8422009-10 CL
-Deepak Industries,
No.25/26, 5th Mian, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit32.59 G-78
Switches without
electroplatinSmall Green 2003
BA31.12.2012
N N N N N N N NA NA NA 0 N NA N N N NA Yes
8432009-10 CL
-Delta Fashions,
No.A-187/188, 4th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Garment75 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2001BA
31.12.2014N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
8442009-10 O Delta Fashions Unit - III,
Unit - III, No.110, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment78 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2001BA
31.12.2021N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
8452009-10 O Delta Fashions Unit-IV,
Unit-IV, No.190-A, I Stage, PIE, Bangalore,
I StageI
Garment91 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2001BA
31.12.2021N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes
8462009-10 O Deshmesh Engineering,
No.D-423, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2005
BA31.12.2021
N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
8472009-10 O
15362Design Crafts,
No.63, 4th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
General Engineering Unit 171 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2004BA
31.12.2022N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
8482009-10 O
28255
Devaki Engineering Enterprises,
No.396, 3rd Main. 11th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Battery manu unit90.82 O-73
battery ( excluding
manufacturiSmall Orange 1995
BA31.12.2025
N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
8492009-10 O
Diamond Dies Manufacturing Corporation Ltd,
No.83, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2003
BA31.12.2021
N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes
8502009-10 CL
-Digvijaya Enterprises,
No.M-413, I Stage, PIE, Bengaluru-560 058
I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2020C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8512009-10 CL
-Dimensions,
No.C-277, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2015
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8522009-10 CL Dinesh Exports,
No.B-378, I Stage, PIE, Bangalore -58 I StageI
Garment23.42 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1991BA
31.12.2020N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
8532009-10 O
26325Ducom,
No.Sb-113, I Stage, PIE, Bengaluru-560 058
I StageI
Manufacturing of Metal and Non-metal components for Aerospce and Non-
51.71 G-7 Brass and bell metal utensilsmanufacturi
Small Green 10.11.1975BA
31.12.2025N N N N N N N NA NA NA 0.88 N NA N Y N NA Yes
8542009-10 O
22942Ducom Instruments Pvt Ltd,
No.477-A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Assembling of testing equipments (Engineering Unit)
501.49 G-10Carpentry & wooden furniture
Medium Green 1994BA
31.12.2023N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes22942 (Engineering Unit) furniture
manufacturiBA N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes
8552009-10 CL
-Dustven Pvt Ltd,
No.A-175/176, I Stage, PIE, Bengaluru-560 058,
I StageI
Pollution control equipments 73.37 G-78
Switches without
electroplatinSmall Green 1991
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8562009-10 CL
-Dyanakesh Tools & Devices,
No.355, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BAC1
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
8572009-10 CL
-Dynalite,
No.V-48, II Stage, PIE, Bangalore -58 II StageI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
WAN
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
8582009-10 CL
-Eagle Graphics,
No.B-206, II Stage, PIE, Bengaluru-560 058
II StageI
Sign BoardsC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8592009-10 CL
-Electrical And Allied Products,
No.B-88/2, I Stage, PIE, Bengaluru-560 058,
I StageI
Elctric control pannel12.7 W-14
Engineering and fabricationunits (dry
Small White 2002WA
31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
8602009-10 O
Electronic Investment & Devices,
No.484, IV Phase, PIA, Bangalore, IV PhaseI
UPS System78 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
8612009-10 O Electrogear,
No.45, I Stage, PIE, Bangalore, I StageI
Assembling of electropanels 24.36 W-14
Engineering and fabricationunits (dry
Small White 1997BA
31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes
8622009-10 CL
-Elmec Engineers,
No.14-A, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8632009-10 CL
-Elrke Systems Pvt Ltd,
No.A-322, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit10 W-14
Engineering and fabricationunits (dry
Small White 1988BA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8642009-10 CL
-Enamellers & Engineers,
No.446, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8652009-10 CL
-Engineering Enterprises,
No.437-A, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8662009-10 CL
-Engineering Equipments,
No.131, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit29.9 G-78
Switches without
electroplatinSmall Green 1969
BA31.12.2010
C1 N C1 N C1 N C1 NA NA NA 0.2 N ST & SP N N N NA NA
8672009-10 O
Engineering Steel Fabricating Works,
No.161, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit20 W-14
Engineering and fabricationunits (dry
Small White 1985BA
31.12.2013N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
8682009-10 CL
-
Engineers Steel Fabricating Works,
No.161, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Fabrication unit20 W-14
Engineering and fabricationunits (dry
Small White 1995BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
8692009-10 O Equipments & Systems,
No.70/71, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
WA31.12.2021
N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
8702009-10 CL
-Escon Jyothi Pvt Ltd,
No.485-C, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2015
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8712009-10 CL
-Ess Flexi Tubes Pvt Ltd,
No.53, 4th Main Road, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit19.88 W-14
Engineering and fabricationunits (dry
Small White 2001WA
31.12.2012N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
8722009-10 CL
-Ess Vee Engineering,
No.508/1, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit71.52 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2015
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
8732009-10 O Evgrien,
No.C-65, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit36.31 W-14
Engineering and fabricationunits (dry
Small White 1992WA
31.12.2020N N N N N N N NA NA NA 0.24 N NA N Y N NA NA
8742009-10 CL
-
Executive Appareal Processors,
No.376, I Stage, PIE, Bengaluru-560 058,
I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8752009-10 O
12727Fashion Matrix Overseas,
No.284, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment308 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2004WA
31.12.2027N N N N N N N NA NA NA 4.8 N NA Y Y N NA NA
8762009-10 O Fashion Power,
No.10, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment78 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
8772009-10 O FDC Ltd,
No.A-7, III Stage, PIE, Banglaroe-58, III StageI
Distribution of Pharmceuticals 41.92 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.20213
N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
8782009-10 CL
-Fibre & Fabrics International,
No.SB-14, I Stage,PIE, Bengaluru-560 058
I StageI
Garment78 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2004BA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
879 No.A-282, II Stage, PIE, Bengaluru- II Stage Fiber sheets Switches 8792009-10 CL
-Fibre Shells Ltd,
No.A-282, II Stage, PIE, Bengaluru-560 058
II StageI
Fiber sheetsC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8802009-10 CL
-Fibres & Fabrics International,
No.90A, II Phase, PIA, Bangalore, II PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8812009-10 CL
-
Fibres & Fabrics International Pvt Ltd,
No.124, III Phase, PIA, Bangalore III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8822009-10 CL
-Fibres Foils Ltd,
No.A-181, I Stage, PIE, Bengaluru-560 058
I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8832009-10 CL
-Filt Crafts Pvt Ltd,
No.B-80, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8842009-10 CL
-Fine Crafts,
No.250, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2019
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8852009-10 CL Fine Plastics,
No.53, 4th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Plastic injection moulding 198 G-32
Polythene and plastic processedproducts
Small Green 2009WA
31.12.2013N N N N N N N NA NA NA 0.3 N ST & SP N N N NA NA
8862009-10 O
24117
Fine Tools India Pvt Ltd., Unit-I,
No.449-P, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Plastic injection moulding 74.23 G-32
Polythene and plastic processedproducts
Small Green 2008BA
31.12.2034N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
8872009-10 O Finetech Toolings,
No.V-16, Next To C-177, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit71.22 G-78
Switches without
electroplatinSmall Green 1995
BA31.12.2025
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
8882009-10 CL
-Flexo Tech Products,
No.B-16, I Stage, PIE, Bengaluru-560 058,
I StageI
Machine component46.89 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2002BA
31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
8892009-10 CL Fluro Light Pvt Ltd,
No.M-11, I Stage, PIE, Bengaluru-560 058
I StageI
Lamp assembly45.83 G-78
Switches without
electroplatinSmall Green 1999
BA31.12.2010
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
8902009-10 CL
-Fluro Start Pvt Ltd,
No.A-153, II Stage, PIE, Bangalore II StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8912009-10 CL
-Fluro Start Pvt Ltd -
No.A-418, II Stage, PIE, Bengaluru-560 058
II StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8922009-10 O
32407Fortiforie Plastics Pvt Ltd,
No.B-43, III Stage,PIE, Bengaluru-560 058
III StageI
Thermocol 68 O-67
Thermocol manufacturing ( withboiler)
Small Orange 1991BA
30.09.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
8932009-10 O Fortune Packaging Pvt Ltd,
No.A-33, II Stage, PIE, Bangalore II StageI
Corrugated Box78 G-9
Cardboard or corrugated box and
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
8942009-10 CL
-G-Max Acids & Chemicals,
No.322, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Chemical Trading C1 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8952009-10 CL
-G.K.S. India,
No.C-217, I Stage, PIE, Bengaluru-560 058
I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2023C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
8962009-10 CL
-G.R.V. Mercandising,
No.A-353, II Stage, PIE, Bengaluru-560 058,
II StageI
Corrugated box17.2 G-9
Cardboard or corrugated box and
Medium Green 2003BA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA
8972009-10 O Ganesh Coil Works,
No.23-A, 1st cross, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Transformer and electric chokes assembly
157.82 G-85Transformer assembly unit(industrial
Small Green 1989BA
31.12.2023N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
8982009-10 O
85262Gaviranga Engineering Works,
No.84, 2nd Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication and engineering unit 78 G-93
Manufacturing of nuts and boltswith cold
Small Green 2004WA
31.12.2034N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
8992009-10 CL
-Gaviranga Engineering Works,
N0.408, IV Phase,PIA,Banglore-58, IV PhaseI
Engineering Unit14.80 W-14
Engineering and fabricationunits (dry
Small White 1986WA
NN N N N N N N NA NA NA 0 N NA N N N NA NA
9002009-10 O
Geekay Tarpaullins & Polymers (P) Ltd,
No.B-142, 3rd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Tarpaullins10.32 G-15
Cotton spinning and weaving(small scale)
Small Green 2003BA
31.12.2034N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes
9012009-10 CL Gem Threads Industries,
No.306, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Nylon thread weaving 47.38 G-78
Switches without
electroplatinSmall Green 2000
BA31.12.2015
N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes
9022009-10 O
24125General Magnetics,
No.C-83, II Stage, PIE, Bengaluru-560 058,
II StageI
Relays23 W-14
Engineering and fabricationunits (dry
Small White 1976BA
31.12.2012N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
9032009-10 CL
28012Gera Auto Industries,
No.A-6, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit52.87 G-78
Switches without
electroplatinSmall Green 1974
BA31.12.2002
N N N N N N N NA NA NA 0 N NA N N N NA Yes28012 electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA Yes
9042009-10 CL
-Girimaji & Sons,
No.5, III Phase, PIA, Bangalore III PhaseI
Fabrication unit9.6 W-14
Engineering and fabricationunits (dry
Small White 1974BA
31.12.2015C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
9052009-10 O Giri Engineering Pvt Ltd,
No 25-E, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Fabrication unit133 G-78
Switches without
electroplatinSmall Green 1991
BA31.12.2035
N N N N N N N NA NA NA 0.32 0.43 NA N Y N NA Yes
9062009-10 O
40802
Girish Paper Packaging Pvt Ltd, ,
No.217, III Phase, PIE, Bengaluru-560 058,
III PhaseI
Corrugated Box155 G-9
Cardboard or corrugated box and
Small Green 1990BA
31.12.2025N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
9072009-10 CL
-Golani & Company,
No.B-30, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9082009-10 CL Golden Profile,
No.B-158, II Stage, PIE, Bengaluru-560 058,
II StageI
Hydraulic fittings49.11 G-78
Switches without
electroplatinSmall Green 1994
BA31.12.2013
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
9092009-10 CL
-Golden Steel Industries,
No.111, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit78 G-78
electroplating/ Control
panelSmall Green 2004
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9102009-10 CL
-
Gowri Shankar Engineering Industries,
I Stage, PIE, Bengaluru-560 058 I StageI
Engineering UnitC1 G-78
equipment and power
devicesSmall Green Closed
BA31.12.2015
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9112009-10 O Growell Cnc Systems,
No.C-438, I Stage, PIE, Bangalore, I StageI
Engineering Unit51 G-78 manufacturi
ng/Small Green 2002
WA31.12.2004
N N N N N N N NA NA NA 0.05 N NA N Y N NA NA
9122009-10 O
27543Gupta Electrical Indsutries,
No.158, III Phase, PIA, Bengaluru-560 058
III PhaseI
Fabrication and engineering unit 270 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1981BA
31.12.2025N N N N N N N NA NA NA 2.8 N NA N Y N NA Yes
9132009-10 O
Guruson Engineering Enterprises,
No.C-26, 2nd Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Transformers11 W-14
Engineering and fabricationunits (dry
Small White 1994WA
31.12.2023C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.48 N NA N Y N NA NA
9142009-10 O
H.R.Engineering Works Pvt Ltd., (Formerly known as H.R.Engineering Works),
No.B-224, II Stage, PIE, Bengaluru-560 058,
II StageI
(Fabrication work) Engineering Unit 53 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1982BA
31.12.2023N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
9152009-10 O Hallidon Industries ,
No.B-39, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit7.56 W-14
Engineering and fabricationunits (dry
Small White 2004BA
31.12.2016N N N N N N N NA NA NA NA N NA N N N NA Yes
9162009-10 CL
-Hampa Industry,
No.V-7, 1st A Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit6.56 W-14
Engineering and fabricationunits (dry
Small White 1995BA
31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9172009-10 O
31676Hanuman Weaving Factory,
No.473/B, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Silk weaving 89 G-15
Cotton spinning and weaving(small scale)
Small Green 2006BA
31.12.2026N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
9182009-10 CL
-Harsha Packaging ,
No.A-37, II Stage, PIE, Bengaluru-560 058
II StageI
Corrugated BoxC1 G-9
Cardboard or corrugated box and
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9192009-10 CL
-Heat Core Enterprises,
No.35, III Phase, PIA, Bengaluru-560 058
III PhaseI
Heat treatment activity on job work and oil componenets only
24 O-63Engineering Industries with HeatTreatment,
Small Orange 30/6/10BA
31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9202009-10 CL
-Hegade Engineering Indsutry,
No.C-135 A, II Stage, PIE, Bangalore II StageI
Engineering Unit8.62 W-14
Engineering and fabricationunits (dry
Small White 1990BA
C1N N N N N N N NA NA NA 0 N NA N N N NA NA
9212009-10 CL Hi-Tech Accumulation,
No.B-231, II Stage, PIE, Bengaluru-560 058,
II StageI
PVC Separators23.17 G-79
covered underPlastic
Small Green 2000BA
31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
9222009-10 CL
-
Hi-Tech Supports (India) Pvt Ltd,
No.A-28, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9232009-10 O
30511
Twivi Technology Pvt Ltd., (Formerly known as Hi-Tech
Times),
No.A-352(B), 8th Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit269 G-18
Brass and bell metal utensilsmanufacturi
Small Green 1992BA
31.12.2024N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
9242009-10 CL
-Hidri Tools Pvt Ltd,
No.535, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering with spary painting 47.22 O-62
Spray painting, paint baking, paint
Small Orange 1991BA
30.09.2007N N N N N N N NA NA NA 0 N NA N N N NA NA
9252009-10 O
75304
Capro Labs Exports India Pvt Ltd,
No.A-109, II Stage, PIE, Bengaluru-560 058
II StageI
Ayurvedic Formulation 34.18 O-6
Ayurvedic and homeopathic medicines
Small Green 2004BA
31.12.2028N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes
9262009-10 O
11518
Chempharm Industrial Vessels,
No.512, IV Phase, PIA, Bangalore-560058
IV PhaseI
Process equipments & Fabrication items 51.47 O-62
Spray painting, paint baking, paint
Small Orange 1996BA
30.09.2022N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
9272009-10 CL Explora Marbles,
No.441/442, IV Phase, PIA, Bangalore-560058
IV PhaseI
Granite cutting and polishing 55.75 G-56
Cutting, sizing and polishing ofmarble
Small Green 1992BA
30.09.2019N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes
928Govind Granites ( Formerly
No.347/348, IV Phase,PIA, Bengaluru- IV Phase Granite cutting and sizing and 9282009-10 CL
-
Govind Granites ( Formerly Gayathri Granites (P) Ltd,)
No.347/348, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Granite cutting and polishing 149 G-56
sizing and polishing of
marble Small Green 2006
BA30.09.2010
N N N N N N N NA NA NA 0 N NA N N N NA NA
9292009-10 O
17999Global Food Specialities,
No.529, IV Phase, PIA, Banglaore-58 IV PhaseI
Food flavours 76.84 O-62
Spray painting, paint baking, paint
Small Orange 2005BA
30.09.2022N N N N N N N NA NA NA 0.6 0.4 ST & SP N N Y NA Yes
9302009-10 CL
-Hindustan Feeds,
No.A-287, II Stage, PIE, Bengaluru-560 058
II StageI
Poultry feeds 42.43 O-30
poultry feed and cattle
feedSmall Orange 2004
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9312009-10 CL
-
Integrated Electric Company Pvt Ltd,
No.B-46, III Stage, PIE, Bengaluru-560 058
III StageI
Engineering Unit63.96 G-78
Switches without
electroplatinSmall Green 2003
BA31.12.2003
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9322009-10 CL
-
Kayanathu Herbals & Aromatics (P) Ltd,
No.470a, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Ayurvedic Formulation C1 O-19
Ayurvedic and homeopathicmedicine
Small Orange ClosedBA
31.12.2018C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9332009-10 O
15240MPP Technologies Pvt Ltd,
No.A-153 & 154, 3rd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering with spary painting 114 O-62
Spray painting, paint baking, paint
Small Orange 1982BA
30.09.2022Y 30.09.2019 N N N N N NA NA NA 1 N NA N Y N NA Yes
9342009-10 O Parijatha Floorings,
No.1-D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Mosaic Tiles170 G-73
Inter locking paving blocks/Manual and
Small Green 1983BA
31.12.2035N N N N N N N NA NA NA 0.32 NA NA N Y N NA Yes
9352009-10 CL
-Spa Labs,
No.23, 13th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Ayurvedic Formulation 29 O-19
Ayurvedic and homeopathicmedicine
Small Orange 2003BA
31.12.2016N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
9362009-10 CL
12781Union Pressings Pvt Ltd,
No.265, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Fabrication 453 O-62
Spray painting, paint baking, paint
Small White 1984BA
30.09.2017N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
9372009-10 O Yes Bee Auto Industries,
No.89, 8th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Precisoin turned componenent 15 W-14
Engineering and fabricationunits (dry
Small White 2008BA
31.12.2013N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
9382009-10 CL
-High Tech Fittings,
No.C-431, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication unit42.4 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2001BA
31.12.2006N N N N N N N NA NA NA 0 N NA N N N NA Yes
9392009-10 O Hindsutan Furniture Works,
No.234, Iii Phase, PIA, Bangalore III PhaseI
Fabrication unit78 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
9402009-10 CL
-Hindustan Lamps,
No.B-32, I Stage, PIE, Bengaluru-560 058
I StageI
Electric BulbsC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9412009-10 CL
-Honey Hill Synergy Systems,,
N0.365,IV Phase,PIA,Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2021
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9422009-10 O Hotel Gurukrupa,
No.P-1A, 14th corss, III Stage,PIE, Bangalore
III StageHospital
ity
Hotel 23 G-3
confectionery / sweetsproducts
Small White 2000BA
31.12.2019N N N N N N N NA NA NA 2 N NA N Y N NA Yes
9432009-10 CL
-
Hydraulics India Services Pvt Ltd,
No.C-288, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BA31.12.2018
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
9442009-10 O
Hydraulics India Services Pvt Ltd,
No.C-294, 8th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Reconditioning and manufacture of hydraulic cyclinders or earth moving
96.35 G-60Repairing, cleaning, degreasing, painting and
Small Green 1999BA
31.12.2021N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes
9452009-10 CL
-Hydro Controls (P) Ltd,
No.49b, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BAC1
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
9462009-10 O Hydrolines.,
No.497-C,IV Phase,PIA,Bengaluru-560 058
IV PhaseI
Hose assembly172 G-86
Tread rubber including pre-curedrubber
Small Green 1982BA
31.12.2018N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
9472009-10 O Hygrade Steels,
No.B-183, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
WA31.12.2021
N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
9482009-10 CL
-I.J.Machines,
No.8, I Stage, PIE, Bengaluru-560 058 I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9492009-10 O India Flexibles,
No.SB-58, I Stage, PIE, Bengaluru-560 058,
I StageI
Hydraulic hose assembly 44.3 W-13
Electrical and electronic item
Small White 2003BA
31.12.2013N N N N N N N NA NA NA NA N NA N N N NA Yes
9502009-10 O Indian Fused Quartz Pvt Ltd,
No.A-110, II Stage, PIE, Bengaluru-560 058
II StageI
laboratory quartz article 3.86 G-108
Fiber glass molding, Fiber Glass reinforced
Small Green 1979BA
31.12.2020N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes
9512009-10 O
21735Indian High Vaccum Pumps,
No.B-28, I Stage, PIE, Bengaluru-560 058
I StageI
Assembly of vaccume pumps 51.58 G-77
Manufacture of Motor & Pumpswithout
Small Green 1979BA
31.12.2023N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
9522009-10 O
Indira Rubber & Plastic Pvt. Ltd.,
No.473,B-1, 12th Cross, IV Phase,PIA,Bengaluru-560 058
IV PhaseI
Battery containers 324 O-73
battery ( excluding
manufacturiSmall Orange 1988
WA31.12.2022
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NAmanufacturi WA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
9532009-10 CL
12420
Cargotech India Private Limited (Multi Assembly Unit),
No.10-B, II Phase, PIA, Bangalore-560058.
II PhaseI
Engineering with spary painting 1100 O-62
Spray painting, paint baking, paint
Large Orange 1989BA
30.09.2017N N N N N N N NA NA NA 2.5 N NA N Y N NA Yes
9542009-10 CL
-Indo Motors,
KIADB 100 Feet Road, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering with spary painting 9.38 O-18
Automobile servicing,repairing and painting
Small Orange 2010BA
30.09.2013N N N N N N N NA NA NA 0.4 2 NA N Y Y NA Yes
9552009-10 O Indus Control & Automation,
No.B-92, 2nd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit (Weigh feeder, Batching plant, belt weigher & filling
67.1 G-7Brass and bell metal utensilsmanufacturi
Small Green 2002WA
31.12.2022N N N N N N N NA NA NA 0.56 N NA N Y N NA NA
9562009-10 O Industrial Automation,
No.12, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BA31.12.2021
N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
9572009-10 O
26597
Industrial Research Corporation,
No.175/176, III Phase, PIA, Bengaluru-560 058
III PhaseI
Ball point pen refills58.91 W-17
Fountain pen manufacturing
Small White 1991BA
31.12.2025N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
9582009-10 O
17011
Infusil Glasstech Machines Manufacutrers,
, No. B-114, III Phase,PIA, Bengaluru-560 058
III PhaseI
Laboratory ware includingglass blowing
46 W-43Laboratory ware includingglass
Small White 1992BA
31.12.2020N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
9592009-10 O Infusil India Pvt Ltd
No.174, 11th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
laboratory glass wares143 G-108
Fiber glass molding, Fiber Glass
Small Green 1992WA
31.12.2034N N N N N N N NA NA NA 0.48 N NA N Y N NA NA
9602009-10 CL
-Innova Polytex,
No.423, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
ResinsC1 O-75 Synthetic
resinsSmall Orange Closed
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9612009-10 CL
-Innova Polytex Pvt Ltd,
No.A-9, I Stage,PIE, Bengaluru-560 058
I StageI
Printed lainatd pouches 54.4 G-32
and plastic processedproducts
Small Green 1998BA
31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9622009-10 O Innovative Equipment,
No.B-123, 3rd Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit29.2 G-78
Switches without
electroplatinSmall Green 1996
BA31.12.2012
N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
9632009-10 O Insufrac Refracteries,
No.345,IV Phase, PIA ,Bengaluru-560 058,
IV PhaseI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
BA31.12.2021
N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes
9642009-10 CL
-Insupac Refractories,
No.345, IV Phase, PIA, Bangalore, IV PhaseI
Ceramic productsC1 O-22
Ceramics and Refractories
Small Orange ClosedBA
31.12.2021C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9652009-10 CL
-
Integrated Process Automation Pvt Ltd,
No 497/A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Motor assembly68 G-77
of Motor & Pumpswithout
Small Green 1989BA
31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9662009-10 CL
-
International Chemicals, No.A-46, II Stage, PIE, Bengaluru-
560 058
No.A-46, II Stage, PIE, Bengaluru-560 058
II StageI
plastic5.6 Closed Small Green 1979
BA31.12.2018
C1 N C1 N Y 16.06.2009 C1 NA NA NA 0 N NA N N N NA NA
9672009-10 CL
-International Machine Tools,
No.255, Iv Phase, PIA, Bangalore, IV PhaseI
Engineering Unit39 G-78
Switches without
electroplatinSmall Green 1991
BAC1
N N N N N N N NA NA NA 0 N NA N N N NA NA
9682009-10 CL
-Intigraters,
No.B-302, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2024
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9692009-10 O IPA Engineering Pvt Ltd,
No.447, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electronic Weighing System 123 G-78
Switches without
electroplatinSmall Green 1993
WA31.12.2021
N N N N N N N NA NA NA 0.17 N NA N Y N NA NA
9702009-10 CL
-Ispl Systems Pvt Ltd,
No.V-3, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2020
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9712009-10 CL
16468J.B.C Garments Pvt Ltd,
No.219, 11th Main , 2nd cross, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment463.99 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1999BA
31.12.2024Y 31.12.2016 N N N N N NA NA NA 8 N STP N N N NA Yes
9722009-10 O J.K.Lines,
No.530, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Coils Transformers8.83 G-85
Transformer assembly unit(industrial
Small Green 1991WA
31.12.2023N N N N N N N NA NA NA 0.32 N ST & SP N N N NA NA
9732009-10 O J.M.T Ventoids Pvt Ltd,
No.B-69, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit80 W-14
Engineering and fabricationunits (dry
Small White 1993BA
31.12.2019N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
9742009-10 CL
-J.S.Enterprises,
No.307, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit78 G-78
Switches without
electroplatinSmall Green 2004
WACL
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
9752009-10 CL
-Jain Raising ,
No.Sb-46, I Stage, PIE, Bangalore, I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2000
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9762009-10 CL
-Jay-Pee Shoes Pvt Ltd,
No.A-290, II Stage, PIE, Bengaluru-560 058
II StageI
Rubber foot wear C1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
30.06.2018C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
977 No.199/3, 3rd cross, III Phase, PIA, III Phase Machine Fabrication Engineering 9772009-10 O
17253Jaya Engineering Works,
No.199/3, 3rd cross, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Machine Fabrication26 W-14
Engineering and fabricationunits (dry
Small White 2008BA
31.12.2017N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
9782009-10 O Jeet Industries,
No.D-431, II Stage, PIE, Bangalore -58
II StageI
Engineering Unit9.56 W-14
Engineering and fabricationunits (dry
Small White 1992BA
31.12.2014N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
9792009-10 O
16222Jigar Marketing Pvt Ltd,
No.B-101, 2nd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Manufacture of Bright steel bars 143.08 R-44
Industry or process involvingmetal
Small Red 1994BA
30.06.2023Y 31.12.2014 N N N N N NA NA NA 0.21 0.2 NA N Y Y NA Yes
9802009-10 CL
-K.C. Industries & Fabricators,
No.C-340, 6th cross,3rd Main, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication unit14.43 W-14
Engineering and fabricationunits (dry
Small White 1995BA
31.12.2013N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
9812009-10 CL
-K.K.Systems,
No.171, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9822009-10 CL
-K.R.Modi & Co,
No.A-182, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2022
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9832009-10 CL
-Kaedia Colthing Co,
No.254/A, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2020C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9842009-10 CL
-
Kalimatha Plastic Machines Manufacturers,
No.A-5, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering with spary painting 20.44 O-62
Spray painting, paint baking, paint
Small Orange 1/1/1979BA
31.12.2002C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
9852009-10 O Kanchan Times,
No.C-285, 7th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit59 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1998BA
31.12.2022N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
9862009-10 CL Kanvas Engineering Indsutries,
No.C-211, 4th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit38.33 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1965BA
31.12.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
9872009-10 O Kapeela Rubbers,
No.C-202, I Stage, PIE, Bengaluru-560 058
I StageI
Rubber componenent41.58 G-41
Rubber goods industry (with gas
Small Green 1980BA
31.12.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
9882009-10 CL
-Kaptronics Pvt Ltd,
No.B-115, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit30.43 G-78
Switches without
electroplatinSmall Green 1983
BA31.12.2012
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
9892009-10 CL
-Karavali Engineers,
No.D-395, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication unit1.73 W-14
Engineering and fabricationunits (dry
Small White 1981WA
31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
9902009-10 O Karnataka Boats,
No.A-44, II Stage, PIE, Bengaluru-560 058
II StageI
Fiber Glass18.77 G-108
Fiber glass molding, Fiber Glass
Small Green 1981BA
31.12.2020N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
9912009-10 O Karnataka Electrical Industry,
No.A-53, II Stage, PIE, Bengaluru-560 058
II StageI
Electronic panel Board 23 W-14
Engineering and fabricationunits (dry
Small White 1998BA
31.12.2013N N N N N N N NA NA NA NA N NA N N N NA Yes
9922009-10 O Karnataka Electro Controls,
No.C-131, II Stage, PIE, Bengaluru-560 058
II StageI
Assemly Blowers19.9 W-14
Engineering and fabricationunits (dry
Small White 1995BA
31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
9932009-10 O
34974
Karnataka Engineering Enterprises,
No.420, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit with Spray painting 267.01 O-62
Spray painting, paint baking, paint
Small Orange 1986BA
30.09.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
9942009-10 O Karnataka Errectors,
No.B-153, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit23 W-14
Engineering and fabricationunits (dry
Small White 1998BA
30.06.2014N N N N N N N NA NA NA NA N NA N N N NA Yes
9952009-10 CL
-Karnataka Plywoods,
No.393, Iv Phase, PIA, Bangalore, IV PhaseI
PlywoodC1 G-10
wooden furniture
manufacturiSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
9962009-10 CL
-
Karnataka Texspares & Steel (P) Ltd,
No.21-D, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Garments stitching310 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1998BA
30.06.2019N N N N N N N NA NA NA 12 N STP Y N N NA Yes
9972009-10 O
27278Suman Plastics
No.A-343, 8th Main, II stage, PIA, Bengaluru-560 058
II StageI
Plastic Moulded chair92.3 O-63
Engineering Industries with HeatTreatment,
Small Orange 1984BA
31.12.2025N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
9982009-10 CL
-Karnataka Electronics,
No.B-166, I Stage, PIE, Bengaluru-560 058
I StageI
Electronic componenets C1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
999
2009-10 O
11607
Karnataka Instruments,
No.A-269, II Stage, PIE, Bangalore -58
II Stage
I
Industrial thermometers (with degreasing and spray painting) (Engineering activity)
57.41 R-44
Industry or process involvingmetal surface treatment or
Small Red 1983
BA
30.06.2024
N N N N N N N NA NA NA 1.2 0.01 NA N Y Y NA Yes
10002009-10 CL
-Kartex,
No.B-218, II Stage, PIE, Bangalore II StageI
Engineering Unit19.9 W-14
Engineering and fabricationunits (dry
Small White 1997BA
31.12.2010C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
1001 No.C-425, 1st cross, I Stage, PIE, I Stage Auto Turned Brass and 10012009-10 O
23251Karthik Industries,
No.C-425, 1st cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Auto Turned Components Pressure (Engineering Unit)
82 G-7Brass and bell metal utensilsmanufacturi
Small Green 2008WA
31.12.2023N N N N N N N NA NA NA 0.24 N NA N Y N NA NA
10022009-10 CL
-Kash Fabror (P) Ltd,
No.376, IV Phase, PIA, Bangalore, IV PhaseI
Engineering Unit23 W-14
Engineering and fabricationunits (dry
Small White 1998BA
31.12.2000N N N N N N N NA NA NA 0 N NA N N N NA Yes
10032009-10 O Kashi Precission Components,
No.B-132, 3rd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Manufacture of Turned Components-Bolts & Nuts
90.42 G-7Brass and bell metal utensilsmanufacturi
Small Green 1977BA
31.12.2020N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes
10042009-10 O Kashyap Industries,
No.C-202/A, 4th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Rubber componenent34.53 G-41
Rubber goods industry (with gas
Small Green 1996BA
31.12.2022N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
10052009-10 O Kaveri Wood & Coir Atainers,
No.287, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Coir product23 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1998BA
31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
10062009-10 O
28962Khedda Insulation Systems,
No.A-279(a), II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit32 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1998BA
31.12.2025N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
10072009-10 O KE Material Handling Pvt Ltd,
No.163, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit12.96 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2033N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes
10082009-10 CL
-Akshya Apprels Pvt Ltd,
No.165, III Phase, PIA, Bangalore III PhaseI
Manufacture of ready made grments 25.1 G-72
Stitching/ Stitching ofshoe uppers/
Small Green 2006BA
31.12.2011C1 N C1 N C1 N C1 NA NA NA 6 N ST & SP N N N NA NA
10092009-10 CL
-Khivaraja Appliences ,
No.245, III Phase, PIA, Bangalore III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10102009-10 CL
-Kiran Plastic Industries,
No.B-351, II Stage, PIE, Bangalore II StageI
Plastic injection moulding C1 G-32
Polythene and plastic processedproducts
Small Green ClosedBA
31.12.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10112009-10 CL
-Kiv Metal Prints Pvt Ltd,
No.39, III Phase, PIA, Bangalore III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10122009-10 O Krishi Irrigation Pvt Ltd,
No.C-184, II Stage, PIE, Bengaluru-560 058
II StageI
Extrude pipes140 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1986BA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
10132009-10 CL
-Krishna Containers,
No.A-7, III Stage,PIE, Bangalore III StageI
Engineering Unit12 W-14
Engineering and fabricationunits (dry
Small White 1971BA
C1C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
10142009-10 CL
-Krishna Industries,
No.200, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Precisoin turned componenent 12 W-14
Engineering and fabricationunits (dry
Small White 1971BA
31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA NA
10152009-10 CL
-Kusum Exim Pvt Ltd,
No.289, IV Phase, PIA, Bangalore, IV PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10162009-10 CL
-L.B.M. Fashions,
No.B-82, I Stage, PIE, Bangalore I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10172009-10 CL
-Bombay Royon Fashions Ltd,
No.498, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment86.26 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1997WA
NN N N N N N N NA NA NA 0 N NA N N N NA NA
10182009-10 CL
-Lakme Paints & Varnishes,
No.498, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
PaintC1 R-21
Manufacturing of paintsvarnishes, pigments
Small Red ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10192009-10 CL
-Lakotia Belting,
No.C-91, II Stage, PIE, Bangalore II StageI
Rubber productsC1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
31.12.2024C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10202009-10 O Lakshmi Enrerprises,
No 25, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Godown13.03 G-19
Facility of handling, storage andtransportatio
Small Green 2005BA
31.12.2015N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes
10212009-10 CL
-Lalitha Indsutries,
No.C-245, I Stage,PIE, Bangalore I StageI
Engineering Unit12 W-14
Engineering and fabricationunits (dry
Small White 1971BA
31.12.2023C1 C1 C1 N C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10222009-10 O Leo Foot Wear Co,
No.A-154, II Stage, PIE, Bengaluru-560 058
II StageI
canvas shoes64.65 G-26
Leather foot wear and leatherproducts
Small Green 1986BA
31.12.2024N N N N N N N NA NA NA 1 N NA N Y N NA Yes
10232009-10 CL
-M.G.Metals Pvt Ltd,
No.406, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10242009-10 CL
24198MPP Technologies Pvt Ltd,
No.B-233, II Stage, PIE, Bangalore, II StageI
Engineering & Fabrication Unit (Stator Stacks and parts)
43.5 G-78Panel Board, Switches withoutelectroplatin
Small Green 29.01.2014BA
31.12.2023N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
10252009-10 O M.S.Storage Industries,
No.C-92, 4th cross, II Stage, PIE, Bengaluru-560 058,
II StageI
General Engineering with spray painting 19.6 W-14
Engineering and Small White 2003 31.12.20992009-10 O M.S.Storage Industries, Bengaluru-560 058, I with spray painting
(dry type) Activity19.6 W-14 and
fabricationunits (dry
Small White 2003BA
31.12.2099N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
10262009-10 O Machine Tool Corporation,
No.C-254, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit21 W-14
Engineering and fabricationunits (dry
Small White 1996WA
NN N N N N N N NA NA NA NA N NA N N N NA NA
10272009-10 CL
-Madhsoodan Foods Pvt Ltd,
No.B-31, Iii Stage,PIE, Bangalore III StageI
Food flavours C1 O-7
food processingincluding
Small Orange ClosedWA
31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10282009-10 O
12302
Magnetic Corporation Of India,
No.C-97, II Stage, PIE, Bangalore-560058,
II StageI
Electro magnetic equipments with spray painting
62.95 O-62Spray painting, paint baking, paint
Small Orange 1982BA
30.09.2029N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
10292009-10 CL Mahaveer Enterprises,
No.B-378, 100 feet ring road, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit65.94 G-79
Plastic sack bags, woven sack -- 10 10 15 -- 15 10
Small Green 1995BA
31.12.2018
N 31.12.2022 N N N N N NA NA NA 0.2 N NA N Y N NA Yes
10302009-10 O
14835Mahe Industries,
No.VP-2, I Stage, PIE, Bngalore-58, I StageI
Engineering Unit124.83 W-14
Engineering and fabricationunits (dry
Small White 2002WA
31.12.2022N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
10312009-10 O
14835Excel Agro Chemicals
No. 358/1, 9th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Production of Pesticides, Fungicides, Herbcides and Growth
94 O-29of
Pesticides, insecticides
Small Orange 2016BA
30.09.2022N N N N N N N NA NA NA 19 N ST & SP N N N NA Yes
10322009-10 O
Maini Precission Products Pvt Ltd,
No.B-165, 3rd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit- Precision Components
2128 G-78Switches without
electroplatinLarge Green 1973
BA31.12.2022
Y 31.12.2023 N N N N N NA NA NA 7 N NA N Y N NA Yes
10332009-10 O Uniqtronics Solutions Pvt Ltd
No.387, 10th Cross, 4th Main, IV Phase,PIA, Bengaluru-560 058,
IV PhaseI
Panel Board switches without electroplating control panel equipment
53.77 G-78Switches without
electroplatinSmall Green 2016
BA31.12.2027
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
10342009-10 O Mallar Indsutries ,
No.B-447, I Stage,PIE, Bengaluru-560 058
I StageI
Fabrication work17.81 W-14
Engineering and fabricationunits (dry
Small White 1987BA
31.12.2021N N N N N N N NA NA NA 0.225 N ST & SP N N N NA Yes
10352009-10 CL
-Malnad Laboratory Pvt Ltd,
No.306/A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electrical component5.84 W-14
and fabricationunits (dry
Small White 1981WA
31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10362009-10 O
39421
R.B. Mangaram Foods Products Ltd,
No.322, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Wafer biscuits90 G-3
Bakery / confectionery / sweetsproducts
Small Green 2002BA
31.12.2027N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
10372009-10 CL
-Manisha Polymers,
No.267, IV Phase, PIA, Bangalore, IV PhaseI
ResinsC1 O-75 Synthetic
resinsSmall Orange Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10382009-10 O Manohar Industries,
No.B-110, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit14 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2022N N N N N N N NA NA NA NA N NA N N N NA Yes
10392009-10 O
17294Mereena Creations,
No.65-A, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment452.83 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003BA
31.12.2023Y 31.12.2019 N N N N N NA NA NA 9.6 N STP - BWSSB N N N NA Yes
10402009-10 O
Maruthi Engineering Enterprieses,
No.D-394, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit12 W-14
Engineering and fabricationunits (dry
Small White 1991WA
31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
10412009-10 O
79253Maruthi Fab Tech,
No.A-45, II Stage, PIE, Bengaluru-560 058,
II StageI
Machinery Parts (Engineering Work) 205 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1971BA
31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
10422009-10 CL Maruthi Shoe Industries,
No.C-287, 8th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Foot wear13 G-26
Leather foot wear and leatherproducts
Small Green 2004BA
31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
10432009-10 O Maruthi Rubber,
No.B-37, III Stage,PIE, Bengaluru-560 058
III StageI
Rubber componenent12 G-41
Rubber goods industry (with gas
Small Green 1971BA
31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes
10442009-10 CL
-Max Polymers,
No.261, IV Phase, PIA, Bangalore, IV PhaseI
ResinsC1 O-75 Synthetic
resinsSmall Orange Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10452009-10 O
22407Mechano Engineering Co,
No.181, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit115.96 W-14
Engineering and fabricationunits (dry
Small White 1983BA
31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
10462009-10 CL
21546Mechatronics,
No.SB-38, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication unit45.19 G-78 Small Green 1974
BA31.12.2015
N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
10472009-10 CL
-
Mectrone Engineering Services,
No.C-146, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit18.7 W-14
Engineering and fabricationunits (dry
Small White 1982BA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA
10482009-10 O Megha Industries,
No.12, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit12 W-14
Engineering and fabricationunits (dry
Small White 1971WA
NN N N N N N N NA NA NA NA N NA N N N NA NA
10492009-10 CL
-Metal Craft,
No.B-198, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2021
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10502009-10 CL
-Micro Cold Forge,
No.D-429, II Stage, PIE, Bengaluru-560 058
II StageI
Screw and Reivent18.65 W-14
Engineering and fabricationunits (dry
Small White 1988BA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10512009-10 O
33385Green Chef Appliances Ltd
No.477E, 12th Cross, 3rd Main, IV Phase, PIA, Bengaluru-560058
IV PhaseI
Manufacture of pressure cooker, LPG Stove, Non stick cookware
950 G-1 Aluminium utensils from aluminium circles by
Medium Green 2014BA
23.08.2021N N N N N N N NA NA NA 6.4 N NA N Y N NA Yes
10522009-10 O
Milestone Alluminium Co Pvt Ltd,
No.B-171, 4th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Aluminium Glazing (Fabrication) 490 G-1
Aluminum utensils fromaluminum circles by
Small Green 1997BA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
10532009-10 O Minar Industries,
No.C-289, 8th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit: Manufacture of precision turned components for
435.66 G-77Manufacture of Motor & Pumpswithout
Small Green 2003BA
31.12.2023N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
10542009-10 CL
-
Mivin Engineering Technologies Pvt Ltd,
No.531, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering with vibropolishing 2099 R-44
process involving
metal Large Red 2002
BA31.12.2014
Y 30.09.2014 N N N N N NA NA NA 0 N NA N N N NA NA
10552009-10 CL
-Moktali Electro Devices,
No.306/A, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electronic Devices2.28 W-14
Engineering and fabricationunits (dry
Small White 1993WA
31.12.2004N N N N N N N NA NA NA 0 N NA N N N NA NA
10562009-10 CL
-Multivista Global Ltd,
No.222, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10572009-10 O My Textiles Pvt Ltd,
No.192, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment97.24 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003BA
31.12.2024N N N N N N N NA NA NA 12 N ST & SP N N N NA Yes
10582009-10 O
Mysonic Industries, No.530, IV Phase, PIA, Bengaluru-560
058,
No.530, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Sign Boards10.66 G-64
Modular wooden furniture from
Small Green 2009BA
31.12.2100N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
10592009-10 O Mysore Enterprises,
No.286, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Gas & Hand cutting and Bailing of Steel scrap (segregation and packing)
114 G-46Steel furniture without spray
Small Green 1980BA
31.12.2023N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
10602009-10 CL
-Mysore Plastics,
No.C-40, II Stage, PIE, Bengaluru-560 058
II StageI
PLASTIC Injection moulding C1 G-32
Polythene and plastic processedproducts
Small Green ClosedBA
30.06.2019C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10612009-10 O N.V.Engineers,
No.C-103, III Stage, PIE, Bengaluru-560 058,
III StageI
Fabrication unit13.13 W-14
Engineering and fabricationunits (dry
Small White 1989BA
31.12.2013N N N N N N N NA NA NA 0.29 N NA N Y N NA Yes
10622009-10 CL Nanavati Engineering Co,
No.A-195, I Stage, PIE, Bangalore I StageI
Engineering Unit12 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1971BA
30.06.2019N N N N N N N NA NA NA 0 N NA N Y N NA Yes
10632009-10 CL
20823Nascent Ventures Pvt Ltd,
No.17E, I st Main Road, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Aluminium and copper extraction from scrap using oil fired furnace
52.94 O-36Heat treatment using oil fired furnace
Small Orange 19/4/2000BA
30.06.2019N NA N N N N N NA NA NA 2 N NA N Y N NA Yes
10642009-10 CL
Navakarnataka Publications Pvt Ltd,
No.167/168, III Phase, PIA, Bengaluru-560 058,
III PhaseI
printing press98.09 O-59
Printing press &/or Screen Printing
Small Orange 5/11/1992BA
31.12.2015N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
10652009-10 O Netra Electronics,
No.B-50,10th Main, 2nd Cross III Stage,PIE, Bengaluru-560 058
III StageI
Printed Circuit Board manufacture 14.62 R-44
Industry or process involvingmetal
Small Red 1991BA
30.06.2024Y 30.06.2015 N N N N N NA NA NA 0.8 0.1 NA N Y Y NA Yes
10662009-10 CL
-New Generation Appareals,
No.286, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Garment washing51.7 O-50
Mechanized laundry using oil fired
Small Orange 1994BA
30.09.2011C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
10672009-10 CL
-New Tech Industries,
No.B-13, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10682009-10 CL
-Nikitha Build Tech Pvt Ltd,
No.344, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10692009-10 CL
-
Nim Auto Machine Tools Industries,
No.B-40, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10702009-10 CL
-Office Line Collections,
No.B/13, III Phase, PIA, Bengaluru-560 058
III PhaseI
GodownC1 G-19
Facility of handling, storage andtransportatio
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10712009-10 O
OM Shakthi Hydraulics Pvt Ltd.,
No.B-197, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit44.12 G-78
Switches without
electroplatinSmall Green 2000
BA31.12.2021
N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes
10722009-10 CL
-Oto Corporation,
No.305, Iv Phase, PIA, Bengaluru-560 058,
IV PhaseI
Stapple Machinery12 W-14
Engineering and fabricationunits (dry
Small White 1991BA
31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA NA
10732009-10 CL
-
P.C.M Crafts, No.789, Peenya, Bengaluru-560 058,
P.C.M Crafts, No.789, Peenya, Bengaluru-560 058,
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
1074 No.B-141, 3rd cross, I Stage, PIE, I Stage Engineering Unit Engineering 10742009-10 O P.M.R. Drilling Equipments,
No.B-141, 3rd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit14 W-14
Engineering and fabricationunits (dry
Small White 2004BA
31.12.2013N N N N N N N NA NA NA 2 N NA N Y N NA Yes
10752009-10 CL
25066P.M.Singania & Co,
No.A-368, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit19.39 W-14
Engineering and fabricationunits (dry
Small White 1971BA
31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA Yes
10762009-10 CL
-P.S.I Hydraulics,
No.A-152, 2nd C Main, II Stage, PIE, Bengaluru-560 058
II StageI
Hydraulic hose44.8 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10772009-10 O Pab Packaging Pvt Ltd,
, No.A-363, I Stage, PIE, Bengaluru-560 058
I StageI
Corrugated box12 G-9
Cardboard or corrugated box and
Small Green 1971BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
10782009-10 CL
-Pan Creations Unit - I,
No.A-188, I Stage,PIE, Bengaluru-560 058
I StageI
Sign BoardsC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10792009-10 CL
-Pan Creations Unit -Iii,
No.A-184, I Stage,PIE, Bengaluru-560 058
I StageI
Sign BoardsC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10802009-10 CL
-Panova Rubber Industries,
No.B-67, I Stage,PIE, Bangalore I StageI
Rubber productsC1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10812009-10 CL
-Paper & Pulp Products,
No.C-285, I Stage,PIE, Bangalore I StageI
pulp manufacturingC1 R-18
Paper ( waste paper
based Small Red Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10822009-10 O Preston India Pvt Ltd
No.45-A1, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Foot wear233.89 G- 41
Rubber goods industry (with gas
Small Green 1987WA
31.12.2024Y 31.12.2019 N N N N N NA NA NA 0.5 N ST & SP N N N NA NA
10832009-10 CL
-
Parvathi Wood Processing Industries,
No.27/28, III Phase, PIA, Bengaluru-560 058
III PhaseI
Wood packing12 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1971BA
31.12.2004N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
10842009-10 CL Pavan Lamps,
, No.B-56, III Stage,PIE, Bengaluru-560 058
III StageI
Electric bulbs12 W-14
Engineering and fabricationunits (dry
Small White 1971BA
31.12.2004N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
10852009-10 CL Pavers And Blocks,
No.C-.46, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Concrete blocks1.6 G-11
Cement products (without using
Small Green 2002BA
31.12.2012N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
10862009-10 CL
-Peak Performance Pvt Ltd,
No.C-94, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit12 W-14
Engineering and fabricationunits (dry
Small White 1971BA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10872009-10 CL
-Peenya Industrial Technique,
No.17E, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10882009-10 CL
-Pheonix Precission Products,
No.17A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10892009-10 CL
-Plasman Industries,
No.206, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10902009-10 CL
-Plastic Gloves Chemicals,
No.C-139, II Stage, PIE, Bengaluru-560 058
II StageI
synthetic glovesC1 G-62
Synthetic detergent
formulationSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10912009-10 CL Plymech Industries,
No.318/P, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Fabrication Assembly16.1 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2003BA
31.12.2024N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
10922009-10 CL
-Polycore Products,
No.276, 4th Main, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Rubber moulded components 23.1 G-86
including pre-cured
rubberSmall Green 1997
BAC1
N N N N N N N NA NA NA 0 N NA N N N NA NA
10932009-10 CL
-Polygon Instrumentation,
No.A-418, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10942009-10 O Polymer Products,
No.C-91, II Stage, PIE, Bengaluru-560 058,
II StageI
Rubber componenent25.5 G-41
Rubber goods industry (with gas
Small Green 1989BA
31.12.2021N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes
10952009-10 CL
-Polyuthrine Pvt Ltd,
No.538, IV Phase, PIA, Bangalore, IV PhaseI
polymer productsC1 R-47
fibers including
rayon ,tyre Small Red Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
10962009-10 O
Power One Micro Systems Pvt Ltd.,
No.F-3 & F-12,Kssidc Building, 5th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Assembly of UPS, Stabilizers & Isolation transformers. (excluding
434.98 G -85Transformer assembly unit(industrial
Small Green 1999BA
31.12.2021N N N N N N N NA NA NA 3 N NA N Y N NA Yes
10972009-10 O Power Plastech Ltd
No.513, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
plastic injection/ extrusion moulded 317 G-32
Polythene and plastic processedproducts
Small Green 2000BA
31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
10982009-10 CL
-
Power Switches And Ancilleries,
No.B-133, I Stage,PIE, Bangalore I StageI
Electric control panels47.9 G-78
Switches without
electroplatinSmall Green 2000
BAC1
N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
10992009-10 CL
-
Prabha Engineering, No.425, IV Phase, PIA, Bangalore,
No.425, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11002009-10 CL
-Pradeep Indsutrial Packaging,
No.A-16, II Stage, PIE, Bangalore II StageI
plastic yarn 24.83 G-32
Polythene and plastic processedproducts
Small Green 1978BA
31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA Yes
11012009-10 CL
-Prajna Rubber Footweras,
No.B-301, II Stage, PIE, Bangalore II StageI
Foot wear47.9 G-26
Leather foot wear and leatherproducts
Small Green 2000BA
C1N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11022009-10 CL
-Prakash Enterprises,
No.B-56, I Stage,PIE, Bangalore I StageI
Engineering Unit47.9 G-78
Switches without
electroplatinSmall Green 2000
WAN
N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11032009-10 O Prakash Leathers,
No.B-234, 5th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Industrial leather hand gloves 15.21 G-26
Leather foot wear and leatherproducts
Small Green 1995BA
31.12.2013N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
11042009-10 CL
-Prameen Industries,
No.9a, II Phase, PIA, Bangalore, II PhaseI
Engineering Unit47.9 G-78
Switches without
electroplatinSmall Green 2000
WAN
N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11052009-10 O Pramukh Plastics (P) Ltd,
No.A-35, 2nd Main II Stage, PIE, Bangalore
II StageI
FRP Sheets 25.42 G-32
Polythene and plastic processedproducts
Small Green 1996WA
31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA
11062009-10 CL
-Prasad Industries,
No.C-261, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit9 W-14
Engineering and fabricationunits (dry
Small White 1978BA
31.12.2012N N C1 N C1 N C1 NA NA NA 0.16 N NA N Y N NA NA
11072009-10 O Pratibha Fashions,
No.F-6, I Stage,PIE, Bengaluru-560 058
I StageI
Garment17 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1984WA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
11082009-10 CL
-Precedralics,
No.2/1, I Stage,PIE, Bangalore I StageI
Engineering Unit13 W-14
Engineering and fabricationunits (dry
Small White 1989WA
NC1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11092009-10 CL
39925Preci-fit India,
No.B-143, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering and assembling 46.94 G-1
Aluminum utensils fromaluminum circles by
Small Green 1996BA
31.12.2015N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes
11102009-10 O Precimech Engineers,
No.C-67, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit20 W-14
Engineering and fabricationunits (dry
Small White 1984BA
31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
11112009-10 O
Precission Engineering Pvt Ltd,
No.48, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit17 W-14
Engineering and fabricationunits (dry
Small White 1984BA
31.12.2100N N N N N N N NA NA NA NA N NA N N N NA Yes
11122009-10 CL
-Preemitha Leather Creations,
No.345/1, IV Phase, PIA, Bangalore, IV PhaseI
Reday made leather garmnet 13.3 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1984BA
31.12.2008N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11132009-10 CL
-Premier Controls ,
No.49a, III Phase, PIA, Bangalore III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2019
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11142009-10 CL
-
Premier Engineering Corporation,
No.404, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11152009-10 CL
-Premier Fashions,
No.63, III Phase, PIA, Bangalore III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11162009-10 O
87875Prerana Engineering Works,
No.B-207, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit250 G-78
Switches without
electroplatinSmall Green 2008
BA31.12.2034
N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
11172009-10 CL
28671Press Comp International,
No.B-150, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit37.8 G-78
Switches without
electroplatinSmall Green 1999
BA31.12.2011
Y 31.12.2016 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11182009-10 CL
-Primetech,
No.471, IV Phase, PIA, Bangalore, IV PhaseI
Non-comPliance154 G-78
Switches without
electroplatinSmall Green 2004
WAN
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11192009-10 CL
-Processed Wood Products,
No.M-13, I Stage,PIE, Bangalore I StageI
Plushed wood doors77.5 G-78
Switches without
electroplatinSmall Green 1982
BA31.12.2010
N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11202009-10 CL
-Prod Aid Engineers,
No.B-260, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2022
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11212009-10 O Progressive Industries,
No.B-106, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit46 G-78
Switches without
electroplatinSmall Green 1992
WA31.12.2034
N N N N N N N NA NA NA 0.22 N NA N Y N NA NA
11222009-10 O Pushpak Electrical Industry,
No.C-96, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit7.13 W-14
Engineering and fabricationunits (dry
Small White 1986WA
31.12.2010N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
1123 No.A-151, II Stage, PIE, Bangalore- II Stage Corrugated Box Cardboard 11232009-10 CL
17967Pyramid Packaging Pvt Ltd,
No.A-151, II Stage, PIE, Bangalore-560058
II StageI
Corrugated Box357 O-98
Cardboard or corrugated box and
Small Orange 2007WA
31.12.2022Y 31.12.2020 N N N N N NA NA NA 2 0.15 NA N Y Y NA NA
11242009-10 O Qualitech,
No.27, 1st cross, 8th Main, II Stage, PIE, Banglaore-58,
II StageI
Engineering Unit8.5 W-14
Engineering and fabricationunits (dry
Small White 2002BA
31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
11252009-10 O Quality Rubber Components,
No.C-90, 2nd B, II Stage, PIE, Bengaluru-560 058,
II StageI
Rubber componenent23.69 G-86
Tread rubber including pre-curedrubber
Small Green 2003WA
31.12.2099N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
11262009-10 CL
-R.L.Numericals,
No.P-10, III Stage, PIE, Banglaore-58, III StageI
Engineering Unit12.58 W-14
Engineering and fabricationunits (dry
Small White 1998BA
31.12.2013N N N N N N N NA NA NA 0 N NA N Y N NA NA
11272009-10 O
39417Raghu Industries,
No.508, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit97.58 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1991BA
31.12.2015N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
11282009-10 O
39928
Rajass Technologies Pvt Ltd (Formerly Rajas Engineering)
No.A-285, 6th Main, II Stage, PIE, Bengaluru-560 058.
II StageI
Engineering Unit63.8 G-7
Brass and bell metal utensilsmanufacturi
Medium Green 2003BA
31.12.2023N N N N N N N NA NA NA 3.36 N NA N Y N NA Yes
11292009-10 CL
-Rajesh Electronics,
No.A-178, I Stage,PIE, Bangalore I StageI
Electronic componenets C1 G-78
Switches without
electroplatinSmall Green Closed
WAN
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11302009-10 O
25749Ram Engineering Co,
No.C-100, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit30.29 G-78
Switches without
electroplatinSmall Green 1987
BA31.12.2015
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
11312009-10 O Ram Engineering Unit II,
Unit -II No.P-20, III Stage, PIE, Banglaore,
III StageI
Engineering Unit54.34 G-78
Switches without
electroplatinSmall Green 2003
BA31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
11322009-10 O Ram Kamal Industries,
No.B-240, 6th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Manufacture of KPTCL Line Fixtures 9.18 W-14
Engineering and fabricationunits (dry
Small White 1979BA
31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
11332009-10 CL
-Rashi Packs Pvt Ltd,
No.B-376, I Stage,PIE, Bangalore I StageI
Corrugated BoxC1 G-9
Cardboard or corrugated box and
Small Green ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11342009-10 CL
-Ravi Machine Tools ,
No.A-289, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BAC1
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11352009-10 CL
-Regent Engineers,
No.A-279, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitCL G-18
CLOSEDSmall Green 1988
BACL
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11362009-10 CL
-Reliance Engineering Ltd,
No.98, III Phase, PIA, Bengaluru-560 058
III PhaseI
Cable manufacturing C1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11372009-10 O Reliance Infocomm Ltd,
No.34-B, 4th cross, II Phase, PIA, Bengaluru-560 058,
II PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2003AA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes
11382009-10 CL
-Republic Clothing Co,
Republic Clothing Co, No.129, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11392009-10 CL
-Restolex Company,
No.490, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2024
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11402009-10 CL
-Rigid Industries,
No.228, II Stage, PIE, Bangalore -58 II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11412009-10 O
85938Rock Tools,
No.B-326, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit47 G-78
Switches without
electroplatinSmall Green 1997
WA31.12.2034
N N N N N N N NA NA NA 0.19 N NA N Y N NA NA
11422009-10 O Rollatainers Ltd,
No.A-414, II Stage, PIE, Bengaluru-560 058
II StageI
Packaing machine64.18 G-46
Steel furniture without spray
Small Green 1994BA
31.12.2015N N N N N N N NA NA NA 1 N NA N Y N NA Yes
11432009-10 O
24477Rotary Systems & Elements ,
No.V-32(A), 10th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit53.23 W-14
Engineering and fabricationunits (dry
Small White 1991BA
31.12.2024N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
11442009-10 CL
-S.K.Fabmac Pvt Ltd, ,
No.400, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Fabrication unit18 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2004N N N N N N N NA NA NA 0 N NA N N N NA Yes
11452009-10 O S.R.S Industries,
No.C-64, II Stage, PIE, Banglaore-58, II StageI
Engineering Unit19.7 W-14
Engineering and fabricationunits (dry
Small White 1988BA
31.12.2012N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
11462009-10 CL S.S.Fabs,
No.240/241, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit64 G-14
Engineering and fabricationunits (dry
Small Green 1983BA
31.12.2017N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
11472009-10 CL
35596
Ace Manufacturing Systems Ltd
No.40A, II Phase, PIA, Bengaluru-560 058
II PhaseI
CNC Machine tool2502 G-78
Switches without
electroplatinLarge Green 2015
BANA
N N N N N N N NA NA NA 0 N NA N N N NA Yes35596 electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA Yes
11482009-10 O
40286
S.Subbarao & Associates Pvt Ltd,
No.246, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Rolling milling equipments 42.67 G-78
Switches without
electroplatinSmall Green 1975
WA31.12.2025
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA
11492009-10 O
Saicorp Industrial Trailers Pvt Ltd.,
No.436 , 12th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Industrial Trailers93.62 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2010BA
31.12.2025N N N N N N N NA NA NA 0.9 N ST & SP N N N NA Yes
11502009-10 CL
15059Sai Kripa Insulations Pvt Ltd,
No.A-105, II Stage, PIE, Bangalore II StageI
Carrugated box 161 G-9
or corrugated
box andSmall Green 1979
BA31.12.2022
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11512009-10 CL
11822Sai Packaging Co Unit-II,
Unit-II, No.42/43, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Offset printing1801.92 Closed Large Green 5/15/2003
WA31.12.2014
Y 31.12.2016 N N N N N NA NA NA 2.8 N ST & SP N N N NA NA
11522009-10 CL
-
Shiva Sai Packaging Industries,
No.B-298, II Stage, PIE, Bangalore II StageI
Corrugated Box28.3 G-9
Cardboard or corrugated box and
Small Green 2000BA
31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA Yes
11532009-10 CL
-Saji Harious Metals (P) Ltd,
, No.526, IV Phase, PIA, Bangalore, IV PhaseI
Coiling Leveling90.95 G-78
Switches without
electroplatinSmall Green 1999
WACL
N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
11542009-10 O Sampriya Industries,
No.B-126, II Stage, PIE, Bengaluru-560 058
II StageI
Machnical componenets 31 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1988BA
31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
11552009-10 CL
-Sandeep Enterprises,
No.54/1, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit65 W-14
Engineering and fabricationunits (dry
Small White 1991BA
C1N N N N N N N NA NA NA 0 N NA N N N NA Yes
11562009-10 O
24611Sands Precission Pvt Ltd,
M1, 5th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
CNC machine46.8 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2004BA
31.12.2023N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
11572009-10 O Sanguine Engineering Pvt Ltd,
No.B-204, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit9 W-14
Engineering and fabricationunits (dry
Small White 1983WA
31.12.2010N N N N N N N NA NA NA 0.16 N NA N Y N NA NA
11582009-10 O
23252
Sapthagiri Auto Precission Engineering,
No.C-426, I Stage, PIE, Bengaluru-560 058,
I StageI
CNC Turned components 48 G-18
Carpentry & wooden furnituremanufacturi
Small Green 1992BA
31.12.2023N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes
11592009-10 CL
-Sara & Co,
No.B-208, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11602009-10 CL
-Sarda Plastics,
No.C-278, 7th Cross, I Stage, PIE, Bengaluru-560 058,
I StageI
plastic components11.1 G-32
and plastic processedproducts
Small Green 1976WA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA
11612009-10 O
Sarvodaya Engineering Equipments (P) Ltd,
No.49-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
General Engineering Unit 59.56 G-78
Switches without
electroplatinSmall Green 1982
WA31.12.2022
N N N N N N N NA NA NA 4 N ST & SP N N N NA NA
11622009-10 O
23872Satish Engineering Co,
No.B-69, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit23.57 W-14
Engineering and fabricationunits (dry
Small White 1981BA
31.12.2023N N N N N N N NA NA NA NA N NA N N N NA Yes
11632009-10 CL
-
Savitha Photographics Pvt Ltd, No.486, IV Phase, PIA,
Bangalore,
, No.486, IV Phase, PIA, Bangalore, IV PhaseI
Sign BoardsC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.18 N NA N Y N NA NA
11642009-10 O Scientific Instruments,
No.313, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit34 G-78
Switches without
electroplatinSmall Green 1995
BA31.12.2001
N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
11652009-10 O
15375Scientific Silica Products,
No.M-17, 7th Cross, I Stage, PIE, Bangalore-560058,
I StageI
Fabrication of Lab glass ware 18.49 G-21
Glass , ceramic, earthenpotteries, tile
Small Green 1987BA
31.12.2033N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
11662009-10 CL
-Scorpion Engineering Works,
No.B-27, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication unit11.28 W-14
Engineering and fabricationunits (dry
Small White 1996BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
11672009-10 CL Scots Fashions Pvt Ltd, .
.B-108, III Stage, PIE, Bengaluru-560 058,
III StageI
Garment42.08 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1998BA
31.12.2014N N N N N N N NA NA NA 5 N NA N Y N NA Yes
11682009-10 CL
13022Scotts Garments,
No.B-66 III Stage,PIE, Bangalore -58 III StageI
Garment24.38 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1999BA
31.12.2014N N N N N N N NA NA NA 4.5 N NA N Y N NA Yes
11692009-10 CL
11333Scotts Garments,
No.481-A & B, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment washing3200 O-50
Mechanized laundry using oil fired
Large Orange 1995BA
30.09.2021N N N N N N N NA NA NA 72 57 STP & ETP Y N N NA Yes
11702009-10 CL
-Sealwell,
No.B-91, I Stage, PIE, Bangalore, I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2000
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11712009-10 O Sedvik Industries,
No.390, IV Phase, PIA, Bangalore, IV PhaseI
Rolling equipment99.92 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2001BA
31.12.2020N N N N N N N NA NA NA 0.8 N ST & SP N N n NA Yes
1172 No.555, 3rd Main, II Stage, PIE, II Stage Plastic processig Polythene 11722009-10 O Services Un Limited,
No.555, 3rd Main, II Stage, PIE, Bengaluru-560 058
II StageI
Plastic processig59.88 G-32
Polythene and plastic processedproducts
Small Green 1992BA
31.12.2015N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
11732009-10 CL
-Services Un Limited,
No.B-262, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11742009-10 CL
-Seven Engineering Pvt Ltd,
No.57-B, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11752009-10 CL
24646Seven Hills International,
No.284, 4th main, 2nd Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Readymade Garments319 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003BA
31.12.2024N N N N N N N NA NA NA 4.8 N ST & SP N N N NA Yes
11762009-10 CL
-
Seven Star Poly Fibres Pvt Ltd,
No.A-12, III Stage, PIE, Bengaluru-560 058
III StageI
Polythene bagsC1 G-32
Polythene and plastic processedproducts
Small Green ClosedBA
31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11772009-10 CL
-
Shakthi Hi-Tech Polymenrs Pvt Ltd,
No.18-A, II Phase, PIA, Bengaluru-560 058
II PhaseI
HDDP/PP woven Sacks 46.7 G-32
Polythene and plastic processedproducts
Small Green 1991BA
31.12.2005N N N N N N N NA NA NA 0 N NA N N N NA NA
11782009-10 CL
-Shalini International ,
No.152, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11792009-10 O Shan Marc,
No.C-86, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit15.5 W-14
Engineering and fabricationunits (dry
Small White 1988WA
31.12.2100N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
11802009-10 O
34504
Envs -Eco- Friendly Digital India Pvt Ltd.,
No.284, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Digital printing in fabric/garments & organic washing
1815 O-50laundry using oil
firedLarge Orange 2017
BA30.09.2022
N N N N N N N NA NA NA 1.6 7 ETP N Y N NA Yes
11812009-10 CL
-Shankala Polymers,
No.126, III Phase, PIA, Bengaluru-560 058
III PhaseI
ResinsC1 O-75 Synthetic
resinsSmall Orange Closed
BA31.12.2013
N N N N N N N NA NA NA 0 N NA N N N NA NA
11822009-10 CL
-Sharada Packaging,
No.A-105, II Stage, PIE, Bengaluru-560 058
II StageI
Corrugated BoxC1 G-9
Cardboard or corrugated box and
Small Green ClosedBA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11832009-10 O Shashi Electrocrafts Pvt Ltd,
No.C-335, II Stage, PIE, Bengaluru-560 058
II StageI
Capacitors14.94 W-14
Engineering and fabricationunits (dry
Small White 1985BA
31.12.2012N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
11842009-10 CL
-Shashi Nag Indusries,
No.411, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2003
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11852009-10 O
23163Shilpa Industries,
No.261, 2nd Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Mfg of Rubber Rollers for printing & textile industries
103 G-86Tread rubber including pre-curedrubber
Small Green 1985BA
31.12.2023N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes
11862009-10 CL
-Shilpi Process Equipments,
No. A-9, III Stage,PIE, Bangalore -58 III StageI
Engineering Unit37.1 G-78
Switches without
electroplatinSmall Green 1986
BA31.12.2015
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
11872009-10 O
17574Shoma Enterprises,
No.C-28, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit84.58 G-78
Switches without
electroplatinSmall Green 1990
BA31.12.2020
N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
11882009-10 CL
-
Shree Ganesh Plastic Industries,
No.C-179, II Stage, PIE, Bangalore, II StageI
Plastic7.5 G-32
Polythene and plastic processedproducts
Small Green 2003WA
31.12.2010N N N N Y 16.16.2009 N NA NA NA 0 N NA N N N NA NA
11892009-10 O
22946Shree Haddinkal Udyog,
No.C-95, II Stage, PIE, Bengaluru-560 058,
II StageI
Machine work (Engineering Unit) 22.75 W-14
Engineering and fabricationunits (dry
Small White 1982WA
31.12.2099N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
11902009-10 CL
-Shree Hanuman Enterprises,
No.C-95, II Stage, PIE, Bengaluru-560 058
II StageI
Plastic covers9.49 G-32
Polythene and plastic processedproducts
Small Green 2003BA
31.12.2013N N N N Y N N NA NA NA 0 N NA N N N NA NA
11912009-10 CL
-Shreya Engineering Pvt Ltd,
No.153, III Phase, PIA, Bangalore III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11922009-10 CL Shrinu Engineers,
No.A-183, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication unit54 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2004WA
31.12.2013N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
11932009-10 CL
-Shubhashree Enterprises,
No.35, III Phase, PIA, Bangalore III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11942009-10 CL
-Shyca Cable Industries,
No.404, IV Phase, PIA, Bangalore, IV PhaseI
Cable manufacturing C1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
11952009-10 O
Sidhivinayaka Fab Engineering Pvt Ltd,
No.206, III Phase, PIA, Bengaluru-560 058,
III PhaseI
General Engineering and Fabrication work of stainless steel pressure vessels &
76.31 W-14Engineering and fabricationunits (dry
Small White 1995WA
31.12.2013N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
11962009-10 CL
-Sigma Metalinks,
No.B-308, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2023
N N N N N N N NA NA NA 0 N NA N N N NA NA- electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA NA
11972009-10 CL
-
Simha Industries, No.C-433, I Stage, PIE, Banglaore-58,
No.C-433, I Stage, PIE, Banglaore-58, I StageI
Engineering Unit17.79 O-69
Transformer repairing/manufacturing ( dry
Small Orange 2001BA
31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes
11982009-10 CL
-
Smart Engineers, No.19, 5th Main, III Phase, PIA, Bengaluru-560 058,
No.19, 5th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Precision Engg componenets 23.81 W-14
Engineering and fabricationunits (dry
Small White 2002BA
31.12.2015N N N N N N N NA NA NA 8 N ST & SP N N N NA Yes
11992009-10 O
Smitha Jyothi Industries, No.164, 10th Main, III Phase,
PIA, Bengaluru-560 058
No.164, 10th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit4.59 W-14
Engineering and fabricationunits (dry
Small White 1981BA
31.12.2020N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
12002009-10 O
24019Sona Engineering Pvt Ltd,
No.159, 10th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
General Engineering and Fabrication 92.79 W-14
Engineering and fabricationunits (dry
Small White 1996BA
31.12.2023N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
12012009-10 O
75204Southern Fastners,
No.537, IV Phase, PIA, Bangalore, IV PhaseI
Manu of bolts, rivets76 G-93
ng of nuts and boltswith cold
Small Green 2009WA
31.12.2018N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
12022009-10 CL
-
Southern Insulations (I) Pvt Ltd,
No.36-B, II Phase, PIA, Bangalore, II PhaseI
Cable manufacturing C1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12032009-10 CL
-Southern Minerals Agencies,
No.150, II Stage, PIE, Bangalore, II StageI
mineral crushingC1 O-26
processing, mineral
processing, Small Orange Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12042009-10 CL
-Space-Way Design Industries,
No.A-21, III Stage,PIE, Bangalore III StageI
Engineering Unit19.99 W-14
Engineering and fabricationunits (dry
Small White 1986BA
31.12.2011N N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
12052009-10 CL
-Span Auto Components,
No.405, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12062009-10 O
32314Span Plastics Pvt Ltd,
No.179, III Phase, PIA, Bengaluru-560 058
III PhaseI
plastic injection moulding 83.52 G-32
Polythene and plastic processedproducts
Small Green 1979WA
31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA NA
12072009-10 O
25149
Karnataka Engineering Enterprises Unit-II (Special
Insulation Manufacturing)Co,
No.472-C2 , IV Phase, PIA, Bangalore,
IV PhaseI
Engineering with pretreatment (Dry process)
72 O-62Spray painting, paint baking, paint
Small Orange 1990BA
31.12.2024N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
12082009-10 O
23189
Special Insulators Manufacturing Company,
No.48, 4th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
General Engineering without surface treatment (Steel fabrication such as
226 O-62Spray painting, paint baking, paint
Small Orange 1982BA
31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
12092009-10 CL
-Specialised Micro Tools,
No.B-311, II Stage, PIE, Bangalore II StageI
Twist Micro Tools130 G-78
Switches without
electroplatinSmall Green 1974
BACL
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
12102009-10 O Specitech,
No.23, 5th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit7.1 W-14
Engineering and fabricationunits (dry
Small White 2003BA
31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
12112009-10 CL
-Spectrum, No.
No.B-193, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12122009-10 CL
-Speedvel India Unit - I,
Unit - I, No.C-313, I Stage,PIE, Bangalore
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WACL
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12132009-10 CL
-Sree Brush,
No.B-32, III Phase, PIA, Bangalore III PhaseI
plastic itemsC1 G-32
Polythene and plastic processedproducts
Small Green ClosedWA
CLC1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12142009-10 O
101500
Shree Mahalakshmi Enterprises (Formerly Shree
Ram Polypacks,)
No.C-213, 4th Cross, I Stage, PIE, Bangalore,
I StageI
HDEP/ PP Woven sack bags stitching 166 O-35
Gravure printing, digital printing on
Small Orange 2002BA
30.09.2030N N N N N N N NA NA NA 0.72 N NA N Y N NA Yes
12152009-10 CL
-
Sree Venkateshwara Electricals,
No.33- A2, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Transformer assembly 28.65 G-85
Transformer assembly unit(industrial
Small Green 1981BA
31.12.2010N N N N N N N NA NA NA 0 N NA N N N NA NA
12162009-10 O
13806Sreenathji Chemicals Industry,
No.88, 7th Cross, III Phase, PIA, Bangalore-560058,
III PhaseI
Chemical Trading80.95 R-25
Basic chemicals and electrochemicals
Small Red 1979BA
30.06.2023N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes
12172009-10 CL Sri Ambika Engineers,
No.B-162, II Stage, PIE, Bengaluru-560 058,
II StageI
Borewell bit29.02 G-78
Switches without
electroplatinSmall Green 2003
WA31.12.2013
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
12182009-10 CL
-Sri Brush, N
No.332, IV Phase, PIA, Bangalore, IV PhaseI
plastic itemsC1 G-32
Polythene and plastic processedproducts
Small Green ClosedBA
CLC1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12192009-10 O
12621
SriChakra Engineering Equipments,
No.21(A1), II Phase, PIA, Bengaluru-560 058,
II PhaseI
Hydraulics Presses machines 1008.53 G-78
Switches without
electroplatinLarge Green 1987
BA31.12.2035
N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
12202009-10 CL Sri Gajalakshmi Metal Works,
No.556, II Stage, PIE, Bangalore, II StageI
Engineering industry 24 O-3
Spray painting, paint baking, paint
Small Orange 1995BA
31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
1221 No.A-321, 7th Main, II Stage, PIE, II Stage Sheet metal Panel Board, 12212009-10 O
34384MJN Industries
No.A-321, 7th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Sheet metal fabrication 696 G-78
Panel Board, Switches withoutelectroplatin
Medium Green 27.12.2009WA
31.12.2026Y 31.12.2023 N N N N N NA NA NA 1.2 N NA N Y N NA NA
12222009-10 CL
-Sri Manjunatha Industries,
No.239, III Phase, PIA, Bangalore III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2002
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N ST & SP N N N NA NA
12232009-10 CL
-Navahira Graphics,
No.C-305, I Stage,PIE, Bangalore I StageI
Metal Engraving C1 R-3
engaged inrecycling/rep
rocessing/Small Red Closed
BA31.12.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12242009-10 O
22880Sri Ramakrishna Dairy,
No.A-22, III Stage,PIE, Bengaluru-560 058
III StageI
mixing of food instants 33.32 O-7
Food and food processingincluding
Small Orange 2007BA
31.12.2024N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
12252009-10 O
Sri Revana Siddeshwara Gears And Sprockets,
No.C-61, 2nd Mian, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit19.79 W-14
Engineering and fabricationunits (dry
Small White 1993WA
31.12.2013N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
12262009-10 CL
-Sri Sai Baba Industries,
No.283, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Manufacture of Bright steel bars with pickling
26.47 R-44Industry or process involvingmetal
Small Red 2004BA
30.06.2014N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
12272009-10 O Sri Sai Fabrications,
No.C-66, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2020N N N N N N N NA NA NA NA N NA N N N NA Yes
12282009-10 O
16395Sri Sai Industries,
No.P-24, III Stage, PIE, Bengaluru-560 058,
III StageI
Engineering Unit with pretreatment, powder coating and spray painting
223 R-44Industry or process involvingmetal
Small Red 1998BA
30.06.2022N N N N N N N NA NA NA 0.16 0.24 NA N Y Y NA Yes
12292009-10 CL
24109Sri Shakti Industries,
No.C-442, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit12.9 W-14
Engineering and fabricationunits (dry
Small White 2002WA
31.12.2013N N N N N N N NA NA NA 0.04 N NA N Y N NA NA
12302009-10 CL
-Sri Shila Industries,
No.C-264, I Stage,PIE, Bangalore I StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2022N C1 N C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12312009-10 CL Shri Vardhman Basic Foods,
No.C-302, 9th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Food products60.09 G-19
Food and food processingincluding
Small Green 1998BA
31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
12322009-10 CL
27062Sri Venkateshwara Packging,
No.329, IV Phase, PIA, Bangalore, IV PhaseI
Corrugated BoxC1 G-9
Cardboard or corrugated box and
Small Green ClosedBA
31.12.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12332009-10 CL
-
Sri Vinayaka Engineering Works,
No.54, III Phase, PIA, Bengaluru-560 058
III PhaseI
Mechanical componenets 6.3 Closed Small Green 1981
WA31.12.2010
N N N N N N N NA NA NA 0 N NA N N N NA NA
12342009-10 O Sri Vinayaka Packs,
No.C-330 (A), 3rd Main, I Stage, PIE, Bengaluru-560 058,
I StageI
Corrugated Box108 G-9
Cardboard or corrugated box and
Small Green 2000BA
31.12.2022N N N N N N N NA NA NA 0.024 N NA N Y N NA Yes
12352009-10 O Sringar Electricals,
No.D-388, 1st cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Assembly of Electrical control pannels 45.55 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1994BA
31.12.2023N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
12362009-10 O
23735Aluminium Innovation
No A-185, 4th Corss, 1st stage, Peenya Industrial Estate, Banglaore-560058
I StageI
Aluminium Windows, Door/Structrual Glazing and wall cladding
60.66 G -1Aluminum utensils fromaluminum circles by
Small Green 2006BA
31.12.2035N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes
12372009-10 O
Srinivasa Engineering Products,
No.72, 6th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Fabrication unit19.6 W-14
Engineering and fabricationunits (dry
Small White 1984WA
31.12.2014N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA
12382009-10 CL
-
Srinivasa Nursing Home, Mayura Complex,
Next To Pia Bhavana, Kiadb Main Road, I Stage, PIE, Bangalore,
I StageI
Health care establishment C1 O-85
Health-care Establishme
ntSmall Orange Closed
BA30.09.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12392009-10 CL
-Srinivasa Plastics,
No.B-211, II Stage, PIE, Bangalore II StageI
Librillated twisted10.84 W-14
Engineering and fabricationunits (dry
Small White 1985BA
30.12.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12402009-10 O Srinu Engineering Industries,
No.B-120, 3rd Main, II Stage, PIE, Bengaluru-560 058,
II StageI
Machinery componenets 28.26 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2000BA
31.12.2034N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes
12412009-10 CL
-Standard Catrons,
No.B-98, I Stage, PIE, Bengaluru-560 058,
I StageI
Corrugated Box29 G-9
or corrugated
box andSmall Green 2009
WA31.12.2013
N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
12422009-10 CL
-Staro Wood,
No.490F, 4th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Treatment and sea servicing of rubber wood
44.25 G-41Rubber goods industry (with gas
Small Green 2001BA
30.09.2011N N N N N N N NA NA NA 0.64 N ST & SP N N N NA Yes
12432009-10 CL
-Stichers,
No.306-B, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12442009-10 CL
-
Stitch Leathers Pvt Ltd, No.120, III Phase, PIA,
Bangalore
No.120, III Phase, PIA, Bangalore III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12452009-10 CL
-Stress Cret,
, No.9 & 11, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Fabrication unit13 W-14
and fabricationunits (dry
Small White 2000BA
31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- units (dry BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12462009-10 CL
-Subham Indsutries,
No.A-52/4, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit16.5 W-14
Engineering and fabricationunits (dry
Small White 1998WA
CLN N N N N N N NA NA NA NA N NA N N N NA NA
12472009-10 CL
-Sudarshan Industries,
No.A-20, III Stage,PIE, Bangalore III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2009
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12482009-10 CL
-Sudarshan Industries Ltd,
No.51, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12492009-10 CL
-
Sri Darshan Packaging Industries,
No.C-310, I Stage, PIE, Bengaluru-560 058
I StageI
Corrugated Box24 G-9
or corrugated
box andSmall Green Closed
WA31.12.2003
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12502009-10 O Sudeep Packaging Indsutries,
No.A-144, I Stage,PIE, Bengaluru-560 058
I StageI
Corrugated Box11.1 G-9
or corrugated
box andSmall Green 1999
BA31.12.2021
N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes
12512009-10 CL
-Sujatha Engineering Co,
No.490, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2004
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12522009-10 O Sujika Induction Enterprises,
No.541, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Activity67 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1992WA
31.12.2020N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA
12532009-10 O
22621
HMX Systems Pvt Ltd (formerly known as Sumaya
Hmx Systems Ltd,) N
No.A-422, I Stage, PIE, Bengaluru-560 058
I StageI
Aircooler14 W-1
Assembly of air coolers/conditioners /repairing
Small White 2001WA
31.12.2023N N N N N N N NA NA NA 2.06 N NA N Y N NA NA
12542009-10 O
26729Sundaram Industries,
No.31, III Phase, PIA, Bangalore-560058
III PhaseI
Tyre Retreading166 O-70
Tyres and tubes vulcanization/ hot
Small Orange 2006BA
30.09.2030N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes
12552009-10 CL
-
Sunmas Machine Tools Pvt Ltd,
No.432/1, IV Phase, PIA, Banglaore-58
IV PhaseI
Engineering Unit65 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1995BA
31.12.2015N N N N N N N NA NA NA 0.09 N ST & SP N N N NA Yes
12562009-10 CL
-Super Bright Bond,
No.486-C, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit23 W-14
Engineering and fabricationunits (dry
Small White 1999BA
31.12.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes
12572009-10 CL
39352Super Chem Indsutries,
No.B-354, I Stage,PIE, Bangalore I StageI
Engineering Unit14.4 W-14
Engineering and fabricationunits (dry
Small White 2002BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
12582009-10 CL
23795Super Corn,
No.C-258, I Stage,PIE, Bangalore I StageI
Food productsC1 O-7
food processingincluding
Small Orange ClosedBA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12592009-10 CL
-Super Star Garments Unit - I,
Unit - I, No.A-190, I Stage,PIE, Bangalore
I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12602009-10 CL
-Super Tech Industries,
No.B-5, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12612009-10 CL
-
Superfine Colourtex Prints Pvt Ltd,
No.Vp-1&2, I Stage, PIE, Bengaluru-560 058,
I StageI
Woven labels C1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12622009-10 O
24692
Superior Electric Machines Pvt Ltd,
No.B-214, 5th Main , II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit38.76 G-78
Switches without
electroplatinSmall Green 1982
BA31.12.2023
N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
12632009-10 O
15447Suraj Metal Finishers,
No.99, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Alluminum Cookers36.88 G-1
Aluminum utensils fromaluminum circles by
Small Green 1983BA
31.12.2035N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
12642009-10 CL
-Surendra Engineering Works,
No.C-135, II Stage, PIE, Bangalore II StageI
Engineering Unit11.34 W-14
Engineering and fabricationunits (dry
Small White 1983BA
31.12.2010N N N N C1 N C1 NA NA NA 2 N NA N N N NA NA
12652009-10 CL
41649Sushma Industries,
No.18-E, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Electronic assemblies62.57 G-78
Switches without
electroplatinSmall Green 1986
BA31.12.2035
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
12662009-10 CL
-Swamy Pollution Control,
No.C-308, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit36.69 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12672009-10 CL
-Swamy Pollution Control ,
No.C-128, I Stage,PIE, Bangalore I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12682009-10 CL
-Switch Crafts India,
No.B-383, I Stage,PIE, Bangalore I StageI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12692009-10 CL
-Synthetic Rubber Products,
No.C-18, II Stage, PIE, Banglaore-58, II StageI
Rubber moulded components 21.22 G-41
Rubber goods industry (with gas
Small Green 2002BA
31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA
1270Systems Cable And Wires Pvt
No.A-352, 8th Mian, II Stage, PIE, II Stage Cable manufacturing Switches 12702009-10 O
17573
Systems Cable And Wires Pvt Ltd,
No.A-352, 8th Mian, II Stage, PIE, Bengaluru-560 058,
II StageI
Cable manufacturing 131 G-78
Switches without
electroplatinSmall Green 2002
BA31.12.2021
N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
12712009-10 O
T.G.R.I Engineering & Automotive
No.B-237, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green 2008
WA31.12.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.05 N NA N Y N NA NA
12722009-10 O Tabular Manufacturing,
No.42, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering Unit13.2 W-14
Engineering and fabricationunits (dry
Small White 1979BA
31.12.2021N N N N N N N NA NA NA NA N NA N N N NA Yes
12732009-10 CL
-Tansar Rubber Products,
No.367, IV Phase, PIA, Bangalore, IV PhaseI
Rubber productsC1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
31.12.2016C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12742009-10 O Tata Telecommunications Ltd,
No.V-88, II Phase, PIA, Bangalore, II PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2004AA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes
12752009-10 O Tata Telesevices Ltd,
No.19, III Phase, PIA, Bengaluru-560 058,
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2004AA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes
12762009-10 O Techno Centre,
No.B-224, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit7.36 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1974BA
31.12.2100N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
12772009-10 CL
-Techno Fab,
No.A-413, 4th cross, I Stage, PIE, Bangalore -58
I StageI
Engineering Unit5.97 W-14
Engineering and fabricationunits (dry
Small White 1974BA
31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12782009-10 O
13225Techno Rubber Products,
No.367, IV Phase, PIA, Bangalore, IV PhaseI
Rubber flaps165 G-41
Rubber goods industry (with gas
Small Green 1986BA
31.12.2021N N N N N N N NA NA NA 9.6 N ST & SP N N N NA Yes
12792009-10 CL
Technoweld Manufacturing Co,
No.229, III Phase, PIA, Bengaluru-560 058
III PhaseI
Welding electrodes62 G-96
Manufacturing of insulatedconductors
Small Green 1994BA
31.12.2016N N N N N N N NA NA NA 0.12 N ST & SP N N N NA Yes
12802009-10 O
20426
Technoheat Bakery Equipments Pvt Ltd,
No.L-1, 7th Cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Bakery Ovens & item equipments with spray painting
355.96 O-62Spray painting, paint baking, paint
Small Orange 1996BA
30.09.2023N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes
12812009-10 O
24465
Technology Development Consultancy Centre,
No.B-446, I Stage, PIE, Bengaluru-560 058,
I StageI
R & D consultancy of Bio-Technology auto machines
19.31 G-81Research laboratories notinvolving
Small Green 2002BA
31.12.2099N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
12822009-10 CL
-Tejpal Extrusions Pvt Ltd,
No.A-363, I Stage,PIE, Bengaluru-560 058
I StageI
R & D activityC1 R--58
Pharmaceutical (Bulk drug &Active
Small Red ClosedBA
C1C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12832009-10 CL
-Teleplast ,
No.C-85, III Stage,PIE, Bengaluru-560 058
III StageI
General Engineering5.3 W-14
Engineering and fabricationunits (dry
Small White 1988BA
31.12.2002C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12842009-10 CL
-Texport Garments,
No.82, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Storing of Garments71.1 W-10
woolen hosiers
making ( Small Green 2001
BA31.12.2015
N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
12852009-10 O Texport Industries Pvt Ltd.,
No.459/B, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment207 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 1998BA
31.12.2023N N N N N N N NA NA NA 24 N STP Y N N NA Yes
12862009-10 CL
-Texport Overseas,
No.266-A, II Stage, PIE, Bengaluru-560 058
II StageI
Garment97.85 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2002BA
31.12.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12872009-10 CL
-Thanwada Corporation,
No.C-204, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
12882009-10 CL
-The C.L.S. Press,
No.A-11, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12892009-10 CL
-
The Charminar Engineering Co,
No.C-348, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2015
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12902009-10 CL
-The Glory Boys Co,
No.12, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2023
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12912009-10 O Tummala Electronics Pvt Ltd,
No.SB-54, II cross, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering Unit42.76 W-13
Electrical and electronic item
Small White 1974BA
31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
12922009-10 CL
-Time Textile Industries,
No.A-198, I Stage,PIE, Bengaluru-560 058
I StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12932009-10 CL
-
Time Textiles Industries Unit - I,
Unit - I, No.1-E, II Phase, PIA, Bengaluru-560 058
II PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12942009-10 CL
-Times Engineering Pvt Ltd,
No.A-106, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- electroplatin BA C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12952009-10 CL
28492Tirupati Adhesives ,
No.47, 4th Main, III Phase, PIA, Bangalore -58
III PhaseI
Adhesive tapes78.25 G-91
Manufacture of Adhesives andadhesive
Small Green 1994BA
31.12.2015N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes
12962009-10 O
Athreya CNC (formerly known as Tocol Enterprises),
No.525, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
(Engineering Unit) CNC Machine components for Aerospace, Air Craft,
54.18 G-10Carpentry & wooden furnituremanufacturi
Small Green 1996BA
31.12.2023N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes
12972009-10 CL
-Tool Craft Assecciries,
No.290, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12982009-10 CL
-Tools Corporations,
No.B-311, II Stage, PIE, Bangalore II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2012
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
12992009-10 CL
-Touch Wood Craft,
No.399, I Phase, PIA, Bangalore, I PhaseI
wood packing C1 G-10
Carpentry & wooden furnituremanufacturi
Small Green ClosedBA
31.12.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13002009-10 CL
-Toyo Corporation,
No.305, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2001
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13012009-10 O Transducer & Allied Product,
No.351, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
elcectronic assembly20.6 W-13
electric and elcectronic assembly
Small White 1991BA
31.12.2015N N N N N N N NA NA NA NA N NA N N N NA Yes
13022009-10 CL
16388
Transteel Sheeting Technology Pvt Ltd,
No.1-A, II Phase, PIA, Bangalore, II PhaseI
Engineering Unit354 G-78
Switches without
electroplatinSmall Green 1998
BA31.12.2008
N N N N N N N NA NA NA 0 N NA N N N NA NA
13032009-10 CL
-Trident Engineering,
No.356, IV Phase, PIA, Bangalore, IV PhaseI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2008N N N N N N N NA NA NA 0 N NA N N N NA Yes
13042009-10 CL
-Trident Fashions,
No.A-322, II Stage, PIE, Bangalore II StageI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2014C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13052009-10 O
26991Trikaya Precission Pvt Ltd,
No.20, 5th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit101 W-14
Engineering and fabricationunits (dry
Small White 2000WA
31.12.2025N N N N N N N NA NA NA 0.48 N ST & SP N N N NA NA
13062009-10 CL
-Triveni Industries.,
No.B-173, II Stage, PIE, Bangalore, II StageI
Engineering Unit70 G-78
Switches without
electroplatinSmall Green 1983
BA31.12.2025
N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes
13072016-17 O Unitech Cnc Centre Pvt Ltd,
Plot No.559, 14th Cross, IV Phase, II Stage, PIA
IV PhaseI
Manufacturing of Hydraulics pumps parts
96.7 G-78Switches without
electroplatinSmall Green 1983
BA31.12.2027
N N N N N N N NA NA NA 2.7 N NA N Y N NA Yes
13082009-10 O
76299Trupti Twines,
No.B-262, II Stage, PIE, Bengaluru-560 058
II StageI
weaving36 G-32
Polythene and plastic processedproducts
Small Green 1999BA
31.12.2028N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes
13092009-10 CL
-Trust Pack,
No.A-3, III Stage,PIE, Bangalore III StageI
Wax coated and laminatd paper roll to rol printing
29.12 G-78Switches without
electroplatinSmall Green 2017
WA31.12.2004
N N N N N N N NA NA NA 0 N NA N N N NA NA
13102009-10 CL
-Tuhina Leather Industries,
No.351, IV Phase, PIA, Bangalore, IV PhaseI
Leather bagsC1 G-26
Leather foot wear and leatherproducts
Small Green ClosedBA
31.12.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13112009-10 O
25488Tulasinath Industries,
No.53, III Phase, PIA, Bangalore, III PhaseI
Engineering Unit12 W-14
Engineering and fabricationunits (dry
Small White 1980BA
31.12.2012N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
13122009-10 CL
-Tyre Soles Bangalore,
No.207, III Phase, PIA, Bangalore III PhaseI
Tyre RetreadingC1 O-70
tubes vulcanizatio
n/ hotSmall Orange Closed
WA30.09.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13132009-10 CL U.M.Fiber Works,
No.D-397, I Stage,PIE, Bangalore I StageI
FRP Products17.89 G-108
Fiber glass molding, Fiber Glass reinforced
Small Green 2001WA
31.12.2020N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
13142009-10 O U.R.Condiments,
No.L-2, 9th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Condiments items 50 G-3
Bakery / confectionery / sweetsproducts
Small Green 1995BA
31.12.2035N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
13152009-10 O
25915Uma Industries,
No.C-85, II Stage, PIE, Bengaluru-560 058
II StageI
Turned components66.35 G-18
Switches without
electroplatinSmall Green 1985
WA31.12.2007
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
13162009-10 CL
-Unik Enterprises,
No.A-45, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001WA
NN N N N C1 N C1 NA NA NA 0 N NA N N N NA NA
13172009-10 CL
-Unik Products
No.C-76, II Stage, PIE, Bengaluru-560 058
II StageI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13182009-10 CL Unique Engineering Services
No.C-86, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit32 G-78
Switches without
electroplatinSmall Green 2004
WA31.12.2015
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
1319Unique Instruments &
No.423, IV Phase, PIA, Bengaluru-560 IV Phase Calibration process in Engineering 13192009-10 O
Unique Instruments & Manufacturing (P) Ltd,
No.423, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Calibration process in grand job works 10.7 W-14
Engineering and fabricationunits (dry
Small White 1997BA
30.12.2000N N N N N N N NA NA NA 0 N NA N N N NA Yes
13202009-10 O
77040Unique Non-Woven Co,
No 218. III Phase, PIA, Bengaluru-560 058
III PhaseI
Non oven cloth35 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2003WA
31.12.2034N N N N N N N NA NA NA 0.19 N NA N Y N NA NA
13212009-10 CL
-Unique Plastic Industries,
No.B-258, II Stage, PIE, Bengaluru-560 058
II StageI
plastic4.2 G-32
Polythene and plastic processedproducts
Small Green 1982BA
31.12.2010N N N N Y 16.06.2009 N NA NA NA 0 N NA N N N NA NA
13222009-10 CL
-Unique Products, N
No.C-76, II Stage, PIE, Bangalore-560058
II StageI
Plastic injection moulding 32 G-32
Polythene and plastic processedproducts
Small Green 1992BA
30.09.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes
13232009-10 CL
-Unitech Cnc Centre Pvt Ltd,
No.B-443, I Stage, PIE, Bengaluru-560 058,
I StageI
Hydrulic Machine parts 200 G-77
Manufacture of Motor & Pumpswithout
Small Green 2001BA
31.12.2016N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
13242009-10 CL
-United Engineering Works,
No.176, III Phase, PIA, Bengaluru-560 058
III PhaseI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedWA
30.09.2008C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13252009-10 O
15258Universal Hands,
No.A-103(a), 3rd Main, II Stage, PIE, Bengaluru-560 058
II StageI
Wrist Watch Hands (Electroplating) 33.33 R-44
Industry or process involvingmetal
Small Red 1995BA
30.06.2020N N N N N N N NA NA NA 0.5 0.065 NA N Y Y NA Yes
13262009-10 O
23240Universal Industries,
No.A-197, 4th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Cushion Pillows and wedding fabrics 9.32 G-15
Cotton spinning and weaving(small scale)
Small Green 1980BA
31.12.2099N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
13272009-10 CL
-
Universal Instruments manufacturing Co Pvt Ltd,
No.26-A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.09.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13282009-10 CL
-
Universal Instruments Services Co,
No.26-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13292009-10 CL
10792
Universal Power Transformers Pvt Ltd,
No.26-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Transformer with painting 2223 O-69
repairing/manufacturi
ng ( dry Large Orange 2003
BA30.09.2010
Y 31.12.2013 N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
13302009-10 O
22204V.B.Enterprises,
No.B-70-A, II Stage, PIE, Bengaluru-560 058,
II StageI
HDPE bags32.97 G-32
Polythene and plastic processedproducts
Small Green 1994WA
31.12.2023N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
13312009-10 O Gurudev Flex
No.D-361, II Stage, 8th Main, PIE, Bengaluru-560 058,
II StageI
Printing on integral part of packing materils
78 G-18 Small Green 1.1.2017WA
31.12.2026N N N N N N N NA NA NA 0.16 N NA N Y N NA NA
13322009-10 CL
-V.F.India,
No.360, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Garment4 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2000BA
31.12.2004N N N N N N N NA NA NA 0 N NA N N N NA Yes
13332009-10 CL
-V.G.Industries,
No.12, I Stage,PIE, Bengaluru-560 058 I StageI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13342009-10 O
34751Taj Computer Solution Pt Ltd
No.38, No.154/1/3, 1st Main Road, III Phase, PIA, Bengaluru
III PhaseI
E-waste collection segregation refurbishment of e-waste
2.65 R-15Recycling
Plants Components
Small Red 30.09.2017BA
-N N N N N N N NA NA NA 0.72 N ST & SP N N N NA Yes
13352009-10 O V.S.K. Enterprises,
No.A-47, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2000N N N N N N N NA NA NA 0.01 N NA N Y N NA Yes
13362009-10 CL
-V.T.,P. Rubber Products,
No.207/208, III Phase, PIA, Bengaluru-560 058
III PhaseI
Rubber productsC1 G-41
Rubber goods industry (with gas
Small Green ClosedBA
31.12.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13372009-10 O
15347
V.T.Switch Gears Transfermers ,
No.33, 4th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Transformer assembly unit(industrial scale)
87.29 G-18Transformer assembly unit(industrial
Small Green 1986BA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
13382009-10 CL
-Vaccum Techniques Pvt Ltd,
No.433, IV Phase, PIA, Bangalore, IV PhaseI
Engineering Unit81.18 G-78
Switches without
electroplatinSmall Green 1989
BA31.12.2006
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13392009-10 CL
-Varchas Impex Pvt Ltd,
No.A-192, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering Unit65 G-78
Switches without
electroplatinSmall Green 2000
BA31.12.2013
N N N N C1 N C1 NA NA NA 0 N NA N N N NA NA
13402009-10 CL
16454Vastushilpi Enterprises,
No.B-219, 4th Cross, I Stage,PIE, Bangalore
I StageI
Engineering Unit77.5 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1982BA
31.12.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
13412009-10 CL
-Veena Industry,
No.30-B, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001WA
31.12.2010N N N N C1 N C1 NA NA NA 0 N NA N N N NA NA
13422009-10 O
12754Vee vee Control Pvt Ltd,
No.216, 11th Main, III Phase,PIA, Banglore-58
III PhaseI
Electrical control panels 332 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1990BA
31.12.2020N N N N N N N NA NA NA 1.65 N ST & SP N N N NA Yes
13432009-10 O Vetril Electronics Pvt Ltd,
No.547-A, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit156 W-13
Electrical and electronic
Small White 2001BA
31.12.2010N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yeselectronic
itemBA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
13442009-10 CL
-Vettiyil Industries,
No.B-69, 2nd cross, cross, Ist Stage,PIE, Bangalore -58
I StageI
Hawai chappel straps40.88 G-26
Leather foot wear and leatherproducts
Small Green 2002BA
31.12.2015N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
13452009-10 O Shree Shyam Polymer.,
No.C-30, 2nd Main, II Stage, PIE, Bengaluru-560 058
II Stage IPolythene industiral packing and bags (above 40 microns)
44.5 G-32Polythene and plastic processedproducts
Small Green 2002WA
31.12.2028N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
13462009-10 CL
-Vibrations,
No.370, IV Phase, PIA, Bangalore, IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2010
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13472009-10 CL
-Video Shack,
No.A-54, 2nd II Stage, PIE, Bengaluru-560 058,
II StageI
Corrugated Box43 G-9
or corrugated
box andSmall Green 1999
BA31.12.2012
N N N N N N N NA NA NA 0 N NA N N N NA Yes
13482009-10 CL
-Vidoo Technical Pvt Ltd,
No.A-54, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
13492009-10 CL
-Vidya Creations - II,
No.288, IVPhase, PIA, Bangalore, IV PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
30.06.2003C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13502009-10 O
23426Vijaya Building Materials,
No.552, IV Phase, PIA, Bangalore, IV PhaseI
Solid and Hllo Concrete blocks 20.78 G-37
Ready mix cement concrete
Small Green 2001BA
31.12.2020N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
13512009-10 CL
-Vikas Plastic Industries,
No.300, IV Phase, PIA, Bangalore, IV PhaseI
Plastic18 G-32
Polythene and plastic processedproducts
Small Green 2003BA
31.12.2005N N N N Y C1 N NA NA NA 0 N NA N N N NA NA
13522009-10 CL
-Vinayaka Engineering ,
No.54, III Phase, PIA, Bangalore III PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2011
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13532009-10 CL
-
Vinayaka Mosquito Coil Manufacturing Co,
No.A-300, I Stage,PIE, Bangalore I StageI
Mosquito CoilC1 O-48
ng of mosquito repellent
Small Orange ClosedBA
30.09.2005C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13542009-10 CL
-Vinod Industries,
No.421, IV Phase, PIA, Bangalore, IV PhaseI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001WA
30.06.2004N N N N N N N NA NA NA 0 N NA N N N NA NA
13552009-10 O
11702Vinu mac,
No.205/A, III Phase, PIA, Bangalore-560058
III PhaseI
Fabrication with pre treatment and spray painting (Hydrulic Pipes & Table
435 R-44Industry or process involvingmetal
Small Red 1985BA
30.06.2023Y 20.3.2025 N N N N N NA NA NA 2.4 0.16 NA N Y Y NA Yes
13562009-10 CL
-
Virendra Garments Manufacturing Ltd,
No.188, III Phase, PIA, Bangalore III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
31.12.2013C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13572009-10 CL Vishal Polymers,
No.B-96, I Stage,PIE, Bengaluru-560 058
I StageI
Plastic sack bags wooven sack with HDPE, LDPE, polythene bags
64.91 G-79Plastic sack bags, woven sack -- 10 10 15 -- 15 10
Small Green 1992BA
31.12.2022N NA N N Y 31.03.2017 N NA NA NA 0.16 N NA N Y N NA Yes
13582009-10 CL
-Vishal Udyog,
No.306/A, IV Phase, PIA, Bangalore, IV PhaseI
Machine component37 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1995BA
31.12.2000N N N N N N N NA NA NA 0 N NA N N N NA Yes
13592009-10 CL
-Voltas Lted,
No.1a, II Phase, PIA, Bangalore, II PhaseI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2000C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13602009-10 O
27956VRL Automation Pvt Ltd,
No.A-170, 4th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication unit60.97 W-33
Scientific and mathematicalinstrument
Small White 1997WA
31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
13612009-10 CL
-Wad Pack Ltd,
No.A-111/112, II Stage, PIE, Bangalore -58
II StageI
Corrugated Box52.94 G-9
products (excluding
paperSmall Green 1999
BA30.06.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13622009-10 O Washwell Processors,
No.Sb-160, I Stage, PIE, Bangalore, I StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2014N N N N N N N NA NA NA NA N NA N N N NA Yes
13632009-10 CL
-Harshita Enterprises,
No.279, IV Phasee PIA, Bengaluru-560 058
IV PhaseI
Garment 87.5 G-72 without
using boilersSmall Green 2007
BA31.12.2016
N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
13642009-10 CL
-Welflex Polymers,
No.B-126, II Stage, PIE, Bangalore II StageI
Rubber productsC1 G-41
Rubber goods industry (with gas
Small Green ClosedWA
30.06.2009C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13652009-10 CL
-Xl Plastics,
No.332, IV Phase, PIA, Bangalore, IV PhaseI
Plastic Injection Moulding C1 G-32
Polythene and plastic processedproducts
Small Green ClosedWA
31.12.2010C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13662009-10 CL
-Yumi Tools,
No.C-87, III Stage,PIE, Bangalore III StageI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2012C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13672009-10 CL
-Zen Graphics,
No.B-237/1, 6th Main, II Stage, PIE, Bengaluru-560 058,
II StageI
sand blasting48.69 G-99
sand reclamation
unit/Small Green 2003
BA31.12.2012
N N N N N N N NA NA NA 0 N NA N N N NA NA
1368 No.94/95, III Phase, PIA, Bengaluru- III Phase Engineering Unit Diesel 13682009-10 O
15673Zenith Precision Pvt Ltd,
No.94/95, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit1364 G-110
Diesel Generator sets (250 KVA
Large Green 1986BA
31.12.2025Y 31.12.2019 N N N N N NA NA NA 1.64 N ST & SP N N N NA Yes
13692009-10 O
28098Alpha Wires And Cables,
No.C-70, II Stage, PIE, Bengaluru-560 058,
II StageI
electric cables26.43 W-13
Electrical and electronic item
Small White 1998BA
31.12.2015N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
13702009-10 O
29475Alphatech,
No.C-244, I Stage, PIE, Bengaluru-560 058,
I StageI
Protection Tools35.43 W-14
Engineering and fabricationunits (dry
Small White 1990WA
31.12.2023N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
13712009-10 O Altech Industries,
No.B-181, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit20 W-14
Engineering and fabricationunits (dry
Small White 2002BA
31.12.2014N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
13722009-10 O Amba Industries,
No.B-125, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit85.25 G-1
Aluminum utensils fromaluminum circles by
Small Green 1999BA
31.12.2020N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
13732009-10 CL
-Anju Phytochemicals (P) Ltd,
No.A-53, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit36.3 G-78
Switches without
electroplatinSmall Green 2007
WA31.12.2021
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
13742009-10 CL
-Anz International,
No.A-322, II Stage, PIE, Banglaore-58, II StageI
Enginerring with heat treatment 165 O-36
treatment using oil
fired furnaceSmall Orange 2003
WA30.09.2005
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
13752009-10 O
25439
Ashwini Engineering Industries,
No.B-205, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit51.83 G-77
Manufacture of Motor & Pumpswithout
Small Green 1983BA
31.12.2024N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
13762009-10 O BSNL,
No.M-7, I Stage, Peenya Industrial Estate, Bangalore,
I StageI
Office Complex (D.G.Set) 33 G-78
Diesel Generator sets (15KVA to 250
Small Green 2008BA
31.12.2021N N N N N N N NA NA NA 0.17 N NA N Y N NA Yes
13772009-10 CL
-Auto Plast Unit-II,
Unit-II, No.556, II Stage, PIE, Banglaore-58,
II StageI
Plastic containers78.84 G-32
Polythene and plastic processedproducts
Small Green 2003BA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes
13782009-10 O Bharath Systems,
No.C-441, I Stage, PIA, Bengaluru-560 058,
I StageI
Electronic assemblies27.16 W-13
Electrical and electronic item
Small White 2002BA
31.12.2014N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
13792009-10 CL
-Bhavana Fluid Power,
No.388, 10th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit8.22 G-78
Switches without
electroplatinMedium Green 2003
BA31.12.2014
N N N N N N N NA NA NA 0 N NA N N N NA NA
13802009-10 CL
-Canara Fastners,
No.C-199A, 4th cross, I Stage, PIA, Bengaluru-560 058,
I StageI
Engineering Unit17.16 W-14
Engineering and fabricationunits (dry
Small White 1974BA
31.12.2013N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
13812009-10 O
24761
Canara Generators And Accoustics (P) Ltd,
No.B-236, II Stage, PIE, Banglaore-58,
II StageI
Engineering Unit15 W-14
Engineering and fabricationunits (dry
Small White 1998WA
31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
13822009-10 O
30226Compac Industries,
No.17/C, II Phase, PIA, Banglaore-58, II PhaseI
Corrugated Box26.77 O-98
Cardboard or corrugated box and
Small Orange 2001BA
30.09.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
13832009-10 O
22978Deva Industries,
No.B-119, II Stage, PIE, Bengaluru-560 058,
II StageI
Manufacturing of Sheet metal fabrication with Vibropolishing
26.28 O-96Gold and Silver smithy (purification
Small Orange 1993BA
30.09.2028N N N N N N N NA NA NA 1.6 0.1 NA N Y Y NA Yes
13842009-10 O Devilog Systems (India),
No.A-316, II Stage, PIE, Bengaluru-560 058,
II StageI
Filter assembling (General Engineering) 448 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1986BA
31.12.2024N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
13852009-10 O Dhanalakshmi Engineering,
No.480/A-1, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Corrugated Box17.89 G-9
Cardboard or corrugated box and
Small Green 2001BA
31.12.2021N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
13862009-10 O
24723Dynam Electro Controls,
No.186, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Electric control panels18.62 W-14
Engineering and fabricationunits (dry
Small White 1984WA
31.12.2024N N N N N N N NA NA NA 1.3 N ST & SP N N N NA NA
13872009-10 O Energy Enterprises,
No.484, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit10.62 W-14
Engineering and fabricationunits (dry
Small White 2004BA
31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
13882009-10 CL
-Famous Wood Packers,
No.M-2, 5th cross. I Stage, PIE, Bengaluru-560 058,
I StageI
wood packing 14.7 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2003WA
31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
13892009-10 CL Globe Technologies,
No.A-193, 4th cross, I Stage,PIE, Bengaluru-560 058,
I StageI
Pressed Metal Components 68.06 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2003WA
31.12.2015N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
13902009-10 O Goodwill Industries, N
No.C-23, 1st cross, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit22 W-14
Engineering and fabricationunits (dry
Small White 2003BA
31.12.2021N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes
13912009-10 O
Hi-Tech Fittings, No.C-431, I Stage, PIE, Bengaluru-560 058,
No.C-431, I Stage, PIE, Bengaluru-560 058,
I StageI
Lamp assembly17.89 W-12
Electric lamp ( bulb) andCFL manufacturi
Small White 2001WA
NN N N N N N N NA NA NA NA N NA N N N NA NA
13922009-10 O
32984Highway Rubber Industries,
No.70/71, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Rubber products19.97 G-41
Rubber goods industry
Small Green 1989WA
31.12.2023N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA32984 industry
(with gasWA N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
13932009-10 O Hytech Industries,
No.548, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit48.12 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2005
N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
13942009-10 O
India Structural And Conveyers (P) Ltd,
No.4, 5th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit12.6 W-14
Engineering and fabricationunits (dry
Small White 1997BA
31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
13952009-10 O Indus Metal Packaging,
No.V-29, II Stage, PIE, Bengaluru-560 058,
II StageI
Engineering Unit52.904 G-1
Aluminum utensils fromaluminum circles by
Small Green 2000BA
31.12.2025N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
13962009-10 O Insta Furn,
No.B-238, II Stage, PIE, Bengaluru-560 058,
II StageI
wooden kitchen furnitures 9.28 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2002BA
31.12.2013N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
13972009-10 O
24129
Weigh Control Systems Pvt Ltd.,(Formerly known as Ipa Flowmatics Pvt Ltd), No.447, IV Phase, Peenya Industrial
No.447, IV Phase, Peenya Industrial Area, Bangalore,
IV PhaseI
Engineering Unit15.6 W-14
Engineering and fabricationunits (dry
Small White 1993WA
31.12.2013N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
13982009-10 O
39346Jagadish Electronics,
No.C-258, 5th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Process control instruments and non destructive testing equipment
1.78 G-81Research laboratories notinvolving
Small Green 1997BA
31.12.2013N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes
13992009-10 CL
-K.R.M International Ltd,
No.360/361, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001WA
31.12.2005N N N N N N N NA NA NA 0 N NA N N N NA NA
14002009-10 CL
-Kedia Clothing Company,
No.254/A, III Phase, PIA, Bengaluru-560 058
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
30.09.2006C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14012009-10 O
Khedda Insulation Systems (P) Ltd,
No.A-297, II Stage, PIE, Bengaluru-560 058
II StageI
insulation components 122 G-78
Switches without
electroplatinSmall Green 1988
WA31.12.2015
N N N N N N N NA NA NA 0.33 N NA N Y N NA NA
14022009-10 O Koodal Engineers,
No.C-162, 4th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Special purpose machine 177 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
14032009-10 O Koshyma Engineering Pvt Ltd,
No.398 (A), I Stage, PIA, Bengaluru-560 058
I StageI
Industrial fans50.06 W-1
Assembly of air coolers/conditioners /repairing
Small White 1993BA
31.12.2015N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
14042009-10 O
Liebherr Machine Tools India Pvt Ltd,
No.353, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Assembly of gear730 G-78
Electrical and electronic item
Medium Green 2005BA
31.12.2021N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
14052009-10 O M.A.M Caps And Closures,
No.B-249, II Stage, PIE, Bengaluru-560 058
II StageI
Bottle caps8.5 W-24
Manufacturing of metal capscontainers
Small White 1996WA
31.12.2013N N N N N N N NA NA NA 0.25 N NA N Y N NA NA
14062009-10 O
15409Mama Furnishers, ,
No.C-243, I Stage, PIE, Bengaluru-560 058
I StageI
Furniture from sheet metal with spray painting
35.84 O-62Spray painting, paint baking, paint
Small Orange 1991BA
30.09.2029N N N N N N N NA NA NA 0.21 N NA N Y N NA Yes
14072009-10 O Manju Packaging Industries,
No.C-434, I Stage, PIE, Bengaluru-560 058
I StageI
Corrugated Box17.89 G-9
paper products (excluding paper
Small Green 2001BA
31.12.2021N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes
14082009-10 CL
-Matha Apparels,
No.B-309, II Stage, PIE, Bengaluru-560 058
II StageI
Garment21.39 G-72
or pulp manufacturing and
Small Green 2001BA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA
14092009-10 CL
-Meta Craft,
No.B-80, I Stage, PIE, Bengaluru-560 058
I StageI
CNC Machinery28.9 G-78
Switches without
electroplatinSmall Green 2003
WA31.12.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14102009-10 CL
-
Micrologix Embedded Controls (P) Ltd,
No.413/A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
PCB AssemblingC1 G-78
Switches without
electroplatinSmall Green Closed
WA31.12.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14112009-10 O
Omega Scientific Instruments Pvt Ltd,
No.C-212, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication unit29.05 W-14
Engineering and fabricationunits (dry
Small White 2003WA
31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
14122009-10 O
28031
Param Shubham Printers & Publishers Pvt Ltd,
No.C-337, II Stage, PIE, Bengaluru-560 058,
II StageI
printing press42.06 O-59
Printing press &/or Screen Printing
Small Orange 1997BA
31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
14132009-10 CL
-Pasuma Industries Unit-II,
Unit-II, No.368/369, 10th cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2014N N N N N N N NA NA NA 0.2 N NA N N N NA Yes
14142009-10 O Power Technologies,
No.185/B, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit80.06 W-14
Engineering and fabricationunits (dry
Small White 1994BA
31.12.2015N N N N N N N NA NA NA 0.075 N ST & SP N N N NA Yes
14152009-10 O Prashanthi Enterprises (India),
No.B-155, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic injection moulding 17.92 G-32
Polythene and plastic processedproducts
Small Green 1996BA
31.12.2013N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
14162009-10 CL
-Prashanthi Polymers,
No.B-155, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic injection moulding 43.69 G-32
Polythene and plastic processedproducts
Small Green 1997WA
31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA NA
1417 No.42B, IIPhase, PIA, Bengaluru-560 II Phase Battery containers battery ( 14172009-10 CL Precission Battery Machines,
No.42B, IIPhase, PIA, Bengaluru-560 058,
II PhaseI
Battery containers 12.7 O-73
battery ( excluding
manufacturiSmall Orange 2004
WA31.12.2013
N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
14182009-10 CL Premier Cnc Tool Room,
No.B-106, III Stage, PIE, Bengaluru-560 058,
III StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2019N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
14192009-10 O Pressweld Engineers (P) Ltd,
No.A-8, III Stage, PIE, Banglaore-58, III StageI
Engineering Unit59.82 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2015
N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
14202009-10 O Protekz,
No.V-6, II Stage, PIE, Bengaluru-560 058,
II StageI
Plastic injection and steel mould 7 G-32
Polythene and plastic processedproducts
Small Green 1987BA
31.12.2025N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
14212009-10 O
33663
Walkaroo International Pvt Ltd (Formerly VKC Footprints
Global Pvt Ltd)
No.488/D/E, 14th Cross, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
PU Footwears manufacturing 2153 G-90
Polyurethane foam extrusion asan allied
Large Green 2001BA
31.12.2027Y 31.12.2025 N N N N N NA NA NA 7.2 N NA N Y N NA Yes
14222009-10 O Ravi Enterprises,
No.D-390, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit4.52 W-14
Engineering and fabricationunits (dry
Small White 1986BA
31.12.2013N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
14232009-10 O
40018
Sanelec Excitation Systems Pvt Ltd,
No.131, 8th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Electronic assemblies67.65 G-78
Switches without
electroplatinSmall Green 1998
BA31.12.2025
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
14242009-10 CL
34390
ICT Services Management Solutions (I) Pvt ltd
No. 30A, Sy.No. 37 & 39, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering Unit666.1 R-10
Industries engaged in recycling/
Large Red 21.9.2017BA
30.06.2022N N N N N N N NA Yes 30.6.2022 9.5 N STP N N N NA Yes
14252009-10 CL
-Schematic Systems Pvt Ltd,
No.A-370/2 6th Main, I Stage,PIE, Bengaluru-560 058,
I StageI
Fabrication unit55.55 G-46
Steel furniture without spray
Small Green 1999WA
31.12.2015N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
14262009-10 CL
-Sonal Garments Unit - III,
Unit - III, No.163, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment312 G-72
Stitching/ Stitching ofshoe uppers/
Small Green 2004BA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 1.8 N ST & SP N N N NA NA
14272009-10 O
26233Super Packs, N
No.39/7, III Phase, PIA, Bengaluru-560 058,
III PhaseI
E.P Foam Filaments, 150 G-9
Cardboard or corrugated box and
Small Green 1986BA
31.12.2025N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
14282009-10 CL
-Sri Ranga Fabtech,
No.281/1c, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14292009-10 O Star Corporation,
No.B-240, II Stage, PIE, Bengaluru-560 058,
II StageI
Staple pins24.66 W-14
Engineering and fabricationunits (dry
Small White 2002WA
31.12.2013N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
14302009-10 O
22940Super Abrasives,
No.264, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Engineering Unit170 O-76
Natural Latex processing and/or
Small Orange 1982WA
30.09.2030N N N N N N N NA NA NA 0.68 0.01 (gardening) NA N Y N NA NA
14312009-10 CL
-Synpack Zipper Bags (P) Ltd, ,
No.B-251, II Stage, PIA, Bengaluru-560 058,
II StageI
Ziplock bags49.95 G-78
Switches without
electroplatinSmall Green 2002
BA31.12.2013
N N N N N N N NA NA NA 0 N NA N N N NA NA
14322009-10 O
23001
Deco Textil (Formerly Swan Silk Pvt Ltd),
No.A-108, 3rd Main, II Stage, PIA, Bengaluru-560 058,
II StageI
weaving- Cushion Covers (Madeups) 56.1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2004BA
31.12.2023N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes
14332009-10 O
20461TMS India Pvt Ltd,
No.14/B, 5th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Valve components of machine parts 191 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1999BA
31.12.2025N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
14342009-10 O Tata Teleservices, Ltd,
No.V-88, II Phase, PIA, Bengaluru-560 058,
II PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2010AA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes
14352009-10 O Tata Telecommunications Ltd,
No.19, III Phase, PIA, Bengaluru-560 058,
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2001AA
31.12.2017N N N N N N N NA NA NA 0 N NA N N N NA Yes
14362009-10 CL
-Techno Polymers (P) Ltd,
No.B-185, II Stage, PIE, Bengaluru-560 058,
II StageI
fiber glass10 O-92
moulding, Fiber Glassreinforced
Small Orange 1983BA
31.12.2016C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
14372009-10 CL
-Techtronics,
No.B-70, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2012N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
14382009-10 CL Textile Engineering Industries,
No.C-440, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit31.1 G-78
Switches without
electroplatinSmall Green 2002
BA31.12.2013
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
14392009-10 O
Transducers & Allied Products,
No.558, IV Phase, PIA, Bengaluru-560 058,
IV PhaseI
Electronic Items357 W-13
Electrical and electronic item
Small White 1991BA
31.12.2022N N N N N N N NA NA NA 0.88 N ST & SP N N N NA Yes
14402009-10 CL
-Tufflan India Interiors,
No.35, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Kitchen baskets with spray painting 31.91 O-62
painting, paint baking,
paintSmall Orange 2005
BA30.09.2005
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14412009-10 O Universal Air Products (P) Ltd,
No.22, III Stage, PIE, Bengaluru-560 058,
III StageI
Oxygen86.6 W-26
Medical oxygen Small White 2005
BA31.12.2024
N N N N N N N NA NA NA 0.08 N NA N N N NA YesBA N N N N N N N NA NA NA 0.08 N NA N N N NA Yes
14422009-10 O
Micrologix Embedded Controls(P) Ltd.,
No.473/D, 12th Cross, IV Phase, PIA, Bagalore-58
IV PhaseI
Assembly of Electronic items 438 W-13
Electrical and electronic item
Small White 2004BA
31.12.2021N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
14432009-10 O
13243
Sree Raj Hard chrome industries
No.388, 10th Cross, IV Phase Bengaluru-560 058
IV PhaseI
Electroplating (Hardchrome) 97.43 R-44
Industry or process involvingmetal
Small Red 2006BA
30.06.2022N N N N N N N NA NA NA 0.8 0.1 ST & SP N N Y NA Yes
14442009-10 CL
11572Jagan Steels,
No.497-D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Bright steel Bars cutting and acid pickling
22.53 R-44Industry or process involvingmetal
Small Red 2007BA
30.06.2019N N N N N N N NA NA NA 0.08 0.2 ST & SP N N Y NA Yes
14452009-10 O
32720
VBL Innovations Pvt Ltd., Unit-IV
No.17, 5th Main, III Phase, PIA, Bengaluru-560058
III PhaseI
Manufacturing of Leather Watch straps 667 G-72
Leather foot wear and leatherproducts
Medium Green 2017BA
31.12.2026N N N N N N N NA NA NA 2.56 N ST & SP N N N NA Yes
14462009-10 O
11724Metal Arts,
No.344, 9th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Aluminium anodizing209 R-44
Industry or process involvingmetal
Small Red 2006BA
30.06.2022Y 30.06.2017 N N N N N NA NA NA 0.7 0.4 NA N Y Y NA Yes
14472009-10 CL
11503
Alkem Laboratories Ltd (Research and Development
Centre),
No.473-D2, 13th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
R & D activity765.99 R-58
cal (Bulk drug &Active
Medium Red 2007BA
30.09.2017Y 30.06.2018 N N N N N NA NA NA 0 N NA N N N NA NA
14482009-10 CL
-Srinidhi Hard chrome,
No. 333, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
ElectroplatingC1 R-44
process involving
metal Small Red Closed
WA30.09.2007
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14492009-10 O
17656Chaitanya Indusries,
No.C-93, II Stage, PIE, Bangalore-560058
II StageI
3 in 1 chemical powder coating,blending & packing of
37.43 G-Industry or process involvingmetal
Small Green 2006BA
31.12.2034N N N N N N N NA NA NA 0.03 N NA N Y N NA Yes
14502009-10 CL
-Meta Gravures (P) Ltd.,
No. 57/B, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2013
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14512009-10 O
34604ENNARR Enterprises,
No. 57/A, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating (Hardchrome) 92 R-44
Industry or process involvingmetal
Small Red 1/7/2006BA
30.06.2022N N N N N N N NA NA NA 0.16 0.2 ST & SP N N Y NA Yes
14522009-10 O
17610M.R. Enterprises,
No. C-73, II Stage, PIE, Bangalore-560058
II StageI
Aluminium anodizing with screen printing 19.12 R-44
Industry or process involvingmetal
Small Red 2006BA
30.06.2025N NA N N N N N NA NA NA 0.7 0.1 NA N Y Y NA Yes
14532009-10 CL
15282Pratham Pressing,
No.341, 9th cross, IV Phase, PIA, Banagalore,PIA, Bangalore.
IV PhaseI
Pressed Component with electroplating 45.42 R-44
CLOSEDSmall Red 2005
WA30.06.2010
N N N N N N N NA NA NA 0 0 NA N N N NA NA
14542009-10 O
40040
Amara E-waste Recyclers, (Formerly Amara Metals
Enterprises,)
No.V-20/1, 4th Main Road, II Stage, PIE, Bangalore-560058
II StageI
Cln, Seg &Dismantling of ewaste in Sch-IV of e waste
94.73 R-15engaged in recycling
/ Small Red 2010
BA30.06.2023
N N N N N N N NA Yes30.06.2023
0.72 N NA N Y N NA Yes
14552009-10 O
24472TUV SUD South Asia
No.A-151/152, 2nd C Main, II Stage, PIE, Bangalore-560058
II StageI
Mechanical, Chemical & Analytical Testing textil & Food product
2890.17 R-83Research and Analyticallaboratories
Large Red 2007BA
30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.8 8 ETP Y Y N NA Yes
14562009-10 O
11633DC Autoparts,
No. A-267, 6th Mian, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering with Pretreatment 826 G-78
Panel Board, Switches withoutelectroplatin
Medium Green 2007BA
31.12.2034N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes
14572009-10 O
23471Sri Ranganatha Wire Products,
No.333,9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Wire drawing with pre cleaning activity 6.63 R-44
Industry or process involvingmetal
Small Red 1/1/2006BA
30.06.2018N N N N N N N NA NA NA 0.24 0.025 ST & SP N N Y NA Yes
14582009-10 CL
37528Srinivasa Metal Coats, N
No. 333, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Blackening4.1 R-44
process involving
metal Small Red 2006
BA30.06.2018
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14592009-10 YTC
25160Synpack Polyolefin Pvt Ltd
A-150, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacture of polyolefin films 257 G-32
Polythene and plastic processedproducts
Small Green 2005BA
NAN N N N N N N NA NA NA 0 N NA N N N NA Yes
14602009-10 CL Unique Enterprises,
No. B-110, III Stage, PIE, Bengaluru-560 058
III StageI
Powder coating with precleaning 46.31 R-44
Industry or process involving metal
Small Red 2006BA
30.06.2017N N N N N N N NA NA NA 0.4 0.1 NA N Y Y NA Yes
14612009-10 O Technofab Industries,
No. P-17, Behind Shed No. C-103, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit33.5 G-78
Switches without
electroplatinSmall Green 2006
WA31.12.2021
N N N N N N N NA NA NA 0.13 N NA N Y N NA NA
14622009-10 CL
12523Ganapathi Metal Finishers,
No. B-113-1, 3rd cross, III Stage, PIE, Bengaluru-560 058
III StageI
Electroplating Zinc plating 20 R-44
Industry or process involvingmetal
Small Red 2004BA
30.06.2023N N N N N N N NA NA NA 0.4 0.4 NA N Y Y NA Yes
14632009-10 O
12524Mohan Metal Finishers,
No. B-113-2, 3rd cross, III Stage, PIE, Bengaluru-560 058
III StageI
Electroplating Zinc plating 20 R-44
Industry or process involvingmetal
Small Red 2006BA
30.06.2023N N N N N N N NA NA NA 0.4 0.4 NA N Y Y NA Yes
14642009-10 CL
24118Hindusthan Forgings,
No.A-332, 9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Forging26 O-32
ferrous and non- ferrous
metals ( Small Orange 2007
BA30.06.2011
N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
14652009-10 O
17734M.S.R Chemicals,
No. B-232-B, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Formulation of Chemical (used for metal finishing industries)
40.98 R-22Organic Chemicalsmanufacturing
Small Red 2007BA
30.6.2023N N N N N N N NA NA NA 0.4 0.4 NA N Y Y NA Yes
1466 No. B-232/A, 5th Main, II Stage, PIE, II Stage Degreasing, De- Industry or 14662009-10 O
12177M.S. Industrial Services,
No. B-232/A, 5th Main, II Stage, PIE, Bangalore-560058
II StageI
Degreasing, De-rusting, Phospating, Pickling & Spray Painting activity
41.81 R-44Industry or process involvingmetal
Small Red 2007BA
30.6.2023N N N N N N N NA NA NA 0.5 0.5 NA N Y Y NA Yes
14672009-10 CL GFA India (P) Ltd.,
No. A-266, 6th Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Godown63 G-19
Facility of handling, storage andtransportatio
Small Green 2006BA
31.12.2015N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
14682009-10 O Anshul Agro Chemicals,
No.454, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Multi Micronutrients11 G-71
Formulation Organic Nutrientwithout the
Small Green 2006WA
30.09.2017N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
14692009-10 O Aqua Plast,
No.B-106-1, III Stage, PIE, Bengaluru-560 058
III StageI
Air blow extruder20 W-14
Engineering and fabricationunits (dry
Small White 2005WA
31.12.2015N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
14702009-10 O Insil Scientific,
No.41, BFW Layout, 5th Cross, III Stage, PIE, Bangalre-58
III StageI
Laboratory Wares30.85 G-78
Switches without
electroplatinSmall Green 2005
BA31.12.2025
N N N N N N N NA NA NA 0.86 N NA N Y N NA Yes
14712009-10 O Padmajyothi Industries,
No. C Plot-A Main Road, III Stage, PIA Bengaluru-560 058
III StageI
Pressed components13.33 G-78
Switches without
electroplatinSmall Green 2006
WA31.12.2034
N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
14722009-10 CL
-Koncretta Exterior Solutions,
No.519, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit17 W-14
Engineering and fabricationunits (dry
Small White 2006BA
31.12.2009N N N N N N N NA NA NA 0 N NA N N N NA Yes
14732009-10 CL
-Ariatex Garments Pvt Ltd.,
No.288, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment1038 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2005WA
31.12.2009N N N N N N N NA NA NA 0 N NA N N N NA NA
14742009-10 CL
-
Sunchirin Auto Parts Inia (p) Ltd.,
No. 260, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit52.32 G-78
Switches without
electroplatinSmall Green 2006
BA31.12.2009
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
14752009-10 CL
34885Vinayaka Enterprises,
No. 473-A, 12th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment Washing60 O-50
Mechanized laundry using oil fired
Small Orange 2008BA
30.09.2012N N N N N N N NA NA NA 1.5 35 ETP Y N N NA Yes
14762009-10 O GCL India Pvt. Ltd.,
No.353, 8th Main, II Stage, Peenya Industrial Estate, Bengaluru-560 058
II StageI
Engineering Unit172 G-78
Switches without
electroplatinSmall Green 2007
WA31.12.2021
N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
14772009-10 CL
-
Concept Hydro Pneumatic Pvt. Ltd.,
No. 450, IV Phase, Peenya Industrial Area, Bengaluru-560 058
IV PhaseI
Engineering with spary painting 56.22 O-62
Spray painting, paint baking, paint
Small Orange 1998WA
30.09.2005C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
14782009-10 O
35296
Hari Bhargo Engineeing Stamping & Tooling
No.112, 7th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Automotive press and press tools 167 G-88
Power pressSmall Green 25.02.2012
BA31.12.2026
N N N N N N N NA NA NA 2 N NA N Y N NA Yes
14792009-10 O
26956Jyothi Hydraulics,
No. 293, 4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit19.32 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2006WA
31.12.2025N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
14802009-10 CL
-
Bombay Royon Fashions Ltd. Unit-IV,
Unit-IV, No.471-D2, IV Phase, Peeenya Indutrial Area, Bengaluru-560 058
IV PhaseI
Garment836 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2007BA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA
14812009-10 O
28338Sujay Industries,
No. A-267(a), 6th Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit49.21 G-78
Switches without
electroplatinSmall Green 1999
BA31.12.2025
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
14822009-10 O
28589Vishwa Safety glass Industries,
No. A-354, 8th Main, II Stage, PIE, Bangalore-560058
II StageI
Glass trimming36.24 O-34
Glass ceramics, earthen potteries and
Small Orange 13-7-2005BA
30.09.2030Y 30.09.2020 N N N N N NA NA NA 2.2 0.7 NA N Y Y NA Yes
14832009-10 O Siddhi Foams,
No. A-352, 9th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Foam products 47.61 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1997WA
31.12.2015N N N N N N N NA NA NA 0.04 N NA N Y N NA NA
14842009-10 CL Brahans Rubber Products,
No.C-68, II Stage, PIE, Bengaluru-560 058
II StageI
Rubber moulded components 28.35 G-41
Rubber goods industry (with gas
Small Green 2006WA
31.12.2015N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
14852009-10 O Dakshin Deco Pvt. Ltd.,
No. B-151, 5th Main, II stage, PIE, Bengaluru-560 058
II StageI
HDPE Hooks and Rolls 127 G-32
Polythene and plastic processedproducts
Small Green 2006WA
31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
14862009-10 O
Tool Grinding Technologies Inc,
No.1-C, Plot No. 467 to 469, IV Phase, PIA, Bagalore-58
IV PhaseI
Engineering Unit44.81 W-14
Engineering and fabricationunits (dry
Small White 2005BA
31.12.2015N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
14872009-10 O
27753
Dr. Fritsch Machines & Powders Pvt. Ltd.,
No.453/A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Polishing of marble stone 128 W-14
Engineering and fabricationunits (dry
Small White 2005BA
31.12.2025N N N N N N N NA NA NA 1.23 N NA N Y N NA Yes
14882009-10 CL
-
Sartorius Mechatronics India (P) Ltd,
No.365/A, I Stage, PIE, Bengaluru-560 058,
I StageI
Testinf of systems376 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2006BA
31.12.2012C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
14892009-10 O
21648Yuken India Ltd.,
No B-80, 2nd cross, I Stage, PIE, Bangalore-560058,
I StageI
Oil Hydraulic equipments spary paiting
487 O-62Spray painting, paint baking, paint
Small Orange 2006BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 2 0.05 -recycled recycled N Y N NA Yes
14902009-10 CL
-V.B.S Petro Chemicals.,
No 11 & 12, I Stage, PIE, Bengaluru-560 058,
I StageI
Grease mfg12 R-4
ng of lubricatingoils ,grease
Small Red 2007BA
C1C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA- oils ,grease BA C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
14912009-10 CL
-Sarda Alloy Steel.,
No B-231, 5th cross, Ist Stage, Peenya Industrial Estate, Bangalore,
I StageI
Bright bars33 R-44
Industry or process involving metal
Small Red 2003BA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA
14922009-10 CL
11232
Uday Computer Aided Manufacturing Pvt Ltd.,
No A-11-A-12 , Ist Cross, Ist Stage, PIE, Bengaluru-560 058,
I StageI
NC Rotary tables & Index tables with spray painting & Assembling of surface
2416 O-62Spray painting, paint baking, paint
Large Orange 1996BA
31.12.2015Y 30.06.2015 N N N N N NA NA NA 2 0.05 NA N Y Y NA Yes
14932009-10 CL
-Varalakshmi Enterprises,
No.A-195, 4th cross, I Stage, PIE, Bangalore
I StageI
Powder coating60.06 R-44
Industry or process involving metal
Small Red 1992BA
31.12.201Y 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA Yes
14942009-10 CL
-
National Metal Processing System & Co.,
No B-25, 1st cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Heat Treatment80.31 O-63
Engineering Industries with HeatTreatment,
Small Orange 2004BA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA NA
14952009-10 CL
-R.B. Industries.,
No B-82, I Stage, Peenya Industrial Estate, Bangalore,
I StageI
Bright bars36 R-44
Industry or process involving metal
Small Red 2005BA
31.12.2015C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
14962009-10 O
11620VBL Innovations Ltd.,
No 81/82, 7th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Leather watch straps767 G-26
Leather foot wear and leatherproducts
Medium Green 1996BA
31.12.2022N N N N N N N NA NA NA 4 N ST & SP N N N NA Yes
14972009-10 CL
-Bundy India Ltd.,
No 13 C,6th Main III Phase, Peenya Industrial Area, Bangalore,
III PhaseI
Manufacture of Auto brake fluid componenets
220 G-78Panel Board, Switches withoutelectroplatin
Small Green 1/9/2005BA
31.12.2005N N N N N N N NA NA NA 0 N NA N N N NA NA
14982009-10 CL
-Mill Mech Engineering ,.,
No M-2, V Cross, I Stage PIE,Bangalore
I StageI
Engineering Unit17.89 W-14
Engineering and fabricationunits (dry
Small White 2001WA
31.12.2005C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
14992009-10 O
27697CNC Automotive - Unit 2.,
Unit 2., No B-228 4th cross, I Stage PIE,Bengaluru-560 058
I StageI
Turn Componenets only 86.93 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2004BA
31.12.2025N NA N N N N N NA NA NA 1.6 N NA N Y N NA Yes
15002009-10 CL Bangalore Clothing House,
No.120, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Garment59.69 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2001BA
31.12.2015N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
15012009-10 CL
-Navami Engineering Pvt Ltd.,
No B-315, 1 Main, I Stage PIE,Bengaluru-560 058
I StageI
Hydraulic fittings84.3 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2006WA
31.12.2017N N N N N N N NA NA NA 0.5 N NA N Y N NA NA
15022009-10 O
16071CNC Automotive - Unit 1.,
Unit 1., No B-444, I Stage PIE,Bengaluru-560 058
I StageI
Engineering Unit314 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2001BA
31.12.2025Y 31.12.2017 N N N N N NA NA NA 0.4 N NA N Y N NA Yes
15032009-10 O ACE Tech.,
No B-226,4th Cross, I Stage PIE,Bengaluru-560 058
I StageI
Precision components, pump barrel and arttist cell
372 G-77Manufacture of Motor & Pumpswithout
Small Green 2006BA
31.12.2025N N N N N N N NA NA NA 1 N NA N Y N NA Yes
15042009-10 CL BDB Packagings ,
No.142/1, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Corrugated Box26 G-9
Cardboard or corrugated box and
Small Green 2002WA
31.12.2015N N N N N N N NA NA NA 0.05 N NA N Y N NA NA
15052009-10 O
40799MRK Industries ,
No.B-398(B) , I Stage, PIE, Bengaluru-560 058,
I StageI
Electric Motor Servising 34.2 G-31
products using Boilers (excluding
Small Green 1995BA
31.12.2025N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
15062009-10 CL
-
Space Age electro Technology (India) Pvt Ltd,
No.A-232, II cross, II Stage, PIE Bengaluru-560 058,
II StageI
Manufacture Of Solar Thermal Absorbers 86.63 R-44
Industry or process involving metal
Small Red 1993BA
30.06.2012N N N N N N N NA NA NA 0.5 0.2 NA N Y Y NA Yes
15072009-10 O
32241P.T Bags ,
No.L-42 & 43, 2nd Main, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Tubular bags(bettery components) 63.95 G-78
Panel Board, Switches withoutelectroplatin
Small Green 9/8/2006BA
31.12.2026N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
15082009-10 CL
-BBR India Pvt Ltd., ,
No.31, II Phase, PIA, Bangalore, II PhaseI
Prestesed tendoses berings shading pipes 91.9 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1/3/2006BA
31.12.2007N N N N N N N NA NA NA 0 N NA N N N NA Yes
15092009-10 CL
-Shiva Exports,
No.C-436, I Stage, PIE, Bengaluru-560 058,
I StageI
Stiching of leather gloves 31.64 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2004WA
30.12.2015N N N N N N N NA NA NA 0.07 N NA N Y N NA NA
15102009-10 O
21649 Mechatronics,
No.64 & 65, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Fabrication unit200 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1980BA
31.12.2024N NA N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
15112009-10 O
12272 Asian Pumps,
No.15/A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering Unit with spray painting 99.45 O-62
Spray painting, paint baking, paint
Small Orange 2002BA
30.09.2028N 30.09.2018
N
NA N N N NA NA NA 0.8 N NA N Y N NA Yes
15122009-10 CL
-Gokuldas Images (P) Ltd,
No.48, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Garment2483 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2007BA
30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA
15132009-10 O Mandhana Industries (P) Ltd,
No.26/A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Garment1635 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2004BA
31.12.2020Y 30.09.2021 N N N N N NA NA NA 30 N STP Y N N NA Yes
15142009-10 CL
-M.S Ferro Guard Pvt Ltd,
No. N-SPL, 7th Cross, I Stage, PIA, Bangalore,
I StageI
Gril blasting & Zinc aluminium spraying 47 R-44
Industry or process involvingmetal
Small Red 1/4/2006BA
31.12.2016N N N N N N N NA NA NA 0 N NA N N N NA NA
1515 No.25 F, II Phase, Peenya Industrial II Phase Garment Garment 15152009-10 O
12050Nisha Designs., Unit-II
No.25 F, II Phase, Peenya Industrial Area, Bengaluru-560 058,
II PhaseI
Garment1131 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 1/7/2007BA
31.12.2028Y 31.12.2022 N N N N N NA NA NA 34 N STP - BWSSB N N N NA Yes
15162009-10 O
11634
Standard International Precision Engineering Pvt Ltd.,
No A-169, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit- Pre treatment 719 R-44
Industry or process involvingmetal
Medium Red 2010BA
30.06.2016N N N N N N N NA NA NA 0.7 N NA N Y N NA Yes
15172009-10 O
11618
Axalta Coating Systems India Pvt Ltd., (Formerly known as
E.I.Dupont Pvt Ltd).,
No.28-D, II Phase, PIA, Bangalore-560058.
II PhaseI
Spray painting252.6 O-62
Spray painting, paint baking, paint
Small Orange 2006BA
30.09.2023Y 30.06.2023 N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
15182009-10 O
11500
South India Wire Products Pvt Ltd.,
No.17, J-2, II Phase, PIA, Bangalore-560058,
II PhaseI
Bright Steel Bars along with pickling and Electroplating
210.32 R-44Industry or process involvingmetal
Small Red 2008BA
30.06.2024Y 30.06.2024 N N N N N NA NA NA 2.8 0.78 ST & SP N N Y NA Yes
15192009-10 CL
-
Bulk Liquid Solutions Pvt Ltd.,
No.135,8th Main, III Phase, PIA, Bangalore
III PhaseI
PVC TanksC1 G-79
covered underPlastic
Small Green ClosedBA
30.06.2007C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15202009-10 CL
-Bosch Rexroth India Ltd.,
No.118, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit214 G-78
Switches without
electroplatinSmall Green 2005
BA30.06.2007
CL 31.12.2013 C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
15212009-10 O
34455
Valdel Advanced Technologies Pvt Ltd
No.470P, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit101 G-78
Switches without
electroplatinMedium Green 2000
BA31.12.2026
N N N N N N N NA NA NA 2 N MSR-STP N N N NA Yes
15222009-10 O
31710
Industrial Engineering Instruments,
No.203, 12th Main, III Phase,PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit27.93 G-78
Electrical and electronic item
Small Green 2007BA
31.12.2026N N N N N N N NA NA NA 0.09 N ST & SP N N N NA Yes
15232009-10 CL
-Neri Machine Tools Pvt Ltd.,
No.92/93, III Phase, Peenya Industrial Area, Bengaluru-560 058,
III PhaseI
Engineering Unit15.6 W-14
Engineering and fabricationunits (dry
Small White 2006BA
31.12.2011N N N N N N N NA NA NA 0 N NA N N N NA NA
15242009-10 CL
-Nikhil Enterprises,
No.118/119, III Phase, PIA, Bengaluru-560 058,
III PhaseI
PCB manufacturing with plating 97.43 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2013
C1 30.06.2015 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15252009-10 CL
-Sartorius IndiaPvt Ltd.,
No.68, Iii Phase, Peenya Industrial Area, Bengaluru-560 058,
III PhaseI
Engineering Unit320 G-78
Switches without
electroplatinSmall Green 2006
BA31.12.2013
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15262009-10 CL
-
Maini Precission Products Pvt Ltd,
No.152, IIIrd Phase, PIA, Bangalore III PhaseI
Maintenance of precision components 400 G-78
Switches without
electroplatinSmall Green 2006
BA31.12.2009
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15272009-10 O
11637
Koustubha Scientific Research Laboratory Pvt Ltd (Formerly
L.G.C Research & Development Center).,
No. 403-406, KIADB Complex, (Model Export Bhavan), Plot No. 488-B, 14th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
R & D activity involving chemicals 482 R-58
Pharmaceutical (Bulk drug &Active
Small Red 2008BA
30.06.2022Y 30.06.2020 N N N N N NA NA NA 0.8 0.2 NA N Y Y NA Yes
15282009-10 CL
-Alankar Deaigns.,
No.182, III Phase, PIA, Bengaluru-560 058,
III PhaseI
GarmentC1 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green ClosedBA
30.06.2012C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15292009-10 CL
-Ganesh Chemicals.,
No.201/3, III Phase, Peenya Industrial Area, Bengaluru-560 058,
III PhaseI
Refilling and Trading of Chemicals 20.94 R-25
chemicals and electrochemicals
Small Red 1994BA
30.06.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15302009-10 YTC Aries Industries.,
No.101, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit2.16 G-78
Switches without
electroplatinSmall Green Closed
BANA
N N N N N N N NA NA NA 0 N NA N N N NA NA
15312009-10 CL
-Infomark Marketing Pvt Ltd.,
No.243/A, III Phase, Peenya Industrial Area, Bengaluru-560 058,
III PhaseI
Garment Washing597 O-50
Mechanized laundry using oil fired
Medium Orange 2007BA
30.09.2005C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
15322009-10 CL
-Tulip Apperals Pvt Ltd.,
No.134, III Phase, PIA, Bangalore, III PhaseI
Garment212 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2006BA
30.09.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15332009-10 CL
-Bosch Rexroth India Ltd.,
No.96, III Phase, PIA, Bangalore III PhaseI
Engineering Unit977 G-78
Switches without
electroplatinMedium Green 1998
BA31.12.2004
CL CL C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
15342009-10 CL
-C.E Gloves India Ltd.,
No 3 , II Phase, PIA, Banagalore 58 II PhaseI
Surgical Gloves1884 R-44
process involving
metal Large Red Closed
BA30.06.2008
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15352009-10 O
10801
ISRO Telematry Tracking and Commond Network.,Unit -II,
Unit -II, No. 7 & 8 II Phase, PIA, Bengaluru-560 058
II PhaseI
satlite tracking4840 G-78
Switches without
electroplatinLarge Green 6/30/1905
BA31.12.2022
N N N N N N N NA NA NA 3.5 N ST & SP N N N NA Yes
15362009-10 O JCR Drillsol Private Limited ,
Plot No 20-B, II Phase, PIA, Bengaluru-560 058.
II PhaseI
Engineering with Heat treatment 654.86 O-63
Engineering Industries with HeatTreatment,
Medium Orange 2001BA
30.06.2012N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes
15372009-10 CL
11438
Anu Solar Power Private Limited, Plont
Plont No 248, 3rd Cross, 8th Main, III Phase, PIA, Bangalore-560058
III PhaseI
Enginerring with Surface treatment 633 R-44
process involving
metal Medium Red 2002
BA31.12.2012
Y 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA NA
15382009-10 O
14812
Paragon Polymer Product Pvt Ltd., (formerly Preston India
Pvt Ltd ),
No.29/A, II Phase, PIA, Bangalore-560058,
II PhaseI
Foot wear & PVC shoes 3737 O-76
Natural Latex processing and/or
Large Orange 1/12/2005BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 22 N STP Y N N NA Yes
15392009-10 CL
-Bosch Rexrith India Pvt., Ltd.,
Plot No 96, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering with Painting 1488 O-62
painting, paint baking,
paintLarge Orange 2007
BA30.06.2008
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- paint BA C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15402009-10 O
11735
Paragon Polymer Product Pvt Ltd., (formerly Preston India
Pvt Ltd ),
No.45/A-1, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Rubber Foot wear & Canvas Footwear 1446.41 O-63
Engineering Industries with HeatTreatment,
Large Orange 1987BA
30.09.2021Y 30.09.2021 N N N N N NA NA NA 22 N STP Y N N NA Yes
15412009-10 CL
24473Southern Auto Products.,
No.41A/1, II Phase, PIA, Bengaluru-560 058
II PhaseI
Toughened Glass1672 G-21
Glass , ceramic, earthenpotteries, tile
Large Green 2005BA
31.12.2024Y 31.12.2016 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
15422009-10 O
16544Heatcarb Enterprises.,
No.34, 4th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Heat Treatment46.33 O-36
Heat treatment using oil fired furnace
Small Orange 2007BA
30.09.2023N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
15432009-10 O
33328Aventics India Pvt Ltd
Shed No.2, Plot No.35, 1St Main , II Phase, PIA, Bengaluru-560 058
II PhaseI
Pneumatic cylinder Assembly Unit 221 G-60
Repairing, cleaning,degreasing, painting and
Small Green 01.05.2017BA
31.12.2027N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes
15442009-10 O
31874Mereena Creation.Polt
No 183 , III Phase, PIA, Bengaluru-560 058.
III PhaseI
Garment801 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2007BA
31.12.2026N N N N N N N NA NA NA 18 N NA N Y N NA Yes
15452009-10 CL
12099 Bombay Rayon Fashions Ltd.,
No. 288, Iv Phase, PIA, Banaglore-58 IV PhaseI
Garment333 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2007BA
31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA
15462009-10 O
35268Armstrong Design Pvt Ltd,
No.41B, II Phase, PIA, Bengaluru-560058
II PhaseI
Manufacturing of ferrous & non ferrous casting
842 G-78 Medium Green 2007BA
31.12.2027Y 31.12.2022 N N N N N NA NA NA 3.4 0.2 ST & SP N N Y NA Yes
15472009-10 O
11704Hanuman Metal Finishers,
No.C-133, 2nd B Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating Zinc plating 19.69 R-44
Industry or process involvingmetal
Small Red 2005BA
30.06.2023N N N N N N N NA NA NA 0.8 0.6 NA N Y Y NA Yes
15482009-10 O
20101 Xcyton Diagnostics Ltd.,
No.449, 10th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Diagonistic Kit647 R-58
Pharmaceutical (Bulk drug &Active
Medium Red 2007BA
30.06.2021N NA Y 31.12.2100 N N N NA NA NA 0.61
0.02 (CBMWTF) ST & SP N N N NA Yes
15492009-10 O
12077
Wonder Fex, (Old name Washwinn Processors),
No.270, IV Phase PIA, Bengaluru-560 058
IV PhaseI
Garment dyeing & washing 312 R-40
Yarn / Textile processinginvolving
Small Red 2008BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 0.76 133 ETP Y Y N NA Yes
15502009-10 CL S R Equipments
B-38, III Stage, PIE, Bengaluru-560 058
III StageI
Engineering Unit189 G-78
Switches without
electroplatinSmall Green 2007
WA31.12.2016
N N N N N N N NA NA NA 1.5 N NA N y N NA NA
15512009-10 O Rohm India Limited , Plot
Plot No A.-53(B), 2nd Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit430 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2007BA
31.12.2023N N N N N N N NA NA NA 0.22 N NA N Y N NA Yes
15522009-10 O
20176
Mechano Engineering CO. Unit-II,
No. 3 & 4, Sy. No. 467 -469, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Fabrication unit & Painting booth 542 O-62
Spray painting, paint baking, paint
Medium Orange 2006BA
31.12.2022N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
15532009-10 CL
10823
Bangalore Suits (M/S Gokul Das Images) ,
No 48, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment1696 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2005BA
31.12.2022Y 31.12.2022 N N N N N NA NA NA 25 N STP Y N N NA Yes
15542009-10 O
11795
ISRO Telematry Tracking and Commond Network., Unit -1,
Unit -1, No. 12 & 13, II Phase, PIA, Bengaluru-560 058
II PhaseI
Setalite traking1087 G-78
Switches without
electroplatinLarge Green 1988
BA31.12.2022
N N N N N N N NA NA NA 25 N STP Y N N NA Yes
15552009-10 CL
-S S Motors,
Plot No.140, 100 feet Road , III Phase, PIA, Bnaglore- 560058
III PhaseI
Automobille repair13 O-18
Automobile servicing, repairing and
Small Orange 2006WA
30.06.2011N N N N N N N NA NA NA 0 N NA N N N NA NA
15562009-10 O Cooltronics,
Plot No 142, 9th Main, III Phase, PIA. Bnaglore-58.
III PhaseI
Fabrication unit14 G-46
Steel furniture without spray
Small Green 2006BA
31.12.2033N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
15572009-10 CL
24470
Dual Manufacturing Technolgies Private Limited ,
Plot No. SB -116, 3 rd Cross, I Stage, PIE, Bnaglore-58
I StageI
CNC Machinery Components 136.83 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2006BA
31.12.2018N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
15582009-10 O Reddy Engineering Works
No. V-75, 5th Cross, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit78 G-78
Engineering and fabricationunits (dry
Small Green 1987BA
31.12.2034N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
15592009-10 CL
- Sigma Fluid Power Pvt. Ltd.,
No. 470-A,IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electroplating64 R-44
process involving
metal Small Red 1/12/2007
BA30.06.2012
N N N N N N N NA NA NA 0 N NA N N N NA NA
15602009-10 O Orient Fab,
No.B-53, III Stage,PIE, Bengaluru-560 058
III StageI
Engineering Unit46 W-14
Switches without
electroplatinSmall White 2007
WA31.12.2016
N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
15612009-10 O Smitvin Engineers Pvt. Ltd.,
No.373, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit36 W-14
Panel Board, Switches withoutelectroplatin
Small White 2007BA
30.06.2016N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
15622009-10 CL
15231Life Line Feeds India Pvt ltd,
No C-214, 4th cross., Ist Stage , PIE, Bengaluru-560 058
I StageI
Cold storage & repacking of chicken meat
308 O-30poultry feed
and cattle feed
Small Orange 2007BA
31.12.2012N N N N N N N NA NA NA 0 N ST & SP N N N NA NA
15632009-10 O Mill Mech Emgioneering
No.205/B, 12th Main, III Phase, PIA, Bengaluru-560 058.
III PhaseI
Fabricatin of Sheet metal 35.25 W-14
Engineering and fabricationunits (dry
Small White 2009BA
31.12.2020N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
1564 No. 187, III Phase, PIA, Bangalore – III Phase Engineering with Engineering 15642009-10 CL
-Satrac Engineering Pvt Ltd.,
No. 187, III Phase, PIA, Bangalore – 560 058
III PhaseI
Engineering with fabrication and painting
16.5 W-14Engineering and fabricationunits (dry
Small White 2004BA
31.12.2010C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
15652009-10 O
15107Excel Forge Tech.
No. 360 and 361, IV Phase, PIA, Bangalore-560058
IV PhaseI
Steel Forging62.15 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2007BA
30.09.2029N N N N N N N NA NA NA 0.5
0.25 (hammer feed) ST & SP N N N NA Yes
15662015-16 O
37172Stevia World Agrotech Pvt Ltd
No.39/1, 2nd Floor, 4th Main, III Phase, PIA, Bengaluru-560058
III PhaseI
Formulation & packing of stevia based herbal products
910 G-2Ayurvedic & Homeopathic medicine
Small Green 2015BA
31.12.2027N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
15672009-10 CL
-Dymaxion Pvt. Ltd.,
No. C-178, II Stage, PIE, Bengaluru-560 058
II StageI
Battery manufacture 42 R-7
batterymanufacturing(excluding
Small Red 2007BA
31.12.2009N N N N N N Y NA NA NA 0 N NA N N N NA Yes
15682009-10 O
11247
Thermal Transfer Products Pvt. Ltd.,(TTP),
No.486-D, 13th Cross, IV Phase, PIA, Bengaluru-560 058.
IV PhaseI
Transformer Radiators (Engineering Unit) with spray painting
2720 O-69repairing/
manufacturing ( dry
Large Orange 2005BA
30.09.2022Y 30.09.2023 N N N N N NA NA NA 11 N STP Y N N NA Yes
15692009-10 CL
-Balaji Hard Chrome Unit-II,
Unit-II, No.C-85, III Stage, PIE, Bengaluru-560 058
III StageI
Electroplating23 R-44
process involving
metal Small Red 2007
BA30.06.2008
N N N N N N N NA NA NA 0 N NA N N N NA NA
15702009-10 O
Universal Power Trasnsformer Pvt. Ltd. Unit-
III,
Unit-III, No.313-A, 314-A, 6th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Assembly of transformers and switch gear
369 G-85Transformer assembly unit
Small Green 1995BA
31.12.2012N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
15712009-10 CL
11706
Universal Power Transformer Pvt. Ltd.,
No. 46/A, II Stage, PIE, Bangalore-560058
II StageI
Battery manufacture 127 R-7
batterymanufacturing(excluding
Small Red 2007BA
30.06.2008N N N N N N Y NA NA NA 0 N NA N N N NA NA
15722009-10 CL
-PCB Services .,
No 118/119, III Phase, PIA, Bengaluru-560 058.
III PhaseI
Engineering Unit108 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2008
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15732009-10 CL
-Shiltron Eletronics .,
No 118/119, III Phase, PIA, Bengaluru-560 058.
III PhaseI
PCB Manufacturing with plating 311 G-78
Switches without
electroplatinSmall Green 2007
WA31.12.2008
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
15742009-10 CL
-
Shakambari Fashions (P) Ltd (formerly Pitambara creations
(India) Pvt ltd.,
No.30-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment washing117 O-50
Mechanized laundry using oil fired
Small Orange 2006BA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA
15752009-10 CL
-Kamath Transformers.,
No.B-71, 2nd cross. Ist Stage, PIE, Bengaluru-560 058
I StageI
Transformer assembly 89 G-85
Transformer assembly unit(industrial
Small Green 2003BA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA
15762009-10 O Kamath Transformers.,
No.A-155, 3rd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Manufacture of Transformers & its parts(without painting)
164 G-85Transformer assembly unit(industrial
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes
15772009-10 O
15215
Sri Balaji Industries(old name: Jyothi Electroplaters),
No.293/A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electroplating4.52 R-44
Industry or process involvingmetal
Small Red 2006BA
17.3.2025N N N N N N N NA NA NA 0.08 0.05 NA N Y Y NA Yes
15782009-10 O
25870Active Knits
No.30/C, 2 nd & 3rd Floor, II Phase, Peenya, Bengaluru-560 058
II PhaseI
Ready made Garments 63 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2015BA
31.12.2024N NA N N N N N NA NA NA 12 N STP Y N N NA Yes
15792009-10 O
39548Tulip Engineers.,
No.249, 3rd cross, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Electroplating (hardchrome) 74.46 R-44
Industry or process involvingmetal
Small Red 2008BA
30.06.2023Y 30.6.2023 N N N N N NA NA NA 0.4 0.25 ST & SP N N Y NA Yes
15802009-10 O
Victory Aluminium (formerly M/s.Anand Rubber)
No.C-54, III Stage, PIE, Bengaluru-560 058
III StageI
Rubber beedings22.5 G-41
Rubber goods industry (with gas
Small Green 2007BA
31.12.2031N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
15812009-10 O Anand Rubber,
No.C-77, III Stage, PIE, Bengaluru-560 058
III StageI
Rubber beedings54.6 G-41
Rubber goods industry (with gas
Small Green 2007WA
31.12.2016N N N N N N N NA NA NA 0.04 N NA N Y N NA NA
15822009-10 CL
10287ABB Ltd.,
No. 485/6, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
assembling of robotic system 607.45 G-78
Panel Board, Switches withoutelectroplatin
Medium Green 2005BA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA NA
15832009-10 O
22951 Vijay Power Control Systems,
No.B-65 P-16, III Stage, PIE, Bengaluru-560 058
III StageI
Transformers92.6 O-69
Transformer repairing/manufacturing ( dry
Small Orange 2006BA
31.12.2024N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes
15842009-10 CL
-
International Trimmings Labels India (P) Ltd.,
No.P-6, III Stage, PIE, Bangalore58 III StageI
printing on labels 193 G-91
of Adhesives and
adhesive Small Green 2007
BA31.12.2012
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
15852009-10 CL
24269
Fine Transferprints India Pvt. Ltd., N
No. 287, 4th main, IV Phase, PIA, Bangalore58
IV PhaseI
Label Printed on tapes & screen printing 390 G-91
of Adhesives and
adhesive Small Green 2007
BA31.12.2022
N N N N N N N NA NA NA 1.2 0.5 ST & SP N N Y NA Yes
15862009-10 O X.L CNC Machines,
No.C-78, III Stage, PIE, Bengaluru-560 058
III StageI
Engineering Unit12.2 W-14
Engineering and fabricationunits (dry
Small White 2005WA
31.12.2016N N N N N N N NA NA NA 0.04 N NA N Y N NA NA
15872009-10 O
11430
Dressmaster suits (Robet Systems),
No.76/77, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment2680 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 1/2/2007BA
31.12.2025N N N N N N N NA NA NA 20 N NA N Y N NA Yes
15882009-10 O
32426ACWA Automatics.,
No.204, 12th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Powder coating, painting without trade 429 G-97
Activity of Powder
Coating onSmall Green 2006
BA31.12.2026
N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes32426 Coating onsurface of
BA N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
15892009-10 CL
-MPP Technologies Pvt. Ltd.,
No. 489/D, 14th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Assembly of Transformers with spray painting
313 O-62Spray painting, paint baking, paint
Small Orange 2005BA
30.09.2017Y 30.09.2018 N N N N N NA NA NA 1.2 0.1 ST & SP N N Y NA Yes
15902009-10 O
33268Ador Fontech Ltd., Unit-II
No. A-288, II Stage, PIE, Bangalore-560058
II StageI
Welding electrodes241 O-4
Coated electrode manufacturing
Small Orange 2007BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 1 0.4 NA N Y Y NA Yes
15912009-10 O
14712 Friction Control Productes ,
Plot No 486 B-2, IV Phase, Bnaglore-560058
IV PhaseI
Mixing & blending of base oil & Additives to produceindustrial lubricating
364 G-27Lubricating oil,greases or petroleum
Small Green 2007BA
31.12.2033N NA N N N N N NA NA NA 0.5 N NA N Y N NA Yes
15922009-10 CL
-
PAXAR INDIA Private Limited,
No A- 252 (A), II Stage, PIA, Bangalore
II StageI
Woven labels 90 G-91
of Adhesives and
adhesive Small Green 2007
BA31.12.2009
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
15932009-10 CL
-Concreate Extrerir Solutions,
No.519, IV Phase, PIA, Bangalore. IV PhaseI
Concrete tiles170 G-37
Ready mix cement
concreteSmall Green 2006
BA31.12.2009
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
15942009-10 O Bangalore Sanchar Nigam Ltd.,
No. 415,11th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2004AA
31.12.2016N N N N N N N NA NA NA 0 N NA N N N NA Yes
15952009-10 O Gopal Engineering,
No.P6/E, II Stage, PIA, Bengaluru-560 058
II StageI
Engineering Unit42 G-78
Switches without
electroplatinSmall Green 2009
WA31.12.2021
N N N N N N N NA NA NA 0.11 N NA N Y N NA NA
15962009-10 O
38323 Porlu Packers,
No.473/D(1), IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Polythene Bag & Sheets 51.95 G-32
Polythene and plastic processedproducts
Small Green 2003BA
31.12.2027N N N N Y N N NA NA NA 0.4 N ST & SP N N N NA Yes
15972009-10 CL
-Adept Polymers Pvt.,
No. B-34, III Stage, PIE, Bengaluru-560 058
III StageI
Engineering with Surface treatment 102 R-44
Industry or process involving metal
Small Red 2006BA
C1N N N N N N N NA NA NA 0 N NA N Y N NA Yes
15982009-10 CL
-
Pragathi Transmission Private Limited.,
No.B-55, III Stage, PIE, Bengaluru-560 058
III StageI
Engineering with Surface treatment 222 R-44
Industry or process involving metal
Small Red 2006BA
30.06.2009N N N N N N N NA NA NA 0 N NA N N N NA NA
15992009-10 CL
-Ratan Mani Industries,
No. 267, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Plastic carry bags40.8 G-32
Polythene and plastic processedproducts
Small Green 2002BA
31.12.2016N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
16002009-10 O
34004SAS Precision Engineering,
No.B-51, 2nd cross, III Stage, PIE, Bengaluru-560 058
III StageI
CNC Components with aluminum melting frunace
234 O-28Non- ferrous
metalextraction
Small Orange 2007BA
30.09.2022N N N N N N N NA NA NA 1.2 0.02 NA N Y Y NA Yes
16012009-10 O Sri Gayathri Luch Home,
No. 59, KIADB Complex, NTTF Circle, IV Phase, PIA, Bengaluru-560 058
IV PhaseHospital
ity
Hotel without rooms13 G-3
confectionery / sweetsproducts
Small White 1999BA
31.12.2021N N N N N N N NA NA NA 0 N NA N Y N NA Yes
16022009-10 O
39361Starline Packers Pvt. Ltd.,
No. 490E, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
wood packing 27.82 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2001BA
31.12.2026N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
16032009-10 CL
-
International Trimmings and Labels India (P) Ltd.,
No. P-6, 1st Cross, III Stage, PIE, Bengaluru-560 058
III StageI
printing on labels 193 G-91
of Adhesives and
adhesive Small Green 2007
BA31.12.2008
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16042009-10 O
17969
CNC India Tools and Services (P) Ltd.,
No.C-342, II Stage, PIA, Bengaluru-560 058
II StageI
Engineering Unit58.64 W-14
Engineering and fabricationunits (dry
Small White 2004BA
31.12.2015N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
16052009-10 O
41066 Locus Machine tools (P) Ltd,
No. 392/1, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit36.9 G-78
Machine tool components Small Green 2005
WA31.12.2025
N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA
16062009-10 CL
-SMS Packaging Pvt. Ltd.,
No. A-36, II Stage, PIE, Bengaluru-560 058
II StageI
Corrugated Box285 G-9
or corrugated
box and Small Green 2004
BA31.12.2015
N N N N N N N NA NA NA 0 N NA N N N NA NA
16072009-10 CL
-Hutchison Essat South Ltd.,
No.399, IV Phase, PIA, Bengaluru-560 058
IV PhaseTT
Telephone towerDG Set W-52
products using Boilers (excluding
Small White 2003AA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
16082009-10 CL
-
Sumukha Battery Manufacturing, plot
Plot No. B-151, II Stage, PIE, Bengaluru-560 058
II StageI
Battery manufacture 11.92 R-7
pulp manufacturi
ng)Small Red 2004
WA30.06.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16092009-10 CL
-Supertex wraps (P) Ltd.,
No. 457-B, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Plastic sheet 10 G-32
Polythene and plastic processedproducts
Medium Green 2005WA
31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16102009-10 CL
-Raj Enterprises, No. Plot
No. Plot No. 471/D2, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Stiching and leather hand floves 23.5 G-72
Stitching/ Stitching ofshoe uppers/
Small Green 2006BA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16112009-10 CL
-
Seven Seas Industries (P) Ltd.,
No. 485/9-A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2003
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16122009-10 CL
- Access Apparels Exports,
No. 88, Renuka complex, II Stage, PIE, Bengaluru-560 058
II StageI
Garment350 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2005BA
31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
1613 Plot No 49, III Phase, PIA, Bengaluru- III Phase coir Matteress Carpentry & 16132009-10 O Kurlon Limited, Plont
Plot No 49, III Phase, PIA, Bengaluru-560 058
III PhaseI
coir Matteress66 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2007BA
31.12.2025Y 31.12.2020 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
16142009-10 CL
12793Garden City Fshions Pvt Ltd.,
No.356-357, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment698 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2009BA
31.12.2028Y 31.12.2018 Y 31.12.2100 N N N NA NA NA 18 N NA N Y N NA Yes
16152009-10 CL
-Surya Hard Chrome Pvt Ltd.,
No.168, Unit-II, III Phase, Bengaluru-560 058
III PhaseI
Elctroplating80 R-44
process involving
metal Small Red 2008
WA30.06.2014
C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16162009-10 O Bharath Sanchar Nigama Ltd.,
Tower Site No.15/4, 3rd Main Peenya New Extension, Bengaluru-560 058
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2007AA
31.12.2017N N N N N N N NA NA NA 0 N NA N N N NA Yes
16172009-10 O Bharath Sanchar Nigama Ltd.,
Bangalore-III Phase,PIA, Bangalor-58 III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2007AA
31.12.2017N N N N N N N NA NA NA 0 N NA N N N NA Yes
16182009-10 O
53439
Bharath Sanchar Nigama Ltd., Tower Site open Land atM/s
Umbrey Engineers P Ltd.,
No.31, II Phase, PIA, Bangalor-58 II PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2006AA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
16192009-10 CL
-Janardhana Enterprises,
No.34/G, 4th Main Raod, III Phase, PIA, Bengaluru-560 058.
III PhaseI
Engineering with Heat treatment 47 O-63
Engineering Industries with HeatTreatment,
Small Orange 2008WA
31.12.2015C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16202009-10 CL
-
PEPPERL + FUCHS (INDIA) PVT. LTD.,
No.C-328, I Stage, PIE, Bengaluru-560 058
I StageI
Proximity switches/ Sensors 107 G-78
Panel Board, Switches withoutelectroplatin
Small Green 27/5/2002BA
31.12.2007C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16212009-10 O
Hutchison essar South Ltd.,C/O Rukmini towers,
No. V-23(A) &(B), PIE, II Stage, Bengaluru-560 058
II StageTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2003AA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
16222009-10 CL
-Universal Gases,
No P-22, Next to B-110, II Stage, PIE, Bengaluru-560 058
II StageI
Industrial Oxygen16.75 G-109
Repacking and
blending of Small Green 2002
WA31.12.2014
N N N N N N N NA NA NA 0 N NA N N N NA NA
16232009-10 O Plexion PDDE,
No. B-116, II Stage, PIE, Bengaluru-560 058
II StageI
Fabrication wings57.85 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2005WA
31.12.2015N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
16242009-10 O Sigma Metaliks,
No. C-490, IV Phase, PIE, Bengaluru-560 058
IV PhaseI
General Engineering activity without surface treatment, plating and spray
448.82 G-10Carpentry & wooden furnituremanufacturi
Small Green 1999BA
31.12.2024N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
16252009-10 CL
-
Shakunthala Mechanized Constructions & Engineering
Pvt. Ltd.,
No. 387, 4th main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Solid and Hllo Concrete blocks 16.9 G-37
Ready mix cement
concreteSmall Green 1993
WA31.12.2011
N N N N N N N NA NA NA 0 N NA N N N NA NA
16262009-10 O Bombay Machines,
No. C-88, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit89.47 W-14
Engineering and fabricationunits (dry
Small White 1992BA
31.12.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
16272009-10 O Premier Packs,
No. B-45, III Stage, PIE, Bengaluru-560 058
III StageI
Corrugated Box20.11 G-9
Cardboard or corrugated box and
Small Green 1994WA
31.12.2024N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
16282009-10 O
39448Sagittarius Metals Pvt. Ltd.,
No. 526, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit90.95 G-7
products using Boilers (excluding
Small Green 1999BA
31.12.2025N N N N N N N NA NA NA 0.9 N NA Y Y N NA Yes
16292009-10 CL
Naval Industrial and Control equipments,
No. 460-C, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of screw and revet 18.32 W-14
paper or pulp manufacturing)
Small White 1994BA
31.12.2014N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes
16302009-10 O Premier packging,
No. B-229, II Stage, PIE, Bengaluru-560 058
II StageI
Cutting and Fabrication of plastic sheet
22 W-14Engineering and fabricationunits (dry
Small White 2003WA
31.12.2016N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
16312009-10 CL Vision Plast,
No. 39, 4th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Plastic injection moulding 32 G-32
Polythene and plastic processedproducts
Small Green 2000WA
31.12.2016N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
16322009-10 O Alpha Industries,
No C-275, Ist Stage, PIE, Bengaluru-560 058
I StageI
CNC Machinery32.69 G-78
Switches without
electroplatinSmall Green 1995
BA31.12.2021
N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes
16332009-10 CL P & S Goldclads,
No A-174, 4th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Immitation Jewellary91 G-23
Gold and silver smithy(purification with acid
Small Green 2005BA
31.12.2015N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
16342009-10 O Asha Engineering,
No B-74, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit18.65 W-14
Engineering and fabricationunits (dry
Small White 2002WA
31.12.2013N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
16352009-10 O Crescent Tool Engineering,
No B-89, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit78.83 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1985BA
31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
16362009-10 CL
-SB Components ,
No C-206, 4th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Plastic injection moulding 11.41 G-32
Polythene and plastic processedproducts
Small Green 1999BA
31.12.2014N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
16372009-10 O Kumar Industriest,
No 8, 10th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication unit7.59 W-14
Engineering and fabrication
Small White 1977WA
31.12.2014N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NAfabrication
units (dry WA N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
16382016-17 O
30868Celest Pharma Labs Pvt Ltd
No.68,6th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Ayurvedic and Homeopathy medicine 9.2 O-19
Ayurvedic & Homeopathic medicine
Micro Orange 1.11.2017BA
30.09.2022N N N N N N N NA NA NA 28 0.04 ST & SP N N Y NA Yes
16392009-10 O
Shree Ganesh Maruthi Fabricators.,
No. 153, III Phase, 10th Main, PIA, Bengaluru-560 058
III PhaseI
Fabrication unit47 W-14
Engineering and fabricationunits (dry
Small White 2003BA
31.12.2016N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes
16402009-10 CL Meenakshi Engineering Co.,
No.237, III Phase, PIA, Bengaluru-560 058
III PhaseI
Fiber glass1.21 G-108
Fiber glass molding, Fiber Glass reinforced
Small Green 1995BA
31.12.2014N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
16412009-10 CL Anand Rubber Industries.,
No.13, III Phase, PIA, Bengaluru-560 058
III PhaseI
Rubber beedings22.92 G-86
Tread rubber including pre-curedrubber
Small Green 2004BA
31.12.2014N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes
16422009-10 O
28597Arjun Plastics,
No.VP-9 & 10, I Stage, PIE, Bengaluru-560 058,
I StageI
Plastic injection moulding 85.27 G-32
Polythene and plastic processedproducts
Small Green 1993BA
31.12.2024N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
16432009-10 O Sepcon System Pvt Ltd ,
No. M-3, I Stage, 5th Cross, PIE, Bengaluru-560 058
I StageI
Pollution control equiment (fabrication) 189.52 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1995WA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
16442009-10 O
Superfchem Consupack Company,
No B-354, I Stage,PIE, Bengaluru-560 058
I StageI
Fabrication unit19.85 W-14
Engineering and fabricationunits (dry
Small White 2002WA
31.12.2012N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
16452009-10 CL
-Universal Furnaces,
No A-371, I Stage,PIE, Bengaluru-560 058
I StageI
Fabrication and Packing 51.24 W-14
Engineering and fabricationunits (dry
Small White 1991BA
31.12.2013N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
16462009-10 CL
-Mysore Vinyl Industries,
No C-209, I Stage,PIE, Bengaluru-560 058
I StageI
Shoe Upper5.5 Closed Small Green 1975
WA31.12.2012
N N N N N N N NA NA NA 0 N NA N N N NA NA
16472009-10 O Hema Engineering Industries,
No C-210, 4th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Auto componenets193.91 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1990WA
31.12.2024N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
16482009-10 CL
-Gears India,
No C-439, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering Unit23 W-14
Engineering and fabricationunits (dry
Small White 2002BA
31.12.2012N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
16492009-10 CL
Shringar Engineering & Energy Systems (P) Ltd.,
No.93, 7th main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Assembly of solar heaters 56 G-78
Solar power generationthrough solar
Small Green 1999BA
31.12.2016N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
16502009-10 CL
15212
Ashwin precision Product Pvt Ltd.,
, No.C-270, I Stage, PIE, Bangalore-560058,
I StageI
Engineering Unit13.56 G-77
Manufacture of Motor & Pumpswithout
Small Green 2000BA
31.12.2014N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
16512009-10 CL
-G.S. Fabricators.,
No.72, III Phase, PIA, Bengaluru-560 058
III PhaseI
Fabrication unit26.77 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2007BA
31.12.2011C1 C1 C1 C1 C1 C1 C1 NA NA NA 0.1 N NA N Y N NA NA
16522009-10 CL Nucleus Engineers.,
No.68, III Phase, PIA, Bengaluru-560 058
III PhaseI
Mild sheet &Aluminium machine 41 G-1
Aluminum utensils fromaluminum circles by
Small Green 1997WA
31.12.2015N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
16532009-10 O
15212
Ashwin precision Product Pvt Ltd.,
No.C-429, I Stage, PIE, Bengaluru-560 058,
I StageI
Degreasing, Pickling,Phosphating 24.75 R-44
Industry or process involvingmetal
Small Red 2001BA
30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.8 0.25 NA N Y Y NA Yes
16542009-10 O
Bharath Precision Machine Tools., 8,
No.B-14, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit95.55 G-77
Brass and bell metal utensilsmanufacturi
Small Green 1974BA
31.12.2024N N N N N N N NA NA NA 1 N NA N Y N NA Yes
16552009-10 O
Ashwin precision Product Pvt Ltd.,
No.A-158, I Stage, PIE, Bengaluru-560 058,
I StageI
Precesion components 915 G-77
Manufacture of Motor & Pumpswithout
Medium Green 2000BA
31.12.2024Y 31.12.2024 N N N N N NA NA NA 0.8 N NA N Y N NA Yes
16562009-10 CL
-
Ashwin precision Product Pvt Ltd.,
No.B-121, I Stage, PIE, Bengaluru-560 058,
I StageI
Engineering Unit65.42 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2002BA
31.12.2014N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
16572009-10 CL
-
Baliga Lighting Co., No.A-10, I Stage, PIE, Bengaluru-560
058,
No.A-10, I Stage, PIE, Bengaluru-560 058,
I StageI
Manufacture of cable glands and accessories
26 G-10Carpentry & wooden furnituremanufacturi
Small Green 1973WA
31.12.2016y 31.12.2019 N N N N N NA NA NA 0.3 N NA N Y N NA NA
16582009-10 O
37789
Sushil Rubber & Allied Products., No.C-203, 4th
cross, I Stage, PIE, Bengaluru-560 058,
No.C-203, 4th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Rubber componenent43.08 G-41
Rubber goods industry (with gas
Small Green 1973BA
31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
16592009-10 O
Aswathy Heat Tech Pvt Ltd.,No.M-2, 5th cross, I
Stage, PIE, Bengaluru-560 058,
No.M-2, 5th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Fabrication of heatreatment equipents
61 W-14Engineering and fabricationunits (dry
Small White 2006WA
31.12.2026N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA
16602009-10 O
39866Sai Scientific Industries.,
No. N-1/1-A, 4th cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Laboratory Seientific Equipments 37.45 W-43
Laboratory ware includingglass
Small White 2007WA
31.12.2016N N N N N N N NA NA NA 1.8 N NA N Y N NA NA
16612009-10 CL Kaamadhenu Industries.,
No.SB-111/112, 2nd cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Rubber Mixing324 G-41
Rubber goods industry (with gas
Small Green 2008WA
31.12.2017N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
1662 No.B-29, 1st cross, I Stage, PIE, I Stage Manufacture of Brass and 16622009-10 O
40072Ganesh Cam Products.,
No.B-29, 1st cross, I Stage, PIE, Bengaluru-560 058,
I StageI
Manufacture of precesion turn components CNC machine components
81 G-7Brass and bell metal utensilsmanufacturi
Small Green 2006BA
31.12.2025N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
16632009-10 CL
-Cimtrix,
NoI-A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering Unit106 G-78
Switches without
electroplatinSmall Green 2004
BA31.12.2004
N N N N N N N NA NA NA 0 N NA N N N NA NA
16642009-10 O
39854Teknic SwitchGear,
No I7-H, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Electronic equipments30.87 G-78
Switches without
electroplatinSmall Green 1988
BA31.12.2015
N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
16652009-10 CL
10648Jeans Knit Pvt Ltd.,
No 26/A, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Ready made Garments 1929.5 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2004BA
31.12.2024Y 31.12.2019 N N N N N NA NA NA 57.6 N NA N Y N NA Yes
16662009-10 CL
-
Euro Clothing CoJeans Knit Pvt Ltd.,
No 26A, II Phase, PIA, Bangalore, II PhaseI
Garment78 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2004BA
31.12.2004C1 C1 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16672009-10 CL TIA Technologies.,
No 39/A, II Phase, PIA, Bangalore, II PhaseI
Engineering Unit45.05 G-78
Switches without
electroplatinSmall Green 2007
WA31.12.2016
N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
16682009-10 O
17181 Souza Engineering.,
No. 39/1, III Phase, PIA, Bengaluru-560 058
III PhaseI
Turned components8.9 W-14
Engineering and fabricationunits (dry
Small White 1999WA
31.12.2022N N N N N N N NA NA NA 0.16 N ST & SP N N N NA NA
16692009-10 O G.K. Engineering.,
No.B-230, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit31.38 W-14
Engineering and fabricationunits (dry
Small White 2006BA
31.12.2015N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
16702009-10 O
40009
S.G. Equipments & Machine Pvt Ltd.,
No.M-15, I Stage, PIE, Bengaluru-560 058
I StageI
Stainless steel equipment 96.85 G-46
Steel furniture without spray
Small Green 1997BA
31.12.2025N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
16712009-10 CL
-
Precimech Precision Products Pvt Ltd.,
No.B-77, I Stage, PIE, Bengaluru-560 058
I StageI
Precision componenets 73.32 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2011
N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
16722009-10 O
28120
Heat Control Instruments & Services.,
Plot No 104, III Phase, PIA, Bengaluru-560 058
III PhaseI
Mfg of heat control instruments 23.2 G-18
Steel furniture without spray
Small Green 2003BA
31.12.2023N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
16732009-10 CL
-Jagan Engineering Company.,
No. C-337, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit23.64 W-14
Engineering and fabricationunits (dry
Small White 1994BA
31.12.2013N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
16742009-10 CL
-
Shrishail Industries., No. C-264, I Stage, PIE, Bengaluru-
560 058
No. C-264, I Stage, PIE, Bengaluru-560 058
I StageI
Automobile parts14 W-14
Engineering and fabricationunits (dry
Small White 1978BA
30.06.2008C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
16752009-10 O
Centra Line Lubro Tech Pvt Ltd.,
No. A-173, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit23 W-14
Engineering and fabricationunits (dry
Small White 2007BA
30.06.2019N N N N N N N NA NA NA NA N NA N N N NA Yes
16762009-10 CL
-Sharman (India) Pvt Ltd,
No. B-22, I Stage, Ist Cross, PIE, Bengaluru-560 058
I StageI
Fabrication unit74 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1972BA
31.12.2016N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes
16772009-10 CL
-
True Image Roto Converter Pvt Ltd,
No. B-15, Ist Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit22.8 W-14
Engineering and fabricationunits (dry
Small White 2001BA
31.12.2007C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16782009-10 CL
-Sonal Garments - IX,
No.110, III Phase, PIA, Bangalore, III PhaseI
Garment10 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2004WA
31.12.2011C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16792009-10 CL
-Sonal Garments -VI,
No.57/B0, III Phase, PIA, Bangalore, III PhaseI
Garment795 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2005BA
30.06.2012C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16802009-10 O Gokuldas India,- Unit II
Unit II No.21 B & 21 C, II Phase, PIA, Bangalore,
II PhaseI
Garment98 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1998BA
31.12.2023Y 28.01.2026 Y 31.12.2100 N N N NA NA NA 27 N STP Y N N NA Yes
16812009-10 CL
-Dantal Hydraulics Pvt Ltd.,
No.480, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering with spary painting 491 O-62
Spray painting, paint baking, paint
Small Orange 2003BA
30.06.2013C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
16822009-10 O
24144
Fine Tools India (P) Ltd., Unit-II,
Unit-II, No.457/B, IV Phase, PIA Bengaluru-560 058
IV PhaseI
Plastic injection moulding 105 G-32
Polythene and plastic processedproducts
Small Green 2008BA
31.12.2023N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
16832009-10 O Allegra Fibres,
No.338, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
fibre glass reinforced14.82 W-14
Engineering and fabricationunits (dry
Small White 2008BA
30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes
16842009-10 O
11710Ace Multi Axes Systems,
No.17, Plot No.467 - 469, IV Phase, PIA, Bengaluru-58
IV PhaseI
CNC Machinery & low pressure Die casting
3669 O-32Forging of ferrous and non- ferrousmetals (
Large Orange 2006BA
30.09.2020N N N N N N N NA NA NA 1.92 N ST & SP N N N NA Yes
16852009-10 CL
-Tanish Technologies (P) Ltd.,
No.B-52, III Stage, PIE, Bengaluru-560 058
III StageI
General Engineering67.86 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2013
N N N N N N N NA NA NA 0 N NA N N N NA NA
16862009-10 O
Fluid Power Technologies Pvt Ltd.,
No.A-23 & 24, III Stage, PIE, Bengaluru-560 058
III StageI
Engineering Unit695 G-78
Switches without
electroplatinMedium Green 2008
BA31.12.2021
N N N N N N N NA NA NA 1.12 N NA N Y N NA Yeselectroplatin BA N N N N N N N NA NA NA 1.12 N NA N Y N NA Yes
16872009-10 O
37886Kurlon Enterprise Ltd
No.28E, 4th Main, II Phase, PIA, Bengaluru-560058
II PhaseI
Manufacture of Spring, Rubberised coir and Foam Mattresses
1519 G-90Polyurethane
foam extrusion
Large Green 1994BA
31.12.2027Y 31.12.2024 N N N N N NA NA NA 4 N NA N Y N NA Yes
16882009-10 O
11487Viziphar Biosciences (P) Ltd.,
No.303-306, Vitc Model Exports Park, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
R & D activity213 R-58
Pharmaceutical (Bulk drug &Active
Small Red 2008BA
30.06.2022Y 30.06.2022 N N N N N NA NA NA 0.4 0.2 NA N Y Y NA Yes
16892009-10 O
11543
Saravana Foundry & Engg Works
No.382,10th cross, IV Phase, Bengaluru-560 058
IV PhaseI
Foundry (Copper & brass sheet/circle) 58.16 O-42
Industry or processes involving
Small Orange 1986BA
30.09.2022Y
30.09.2022N N N N N NA NA NA 1.2 0.05 ST & SP N N Y NA Yes
16902009-10 O
24318Varu Founders,
No.510, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Non-Ferrous Castings24.32 O-32
foundry operations Small Orange 1982
BA30.06.2019
N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes
16912009-10 CL
-
Turbo Tech Precision Eng Pvt Ltd.,
No.343/A, II Stage, PIE, Bengaluru-560 058
II StageI
Turbines 571 O-32
Forging of ferrous and non- ferrousmetals (
Medium Orange 2007BA
31.12.2006N N N N N N N NA NA NA 0 N NA N N N NA NA
16922009-10 O
36722Alpha Linear,
No.V-55, II Stage.PIE, Bengaluru-560 058
II StageI
Fabrication unit70 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2008BA
31.12.2027N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
16932009-10 O Highway Rubber Industries,
C-74, II Stage, Bengaluru-560 058 II StageI
Blending raw materials, rubber 25.51 G-86
Tread rubber including pre-curedrubber
Small Green 2007WA
31.12.2026N N N N N N N NA NA NA 0.16 N NA N Y N NA NA
16942009-10 CL
24113Kavitha Industries
No.C-256, I Stage, Bengaluru-560 058 I StageI
Parts of Solar Water heater and Tunning components with spray painting
17.27 O-22Ferrous and Non- ferrous metalextraction
Small Orange 2002BA
30.06.2012N N N N N N N NA NA NA 0.55 N NA N Y N NA Yes
16952009-10 O
30078Auto Components
No.M-7 7th cross, PIE, I Stage, Bengaluru-560 058
I StageI
Fuel Injection43 G-77
Manufacture of Motor & Pumpswithout
Small Green 1981WA
31.12.2025N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
16962009-10 CL
-Safe Metals,
No.42, II Phase, PIA, Bengaluru-560 058
II PhaseI
Pure lead67.97 R-7
batterymanufacturing(excluding
Small Red 2008BA
30.06.2014Y 30.06.2014 N N N N N NA NA NA 0 N NA N N N NA NA
16972009-10 CL
-kyes Industries,
No.SB-43, I Stage, PIE, Banglaore I StageI
Heat Treatment8.27 O-63
Engineering Industries with HeatTreatment,
Small Orange 1974BA
30.06.2013C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
16982009-10 CL
Arvind Forging and Engineering
No.B-131, 3rd cross, I Stage, Bangalore-560058
I StageI
Forging 89.64 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2000BA
30.06.2012N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
16992009-10 CL
-Maini Precision Products,
No.C-217, 4th cross, I Stage, Bengaluru-560 058
I StageI
Engineering Unit221 G-78
Switches without
electroplatinSmall Green 2008
WA31.12.2023
N N N N N N N NA NA NA 5 N NA N Y N NA NA
17002009-10 CL
-A.G.Sons Penel Processors,
No.B-82, I Stage, PIE, Bengaluru-560 058
I StageI
Assembly of electronics 557 G-78
Switches without
electroplatinMedium Green 1991
WA31.12.2011
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
17012009-10 O
Maini Precision Products Pvt Ltd,
No.163, I Stage, PIE, Bengaluru-560 058
I StageI
Precisoin turned componenent 576 G-7
Brass and bell metal utensilsmanufacturi
Medium Green 2006BA
31.12.2023Y 31.12.2022 N N N N N NA NA NA 0.4 N NA N Y N NA Yes
17022009-10 O
11588Prianka Graphics Pvt Ltd.,
No.M-6, 6th cross, I Stage , Bengaluru-560 058
I StageI
Printed Laminated pouches 193.52 G-32
Polythene and plastic processedproducts
Small Green 2007BA
31.12.2022Y 31.12.2022 N N N N N NA NA NA 0.5 N NA N Y N NA Yes
17032009-10 O Sankala Polymers p Ltd
No.9-D, II Phase, PIA, Bengaluru-560 058
II PhaseI
PVC Granules82 G-79
covered underPlastic
Small Green 2007BA
31.12.2034N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
17042009-10 CL
12420
Cargatec Manufcturing (India) Old Nmae Indiatals
Construction,
Polt No 10 B , II Phase, PIA, Bangalore.
II PhaseI
Meteralised Handling equipments withh spray painting
945 O-32Ferrous and Non- ferrous metalextraction
Large Orange 1989BA
30.06.2012N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
17052009-10 CL
31004Texport Syndicate (P) Ltd.,
Unit-B9J, Sy No 3 Plot No 9C, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment2393 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2007BA
31.12.2016Y 31.12.2022 N N N N N NA NA NA 15 N NA N Y N NA Yes
17062009-10 O
38785Systems Manufacturing,
No.1/A, II Phase, PIA,Bengaluru-560 058
II PhaseI
Engineering Unit1438 O-100
STPs Established at Residential
Large Orange 2008BA
30.09.2023N N N N N N N NA NA NA 19.44 N STP Y N N NA Yes
17072009-10 O
14733Galvano Casting (P) Ltd.,
No.549, 14th cross , IV Phase, Bengaluru-560 058
IV PhaseI
Foundry 1337.65 O-32
Ferrous and Non- ferrous metalextraction
Large Orange 2008BA
30.09.2022Y 30.06.2018 N N N N N NA NA NA 2 N ST & SP N N N NA Yes
17082009-10 O G.L.S.Polymers Pvt Ltd.,
No.415, 11th cross, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Polymer compound based 354 G-32
Polythene and plastic processedproducts
Small Green 2006BA
31.12.2025N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes
17092009-10 CL
-Times Creations (P) Ltd.,
A-354, II Stage, PIE, Bengaluru-560 058
II StageI
Sign BoardsC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2007
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17102009-10 CL
-Super Bright Enterprises,
No.P-21,III Stage, PIE Bengaluru-560 058
III StageI
Bright BarsC1 R-44
process involving
metal Small Red Closed
WA30.06.2014
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
1711 No.9C, II Phase, PIA, Bengaluru-560 II Phase Engineering Unit Switches 17112009-10 CL
-Skill Manufacturing Company,
No.9C, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2006
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17122009-10 CL
-Multi castings (P) Ltd.,
No.B-10, II Phase, PIA, Bengaluru-560 058
II PhaseI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2014C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17132009-10 CL
15423
G.S.Enterprises, (Formerly Global RMC)
No.28, 5th Main road, III Phase, Bangalore-560058
III PhaseI
Ready Mix Concrete176 G-37
Ready mix cement concrete
Small Green 2008BA
31.12.2017N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes
17142009-10 CL
15132
D F Forging & Machining Centre
No.147/1, 3rd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Mechanical componenets 57 G-77
Brass and bell metal utensilsmanufacturi
Small Green 2008BA
31.12.2017N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
17152009-10 CL
Vidyuth Instrumentation Technologies,
No.20 B ( Shed -1), 3rd cross, II Phase, Bengaluru-560 058
II PhaseI
Assembling and wiring of Electrical panel Board
53.2 G-78Switches without
electroplatinSmall Green 2008
WA31.12.2017
N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
17162009-10 O BSNL,
No.203, III Phase, PIA, Bengaluru-560 058
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2008AA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
17172009-10 CL
-G.R.Lubricants (P) Ltd.,
No.72, III Phase, PIA, Bengaluru-560 058
III PhaseI
Grease mfgC1 R-4
ng of lubricatingoils ,grease
Small Red ClosedBA
30.06.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17182009-10 CL
-Karntaka Feeds Corporation
No.313, II Stage, PIE, Bengaluru-560 058
II StageI
Food productsC1 O-7
food processingincluding
Small Orange ClosedBA
30.06.2006C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17192009-10 CL
-
Hindustan Electro Technologies,
No.SB-57, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2002C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17202009-10 CL
15196Galvano Casting Pvt Ltd.,
No.M-9, 7th Cross, I Stage, Bengaluru-560 058
I StageI
Shot blasting and Heat Treatment 249.77 O-63
Industries with Heat
Treatment, Small Orange 2008
BA30.06.2005
Y 30.06.2013 N N N N N NA NA NA 0 N NA N N N NA NA
17212009-10 YTC Sri Varu Udyog,
No.247, III Phase, PIA, Bangalore-560058
III PhaseI
Non Ferrous Metal16 O-28
Non- ferrous metal
extraction Small Orange 2008
WAN
N N N N N N N NA NA NA 0.4 0.05 NA N N N NA NA
17222009-10 O Power Tech,
Plot no.24, 5th Main,III Phase, Bengaluru-560 058
III PhaseI
Engineering Unit121 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2008WA
31.12.2018N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
17232009-10 CL
23235
Athena India Hitech Components (Basrur Uniseal)
(P) Ltd.,
No.20-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Punching of non asbestors gaskets 528 O-62
Spray painting, paint baking, paint
Medium Orange 2008BA
30.09.2020N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
17242009-10 CL
-Accurate extracts,
No.538, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Pulversing and blending 25 O-26
involving ore
sintering, Small Orange 2000
WA30.06.2010
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17252009-10 CL
-
Hindustan Oils and petrochemicals,
No.438, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Oil Blending C1 R-3
engaged inrecycling/rep
rocessing/Small Red Closed
BA30.06.2012
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17262009-10 CL
-Divya Jyothi Plast,
No.135, II Stage, PIE, Bengaluru-560 058
II StageI
P.V.C. Pipe14.1 G-32
and plastic processedproducts
Small Green 2001BA
30.06.2012C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
17272009-10 CL
-Sai Quality Casting,
No.B-166, I Stage, PIE, Bengaluru-560 058
I StageI
Diesel Filters8.2 W-14
Engineering and fabricationunits (dry
Small White 1981BA
C1C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17282009-10 O MSG Tradelinks (P) Ltd.,
No.B-256, II Stage, Bengaluru-560 058
II StageI
Plastic sheet 31.59 G-32
Polythene and plastic processedproducts
Small Green 2005BA
31.12.2014N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
17292009-10 O
37734Manuli PSI Hydraulics,
No.A-111 & A-112, 2nd Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Assembly Hydraulics381 G-78
Switches without
electroplatinSmall Green 2008
BA31.12.2027
N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes
17302009-10 CL
-Empire Industries,
No.C-23, II Stage, PIE, Bengaluru-560 058
II StageI
Cuttingh of M.S. and aluminium 39 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2008
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17312009-10 CL
-Leonardo Egineering (P) Ltd.,
No.V-32-B, IV Phase, PIA Bengaluru-560 058
IV PhaseI
Test Rings Hydraulic95.32 G-78
Switches without
electroplatinSmall Green 1985
BA31.12.2004
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17322009-10 O Paragon Metalex (P) Ltd.,
No,B-233, II Stage,PIE, Bengaluru-560 058
II StageI
Engineering Unit43.34 W-14
Engineering and fabricationunits (dry
Small White 1995BA
31.12.2015N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
17332009-10 YTC Rajashree Pipe Products,
No.B-189, II Stage,PIE, Bengaluru-560 058
II StageI
PVC Elecrical22.45 G-79
covered underPlastic
Small Green 2007WA
NN N N N N N N NA NA NA 0 N NA N N N NA NA
17342009-10 CL
-Hegde Engineering Industries,
No.C-135(A), 2nd B Main, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit65.36 G-78
Switches without
electroplatinSmall Green 1990
BA31.12.2010
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
17352009-10 CL
-Bangalore Spemech (P) Ltd.,
No.340, IV Phase, PIA Bengaluru-560 058
IV PhaseI
Engineering Unit17.19 W-14
Engineering and fabrication
Small White 1991BA
31.12.2020C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA- fabrication
units (dry BA C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17362009-10 CL
-Amar Engineering,
No.V-32, II Stage, PIE, Bengaluru-560 058
II StageI
Fabrication unit17.65 W-14
Engineering and fabricationunits (dry
Small White 1983BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
17372009-10 CL Unique Products,
No.C-60, II Stage,PIE,Bengaluru-560 058
II StageI
Plastic injection moulding 24 G-32
Polythene and plastic processedproducts
Small Green 1992WA
31.12.2015N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
17382009-10 O Lab Engineering Industries,
No.B-178, II Stage, PIE, Bengaluru-560 058
II StageI
Laboratory Equipments 11.73 G-81
Research laboratories notinvolving
Small Green 2002WA
31.12.2013N N N N N N N NA NA NA 0.05 N NA N Y N NA NA
17392009-10 O Avant Tools,
No.B-296, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit43.69 G-78
Switches without
electroplatinSmall Green 1997
BA31.12.2021
N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
17402009-10 CL
-
Textiles Engineering Industries,
No.C-440, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit10.85 W-14
Engineering and fabricationunits (dry
Small White 2002BA
C1N N N N N N N NA NA NA NA N NA N N N NA Yes
17412009-10 CL
-
LGC Research & Development Centre,
No.167/168, III Phase, PIA, Bengaluru-560 058
III PhaseI
R & D activityC1 R--58
Pharmaceutical (Bulk drug &Active
Small Red ClosedBA
30.06.2008C1 30.06.2013 C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17422009-10 O
37833ACC Ltd
Plot No.32, II Phase, PIA, Bengaluru-560 058
II PhaseI
Ready Mix Concrete1140 G-78
Switches without
electroplatinLarge Green 2007
BA31.12.2027
N N N N N N N NA NA NA 3.5 N ST & SP N N N NA Yes
17432009-10 CL
-Bangalore Values Pvt Ltd.,
No.A252(a), II Stage II StageI
Engineering Unit41.75 G-78
Switches without
electroplatinSmall Green 1984
BA31.12.2001
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17442009-10 CL
74256Eskay Heat Transfers Pvt Ltd.,
B-253, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit239 G-78
Switches without
electroplatinSmall Green 1994
BA31.12.2000
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
17452009-10 O Bharthi Mobile Ltd.,
No.B-252, II Stage,PIE, Bengaluru-560 058
II StageTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2003AA
NAN N N N N N N NA NA NA 0 N NA N N N NA Yes
17462009-10 CL Cosmo Engineering,
No.28, III Stage, PIE, Bangalore--58 III StageI
Pressed and fabricated compnent 38.3 G-78
Switches without
electroplatinSmall Green 2003
WA31.12.2014
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
17472009-10 CL
-
Amanath Motor Owners Co-operative Society Ltd.,
BMTC depot, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Bus depot23 O-18
Automobile servicing, repairing and
Small Orange 2000WA
30.06.2013C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
17482009-10 CL
-Manjunath Restaurant,
No.426, IV Phase, PIA, Bengaluru-560 058
IV PhaseHospital
ity
Hotel9 W-52
Generator sets (15
KVA to 250 Small White 1998
BA30.06.2010
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
17492009-10 O Bangalore Sanchara Nigaa,
No 415, IV Phase , PIA , Bengaluru-560 058
IV PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2004AA
NAN N N N N N N NA NA NA 0 N NA N N N NA Yes
17502009-10 CL
-Fluo Lite Pvt Ltd.,
No.11, I Stage, PIE , Bengaluru-560 058
I StageI
Fil Starters32.4 G-78
Switches without
electroplatinSmall Green 1986
BA31.12.2004
N N N N N N N NA NA NA 0 N NA N N N NA Yes
17512009-10 CL
-
Restolex Cor Products Pvt Ltd.,
No.425, IV phase, PIA, Bengaluru-560 058
IV PhaseI
Rubber coir Mattress60.15 G-41
Rubber goods industry (with gas
Small Green 1998BA
30.06.2005C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17522009-10 CL
-Preston India (P) Ltd.,
No.268, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Synthetic Rubber foot wear 7.2 G-26
Leather foot wear and leatherproducts
Small Green 2003BA
31.12.2012N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
17532009-10 CL
-
Bangalore Biotech Labs Pvt Ltd.,
No.460-B, IV Phase IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA31.12.2002
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17542009-10 O
17057Sai Kripa Insulations (P)
A-36, II Stage, Bengaluru-560 058 II StageI
Manufacture of corrugated Board boxer
45 G-9Cardboard or corrugated box and
Small Green 2010BA
31.12.2020N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
17552009-10 CL
-Recabo India Pvt Ltd.,
No.375-A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering UnitC1 G-78
Switches without
electroplatinSmall Green Closed
BA30.06.2008
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17562009-10 CL
-cosmo Engineering,
0-D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Ferrous castingC1 O-28
Non- ferrous metal
extraction Small Orange Closed
BA31.12.2011
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17572009-10 CL
-Audithya Industries
No.A-25 & 26, III Stage, PIE, Bengaluru-560 058
III StageI
Pultry feeds15.86 O-30
poultry feed and cattle
feedSmall Orange 1990
BA30.09.2015
C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17582009-10 CL
-Unique Apparels Pvt Ltd.,
V-40, II Stage, PIE, Bengaluru-560 058
II StageI
Garment139 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2005BA
30.06.2012Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA
17592009-10 CL
-Rajat Gobal,
No.343, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment42 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1997BA
31.12.2008C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
1760 No.C-256, I Stage, PIE, Bengaluru- I Stage Fabrication unit Panel Board, 17602009-10 CL
-Praveen Metal & Alloys,
No.C-256, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2001C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17612009-10 CL
-Lakshmi Metal & Traders,
No.204, III Phase, PIA, Bengaluru-560 058
III PhaseI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedBA
31.12.2013C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17622009-10 CL Reliance Marketing,
No.198, III Phase, PIA, Bengaluru-560 058
III PhaseI
Wire Drawing10 G-96
Manufacturing of insulatedconductors
Small Green 1997BA
31.12.2011N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
17632009-10 CL
-Track Mack Corporation
No.456, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Fabrication unitC1 G-78
Panel Board, Switches withoutelectroplatin
Small Green ClosedWA
31.12.2003C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
17642009-10 O E.S.I.Dispensary,
No.107, 6th Main, III Phase, PIA, Bengaluru-560 058
III PhaseHCE
Helath Care establishment 25 W-58
a)Non-bedded HCE’s(clinics,
Small White 2000BA
-N N Y 30.06.2016 N N N NA NA NA 0 N NA N N N NA Yes
17652009-10 O Ampere Elecric System,
No.120, 7th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Assembling of wiring of electrical control panel Board
68 G-78Switches without
electroplatinSmall Green 2007
BA31.12.2021
N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes
17662009-10 CL
-
Innova Consumer Care (P) Ltd.,
No.B-293, II Stage, PIE,Bengaluru-560 058
II StageI
Non-Medicated of Soaps and Shampoos. 285 O-13
detergents and
soaps(excludSmall Orange 2006
BA31.12.2013
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
17672009-10 O Micron Electric Syste,
No.251, 11th Main, 3rd Cross, III Phase, PIA, Bamgalore-58
III PhaseI
Manufacture of electric panel board 22.04 W-14
Engineering and fabricationunits (dry
Small White 2008WA
31.12.2017N N N N N N N NA NA NA 0.22 N ST & SP N N N NA NA
17682009-10 O
21282Best Coats,
No.B-136, 2nd 'C' Main Road, II Stage, PIE, Bengaluru-560 058,
II StageI
powder Coating45.84 O-17
Aluminium & copper extraction from
Small Orange 1997BA
30.09.2022N N N N N N N NA NA NA 0.4 0.16 NA N Y Y NA Yes
17692009-10 O Kruger Industries.,
No 42, II Phase, PIA, Bengaluru-560 058
II PhaseI
Plastic Injection moulded components 18.85 G-32
Polythene and plastic processedproducts
Small Green 1999WA
31.12.2024N N N N N N N NA NA NA 0.48 N NA N Y N NA NA
17702009-10 CL
15630Zuman Exports Ltd.,
No.183, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment368.79 G-72
Stitching/ Stitching ofshoe uppers/
Small Green 2005BA
31.12.2020N N N N N N N NA NA NA 5 N ST & SP N N N NA Yes
17712009-10 O
39352Superchem oxide,
No.321-B, 8th Cross, IV Phase, PIA, Bangalore -58
IV PhaseI
Lead suboxide40.35 R-7
Lead acid batterymanufacturing(excluding
Small Red 2009BA
30.06.2019Y 30.06.2016 N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
17722009-10 O Indian Electrical Accessories.,
No B-237, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication of electrical distribution boxes.
28 G-78Panel Board, Switches withoutelectroplatin
Small Green 31/12/2014WA
31.12.2018N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
17732009-10 CL
-Sharda Designs,
No 226, 2nd & 3rd Floor, 8th main, III Phase, PIA, Bengaluru-560 058.
III PhaseI
Textile Printing41 R-40
Textile processinginvolving
Small Red 2008WA
30.06.2009C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
17742009-10 O Seth Switch Gears.,
No.M2/1-A, 5th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering Unit12 W-14
Engineering and fabricationunits (dry
Small White 2006BA
31.12.2017N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
17752009-10 CL
15273Spectronic Plating Pvt. Ltd.,
No. A-152, 2nd Main, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating241.24 R-44
Industry or process involvingmetal
Small Red 2009WA
30.06.2018Y 30.06.2015 N N N N N NA NA NA 0.4 0.1 NA N Y Y NA NA
17762009-10 O Sri Sai Industry Unit-II,
No. B-107, III Stage, PIE, Bengaluru-560 058
III StageI
Engineering Unit219 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2018
N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
17772009-10 CL
11644Garden City Fashion Pvt. Ltd.,
No.B-175, II Stage, PIE, Bengaluru-560 058
II StageI
Garment washing150 O-50
Mechanized laundry using oil fired
Small Orange 2008BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 1.6 40 ETP Y Y N NA Yes
17782009-10 CL
-
Belrock Construction Chemicals India (P) Ltd.,
No. B-324, 8th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Construction Chemicals 160 R-25
chemicals and electrochemicals
Small Red ClosedBA
30.06.2010CL 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA NA
17792009-10 O Plasmix Pvt. Ltd. Unit-II,
No. 406, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Plastic Granules45 G-32
Polythene and plastic processedproducts
Small Green 2009BA
31.12.2034N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
17802009-10 O
Akshaya Engineering Industries,
No. A-20, III Stage, PIE, Bangalpre-58 III StageI
Engineering Unit234 G-78
Switches without
electroplatinSmall Green 2009
WA31.12.2021
N N N N N N N NA NA NA 0.48 N NA N Y N NA NA
17812009-10 CL
22801
Synergy Punching Pvt. Ltd., Unit-II,
No. A-3 & A-4, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit- fabrication of sheet metal components
784.12 G-78Switches without
electroplatinMedium Green 2008
BA31.12.2022
N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes
17822009-10 CL Hira Rubber,
No. 519, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Rubber moulded components 56 G-41
goods industry (with gas
Small Green 2008WA
NAN N N N N N N NA NA NA 0.4 N ST & SP ETP Y N N NA NA
17832009-10 O
75447 Shree Polyplast, N
No. C-20, II Stage, PIE, Banaglore-58 II StageI
Plastic carry bags 31.26 G-32
Polythene and plastic processedproducts
Small Green 2008BA
31.12.2022N N N N Y 31.03.2017 N NA NA NA 0.2 N NA N Y N NA Yes
17842009-10 O V.J.Industries,
No. A-290, 6th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit360 G-78
Switches without
electroplatinSmall Green 2008
BA31.12.2023
N N N N N N N NA NA NA 1.6 N NA N Y N NA Yeselectroplatin BA N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
17852009-10 CL
-Rallis India Ltd.,
No.334,9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Micronutrient formulation 58 G-78
Switches without
electroplatinSmall Green 2008
BA31.12.2009
N N N N N N N NA NA NA 0 N NA N N N NA Yes
17862009-10 CL
12734Balaji Super Spandex
No. 497/D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Polywoven Tapes374 G-32
Polythene and plastic processedproducts
Small Green 2007BA
31.12.2013N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
17872009-10 O
32675Nagson And Company
No. 30C, II Phase, PIA, Bengaluru-560 058
II PhaseI
Ready Mix Concrete400 G-37
Ready mix cement
concreteSmall Green 2008
BA31.12.2033
N N N N N N N NA NA NA 2.5 N NA N Y N NA Yes
17882009-10 CL Signericks Tools,
No. B-206, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering Unit21.17 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2008WA
31.12.2016N N N N N N N NA NA NA 0.24 N NA N Y N NA NA
17892009-10 CL
-S.S. Engineering
No. 293, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering Unit46.82 W-14
Engineering and fabricationunits (dry
Small White 2005WA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA NA
17902009-10 CL
-
Ariatex Apparels Bangalore Ltd.,
No.351, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment1907 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2008WA
31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA
17912009-10 O
13801Gem Paints Ltd.,
No.417 & 418, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Repacking of Paints271 G-109
Refilling, Repacking and
Small Green 2009BA
31.12.2034N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
17922009-10 O
11071
Spraying Systems (India) Pvt. Ltd.,
No. 303 & 304, 2nd Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
General Engineering Unit 1057.79 G-78 blending of
chemicalsLarge Green 2008
BA31.12.2022
Y 31.12.2014 N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
17932009-10 O
39957
Sidhi Vinayaka Fab Engineering,
No.173, 11th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
SS Pressure vessel for Pharmaceutical Ind with Fabrication&Buffing
40 G-78Panel Board, Switches withoutelectroplatin
Small Green 2005BA
31.12.2027N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
17942009-10 CL
Siddivinayaka Fab Engineering,
No.172/A, 11th Main, III Phase, PIA, Bangalore,
III PhaseI
Engineering Unit64 O-63
Engineering with heat treatment
Small Orange 2007
BA
31.12.2017
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes1795
2009-10 O14968
Sidhivinayaka Fab Engineering,
, No.172, 11th main, III Phase, PIA, Bangalore-560058,
III PhaseI
Manufacture of steel fabrication and pressure vessel & passivation
158 R-44Industry or process involvingmetal
Small Red 2008BA
30.06.2023Y 30.03.2019 N N N N N NA NA NA 0.96 0.24 NA N Y Y NA Yes
17962009-10 O
23910Ashoka Intercast Foundary,
No.46/B, II Phase, PIA, Bangalore- 560 058,
II PhaseI
Iron Casting (Foundry) 118.35 O-66
Ferrous and Non- ferrous metalextraction
Small Orange 2007BA
30.09.2022N NA N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
17972016-17 O Electohms Pvt Ltd
No.473 D/2, 13 Cross, IV Phase, PIA, Banglaore
IV PhaseI
Manufacturing of current transformers, Hall effect current sensors
411 G-85Transformer Assembly unit
Small Green 2017WA
31.12.2027N N N N N N N NA NA NA 3 N NA N Y N NA NA
17982009-10 CL
-
Anatech Ultra Coater & Controls (P) Ltd.,
No.C-265, 6th Cross, Ist Stage, PIE, Bangalore-560058,
I StageI
Powder coating & Tin Electroplating 26.5 R-44
process involving
metal Small Red 2008
BA30.06.2010
N N N N N N N NA NA NA 0.1 0.1 NA N Y Y NA NA
17992009-10 CL
-
Madhu Machine Systems Pvt Ltd.,
, No.47/1, 4th Main, III Phase, PIA, Bengaluru-560 058.
III PhaseI
Plastic injection moulding 191.72 G-32
Polythene and plastic processedproducts
Small Green 2008BA
31.12.2012N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
18002009-10 CL
-Inbiopro Solutions Pvt Ltd,
No 138-B,II & III Floor, 3rd Phase, PIA, Bangalore,
III PhaseI
R & D activity on Biotechnology 959.28 R--58
Pharmaceutical (Bulk drug &Active
Medium Red 2008BA
31.12.2012N N Y 30.06.2014 N N N NA NA NA 0 N NA N N N NA NA
18012009-10 CL
11647Delkor Technic India Pvt Ltd.,
No.108/D, 6th Main, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Engineering Unit - Filter, agitator 427.29 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2003BA
31.12.2020N N N N N N N NA NA NA 1.3 N ST & SP N N N NA Yes
18022009-10 O Southren Fastners.,
No.C-339, 6th cross, Ist Stage, PIE, Bengaluru-560 058.
I StageI
Engineering (Cold Forging) 76 G-93
Manufacturing of nuts and boltswith cold
Small green 2007BA
31.12.2021N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
18032009-10 CL
24960Felsomat India Pvt ltd.,
No.A-149, Ist Stage, PIE, Bengaluru-560 058.
I StageI
Assembly of gantry automation system and machine tools
445.46 G-7Brass and bell metal utensilsmanufacturi
Small Green 2008WA
31.12.2002N N N N N N N NA NA NA 0.32 N NA N Y N NA NA
18042009-10 O Moda Suola India (P) Ltd,
No.SB-37, 2nd Cross, Ist Stage, PIE, Bengaluru-560 058,
I StageI
Footware soles215.12 G-26
Leather foot wear and leatherproducts
Small Green 2008BA
31.12.2021N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes
18052009-10 O
35267Madox Technologies Pvt Ltd
No.473/D4, 13 Cross, IV Phase, PIA, Bangalore,
IV PhaseI
Assembly of electrical control panels and elevator parts
421 G-78Panel Board, Switches withoutelectroplatin
Small Green 2009BA
31.12.2027N N N N N N N NA NA NA 2.2 N ST & SP N N N NA Yes
18062009-10 CL
-Prescient Bio Scince Pvt Ltd.,
No 101, III Phase, PIA, Bangalore, III PhaseI
R & D activity on Biotechnology 230 R--58
Pharmaceutical (Bulk drug &Active
Small Red 2008WA
31.12.2010C1 N C1 C1 C1 N C1 NA NA NA 0 N NA N N N NA NA
18072009-10 YTC Lavanya Enterprises .,
No.F3(a), Ist Stage, PIE, Bangalore. I StageI
Engineering Unit22 W-14
Engineering and fabricationunits (dry
Small White 2009BA
31.12.2019N N N N N N N NA NA NA NA N NA N N N NA NA
18082009-10 O
75709Abhaya Packagings ,
No.147, 9th Main, III Phase, PIA, Bangalore,
III PhaseI
LLDPE/LDPE plastic liner/roll 141 G-79
Plastic bags, woven sack with HDPE,LDPE
Small Green 2008BA
31.12.2028N N N N N N N NA NA NA 0.58 N ST & SP N N N NA Yes
1809 No.08, Plot No.35, Ist Main, II Phase, II Phase Assembly of control Panel Board, 18092009-10 O
38542Avana Electro Systems Pvt Ltd
No.08, Plot No.35, Ist Main, II Phase, PIA, Bngalore-58.
II PhaseI
Assembly of control and relay panel 613 G-78
Panel Board, Switches withoutelectroplatin
Medium Green 2010WA
31.12.2027N N N N N N N NA NA NA 2.3 N NA N Y N NA NA
18102009-10 O Incite Cam Centre,
No.A-12/1, 1st Main road, II Stage,PIE, Bengaluru-560 058.
II StageI
Syntheic rubber moulded components 464 G-86
paper or pulp manufacturing)
Small Green 2005BA
31.12.2022Y 31.12.2019 N NA N N N NA NA NA 0.8 N NA N Y N NA Yes
18112009-10 O
23231Press Comp International,
No.A-106, 3rd Mian, II Stage, PIE, Bengaluru-560 058.
II StageI
Mfg of Press Tools & Precision Pressing Components (Engineering Unit)
927 G-78Panel Board, Switches withoutelectroplatin
Medium Green 2004BA
31.12.2026Y 31.12.2024 N N N N N NA NA NA 2 N NA N Y N NA Yes
18122009-10 CL
-
Daramic Battery Seperator (I) Pvt Ltd., (Formerly Super
tech)
No.A-101, II Stage,PIE, Bengaluru-560 058.
II StageI
battery separator464 O-73
battery ( excluding
manufacturiSmall Orange 2003
BA31.12.2012
N N N N N N N NA NA NA 0 N NA N N N NA NA
18132009-10 CL
17653Sree Ranganatha Industries,
No.534/B, 8th Main, II Stage,PIE, Bangalore.
II StageI
Electroplating (Zinc Plating) 32.1 R-44
Industry or process involvingmetal
Small Red 2008BA
30.06.2019N N N N N N N NA NA NA 0.1 0.3 ST & SP N N Y NA Yes
18142009-10 O
35607M.E. Forge Tech, N
No.234, 11 Main, 3rd cross, III Phase, PIA, Bangalore-560058
III PhaseI
Forging754 O-32
Forging of ferrous and non- ferrousmetals (
Medium Orange 2009BA
30.09.2022N NA N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
18152009-10 CL
-GRV Marchandizing,
No.149, II Stage, PIA, Banglore-58 II StageI
Corrugated box520 G-9
or corrugated
box and Medium Green 2003
BA31.12.2001
N N N N N N N NA NA NA 0 N NA N N N NA NA
18162009-10 CL
23590GCL India Pvt. Ltd.,
No.433, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Assembly tape plant extusion 456.76 G-79
products using Boilers
(excludingSmall Green 2003
WA31.12.2013
N N N N N N N NA NA NA 0 N ST & SP N N N NA NA
18172009-10 O Airel India (P) Ltd.,
No.412, IV Phase,PIA, Banglore-58 IV PhaseI
Dental chair assembly170 G-46
paper or pulp manufacturing)
Small White 2008WA
31.12.2018N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
18182009-10 O Ganesh Metal Works,
No.143-1, 9th Main, III Phase,PIA, Banglore-58
III PhaseI
Engineering Unit182 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009BA
31.12.2034N N N N N N N NA NA NA 1 N NA N Y N NA Yes
18192009-10 CL CNC Automation, Unit-IV,
Unit-IV, No.17/D, 1st Main, II Phase,PIA, Banglore-58.
II PhaseI
Engineering Unit280 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2018
N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes
18202016-17 O
38543
Avana Electro Systems Pvt Ltd Unit-I
No.N1, 4th Cross, I Stage, PIE, Bengaluru-560 058.
I StageI
Manufacturing of relays 387 G-78
Switches without
electroplatinSmall Green 1.1.2013
BA31.12.2027
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
18212009-10 O S.R.Industries,
No.C-75, II Stage,PIA, Banglore-58 II StageI
Engineering Unit32 G-78
Switches without
electroplatinSmall Green 2009
WA31.12.2018
N N N N N N N NA NA NA 0.05 N NA N Y N NA NA
18222009-10 O Progressive Systems,
No.282,6th main,II Stage,PIA, Banglore-58
II StageI
Engineering Unit375 G-78
Switches without
electroplatinSmall Green 2009
WA31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
18232009-10 O
11126
Shahi Exports (Formerly known as Hindusthan Clothing
& Marketing Company),
No.323, IV Phase,PIA, Banglore-58 IV PhaseI
Garment1283 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2012BA
31.12.2021Y 31.12.2020 N N N N N NA NA NA 15.8 N STP - BWSSB Y N N NA Yes
18242009-10 O
27014Vee Vee Controls,
No.L-3 & 4, 9th Cross, I Stage,PIE, Bengaluru-560 058
I StageTT
D.G SET428 W-52
Diesel Generator sets (15KVA to 250
Small White 2009BA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
18252009-10 CL
11621G.G.Tronics India Pvt Ltd.,
No.SB-168, I Stage, PIA, Banglore-58 I StageI
assembly of electronics items 834 G-78
Switches without
electroplatinMedium Green 2003
BA31.12.2012
C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
18262009-10 O
17033A.P.D Exports,
No.V-24(B), 6th Main, Annexure Buiding, II Stage,PIA, Banglore-58
II StageI
Garment279 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2000BA
31.12.2023N N N N N N N NA NA NA 5.2 N NA N Y N NA Yes
18272009-10 O
15689Naganda Enterprises,
No.149, 2nd C Main, II Stage,PIA, Banglore-58
II StageI
Engineering Unit221 G-44
Spice grinding (20 HP motor)
Small Green 2008WA
31.12.2019N N N N N N N NA NA NA 0.6 N NA N Y N NA NA
18282009-10 O
85043Advanced Electronic Systems,
No.143, 9th Main, III Phase,PIA, Banglore-58
III PhaseI
Assembly of electrical items 135 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2034
N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes
18292009-10 O
Domacles Engineering Pvt Ltd.,
No.214, 1st cross, III Phase,PIA, Banglore-58
III PhaseI
Truck & wagon loading machine 165 G-46
Steel furniture without spray
Small Green 1993BA
31.12.2034N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
18302009-10 O
11901
Pragathi Transmission Pvt Ltd.,
No.103 & 104, 3rd Cross, II Stage,PIA, Banglore-58
II PhaseI
General Engineering Unit 1616 G-78
Switches without
electroplatinLarge Green 2009
BA31.12.2023
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
18312009-10 CL V.R.Enterprises,
No.333, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Manufacture of Button bolts, hammer 16.82 G-93
Manufacturing of nuts and boltswith cold
Small Green 2005WA
31.12.2018N N N N N N N NA NA NA 0.16 N ST & SP N N N NA NA
18322009-10 O Triveni Hi-Tech Pvt Ltd,
No.B-169, 4th Main, II Stage, PIA, Banglore-58
II StageI
Engineering Unit512 G-7
Brass and bell metal utensilsmanufacturi
Medium Green 1997BA
31.12.2022N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes
18332009-10 CL
-Pepperl+ Fuchs(P) Ltd.,N
No.M-11, I Stage,PIA, Banglore-58 I StageI
Engineering Unit437 G-78
Switches without
electroplatinSmall Green 2009
BA30.06.2009
N N N N N N N NA NA NA 0 N NA N N N NA NA- electroplatin BA N N N N N N N NA NA NA 0 N NA N N N NA NA
18342009-10 O Indus Towers Ltd.,
No.97, III Phase, PIA, Banglore-58 III PhaseTT
telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2010AA
30.06.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes
18352009-10 O Wipro Ltd.,
No.183/A, I Stage, PIA, Banglore-58 I StageI
solar lightings225 G-78
Switches without
electroplatinSmall Green 2009
BA31.12.2021
N N N N N N N NA NA NA 0.14 N NA N Y N NA Yes
18362009-10 O Indus Towers Ltd.,
No.99, 8th Main, III Phase, PIA, Banglore-58
III PhaseTT
Telephone towerDG Set W-52
15 KVA DG Set
Small White 2010AA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes
18372009-10 O Tower Vision Pvt Ld.,
No. M-7, 7th cross, Ist Stage, PIE, Banglore-58
I StageTT
Telephone towerDG Set W-52
15 KVA DG Set
Small White 2010AA
31.12.2013N N N N N N N NA NA NA 0 N NA N N N NA Yes
18382009-10 CL
-
Siddhi Vinayaka Fab Engineering (P) Ltd.,
No.B-119, III PHASE, PIA, Banglore-58
III PhaseI
Engineering Unit444 G-78
Switches without
electroplatinSmall Green 2009
BA30.06.2010
Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA
18392009-10 O Khoday Control Systems,
No.B-187, II Stage, PIA, Banglore-58 II StageI
Assembly of electrical pannel 12.7 G-78
Switches without
electroplatinSmall Green 2008
WA31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
18402009-10 O Precision Sheet Metal Works,
No.A-3 & A-4, III Stage, PIA, Banglore-58
III StageI
Engineering Unit476 G-78
Switches without
electroplatinSmall Green 2010
BA31.12.2021
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
18412009-10 CL Preston India (P) Ltd.,
No.97/98, III Phase, PIA, Banglore-58 III PhaseI
Rubber foot wear 143 G-41
Rubber goods industry (with gas
Small Green 2010BA
31.12.2019N N N N N N N NA NA NA 1.5 N ST & SP N N N NA Yes
18422009-10 CL TIA Technology,
Plot No.C-76, II Stage, PIE, Banglore-58
II StageI
Engineering Unit75 G-78
Switches without
electroplatinSmall Green 2008
WA31.12.2018
N N N N N N N NA NA NA 2.4 N NA N Y N NA NA
18432009-10 O Thirumalai Industries,
No.A-289, II Stage, PIA, Banglore-58 II StageI
foot wear top wear24 G-26
Leather foot wear and leatherproducts
Small Green 2006BA
31.12.2019N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
18442009-10 CL
-Naganda Enterprises,
No.149, II Stage,PIA, Banglore-58 II StageI
Engineering Unit212 G-78
Switches without
electroplatinSmall Green 2008
BA30.06.2006
Cl N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA
18452009-10 CL Omtech,
No.246, III Phase, PIA, Banglore-58 III PhaseI
Engineering Unit49 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2009WA
31.12.2018N N N N N N N NA NA NA 0.15 N ST & SP N N N NA NA
18462009-10 O
Renukamba Engineering Works,
No.246, III Phase, PIA, Banglore-58 III PhaseI
Engineering Unit49 W-14
Engineering and fabricationunits (dry
Small White 2008WA
31.12.2017N N N N N N N NA NA NA 0.3 N ST & SP N N N NA NA
18472009-10 O Indus Towers Ltd.,
No.P6, III Stage, PIA, Banglore-58 III StageTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2001AA
31.12.2022N N N N N N N NA NA NA 0 N NA N N N NA Yes
18482009-10 O Tufflan Space Makers,
No.B-226, 1st & 2nd Floor, II Stage, PIA, Banglore-58
II StageI
coating on wires 50 G-96
Manufacturing of insulatedconductors
Small Green 2009BA
31.12.2019N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
18492009-10 O
Transteel Seating Technologies,
No.10/A, 10th Cross, I Stage, PIA, Banglore-58
I StageI
Manufacture of office furniture 451 G-46
Steel furniture without spray
Small Green 1995BA
31.12.2022N N N N N N N NA NA NA 3 N NA N Y N NA Yes
18502009-10 CL Sreeja Enterprises,
No.142, 9th Main, III Phase,PIA, Banglore-58
III PhaseI
Engineering Unit28 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2009BA
31.12.2019N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes
18512009-10 O
Asmet Industries Pvt Ltd, UNIT-II,
No.B-253, II Stage, PIA, Banglore-58 II StageI
Engineering Unit153 G-46
Panel Board, Switches withoutelectroplatin
Small Green 2008BA
31.12.2035N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes
18522009-10 O
11725
Rollon Hydraulics Pvt Ltd(Formerly Known as TMI Rollon Engineering Pvt Ltd.,)
No.272, 8th cross, IV Phase, PIA, Banglore-58
IV PhaseI
Hydraulics valve spools 1304.94 O-63
Engineering Industries with HeatTreatment,
Large Orange 2008BA
30.09.2021N N N N N N N NA NA NA 6.4 0.1 NA N Y Y NA Yes
18532009-10 O Creative Micro Systems,
No.300/B, 5th Main, IV Phase, PIA, Banglore-58
IV PhaseI
Assembly of electronic items 248 W-13
Electrical and electronic item
Small White 2009BA
31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
18542009-10 O vinayaka Industries,
No.220, 2nd cross, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Unit63.69 W-14
Engineering and fabricationunits (dry
Small White 2010BA
31.12.2018N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
18552009-10 O
17026E-R3 Solutions
No.C-430, 1st Cross, Ist State, PIE, Banglore-58
I StageI
Recycle (Cleaning) of printer cartridge reconditioner, E-Waste Dismantling
40.09 R-3Industries engaged inrecycling/reprocessing/
Small Red 2010BA
31.03.2019Y 30.06.2015 N N N N N NA Yes 30.06.2020 0.56 N NA N Y N NA Yes
18562009-10 CL S.K.Industries,
No.D-426/C, 10th Main, II Stage, PIE, Banglore-560058
II StageI
Engineering Unit67 R-44
Industry or process involvingmetal
Small Red 2009BA
30.06.2014N N N N N N NA NA NA 0.08 0.05 NA N Y Y NA Yes
18572009-10 O
Globe Enterprises (Formerly Globe Hard Chrome
Industries)
No.D-426A,10th Main, II Stage, PIE, Banglore-58
II StageI
Electroplating54.78 R-44
Industry or process involvingmetal
Small Red 2008BA
30.06.2024N N N N N N N NA NA NA 0.08 0.06 NA N Y Y NA Yes
1858 No.101, III Phase, PIA, Bangalore. III Phase R & D activity Pharmaceuti18582009-10 CL
-Precient Bio-Sciences,
No.101, III Phase, PIA, Bangalore. III PhaseI
R & D activity944 R--58
Pharmaceutical (Bulk drug &Active
Medium Red 2009BA
30.09.2007N N N N N N N NA NA NA 0 N NA N N N NA NA
18592009-10 O Island Hydraulics,
A-19,III Stage, PIE, Banglore-58 III StageI
Engineering Unit89 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2028
N N N N N N N NA NA NA 1.7 N NA N Y N NA Yes
18602009-10 O
Siddhi vinayaka Fab Engineering Pvt Ltd Unit-3
No.172, III Phase,11th Main, PIA, Banglore
III PhaseI
Engineering Unit157.91 G-78
Switches without
electroplatinSmall Green 2008
WA31.12.2021
Y 30.06.2019 N N N N N NA NA NA 0.15 N NA N Y N NA NA
18612009-10 O
16684S&S Gud Services,
No C-24,1st Cross, II Stage, PIE, Banglore-58+E31
II StageI
Electroplating22 R-44
Industry or process involvingmetal
Small Red 2009BA
30.06.2023Y 30.06.2014 N N N N N NA NA NA 0.29 0.13 NA N Y Y NA Yes
18622009-10 CL
-Avatar II Diagnostics Pvt Ltd.,
No 99, 8th Main,, III Phase, PIA, Bangalore-560058.
III PhaseI
Antibody synthesis191 R-58
Pharmaceutical (Bulk drug &
Small Red 2001BA
30.06.2010N N N N N N N NA NA NA 0 N NA N N N NA NA
18632018-19 O
26730Evexia Nutritions Pvt Ltd
No.278/A, 6th Main, II Stage, PIE, Bengaluru-560058
II StageI
Cereals, Flakes, Rolled oats, Malt
based food400 O-7
Food and food
processing including
Small Orange 10.1.2016BA
30.09.2022N N N N N N N NA NA NA 1.2 NA ST & SP N N N NA Yes
18642009-10 CL
-
Indus Intex, No.226 & 227, III Phase, PIA, Banglore
No.226, III Phase, PIA, Banglore-58 III PhaseI
Garment washing2886 O-50
Mechanized laundry using oil fired
Large Orange 2002WA
30.06.2013C1 N C1 C1 C1 C1 C1 NA NA NA 0 N NA N N N NA NA
18652009-10 CL
12598Micro Coats India,
No.223,8th Main, III Phase, PIA, Bangalore-560058
III PhaseI
Powder coating & Spray Painting Activity
26.8 R-44Industry or process involvingmetal
Small Red 2009BA
30.06.2017Y 30.06.2015 N N N N N NA NA NA 0.16 0.002 ST & SP N N Y NA Yes
18662009-10 O
12525Shree Maruthi Metals,
No.C-82, 3rd cross, III Stage, PIA, Banglore-58
III StageI
Electroplating30 R-44
Industry or process involvingmetal
Small Red 2010BA
30.06.2023N N N N N N N NA NA NA 0.5 0.4 NA N Y Y NA Yes
18672009-10 CL Safe Metals,
No.42 & 43, II Phase, PIA, Banglore-58
II PhaseI
Lead suboxide 67.97 R-7
Lead acid batterymanufacturing(excluding
Small Red 2009BA
31.12.2019N N N N N N N NA NA NA 0 N NA N Y N NA Yes
18682009-10 CL
21099Nippon Paint (India) Pvt Ltd.,
No.A1 & A2, III Stage, PIE, Banglore-58
III StageI
Paint759.77 R-21
Manufacturing of paintsvarnishes, pigments
Medium Red 2009BA
30.06.2021Y 30.06.2015 N N N N N NA NA NA 0.16 0.32 NA N Y Y NA Yes
18692009-10 CL Adobe Metal Products ,
No.120,7th Main, III Phase, PIA, Bengaluru-560 058.
III PhaseI
Electrcial pannel boards 72.89 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2007WA
31.12.2016N N N N N N N NA NA NA 0.5 N ST & SP N N N NA NA
18702009-10 O
39500S.D.Ruparel ,
No.B-67, 2nd cross, I Stage, PIE, Bengaluru-560 058.
I StageI
PVC pipes 9.8 G-79
Plastic sack bags, woven sack with HDPE,
Small Green 2008BA
31.12.2100N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
18712009-10 O Spectra Pavers Pvt Ltd.,
No.437, 12th cross, IV Phase, PIA, Banglore-58
IV PhaseI
CemENT Pavers & Tiles 215 G-37
Ready mix cement concrete
Small Green 2009BA
31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
18722009-10 O
24162Sain Coating Pvt Ltd.,
No.A-25/26, III Stage, PIA, Banglore-58
III StageI
powder coating318 R-44
Industry or process involving metal
Small Red 2009BA
30.06.2024N N N N N N N NA NA NA 0.36 0.25 NA N Y Y NA Yes
18732009-10 O
11485Amar Powder Coating,
No.470-A, Shed No 2, IV Phase, PIA, Banglore-560058
IV PhaseI
Powder coating with surface treatment 67.85 R-44
Industry or process involving metal
Small Red 2008BA
30.06.2023N N N N N N N NA NA NA 0.1 0.1 NA N Y Y NA Yes
18742009-10 CL
16464Larsen & Turbo Ltd.,
No.32/A, II Phase, PIA, Banglore-58 II PhaseI
Ready mix concrete595.02 G-37
Ready mix cement concrete
Medium Green 2009BA
31.12.2012N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
18752009-10 CL
-Shree Suyoga Technologies,
No.D-432,10th Main, II Stage, PIA, Banglore-58
II StageI
Electroplating17.03 R-44
process involving
metal Small Red 2009
BA30.06.2014
N N N N N N N NA NA NA 0.03 0.03 NA N Y Y NA NA
18762016-17 O
38558
Coretec Engineering India Pvt Ltd
No.1, KIADB Plot No.35, II Phase, PIA, Bengaluru-560058
II PhaseI
Hydraulic cylinder & CNC machining 306 O-62
Spray painting, paint baking, paint
Medium Orange 1.1.2017BA
30.09.2022N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
18772009-10 CL
-Sree Manjunath Refreshment,
No.426, IV Phase, PIA, Banglore-58 IV PhaseI
Hotel5 G-3
confectionery / sweetsproducts
Small Green 2003BA
31.12.2012C1 N C1 N C1 N C1 NA NA NA 0 N NA N N N NA NA
18782009-10 O
17174Adarsha Control Systems,
No.B-231,5th Main, II Stage, PIA, Banglore-560058
II StageI
Surface Treatment & Powder coating 61.57 R-44
Industry or process involvingmetal
Small Red 2008BA
30.06.2024N N N N N N N NA NA NA 0.64 0.1 NA N Y Y NA Yes
18792009-10 CL
14927Decan Agro Chemicals,
No.411, 11th cross, IV Phase, PIA, Banglore
IV PhaseI
Pesticide formulation34.48 R-11
Processes involvingchlorinated hydrocarbon
Small Red 2010BA
30.06.2019N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
18802009-10 CL
-
Samarthanam Trust for the Disables,
No.66, 6th Main, III Phase, PIA, Banglore-560058
III PhaseI
Printer cartridge reconditioner 7.5 R-80
Currency notes ¤cy
Small Red ClosedBA
30.06.2016Y 30.06.2015 N N N N N NA NA NA 0 N NA N N N NA NA
18812009-10 CL
16369Dinesh Creations,
No.C-319, 1st Floor, I Stage, PIE, Banglore-560058.
I StageI
Printing on clothes15.4 R-40
Yarn / Textile processinginvolving
Small Red 2009BA
30.06.2019N N N N N N N NA NA NA 0.4 0.045 ST & SP N N Y NA Yes
18822009-10 O
11711Weir Minerals (P) Ltd.,
No.33 A-2, II Phase, PIA, Banglore-560058
II PhaseI
Mfg and supply of slurry handling Equipments like
415.1 O-63Engineering Industries with Heat
Small Orange Mar-10BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 1.5 0.08 STP - BWSSB Y N Y NA Yes11711 Equipments like
pumps , valves, with HeatTreatment,
BA Y 30.09.2022 N N N N N NA NA NA 1.5 0.08 STP - BWSSB Y N Y NA Yes
18832009-10 O
24122A.K.Engineers
No.424/1, 11th cross, IV Phase, PIA, Banglore-58
IV PhaseI
Engineering Unit328 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1996BA
31.12.2023N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
18842017-18 O
19498KHT Agencies Pvt Ltd
No.302, IV Phase, PIA, Bengaluru-560058
IV PhaseI
Automobile service center 57.45 O-18
servicing, repairing
andSmall Orange 1.11.2017
BA30.09.2022
Y 30.09.2022 N N N N N NA NA NA 1.2 2.4 ETP Y Y N NA Yes
18852009-10 O Peeceeyes Industries Pvt Ltd
No.22, 5th Main, III Phase,PIA, Bengaluru-560 058
III PhaseI
Engineering Unit96 G-46
furniture without spray
Small Green 2016BA
31.12.2022N N N N N N N NA NA NA 0.38 N NA N Y N NA Yes
18862009-10 CL
15387Global Hydraulics Pvt Ltd.,
No.222, 8th Main, III Phase, PIA, Banglore-58
III PhaseI
Engineering Unit65.85 G-78
Switches without
electroplatinSmall Green 2008
BA31.12.2020
N N N N N N N NA NA NA 0.64 N ST & SP N N N NA Yes
18872009-10 O
42388
Precitec Precision Machineries Pvt Ltd
No.A-353(b), 8th Main, II Stage, PIA, Banglore-58
II StageI
Engineering Unit466 G-7
bell metal utensils
manufacturiSmall Green 2008
BA31.12.2033
N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
18882009-10 O
39161Mirapro India Pvt Ltd
No.35, I Main, 4th Cross, II Phase, PIA, Bangalore-58
II PhaseI
Cleaning of Vaccum components 248 O-101
cleaning, degreasing, painting and
Small Orange 2008BA
30.09.2022Y 30.9.2022 N N N N N NA NA NA 0.8 0.4 NA N Y Y NA Yes
18892009-10 O
38978Machine Tool Engineering
No.24/2, 5th Main, III Phase, PIA, Bengaluru-560058
III PhaseI
Engineering Unit294 G-78
Switches without
electroplatinSmall Green 2014
BA31.12.2027
N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
18902009-10 O RD CNC Products
No.39, 4th Main, III Phase, PIA, Bengaluru-560058
III PhaseI
Engineering Unit41 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2027
N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
18912010-11 O
Acucom Manufacturing Systems,
No.B-302, 7th MaIn, II Stage,PIE, Bengaluru-560 058
II StageI
Engineering74 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009BA
31.12.2019N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
18922010-11 O
12072Adarsha Control Systems,
No.A-273, 6th Main, II Stage PIE, Bengaluru-560 058
II StageI
Engineering265 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes
18932010-11 CL
-E-Sparsh,
No.C-134, II Stage, PIE, Bangalore-560058.
II StageI
E-Waste45 R-3
Industries engaged inrecycling/reprocessing/
Small Red ClosedBA
30.06.2009C1 N C1 N C1 N C1 NA Yes 0 N NA N N N NA Yes
18942010-11 CL
24114MetaCast Enterprises,
No.190,11th Main Road, III Phase, PIA, Bangalore-560058
III PhaseI
Aluminium Casting (Foundry) 27.49 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 2010BA
30.06.2013N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes
18952010-11 O MSR & Sons Investments,
No.470,IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Software Techonology 2180 G-78
Panel Board, Switches withoutelectroplatin
Large Green 2010BA
31.12.2021Y 31.12.2018 N N N N N NA NA NA 40 N STP Y N N NA Yes
18962010-11 CL
-
DF Forging & Maching Controls
No.196 , 4th cross, I Stage, PIE, angalore-560058
I StageI
Forging74 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2010BA
CLN N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
18972017-18 O Anil Gears.,
No.A-181 (a), 4th Cross, I Stage, PIE, Bengaluru-560068.
I StageI
Gears and Machine components 25 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2004BA
31.12.2033N N N N N N N NA NA NA 0.43 N NA N Y N NA Yes
18982010-11 O Ixetic DSI Auto Products,
No.21-D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering unit- Assembling of Vacuum pumps
434 G-77of Motor &
Pumpswithout
Small Green 2010BA
31.12.2022N N N N N N N NA NA NA 0.64 N ST & SP N N N NA Yes
18992010-11 O
12778Peenya Industrial Gases,
No.313, 8th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Industrial gases other than oxygen and carbon dioxide
867.56 R-84Stand alone Production ofIndustrial
Medium Red 2010BA
30.06.2021N N N N N N N NA NA NA 3 N ST & SP N N N NA Yes
19002010-11 O
15505Vinayaka CNC Precision,
No.168/B, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering83 G-78
Switches without
electroplatinSmall Green 2010
BA31.12.2021
N N N N N N N NA NA NA 0.17 N ST & SP N N N NA Yes
19012010-11 O
Wireless TT Info Services Ltd.,
No.182/4, III Phase, PIA, Bengaluru-560 058
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2010AA
31.12.2018N N N N N N N NA NA NA 0 N NA N N N NA Yes
19022010-11 O
17484
Hindustan Clothing & Marketing Company (Unit-II),
No.68, 6th Main, III Phase,PIA, Banglore-58
III PhaseI
Garment stiching 319.62 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2010BA
31.12.2022N N N N N N N NA NA NA 5 N ST & SP N N N NA Yes
19032010-11 O M.G Metals Pvt Ltd.,
No.513-A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Plastic Chairs70 G-32
Polythene and plastic processedproducts
Small Green 2010BA
31.12.2019N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes
19042010-11 O Indus Towers Ltd.,
No.473(D), 13th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2010AA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
19052010-11 O
15169Innova Engineering,
No.352, 9th Mian, 4th cross, IV Phase, PIA, B+E31engaluru-560 058
IV PhaseI
Electroplating (Hardchrome) 36.15 R-44
Industry or process involvingmetal
Small Red 2011BA
30.06.2024N NA N N N N N NA NA NA 0.4 0.08 ST & SP N N Y NA Yes
19062010-11 CL
-Aircel Ltd.,
No.C-324/1, I Stage, PIE, Bengaluru-560 058
I StageTT
Telephone towerDG Set White
15 KVA DG Set
Small White 2010AA
30.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes
1907 No.136- 137/2, 8th Main, III Phase, III Phase Manufacture of R.F Brass and 19072010-11 O 4S Telecom Pvt Ltd.,
No.136- 137/2, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of R.F microwave products 273 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009BA
31.12.2034N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes
19082010-11 O
Wireless TT Info Services Ltd.,
No.V-30(C), SS Weighers, II Stage, PIE, Bengaluru-560 058
II StageTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2010AA
31.12.2019N N N N N N N NA NA NA 0 N NA N N N NA Yes
19092010-11 O
11135Quenby Transfer (I) (P) Ltd.,
No.542, 14th Cross, IV Phase. PIA, Bengaluru-560 058
IV PhaseI
printing on sheets1339 O-65
Silk screen printing, sari printing bywooden
Large Orange 2010BA
30.09.2030Y 30.9.2026 N N N N N NA NA NA 8 4 STP & ETP Y N N NA Yes
19102010-11 O Shree nathaji Fabricators,
, No.146, 9th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering31 W-14
and fabricationunits (dry
Small White 2009BA
31.12.2019N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
19112010-11 CL Peevee Kicthen Equipments,
No.199/5, 12th Main, III Phase. PIA, Bengaluru-560 058
III PhaseI
Engineering43.3 G-46
Steel furniture without spray
Small Green 2006BA
31.12.2019N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
19122010-11 CL
-Sivara Automation & Controls
No.22, 5th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering260 W-14
and fabricationunits (dry
Small White 2010BA
31.12.2011C1 N C1 N C1 N C1 NA NA NA 0 0 NA N N N NA NA
19132010-11 O
63981Surface Technik,
No.C-86, 2nd A Main, II Stage, PIE, Bengaluru-560 058
II StageI
Vibropolishing using ceramic media and soap water (wet polishing) and using
31 O-22Ceramics and Refractories
Small Orange 2010BA
30.09.2023N N N N N N N NA NA NA 0.8 0.1 NA N Y Y NA Yes
19142010-11 O
39904
Hi-Speed Maching India Pvt Ltd
No.A-152, 2nd C Main Road,, II Stage, PIE, Bengaluru -560058
II StageI
Alloy steel tool holder with CNC Machine 200 G-78
Panel Board, Switches withoutelectroplatin
Small Green 5.12.2016BA
31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
19152010-11 CL
12784
Paragon Polymer Products Pvt Ltd (formerly Elastrex
Polymers Pvt Ltd.,)
No.343-A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Assembly of shoe & leather chappals 587 G-26
Leather foot wear and leatherproducts
Medium Green 2010BA
31.12.2022N N N N N N N NA NA NA 1.5 N ST & SP N N N NA Yes
19162010-11 CL
11721
Concord Creations India (P) Ltd.,
No.57-B,III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment stiching 1941 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2010BA
31.12.2014Y 31.12.2017 N N N N N NA NA NA 17.6 N STP - BWSSB Y N N NA Yes
19172010-11 O
HindusthanTurbo Machinery Ltd.,
No.40-B, II Phase,PIA, Banglore-58 II PhaseI
Engineering803.86 G-78
Switches without
electroplatinMedium Green 2010
BA31.12.2022
N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes
19182010-11 CL
-Nobel Technology,
No.46, 14th cross, IV Phase. PIA Bengaluru-560 058
IV PhaseI
E-Waste15.7 R-10
Industries engaged in recycling/
Small Red 12.5.2011BA
30.06.2017N N N N N N N NA Yes 0.3 N ST & SP N N N NA Yes
19192010-11 O U.K Industries
No.M-8, 7th Cross, I Stage, PIE, Bengaluru-560058
I StageI
Manu of commercial stainless steel kitchen equipment
78.73 G-46Steel furniture without spray
Small Green 1.11.2015BA
31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
19202010-11 O
13597Magnum Enterprises,
No.371, IV Phase, PIA,Bengaluru-560 058
IV PhaseI
Garment stiching 563 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2010BA
31.12.2019N N N N N N N NA NA NA 3.2 N ST & SP N N N NA Yes
19212010-11 O
11472
Venkat switchgears,(Formerly known as Supreeth
Switchgears,)
No.150, III Phase, PIA, Bangalore-560058
III PhaseI
Powder coating237 R-44
Industry or process involvingmetal
Small Red 2002BA
30.06.2022Y 30.06.2017 N N N N N NA NA NA 1.7 1.6 NA N Y Y NA Yes
19222010-11 O
11523Drawcans Pvt Ltd.,
No.380, 10 th cross , IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Aluminium Containers 490 O-101
Repairing, cleaning, degreasing,painting and
Small Orange 2009BA
30.09.2029Y 30.9.2024 N N N N N NA NA NA 19.2 1.5 ST & SP ETP Y N N NA Yes
19232010-11 CL
25872Sunlight Machine Tools.
No.B-68, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering - Machined turned components
95.36 G-10Carpentry & wooden furnituremanufacturi
Small Green 2010BA
31.12.2019N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
19242010-11 CL
-Metrex Alloys (India) (P) Ltd,
No.358/359, 3rd main , 9th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Copper recycling96 R-10
Industries engaged in recycling/
Small Red 2010BA
30.06.2013Y 30.06.2015 N N N N N NA NA NA 0.6 0.2 ST & SP N N Y NA NA
19252010-11 O
15180Sai Sri Industries,
No.B-151, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating30 R-44
Industry or process involvingmetal
Small Red 2010BA
30.06.2022N N N N N N N NA NA NA 0.12 0.1 ST & SP N N Y NA Yes
19262010-11 O
35047
Dynamatic Technologies Limited,
No.343A, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of gear pumps Lube pumbs 1809 G-77
Manufacture of Motor & Pumps without
Large Green 2018BA
31.12.2033Y 31.12.2024 N N N N N NA NA NA 3.6 N NA N Y N NA Yes
19272010-11 O
80023Adept Polymers Pvt . Ltd.,
No.555, IV Phase, PIA, Bangalore-560058
IV PhaseI
Plastic injection moulding parts with melting & extrusion
256 O-62Spray painting, paint baking, paint
Small Orange 2009BA
30.09.2028N NA N N N N N NA NA NA 1.2 0.01 NA N Y Y NA Yes
19282010-11 O
41356Eco Green Fules Pvt Ltd.
No.E4, 98, II Phase, PIA, Bangalore-560058
II PhaseI
Bio-diesel61.74 R-4
ng of lubricating oils ,grease
Small Red 1.8.2010BA
30.06.2023Y 30.06.2021 N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
19292010-11 O
33278Nash Industries (I) Pvt Ltd.,
No.235,8th Main, 3rd cross III Phase, PIA, Bangalore-560058
III PhaseI
powder coating417.07 O-62
Spray painting, paint baking, paint
Small Orange 2011BA
30.09.2022Y 30.06.2017 N N N N N NA NA NA 2.8 N NA N Y N NA Yes
19302010-11 CL
-Sara Suole Pvt Ltd.,
No.134, 8th Main, 3rd cross, III Phase, PIA, Bengaluru-560 058
III PhaseI
Footwear (Shoe upper pairs) 321 G-26
wear and leather
products Small Green 2010
BA31.12.2000
N N N N N N N NA NA NA 2.5 N ST & SP N N N NA NA
19312010-11 O
11527Korta Engineering Pvt Ltd.,
No.163, 10tjh Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Fabrication of machine tool accessories, ball
777.46 G-93Manufacturing of nuts and bolts
Medium Green 2010BA
31.12.2033N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes11527 accessories, ball
screw, lead roller and boltswith cold
BA N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
19322010-11 O
MCC Alcast (P) Ltd (formerly know as Marvel Castings &
Componenets),
No.A-366, 6th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Manu of Aluminium casting & components 367 R-50
Aluminum Smelter Small Red 2010
BA30.06.2020
N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes
19332010-11 O Maxpreci Machines Pvt Ltd.,
No.A-373, 4th Main, 6th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering129 G-97
Activity of Powder Coating onsurface of
Small Green 2008BA
31.12.2021N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
19342010-11 O Prashanthi Polymers,
No.A-41, 2nd Main, II Stage, PIE, Bengaluru-560 058,
II StageI
plastic items75.16 G-32
Polythene and plastic processedproducts
Small Green 2010BA
31.12.2019N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
19352010-11 CL
16105
Bangalore Excel Shine Pvt Ltd.,
No.291/292, 8th cross, I Stage, PIE, Bengaluru-560 058
I StageI
PVC coated aluminium sheets 89.62 R-44
Industry or process involvingmetal
Small Red 2010BA
30.06.2016N N N N N N N NA NA NA 0.5 0.1 NA N Y Y NA Yes
19362010-11 O
15130
Globetech Fortune Industries Pvt Ltd (Formerly Fortune
Industries,
No.438, 12th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering with heat treatment 290 O-63
Engineering Industries with HeatTreatment,
Small Orange 2010BA
30.09.2023N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes
19372010-11 O
A.S.R Engineering Equipments,
No.B-83, 2nd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication & Turned components 89 W-14
Engineering and fabricationunits (dry
Small White 2010BA
31.12.2034N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes
19382010-11 CL Hindustan Feeds
No.B-40, 2nd cross, III Stage, PIE, Bengaluru-560 058
III StageI
Cattle Feed31.04 O-30
Fish feed, poultry feed and cattle feed
Small Orange 2004BA
30.09.2017N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
19392010-11 O
34388
Kaynes Technology India Pvt Ltd
No.A-53, 2nd Main,II Stage, Peenya Industrial Estate, Bengaluru-560068
II StageI
Assembling of populated printed circuit Board
5.24 G-78Switches without
electroplatinMedium Green 2018
BA31.12.2027
N N N N N N N NA NA NA 2 N NA N Y N NA Yes
19402010-11 O Cubic Controls Systems.,
No.543, 14th cross, IV Phase. PIA, Bengaluru-560 058
IV PhaseI
Electrical Appliances including washing machines
461.65 G-78Panel Board, Switches withoutelectroplatin
Small Green 2010BA
31.12.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
19412010-11 CL
16464Larsen & Turbro Ltd.,
No.92/93, 7th Main, III Phase,PIA, Bangalore-560058
III PhaseI
Engineering with spray painting 132.13 O-62
Spray painting, paint baking, paint
Small Orange 2010BA
30.06.2017N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
19422010-11 O
37643Hydreco Hydraulics Pvt Ltd
No.A 149, I Stage, PIE, Bengaluru-560058
I StageI
Hydraulic pumps and PTO with assembly and testing
18.35 O-62painting,
paint baking, paint
Small Orange 2017BA
30.09.2023N N N N N N N NA NA NA 0.65 0.033 NA N Y Y NA Yes
19432010-11 O Multiplex Bio-tech Ltd.,
No.A 420, I Stage, PIE, Bengaluru-560 058
I StageI
Manufacturing of liquid Bio-Fertilizers and Bio-Pesticides
24 G-70Formulation of Bio pesticides and
Small Green 2010BA
31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
19442010-11 O
12765
Paragon Polymer Products Pvt Ltd (Formerly Elastrex
Polymers Pvt Ltd).,
No.489, 14th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
PU footwear with cutting,embossing, Screen printing and Stitching
662 O-59 Printing Press &/or screenPrinting
Medium Orange 2010BA
30.09.2029Y 30.9.2023 N N N N N NA NA NA 11.2 N STP N Y N NA Yes
19452010-11 CL
-
Starrag Heckert Machine Tools Ltd.,
No.349 & 350, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering615 G-46
furniture without spray
Medium Green 2010BA
31.12.2013N N N N N N N NA NA NA 4.5 N NA N Y N NA Yes
19462010-11 CL
-Reid & Taylor India Ltd.,
No.28/C,II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment stiching 34146.75 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green ClosedWA
31.12.2003N N N N N N N NA NA NA 0 N NA N N N NA NA
19472010-11 YTC Toyada Micro Matic Machines,
No.A-268, 6th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Engineering500 G-78
Switches without
electroplatinSmall Green 2010
BANA
N N N N N N N NA NA NA 0 N NA N N N NA NA
19482010-11 CL
-Mag Engineering Pvt Ltd.,
Plot No.4, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering with powder coating 935 R-44
Industry or process involving metal
Medium Red 2011BA
30.06.2014N N N N N N N NA NA NA 0 N NA N N N NA NA
19492010-11 CL
-ESCO Coplings,
No.B-325, I Stage, 3rd Main Road, PIE, Bengaluru-560 058
I StageI
Engineering611 G-78
Switches without
electroplatinMedium Green 2010
BA31.12.2005
N N N N N N N NA NA NA 0 N NA N N N NA NA
19502010-11 CL
39223CEJN Products India Pvt Ltd,
No.P-21/1, III Stage, PIE, Bengaluru-560 058
III StageI
Engineeringindustry 101.8 G-78
Switches without
electroplatinSmall Green 2010
WA31.12.2022
N N N N N N N NA NA NA 0.07 N NA N Y N NA NA
19512010-11 O
11224
Alpha Tocol Engineering Services Pvt Ltd,
No.535/540, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering1336 G-46
Steel furniture without spray
Large Green 2009BA
31.12.2021N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
19522010-11 O
13489Armstrong Acmite India,
No.41-B,II Phase, PIA, Bangalore-560058
II PhaseI
Foundry (Copper Casting) 2293.17 O-28
Ferrous and Non- ferrous metal extraction
Large Orange 1.6.2012BA
30.09.2030Y 30.09.2022 N N N N N NA NA NA 2 0.1 ETP N Y N NA Yes
19532010-11 CL
16858Saddhguru Chemicals,
No.B-68, 2nd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Copper Extraction from Hazardous waste 36.2 R-51
Copper Smelter Small Red 2011
BA30.06.2018
Y 30.06.2016 N N N N N NA NA NA 0.2 4 NA N Y Y NA Yes
19542010-11 O
20947GRV Merchandizing,
No.393, 10th cross, IV Phase, PIA, Banglore-58
IV PhaseI
Corrugated box480 O-98
Cardboard or corrugated box and
Small Orange 2011BA
30.09.2029N N N N N N N NA NA NA 1.8 0.15 NA N Y Y NA Yes
19552010-11 O
33160Bio gen Extracts Pvt Ltd
Plot No.253, 245 & 254/B (Part), 11th Main, 3rd Phase, PIA, Bengaluru-560 058
III PhaseI
Formulation of Pharmaceutical Product
380 O-74Pharmaceuti
cal formulation
Small Orange 2017BA
30.9.2023Y 30.09.2023 N N N N N NA NA NA 4.8 0.05 (STP) STP N N N NA Yes
1956 No.P-8B, III Stage, PIE, Bengaluru- III Stage R & D activity on Pharmaceuti19562010-11 CL
-Vital Biotech India Pvt Ltd.,
No.P-8B, III Stage, PIE, Bengaluru-560 058
III StageI
R & D activity on Biotechnology 21 R-58
Pharmaceutical (Bulk drug &Active
Small Red ClosedBA
31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA
19572010-11 O
11723
Indian Designs Exports Pvt Ltd., Unit-3,
No.243 & 243/A, 6th Main III Phase, PIA, Bengaluru-560 058.
III PhaseI
Garment stitching 432.73 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 12 N NA N Y N NA Yes
19582010-11 CL
Hycom Engineering India Pvt Ltd.,
No.M-7/1, 6th cross, I Stage PIE, Bengaluru-560 058
I StageI
Assembling & Testing of hydraulic components
429.743 G-7Brass and bell metal utensilsmanufacturi
Small Green 2011WA
31.12.2020Y 31.12.2020 N N N N N NA NA NA 1.5 N ST & SP N N N NA NA
19592010-11 O Spiro Gears,
No.40-B, II Phase. PIA, Bengaluru-560 058
II PhaseI
Engineeringindustry 195.24 G-78
Switches without
electroplatinSmall Green 2011
BA31.12.2020
N N N N N N N NA NA NA 0.72 N ST & SP N N N NA Yes
19602010-11 O
23198Charu Perfumes House,
No.202, 12th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Agarbatties202.63 W-37
Agarbathi Manufacturi
ngSmall White 2010
BA31.12.2012
N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes
19612010-11 O
40546Kiran Metal Finishers,
No.A-370/2, I Stage, PIE, Bengaluru-560 058
I StageI
Electroplating Zinc plating 94.35 R-44
Industry or process involvingmetal
Small Red 2010BA
30.06.2023Y 30.06.2015 N N N N N NA NA NA 0.32 0.15 NA N Y Y NA Yes
19622010-11 O Tower Vision Pvt Ld.,
No 183, III Phase, PIE, Banglore-58 III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2009AA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
19632010-11 CL LN Life Care Pvt Ltd.,
No.477-D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Sterilisation of surgical products 1400.28 O-65
medical productsincluding
Large Orange 2010BA
CLN N N N N N N NA NA NA 0 N NA N N N NA NA
19642010-11 O Flexo Tech Products,
No.P-18, III Stage. PIE, Bengaluru-560 058
III StageI
Engineeringindustry 87.7 G-78
Switches without
electroplatinSmall Green 2010
BA31.12.2021
N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
19652010-11 CL
-
Prime Progression Export Services, No.A-37, A-38, V-42,V42, 2nd Main , II Stage,
PIE, Bengaluru-560 058
No.A-37, A-38, V-42,V42, 2nd Main , II Stage, PIE, Bengaluru-560 058
II StageI
Plastic Large Bags624 G-32
Polythene and plastic processedproducts
Medium Green 2010BA
30.06.2007N N N N N N N NA NA NA 0 N NA N N N NA NA
19662010-11 O
VIvekananda Electrical Industries, No.A-14,II Stage,
PIE, Bengaluru-560 058
No.A-14,II Stage, PIE, Bengaluru-560 058
II StageI
assembly of transformers 51 G-85
Transformer assembly unit
Small Green 20111BA
31.12.2020N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
19672010-11 O
12183
Disa India Ltd., No.1-A,3RD & 5TH Floor, Kushal arcade
Garden II Phase,PIA, Bengaluru-560 058
No.1-A, II Phase,PIA, Bengaluru-560 058
II PhaseI
Software Techonology 819.6 G-84
units generatingwastewater
Medium Green 2010BA
31.12.2024N N N N N N N NA NA NA 3 N STP Y N N NA Yes
19682010-11 CL
24018Trishyiraya Recycling Pvt Ltd.,
No.315,IV Phase, PIA, Bengaluru-560 058
IV PhaseI
E-Waste78.3 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2012BA
30.06.2017N N N N N N N NA Yes 30.06.2019 1.08 N ST & SP N N N NA Yes
19692010-11 O Flexo Tech Products,
No.B-34, 2nd cross, III Stage. PIE, Bengaluru-560 058
III StageI
Engineeringindustry 92.11 G-78
Switches without
electroplatinSmall Green 2010
BA31.12.2021
N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
19702010-11 O
13774
Vimala Mass Finishing Pvt Ld.,
No.B-154, 5th Main road, II Stage, Bangalore-560058
II StageI
Powder Coating96.37 R-44
Industry or process involvingmetal
Small Red 2011BA
30.06.2022N N N N N N N NA NA NA 0.48 0.45 NA N Y Y NA Yes
19712010-11 CL
11625Supertex Lables (P) Ltd.,
No. 202, 12th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Lables1977 G-91
Manufacture of Adhesives andadhesive
Large Green 2011WA
31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
19722010-11 CL Saravana Centri cast,
No.A-56, 2nd Main, II Stage, PIE, Bangalore-560058
II StageI
Foundry91 O-42
Industry or processes involvingfoundry
Small Orange 2004BA
30.06.2017N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
19732010-11 O Venus Engineering Industries,
No.157, 10th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineeringindustry 46 W-14
Engineering and fabricationunits (dry
Small White 2009BA
31.12.2020N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
19742010-11 CL
17966A.K.S Trading Company.,
No.C-69, 2nd cross, II Stage, PIE, Bangalore-560058
II StageI
Copper recovery137.38 R-10
Industries engaged in recycling/
Small Red 2011BA
30.06.2018Y 30.06.2016 N N N N N NA NA NA 0.096 0.4 NA N Y Y NA Yes
19752010-11 CL
16481Kargil Equipments,
No.199/2, 12th Main, III Phase ,PIA, Bengaluru-560 058
III PhaseI
Stainless steel kitchen equipments 33 G-46
Steel furniture without spray
Small Green 2004BA
31.12.2018N N N N N N N NA NA NA 0.7 N ST & SP N N N NA Yes
19762010-11 O
15435Ra TMT India,
No.246, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineeringindustry 49 W-14
Engineering and fabricationunits (dry
Small White 2009BA
31.12.2018N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
19772010-11 CL
-Sutures India Pvt Ltd.,
No.379 & 380, 10th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
surgical needle238 O-65
Surgical and medical products
Small Orange 2010BA
31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA NA
19782010-11 O
39360Starline Packers Pvt. Ltd.,
No. 490F, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
wood packing 27.82 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2014BA
31.12.2027N N N N N N N NA NA NA 2.75 N ST & SP N N N NA Yes
19792010-11 O
36817Metro Fashions
No.A-313 &A-314, 7th Main, II Stage, PIE, Bengaluru-560058
II StageI
Garment washing273 O-50
laundry using oil
firedMedium Orange 2018
BA30.09.2022
N N N N N N N NA NA NA 2.4 57 ETP N Y N NA Yes
19802010-11 O
14279Surface chem Finishers.,
No.B-41, B-Type, III Stage, PIE, Bengaluru-560 058
III StageI
Electroplating( Gold Plating ) 78.63 R-44
Industry or process involving
Small Red 1995BA
30.06.2023Y 30.06.2018 N N N N N NA NA NA 0.3 0.05 NA N Y Y NA Yes14279 involving
metal BA Y 30.06.2018 N N N N N NA NA NA 0.3 0.05 NA N Y Y NA Yes
19812010-11 CL
12453Mandhana Industries Ltd.,
No.21-D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment stitching 565 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2010BA
31.12.2021N N N N N N N NA NA NA 10.2 N STP Y N N NA Yes
19822010-11 CL
11332Scotts Garments,
No.V-27, II Stage, PIE, Bengaluru-560 058
II StageI
Garment stitching 900 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2010BA
31.12.2022N N N N N N N NA NA NA 15 N STP Y N N NA Yes
19832010-11 O 3D Concept Tooling,
SB-44, 1st cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineeringindustry 179.84 W-14
Engineering and fabricationunits (dry
Small White 2010BA
30.12.2019Y 30.06.2017 N N N N N NA NA NA 0.4 N NA N Y N NA Yes
19842018 O
39801Venture Lighting India Ltd
No.385 &386, 10th Cross, IV Phase, PIA,Bengaluru -560058
IV PhaseI
Sales, Maintenance and replacement of LED Fixture in Govt. in Pvt companies
200 G-81Research laboratories not involving
Small Green 2018BA
31.12.2028N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
19852018 O Sanju Clinic
No.43, 8th Main, III Phase, PIA, Bengaluru-560058
III PhaseHCE
Clinic0 W-58
ClinicSmall White 2018
BA-
N N Y 31.12.2100 N N N NA NA NA NA N NA N N N NA Yes
19862010-11 O
Fusion Metals Tech India Pvt Ltd.,
No.D-480, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Engineering industry (Sheet Metal Fabrication)
114.78 G-7Steel furniture without spray
Small Green 2010BA
31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
19872010-11 CL
13029Scotts Garments Ltd.,
No.A-353a, 8th Main II Stage,PIE, Bengaluru-560 058
II StageI
Stitching900 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2009BA
31.12.2022Y 31.12.2019 N N N N N NA NA NA 11 N STP - BWSSB Y N N NA Yes
19882010-11 O
29736San Industrial Enterprises
No.198,12th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Powder coating activity without 7 tank process
27.7 G-97Powder
Coating onsurface of
Small Green 2015BA
31.12.2025N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
19892010-11 O
11628
Sri Rama & Sons ( Formerly Bombay Rayon Fashions
Limited., Unit-22
No.193-B, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment stitching 263 G-78
StichingSmall Green 2010
BA31.12.2022
N N N N N N N NA NA NA 6.3 N STP - BWSSB N N N NA Yes
19902010-11 O Thumbe Engineering,
No.1-D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineeringindustry 255 G-78
Switches without
electroplatinSmall Green 2010
BA31.12.2022
N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes
19912010-11 O HDFC Bank, Mayur Complex,
100ft Road, I Stage, PIE, Bengaluru-560 058
I StageOthers
BankDG set W-52
Diesel Generator sets (15KVA to 250
Small White 2010AA
31.12.2019N N N N N N N NA NA NA 0 N NA N N N NA Yes
19922010-11 O
35335Laboratory for Electro Optics,
No.16, 1st cross, I Stage, PIE, Bengaluru-560 058
I StageI
Electronic Equipments 1800 G-53
Manufacturing of optical lenses(using
Large Green 2002BA
31.12.2022N N N N N N N NA NA NA 14 N STP Y N N NA Yes
19932010-11 CL
12825F.P. Seating Systems Pvt Ltd,
No.485/10, 14 th cross, IV Phase, PIA, Bangalore-560058
IV PhaseI
Polyurethene Foam seatsand assembly 365 O-80
Foam manufacturing
Small Orange 2008BA
30.09.2017N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
19942010-11 O
11414
Mag Engineering (Formerly known as Mag Engineering Pvt
Ltd.,) Plot
Plot No.34/B, II Phase, PIA, Bengaluru-560 058
II PhaseI
(Metal Fabrication) Engineering Industry 1807 G-78
Switches without
electroplatinLarge Green 2010
BA31.12.2022
N N N N N N N NA NA NA 7 N STP Y N N NA Yes
19952010-11 O
38467Center Front Clothing
No.27, 10th Main Road, III Stage, PIE, Bengaluru-560058
III StageI
Ready made garment9432 G-72
Stitching/ Stitching of shoe uppers/
Small Green 2017BA
31.12.2027N N N N N N N NA NA NA 4.5 N ST & SP N N N NA Yes
19962010-11 O Indus Towers Ltd.(Unit-II),
No.99, III Phase, Peenya Industrial Area, Bengaluru-560 058
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2011AA
31.12.2014N N N N N N N NA NA NA 0 N NA N N N NA Yes
19972010-11 O Towers Vision,
No.183, III Phase, PIA, Bengaluru-560 058
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2011AA
NAN N N N N N N NA NA NA 0 N NA N N N NA Yes
19982011-12 O
11645
Almighty Ring Forgings (P) Ltd.,
No.460/A1, IV Phase, PIA, Bangalore-560058
IV PhaseI
Forging194.56 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2012BA
30.09.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
19992011-12 CL
-
Lakshmi Metals & Alloys (P) Ltd.,
No.105, III Phase, PIA, Bangalore-560058
III PhaseI
Mineral Processing15 O-26
processing, mineral
processing, Small Orange Closed
WA30.09.2015
N N N N N N N NA NA NA 0 N NA N N N NA NA
20002011-12 O
Acumac Machine Tools Pvt Ltd,
No. 472/A, 12th Corss, IV phase, Peenya Industrial Area, Bengaluru-560 058
IV PhaseI
Manufacture machine tools components 432 O-62
painting, paint baking,
paintSmall Orange 2012
BA30.09.2012
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
20012011-12 O Statweigh India Pvt Ltd.,
No.447, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electrical weigh bridges and parks 97 W-13
Electrical and electronic item
Small White 2011WA
31.12.2020N N N N N N N NA NA NA 0.25 N ST & SP N N N NA NA
20022011-12 O
13795Veeyor Polymers (P) Ltd.,
No.B-161, 4th Main, II Stage, PIE, Bangalore-560058
II StageI
Resin Manufacturing59.76 O-75
Synthetic resins Small Orange 2009
BA30.09.2022
N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes
20032011-12 O
32475Manjushree Heat Tech Ltd.,
No.C-90, 3rd cross, III Stage,PIE, Bengaluru-560 058
III StageI
Heat Treatment76.43 O-63
Engineering Industries with HeatTreatment,
Small Orange 2011BA
30.09.2022N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
20042011-12 O
Rinse Top Tex (P) Ltd., Unit-II,
No.B-237, 3rd Main road, II Stage, Bengaluru-560 058
II StageI
Ready made garments33.8 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2011BA
31.12.2020N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
2005 No.B-153(b), 5th Main Road, II Stage, II Stage Foot wear soles Leather foot 20052011-12 O Hakasa India,
No.B-153(b), 5th Main Road, II Stage, Bengaluru-560 058
II StageI
Foot wear soles (parts) 48.62 G-26
Leather foot wear and leatherproducts
Small Green 2009WA
31.12.2020N N N N N N N NA NA NA 1.3 N NA N Y N NA NA
20062011-12 O Century Polymers,
No.C-209-A, 4th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Rubber products59.75 G-41
Rubber goods industry (with gas
Small Green 2011BA
31.12.2020N N N N N N N NA NA NA 2 N NA N Y N NA Yes
20072011-12 CL
Hess Enterprises, India (P) Ltd.,
No.4, 5th Main, III Phase , Bengaluru-560 058
III PhaseI
Special Proposemachine 472.38 G-78
Switches without
electroplatinSmall Green 2011
BA31.12.2011
N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
20082011-12 O
15059Sai Kripa Insulations Pvt Ltd.,
No.A-151 & 152, 3rd cross, I Stage, PIE,Bengaluru-560 058
I StageI
Corrugated boxes & allied products with boiler
434 O-98Cardboard or corrugated box and
Small Orange 2010BA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
20092011-12 CL
-MBS Metal Refiners,
No.V-20/1, II Stage,PIE, Bengaluru-560 058
II StageI
Lead Reprocessing 81 R-32
engaged in recycling
/ Small Red 2011
BANA
N N N N N N N NA NA NA 0 N NA N N N NA NA
20102000 O
39193Wave Mechanics Pvt Ltd
No.V-3, Ist Main, I Stage, III Stage ,PIE, Bangalore
III StageI
CNC Mechanical components & Electronic sub assembly
2897 G-78Switches without
electroplatinLarge Green 1.3.2000
BA31.12.2028
Y 31.12.2023 N N N N N NA NA NA 2.4 N NA N Y N NA Yes
20112011-12 O Axis Bank,
Axis Bank, No 149, 100 Ft road, I stage, PIE, Bengaluru-560 058
I StageOthers
BankDG Set W-14
Diesel Generator sets (15KVA to 250
Small White 2011WA
NAN N N N N N N NA NA NA 0 N NA N N N NA NA
20122011-12 CL
-Raj Metal Finishers,
No.460-A & 460A-1, IV Phase.PIA, Bengaluru-560 058
IV PhaseI
Electro plating45 R-44
process involving
metal Small Red 2011
BA30.06.2014
CL N Cl N Cl N Cl NA NA NA 0.3 0.08 ST & SP N N Y NA NA
20132011-12 O Canara Hydraulics Pvt Ltd.,
No.26-E, II Phase, PIA, Bengaluru-560 058
II PhaseI
Hydraulics Cylinders404 G-78
Switches without
electroplatinSmall Green 2011
BA31.12.2020
N N N N N N N NA NA NA 3.6 N ST & SP N N N NA Yes
20142011-12 CL Maahi Industries,
No.B-379/1, I Stage, PIE, Bengaluru-560 058
I StageI
PVC pipes30.5 G-39
Plastic sack bags, woven sack with HDPE,
Small Green 2011WA
31.12.2020N N N N N N N NA NA NA 0.36 N NA N Y N NA NA
20152011-12 O
38738Das CNC Products,
No.10-B, 10th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Manufacture of precision turned components
94.3 G-75Brass and bell metal utensilsmanufacturi
Small Green 2010BA
31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
20162011-12 O
12799Ace Multi Axes Systems,
No.532, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
General Engineering458.82 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2011BA
31.12.2022N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes
20172011-12 O
23894Integrated Metal Coats,
No.333, 4th main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electroplating8.14 R-44
Industry or process involvingmetal
Small Red 2011BA
30.06.2024N N N N N N N NA NA NA 0.1 0.05 NA N Y Y NA Yes
20182011-12 O
Mamatha Specialities Foods Ltd.,
No.B-170, 4th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Powdering of spices and instant 49.4 G-112
Fragrance, flavours essence etc.for food
Small Green 2009WA
31.12.2020N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
20192011-12 CL
11419Shashikar Enterpries,(P) Ltd.,
No.473/A, 12TH CORSS, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Garments933 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2011BA
31.12.2026N N N N N N N NA NA NA 9.6 N STP Y N N NA Yes
20202011-12 O Weltech Engineering Pvt Ltd.,
No.473D/3, 13th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of chair, table computer table 76 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2011WA
31.12.2035N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
20212011-12 CL
33835Arrow Systems,
No.SM-3, III Stage, PIE, Bengaluru-560 058
III StageI
Electronic Waste24.8 R-33
Items namely -IntegratedRecycling
Small Red 2011BA
30.06.2017Y 30.06.2017 N N N N N NA NA NA 0.96 0.01 NA N Y Y NA Yes
20222011-12 O
15622Mohan Industrial Suppliers,
No.122 , 7th Main, 3rd cross, III Phase,PIA, Bengaluru-560 058
III PhaseI
Engineering350 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2011BA
31.12.2035N N N N N N N NA NA NA 0.72 N ST & SP N N N NA Yes
20232011-12 O
Pallakki NDT exclusive Controls,
No.250, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering75 G-78
Switches without
electroplatinSmall Green 2010
WA31.12.2021
N N N N N N N NA NA NA 0.001 N ST & SP N N N NA NA
20242011-12 CL
-DeBeers India Pvt Ltd.,
No.18/A,II Phase, PIA, Bangalore-560058
II PhaseI
Mineral Processing991.71 O-26
processing, mineral
processing, Medium Orange 17.3.2012
BA31.12.2021
Y 30.06.2016 N N N N N NA NA NA 0 N NA N N N NA NA
20252011-12 O Indus Electro Controls,
No.408/3, II Phase, PIA, Bengaluru-560 058
II PhaseI
Electrical Assembly86.21 G-78
Switches without
electroplatinSmall Green 2004
BA31.12.2020
N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
20262011-12 O
17482Glosil Silicaware Pvt Ltd.,
No.A-353,II Stage, PIE, Bengaluru-560 058
II StageI
Manufacture of Silica ware 184 G-98
Silicon Rubber Mouldings
Small Green 2009BA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
20272011-12 CL Precision Tools Implements,
No.B-259, 6th Main, II Stage,PIE, Bengaluru-560 058
II StageI
General Engineering Industry 326 G-78
Switches without
electroplatinSmall Green 2010
BA31.12.2021
N N N N N N N NA NA NA 0 N NA N Y N NA Yes
20282018-19 O
I.E.Power Technologies Pvt Ltd
No.3, 14th Cross, IV Phase, PIA, Bengaluru-560058
IV PhaseI
AC drives, Automatic voltage controller 84 G-78
(Panel Board, Switches without
Small Green 1.10.2017BA
31.12.2027N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
20292011-12 O
14188Shiva Battery Components,
No., A-1/1, 1st Main Road, II Stage,PIE, Bengaluru-560 058
II StageI
Battery containers 127 G-79
bags, woven sack -- 10 10 15 -- 15 10
Small Green 2011BA
31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes14188 15 -- 15 10 BA N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
20302011-12 O
27628Lakshmi Electro platers,
No.338, 9th Cross, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Electroplating24 R-44
Industry or process involvingmetal
Small Red 2011BA
30.06.2025N N N N N N N NA NA NA 0.3 0.05 NA N Y Y NA Yes
20312011-12 CL
-Netway HomeProducts,
No.V-40, II Stage,PIE, Bengaluru-560 058
II StageI
Perfumed floor cleaners 139 O-10
Manufacturing of tooth powder,toothpaste,
Small orange 2011BA
31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes
20322011-12 O
30739Galaxy Hard Chrome (P) Ltd.,
No.38,B-1, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Electroplating (Hardchrome) 49.8 R-44
process involving
metal Small Red 2011
BA30.06.2021
N N N N N N N NA NA NA 0.16 0.05 ST & SP N N Y NA Yes
20332011-12 O Indus Towers Ltd.,
NO.A-52/1, Plot No 493, 1st cross, II Stage,PIE, Bengaluru-560 058
II StageTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2011AA
31.12.2015N N N N N N N NA NA NA 0 N NA N N N NA Yes
20342011-12 O
15075Sagittarius Profiles Pvt Ltd.,
No.403, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Engineering activity (Roofing Section- colour coated prifile sheets, "Z" Purlin and
326.8 G-10Carpentry & wooden furnituremanufacturi
Small Green 2012WA
31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
20352011-12 CL Stock Redler India (P) Ltd.,
No.1-A,II Phase,PIA, Bengaluru-560 058
II PhaseI
Assembly of chain conveyors 488.3 G-78
Switches without
electroplatinSmall Green 2009
BA31.12.2018
N N N N N N N NA NA NA 0.6 N STP Y N N NA Yes
20362011-12 O Classic Enterprises,
No.D/396, Ist Cross, I Stage, Peenya Industrial Estate, Bengaluru-58
I StageI
Manufacture of turned components 7.94 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1986WA
31.12.2035N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
20372011-12 O Venkat Switchgears,
No.439 &440, 12th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Sheet shearing, bending, notching and fabrication
196 G-46Steel furniture without spray
Small Green 2012BA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
20382011-12 O
15449Shreyas Machine Tools,k
No.83, 7th Main, III Phase,PIA, Bangalore-560058
III PhaseI
Machine tumed componenets 90.68 G-78
Engineering and fabricationunits (dry
Small Green 2011WA
31.12.2020N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
20392011-12 O
16395Sri Sai Industries, Unit-II,
No.P-26/A,III Stage,PIE, Bengaluru-560 058
III StageI
Laser cutting beding machines 446 W-14
Engineering and fabricationunits (dry
Small White 2011BA
31.12.2020N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes
20402011-12 CL
37190Vinayaka Enterprises,
No.280,4th Main, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Electro plating68 R-44
process involving
metal Small Red 2010
BA31.12.2009
CL N Cl N Cl N Cl NA NA NA 0 N NA N N N NA NA
20412011-12 O
10950Shahi Exports Pvt Ltd.,
No.226, 227, 8th Main, 2nd cross, III Phase,PIA, Bengaluru-560 058
III PhaseI
Ready made Garments 1782 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2011BA
31.12.2022Y 31.12.2020 N N N N N NA NA NA 30.4 N STP N N N NA Yes
20422011-12 O
15509Mark Equipments & Services,
Mark Equipments & Services, No.63/3, 4th Main,II,Phase,PIA, Bengaluru-560 058
II PhaseI
Fabrication of refigeration equipments
36.21 W-14Engineering and fabricationunits (dry
Small White 2010BA
31.12.2020N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
20432011-12 CL
24694Cannula Plus India Pvt Ltd
No.V-6, 3rd Main Road, II Stage, PIE, Bengaluru
II StageI
Laser cutting 368 G-78
Switches without
electroplatinSmall Green 2009
BA31.12.2025
N N N N N N N NA NA NA 0.816 N NA N Y N NA Yes
20442011-12 CL
34030Gajanana Enterprises,
No.338, 9th cross,IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Grit Blasting16.47 G-92
Shot blasting operation Small Green 2011
BA31.12.2099
N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
20452011-12 O Nagur Forging,
No.63/A, 4th Main, III Phase, PIA, Bangalore-560058
III PhaseI
Forging21.5 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2011BA
31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
20462018-19 O
41566Karnataka Rubber Industries
No.A-286, 6th Main, II Stage, PIE, Bengaluru-560058
II StageI
Stitching of shoe upper and insoles with cutting and stitching oprs
8.49 G-26wear and
leatherproducts
Small Green 2018BA
31.12.2027N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
20472011-12 O
24114Meta Cast,
No.A-359, 1st Main, I Stage,PIE, Bengaluru-560 058
I StageI
Aluminium casting24.15 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 2008BA
30.09.2029N N N N N N N NA NA NA 0.61 N NA N Y N NA Yes
20482011-12 O
23793Unique Heat Carbo,
No.B-376, 9th cross, I Stage,PIE, Bangalore-560058
I StageI
Heat Treatment22.77 O-63
Engineering Industries with HeatTreatment,
Small Orange 2010BA
30.09.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
20492011-12 CL
Swastik Technologies Bangalore.
No.17, 5th Main, III Phase,PIA, Bengaluru-560 058
III PhaseI
Electrical Assembly264 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2010BA
31.12.2012N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
20502011-12 O Devilog Systems India, Unit-II,
No. 5 ,21-D, II Phase,PIA, Bengaluru-560 058
II PhaseI
Engineering157 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.56 N ST & SP N N N NA NA
20512011-12 O Futura automation (P) Ltd.,
No.S4, off: 3rd cross, I Stage,PIE, Bengaluru-560 058
I StageI
Assembly of computers 690 G-78
Panel Board, Switches withoutelectroplatin
Medium Green 2008BA
31.12.2035N N N N N N N NA NA NA 1 N NA N Y N NA Yes
20522011-12 O
16376Screen Touch Designs,
V-1C, 1 E Cross, I Stage,PIE, Bengaluru-560 058
I StageI
Textile Screen Printing 34.7 O-12
Screen printing Small Orange 2011
BA30.09.2022
N N N N N N N NA NA NA 0.32 0.03 NA N Y Y NA Yes
20532011-12 CL
100880G.G.Tronics India Ltd.,
No.10, 6th Main, III Phase,PIA, Bengaluru-560 058
III PhaseI
Assembly of computers 1300 G-78
Electrical and electronic item
Large Green 2011BA
31.12.2035N N N N N N N NA NA NA 2.1 N NA N Y N NA Yes
2054 No.34-D,III Phase, 4th Main, PIA, III Phase Refractories and Ceramics 20542011-12 O
15467Anjanadri Refractories,
No.34-D,III Phase, 4th Main, PIA, Bangalore-560058
III PhaseI
Refractories and Alumina tubes 21.42 O-22
Ceramics and Refractories
Small Orange 2011BA
30.06.2017N N N N N N N NA NA NA 0.04 N ST & SP N N N NA Yes
20552011-12 O Moda Suole (India) Pvt Ltd.,
No.SB-105, I Stage,PIE, Bengaluru-560 058
I StageI
Shoes & Leather Chappals 200.63 G-26
Leather foot wear and leatherproducts
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
20562011-12 CL
33199Surfa Coats Ltd., No. Unit-V,
No.VC-84, 3rd Cross, II Stage,PIE, Bangalore-560058
II StageI
Paint formulation30.75 O-54
Paint blending and mixing (Ball mill)
Small Orange 2008WA
30.09.2017Y N N N N N NA NA NA 1.28 0.7 NA N Y Y NA NA
20572011-12 O CIM Tools Pvt Ltd.,
No.467/469, Site No 1D, 12th Cross, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Parts & sub assembly for commercial aricrafts
2269 G-10Carpentry & wooden furnituremanufacturi
Large Green 1997BA
31.12.2035N N N N N N N NA NA NA 4.3 N NA N Y N NA Yes
20582011-12 O Soplar India Pvt Ltd.,
No.1-A,II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering activity207 G-78
Switches without
electroplatinSmall Green 2011
WA31.12.2021
N N N N N N N NA NA NA 0.48 N STP Y N N NA NA
20592011-12 O
10660
Aditya Auto Products & Engineering (I) Pvt Ltd, No.23/24 , II Phase, PIA
Bengaluru-560 058
No.23/24, II Phase,PIA, Bengaluru-560 058
II PhaseI
Engineering activity2143.54 G-78
Panel BoardLarge Green 2011
BA31.12.2021
Y 30.06.2017 N N N N N NA NA NA 72 N STP Y N N NA Yes
20602011-12 O
15394Sri Vanadurga Fabrications,
No.139/149, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering activity10.6 W-14
Engineering and fabricationunits (dry
Small White 2011BA
31.12.2020N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
20612011-12 CL Anjanadri Enterprises,
No.B-70, 2nd cross, II Stage, PIE, Bangalore-560058
II StageI
Phospating and powder coating 51.86 R-44
process involving
metal Small Red 2008
BA30.06.2020
N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes
20622011-12 O Chirag Industries,
No.M-5,I Stage, PIE, Bengaluru-560 058
I StageI
Manufacture of Fasteners 28.09 G-75
Brass and bell metal utensilsmanufacturi
Small Green 2006BA
31.12.2035N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
20632011-12 O
13920Balaji Hard Chrome,
No.473-D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electroplating (Hardchrome) 259 R-44
process involving
metal Small Red 2012
BA30.06.2022
N N N N N N N NA NA NA 0.8 3.9 NA N Y Y NA Yes
20642011-12 O
10653
DF Forging & Maching Centre Pvt Ltd ( Unit-1)
No.498,IV Phase, PIA, Bangalore-560058
IV PhaseI
Engineering activity- Precision machined components
2351 G-110Diesel Generator sets (250 KVA
Large Green 2012BA
31.12.2021N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
20652011-12 O
29688Rishab Heat Treaters,
No.115/B, 3rd cross, III Phase, PIA, Bangalore-560058
III PhaseI
Heat Treatment206.01 O-36
Heat treatment using oil fired furnace
Small Orange 2011BA
30.09.2021N N N N N N N NA NA NA 0.43 N NA N Y N NA Yes
20662011-12 O Amba Industries,
No.B-125, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering activity85.25 G-78
Switches without
electroplatinSmall Green 1995
WA31.12.2007
N N N N N N N NA NA NA 0.35 N NA N Y N NA NA
20672011-12 O
11408Ultratech Cement Ltd.,
No.27-C & 28-B, II Phase,PIA, Bengaluru-560 058
II PhaseI
Ready mix concrete1378 G-37
Ready mix cement concrete
Large Green 2011BA
31.12.2023N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
20682011-12 O Venson Electric Pvt Ltd.,
No.331, 9th cross, IVth Phase, PIA, Bengaluru-560 058
IV PhaseI
Electrical Assembly229 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1983BA
31.12.2022N N N N N N N NA NA NA 2.4 N ST & SP N N N NA Yes
20692011-12 O Navalagunda Auto Park,
No.92,93 & 100, III Phase,PIA, Bengaluru-560 058
III PhaseI
Service station21.87 O-62
Automobile servicing,repairing and painting
Small Orange 2011BA
30.09.2012N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
20702011-12 O
12159I.G.Workshop.,
No.207& 208, III Phase, Bengaluru-560 058
III PhaseI
Automobile Service station 257.37 O-18
Automobile servicing, repairing and
Small Orange 2012BA
30.09.2021
Y 30.09.2021 N N N N N NA NA NA 1.2 3 ST & SP ETP Y N N NA Yes
20712011-12 O Vyoma Switch Grear Industry,
No.33/A, II Phase,PIA, Bengaluru-560 058
II PhaseI
Electronic choke79 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2011WA
31.12.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
20722011-12 O 3D Concept Tooling,.
No.C-338, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering Compnent (Die Casting)
88 G-93Panel Board, Switches withoutelectroplatin
Small Green Dec-11BA
30.12.2034N N N N N N N NA NA NA 1.05 N NA N Y N NA Yes
20732011-12 O Peerless Engineering Products
No.B-174, II Stage,PIE, Bengaluru-560 058
II StageI
Engineering activity6.3 W-14
Engineering and fabricationunits (dry
Small White 2007BA
31.12.2020N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
20742011-12 O Tool Tech Engineers,
No.D-395 , 1st Cross, I Stage, Bengaluru-560 058
I StageI
Engineering activity27.91 G-10
wooden furniture
manufacturiSmall Green 2015
WA31.12.2025
N N N N N N N NA NA NA 0.26 N NA N Y N NA NA
20752011-12 O
24771
Paragon Polymer Products Pvt Ltd (form Elastrex Polymers
Pvt Ltd).,
No.V-42& 42(a), II Stage,PIE, Bengaluru-560 058
II StageI
Footwear961.27 G-26
Leather foot wear and leatherproducts
Medium Green 2011BA
31.12.2024N N N N N N N NA NA NA 2 N NA N Y N NA Yes
20762011-12 O
12765Elastrex Polymers Pvt Ltd.,
No.488/D, 14th Cross, IV Phase, PIA ,Bengaluru-560 058
IV PhaseI
Footwear1829.8 G-26
Leather foot wear and leatherproducts
Large Green 2011BA
31.12.2024N N N N N N N NA NA NA 4 N ST & SP N N N NA Yes
20772011-12 O
12596Galvano centricast (P) Ltd.,
No.152, 10th Main Road, III Phase, PIA, Bangalore-560058
III PhaseI
Castings276 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 2010BA
30.09.2022N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
20782011-12 O Viom Netwroks Ltd.,
No.P-6,III Stage, PIE, Bengaluru-560 058
III StageTT
Telephone towerDG Set W-52
Diesel Generator sets (15
Small White 2011AA
NAN N N N N N N NA NA NA 0 N NA N N N NA Yessets (15
KVA to 250 AA N N N N N N N NA NA NA 0 N NA N N N NA Yes
20792011-12 CL
30528CMAX Metals India (P) Ltd.,
No.309,8th Cross, IV Phase , PIA, Bengaluru-560 058
IV PhaseI
Engineering activity329 G-78
Switches without
electroplatinSmall Green 2012
BANA
Y N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
20802011-12 YTC Tech Power Corporation Ltd.,
No.25/A,II Phase,PIA, Bengaluru-560 058
II PhaseI
Engineering activity485.99 G-78
Switches without
electroplatinSmall Green 2000
BANA
N N N N N N N NA NA NA 0 N NA N N N NA NA
20812011-12 O
12203
Homag Machinery Bangalore(P) Ltd.,
No.25 B-C, 3rd Main, 4th Cross, II Phase, PIA, Bengaluru-560 058
II PhaseI
Engineering activity448 G-78
Switches without
electroplatinSmall Green 2012
BA31.12.2021
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
20822011-12 O
18130Sai Industries,
No 02, .9-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Plastic Utencils41.27 G-32
Polythene and plastic processedproducts
Small Green 2010WA
31.12.2021N N N N N N N NA NA NA 0.12 N ST & SP N N N NA NA
20832011-12 O
17422Skanda Machine Tools
No.46, 4th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering activity202.56 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2012BA
31.12.2021N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
20842011-12 O Werner Finely Pvt Ltd.
No.A-105, 3rd Main, II Stage, Bengaluru-560 058
II StageI
Engineering activity284 G-78
Switches without
electroplatinSmall Green 2011
BA31.12.2021
N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
20852011-12 O
26493Primex Plastics (P) Ltd.,
No.9-D,II Phase, PIA, Bengaluru-560 058
II PhaseI
Plastic Moulded297 G-32
Polythene and plastic processedproducts
Small Green 2010BA
31.12.2022N N N N N N N NA NA NA 0.25 N ST & SP N N N NA Yes
20862011-12 YTC
14447
Electric Power Equipment Company,
No.44, III Phase, PIA, Bengaluru-560 058
III PhaseI
AssembLy of Transofrmers 53.2 G-85
Transformer assembly unit(industrial
Small Green 2009BA
NN N N N N N N NA NA NA 0 N NA N N N NA Yes
20872011-12 CL
29650
Lakshmi Vacuum Heat Treaters (P) Ltd.,
No.3B-05,IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Heat treatment84.69 O-63
Engineering Industries with HeatTreatment,
Small Orange 2010BA
30.06.2017N N N N N N N NA Y 30.06.2018 0.4 N NA N Y N NA Yes
20882011-12 O
38391
ITW India Pvt Ltd-BISS Division (Formerly Bangalore
Integrated Systems),
No.497-E,IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of servo Hydraulic testing systems components (Engineering unit)
1092 G-10Carpentry & wooden furnituremanufacturi
Large Green 2010BA
31.12.2023Y 31.12.2019 N N N N N NA NA NA 2.8 N STP Y N N NA Yes
20892011-12 O Crescent Enterprises,
No.V-12(a), III Stage, PIA, Bengaluru-560 058
III StageI
Buffing & Polishing Watch components 42.47 G-1
Aluminum utensils fromaluminum circles by
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes
20902011-12 CL
24141E-Waste Managers,
No.C-311, 9th cross, I Stage, PIA, Bengaluru-560 058
I StageI
E-Waste25.2 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2010BA
30.06.2017N N N N N N N NA Y 0.432 N NA N Y N NA Yes
20912011-12 O Indus Towers Ltd.,
No.473-D, 13th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseTT
Telephone TowerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2012AA
31.12.2021N N N N N N N NA NA NA 0 N NA N N N NA Yes
20922011-12 O
16750Crescent Polymers,
No.93, 4th main, III Phase, PIA, Bangalore-560058
III PhaseI
silicon emulsions for garment washing with blending andpackaging operation
327 G-62Synthetic detergent formulation
Small Green 2012BA
31.12.2032N NA N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
20932011-12 O
12167Slider Bags Bangalore Pvt Ltd,
, No.B-113, 3rd Main, II Stage, Bengaluru-560 058
II StageI
LDPE Stretch Roll (More than 40 Microns)
107.24 G-32Polythene and plastic processedproducts
Small Green 2012WA
31.12.2022N N N N N N N NA NA NA 0.16 N NA N Y N NA NA
20942011-12 O Technoheat ovens & Furnaces,
No.C-127, 2nd B Main road, II Stage, Bengaluru-560 058
II StageI
Engineering13 W-14
Engineering and fabricationunits (dry
Small White 2011WA
31.12.2021N N N N N N N NA NA NA 0.24 N NA N Y N NA NA
20952011-12 O Indian Clothing Company,
No.A-315, 7th Main Raod ,II Stage,PIE, Bengaluru-560 058
II StageI
Ready made garments 270 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2012BA
31.12.2022N N N N N N N NA NA NA 4 N ST & SP N N N NA Yes
20962011-12 O
22852Shipai Industries,
No.V-15A, Shed No.C-178, 4th main, II Stage,PIE, Bengaluru-560 058
II StageI
Alluminum Fabrication with anodising
87.42 R-44Industry or process involvingmetal
Small Red 2011BA
30.06.2023N N N N N N N NA NA NA 0.28 0.3 ST & SP N N Y NA Yes
20972011-12 O N.S.R. Copper,
No.22, 5th Main, III Phase,PIA, Bengaluru-560 058
III PhaseI
Copper drawing94.71 G-32
Polythene and plastic processedproducts
Small Green 2011BA
31.12.2024N N N N N N N NA NA NA 0.27 N ST & SP N N N NA Yes
20982011-12 O R.S. CNC,
No.C-186,II Stage,PIE, Bengaluru-560 058
II StageI
Engineering 192 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2012
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
20992018 O
41917
Alpha Elsec Defence and Aerospace Systems Pvt Ltd
No.193B, 4th Cross, I Stage, PIE, Bengaluru-560058
I StageI
Optical instruments850 O-62
painting, paint baking,
paintMedium Orange 2018
BA30.09.2023
N 30.09.2023
N
N N N N NA NA NA 2.2 N NA N Y N NA Yes
21002011-12 O Tower Vision India Ltd.,
No.36 & 37,II Phase,PIA, Bengaluru-560 058
II PhaseTT
Telephone TowerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2011AA
NAN N N N N N N NA NA NA 0 N NA N N N NA Yes
21012011-12 O CNC India Tools & Services,
No.A-319,A-320, 7th Main, II Stage,PIE, Bengaluru-560 058
II StageI
Manufacture of electrical panels Jigs fixtures, cutting tools, Electrical panel
491 G-78Panel Board, Switches withoutelectroplatin
Small Green 2004BA
31.12.2024N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
21022011-12 O Shrusti Innovation,
No.466, 3rd Main, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Engineering activity32.31 G-46
Steel furniture without spray
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
2103 No. 484/A, IV pahse peenya Industrial IV Phase Engineering activity Spray 21032011-12 O
29268Bulkmov Engineering
No. 484/A, IV pahse peenya Industrial area, Banglaore 560058
IV PhaseI
Engineering activity with spray paintng 112 O-62
Spray painting, paint baking, paint
Small Orange 1.10.1992BA
31.12.2025N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
21042011-12 O
15661Sun Modular Systems,
No.C-179, 5th C Main Road II Stage,PIE, Bengaluru-560 058
II StageI
Modular Furniture46.87 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
21052011-12 O
POM Systems Services Pvt. Ltd.,
No.75, 6th Main, III Phase,PIA, Bengaluru-560 058
III PhaseI
Engineering activity160 W-13
Electrical and electronic item
Small White 2000WA
31.12.2021N N N N N N N NA NA NA 1.9 N ST & SP N N N NA NA
21062011-12 CL R.O.Dasa
rahalliGajendra Enterprises,
No.129,IV Phase,PIA, Bangalore-560058
IV PhaseI
Forging23.55 O-63
Industries with Heat
Treatment, Small Orange 2010
WANA
N N N N N N N NA NA NA NA N NA N N N NA NA
21072011-12 CL R.O.Dasa
rahalli
Varsha Castings & engineering,
No.129,IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Non-Ferrous CAstingV 31.94 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2010WA
NAN N N N N N N NA NA NA 0 N NA N N N NA NA
21082011-12 O
15693Aries Precision Technologoies,
No.A-352, 8th Main II Stage,PIE, Bengaluru-560 058
II StageI
Engineering activity326.3 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009BA
31.12.2023N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
21092011-12 O
42492Perfect Laser Serivces,
No.B-231, 6th cross, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering activity157 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2011WA
31.12.2012N N N N N N N NA NA NA 0.14 N NA N Y N NA NA
21102011-12 CL
-Mahe Industries,
No.V-P, I Stage,PIE, Bangalore I StageI
Engineering activity120 G-78
Switches without
electroplatinSmall Green 2011
BA31.12.2022
N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes
21112011-12 CL
-Mallar Industries,
No.B-447,I Stage,PIE, Bangalore I StageI
Engineering activity17.81 W-14
Engineering and fabricationunits (dry
Small White 2011WA
NN N N N N N N NA NA NA NA N NA N N N NA NA
21122011-12 O United Engineers,
No.VP-8, I Stage,PIE, Bengaluru-560 058
I StageI
Engineering Activity & Fabrication 12.49 W-14
Engineering and fabricationunits (dry
Small White 2004WA
31.12.2021N N N N N N N NA NA NA 0.22 N NA N Y N NA NA
21132011-12 O
35475Shreyas Meta Castings,
No.83/1 , III Phase,PIA, Bangalore-560058
III PhaseI
Alluminium Gravity Die casting 30.5 O-28
Ferrous and Non- ferrous metalextraction
Small Orange 2011BA
30.09.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
21142011-12 O
17186Aries Precision Technologoies,
No.182/C, III Phase,PIA, Bengaluru-560 058
III PhaseI
Engineering and fabrication 41.85 W-14
Engineering and fabricationunits (dry
Small White 2006WA
31.12.2021N N N N N N N NA NA NA 0.14 N ST & SP N N N NA NA
2115O
Bhagyalakshmi Industrial Corporation,
B-85, 2nd Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Steering coloumn27.54 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1982WA
31.12.2035N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
2116O
Electrical and Allied Products, No. 136-137/5, 8th Main, III Phase PIA, Bangalore – 560 058
III PhaseI
Manufacture of cable assys and ATC brands 74.4 G-78
Switches without
electroplatinSmall Green 2002
WA31.12.2021
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
2117O Goodwill Industries,
No.148, 9th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Sheet metal components 542 G-7
Brass and bell metal utensilsmanufacturi
Medium Green 2008WA
31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA NA
2118O
Prakash Industries, B-225, 4th Cross, I stage, PIE, Bangalore – 560 058
I StageI
Electrical components21.62 W-13
Electrical and electronic item
Small White 1981BA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
2119O Pressed Products,
No.222, 8th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Manufacture of press components 46.77 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2010WA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
2120O
Rajdeep Engineering Works, B-126, 3rd Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Sheet metal fabrication 48 G-78
Switches without
electroplatinSmall Green 2003
WA31.12.2021
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
2121O
Replica Xerography Pvt Ltd., B-375, 100Ft Road, I stage, Peenya Industrial Estate, Bangalore – 560 058
I StageI
Scanning, printing and documetation service
445 G-78Switches without
electroplatinSmall Green 2007
BA31.12.2021
N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
2122O
14330
Sadbhava Fabricators (P), No.SB-52, 4th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Machined turned Components 245 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1996WA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
2123O
Hydro-Links Flexibles Pvt Ltd.,
No.C-329, 3rd Main Road, I Stage, PIE, Bangalore – 560 058
I StageI
Hose assemblies95.94 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1990WA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
2124O
M M Equipments, B-387, I Stage,PIE, Bangalore – 560 058
I StageI
Commercial kitchen equipments 107 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2003BA
31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
2125O
Mesh Well Gears, No.221, 9th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Manufacture of gears and sprockets 89.19 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1981BA
31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
2126O
Precision Engineering Accessories,
SB-109, I Stage, KSSIDC, PIE, Bangalore – 560 058
I StageI
Hydrulic and pneumatic cylinders156 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1973BA
31.12.2021N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes
2127O
Pride Machine Tools, No.89/1, 7th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
CNC machine components 113 G-78
Switches without
electroplatinSmall Green 2005
BA31.12.2021
N N N N N N N NA NA NA 0.45 N ST & SP N N N NA Yeselectroplatin BA N N N N N N N NA NA NA 0.45 N ST & SP N N N NA Yes
2128O
Sainit Engineering,B-18, I Stage,PIE, Bangalore – 560 058
I StageI
Fabrication54.45 G-78
Switches without
electroplatinSmall Green 2006
WA31.12.2021
N N N N N N N NA NA NA 0.05 N NA N Y N NA NA
2129O
Sridarshan Packaging Industries, No.26, 5th Main, III Phase, PIA,
Bangalore – 560 058
III PhaseI
Wooden pacakaging54.25 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
2130O
Veda Tooling systems (P) Ltd., B-317, I Stage, PIE, Bangalore – 560
058
I StageI
CNC Machine156 G-78
Switches without
electroplatinSmall Green 1991
BA31.12.2021
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
2131O
Auto Cut Enterprises, No.54/1, 4th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
CNC Machines34.52 G-78
Switches without
electroplatinSmall Green 2006
WA31.12.2021
N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA
2132O
B M L Industries, No.39/3, 4th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Repacking of chemicals 21.21 G-109
Refilling, Repacking andblending of
Small Green 2005WA
31.12.2021N N N N N N N NA NA NA 0.19 N ST & SP N N N NA NA
2133O
29844
Indvac Systems & Components,
No.B-28/B, I Stage, PIE, Bangalore – 560 058
I StageI
Vaccum pumps assembly 23.69 W-13
Electrical and electronic item
Small White 2011BA
31.12.2021N N N N N N N NA NA NA 0.38 N NA N Y N NA Yes
2134O
14316Micro Moulds & Plastics,
No.C-206, 4th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Tools dies and components 87.56 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2004WA
31.12.2021N N N N N N N NA NA NA 0.225 N NA N Y N NA NA
2135O R.R. Techno Products,
No.25/3, V Main, Near UCO Bank, III Phase, PIA, Bangalore – 560 058
III PhaseI
CNC machine components 82.55 G-78
Switches without
electroplatinSmall Green 2004
WA31.12.2021
N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
2136O Samm Technologies,
No.198/A, 2nd Cross, 11th main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Fabrication150 G-78
Switches without
electroplatinSmall Green 2001
BA31.12.2021
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
2137O V-3 CNC Centre,
Plot-M1, 4th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
CNC machined components 93.18 G-78
Switches without
electroplatinSmall Green 2012
WA31.12.2021
N N N N N N N NA NA NA 0.25 N NA N Y N NA NA
2138O Deepak Industries,
No.25, 5th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Bandsaw cutting of steel 32.59 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2004WA
31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA
2139O
Electric Power Equipment Company,
No.44, 4th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Assembly of high voltage instrument transformers
60.92 G-78Switches without
electroplatinSmall Green 2009
WA31.12.2021
N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA
2140O Kashyap Machine Tools,
No.C-208, 4th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
CNC Machine shop39.26 G-78
Switches without
electroplatinSmall Green 2007
WA31.12.2021
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
2141O
14526Nag Tech Electronics,
No.A-421, I Stage, PIE, Bangalore – 560 058
I StageI
Fabrication of sensing instruments 19 W-14
Engineering and fabricationunits (dry
Small White 20012WA
31.12.2021N N N N N N N NA NA NA 0.225 N NA N Y N NA NA
2142O
14359N R Automats, No.93, 7th Main, III Phase, PIA,
Bangalore – 560 058
III PhaseI
Automobile components 9.28 W-14
Engineering and fabricationunits (dry
Small White 2012WA
31.12.2021N N N N N N N NA NA NA 0.225 N ST & SP N N N NA NA
2143O Opto Electronics Pvt Ltd., No.C-346, I Stage, PIE, Bangalore –
560 058
I StageI
Manufacture of opto mechanical products 19.75 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2012WA
31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
2144O
Skanda Manufacturing Systems Pvt Ltd.,
No.46, 4th Main, III Phase, PIA, Bangalore – 58
III PhaseI
Retrofinishing of machinieries 76.24 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2010WA
31.12.2021N N N N N N N NA NA NA 0.7 N ST & SP N N N NA NA
2145O
14494
Sree Lakshmi Narasimha Automats,
No.93, 7th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Automobile components 29.85 G-78
Switches without
electroplatinSmall Green 2011
WA31.12.2021
N N N N N N N NA NA NA 0.45 N ST & SP N N N NA NA
2146O S R R Enterprises,
Plot No.M-10, 7th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
packing boards1.68 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
2147O
Sunlight Interiors & Exhibitions Pvt Ltd.,
Plot No.B-239, 6th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Making of wooden furniture 20.82 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2009WA
31.12.2021N N N N N N N NA NA NA 0.03 N NA N Y N NA NA
2148O Hidri Tools, No.38-B/2, II Phase, PIA, Bangalore –
560 058
II PhaseI
Fabrication f machine tools components 14.84 W-14
Engineering and fabricationunits (dry
Small White 2011WA
31.12.2021N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
2149O Maruthi Enterprises, No.460/A-1, III Phase, PIA, Bangalore
– 560 058
III PhaseI
CNC machining12.98 W-14
Engineering and fabricationunits (dry
Small White 2008BA
31.12.2021N N N N N N N NA NA NA NA N NA N N N NA Yes
2150O
14475Nisarga Enterprises,
No.168/A,Behind Sonal Garments, III Phase, PIA, Bangalore – 560 058
III PhaseI
Manufacture of soaps, shampoo, detergents 17.22 G-43
Soap manufacturing (hand made
Small Green 2003WA
31.12.2021N N N N N N N NA NA NA 1.5 N ST & SP N N N NA NA
2151O
Precimeasures Controls Pvt Ltd.,
No.168/C, III Phase, PIA, Bangalore – 560 058
III PhaseI
Manufacture of assembly of temperature indicators and cables
425 G-78Panel Board, Switches withoutelectroplatin
Small Green 2005WA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
2152Sree Manjunatha Engineering
No.93/1, 9th Main, III Phase, PIA, III Phase Engineering activity Engineering 2152O
14500
Sree Manjunatha Engineering Works,
No.93/1, 9th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Engineering activity6.95 W-14
Engineering and fabricationunits (dry
Small White 2003WA
31.12.2021N N N N N N N NA NA NA 0.03 N ST & SP N N N NA NA
2153O Taurus Technologies,
No.40-B/2, II Phase, PIA, Bangalore – 560 058
II PhaseI
Manufacture of milling 21.81 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.27 N ST & SP N N N NA NA
2154O
14400Twilight Plasic Industries,
No.B-79, I Stage, PIE, Bangalore – 560 058
I StageI
PVC sleeving and tubing 27.57 G-79
covered underPlastic
Small Green 1975WA
31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
2155O Ven-Tech Systems,
No.B-160, 3rd Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Fabrication80.87 G-78
Switches without
electroplatinSmall Green 2004
WA31.12.2021
N N N N N N N NA NA NA 0.75 N NA N Y N NA NA
2156O CNC Automative Unit-VII,
Unit-VII, No.26/A, 5th Main, III Phase, PIE, Bangalore – 560 058
III PhaseI
precision auto components 3.22 G-78
Switches without
electroplatinSmall Green 2011
BA31.12.2021
N N N N N N N NA NA NA 0.75 N ST & SP N N N NA Yes
2157O
HIV AC Instruments & Service Centre,
No.B-230, 4th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Fabrication of vaccum components 8.51 W-14
Engineering and fabricationunits (dry
Small White 1993BA
31.12.2021N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes
2158O
14505
Indus Arc Power Private Limited,
No.108E, III Phase, PIA, Bangalore – 560 058
III PhaseI
Engineering activity43.41 G-78
Switches without
electroplatinSmall Green 2010
WA31.12.2021
N N N N N N N NA NA NA 0.06 N ST & SP N N N NA NA
2159O
Kolekar Toolings Private Limited,
No.63, 4th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
CNC cutting components 94.97 G-78
Switches without
electroplatinSmall Green 2009
BA31.12.2021
N N N N N N N NA NA NA 0.35 N ST & SP N N N NA Yes
2160O
14523M.V Auto Mats,
No.93, 7th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Fabriction of precision turning components
8.31 W-14Engineering and fabricationunits (dry
Small White 2005BA
31.12.2021N N N N N N N NA NA NA 0.03 N ST & SP N N N NA Yes
2161O
Cingularity Tooling & Engineering
Concepts India Pvt Ltd
No.SB.164, 3rd Cross, I Stage,PIE, Bangalore – 560 058
I StageI
Fabrication of CNC machinery 83.1 G-78
Switches without
electroplatinSmall Green 2007
BA31.12.2021
N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes
2162O
14539Prajwal Logic Controls,
No.300, 5th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
panel board assembly15.07 W-14
Engineering and fabricationunits (dry
Small White 2007WA
31.12.2021N N N N N N N NA NA NA 0.025 N ST & SP N N N NA NA
2163O Shree Laxmi Saw Mills,
Plot No.185, 11th Cross, 100Ft Road, KIADB, III Phase, PIA, Bangalore – 560 058
III PhaseI
Saw mills6.76 W-14
Engineering and fabricationunits (dry
Small White 2010BA
31.12.2021N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
2164O
14439
SNG Test & Measurement Systems,
No.68, VI Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
Fabrication of energy metre testing equipment
56.59 G-78Switches without
electroplatinSmall Green 2009
WA31.12.2021
N N N N N N N NA NA NA 0.17 N ST & SP N N N NA NA
2165O
14343Sri Laxmi Metal Works,
Plot No.72, 6th Main, III Phase, PIA, Bangalore – 560 058
III PhaseI
tools dies and components 11.25 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2012WA
31.12.2021N N N N N N N NA NA NA 0.04 N ST & SP N N N NA NA
2166O Standard Cartons,
No.245, III Phase, PIA, Bangalore – 58
III PhaseI
Manufacture of corrugated boxes 59.4 G-9
Cardboard or corrugated box and
Small Green 2000BA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
2167O Subas Technologies,
No.54, III Phase, PIA, Bangalore – 58 III PhaseI
Fabrication of turning and milling 19.21 W-14
Engineering and fabricationunits (dry
Small White 2004WA
31.12.2021N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA
2168O Trans Generators Pvt Ltd.,
No.7, 5th Main, III Phase, PIA, Bangalore – 58
III PhaseI
D G set assembling62.24 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2004WA
31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA
2169O
87525
Trio-Tech Manufacturing System,
No.848/5, 4th Cross East End, I Stage, PIE, Bangalore – 58
I StageI
Machinery components 80.6 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1998BA
31.12.2034N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes
2170O Unite Industries,
No.C-350, I Stage, PIE, Bangalore – 58
I StageI
Transformer assembly, motar rewinding
63.11 G-85Transformer assembly unit(industrial
Small Green 1971BA
31.12.2021N N N N N N N NA NA NA 1.05 N NA N Y N NA Yes
2171O Adarsh Machine Tools,
No.40B/4A, II Phase, PIA, Bangalore – 58
II PhaseI
CNC Machine 102 G-78
Switches without
electroplatinSmall Green 2003
WA31.12.2021
N N N N N N N NA NA NA 0.125 N ST & SP N N N NA NA
2172O Excellence Technologies,
No.B-380, 4th Main, 8th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Precision components126 G-78
Switches without
electroplatinSmall Green 2008
WA31.12.2021
N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
2173O
14340G S Gears India (P) Ltd.,
No.C-439, (Behind Peenya Police Station), I Stage, PIE, Bangalore – 58
I StageI
Manufacture of gears and pnions 116 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2004WA
31.12.2021N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
2174O Mighty Machines,
No.C-283, 7th Cross, I Stage, PIE, Bangalore – 58
I StageI
CNC machines67.5 G-78
Switches without
electroplatinSmall Green 2004
WA31.12.2021
N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
2175O Schleif Master Pvt Ltd.,
No.A/189, 4th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Fabrication of starter box and control panel 22.29 W-14
Engineering and fabricationunits (dry
Small White 1974WA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
2176O
14515Trimurthi CNC Machining,
No.B-355, 9th Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Turning components70.3 G-7
Brass and bell metal utensils
Small Green 1995WA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA14515 utensils
manufacturiWA N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
2177O
14470Sahyadri Electro Controls,
No.10, Vinay complex, 1st Cross, Rajgopalnagar Main Road, III Phase, PIA, Bangalore – 58.
III PhaseI
Assembly of electrical appliances 79.04 G-78
Switches without
electroplatinSmall Green 2006
WA31.12.2021
N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
2178O 2 M Enterprises,
C-74, III Stage, PIE, Bangalore – 560 058
III StageI
Manufacture of Brakes, brake motars 13.92 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2000WA
31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
2179O 2 M Enterprises,
D-427, 10th Main, II Stage, PIE, Bangalore – 560 058
II StageI
Manufacture of spinning machine 26.06 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
2180O 2 M Enterprises,
A-27, III Stage, PIE, Bangalore – 560 058
III StageI
Manufacture os spinning machine, needli for machine
136 G-7Brass and bell metal utensilsmanufacturi
Small Green 2010WA
31.12.2021N N N N N N N NA NA NA 0.09 N NA N Y N NA NA
2181O Dashmesh Engineering,
No.255/2, 8th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Engineering activity15.37 W-14
Engineering and fabricationunits (dry
Small White 1979WA
31.12.2021N N N N N N N NA NA NA 0.15 N ST & SP N N N NA NA
2182O Data Care Networks,
B-11, 1st floor, II Block, 14th cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
DISPLAY AND SALES OF ELECTRIC GOODS
2.51 W-14Engineering and fabricationunits (dry
Small White 1994BA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
2183O Data Care Systems Pvt Ltd..,
No.11 & 12, 1st Floor, 2nd Block, KIADB Industrial Complex, plot No.488, 14th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Assembly of electronic items like linedrivers, multiplexar
91.85 G-78Switches without
electroplatinSmall Green 1994
BA31.12.2021
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
2184O EMKAY Engineers
No.A-5/1, III Stage, Peenya Industrial Estate, Bangalore – 560 058.
III StageI
Engineering activity168 G-78
Switches without
electroplatinSmall Green 1996
WA31.12.2021
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
2185O Hegde Engineering Industries, No.C-135(A), 2nd B Main, II stage,
PIE, Bangalore – 560 058
II StageI
Cold wire drawing65.36 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1990BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
2186O
International Machine Tool Accessories,
No. 255/2, 8th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Machine tool accessories 64.62 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1991BA
31.12.2021N N N N N N N NA NA NA 0.15 N ST & SP N N N NA Yes
2187O
Process Care Systems (India) Pvt Ltd.,
No.11 & 12, 1st Floor, 2nd Block, KIADB Industrial Complex, plot No.488, 14th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Electric instruments15.58 W-14
Engineering and fabricationunits (dry
Small White 1993WA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
2188O SITAS,
C-72, III Stage, Peenya Industrial Estate, Bangalore – 560 058
III StageI
Non Destructive radiographic & Ultrascan inspection
265 G-78Panel Board, Switches withoutelectroplatin
Small Green 1979WA
31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
2189O
Surabhi Engineering Enterprises,
No.P6/D, III Stage, Behind BTS Depot, Peenya Industrial Estate, Bangalore – 560 058.
III StageI
Fabrication17.55 W-14
Engineering and fabricationunits (dry
Small White 2006WA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
2190O Accuspirala Unit-2, No.B-60, III Stage, PIE, Bangalore –
560 058
III StageI
Gears, spirala, wheels369 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
2191O G R S Industries,
No.C-83/2, 2nd Main, II Stage, PIE, Bangalore – 560 058
II StageI
Manufacture of tools and dies 37.33 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2003WA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
2192O G S Fabricators,
Plot No. 473/D(6), 13th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Fabrication Unit74.29 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2000BA
31.12.2021N N N N N N N NA NA NA 0.55 N ST & SP N N N NA Yes
2193O
18385
IPA Pvt Ltd. (Fabrication Unit),
No.464, 12th Cross, Near Brindavan Bus Stop, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Fabrication Unit81.86 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 0.55 N ST & SP N N N NA Yes
2194O Joy Industries,
No.391, 10th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
fabrication of sheet metal components and panels
378 G-78Panel Board, Switches withoutelectroplatin
Small Green 1974BA
31.12.2021N N N N N N N NA NA NA 0.24 N ST & SP N N N NA Yes
2195CL
-
OM Shakthi Hydraulics Pvt Ltd.,
20No. B-197, 5th Main, II Stage, PIE, Bangalore –58
II StageI
fabrication of sheet metal components and panels
44.12 G-78Panel Board, Switches withoutelectroplatin
Small Green 25.05.2000WA
31.12.2000N N N N N N NA NA NA 0 N NA N N N NA NA
2196O Prakash Engineering Works,
No.B-44, 2nd Cross, III Stage, PIE, Bangalore – 560 058
III StageI
Turning components40.82 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2006BA
31.12.2021N N N N N N N NA NA NA 0.325 N NA N Y N NA Yes
2197O Shree Durga Equipments,
No.C-96, III Stage, PIE, Bangalore – 560 058
III StageI
Commercial kitchen equipments 29.13 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2000BA
31.12.2021N N N N N N N NA NA NA 0.19 N NA N Y N NA Yes
2198O Sundarlam Industries,
No.A-12, III Stage, PIE, Bangalore – 560 058
III StageI
plastic machinery and its parts 87.73 G-32
Polythene and plastic processedproducts
Small Green 1985BA
31.12.2021N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes
2199O
Universal Instruments MFG. Company (P) Ltd.,
No.268A, 1st Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Manufacture of battery charge solar power controller
119 G-78Switches without
electroplatinSmall Green 1971
BA31.12.2021
N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes
2200O Anura Metals (India),
No.C-345, 1 st Main road, I stage PIE, Bangalore – 560 058
I StageI
Earth movers equipments 29.16 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1974WA
31.12.2021N N N N N N N NA NA NA 0.25 N NA N Y N NA NA
2201 Plot No. 395, 11th Cross, IV Phase, IV Phase fabrication Switches 2201O
14408Balaji Engineers,
Plot No. 395, 11th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
fabrication39.25 G-78
Switches without
electroplatinSmall Green 1996
WA31.12.2021
N N N N N N N NA NA NA 0.32 N ST & SP N N N NA NA
2202O Hi-Tech Automats
Hi-Tech Automats B-125, 3rd Main Road, II Stage, PIE, Bangalore – 560 058
II StageI
CNC machine components 45 G-78
Switches without
electroplatinSmall Green 1993
WA31.12.2021
N N N N N N N NA NA NA 0.5 N NA N Y N NA NA
2203O Hi-Tech Toolings (Unit-) No.B-195, 5th Main Road, II Stage,
PIE, Bangalore – 560 058
II StageI
Precision components46 G-78
Switches without
electroplatinSmall Green 1993
WA31.12.2021
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
2204O Hi-Tech Toolings (Unit-2), B-125, 3rd Main Road, II Stage, PIE,
Bangalore – 560 058
II StageI
Auto components45 G-78
Switches without
electroplatinSmall Green 2010
WA31.12.2021
N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
2205O Indotech Toolings Pvt Ltd., No. 549/A, IV Phase, PIA, Bangalore
– 560 058
IV PhaseI
Pressed components295 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1991WA
31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA
2206O J.S. Industries, No.395, 11th Cross, IV Phase, PIA,
Bangalore – 560 058
IV PhaseI
Manufacture of machine tools 43.81 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2008WA
31.12.2021N N N N N N N NA NA NA 0.35 N ST & SP N N N NA NA
2207O Madhura Industries, No.C-104, III Stage, Peenya Industrial
Estate, Bangalore – 560 058
III StageI
turned and pressed components 11.08 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1991WA
31.12.2021N N N N N N N NA NA NA 0.24 N NA N Y N NA NA
2208O Micro Tech CNC, No.339, 9th Cross, IV Phase, PIA,
Bangalore – 560 058
IV PhaseI
Precision components79.21 G-78
Switches without
electroplatinSmall Green 2008
WA31.12.2021
N N N N N N N NA NA NA 0.23 N ST & SP N N N NA NA
2209O
23289Ram Tech, No.P-19, III Stage, PIE, Bangalore –
560 058
III StageI
Machine components97.35 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2005BA
31.12.2021N N N N N N N NA NA NA 0.08 N ST & SP N N N NA Yes
2210O S.K. Plastics Works, No.346, 9th Cross, IV Phase, Peenya
Industrial Area, Bangalore – 560 058
IV PhaseI
Polythene pipes for agriculture purpose 18.65 G-32
Polythene and plastic processedproducts
Small Green 2010WA
31.12.2021N N N N N N N NA NA NA 0.1 N ST & SP N N N NA NA
2211O
14327
Spoorthy Irrigation Equipments,
No.B-61, 2nd Cross, III Stage, PIE, Bangalore – 560 058
III StageI
Manufacture of irrigation of equipments
24.96 G-7Brass and bell metal utensilsmanufacturi
Small Green 2005WA
31.12.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
2212O Sri Laven Enginnering Pvt ltd., No.B-37, III Stage, PIE,
Bangalore – 560 058
III StageI
Machine tools 58.1 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2006WA
31.12.2021N N N N N N N NA NA NA 0.47 N NA N Y N NA NA
2213O
Sri Tanish Innovations Pvt ltd.,
No.490-B/1, II Stage, Peenya Industrial Estate, Bangalore – 560 058
II StageI
Machinery and steel forgings 46.65 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009WA
31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA
2214O
Sri Tanish Technologies Pvt ltd.,
No.490-B/2, II Stage,PIE, Bangalore – 560 058
II StageI
Fabrication and machine components 30.24 G-78
Switches without
electroplatinSmall Green 2007
WA31.12.2021
N N N N N N N NA NA NA 0.18 N NA N Y N NA NA
2215O Aadi Tech,
No.453-B, 12th Cross, IV Phase, PIA, Bangalore –-560 058
IV PhaseI
precision machined tools 14.72 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009WA
31.12.2021N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
2216CL
-Accutech CNC,
No.450/A, 12th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Machined Components 103 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2008BA
31.12.2012N N N N N N N NA NA NA 2 N NA N Y N NA Yes
2217CL
-Brilliant Electricals,
No.487, D1 & D2, 13th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Manufacture of control panels 166 G-78
Switches without
electroplatinSmall Green 2011
WA31.12.2021
N N N N N N N NA NA NA 0.25 N ST & SP N N N NA NA
2218O Concentra Heavy Engineering,
No.B-230, 5th Main, II Stage, PIE, Bangalore – 560 058
II StageI
miling and drilling60.96 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2007BA
31.12.2021N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
2219O Culture Instruments,
No. D-428, 10th Main, II Stage, PIE, Bangalore – 560 058
II StageI
Fabrication of laboratary equipments 8.13 W-14
Engineering and fabricationunits (dry
Small White 1993WA
31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA
2220O
14411Divya Enterprises,
Plot No V-45, 9th Main, Ridge Road, II Stage, PIE, Bangalore – 560 058
II StageI
Turned components5.95 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1990WA
31.12.2021N N N N N N N NA NA NA 0.025 N NA N Y N NA NA
2221O
14338Dynamic Innovation,
No.405, 11th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Fabrication and machine components 36.11 G-78
Switches without
electroplatinSmall Green 2011
WA31.12.2021
N N N N N N N NA NA NA 0.3 N ST & SP N N N NA NA
2222O
14352Flex-Trans Industries,
No.B-183, 4th Main, II Stage, PIE, Bangalore – 560 058
II StageI
Machine tool components 47.88 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2001WA
31.12.2021N N N N N N N NA NA NA 0.18 N NA N Y N NA NA
2223O
Gowrishankar Engineering Industries,
No.269, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
precision turned parts275 G-78
Switches without
electroplatinSmall Green 1985
BA31.12.2021
N N N N N N N NA NA NA 0.6 N ST & SP N N N NA Yes
2224O Hoshi Tools (P) Ltd.,
No.A-17, 10th Main, III Stage, Peenya Industrial Estate, Bangalore – 560 058
III StageI
Machine Components878 G-7
Brass and bell metal utensilsmanufacturi
Medium Green 1994BA
31.12.2021N N N N N N N NA NA NA 2 N NA N Y N NA Yes
2225O
14484Lakshma Tools,
No. V-45, Opp. 9th Main, Ridge Road, II Stage, Peenya Industrial Estate, Bangalore – 560 058
II StageI
press toll components12.11 G-7
Brass and bell metal utensils
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes14484 Bangalore – 560 058 utensils
manufacturiBA N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes
2226O Malhar Ceat (India) Pvt Ltd.,
No.B-217, II Stage, PIE, Bangalore – 560 058
II StageI
Engineering Unit53.77 G-78
Switches without
electroplatinSmall Green 1981
WA31.12.2021
N N N N N N N NA NA NA 0.3 N NA N Y N NA NA
2227O
38684
Wolf Precision Tools India Pvt Ltd
No.18/A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Carbide tools for aerospace auto components
610 G-78Switches without
electroplatinMedium Green 2018
BA31.12.2027
N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes
2228O Rajass Kabel, No.B-55, III Stage, PIE, Bangalore –
560 058
III StageI
PVC cables and wires161 G-79
covered underPlastic
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 0.12 N NA N Y N NA Yes
2229O Reva Project Engineers,
No.C-103, III Stage, PIE, Bangalore – 560 058
III StageI
Special Purpose machine 22.47 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2000BA
31.12.2021N N N N N N N NA NA NA 0.25 N NA N Y N NA Yes
2230O Techno Scientific Products, No.B-61, 10th Main, 2nd Cross, III
Stage, PIE, Bangalore – 560 058
III StageI
Laboratory Equipments 9.48 W-43
Laboratory ware includingglass
Small White 1985WA
31.12.2021N N N N N N N NA NA NA 0.35 N NA N Y N NA NA
2231O
Unnathi CNC Technologies Pvt Ltd.,
No.487, D1 & D2, 13th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Auto components279 G-78
Switches without
electroplatinSmall Green 2011
WA31.12.2021
N N N N N N N NA NA NA 0.5 N ST & SP N N N NA NA
2232O Yame Tools, No. V-41, 7th Main, II Stage, PIE,
Bangalore – 560 058
II StageI
Manufacture of tools jigs and fixutures 141 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1999WA
31.12.2021N N N N N N N NA NA NA 1.68 N NA N Y N NA NA
2233O Burji Enterprises, No.471/A, 12th Cross, IV Phase, PIA,
Bangalore – 560 058
IV PhaseI
CNC Machined components 91.18 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1982WA
31.12.2021N N N N N N N NA NA NA 0.27 N ST & SP N N N NA NA
2234CL
Fleurdelis Technologies Pvt Ltd.,
No.440, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Manufacture of Speical purpose machicnes
1180 G-7Brass and bell metal utensilsmanufacturi
Large Green 2008BA
31.12.2012N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
2235O
Maruthi Machine Tools Pvt Ltd.,
No.460/A, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
CNC Machinig175 G-78
Switches without
electroplatinSmall Green 1989
WA31.12.2021
N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
2236O
14504
Shree Shiva Shakhi Shekar Industries,
Plot No.344, 9th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Electrical transformers 23.08 W-13
Electrical and electronic item
Small White 1980BA
31.12.2012N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
2237O Sign Age Products, No.452, 12th Cross, IV Phase, PIA,
Bangalore – 560 058
IV PhaseI
Fabrication of machine tools components
23.22 W-14Engineering and fabricationunits (dry
Small White 1986BA
30.06.2017N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
2238O Tocol Machine Tools Pvt Ltd., NO.472, C-1, 13th Cross, IV Phase,
PIA, Bangalore – 560 058
IV PhaseI
Manufacture of steam turbines spares 263 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1985BA
31.12.2021N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
2239O A R Industries, AP Complex, No.470/D, 12th Cross, IV Phase,
Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Fabriction13.59 W-14
Engineering and fabricationunits (dry
Small White 2009WA
31.12.2021N N N N N N N NA NA NA 0.08 N ST & SP N N N NA NA
2240O ACETECH Unit II, No.B-218, 5th Main, II Stage, PIE,
Bangalore – 560 058
II StageI
Machined turned Components 81.3 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009BA
31.12.2021N N N N N N N NA NA NA 1.1 N NA N Y N NA Yes
2241O
14520ACME Technologies, No.C-80, II Main, II Stage, PIE,
Bangalore – 560 058
II StageI
Machine tools12.73 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2010WA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
2242O Adpac Industries, No.B-244, 6th Main, II Stage, Peenya
Industrial Estate, Bangalore – 560 058
II StageI
Manufacture of corrugated boxes 98.73 G-9
Cardboard or corrugated box and
Small Green 2000BA
31.12.2021N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes
2243O
14429Balaji Polymer Industries,
, No.C-340, 8th Main, II Stage, Peenya Industrial Estate, Bangalore – 560 058
II StageI
Assembly plastic components for making toys etc
38.22 G-32Polythene and plastic processedproducts
Small Green 1999WA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
2244
2013-14 O19230
Cerebra Integrated Technolgies Ltd.,
No.S5, 3rd Cross, I Stage, PIE, Bangalore – 560 058
I StageI
Assembling of computer peripherals PCB
420 G-78Switches without
electroplatinSmall Green 1999
BA31.12.2021
Y 30.06.2015 N N N N N NA NA NA 0.8 N NA N Y N NA Yes
2245O CNC Automative Unit-V, No.B-198, 5th main, II Stage, PIE,
Bangalore – 560 058
II StageI
Precision auto turned components 209 G-78
Switches without
electroplatinSmall Green 2009
BA31.12.2021
N N N N N N N NA NA NA 1.8 N NA N Y N NA Yes
2246O CNC Automative Unit-VI, No.A-268, 6th main, II Stage, PIE,
Bangalore – 560 058
II StageI
Precision auto components 4.55 G-78
Switches without
electroplatinSmall Green 2010
BA31.12.2021
N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes
2247O G L N Industries,
No.453-B, 12th Cross, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Precision machined cmponents, 19.82 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2006WA
31.12.2021N N N N N N N NA NA NA 0.04 N ST & SP N N N NA NA
2248O
23251Karthik Industries, No.B-105, III Stage, PIE, Bangalore –
560 058
III StageI
Precision tools and components 36.52 G-78
Switches without
electroplatinSmall Green 1994
WA31.12.2021
N N N N N N N NA NA NA 0.18 N NA N Y N NA NA
2249O
K N S Engineering Works Pvt Ltd., Plot
Plot No.383, 10th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Fabrication4.58 W-14
Engineering and fabricationunits (dry
Small White 1987BA
31.12.2021N N N N N N N NA NA NA 0.55 N ST & SP N N N NA Yes
2250M & M Manufacturing
No.C-136, 2nd C Main, II Stage, PIE, II Stage Precision machined Brass and 2250O
14521
M & M Manufacturing Solutions,
No.C-136, 2nd C Main, II Stage, PIE, Bangalore – 560 058
II StageI
Precision machined components 58.8 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2009WA
31.12.2021N N N N N N N NA NA NA 0.52 N NA N Y N NA NA
2251O Mechsys, No.A-52/1, I Cross, II Stage, PIE,
Bangalore – 560 058
II StageI
CNC machined components 21.39 W-14
Engineering and fabricationunits (dry
Small White 2007BA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
2252O
14472Meghana Precitech, No.B-49, 10th Main, 2nd Cross, III
Stage, PIE, Bangalore – 560 058
III StageI
Manufacture of CNC turned components 129 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2004WA
31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
2253O Mehra Packaging, Plot No.411, 11th Cross, IV Phase,
Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Manufacturing of corrugated box 51.15 G-9
Cardboard or corrugated box and
Small Green 2009BA
31.12.2021N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
2254O Pattansheti Industries,
Plot No.291, IV Phase, Peenya Industrial Area, Bangalore – 560 058
IV PhaseI
Transformer assembly, motar rewinding
30.52 G-85Transformer assembly unit(industrial
Small Green 1990BA
31.12.2021N N N N N N N NA NA NA 0.54 N ST & SP N N N NA Yes
2255O Precise Small Motors Pvt Ltd., No B-243, 6th Main, II Stage, PIE,
Bangalore – 560 058
II StageI
FHP Motars86.13 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1995BA
31.12.2021N N N N N N N NA NA NA 0.45 N NA N Y N NA Yes
2256O
14487Pushpagiri Punch Forms,
No.C-87, 10th Main, III Cross, III Stage, PIE, Bangalore – 560 058
III StageI
Fabrication of steel metal components 59 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.05 N NA N Y N NA NA
2257CL
-R A Enterprises,
Plot No.291, IV Main, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Fabrication of electrical fixtures 10.7 W-14
Engineering and fabricationunits (dry
Small White 1994WA
NN N N N N N N NA NA NA NA N NA N N N NA NA
2258O
14434Ravijay Engineers,
No.453-B, 12th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Manufacture of spindles, spacens, housing
17.79 O-62Spray painting, paint baking, paint
Small Orange 1997WA
31.12.2021N N N N N N N NA NA NA 0.05 N ST & SP N N N NA NA
2259O Seal Well (P) Ltd.,
No.335, 9th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Manufacturing of hydraulic seal 96.11 O-62
Spray painting, paint baking, paint
Small Orange 2001BA
31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes
2260O
14347Shiva Sai Packaging,
No.B-298, 7th Main, II Stage, PIE, Bangalore – 560 058
II StageI
Manufacture of corrugated boxes 28.3 G-9
Cardboard or corrugated box and
Small Green 2000-2001WA
31.12.2021N N N N N N N NA NA NA 0.045 N NA N Y N NA NA
2261O
14425S L N Precision Works,
No.C-134, 2nd B Main, II Stage, PIE, Bangalore – 560 058
II StageI
Precision machine components 103 O-62
Spray painting, paint baking, paint
Small Orange 2007BA
31.12.2021N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes
2262O Trinity NDT Engineers,
Plot No.V-22(A), Beside KSSIDC Complex, II Stage, PIE, Bangalore – 560 058
II StageI
Fabrication of finished goods testing lab
45.9 G-78Switches without
electroplatinSmall Green 2012
BA31.12.2021
N N N N N N N NA NA NA 0.05 N NA N Y N NA Yes
2263O Ven Pack,
No.556, Block-C, III Main, 2nd Stage, PIE, Bangalore – 560 058
II StageI
Wooven bags and lines 42.6 G-32
Polythene and plastic processedproducts
Small Green 2007BA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
2264O
14441Accurate CNC Toolroom,
Plot No.388, 10th Cross, III Main, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Precision tools and components 62.34 G-78
Switches without
electroplatinSmall Green 1996
BA31.12.2021
N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
2265O Adarsh CNC, No.40B/4B, IV Phase, Peenya
Industrial Area, Bangalore – 560 058
IV PhaseI
CNC Machining36.26 G-78
Switches without
electroplatinSmall Green 2006
WA31.12.2021
N N N N N N N NA NA NA 0.2 N ST & SP N N N NA NA
2266O Dhanalakshmi Enterprises, Plot No.480-A1, IV Phase, PIA,
Bangalore – 560 058
IV PhaseI
Corrugated box185 G-9
Cardboard or corrugated box and
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
2267O Gajalakshmi Industries,Plot
Plot No.556, 3rd Main Road, II Stage, PIE, Bangalore – 560 058
II StageI
Manufacture of sericulture machinery 9.46 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2006WA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
2268O
14533 Varun Industries,
No.411, 11th Cross, IV Phase, PIA, Bangalore – 560 058
IV PhaseI
Machine tool components 87.12 O-62
Spray painting, paint baking, paint
Small Orange 2009BA
31.12.2021N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
2269O
23291 Ram Engineering.,
No.P-20, III Stage, PIE, Bangalore- 560 0058.
III StageI
Machined Components 67.93 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2002BA
31.12.2034N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
2270O
Qualitech Precision Industries.,
No.473, 13th Cross, IV Phase, PIA Bangalore- 560 058.
IV PhaseI
CNC Machining235 G-78
Switches without
electroplatinSmall Green 2011
WA31.12.2021
N N N N N N N NA NA NA 0.4 N ST & SP N N N NA NA
2271O Vidmas.,
No.A-52/2, 1st Cross, 2nd Stage, PIE, Bangalore- 560 058.
II StageI
Machined Components 21.39 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1992WA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
2272O
37633
Super PVD Technbologies, (P) Ltd.,
No.B-211, 5th Main, II Stage, Bangalore-560058
II StageI
PVD Coating on watch components 155 O-42
Coated electrode manufacturing
Small Orange 2012BA
30.09.2022N NA N N N N N NA NA NA 0.36 0.05 NA N Y Y NA Yes
2273O S.N.Enterprises,
No.V-9, 2nd Main road, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacturing of shoe uppers 54.5 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes
2274CL
22825Chamundi Engineering Works,
No.432 4th Main,,IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of precision turned components
109 G-10Carpentry & wooden furniture
Small Green 1990BA
31.12.2012N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes22825 components furniture
manufacturiBA N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
2275O
39092Niqueu Heat Treaters,
No.B-140/A, 3rd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Heat treatment15.04 O-63
Engineering Industries with HeatTreatment,
Small Orange 2009BA
30.09.2029N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
2276
2011-12 CL12035
Bangalore Shirt company, No.254/A, Sy No 87 &150, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garment stitching1310 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2012BA
31.12.2022CL N N N N N NA NA NA 38 N STP - BWSSB Y N N NA Yes
2277O
15286Avco Tech India) (P) Ltd.,
No.110/3, 7th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Assembly of Pneumatic Valves, Cylnders,punch
25.07 W-13Electrical and electronic item
Small White 2011BA
31.12.2021N N N N N N N NA NA NA 0.26 N ST & SP N N N NA Yes
2278O Puronics Systems,
No 162/1, 10th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture filters and air dryer 51.7 W-14
Engineering and fabricationunits (dry
Small White 1993WA
31.12.2021N N N N N N N NA NA NA 0.18 N ST & SP N N N NA NA
2279CL
-High Tech Fittings,
No.C-431,I Stage, PIE, Bengaluru-560 058
I StageI
Sheet metal fabrication work 42.4 W-14
and fabricationunits (dry
Small White 2012WA
31.12.2015N N N N N N N NA NA NA 0.14 N NA N Y N NA NA
2280CL
16524Yashas Industries,
No.139 & 140, 100 ft Ring road, III Phase, PIA, Bangalore-560058
III PhaseI
Fettling and shot blasting 6.26 G-92
Shot blasting operation Small Green 2011
BA31.12.2020
N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
2281O
Chaitanya Precitech Pvt Ltd., Unit-II,
Unit-II, No.316, 8th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Automobile precision components 436 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2007BA
31.12.2021N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
2282O
17583
Chaitanya Hi-Tech Engineering Company Pvt Ltd.,
No.A-328,II Stage, PIE, Bengaluru-560 058
II StageI
Automobile precision components 433 G-78
Switches without
electroplatinSmall Green 2008
BA31.12.2021
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
2283CL
-Krishna Fabricators,
No.448, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Heavy sheet metal Fabrications 291 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2010BA
31.12.2012N N N N N N N NA NA NA 0 N NA N N N NA Yes
2284O
40549
Hexa Technologies (India) (P) Ltd.,
No.B-229, 5th Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Plastic Moulding, Precision,plasatic tubes
82.51 G-32Polythene and plastic processedproducts
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
2285YTC Shree Deepam Enterprises,
No.A-48/A, 2nd Main, II Stage, PIE, Bengaluru-560 058
II StageI
Phosphating and powder coating activity
75 R-44Industry or process involvingmetal
Small Red 2012BA
NAN N N N N N N NA NA NA 0.4 0.3 NA N Y Y NA NA
2286O
24134Festo Power Industries,
No.C-178,II Stage, PIE, Bengaluru-560 058
II StageI
Batteries32 R-7
batterymanufacturing(excluding
Small Red 2012BA
30.6.2022Y 30.6.2022 N N N N Y NA NA NA 0.12 0.05 ST & SP N N Y NA Yes
2287O KALPA ENGINEERING.,
No.326, 9th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Engineering machine components 65 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2012BA
31.12.2021N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
2288O
53062M.M Metal Industries
No.B-122A, 3rd Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacturing of Copper granules from PCB scraps
76 R-34engaged in recycling
/ Small Red 1.10.2018
BA30.6.2023
Y 30.6.2023 N N N N N NA NA NA 0.2 N NA N Y N NA Yes
2289O
12171Makam Agrochem (P) Ltd.,
No.A-280,II stage, PIE, Bengaluru-560 058
II StageI
Phaceutical formulation product 95 O-74
Pharmaceutical
formulationSmall Orange 1978
BA30.09.2033
N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes
2290O Texel Engineers
No.A-418(a1), II Stage, PIE, Bengaluru-560058
II StageI
Hydraulic piston rods of earth moving equipments
169 G-79Plastic sack bags, woven
sackSmall Green 2003
BA31.12.2027
N N N N N N N NA NA NA 1 N NA N Y N NA Yes
2291CL
-Mitte Construction Chemicals,
No.201/4,III Phase, PIA, Bengaluru-560 058
III PhaseI
Ready mix concrete35.34 G-37
Ready mix cement concrete
Small Green 2011BA
31.12.2002N N N N N N N NA NA NA 0 N NA N N N NA NA
2292YTC Ra Bio-Energy.
No246, III Phase, 8th Main, 3rd cross., PIA, Bangalore-560058
III PhaseI
Recycling of rubber oil, carbon black 95 R-6
carbon includingelectrodes
Small Red 2012BA
NAY N N N N N N NA NA NA 0 N NA Y N N NA NA
2293O
15346Accu Precisions.
No.223, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Machine turned components 97.48 W-14
Engineering and fabricationunits (dry
Small White 2011BA
31.12.2021N N N N N N N NA NA NA 0.144 N ST & SP N N N NA Yes
2294O R.A.Enterprises,
No.291,IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Fabrication of Electrical fitness 10 W-14
Engineering and fabricationunits (dry
Small White 2012WA
31.12.2021N N N N N - - NA NA NA 0.18 N ST & SP N N N NA NA
2295O
15677Vin Precise Punch,
No.B-168, 4th Main , II Stage, Bengaluru-560 058
II StageI
Manufacture of sheet metal components 86.42 O-62
Spray painting, paint baking, paint
Small Orange 2010BA
31.12.2021N N N N N N N NA NA NA 0.15 N NA N Y N NA Yes
2296O Chesters,
No.182,III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of wooden furniture 235.67 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2004BA
31.12.2021N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes
2297O
15132DF Forgings Ltd (Unit-II)
No.498, IV Phase, PIA, Bangalore-560058
IV PhaseI
Steel Forging 432 O-32
Forging of ferrous and non- ferrousmetals (
Small Orange 2012BA
30.09.2022N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes
2298O Serwel Electronics Ltd,
No.27, III Stage, PIE, Bengaluru-560 058
III StageI
Manufacture of Transformers & servo stabilizers
144 O-62Spray painting, paint baking, paint
Small Orange 2011BA
31.12.2021N N N N N N N NA NA NA 0.45 N NA Y Y N NA Yes
2299 No.337, 10th Cross, IV Phase, PIA, IV Phase Sheet Metal Carpentry & 2299O Synergy Punching Pvt Ltd.,
No.337, 10th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Sheet Metal Component 316 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2001BA
31.12.2023N N N N N N N NA NA NA 2.7 N NA N Y N NA Yes
2300O
11626VRL Media Ltd.,
No 193/A,No.257,III Phase, PIA, Bengaluru-560 058
III PhaseI
Newspaper printing2990 O-59
Printing press &/or Screen Printing
Large Orange 2012BA
31.12.2021Y 31.12.2016 N N N N N NA NA NA 1.44 N ST & SP N N N NA Yes
2301O
L Square Eco-Products (P) Ltd.,
No.149/A, & 150/A, 5th Main, II Stage, PIE, Bangalopre-58
II StageI
Manufacturing of Honeycomb,& Honecore furniture
250 W-51 Honey Processing
Small White 2011BA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
2302O
Flowline Instrumentation (P) Ltd.,
No.B-235 , 6th cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication & assembly of sampling & analyser system
70.09 W-14Engineering and fabricationunits (dry
Small White 2010BA
31.12.2021N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
2303O
17708E Pragathi (A-Devision)
. M-405, 1st & 2nd Floor, 7th & 8th cross, I Stage, PIE, Bengaluru-560 058
I StageI
E-Waste Recycling8.6 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2012BA
30.06.2022Y 30.6.2022 N N N N N NA Yes
30.06.20220.4 N ST & SP N N N NA Yes
2304O Bairavi Industries
No.V-45, 8th Mian, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacture of Engineered components
53.4 W-14Engineering and fabricationunits (dry
Small White 2010BA
31.12.2021N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
2305O
15099Analytica Chemie INC,
No.307 & 308,,IV Phase, PIA, Bangalore-560058
IV PhaseI
Marketing & Distribution of reagents, columns.R & D lab,
98.84 R-58Pharmaceutical (Bulk drug &Active
Small Red 2012BA
30.06.2022N N N N N N N NA NA NA 0.5 0.2 NA N Y Y NA Yes
2306CL
-Enzene Biosciences Ltd.,
No.101,III Phasee, PIA, Bengaluru-560 058
III PhaseI
Reasearch and development of biopharmaceuticals
417.95 R-58Pharmaceutical (Bulk drug &Active
Small Red 2012BA
30.06.2017Y N Y N N N N NA NA NA 0.8 0.1 ST & SP N N Y NA Yes
2307O Sawant Dyes & chemicals,
No.3B-46, Block -3, M S Industrial Complex, IV Phasae, PIA, Bengaluru-560 058
IV PhaseI
Heat Transfer Lables41 G -91
Manufacture of Adhesives andadhesive
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
2308O
18129Global Fab,
No.10/A,II Phase, PIA, Bangalore-560058
II PhaseI
Fabrication32.02 W-14
Engineering and
FabricationSmall White 2011
BA31.12.2021
N N N N N N N NA NA NA 0.32 N ST & SP N N N NA Yes
2309CL
11574Colour Plus Enterprises,
No.450/A, 12th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Powder Coating28.17 R-44
Industry or process involving metal
Small Red 2012BA
30.06.2016N N N N N N N NA NA NA 3.2 0.05 ST & SP N N Y NA Yes
2310O Hydro Products,
No.A-270. 6th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacture of Hydraulic cylinders 72.14 G-60
leak proof testing of L.P.G.cylinders
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
2311O Tekcel Engineering (P) Ltd.,
No.B-212, 5th Main Road, II Stage. PIE, Bengaluru-560 058
II StageI
Manufacture of Special purpose 203 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1995BA
31.12.2021N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
2312CL
-
Alkem laboratories Ltd R & D Unit,
R & D Unit, # 473-D2, 13th cross, IV phase, PIA, Bangalore - 58
IV PhaseI
R & D only No mfg activity 632 R-58
Pharmaceutical (Bulk drug &Active
Medium Red 2007BA
30.06.2012N N N N N N N NA NA NA 0.8 0.5 ST & SP N N Y NA Yes
2313O
11649KDDL ltd, (Unit: Hands-II),
No, 408, IV Phase,PIA Bangalore- 58 IV PhaseI
Nickle & gold Eletroplating on wrist watch hands
783 R-44Industry or process involvingmetal
Medium Red Jun-12BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 4.8 5.1 STP & ETP Y N N NA Yes
2314O
12528
Shree Hari Precision Products Private ltd,
No 124,7th Main III Phase PIA, Bangalore-560058
III PhaseI
Mechanical Assembly, Spray Painting, Power Coating
159.82 R-44Industry or process involvingmetal
Small Red 2003BA
30.06.2023Y 30.06.2023 N N N N N NA NA NA 8 0.08 STP Y N Y NA Yes
23152017 O
39981
Paragon Polymer Products Pvt Ltd.,
No.397/398, III Main, IV Phase PIA Bangalore -58
IV PhaseI
Ethylene vinyl acetate chappell pellets with banbury mixing & calendaring process
1435 O-99DG set capacity more than 1MVA to
Large Orange 1985BA
30.09.2023Y 30.9.2023 N N N N N NA NA NA 6.5 4 STP & ETP N N N NA Yes
2316O
LSQUARE ECO- PRODUCTS pvt Ltd,.
No B-194, 5 th Main, II stage, PIE , Bengaluru-560 058
II StageI
Manufacturing Honeycore 118 W-51
Honey Processing Small White 2007
BA31.12.2021
N N N N N N N NA NA NA 0.2 N NA N Y N Yes
2317O
15661 Sun Modular Systems,
No 72, 4th Main III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacturing of Modular Furniture 21.93 O-51
Modular wooden furniture from
Small Orange 2011BA
31.12.2021N N N N N N N NA NA NA 0.38 N ST & SP N N N Yes
2318O
16472
Dynatech Tools and Devices, Unit-II,
Unit-ll, No 55, 4th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Machine tools and accessories 329.25 G-110
Diesel Generator sets (250 KVA
Small Green 2006BA
31.12.2020N N N N N N N NA NA NA 1.4 N ST & SP N N N Yes
2319O
12136
Paragon Polymer Products Pvt Ltd (Formerly Elastrex
Polymers Pvt Ltd.,
No 97/98. III phase, PIA, Bengaluru-560 058
III PhaseI
PU Foot wear665 G-26
Leather foot wear and leatherproducts
Medium Green 2011BA
31.12.2024N N N N N N N NA NA NA 6 N ST & SP N N N Yes
2320O Manjunath Industries,
No 242, 11th main, 2nd cross, III Phase, PIA, Bengaluru-560 058
III PhaseI
Fabriction work & Machine turned components
314.67 G-78Panel Board, Switches withoutelectroplatin
Small Green 2010BA
31.12.2034N N N N N N N NA NA NA 0.8 N NA N Y N Yes
2321O
15390
Shraddha Saburi Printers Pvt Ltd,.
No 224, 8th Main, 2nd cross, KIADB III Phase;PIA, Bengaluru-560 058
III PhaseI
Block Manufacturing, offset printing on cartoons, & LABEL
100 O-58Printing press &/or Screen Printing
Small Orange 2012BA
30.09.2029Y 30.09.2025 N N N N N NA NA NA 2.2 N NA N Y N Yes
2322O
Lazzari Machines India Pvt Ltd,.
Special Plot, Next to B-82, 2nd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Assembly of wood working machines 144.16 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2007WA
31.12.2022N N N N N N N NA NA NA 0.35 N NA N Y N NA
2323CL Oom Sakthi Enterprises,
No.B-236, 5th Main, I stage, PIE, Bengaluru-560 058
I StageI
Engaged in lathe working, miling & machining work
38.5 G-7Brass and bell metal utensils
Small Green 2009BA
31.12.2015N N N N N N N NA NA NA 0.4 N NA N Y N Yesmachining work utensils
manufacturiBA N N N N N N N NA NA NA 0.4 N NA N Y N Yes
2324CL
25479
Dynatech Tools & Devices (Unit-I)
No. 355, IV phase, PIA, Bengaluru-560 058
IV PhaseI
Machine tool components 154 G-10
Carpentry & wooden furnituremanufacturi
Small Green 1991BA
31.12.2017N N N N N N N NA NA NA 1.8 N ST & SP N N N Yes
2325O Trident Infosol Pvt Ltd
1st Floor, Block A, Kushal Garden Arcade, 1A, II Phase , PIA ,Bengaluru-560 058
II PhaseI
Fabrication & assembly of electronic product
824.84 G-78Switches without
electroplatinMedium Green 2010
BA31.12.2021
N N N N N N N NA NA NA 1.2 N STP Y N N Yes
2326O
16267
Integral Systems & Components Pvt Ltd,.
No D-388/1,I cross, I stage, PIE, Bengaluru-560 058
I StageI
Production of electronic switches & components
249.95 G-78Panel Board, Switches withoutelectroplatin
Small Green 2012BA
31.12.2022N N N N N N N NA NA NA 0.16 N NA N Y N Yes
2327O Synpack Zipper Bags Pvt Ltd,.
No. SB 161, 3rd cross, I stage, PIE, Bengaluru-560 058
I StageI
Manufacture of plastic sack bags 294 G-32
Polythene and plastic processedproducts
Small Green 2002BA
31.12.2022N N N N Y N N NA NA NA 0.15 N NA N Y N Yes
2328O Hittco Tools Ltd (Unit-II).,
(Unit-II) No.B-162, 3rd cross, I stage, PIE, Bengaluru-560 058,
I StageI
Manufacture of solid carbide Tools 734 G-77
Manufacture of Motor & Pumpswithout
Medium Green 2012BA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N Yes
2329O
Wireless TT info services limited.
No B - 130/A, 3rd cross,I stage, PIA, Bengaluru-560 058
I StageTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2009AA
31.12.2100N N N N N N N NA NA NA 0 N NA N N N Yes
2330CL
-Bharath Machines,
No 9-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Fabrication of conveyor system work
99.85 G-78Switches without
electroplatinSmall Green 2002
BA31.12.2002
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA
23312012-13 O
53335Accu Plast
No.C-98, 3rd Cross, III Stage, PIE, Bengaluru-560 058
III StageI
Melting of virgin of PP & HDPE pipes 67.41 G-32
Polythene and plastic processed products
Small Green 2018WA
31.12.2028N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
23322012-13 CL
-Power Gear,
No.275, 4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of electrical bus duct assembly
910 G-78Switches without
electroplatinMedium Green 2010
BA31.12.2012
N N N N N N N NA NA NA 0 N NA N N N NA
23332012-13 CL
-Delkor Technic India Pvt Ltd.,
No.421 11th cross, Iv Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of Filters, Agitators,Thickeners,Linear screens,
488 G-46Steel furniture without spray
Small Green 2012WA
31.12.2021CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
23342009-10 CL Jaya Engineering Works,
No.234, 12th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Machine Fabrication26 G-78
Engineering and fabricationunits (dry
Small Green 2008BA
31.12.2013N N N N N N N NA NA NA 0.64 N NA N Y N Yes
2335O
41593
Ausa Medical Devices Pvt. Ltd (Formerly Cannula Plus Pvt
Ltd)
No.375A, 10th Cross, IV Phase, PIA, Bengaluru-560058.
IV PhaseI
SSTubes, Needles for surgical/medical application
900 G-78Panel Board,
Switches without
electroplatin
Medium Green 2018BA
31.12.2027N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
23362012-13 O Rigid industries
No.C-449, I stage, PIE , Bengaluru-560 058
I StageI
Manufacture of footwear parts 16.33 G-26
Leather foot wear and leatherproducts
Small Green 2012WA
31.12.2100N N N N N N N NA NA NA 0.4 N NA N Y N NA
23372012-13 O
11401Pepperl+ Fuchs(P) Ltd.,
No.546/1, 7th Main, IV phase, PIA, Banglore-58
IV PhaseI
Manufacture of prosimity switches 1051 G-78
Panel Board, Switches withoutelectroplatin
Large Green 2012BA
31.12.2021N N N N N N N NA NA NA 3.6 N ST & SP N N N N Yes
23382012-13 O
15683Kiran Enterprises
No.V-61, Near Andrahalli Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Grinding of Hydraulic piston rod 34 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2012BA
31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N Yes
23392012-13 O
10814Nash Industries (I) Pvt Ltd,
No.247, 8th Main, 3rd cross, III Phase, PIA, Bengaluru-560 058
III PhaseI
Sheet metal press components 488 G-110
Diesel Generator sets (250 KVA
Small Green 2012BA
31.12.2021Y 31.12.2025 N N N N N NA NA NA 5.2 N NA N Y N Yes
23402012-13 CL
21502STI Sanoh India Ltd.,
No.471/D1, 13th cross, IV phase, PIA, Bangalore-56
IV PhaseI
Break pipes, Fuel pipes 581 G-79
Plastic sack bags, woven sackwith HDPE,
Medium Green 2012BA
31.12.2021Y 31.12.2016 N N N N N NA NA NA 4.8 N ST & SP N N N Yes
23412012-13 CL
20572Encore Asia,
No.271, IV phase, PIA, Bengaluru-560 058
IV PhaseI
Washing of readymade garments 43.9 O-50
Mechanized laundry using oil fired
Small Orange 2011BA
30.09.2017N N N N N N N NA NA NA 0.2 1.3 ST & SP N N Y Yes
23422012-13 CL
15439Delkor Technic India Pvt Ltd.,
No.31, 6th Main Road, II Phase, PIA, Bengaluru-560 058,
II PhaseI
Engineering unit601.83 G-7
Brass and bell metal utensilsmanufacturi
Medium Green 2011BA
31.12.2021CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
23432012-13 O
24171Maruthi Steel Wires.,
No.29-B, II Phase, PIA, Bengaluru-560 058
II PhaseI
Bright Steel Bars & coils 108 G-96
Manufacturing of insulated conductors
Small Green 2005BA
31.12.2034N NA N N N N N NA NA NA 0.11 N NA N Y N Yes
23442012-13 O
15678Standard Polypack,
B-255, II Stage, PIA, Bengaluru-560 058
II StageI
P E Master batch polypack Granules 11.36 G-32
Polythene and plastic processedproducts
Small Green 2006BA
31.12.2099N N N N N N N NA NA NA 0.16 N NA N Y N Yes
23452012-13 O Priyanka Twines & Ropes
No B-255, II stage, PIE, Bengaluru-560 058
II StageI
Manufacture of P E Master batch polypack Granules
378 G-78Engineering and fabricationunits (dry
Small Green 2012WA
31.12.2034N N N N N N N NA NA NA 0.2 N NA N Y N NA
23462012-13 CL Swathi Agro Biotech,
No B-38, III Stage, PIE, Bengaluru-560 058
III StageI
Manufacture of Biomass pellets or Briquette
87 G-78Panel Board, Switches withoutelectroplatin
Small Green 2000BA
NAN N N N N N N NA NA NA 0 N NA N N N NA NA
23472012-13 CL
11421
KOTAK URJA Pvt Ltd+D1580.,
No 56, III Phase, PIA, Bangalore-560058
III PhaseI
Manufacture of solar water heating and lighting system
127 O-62Spray painting, paint baking, paint
Small Orange 1997BA
30.09.2017Y 30.09.2017 N N N N N NA NA NA 0.8 0.01 ST & SP N N Y NA Yes
2348 No, V-88, II Stage bus Stop, II stage, II StageHospital
Hotel Generator 23482012-13 O Sri Rama Deluxe,
No, V-88, II Stage bus Stop, II stage, PIE, Bangalore
II StageHospital
ity
Hotel38.09 W-52
Generator sets (15
KVA to 250 Small White 2007
WA31.12.2016
N N N N N N N NA NA NA 4.4 N NA N Y N NA
23492012-13 O
17553
Marvel Technology & Tools Pvt Ltd.,
No B-177 , II Stage, PIE,Bengaluru-560 058
II StageI
Engineering Activity152 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2012WA
31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA
23502012-13 O
15692
Accurate Engineering Industries,
B-159,4th Main, II Stage, PIA, Bengaluru-560 058
II StageI
Fabrication of Alluminium Frames 54.56 G-1
Aluminum utensils fromaluminum circles by
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.2 N NA N Y N NA
23512012-13 O
34956Stanzen Engineering,
No.260, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Manufacture of automobile parts 755 G-110
Diesel Generator sets (250 KVA
Medium Green 2011BA
31.12.2021Y 31.12.2025 N N N N N NA NA NA 1.6 N ST & SP N N N Yes
23522012-13 O
12424
Micromatic Machine Tools Pvt Ltd.,
No. 240/241, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engineering Activity1857 G-81
Research laboratories notinvolving
Large Green 2011BA
31.12.2035N N N N N N N NA NA NA 5 N NA N Y N Yes
23532012-13 O
15109
Alchemy Surface Technologies,
No.344, 9th cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electroplating64.73 R-44
Industry or process involvingmetal
Small Red 2009BA
30.06.2024N N N N N N N NA NA NA 0.4 0.1 NA N Y Y Yes
23542012-13 O R & M Corrosion Preventers ,
No.213, 1st Cross, III Phase, PIA, bangalore-560058
III PhaseI
Grit Blasting machine34.27 G-92
Shot blasting operation Small Green 2009
BA31.12.2026
N N N N N N N NA NA NA 0.5 N ST & SP N N N NA Yes
23552012-13 O
15662Cam - Pro Technologies
No.123/1, 7th main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of CNC turned components 310 G-46
Steel furniture without spray
Small Green 2010BA
31.12.2034N N N N N N N NA NA NA 1.2 N NA N Y N N Yes
23562012-13 O
22829SNS Industries,
Plot No.P 26 © & strom water drain, 10th main, 3rd Cross, III Stage, PIE, Bengaluru-560 058
III StageI
Manufacture of relays,coils, transformers
200 O-69Transformer repairing/manufacturing
Small Orange 2010BA
31.12.2021Y 31.12.2017 N N N N N NA NA NA 3.2 N ST & SP N N N Yes
23572012-13 CL
34112E-Parisara Pvt Ltd., Unit-2,
Unit-2, No P-10(A), III Stage, PIE, Bengaluru-560 058
III StageI
E-Waste Recycling75 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2012BA
30.06.2017N NA N N N N N NA Yes 0.8 N NA N Y N Yes
23582012-13 CL Tex Labels, Division- II,
No.326 (Part), 9th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Narrow woven polyester labels 161 G-91
Manufacture of Adhesives andadhesive
Small Green 2011BA
31.12.2020N N N N N N N NA NA NA 0.4 N ST & SP N N N Yes
23592012-13 O
17514Sri Balaji Industries,
No.D-361, 8th Main, II Stage, PIE, Bengaluru-560 058
II StageI
CNC machining98.48 W-14
Engineering and fabricationunits (dry
Small White 2012BA
31.12.2021N N N N N N N NA NA NA 0.64 N NA N Y N Yes
23602012-13 O
Entente Retail Fixtures Pvt Ltd.,
No SB-56, 2nd cross, I Stage, PIE, Bengaluru-560 058
I StageI
Manufacturing of retail fixtures and furnitures
125 G-10Carpentry & wooden furnituremanufacturi
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 1.05 N NA N Y N Yes
23612012-13 O
14453Aditya Industries,
No B-376, I Stage, PIE, Bengaluru-560 058
I StageI
Embroidary works on ready made garments 107 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2007WA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA
23622012-13 O Polylam Industries,
No.A-11, III Stage, PIE, Bengaluru-560 058
III StageI
HDPE Lamination Processing 51.67 G-32
Polythene and plastic processedproducts
Small Green 2005WA
31.12.2033N N N N N N N NA NA NA 0.36 N NA N Y N NA
23632012-13 O
402684R Recycling Pvt Ltd.,
Shed No, A-5, III Stage, PIE, Bengaluru-560 058
III StageI
Dismantling and recycling of E-waste 460 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2012BA
30.06.2023Y 30.6.2023 N N N N N NA Yes 30.6.2023 1 N NA N Y N Yes
23642012-13 CL
19255
Cerebra Integrated Technolgies Ltd.,
No 422/2, 11th Cross, 3rd Main, IV Phase, PIA, Bangalore -58
IV PhaseI
Dismantling and recycling of E-waste 273 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2011BA
30.06.2017N N N N N N N NA Yes NA 0.2 N ST & SP N N N NA Yes
23652012-13 O
11092
Sphoorthi Machine Tools Pvt Ltd,
Plot No. 467-469, Site No. 18, 12th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
CNC machining with turn,dril,mill,black 1083 O-63
Engineering Industries with Heat Treatment,
Medium Orange 1996-97BA
30.09.2021Y 30.06.2023 N N N N N NA NA NA 2.78 0.6 NA N Y Y NA Yes
2366O
14285Makam Pharmachem,
No. A-281, 6th Main, II stage, PIE, Bengaluru-560 058
II StageI
Formulation of pesticides 80.29 O-26
Formulation of Pesticide,insecticide, & fungicide
Small Orange 2011BA
30.09.2022N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
2367O
10520
Dynamatic Technologies Limited,
No. 11, Dynametic park, II Phase, PIA, Bengaluru-560 058
II PhaseI
R & D activites and manufacture of Hydraulic equipments
16708 R-44Industry or process involvingmetal
Large Red 1974BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 30 1.25 STP & ETP Y N N NA Yes
23682012-13 O
34257Hi-tech Blasters & Metallizers,
No.480-D, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Grit Blasting activity44 G-92
Shot blasting operation Small Green 2012
BA31.12.2031
N N N N N N N NA NA NA 0.6 N ST & SP N N N Yes
23692012-13 CL
Sante Mernaud Pharmaceuticals Pvt Ltd,
NO 466, 12th Cross, IV pahse Peenya Industrial Area, Bangalore -560058
IV PhaseI
Formulation of Pharmaceuticals 500 O-74
Pharmaceutical
formulationSmall Orange 2010
BANA
N N N N N N N NA NA NA 1 0.02 ST & SP N N Y NA NA
23702012-13 YTC
40623Alliage Metal Casting Pvt Ltd
No.480-D, IV Phase, PIA, Bengaluru-560058
IV PhaseI
Steel Forging Activity 391 O-32
Steel and steel products using
Small Orange 2018BA
17.5.2023N N N N N N N NA NA NA 2.5 N ST & SP N N N NA NA
2371O
31017
Alpha Design Technologies Pvt Ltd
No. 193A, 4th Cross, I Stage, PIE, Bengaluru-560058
I StageI
Assembly of ULAB electronic components
295 G-78Switches without
electroplatinSmall Green 15.1.2017
BA31.12.2028
N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes
2372O
11646
Bhandari Precision Forgings Pvt Ltd.,
No.A-271, II stage, PIA, Bengaluru-560 058
II StageI
Hazardous waste (Used oil) 843 O-81
Industries engaged in recycling /
Medium Orange 2000BA
30.09.2021Y 30.09.2022 N N N N N NA NA NA 1.5 N NA N Y N NA Yes11646 recycling /
reprocessingBA Y 30.09.2022 N N N N N NA NA NA 1.5 N NA N Y N NA Yes
2373O
42735Biomylz Limited
No. 21-D, II Phase, PIA, Bengaluru-560 058
II PhaseI
Capsules, cream/Get liquids powder & tablets
600 O-74Pharmaceuti
cal formulation
Medium Orange 2018BA
30.09.2029N N N N N N N NA NA NA 3.8 N STP N N N NA Yes
2374O
37686Universal Industries
No.V-32/A, 10th Main Road, II Stage, PIE, Bengaluru-560058
II StageI
SS brist watch buckels 412 G-93
Manufacturing of nuts and boltswith cold
Small Green 2018BA
31.12.2027N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes
2375CL
11707DST Chemicals India Pvt Ltd.,
B-172,4th Main,II stage, PIE, Bengaluru-560 058
II StageI
Repacking of chemicals 100 R-22
Organic Chemicalsmanufacturing
Small Red 2011BA
30.06.2016N N N N N N N NA NA NA 0.4 0.15 NA N Y Y N Yes
2376O
33614Hi-Tech Pest control,
P-5, Ist Floor, III Stage, PIE, Bengaluru-560 058
III StageI
Phaceutical formulation product 24.4 O-26
Formulation of Pesticide,insecticide, & fungicide
Small Orange 2010BA
30.09.2022N N N N N N N NA NA NA 0.18 N ST & SP N N N NA Yes
2377O
24666Sara Soule Pvt Ltd.,
No.P-27, III Stage, PIE, Bengaluru-560 058
III StageI
Manufacture of leather upper 117 G-26
Leather foot wear and leatherproducts
Small Green 2007BA
31.12.2022N N N N N N N NA NA NA 1.84 N NA N Y N NA Yes
2378O Shree Polypacks.,
No. C-29, II Stage, PIE, Bengaluru-560 058
II StageI
Plastic sack bags93.95 G-32
Polythene and plastic processedproducts
Small Green 2005BA
31.12.2022N N N N Y 31.03.2017 N NA NA NA 0.25 N NA N Y N NA Yes
2379O
11582
Mann & Hummel Filter Pvt Ltd.,
No.231/1, 11th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
R & D Testing center for automatic and industrial filter
3943 G-81Research laboratories notinvolving
Large Green 2010BA
31.12.2022Y 31.12.2021 N N N N N NA NA NA 4 N NA N Y N NA Yes
2380O
30838
Vee vee Controls Pvt Ltd, Unit-III
No.A-187 & 188, 4th cross, I Stage, PIE, Bengaluru-560058
I StageI
PV Solar compact stations for Solar Electrical panels
793 G-78Switches without
electroplatinMedium Green 2015
BA31.12.2027
N N N N N N N NA NA NA 1.56 N NA N Y N NA Yes
2381O Fine Tools India Pvt Ltd.,
No.441, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Plastic injection moulding 206 G-32
Polythene and plastic processedproducts
Small Green 2011BA
31.12.2023N N N N N N N NA NA NA 1.6 N ST & SP N N N NA Yes
2382O Arasu Enterprises.,
No.V-12(a), II Stage, PIA, Bengaluru-560 058
II StageI
General Engineering56 G-78
Switches without
electroplatinSmall Green 2011
BA31.12.2021
N N N N N N N NA NA NA 0.13 N NA N Y N NA Yes
2383O
Gemini Dyeing & Printing Mills Ltd., Garment Division-1, No. 1-E, 1st Main, II Phase,
PIA, Bengaluru-560 058
No. 1-E, Ist main, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment stitching 592 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2011BA
31.12.2022N N N N N N N NA NA NA 2.5 N ST & SP N N N NA Yes
2384O
Maini Precision Products Pvt Ltd.,
No. B-59, I Stage, PIE, Bengaluru-560 058
I StageI
Filter Assmbly251 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2011BA
31.12.2024Y 31.12.2024 N N N N N NA NA NA 2.4 N NA N Y N NA Yes
2385O
15367
Parvathi Shankar Engineering Pvt Ltd.,
No.119, 7th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Moto stamping and Automobile Components
406.44 G-78Panel Board, Switches withoutelectroplatin
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 2 N NA N Y N NA Yes
2386O
11734
Texport Syndicate India (P) Ltd.,
No. 9B/1, II Phase, PIA, Bengaluru-560 058
II PhaseI
Ready made Garment3026 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2015BA
31.12.2026Y 31.12.2022 N N N N N NA NA NA 54 N STP N N N NA Yes
2387O
29376
Devilog systems (India), Unit-III,
No.A-414 9th Main, II Stage, PIA, Bengaluru-560058
II StageI
Automotive Diesel scale fillter with die casting operations
350 R-50 Die casting operations
SmallRed 2015
BA30.06.2021
N N N N N N N NA NA NA 1.8 N ST & SP N N N NA Yes
2388O
15414Trans-I Press Parts Pvt Ltd.,
Shed No.3, No.154, 10th Main, III phase, PIA, Bengaluru-560 058
III PhaseI
Deep Drawn Metal Components 77.89 G-95
Shell Moulding withoutgenerating
Small Green 2012BA
31.12.2021N N N N N N N NA NA NA 0.096 N ST & SP N N N NA Yes
2389O Radhalakshmi Metallurgicals No.446, Sy.No.46, IV Phase, Peenya
Industrial Area, Bengaluru- 560058 IV Phase
OthersImports of Ferrous and non Ferrous metal scraps
NA HW ImporterHWM - Reg Importer Small White 5.7.2016
BANA
Y 30.06.2100 N N N N N NA NA NA 0 N NA N Y N NA Yes
2390O
32136Vescon Engineering
Plot No.480B, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Heat treatment 35.97 O-36
Heat treatment using oilfired furnace
Small Orange 2016BA
30.09.2021N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
2391O
12092
Healthium Medtech Pvt Ltd (Formerly Sutures India Pvt
Ltd.),
No.477C, Opp. to Bata Factory, BMTC Depot Main Road, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
surgical needle1388 R-44
Industry or process involvingmetal
Large Red 2009BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 1.6 0.03 ST & SP N N Y NA Yes
2392CL
23799
Tenonyx Precision Technologies (p) Ltd.,
No.B-19, 1st Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering components (Aluminum and Zinc Casting)
164.86 O-28Non- ferrous
metalextraction
Small Orange 21.4.2004BA
30.06.2012N N N N N N N NA NA NA 1 N NA N Y N NA Yes
2393O
Ace Super Auto Forge (P) Ltd.,
No.V-60,II Stage, PIE, Bengaluru-560 058
II StageI
Engineering components 165.55 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 0.96 N ST & SP N N N NA Yes
2394O Srivinayaka Industries.,
No.A-343(A), II Stage, PIE , Bengaluru-560 058
II StageI
Manufacture of Plastic cups and Glases
22.05 G-32Polythene and plastic processedproducts
Small Green 2005WA
31.12.2018N N N N N N N NA NA NA 0.32 N NA N Y N NA NA
2395O
81859Power Tech Fab Systems.,
No.261, 2nd cross, 3rd Main, IV Phase,PIA, Bengaluru-560 058
IV PhaseI
Engineering Activity46 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2008WA
31.12.2033N N N N N N N NA NA NA 0.6 N NA N Y N NA NA
23962012-13 O
14733Galvano Casting Pvt Ltd.,
No.134, III Phase, PIA, Bangalore-560058
III PhaseI
Heat treatment330 O-36
Heat treatment using oil fired furnace
Small Orange 2012BA
30.09.2022Y 30.06.2017 N N N N N NA NA NA 1.6 N NA N Y N NA Yes
2397 No.57/A, III Phase, PIA, Bengaluru- III Phase Garments stitching Garment 23972012-13 O
31290Creative Garments Pvt Ltd.,
No.57/A, III Phase, PIA, Bengaluru-560 058
III PhaseI
Garments stitching 900 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2016-17BA
31.12.2026N N N N N N N NA NA NA 36 N ST & SP N N N NA Yes
2398O
14198SCJ Polybatch.,
No.B-228, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Plastic Granules128.6 G-32
shoe uppers/ Cotton knitting
Small Green 2010BA
31.12.2022N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes
2399O Paras Engineering Pvt Ltd.,
No.434, 12th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Voltage Transformers with Painting 389 O-69
including Socks, Shoe lace/
Small Orange 2001BA
30.09.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
2400
2012-13 YTCDevilog systems (India), Unit-
III,
No.C at 9-B, 2nd Phase, PIA, Bengaluru-560 058.
II PhaseI
Aluminum Die Casting 327 O-28
Readymade leather garments
Small Orange 2011WA
NN N N N N N N NA NA NA 2 N ST & SP N N N NA NA
2401O
27792Uma industries,
Uma industries, No.45/5, III Phase, PIA, Bengaluru-560 058,
III PhaseI
Glass Processing 66.35 G-21
Glass , ceramic, earthenpotteries, tile
Small Green 31.1.2009BA
31.12.2035N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes
24022015-16 CL
31212J.K.Clothing Company
No.B-108, 3rd Cross, 3rd Stage, PIE, Bengaluru-560058
III StageI
Garment Stitching950 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2015WA
31.12.2021N N N N N N N NA NA NA 13 N NA N Y N NA NA
24032012-13 O
21194
Bimal Auto Agency India Pvt Ltd.,
No.A-37 & 38, II Stage, PIA, Bengaluru-560 058
II StageI
Servicing of Maruthi vehicles and painting 602 O-18
Automobile servicing, repairing and
Medium Orange 15.12.2012BA
30.09.2021Y 30.09.2022 N N N N N NA NA NA 2.8 5 ETP Y Y N NA Yes
2404O
12285Diamond Plastics.,
No.A-350,II Stage, PIE, Bengaluru-560 058
II StageI
Plastic moulded Furnitures 154 G-32
Polythene and plastic processedproducts
Small Green 2003BA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
24052015-16 O
Radiant Research Services Pvt Ltd
No.99/A, 8th Main Road, III Phase, PIA, Bengaluru-560058
III PhaseI
Research Laboratories71 R-83
and Analytical
laboratories Small Red 2015
BA30.06.2025
N N Y 31.12.2100 N N N NA NA NA 0.525 0.11 NA N Y Y NA Yes
24062007-08 O
83441Kaizen CNC Center Pvt Ltd.,
No.SB-14, 3rd Cross, I Stage, PIE, Bangalore,
I StageI
Engineering 438 G-7
Brass and bell metal utensilsmanufacturi
Small Green 2007BA
31.12.2035N N N N N N N NA NA NA 1.9 N NA N Y N NA Yes
24072012-13 CL
23852Alkem NCE R & D Labs,
No. 64/1B, III Stage, PIE, Bengaluru-560 058
III StageI
R & D Centre(finding new therapies for diseases)
1065.67 R-58Pharmaceutical (Bulk drug &Active
Large Red 2012BA
30.06.2015CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
24082012-13 CL
29360Anu Solar Power Pvt Ltd.,
No.19-A, II Phase, PIA, Banglore-58 II PhaseI
Solar Water Heating Systems, Solar Lighting System, Solar Power
1855 R-65Generation plant and Bio Mass
Large Red 2012BA
30.06.2016Y N N N N N N NA NA NA 6 0.06 ST & SP N N Y NA Yes
2409O
18005Apoorva Auto Components,
, No. V-58, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Fuel injection parts, Speedometer parts & Horlogical parts
243.2 G-78Panel Board, Switches withoutelectroplatin
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 1 N NA N Y N NA Yes
2410O Venus Precision Industries,
No.N1/2, 4th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication of machine tools components
67.38 G-78Panel Board, Switches withoutelectroplatin
Small Green 2011WA
31.12.2021N N N N N N N NA NA NA 0.1 N NA N Y N NA NA
2411O vinayaka Industries,
vinayaka Industries, No.238, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Motor Winding & Rewinding activity 121 W-45
Repairing of electric motorsand
Small White 2008BA
31.12.2023N N N N N N N NA NA NA 0.8 N NA N N N NA Yes
2412O
10845Shahi Exports Pvt Ltd.,
No.10-A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment2667.67 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2007BA
31.12.2023Y 31.12.2020 N N N N N NA NA NA 30 N STP Y N N NA Yes
2413O
S.V Rubber Industries (Formerly Polymer India).,
No.335, 9th Cross, IV Phase, Peenya Industrial Area, Bengaluru-560 058
IV PhaseI
Rubber moulded components 65 G-86
Tread rubber including pre-curedrubber
Small Green 2007BA
31.12.2027N N N N N N N NA NA NA 1.3 N NA N Y N NA Yes
24142012-13 CL
22617Nippon Paint (India) Pvt Ltd.,
No.39-A, II Phase, PIA, Banglore-560 058
II PhaseI
ware house 332 W-52
Diesel Generator sets (15KVA to 250
Small White 2012BA
31.12.2023CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
24152016-17 O
32540Supercraft 3d wellness Pvt Ltd
No.B-17, I cross, I stage, PIE, Bengaluru-560058.
I StageI
Printing of plastic & metal models tools 165 G-78
on plastic&meta
l Small Green 2017
BA31.12.2033
Y 31.12.2024 N N N N N NA NA NA 0.6 N NA N Y N NA Yes
24162012-13 O Indovedic Nutrients Pvt Ltd.,
No.96, III Phase, PIA, Bangalore-560058
III PhaseI
Formulation & finishing of Herbal extracts
148.88 G-2Ayurvedic and homeopathicmedicines
Small Green 2013WA
31.12.2022N N N N N N N NA NA NA 0.4 0.02 NA N Y Y NA NA
24172012-13 O
21653
Hallite Sealing Solutions India Pvt Ltd.,
No.10, III Main, I Stage, PIE, Bengaluru-560 058
I StageI
Repacking of Hydraulic sealing items
366.28 G-78Re-packing of finishedproducts (Dry
Small Green 2012BA
31.12.2021N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
24182012-13 CL
23701
Brandis Manufacturing & Marketing Pvt Ltd.,
No.490-A, 2nd Main Road, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Ready made garments 1142 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 2012BA
31.12.2022N N N N N N N NA NA NA 16 N STP Y N N NA Yes
24192012-13 CL
-
Prime Progression Export Service Pvt Ltd.,
No.422, 11th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Container liners & Bulk Heads made of Woven fabrics
188 G-78Switches without
electroplatinSmall Green 2009
BA31.12.2001
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
24202012-13 O
34799Fashion Matrix Clothing.,
No 284, II Cross, IV Phase, PIA, Bangalore-058
IV PhaseI
Ready made garments 107 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2012WA
31.12.2021N N N N N N N NA NA NA 7.5 N NA N Y N NA NA
24212012-13 O
22181BMTC Depot-9,
BMTC Depot-9, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Sevicing of buses33.63 O-18
Automobile servicing, repairing
Small Orange 1987BA
30.09.2029Y 30.09.2023 N N N N N NA NA NA 20.3 8 ETP Y Y N NA Yes22181 repairing
andBA Y 30.09.2023 N N N N N NA NA NA 20.3 8 ETP Y Y N NA Yes
24222012-13 O Merrick Industries Pvt Ltd.,
Plot No. 103, 113 & 114, 7th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Coal feeders, Chain Conveyors 464 G-60
Repairing, cleaningdegreasing, painting and
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
24232012-13 O Eurosit Systems Furniture's,
No.273, IV Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Coal feeders, Chain Conveyors 250.63 G-10
Carpentry & wooden furnituremanufacturi
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.3 N ST & SP N N N NA Yes
24242012-13 O
23805Mythri Metallizing India.,
No.177-178, III Phase, PIA, Bangalore-560058
III PhaseI
Cast iron & MS Engineering 641 O-63
Engineering Industries with HeatTreatment,
Medium Orange 2012BA
30.09.2028N N N N N N N NA NA NA 0.43 N NA N Y N NA Yes
24252012-13 O Vodafone South Ltd.,
Plot No.19, 5th Main, III Phase, PIA, Bengaluru-560 058
III PhaseTT
Telephone towerDG Set W-52
Diesel Generator sets (15KVA to 250
Small White 2012AA
31.12.2016N N N N N N N NA NA NA 0 N NA N N N NA Yes
2426O
31751
Chhaperia International Company, No.270, IV Phase,
PIA, Bengaluru-560 058
No.270, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Mica Tape78.53 G-6
Blending of melamine resins
Small Green 2007BA
31.12.2026N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
2427O
16258Karnataka Fine Chem.,
No.8, 10th Cross, I Stage, PIE, Bangalore-56008
I StageI
Trading of Laboratory chemicals with packing & refilling
53.01 R-25Basic chemicals and electrochemicals
Small Red 2009WA
30.06.2024N N N N N N N NA NA NA 0.24 N NA N Y N NA NA
2428O Janma Precision.,
No.C-83, III Stage, PIE, Bengaluru-560 058
III StageI
Manufacture of precision turned components
33 G-78Switches without
electroplatinSmall Green 2010
WA31.12.2020
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA
2429O
24823Global Electro Enterprises
No.510, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Electrical panel wiring21 G-78
Panel Board, Switches without
Small Green 2001WA
31.12.2025N N N N N N N NA NA NA 0.15 N NA N Y N NA NA
2430CL
24112Protective Coating Pvt Ltd.,
No.A-29, 2nd Cross, III Stage, PIE, Bengaluru-560 058
III StageI
Shot blasting and Spray painting (Dry type)
89.59 O-62Spray painting, paint baking, paint
Small Orange 2009BA
30.06.2018N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes
2431O
23199
Rajath Material Handling Systems Pvt Ltd.,
No. P-8, 2nd Cross, III Stage, PIE, Bengaluru-560 058
III StageI
Fabrication Work21.21 W-14
Engineering and fabricationunits (dry
Small White 2012WA
31.12.2099N N N N N N N NA NA NA 0.24 N NA N Y N NA NA
2432O Comet Environs.,
No.B-57, III Stage, PIE, Bengaluru-560 058
III StageI
Manufacture of sub zero chambers, water re coolers & oil coolers
19 G-7Brass and bell metal utensilsmanufacturi
Small Green 2010BA
31.12.2034N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes
2433O Sri Maruthi Precision.,
No.C-82, 3rd Cross, III Stage, PIE, Bengaluru-560 058
III StageI
Precision components12.66 O-62
Spray painting, paint baking, paint
Small Orange 2011BA
31.12.2020N N N N N N N NA NA NA 0.1 N ST & SP N N N NA Yes
24342012-13 CL
15254
David Brown Hydraulics India Pvt Ltd.,
No.C-200, 4th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Hydraulic Press Pumps & PTO Valves (With painting)
199 O-62Spray painting, paint baking, paint
Small Orange 2013BA
30.09.2016CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
24352012-13 O
16476
Komtech Plastic Technologies India Pvt Ltd.
No 81 & 82 (B1&B2) 7th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of polythene & plastic products
979.4 G-32Polythene and plastic processedproducts
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
24362012-13 O Krishi Biosys ( Bio Fertilizer)
No 471, D1/S2, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of Bio- fertilizer not involving spent wash
37 W-4Bio fertilizer andbio-pesticides
Small White 18.02.2013WA
31.12.2022N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
24372012-13 O Krishi Biosys ( Bio pesticide )
No 471, D1/S2, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Formulation of Bio-pesticides 37 O-29
Formulation of Pesticide,insecticide, & fungicide
Small Orange 18.02.2013BA
31.12.2022N N N N N N N NA NA NA 0.08 N NA N Y N NA Yes
24382012-13 CL
-XL Engineering & Fabricators,
No. B-188, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
E-waste35 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2012BA
30.06.2018Y N N N N N N NA Yes 0.4 N ST & SP N N N NA Yes
24392013-14 O
Armstrong Manufacturing Center
No.490L, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
HVAC Pumps and Accessories 1184.48 O-62
Spray painting, paint baking, paint
Medium Orange 06.07.2007BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 3.4 N ST & SP N N N NA Yes
2440
2013-14 CL16882
Diamond Hard Chrome Platers.,
No.C-130, 2nd 'B' Cross, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating Hard Chrome Plating activity (Hardchrome)
49.6 R-44Industry or process involvingmetal
Small Red 2008BA
30.09.2017Y 30.06.2011 N N N N N NA NA NA 0.15 0.1 NA N Y Y NA Yes
24412013-14 O
17501Yashaswini CNC.,
No.54, 4th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
CNC Turned componenets 41.65 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2009BA
31.12.2021N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
24422013-14 O
Precimeasure Controls Pvt. Ltd.,
Unit-II, No.B-71, 2nd Cross, I Stage, PIE , Bengaluru-560 058
I StageI
Pressure Gauges & Marshalling Box & Panel
365 G-78Electrical and electronic item
Small Green 2011BA
31.12.2021N N N N N N N NA NA NA 0.11 N NA N Y N NA Yes
24432012-13 O
Wistra Elemetherma India Pvt Ltd.,
No.530, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Ovens, Kilns, and Special purpose machine
83.83 W-13Electrical and electronic item
Small White 2013WA
31.12.2022N N N N N N N NA NA NA 0.45 N ST & SP N N N NA NA
24442013-14 O
24137R.K. Engineering Industries.,
No.B-87, 2nd Cross, I Stage, PIE , Bengaluru-560 058
I StageI
Electro polishing 12.5 R-44
Industry or process involvingmetal
Small Red 2000BA
30.06.2024N N N N N N N NA NA NA 1.5 0.05 NA N Y Y NA Yes
24452013-14 CL
23800Tes-Amm India Pvt Ltd,
No.A-365,6th cross, I stage, Peenya Industrial Estate, Bengaluru-560 058
I StageI
Electro polishing (E-waste Dismentling) 220 R-3
Industries engaged inrecycling/reprocessing/
Small Red 2013BA
30.06.2018N N N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
2446ABB India Limited, Service
No. SB-115, 3rd cross, Ist Stage , I Stage Service Centre Research 24462013-14 O
23368
ABB India Limited, Service Center
No. SB-115, 3rd cross, Ist Stage , Peenya industrial Estate, Bangalore-=58
I StageI
Service Centre (Recovery of copper clad & strips)
64.73 G-81Research laboratories notinvolving
Small Green 2013WA
31.12.2022N N N N N N N NA NA NA 0.32 N NA N Y N NA NA
24472013-14 CL
-Indus Intex Pvt Ltd.,
No. 183, III Phase, 100 feet road, Peenya Industrial Area, Bengaluru-560 058
III PhaseI
Readymade Garments616.09 G-72
Stitching/ Stitching ofshoe uppers/
Medium Green 2013BA
31.12.2004CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
24482013-14 O Dynamatic Hydraulics.,
Unit-II, No.K-11, Between 5th & 6th Cross, I Stage, Bengaluru-560 058
I StageI
Manufacturing of Composite Bush & Gear Hobing
1216.5 G-7Brass and bell metal utensilsmanufacturi
Large Green 2013BA
31.12.2022Y 31.12.2022 N N N N N NA NA NA 1.2 N NA N Y N NA Yes
24492013-14 O SAP Engineering.,
No.B-16, 1st Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabricted items (Hyraulic tanks, frames) & machined components
93.46 G-10Carpentry & wooden furnituremanufacturi
Small Green 05.01.2011BA
31.12.2022Y 31.12.2017 N N N N N NA NA NA 0.6 N NA N Y N NA Yes
24502013-14 O
24898
Magod Laser Machining Pvt Ltd.,
No.490-G, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
General Engineering of sheet metal components (CNC Laser cutting)
642.78 G-46Steel furniture without spray
Medium Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.4 N ST & SP N N N NA Yes
24512013-14 O
21286Santhosh Sharp Tools.,
No.105, 4th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Engineering cutting tools 18.48 G-10
paintingSmall Green 2013
WA31.12.2100
N N N N N N N NA NA NA 0.13 N ST & SP N N N NA NA
24522013-14 O
23691Nash Industries (I) Pvt Ltd.,
No.102/103, III Phase, 6th Main Road, 3rd Cross, PIA, Bengaluru-560 058
III PhaseI
Sheet Metal Press Components 984 G-110
Diesel Generator sets (250 KVA
Medium Green 2013BA
31.12.2022Y 31.12.2025 N N N N N NA NA NA 5.6 N NA N Y N NA Yes
24532013-14 O
21453Alufit India Pvt Ltd.,
No.C-331, IV Phase, I Stage, PIE, Bengaluru-560 058
IV PhaseI
General Engineering (Aluminium Composite Panel Sheet)
164.29 G-1Aluminum utensils fromaluminum circles by
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes
24542013-14 O Shri Cauvery Industries.,
No.B-33, II Stage, PIE, Bengaluru-560 058
II StageI
Sheet metal fabrication parts for machining (cutting, deburring, bending,
189.33 G-78Switches without
electroplatinSmall Green 2013
BA31.12.2022
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes
24552013-14 O
20466TMS India Pvt Ltd.,
Unit-V, No.5, 5th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Valve components & machined parts 708.77 G-78
Panel Board, Switches withoutelectroplatin
Medium Green 2013BA
31.12.2022N N N N N N N NA NA NA 2 N ST & SP N N N NA Yes
24562013-14 O
21685Gears & Pinions Pvt Ltd.,
No.A-323, 7th Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
General Engineering (Straight Spiral Bevel Gear & Pinion)
362 G-92.Shot blasting operation
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
24572013-14 O
22107
Paragon Polymer Products Pvt Ltd.,
No.SB-107 & 108, 2nd Cross, I stage, PIE, Bengaluru-560 058
I StageI
Designing of New Foot wear (Mould designing/upper designing, sample
189 G-26Leather foot wear and leatherproducts
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.96 N NA N Y N NA Yes
24582013-14 CL
21751
Pentair Technical Products Pvt Ltd.,
No.10-C, II Phase, PIA, Bengaluru-560 058
II PhaseI
General Engineering (S.S.Enclosures & cabients)
1212 G-78Switches without
electroplatinLarge Green 2013
BA31.12.2027
Y 31.12.2019 N N N N N NA NA NA 3.6 N STP Y N N NA Yes
24592013-14 CL
22360ADC India Communications.,
No.485/ 8A & 8B, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
D.G SET2004.59 G-110
Diesel Generator sets (250 KVA
Large Green 2013BA
31.12.2022Y 31.12.2023 N N N N N NA NA NA 8 N ST & SP N N N NA Yes
24602013-14 CL
-Kongovi Electronics Pvt Ltd.,
No.53-A, 4th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Moulding of plastics components 382.81 G-32
Polythene and plastic processedproducts
Small Green 2013BA
30.06.2021CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
24612013-14 O
22432Delta Electro Controls.,
No.160, 4th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Assembling of Electric panel Boards 72 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2013WA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
24622013-14 CL Span Diagnostics Ltd.,
No.B-42, III Stage, PIE, Bengaluru-560 058
III StageI
Distribution Depot of Diagnostic reagents 99.82 R-25
chemicals and electrochemicals
Small Red 2013BA
NN N N N N N N NA NA NA 0.24 N NA N Y N NA NA
24632013-14 O Span Diagnostics Ltd.,
No.17(i), 2nd Floor, I C Main Road, II Phase, PIA, Bengaluru-560 058
II PhaseI
Assembling of control panel accessories, locks, hinges, latches & industrial handles.
116.52 G-78Switches without
electroplatinSmall Green 2013
WA31.12.2022
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
24642013-14 O
23569
Mittal Clothing Company Unit-I (Formerly known as S.A.S
Apparels).,
No.471-D2, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Garment Stitching 628.42 G-72
Garment Stitching/ Stitching ofshoe uppers/
Medium Green 2013BA
31.12.2022N N N N N N N NA NA NA 9.6 N STP - BWSSB Y N N NA Yes
24652013-14 O Quality Insulated Conductors.,
No.A-12, 1st Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Insulated Copper, Aluminum conductor manufacturing
187.54 G-78Panel Board, Switches withoutelectroplatin
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes
24662013-14 O
22807
Torry Harries Restaurants Pvt Ltd.,
No.25-A, 5th Main, III Phase, PIA, Bangalore-560058
III PhaseHospital
ity
Food Processing Industry 760.12 G-52
Hotel/Resorts having more than 20 rooms
Medium White 2013BA
31.12.2027N N N N N N N NA NA NA 1.2 3.5 ST & SP N N Y NA Yes
24672013-14 O
23368ABB India Ltd-Robotics,
No.1-A, II Phase, PIA, Bangalore-560058
II PhaseI
Assembling and testing of Robotic system along with spary painting
1601.68 O-62Spray painting, paint baking, paint
Large Orange 2013BA
30.09.2022Y 30.09.2022 N N N N N NA NA NA 2.6 N STP Y N N NA Yes
24682013-14 O
74848Sai Bikes.,
No.P-6, 1st Cross, I Stage, PIA, Bengaluru-560 058
I StageI
Servicing of Honda Bikes 312 O-18
Automobile servicing, repairing and
Small Orange 2013BA
30.09.2023Y 30.09.2023 N N N N N NA NA NA 0.72 5 ETP N Y N NA Yes
24692013-14 O
83573
Dynamatic Hydraulics-Unit-I, A.Div. of Dynamatic
Technologies.,
Unit-I, No.1A/1, 1st Main Road, II Phase, PIA, Bengaluru-560 058
II PhaseI
Manufacture of Hydraulic Gears and Pumps of capacity 5 Lakh No's/ Annum
2412.91 G-77Manufacture of Motor & Pumpswithout
Large Green 2013BA
31.12.2023Y 31.12.2023 N N N N N NA NA NA 17 N STP Y N N NA Yes
24702013-14 O
AESTHEBIO., ( Formerly Ayurpetals
No.466, 1st & 2nd Floor, 12th A Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Formulation and finishing of Ayurvedic herbal
100 G-2Ayurvedic and homeopathic
Small Green 2013WA
30.09.2018N 30.09.2018 N N N N N NA NA NA 0.5 0.2 ST & SP N N Y NA NA058 Ayurvedic herbal
extractshomeopathicmedicines
WA N 30.09.2018 N N N N N NA NA NA 0.5 0.2 ST & SP N N Y NA NA
24712013-14 O
75778
RKN Heat Treatment Solutions.,
No.C-185, 5th Cross,2nd Stage, PIE, Bangalore-560058
II StageI
Heat Treatment unit on job work 98.21 O-36
Heat treatment using oil fired furnace
Small Orange 2013BA
30.09.2022N N N N N N N NA NA NA 1.08 N NA N Y N NA Yes
24722013-14 O
29704
Strecken India Manufacturing Pvt Ltd (Formerly Synpack
Flexipacks Pvt Ltd).,
No.A-45(a) 2nd Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
LDPE Stretch film for integral packing 168.8 G-32
Polythene and plastic processedproducts
Small Green 2013WA
31.12.2034N N N N N N N NA NA NA 0.7 N NA N Y N NA NA
24732013-14 CL
-Aries Powder Coaters.,
No.A-322, 7th Main, II Stage, PIE, Bangalore-560058
II StageI
Powder Coating with Precleaning 86 O-62
painting, paint baking,
paintSmall Orange 2013
BA31.12.2023
CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
24742013-14 O Matxin Labs Pvt Ltd.,
No.M-11, I Stage, PIE, Bengaluru-560 058
I StageI
Herbal Products (Tablets) 178 G-2
Ayurvedic and homeopathicmedicines
Small Green 2013WA
31.12.2022N N N N N N N NA NA NA 0.4 N NA N Y N NA NA
24752013-14 O Lakhotia Belting Pvt Ltd.,
No.276, 4th Main, IV pHase, PIA, Bengaluru-560 058
IV PhaseI
Rubber Products (Conveyor Belts) 328 G-86
Tread rubber including pre-curedrubber
Small Green 2013BA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
24762013-14 O Sudhir Enterprises.,
No.200, III Phase, PIA, Bengaluru-560 058
III PhaseI
Sheet Metal Components & Precision Turned components
299.74 G-78Engineering and fabricationunits (dry
Small Green 2013BA
31.12.2022N NA N N N N N NA NA NA 0.8 N ST & SP N N N NA Yes
24772013-14 O
30466
Paragon Polymer Product Pvt Ltd., (formerly Preston India
Pvt Ltd ),
No.486-A, 13th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Foot Wear Manufacturing 3782 G-26
wear and leather
products Large Green 2014
BA31.12.2026
N N N N N N N NA NA NA 4.8 N STP Y N N NA Yes
24782013-14 O
23803Varasiddi Induction.,
No.40-B/8, II Phase, PIA, Bengaluru-560 058
II PhaseI
Heat Treatment by induction method for automobile, agricultural
111 G-24Heat treatment with any of the
Small Green 2014WA
31.12.2032N N N N N N N NA NA NA 0.56 N NA N Y N NA NA
24792013-14 CL
22311Balaji Metal Finishers.,
No.68-A, 1st Floor, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating activity of Nickel & Copper 21 R-44
Industry or process involvingmetal
Small Red 2014BA
30.06.2018N N N N N N N NA NA NA 0.4 0.06 NA N Y Y NA Yes
24802013-14 O
24069S R Pharmaceuticals.,
No.309, 8th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Herbal Products (Tablets) 270 G-02
Ayurvedic and homeopathicmedicines
Small Green 2014BA
31.12.2022N N N N N N N NA NA NA 0.48 0.2 ST & SP N N Y NA Yes
24812013-14 CL
Orion CNC Components Ltd., Shed
Shed No.6, Plot No.498, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Precision Machined Components 392 G-10
wooden furniture
manufacturiSmall Green 2014
BANA
N N N N N N N NA NA NA 0 N NA N N N NA NA
24822013-14 O
11605
Synthetic Packers Pvt Ltd-(Unit0-II),
No.171/A,4th Cross, I Stage, Peenya Industrial Estate, Bengaluru-560 058,
I StageI
polythene rolls and 1864 G-32
Polythene and plastic processedproducts
Large Green 2013BA
31.12.2022N N N N Y 31.1.2021 N NA NA NA 1.2 N NA N Y N NA Yes
24832013-14 O Sri Vyoma Clothing,
No.28C, 1st Floor, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment Stiching 485.7 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 2014BA
31.12.2022N N N N N N N NA NA NA 3.2 N NA N Y N NA Yes
24842013-14 CL
-Alpa Design Technologies
No.193A and 193B, 4th Cross, 1st Stage, PIE, Bengaluru-58
I StageI
Precision machined components and Unit level switch board
873 G-78Panel Board, Switches withoutelectroplatin
Medium Green 2016BA
26.01.2022N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes
24852013-14 O Sunil Steel & Scrap Traders.,
No.363/1, 10th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Scrap import and trading 85 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2014BA
31.12.2021Y 31.12.2015 N N N N N NA NA NA 0.1 N NA N Y N NA Yes
24862013-14 O
77333
Mallya Fine Chem (P) Ltd., Unit-2,
No.V-40, 9th Main Road, II Stage, PIE, Bangalore-560058
II StageI
Food Color Preparation and detergent flavours
194 O-7Food and food processingincluding
Small Orange 2014BA
30.09.2023N N N N N N N NA NA NA 0.6 0.52 NA N Y Y NA Yes
24872013-14 O
77443Fine Plastics,
No.43, I st cross, I stage PIA, Bengaluru-560 058,
I StageI
Plastic injection moulding components 198 G-32
Polythene and plastic processedproducts
Small Green 2012WA
31.12.2022N N N N N N N NA NA NA 0.8 N NA N Y N NA NA
24882013-14 O
39995Barrix Agro Sciences (P) Ltd,
No 68A, ground Floor, 6th Main, III Phase, Peenya Industrial Area, Bangalore -560058
III PhaseI
Pest Control Catches and R&D for Pheramones
106 R-58cal (Bulk drug &Active
Small Red 2014BA
30.06.2023N NA N N N N N N N NA 1 0.15 NA N Y Y NA Yes
24892013-14 O
24203
National Metal Processing System & Co.,
No A348, 8th main , II Stage, PIE, Bangalore-560058,
II StageI
Heat Treatment on job work 250 O-63
Engineering Industries with HeatTreatment,
Small Orange 2012BA
30.06.2017N NA N N N N N NA NA NA 0.8 N NA N Y N NA Yes
24902013-14 O
84765Sri Vijaya Sai Heat Carbo.,
No.M-9, 7th Cross, I Stage, Bengaluru-560 058
I StageI
Heat treatment 242.5 O-63
Engineering Industries with HeatTreatment,
Small Orange 2014BA
30.09.2029N N N N N N N NA NA NA 1.7 N NA N Y N NA Yes
24912012-13 O Shivajyothi coaters,
No SM-7&8, 3rd stage, Peenya Industrial Estate, Bangalore -560058
III StageI
Powder coating 24.14 G-97
Activity of Powder Coating on surface of
Small Green 2013BA
31.12.2027N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
24922013-14 O Bitzer india pvt ltd ,
No.17(1), 2nd Floor,1st C Main Road, II Phase, PIA, Bengaluru-560 058
II PhaseI
Repair and aervice of air conditioners 111.48 G-78
Panel Board, Switches withoutelectroplatin
Small Green 2013WA
31.12.2022N N N N N N N NA NA NA 0.13 N ST & SP N N N NA NA
24932014-15 O
34330
Advaith Metal Finishers (Formerly Known as Profal
Coaters).,
No.342, , IV Phse, PIA, Bangalore-560058
IV PhaseI
Powder Coating51.04 R-44
Industry or process involving metal
Small Red 24.02.2010BA
30.06.2017N N N N N N N NA NA NA 0.4 0.5 NA N Y Y NA Yes
24942014-15 O Cimtrix Systems Pvt Ltd.,
No.320, 8th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Assembling of Armature winding machines including SBD turning machine
154 G-10Carpentry & wooden furnituremanufacturi
Small Green 08.05.2014BA
31.12.2023N N N N N N N NA NA NA 1.2 NA ST & SP N N N NA Yes
2495 4th Main, 11th Cross, No, 408, IV IV Phase Precision sheet metal Brass and 24952013-14 O
17880KDDL ltd, (Unit: EIGEN),
4th Main, 11th Cross, No, 408, IV Phase,PIA, Bangalore- 58
IV PhaseI
Precision sheet metal pressed cmponents and Precision press tools
1504.4 G-7Brass and bell metal utensilsmanufacturi
Large Green 01.10.2006BA
31.12.2022N N N N N N N NA NA NA 4 N STP Y N N NA Yes
24962014-15 O
Samcal Cutting Solutions (I) Pvt Ltd.,
No.B-251, 6th Main, II Stage, PIE, Bengaluru-560 058
II StageI
High pressure Water jet cutting activity 136 G-54
Mineralized water Small Green 05.05.2014
BA31.12.2022
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
24972014-15 CL
25890
Bonfiglioli Renewable Power Conversion India (P) Ltd.,
No.543, 14th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Assembly of electrical control panels and elevator parts
845 G-78Panel Board, Switches withoutelectroplatin
Medium Green 08.05.2014BA
31.12.2026N N N N N N N NA NA NA 2.64 N ST & SP N N N NA Yes
24982014-15 O
ABB India Ltd., (LV Capacitor),
(LV Capacitor), No.485/6, 14th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Carrying out inspecting, testing & packing os assembled Electrical and
497 G-78Panel Board, Switches withoutelectroplatin
Small Green 2014BA
31.12.2023Y 31.12.2023 N N N N N NA NA NA 3 NA ST & SP N N N NA Yes
24992014-15 O Powertrek Industries.,
No.B-197, 5th Main Road, II Stage, Bengaluru-560 058
II StageI
Lead Sub-Oxide (by using pure lead ingots only)
134.05 R-7Lead acid batterymanufacturing(excluding
Small Red 2013BA
30.06.2020
N NA N N N N N NA NA NA 0.4 N NA N Y N NA Yes
25002014-15 O
Therelek Engineers Private Limited.,
Plot No.'N' Special, 7th Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Fabrication of furnaces along with paint touchup & ovens
212.23 G-46Steel furniture without spray
Small Green 01.04.2014BA
31.12.2022N N N N N N N NA NA NA 0.54 N NA N Y N NA Yes
25012014-15 CL
Rubber Extrusion & Moulding Company.,
No.B-26, 2nd Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacture of Rubber Profiles 54.97 O-76
Natural Latex processing and/or
Small Orange 2005BA
30.06.2018N N N N N N N NA NA NA 0.55 N NA N Y N NA Yes
25022014-15 O Shri Balaji Components.,
No.14-C, 5th Main, III Phase, PIA, Bangalore-560058
III PhaseI
Manufacture of cold forged fasteners (Nuts & bolts for Automoblies)
242 O-32Forging of ferrous and non- ferrousmetals (
Small Orange 28.10.2010BA
31.12.2022N NA N N N N N NA NA NA 0.2 0.3 NA N Y Y NA Yes
25032014-15 O Veerabhadreshwra Industries.,
No.21, 5th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Machine Components25.44 W-14
Engineering and fabricationunits (dry
Small White 2010WA
30.09.2020N N N N N N N NA NA NA 0.12 N NA N Y N NA NA
25042014-15 O
Sri Nitya Packaging Company.,
No.A-313 & 314, 7th Main, II Stgae, PIE, Bengaluru-560 058
II StageI
Corrugated box331 G-9
Cardboard or corrugated box and
Small Green 28.02.2014BA
31.12.2023
N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes
25052014-15 O Industrial Rubber Works.,
No.C-89, 2nd B Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacturing Moulded products & Rubber extrusion products (rubber
78.51 G-86products using Boilers (excluding
Small Green 26.06.2014BA
31.12.2023
N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes
25062014-15 CL
-Vam International.,
No.V-43 B-(1), 2nd B Main Raod, II Stage, PIE, Bengaluru-560 058
II StageI
Solar street lights integration and assembling only
25.46 W-34paper or pulp manufacturing)
Small White 27.06.2014WA
31.12.2023
N N N N N N N NA NA NA 0.08 N NA N Y N NA NA
25072014-15 O
Ajax Fiori Engineering (India) Pvt Ltd.,
No.253/1, 11thMain, III Phase, PIA, Bengaluru-560 058
III PhaseI
Engaged in Industrial Warehouse and Corporate office
1158.52 G-78Panel Board, Switches withoutelectroplatin
Large Green 27.06.2014BA
31.12.2023Y 31.12.2026 N N N N N NA NA NA 3.2 N STP Y N N NA Yes
25082014-15 O
SRP Synthetic Rubber Products Pvt Ltd.,
No.C-81, 2nd "A" Main, II Stage, Peenya Industrial Estate, Bengaluru-560 058
II StageI
Manufacture of Rubber Moulded Component
174.76 G-41Rubber goods industry (with gas
Small Green 17.06.2014BA
31.12.2023N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes
25092014-15 O
Sri Venkateshwara Equipments.,
No.24/1, 5th Main, III Phase, PIA, Bangnalore-58
III PhaseI
Fabrication of Kitchen Equipment maily with SS material
78.38 W-14Engineering and fabricationunits (dry
Small White 11.07.2014BA
31.12.2023N N N N N N N NA NA NA 0.48 N ST & SP N N N NA Yes
25102014-15 O
12161
Madhur Pharma & Research Laboratories (P) Ltd.,
No.274, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacture of Glucose bolts & powder & Capsule (Formulation- Dry
138 G-2Ayurvedic and homeopathicmedicines
Small Green 01.08.2014BA
31.12.2024N N N N N N N NA NA NA 0.16 N ST & SP N N N NA Yes
25112014-15 O
24436Robust Hydraulics.,
No.22, 5th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacturing of hydraulic Cylinders (Only turning, assembling and
20.166 G-14Engineering and fabricationunits (dry
Small Green 2009BA
31.12.2100N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
25122014-15 CL
37948
International Trimmings and Labels India Pvt Ltd.,
No.471/A2, IV Phase, PIA, Bangalore58
IV PhaseI
Engaged in printing on lables, stickers, tags, paper tickets & packing materials
501 O-12Silk screen printing, sari printing bywooden
Medium Orange 01.08.2014BA
31.12.2023Y 31.12.2018 N N N N N NA NA NA 2.4 N NA N Y N NA Yes
25132014-15 CL
-Para Fine-Chem Industries.,
No.V-43B, 2nd B Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Refilling of Acids and Trading of Chemicals 96.64 R-25
Basic chemicals and electrochemicals
Small Red 2012BA
30.09.2018N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
25142014-15 O
Maini Precision Products Pvt Ltd.,
No.C-217, I Stage, PIE, Bengaluru-560 058
I StageI
Auto Components (Precision Products) 327 G-7
Brass and bell metal utensilsmanufacturi
Small Green 30.07.2014BA
31.12.2023Y 31.12.2023 N N N N N NA NA NA 1.8 N NA N Y N NA Yes
25152014-15 O GRV Merchandizing,
No.368 & 369,10th Cross, IV Phase, PIA, Banglore-58
IV PhaseI
BOPP Tapes186 G-32
Polythene and plastic processedproducts
Small Green 01.08.2014BA
31.12.2023N N N N N N N NA NA NA 1 N ST & SP N N N NA Yes
25162014-15 O M N Industries.,
No.209, 12th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
General Engineering and Motor Winding 230 G-78
Switches without
electroplatinSmall Green 06.09.2014
BA31.12.2023
Y 31.12.2018 N N N N N NA NA NA 0.64 N NA N Y N NA Yes
25172014-15 CL
37605Srinivasa Metal Coats.,
No. 293, IV Phase, Peenya Industrial Area, Bengaluru-560 058
IV PhaseI
Blackening Section 8.2 R-44
Industry or process involvingmetal
Small Red 08.04.2014BA
30.06.2017N N N N N N N NA NA NA 0.4 0.15 ST & SP N N Y NA Yes
25182013-14 O
24468Sam Machinery.,
No.51, 4th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Special Purpose machine assembly and Lab for Siemens Equipment Validation
153 R-83Research and Analyticallaboratories
Small Red 06.12.2013BA
30.06.2021Y 30.06.2021 N N N N N NA NA NA 0.54 0.08 NA N Y Y NA Yes
25192013-14 CL
-Delkor Technik India Pvt Ltd.,
No.32-A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Manufacturing of Engineering items: Filters, Agitators,
959.27 O-62Spray painting, paint baking,
Medium Orange 01.11.2012WA
30.06.2015CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL- Filters, Agitators,
Thickeners, Linear paint baking, paint
WA CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL CL
25202014-15 O
24999
Auxel FTG India Private Limited.,
No.124, 1st Floor, 7th Main Road, III Phase, PIA, Bengaluru-560 058
III PhaseI
Manufacture of Electrical Terminal Blocks- 3 Lakhs units and Buss Bars- 1.8
2358 G-78Panel Board, Switches withoutelectroplatin
Large Green 01.01.2014BA
31.12.2024N N N N N N N NA NA NA 1.2 N NA N Y N NA Yes
25212014-15 O
36728Rajasthan Patrika Pvt Ltd.,
No.A-198, 4th Cross, I Stage, PIA, Bengaluru-560 058
I StageI
News Paper Printing490 O-59
Printing press &/or Screen Printing
Small Orange 12.09.2014BA
31.12.2024Y 31.12.2024 N N N N N NA NA NA 1.2 N NA N Y N NA Yes
25222014-15 O
42563N.K. Pack
No.151,11 th Main, III Phase, PIA, Bengaluru-560058
III PhaseI
Paper back support for shirt packing for garments
348 G-79Plastic sack bags, woven sack with HDPE,
Small Green 7.1.2017WA
31.12.2028N N N N N N N NA NA NA 0.5 N NA N Y N NA NA
25232014-15 O
Cartonal Machine India Pvt Limited.,
No.52, 4th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Automatic Folder Gluer, Liner & Auto Die Cutter Machine. Main Activity
45.08 W-14Engineering and fabricationunits (dry
Small White 10.05.2013BA
31.12.2022N N N N N N N NA NA NA 0.2 N ST & SP N N N NA Yes
25242014-15 O
24639
Seven Hills Internationals- Unit-II.,
No.13-C, 5th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
Readymade Garments Stitching 140 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 05.11.2014BA
31.12.2023N N N N N N N NA NA NA 4.8 N NA N Y N NA Yes
25252014-15 O Buildmet Fibers Pvt Ltd.,
No.B-24, I Stage, PIE, Bengaluru-560 058
I StageI
Stitching of PP Bags150 G-32
Polythene and plastic processedproducts
Small Green 01.07.2010BA
31.12.2023N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes
25262014-15 O Sonal Apparel Pvt Ltd.,
No.28-C, II Phase, PIA, Bengaluru-560 058
II PhaseI
Garment Stitching1560 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 19.12.2014BA
31.12.2023N N N N N N N NA NA NA 5.6 N NA N Y N NA Yes
25272014-15 O
Eyyani Electric Machines Pvt Ltd.,
No. B-234, II Stage, PIE, Bengaluru-560 058
II StageI
Industrial blowers and Fans 76 G-78
Electrical and electronic item
Small Green 06.12.2014BA
31.12.2023N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes
25282013-14 O Shiva Krupa Industries.,
No.D-426/C, 10th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating
9.4 R-44Industry or process involvingmetal
Small Red 01.06.2012BA
30.06.2024N N N N N N N NA NA NA 0.03 0.06 NA N Y Y NA Yes
25292013-14 O Ambika Industries.,
No.V-48, 5th Main, II Stage, PIE, Bengaluru-560 058
II StageI
Electroplating
42.4 R-44Industry or process involving metal surgace treatment such as packing
Small Red Aug-09BA
30.06.2024N N N N N N N NA NA NA 0.2 0.16 NA N Y Y NA Yes
25302014-15 CL
-Creative Garments Pvt Ltd.,
No.351, 9th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI Manufacturing of
readymade garments
1031 G-72Garment Stitching/ Stitching ofshoe uppers/
Large Green 2014BA
31.12.2023
Y 31.12.2019 N N N N N NA NA NA 12 CL NA N Y N NA Yes
25312014-15 O
32650Pearl Global Industries Ltd.,
No.19/A, II Phase, PIA, Bengaluru-560 058
II PhaseI
Washing of readymade garments
2456 O-50Mechanized laundary Large Orange 21.1.2015
BA30.09.2022
Y 30.09.2022 N N N N N NA NA NA 48 25.16 STP&ETP Y N N N Yes
25322014-15 O Rigid industries
No C-252, I stage, PIE , Bengaluru-560 058
I StageI
Foorwear products
231 G-26Leather foot wear and leatherproducts
Small Green 1.6.2014BA
31.12.2023
N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes
25332014-15 O
Dual Manufacturing Technolgies Private Limited ,
No. 321, 8th Cross, IV Phase, PIA, Bnaglore-58
IV PhaseI Precision Machined
Components
215 G-78Panel Board, Switches withoutelectroplatin
Small Green 2014WA
31.12.2023
N N N N N N N NA NA NA 0.8 N ST & SP N N N NA NA
25342014-15 O Royal Touch.,
No.B-126, 3rd Cross, I Stage, PIA, Bengaluru-560 058
I StageI Powder coating with 3
in 1 chemical
65 G-97Activity of Powder Coating onsurface of
Small Green Feb-15BA
31.12.2034
N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes
25352014-15 CL D.S Foundries India Pvt Ltd.,
No.C-204, 4th Cross, I Stage, PIE, Bengaluru-560 058
I StageI Foundary activity
centrugal castings
95 O-42Industry or processes involving foundary
Small Orange 16.4.2014BA
30.06.2018
N N N N N N N NA NA NA 0.56 N NA N Y N NA Yes
25362014-15 O
27348Metal Storage Systems.,
No.384, 10th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI spray painting
without trade effluent
N O-62Spray painting, paint baking, paint
Small Orange Sep-14BA
31.12.2023
N N N N N N N NA NA NA 0.85 N NA N Y N NA Yes
25372014-15 O
Solidex Manufacturing Company.,
No.25A/2, KIADB Main Road, II Phase, PIA, Bengaluru-560 058
II PhaseI Sheet metal
fabrication
43 G-78Switches without
electroplatinSmall Green 15.10.2014
BA31.12.2023
N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes
25382014-15 CL Metpack Industries
No.C-85, 3rd Cross, III Stage, PIE, Bamgalore-58
III StageI Reprocessed graules
of PE
11.45 O-101cleaning,
degreasing, painting and
Small Orange Dec-13BA
30.09.2018
N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
25392014-15 O
24607Macro Precision Components.,
No.131, 8th Main, III Phase, PIA, Bengaluru-560 058
III PhaseI
General Engineering
476 G-78Switches without
electroplatinSmall Green 14-Aug
BA31.12.2024
N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes
25402014-15 O
Ace Multi Axes Systems Limited.,
No.A-47, 2nd Main, II Stage, PIE, Bengaluru-560 058
II StageI
General Engineering
420 G-1Aluminum utensils fromaluminum circles by
Small Green 2015BA
31.12.2024
Y 31.12.2020 N N N N N NA NA NA 1.6 N NA N Y N NA Yes
25412013-14 CL
31003
Peenya Pharmaceuticals PVt Ltd
No.68, 6th Main, 3rd Phase, PIA, Bengaluru-560 058
III PhaseI
Ayurvedic/Herbal formulation and dietary supplements
385 O-19and
homeopathicmedicine
Small Orange 2016BA
30.09.2022N N N N N N N NA NA NA 2.5 1 ST & SP N Y Y NA Yes
25422014-15 O
24620Magnum Enterprises Unit-II.,
No.18/A, II Phase, PIA, Bengaluru-560 058
II PhaseI Readymade Garment
stitching
606 G-72Garment Stitching/ Stitching ofshoe uppers/
Medium Green 1.1.2015BA
30.12.2024
N N N N N N N NA NA NA 14 N NA N Y N NA Yes
25432015-16 O Hoshi Tools (P) Ltd.,
No.B-76, 2nd Cross, I Stage, Peenya Industrial Estate, Bangalore – 560 058
I StageI
Engineeering Activity
867 G-10Carpentry & wooden furnituremanufacturi
Medium Green 1.1.2015BA
31.12.2024
N NA NA NA NA NA NA NA NA NA 1.85 N NA N Y N NA Yes
2544 Dynamatic Hydraulics Unit-II, K-12, 5th Cross, I Stage, PIE, I Stage Manufacture of gear Industries 25442015-16 O
Dynamatic Hydraulics Unit-II, A Division of Dynamatic
Technologies Ltd.,
K-12, 5th Cross, I Stage, PIE, Bengaluru-560 058.
I StageI
Manufacture of gear
units, control valves,
hand pumps
1864 O-63Industries with Heat
Treatment, Large Orange Aug-15
BA30.09.2020
Y 30.09.2024 N N N N N NA NA NA 6.2 0.1 NA N Y Y NA Yes2545
2015-16 O Sara Soule Private Limited., No.443, 12th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Shoe upper pairs
475 G-45Leather foot wear and leather products
Small Green 19.9.2015BA
31.12.2024
N NA NA NA NA NA NA NA NA NA 5.6 N ST & SP N N N NA Yes
25462015-16 CL
24865Hydac (India) Pvt Ltd.,
No. 275, 4th Main Road, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Manufacturing of hydralic power packs calibration
606 G-78Engineering Industries Medium Green 01.02.2015
BA31.12.2024
Y 31.12.2021 NA NA NA NA NA NA NA NA 1.2 N NA N Y N NA Yes
25472015-16 CL
Talin Modular Office Furniture Systems Pvt Ltd.,
Unit-II, No. A-17, III Stage, PIE, Bengaluru-560 058
III StageI
Modular wooden kitchens 201 O-51
Modular wooden furniture
from
Small Orange 1.1.2015BA
30.09.2018N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
25482015-16 CL M.M Heat Treaters.,
No.B-25/A, 2nd Cross, 2nd Main, II Stage, PIE, Bengaluru-560 058
II StageI
Heat Treatment44.5 O-36
Heat treatment using oil fired furnace
Small Orange 2013BA
30.06.2018
N NA NA NA NA NA N NA NA NA 0.15 N NA N Y N Yes
25492015-16 O
24985
Digiflic Enerpax Global Private Limited.,
No.387, 10th Cross, 4th Main, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
LED lights Manufacturing 2090 G-114
Solar power generation through, solar
Small Green 29.10.2014
BA31.12.2025
N NA NA NA NA NA NA NA NA NA 0.7 N NA N Y N NA Yes2550
2015-16 O24771
Paragon Polymer Products Pvt Ltd (Formerly Elastrex
Polymers Pvt Ltd).,
No.B-69, 2nd Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Hot and Cold Insole69 G-78
Panel Board, Switches withoutelectroplatin
Small Green 24.4.2015BA
31.12.2025
N NA NA NA NA NA NA NA NA NA 0.75 N NA N Y N NA Yes
25512015-16 O
24986
Digiflic Controls India Private Limited.,
No.3B-04, No.3, Plot No. 488-B, MS Industrial Complex, 14th Cross, IV Phase, PIA, Banagalore-58
IV PhaseI
Solar home lighting system 40 G-114
Solar power generation through, solar
Small Green 20.10.2009BA
31.12.2024N NA NA NA NA NA NA NA NA NA 0.85 N NA N Y N NA Yes
25522015-16 O
29066BPE Biotree India Pvt Ltd.,
No.96,III Phase, PIA, Banghalore-560058
III PhaseI Bio pharmaceutical
equipments
345 G-46Steel furniture without spray
Small Green 01.04.2015BA
31.12.2025
N NA NA NA NA NA NA NA NA NA 2 N NA N Y N NA Yes
25532015-16 O
Allied Metallurgical Products Pvt Ltd,
No.201/3, 12th Main, III Phase, PIA, Bangalore-560058,
III PhaseI Metallurgical
products
400 G-109Refilling, Repacking andblending of
Small Green 2007BA
30.6.2019
N NA N N N N N NA N NA 0.64 N NA N Y N NA Yes
25542015-16 O Velox Tyres Pvt Ltd.,
No.A-345, 9th Main, II Stage, PIE, Bengaluru-560 058
II StageI Solid tyre
manufacturing
160 O-70Tyres and tube volcanization / hot retreading
Small Orange 1.1.2015BA
12.01.2025
N NA NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes
25552015-16 O
25334RA Fashions Pvt Ltd.,
No.57-B, III Phase, Peenya Industrial Area, Bengaluru-560 058
III PhaseI
Garments stitching
1216 G-72Garment Stitching/ Stitching ofshoe uppers/
Large Green 01.05.2015BA
31.12.2024
N NA NA NA NA NA NA NA NA NA 17.5 N ST & SP N N N NA Yes
25562015-16 O
25465A.T.E Enterprises Pvt Ltd.,
No. 103, 113 & 114, III Phase, PIA, Bengaluru-560 058
III PhaseI
Industrial pre cooling system 760 G-90
Polyurethane foam extrusion as an allied activityMedium Green 01.09.2015
BA31.12.2024
N NA NA NA NA NA NA NA NA NA 3.2 N ST & SP N N N N Yes
25572015-16 CL
25072Shahi Exports Pvt Ltd.,
No.V-80, 1st A Main Road, II Stage, PIE, Bengaluru-560 058
II StageI
Manufacturing of readymade garments
500 G-98Garments Stitching
Small Green 2012BA
31.12.2025
Y 31.12.2020 NA NA NA NA NA NA NA NA 8 N NA N Y N Yes
25582015-16 O
24865Hydac (India) Pvt Ltd.,
No. 17/i, 1st Main Road, II Phase, PIA, Bengaluru-560 058
II PhaseI
Manufacturing of hydralic cylinder
486 G-60Repairing, cleaning,degreasing, painting and
Small Green 01.01.2015WA
31.12.2024Y 31.12.2021 NA NA NA NA NA NA NA NA 1.3 N NA N Y N NA NA
25592015-16 CL Sairam Creations.,
No.40B, II Phase, PIA, Bangalore- 560058
II PhaseI
Garments washing
398 O-13Mechanized laundry using oil fired boiler
Small Orange 2015BA
30.09.2019
Y 30.09.2020 NA NA NA N N NA NA NA 0.4 18 ETP Y Y N Yes
25602015-16 O
25460Mahesh Machine Tools.,
No.2-B, 1st Cross, 5th Main, III Phase, PIA, Bnagalore-58
III PhaseI
Machine Components
25.2 G-78Panel Board, Switches withoutelectroplatin
Small Green 25.2.2004WA
31.12.2024
N NA NA NA NA NA NA NA NA NA 0.04 N NA N Y N NA NA
25612014-15 CL
MJS Metal Coaters Private Limited.,
No.729/B, 3rd Cross, I Stage, PIE, Bengaluru-560 058
I StageI
Sheet blasting painting and power coating
66 R-44Industry or process involving metal surgace treatment such as packing
Small Red Jul-14BA
30.06.2019
Y 30.06.2019 NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes
25622015-16 CL PADM Laboratiories Pvt Ltd.,
No.453/A, First Floor, 12th Cross, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Pharmaceutical Products
150 O-74Pharmaceuti
cal formulation
Small Orange 2015BA
30.09.2028
N NA NA NA NA NA NA NA NA NA 0.4 0.05 ST & SP N N Y NA Yes
25632013-14 CL
Radhalakshmi Smelters Private Limited.,
No.446, IV Phase, PIA, Bengaluru-560 058
IV PhaseI
Aluminium alloy ingots and billets
65.45 R-50Aluminium alloy ingots and billets
Small Red 16.1.2013BA
30.06.2017
N N N N N N N NA NA NA 1.2 N ST & SP N N N NA Yes
25642015-16 O
26425Kaba steels,
No. 53/13, Andrahalli main road, PEENYA Ind ESTATE -stage
2,peenya,bangalore urban
II StageI
Aluminium waste
copper waste
corrugated box
15 G-1Aluminium waste copper waste corrugated box
Small Green 1.1.2016BA
31.12.2099N NA NA NA NA NA NA NA NA NA 0.4 N NA N Y N NA Yes
25652015-16 O
Newgen wires & coils Pvt Ltd.,
V-28 , 9th main road peenya ind estate, II Stage, PIE ,Banglore-58
II StageI
insulator conductor
including wire
drawing with
541 O-72
Wire
drawing and
wire netting
Medium Orange 04.01.2016BA
31.12.2025Y 31.12.2025 NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes
25662015-16 O
Ponalab biogrowth private limited ,
10th cross , III Stage, PIE, Bengaluru-560 058
III StageI
Biocontrol agents and
animal feed
suppliments
73 O-21Fish feed, poultry feed and cattle feed
Small Orange Aug-15BA
30.09.2029N NA NA NA NA NA NA NA NA NA 0.72 0.31 NA N Y Y Yes
25672015-16 CL 33274 Surya metal finishers ,
P-17 , 3rd cross, III Stage ,PIA, Bengaluru-560 058
III StageI
Job working electroplating
30.84 R-44Industry or process involving metal surgace treatment such as packing
Small Red Aug-11
BA30.06.2016
N N N N N N N NA NA NA 0.08 0.08 NA N Y Y NA Yes2568
2015-16 O25226
SO Design factory, No.244,4th main, IV Phase,PIA
Bengaluru-560 058IV Phase
IGarments stitching
21.66 G-72Garment Stitching/ Stitching of
Small Green 01.07.2014BA
31.12.2024N NA NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes25226 Garments stitching Stitching of
shoe uppers/ BA N NA NA NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes
25692015-16 O Fine Plastics,
No.546/2, 7th main,IV phase,PIA , Bengaluru-560 058
IV PhaseI
Plastic injection moulded components N G-32
Polythene and plastic processedproducts
Small Green 2010BA
31.12.2021N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes
25702015-16 O Hanu Vibro technologies,
No.C 248,5th cross, I State,peenya industrial estate ,banglore 58
I StageI
Metal and steel
blockening and grit
plasting
10 R-44Industry or process involving metal surgace treatment such as packing
Small Red 2012BA
30.06.2020N NA NA NA NA NA NA NA NA NA 0.16 0.03 NA N Y Y NA Yes
25712015-16 CL
-Super Power System,
No.B-151, 5th main,II Stage, PIE, Bangalore -58
II StageI
Battery manufacturing
23 R-7Lead acid batterymanufacturing(excluding
Small Red 2009BA
30.06.2011N N N N N N Y NA NA NA 0.2 0.75 NA N Y Y NA Yes
25722015-16 O 25924
Master Heat Treaters Private Limited.,
No.102-A (B), II Stage, PIE, Bangalore-560058
II StageI Heat Treatment on
job work
472 O-36Heat treatment using oil fired furnace
Small Orange May-14
BA
30.09.2029
N NA NA NA NA NA NA NA NA NA 1.044 0.2 NA N Y Y NA Yes2573
2015-16 O HeatronixNo 296, 297, IV Phase, 5th main,
Peenya Industrial Area, Bengaluru 560 058
IV PhaseI
Extrusion of
aluminium and
fabrication
42.9 O-17Aluminium & copper extraction from
Small Orange 2014
BA
30.09.2020
N NA NA NA NA NA NA NA NA NA 0.6 N NA N Y N NA Yes2574
2015-16 O11470
Synergy Punching Pvt Ltd., No.374, 10th Cross, IV Phase, PIA,
Bengaluru-560 058IV Phase
I
Sheet metal
enclosures with
surface treatment
260 R-9
enclosures
with surface
treatment
Medium Red 28.7.2010 BA 30.06.2022N NA NA NA NA NA NA NA NA NA 6 10 ST & SP ETP Y N N NA Yes
25752015-16 O
29263P & S Chemtech
Plot No. B-223, I st Stage, Peenya Indl Estate, Bengaluru-560 058
I Stage I Chemical blending &
packaging
50 R-25chemicals
and electrochemicals
Small Red 22.08.2016 BA 30.06.2021N NA NA NA NA NA NA NA NA NA 0.08 0.01 NA N Y Y NA Yes
25762015-16 O
24749Steer Engineering Pvt Ltd
No. 349/350, 9th Cross, IVth Phase, Peenya Indl Area, Bengaluru-560 058
IV Phase IR & D
654 G-81laboratories
notinvolving
Medium Green 2010 BA 31.12.2034Y 31.12.2024 NA NA NA NA NA NA NA NA 4 N NA N Y N NA Yes
25772015-16 CL
25139Bel Pharma
No. 271, IVth Phase, Peenya Indl Area, Bengaluru-560 058
IV Phase IFood and herbal
tablets 364 G-2Ayurvedic and homeopathicmedicines
Small Green 09.09.2015 BA NAN NA NA NA NA NA NA NA NA NA 0 N ST & SP N N N NA Yes
25782015-16 CL Chaitanya Colourants
No. C-93/A, 2nd B Main, 2nd Stage, Peenya Indl Estate, Bengaluru-560 058
II Stage IPowder
manufacturing 85.2 O-81Repackaging and blending of chemicals
Small Orange Jan-16 BA NAN NA NA NA NA NA NA NA NA NA 0 N NA N Y N NA Yes
25792015-16 O
27110Tholasi Prints India Pvt Ltd
Plot No 379, 10th Cross, IV Phase, Peenya Industrial Area, Bengaluru 560
058IV Phase I
Printing publicity materrial 1205 O-59
Printing press &/or Screen PrintingLarge Orange 13.11.2013 BA 31.12.2024
N NA NA NA NA NA NA NA NA NA 0.08 0.2 ST & SP N N Y NA Yes
25802015-16 O
11616
Ams Bhargava Machining Pvt Ltd
Plot No. 132, 8th Main, IIIrd Phase, Peenya Indl Area, Bengaluru-560 058
III Phase IMachine tools parts
CNC job works 1039 G-78Machine tool parts and CNC job works
Large Green 19.08.2010 BA 31.12.2027N NA NA NA NA NA NA NA NA NA 1.8 N NA N Y N NA Yes
25812015-16 O
31743
SAPL Industries Pvt Ltd (Printing Div)
Plot No. 28C, 2nd Phase, Peenya Indl Area, Bengaluru-560 058
II Phase IPrint on ready made
garments 24 O-12Silk screen printing, sari printing bywooden
Small Orange Dec-14 BA 30.09.2021N NA NA NA NA NA NA NA NA NA 1 0.38 NA N Y Y NA Yes
25822015-16 O
24059Metal Storage Systems Pvt Ltd
No. 410, 11th Cross, 4th Phase, Peenya Indl Area, Bengaluru-560 058
IV Phase IPowder coating
474 G-97Activity of
Powder Coating onsurface of
Small Green 06.01.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes
25832015-16 O
26986
Life Line Feeds(India) Pvt Ltd No 25, B-C, 3rd main, 4th cross, II Phase, Peenya Industrial Area,
Bengaluru 560 058 II Phase I
Cold storage and redistribution 700 O-10
Chilling plant cold storage and ice making Medium Orange 15.3.2016 BA 30.09.2030
N NA NA NA NA NA NA NA NA NA 2.9 N NA N Y N NA Yes
25842015-16 O
28588
Deccapel Fashions Pvt. Ltd (formerly Deccan Leather
Fashions)
No. 306-B, IVth Phase, 4th Main, Peenya Indl Area, Bengaluru-560 058
IV Phase IReady made leather
garments 1574 G-72Leather cutting and stitching including Ready made leather garments
Large Green 10.03.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.8 N NA N Y N NA Yes
25852015-16 O
24689Colors Matrix
Plot No 310, 8th cross, 4th phase, Peenya Industrial Area, Bengaluru 560
058IV Phase I
Garment Stiching 240.7 G-72
Garments StitchingSmall Green 06.01.2014 BA 31.12.2025
N NA NA NA NA NA NA NA NA NA 3.8 N NA N Y N NA Yes
25862015-16 O
28508Karthik Electricals
No. 79-80, Ranjit compound, peenya 3rd Phase, PIA, Bengaluru-560 058
III Phase IDistribution transformer
48 G-85Transformer assembly unit
Small Green 01.04.2014WA
31.12.2025N NA NA NA NA NA NA NA NA NA 0.15 N NA N Y N NA NA
25872015-16 O
28117HK Wentworth India Pvt Ltd
No. 73, 6th Main, 3rd Phase, Peenya Indl Area, Bengaluru-560 058
III Phase I
encaptulation resin,
thermal interfcae
material
833 O-75 Synthetic
resins
Small Orange 2.4.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.5
0.2 (inceneration) NA N Y N NA Yes
25882015-16 O RPS Industries
No. 79/80, 3rd Phase, Peenya Indl Area, Chokkasandra, Bengaluru-560
058III Phase I
air,exhaust systmes,
air pollution
equipments, kitechn
29 G-78Panel Board, Switches withoutelectroplatin
Small Green 12.08.2015BA
31.12.2025N NA NA NA NA NA NA NA NA NA 0.16 N NA N Y N NA Yes
25892015-16 O
29353Rajendra Enterprises
No. 21, 5th Main, IIIrd Phase, Peenya Indl Area, Chokkasandra, Bengaluru-
560 058III Phase I
Powder coating for furnitures and machinery parts
8 G-97Activity of Powder Coating onsurface of
Small Green 01.04.2013 WA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.18 N NA N Y N NA NA
25902015-16 O
25187BPE Bio Tree India Pvt Ltd
No. 105, IIIrd Phase, Peenya Indl Area, Bengaluru-560 058-560058
III Phase IManufacturing of Bio pharmaceutical equipments
471 G-78Panel Board, Switches withoutelectroplatin
Small Green 16.05.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 2 N NA N Y N NA Yes
25912015-16 O Nikitech Electric Pvt Ltd
No 627/3, Plot No 36B, NTTF Circle, Peenya 2nd Phase, Peenya Industrial
Area, Bengaluru 560 058II Phase I
Manufacturing of
electric control panel
boards
317 G-78Panel Board switches without electroboard / control panel
Small Green 01.02.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.25 N ST & SP N N N NA Yes
25922015-16 O
29699
Facade Clad Tech Private Limited
No 310/2, 8th cross, 4th phase, Peenya Industrial Area,, Bengaluru 560 058
IV Phase IAlunimuim panels
13.2 W-14Engineering and fabricationunits (dry
Small White 20.06.2015WA
31.12.2025N NA NA NA NA NA NA NA NA NA 0.18 N NA N Y N NA NA
2593 No 460 B, Ist and 2nd floor, Near Garments stitching Garment 25932015-16 O
29724Akash Apparels
No 460 B, Ist and 2nd floor, Near NTTF Circle, Ivth phase,
Chokkasandra, Bengaluru Urban District, Bengaluru 560 058
IV Phase IGarments stitching
112 G-72Garment Stitching/ Stitching ofshoe uppers/
Small Green 01.01.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 6 N ST & SP N N N NA Yes
25942015-16 O
29722
Coastal Heat Treatment Solution
No. B188/1, 5th Main Rd, Peenya 2nd Stage, Bengaluru-560 058
II Stage IHeat treatment
130 O-36Heat treatment using oil fired furnace
Small Orange 2016 BA 30.09.2023N NA NA NA NA NA NA NA NA NA 0.4 N NA N Y N NA Yes
25952015-16 O
26993
Maruthi Microcomponents Pvt Ltd
No. 17 G1, IInd Phase, Peenya Indl Area, Bengaluru-560 058
II Phase IGeneral engineering
485 G-10Carpentry & wooden furnituremanufacturi
Small Green 01.04.1999 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes
25962015-16 O Kurlon Enterprise Limited
No. 287, 4th Phase, Peenya Indl Area, Bengaluru-560 058
IV Phase I foam mattress spring
mattress
317 G-90foam
extrusion asan allied
Small Green 01.05.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 2.2 N ST & SP N N N NA Yes
25972015-16 O
28310Tharu & Sons
Plot No. 9E/20, IInd Phase, Peenya Indl Area,Bengaluru-560 058
II Phase IMechanized laundry
432 O-46Mechanized laundry using oil fired boiler
Small Orange May-16 BA 30.09.2021N NA NA NA NA NA NA NA NA NA NA N NA N Y N NA Yes
25982015-16 O
25499
Pronk Multiservice India Pvt Ltd Unit-2
No A52, nd main road, 2nd stage, Peenya Industrial Estate, Bengaluru
560 058II Stage I
Wooden boxes,
Wooden crates and
Pallets
135 G-7Brass and bell metal utensilsmanufacturi
Small Green 01.10.2015 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 2 N NA N Y N NA Yes
25992015-16 O
Indvac Systems And Components
B-167, 4th Main, 2nd Stage, Peenya Indl Estate, Chokkasandra, Bengaluru-
560 058II Stage I
Assembly, testing and
service, manufacture
of vaccum pumps
128 G-78Panel Board, Switches withoutelectroplatin
Small Green 28.112005WA
31.12.2025N NA NA NA NA NA NA NA NA NA 0.1 N NA N Y N NA NA
26002015-16 CL
30555
Tirupathi Lpg Industries Pvt Ltd Unit-II
No. 15, 2nd Phase, Peenya Indl Area, Bengaluru-560 058-560058
II Phase I Manufacturing of LPG
cylinders
450 O-101manufacture of cylinders caps for L.P.G. cylinders
Small Orange 01.08.2016 BA 30.09.2017Y N N N N N N N N NA 3.8 0.12 ST & SP N N Y NA Yes
26012015-16 O
26701Akshara Drug House Pvt Ltd
No 333, Ist Floor, 9th Cross, 4th Main, IVth Phase, Peenya Industrial Area,
Bengaluru 560 058IV Phase I Manufacturing of
Ayurvedic products
90 O-19Ayurvedic and homeopathic medicine
Small Orange 04.12.2015 BA 30.09.2020N NA NA NA NA NA NA NA NA NA 1 0.2 NA N Y Y NA Yes
26022015-16 O 24305 Washport Processing
No. 288, 4th Phase, Peenya Industrial Area, Peenya, Bengaluru-560 058
IV Phase I Washing of
readymade garments
345 O-50Mechanized laundry using oil fired
Small Orange 9.9.2016 BA 30.09.2017
N NA NA NA NA NA NA NA NA NA 1.8 45 ETP Y Y N NA Yes2603
2015-16 CL28650
Marman Food & Beverage Technologies India Pvt Ltd
No. 49A & 49B, IIIrd Phase, Peenya Indl Area,Chokkasandra, Bengaluru-
560 058III Phase I
Food and beverages
584 O-7Food and food processing
Medium Orange 02.04.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 1.6 N ST & SP N N N NA Yes
26042015-16 O Minebea Intec India Pvt Ltd
No.26D, II Phase, PIA, Bengaluru-560 058.
II Phase I Assembly of Weighing
Machine
2500 G-78Switches without
electroplatinLarge Green 16.12.2016 BA 31.12.2026
Y 31.12.2024 NA NA NA NA NA NA NA NA 0.001 N NA N Y N NA Yes
26052015-16 CL Gayathri Metal Finishers, No.C-212, I Stage, PIE, Banglaore -58 I Stage I
Electroplating126 R-44
processingSmall Red 2014 BA 30.06.2016
N NA NA NA NA NA NA NA NA NA 0.064 0.03 NA N Y Y NA Yes2606
2015-16 OAstek Electric Company Pvt
LtdNo.B-301, 7th Main, 2nd Stage,
Peenya Indl Estate, Bengaluru-560 058II Stage I
Manufacture of AC & DC motors
76 G-77Motor manufacturing
Small Green 1.2.2016 BA 31.12.2025N NA NA NA NA NA NA NA NA NA 0.18 N NA N Y N NA Yes
26072015-16 O
25475Neoairtech India Pvt Ltd
No 546/2, 7th main, IVth phase, Peenya Industrial Area, bengaluru 560
058IV Phase I
Air pollution control equipment
223 G-46Steel furniture without spray
Small Green 13.8.2012 BA 31.12.2024N NA NA NA NA NA NA NA NA NA 0.17 N NA N Y N NA Yes
26082015-16 CL
11046
Bangalore Shirt company, (Printing Div)
No.254/A, Sy No 87 &150, III Phase, PIA, Bangalore-560058
III Phase IPrinting and readymade garments 51.98 R-40
Yarn / Textile processinginvolving
Small Red 6.4.2015 BA 30.06.2014Y 31.12.2020 N N N N N NA NA NA 0.15 0.05 NA N Y Y Yes
26092015-16 O
41505
Komtech Plastic Technologies India Pvt Ltd.
No 136/137 , I st Floor, III Phase, PIA, Bengaluru-560 058
III Phase ISpray painting
59.75 O-62Spray painting, paint baking, paint
Small Orange 2013 BA 30.09.2023N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
26102015-16 O
17881Hanu Heat Treaters, Unit-II
No.B-317, 2nd Main Road, I Stage, PIE, Bengaluru-560 058,
I Stage IHeat Treatment
285 O-36Heat treatment using oil fired furnace
Small Orange 15.5.2016 BA 30.09.2030N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes
26112015-16 O
28439Sri Venkateshwara Packging,
No.333, 9th cross, IV Phase, PIA, Bangalore,
IV Phase IManufacturing of packing machine and accessories
36 G-78Panel Board, Switches withoutelectroplatin
Small Green 1.7.2015WA
31.12.2025N NA NA NA NA NA NA NA NA NA 0.4 N NA N Y N NA NA
26122015-16 O
29398Maruthi Steels
Mo. B-141, 3rd Cross, II Phase, Peenya Indl Area, Chokkasandra,
Bengaluru-560 058II Phase I
Iron, steel scraps
4.6 W-14
and
fabrication
units (dry
Small White 17.11.2006BA
31.12.2024N NA NA NA NA NA NA NA NA NA 0.1 N NA N Y N NA Yes
26132015-16 O
40872Excelon Technologies
Plot No.340, 9th Cross, IV Phase, Peenya Indl Area, Bengaluru-560 058
IV Phase I
machined
components for
airospace
324 G-78Switches without
electroplatinSmall Green 1.6.2016 BA 31.12.2027
N NA NA NA NA NA NA NA NA NA 1.8 N NA N Y N NA Yes2614
2015-16 O27563
Mitsubishi Electric India Pvt Ltd
No. 56, 4th Main, Peenya 3rd Phase, Peenya Indl Area, Bengaluru-560 058
III Phase I
cooler/conditioners ,
repairing and
servicing
2180 G-78Switches without
electroplatinLarge Green 2016 BA 31.12.2026
N NA NA NA NA NA NA NA NA NA 0.64 N NA N Y N NA Yes
2615 2018-19O
41291Echakra Innovations Pvt Ltd
No. SB/47, I Cross, I Stage, Peenya Indl Estate, Bengaluru-560 058
I Stage Ie-waste dismantling
128 R-33engaged in recycling/
Small Red 2018 BA 30.06.2023N NA NA NA NA NA NA NA NA NA 0.26 N NA N Y N NA Yes
2616 2018-19O
63945
Hydratech Industries India Pvt Ltd
No.307 & 308, 5th Main, IV Phase, PIA, Bangalore-560058
IV Phase IAssembling and testing of cooling systems for wind turbine
1373 O-101cleaning,
degreasing, painting and
Large Orange 2018 BA 30.09.2027N NA N NA NA NA NA NA NA NA 2.5 N NA N Y N NA Yes
2617 2018-19YTC
53371Shoma Automation Pvt Ltd
No.C-28, 2nd Main, II Stage PIE, Bengaluru=560058
II Stage IManufacture of Fabricated metal products, except
81 G-78Switches without
electroplatinSmall Green 2018 BA 10.12.2023
N NA N NA NA NA NA NA NA NA NA N NA N N N NA Yes53371 products, except machinery and
electroplatin N NA N NA NA NA NA NA NA NA NA N NA N N N NA Yes
2618 2018-19YTC
53369Evgrien Services Pvt Ltd
No.C-65, 2nd Main, II Stage, PIE, Bengaluru-560058
II Stage IManufacture of Fabricated metal products, except machinery and
196 Switches without
electroplatinSmall Green
2017 BA 10.12.2023 N NA N NA NA NA NA NA NA NA NA N NA N N N NA Yes
2619 2018-19O
40779Sri Sai Enterprises
No.P-10-A, 3rd Cross, III Stage, PIE, Bengaluru-560058
III Stage IFurniture cushion moulds with mixing & moulding
11.8 O-80Foam manufacturing
Small Orange10.10.2017 BA 30.09.2022 N NA N NA NA NA NA NA NA NA 0.32 N NA N Y N NA Yes
2620 2018-19O
23357Veeresh Industries
No.C-27, II Stage , PIE, Bengaluru-560058
II Stage IAromatic Chemicals
2.2 R-22Chemicalsmanufacturing
Small Red2007 BA 30.06.2023 N NA N NA NA NA N NA NA NA 0.24 N NA N Y N NA Yes
2621 2018-19O
34596Sai Sathyasiri Eximm
No.116, 7th Main, III Phase, PIA, Bengaluru-560058
III Phase IEdibal super olein plam oil
98 O-71Vegetable oil manufacturing including solvent
Small Orange 2018 BA 30.09.2023N NA N NA NA NA NA NA NA NA 0.48 N NA N Y N NA Yes
2622 2018-19O
39611Ceramed Engineers Pvt Ltd,
No.290, 6th Main, II Stage, PIE, Bengaluru-560058
II Stage IHeat treatment furnace and its parts 202 G-78
switches without electroboard
Small Green 2018 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.8 N NA N Y N NA Yes
2623 2018-19CL
28611
Lakshmi Vacuum Heat Treaters (P) Ltd
No.27 & 28, 5th Main, III Phase, PIA, Bengaluru-560058
III Phase IVaccum heat treatment of engineering tools & components
1281 O-36treatment using oil fired furnace
Large Orange 2018 BA 30.09.2022N NA N NA NA NA NA NA NA NA 0.8 0.05 NA N Y Y NA Yes
2624 2018-19O
76077Srujana Enterprises
No.116/117-1, III Phase, PIA, Bengaluru-560058
III Phase ICu&Pb precision components 747.56 G-7
bell metal utensilsmanufacturi
Medium Green 20.3.2018 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.96 N NA N Y N NA Yes
2625 2018-19O
75481Lecon Energetics Pvt Ltd
No.484, B & C, IV Phase, PIA, Bengaluru-560058
IV Phase IAssembly of electrical control panels with soft starter
112 O-62painting, paint baking, paint
Small Orange 26.12.2018 BA 30.09.2023N NA N NA NA NA NA NA NA NA 0.84 N NA N Y N NA Yes
2626 2018-19O
76855SET Manufacturing Systems
No.C-351/1, I Stage, 9th Cross, PIA, Bengaluru-560058
I Stage IPrcession components with CNC machining 112 G-7
bell metal utensilsmanufacturi
Small Green 1.1.2019 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.33 N NA N Y N NA NA
2627 2018-19O
76959AMS Technologies
No.16, I Cross, I Stage, PIE, Bengaluru-560058
I Stage IPlastic injection moulded components 296 G-32
and plastic processed products
Small Green 1.3.2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 1.6 N NA N Y N NA Yes
2628 2018-19O
76799Excellent Engineering No.C-283, I Stage, PIE I Stage I
Borewell drill bits and hammers with CNC machining
151 G-93ng of nuts and bolts with
Small Green 2012 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.54 N NA N Y N NA NA
2629 2018-19O
75136STJ Industries No.A/364, 1 Main, I Stage, PIE I Stage I
Borewell drill bit & hammer 93 O-36
treatmentusing oil fired furnace
Small Orange 2015 BA 30.09.2023N NA N NA NA NA NA NA NA NA 0.24 N NA N Y N NA Yes
2630 2018-19O
77127
Unique punch systems Pvt Ltd - Unit III
No.57-B, 3rd Main, III Phase, Peenya Industrial Area, Bengaluru-560 058
III Phase IFabrication, Assembly & screen printing of electrical cabinet radical equipments
1267 O-59press &/or Screen Printing
Large Orange 2018 WA 30.09.2023N NA N NA NA NA NA NA NA NA 3.32 N NA N Y N NA NA
2631 2018-19O
75917VEC Solutions
No.C-284, 7th Cross, I Stage, PIE, Bengaluru-560058
I Stage IAssembly/testing of lab vaccum equipments
110 G-7bell metal utensilsmanufacturi
Small Green 2010 WA 31.12.2029N NA N NA NA NA NA NA NA NA 0.54 N NA N Y N NA NA
2632 2018-19O
25458Dandy Rolls India Pvt Ltd
No.A-179, 4th Cross, I Stage, PIE, Bengaluru-560058
I Stage ISS hollow plaint rolls m/c paper parts 301 G-7
bell metal utensilsmanufacturi
Small Green 1975 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.48 N NA N Y N NA Yes
2633 2018-19O
77051Easun Enterprises
No.231, 11th Main Road, III Phase, PIA, Bengaluru-560 058
III Phase IGrinding & Milling f m/c MS Rollers & shafts
30 G-93ng of nuts and bolts with with
Small Green 2017 WA 31.12.2029N NA N NA NA NA NA NA NA NA 0.33 N NA N Y N NA NA
2634 2018-19O
75982Mehta Industrial Corporation
No.35/1, I Main, II Phase, PIA, Bengaluru-560058
II Phase IAluminium cooking wares with pressing 94 G-1
utensils from aluminium circles by
Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.25 N NA N Y N NA Yes
2635 2018-19O
77213Sri Venkateshwara Glass N Ply
No.A-357/B, 9th Cross, I Stage, PIE, Bengaluru-560058
I Stage Icutting and cnc polising of glass 209 G-21
ceramic, earthenpotteries, tile
Small Green 2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.19 N ST & SP N N N NA NA
2636 2018-19O
24085Mallya Fine Chem (P) Ltd.,
No.A-266(A), II Stage, PIE, Bengaluru-560058
II Stage IFragrance powder detergent application 264 G-62
Synthetic detergent formulation
Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.21 N NA N Y N NA Yes
2637 2018-19O
75184
Schunk Metal & Carbon (India) Pvt Ltd
No.485/2, 14th Cross, IV Phase, PIA, Bengaluru-560058
IV Phase IAss & test of electric tain earth return brush 2240 G-78
Switches withoutelectroplatin
Large Green 18.1.2019 BA 31.12.2028Y 31.12.2024 N NA NA NA NA NA NA NA 3.6 N NA N Y N NA Yes
2638 2018-19O
77476Uday Industries
No.239, 11th Main, III Phase, PIA, Bengaluru-560058
III Phase IFabrication & m/c of MS electrical motor components
60 G-77of Motor & Pumpswithout
Small Green 2019 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.48 N NA N Y N NA Yes
2639 2018-19O
77484BIR Metal Systems
No.A-276, II Stage, PIE, Bengaluru-560058
II Stage ISheet metal components for CNC m/c
116 G-46furniture without spray
Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 1.08 N NA N Y N NA Yes
2640 2018-19O
76165Trinity NDT Engineers -Unit-II
No.491, 14th Cross, IV Phase, PIA, Bengaluru-560058
IV Phase ITesting of Ferrous &Non Ferrous fabricated and welding items and
179 G-81laboratories notinvolving
Small Green 2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.28 N NA N Y N NA NA
2641 2018-19 O
75612Mamatha Industries
No.1A, 6th Main, &th Cross, III Phase, PIA, Bengaluru-560058
III Phase IPrecision components for aerospace application with m/c &turning opers
277 G-93 ng of nuts and bolts with with
Small Green 2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.72 N NA N Y N NA Yes
2642 2018-19No.49/A, II Phase, PIA, Bengaluru-
Modular wooden wooden 2642 2018-19O
41493Namma Karkhane LLP
No.49/A, II Phase, PIA, Bengaluru-560058
II Phase IModular wooden kitchens 5.34 G-64
wooden furniture from
Medium Green 2017 BA 31.12.2023N NA N NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes
2643 2018-19O
41076
Difacto Robotics & Automation Pvt Ltd
No.151A, 152A, 3rd Cross, I Stage, PIE, Bengaluru-560058
I Stage IAssembling & testing of Robotic &automation m/c with software
993 G-7bell metal utensilsmanufacturi
Medium Green 2.12.2017 BA 31.12.2028N NA N NA NA NA NA NA NA NA 2.88 N NA N Y N NA Yes
2644 2018-19O
78318Cosmo Engineering,
No.446, 4th Phase, PIA, Bengaluru-560058
IV Phase IHydraulic pressing of Automobile components
71 G-78Switches withoutelectroplatin
Small Green 6.4.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.24 N NA N Y N NA NA
2645 2018-19O
75535Para Fine-Chem Industries.,
No.B-230, 5th Main, II Stage, PIE, Bengaluru-560058
II Stage IFormulationm, blending & packing of speciality chemicals for
185 R-1storage of hazardouschemicals
Small Red 28.12.2018 BA 30.06.2023N NA N NA NA NA NA NA NA NA 0.26 0.1 NA N Y Y NA Yes
2646 2018-19O
76264ITL India Pvt Ltd
No.463/1, IV PhaseKIADB Main Road, PIA, Bengaluru-560058
IV Phase IPaper labels for garments & printed fabric labels
1564 O-59Printing press &/or Screen Printing
Large Orange 9.2.2017 BA 30.09.2023N NA N NA NA NA NA NA NA NA 6.84 0.11 NA N Y Y NA Yes
2647 2018-19O
77323Usha steel Centre
No.M-2, 5th Cross, I Stage, PIE, Bengaluru-560 058
I Stage IMS&CI steel rods with lath machine
oprs59 G-93
ng of nuts and bolts with with
Small Green 1.1.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.24 N NA N Y N NA NA
2648 2018-19O
77443Fine Plastics,
No.SB-43, I stage, PIE, Bengaluru-560 058
I Stage IPlastic injection
moulded components 118 G-32Polythene and plastic processed products
Small Green 2.4.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.4 NA NA N Y N NA NA
2649 2018-19O
76973Vainatheya Enterprises Pvt Ltd
No.246, 8th Main, III Phase, PIA, Bengaluru-560058
III Phase IFabrication Assembly and testing of Solar lights&Solar water
heaters
69G-7
bell metal utensilsmanufacturi
Small Green 2.5.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.2 NA NA N Y N NA NA
2650 2018-19O
77178Elmec Engineers
No.14, 5th Main, III Phase, PIA, Bengaluru-560058
III Phase IMS &SS Eng components with drilling & cutting oprs
8 G-93ng of nuts and bolts with with
Small White 1.10.2017 WA 31.12.2100N NA N NA NA NA NA NA NA NA 0.18 NA NA N Y N NA NA
2651 2018-19O
75728Dfab Stainless Systems Pvt Ltd
No.3B-415/8, I stage, PIE, Bengaluru-560 058
I Stage ICopper buss cutting & welding Oprs 56 G-7
bell metal utensilsmanufacturi
Small Green 1.6.2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.32 NA NA N Y N NA NA
2652 2018-19O
77063Das Industries
No.M-5, 5th Cross, I stage, PIE, Bengaluru-560 058
I Stage IBolts&Rivets with wire drawing, cold forging, polishing,trimming&threading
468 G-93ng of nuts and bolts with with
Small Green 1.11.2018 BA 31.12.2028N NA N NA NA NA NA NA NA NA 0.52 NA NA N Y N NA Yes
2653 2018-19O
77616Fine Wood Industries
No.184 & 184/2, 11th Main, III Phase, PIA, Bengaluru-560058
III Phase ISaw mill with cutting of silver oak wood 29 G-42 Saw Mill Small Green 10.10.2017 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.24 NA NA N Y N NA NA
2654 2018-19O
75738Shree Manjunath Profiles
No.222/2, 8th Main, III Phase, PIA, Bengaluru-560058
III Phase IMS&SS sheet metal
profile&plasma cutting
150 G-7bell metal utensilsmanufacturi
Small Green 8.12.2016 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.43 NA ST & SP N N N NA NA
2655 2018-19O
75055Lohia Corp Ltd
No.486-C1, 14th Cross, IV Phase, PIA, Bengaluru-5600058
IV Phase IHDPE/PP wovensack
machineries for cement/ fertilizer ind with asmbly & paint
25 O-62painting, paint baking, paint
Large Orange 6.7.2017 BA 30.09.2029N NA N NA NA NA NA NA NA NA 2.8 NA NA N Y N NA Yes
2656 2018-19O
75695S.P.Precision Engineering
ComponentsNo.50/A, 4th Main, III Phase, PIA,
Bengaluru-5600058III Phase I
SS & Aluminium components with
CNC turning & m/c45 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1.1.2019 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.12 NA NA N Y N NA NA2657 2018-19
O76803
Wacker Chemie (I) Pvt LtdNo.9E, II Phase, PIA, Bengaluru-
5600058II Phase I
Demo&testing of adhesive polymer
powder for binding floor/wall tiles
264 O-54blending and mixing (Ball mill)
Small Orange 10.12.2017 WA 30.09.2023N NA N NA NA NA NA NA NA NA 0.25 NA NA N Y N NA NA
2658 2018-19O
77989Mahaveer Pipes
No.B-378, 100 Ft Rd, I Stage, PIE, Bengaluru-560058
I Stage IIDPE irrigation pipes by extrusion of recycled plastic granules
28 G-32Polythene and plastic processed products
Small Green 1.12.2018 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.18 NA NA N Y N NA NA
2659 2018-19O
76932Chiranthana Agri Solutions
No.93, 7th Main, III Phase, PIA, Bangalore – 560 058 III Phase I
LDPE&HDPE irrigation pipes of various sizes by extrusion of recycled
89 G-32Polythene and plastic processed products
Small Green 3.5.2017 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.12 NA NA N Y N NA NA
2660 2018-19O
76929
Vedantha Irrigation Systems Pvt Ltd
No.111, 3rd Phase, PIA, Bangalore – 560 058
III Phase ILDPE&HDPE irrigation pipes of various sizes by extrusion of recycled
527 G-32Polythene and plastic processed products
Medium Green 15.6.2016 WA 31.12.2028N NA N NA NA NA NA NA NA NA 0.72 NA NA N Y N NA NA
2661 2018-19CL
11700Swan Silk Pvt Ltd,
No.107/108, III Phase, PIA, Bengaluru-560058
III Phase ISilk yarn dyeing
305 R-40Textile processinginvolving
Small Red 1.1.2019 BA 30.06.2022N NA N NA NA NA NA NA NA NA 0.8 5 ETP N Y N NA Yes
2662 2018-19O
78225
Insil ScientificNo.491/2B, 14th Cross, IV Phase, PIA,
Bengaluru-560058IV Phase I
Analytical cellulose thimbles310 G-81
Research laboratories notinvolving
Small Green 5.2.2019 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 1.2 N NA N Y N NA Yes2663 2018-19
O
78112
Envisys Technologies Pvt LtdNo.SB.118, 3rd Cross, I Stage, PIE,
Bengaluru-560058I Stage I
Assembly & testing of Environment test chambers with accessories363 G-78
Panel Board, Switches withoutelectroplatin
Small Green 9.10.2018 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 1.5 N NA N Y N NA Yes2664 2018-19
CL
33578
RKN Heat Treatment Solutions., - Unit-II
No. A-56, 2nd Cross, II Stage, Peenya Industrial Estate, Bengaluru-560058
II Stage I Heat treatment of Alloy Steel components with induction
329 O-36
(Heat treatment using oil fired
Small Orange 5.3.2017 BA 30.09.2023
N NA N NA NA NA NA NA NA NA 0.48 0.032 NA N Y Y NA Yes2665 2018-19
O
78025
ESS CEE EnterprisesNo.256, 8th Cross, IV Phase, PIA,
Bengaluru-560 058 IV Phase I
duplex board cartoon boxes for various packing applications with cutting and off
1806 O-35
Gravure printing, digital printing on
Large Orange 15.1.2018 BA 30.09.2023
Y 30.09.2023 N NA NA NA NA NA NA NA 0.4 N NA N Y N NA Yes2666 2019-20
O
39155
Steer Life India (P) LtdNo.290, 4th Main, IV Phase, PIA,
Bengaluru-560058IV Phase I
R&D for PSDC and PDC 749 R-58
Pharmaceutical (Bulk drug &Active
Medium Red 13.3.2018 BA 30.06.2021
N NA N NA NA NA NA NA NA NA 0.8 0.005 ST & SP N N Y NA Yes39155 Active N NA N NA NA NA NA NA NA NA 0.8 0.005 ST & SP N N Y NA Yes2667 2019-20
O
75482
Dirak India Panel Fittings Pvt Ltd
No.111, 1st Main Road, II Phase, PIA, Bangalore – 560 058
II Phase IAssembly & testing of electrical panel board locks & hinges
505 G-78
Panel Board switches without electroboard
Medium Green 1.5.2018 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.96 N NA N Y N NA Yes2668 2019-20
O
78364
Unimech Aerospace & Manufacturing Pvt Ltd
No.103,113,114, 7th Main, III Phase, Bengaluru-560058
III Phase I Ferrous & Non ferrous aerospace m/c repair tooling
1019 G-93
Manufacturing of nuts and boltswith cold
Large Green 1.10.2019 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 3.6 N NA N Y N NA Yes2669 2019-20
O
77367
Venkateshwara Manufacturing & system
No.B-303 &304, 7th Main road, II Stage, PIE, Bengaluru-560058
II Stage Iprecision turned parts
146 G-78
Panel Board switches without electroboard
Small Green 1.4.2018 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.5 N ST & SP N N N NA NA2670 2019-20
O
75983
Fine craftsNo.18-B, II Phase, PIA, Bengaluru-
560058II Phase I
Micro meters with turning, milling, assembling &chrome plating
127 R-44Industry or process involving metal
Small Red 6.6.2018 BA -
N NA N NA NA NA NA NA NA NA 0.36 0.16 ST & SP N N Y NA Yes2671 2019-20
O
79085
Sharat EngineeringNo.A-18, III Stage, PIE, Bengaluru-
560058III Stage I
Manufac153 G-93
Manufacturing of nuts and boltswith cold
Small Green 17.5.2018 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.5 N NA N Y N NA Yes2672 2018-19
O
32460
Chem Star Marketing Pvt LtdNo.P-5/A, 1 Cross, 10th Main Road,
III Stage, PIE, Bengaluru-560058III Stage I
Special purpose herbal extraction with R & D
26 O-19
Ayurvedic and homeopathic medicine
Small Orange 15.2.2017 BA 30.09.2021
N NA N NA NA NA NA NA NA NA 0.4 0.35 NA N Y Y NA Yes2673 2019-20
O
77610
Rotzler Semices Pvt LtdNo.4, 5th Main Road, III Phase, PIA,
Bengaluru-560058III Phase I
Assembly& testing of printed circuit board 497 G-93
Manufacturing of nuts and boltswith cold
Small Green 5.5.2019 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.55 NA ST & SP N N N NA NA2674 2019-20
O
79234
Ambika Industries.,No.491, IV Phase, PIA, Bengaluru-
560058IV Phase I
JCB Hydraulic piston rods with CNC M/c 330 G-93
Manufacturing of nuts and boltswith cold
Small Green 16.5.2019 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.28 NA NA N Y N NA NA2675 2019-20
O
79707
Traab Engg India Pvt LtdNo.5, III Phase, PIA, Bengaluru-
560058III Phase I
Asmbly&testing of printed circuit board 558 G-93
Manufacturing of nuts and boltswith cold
Small Green 15.5.2019 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.28 NA NA N Y N NA NA2676 2019
O
77154
Rigid Industries.,No. SB 37, I Stage, PIE, Bengaluru-
560058.I Stage I
PVC 138 G-26
Leather foot wear and leatherproducts
Small Green 26.2.2019 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.96 NA NA N Y N NA Yes2677 2019
O
75698
Space SpectrumNo.466, 3rd Main, 12th Cross, IV
Phase,PIA, Bengaluru-560 058IV Phase I
Modular Kitchen cabinets and Furniture’s with cutting & Assembly
40 G-10
Carpentry & wooden furniture manufacturi
Small Green 7.2.2017 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.29 NA NA N Y N NA Yes2678 2019
O
76221
Box Tech BangaloreNo.C-101/1, 3rd Cross, III Stage, PIE,
Bengaluru-560058III Stage I
MS Carton folding & Gluing machines 203 G-93
Manufacturing of nuts and boltswith cold
Small Green 1.4.2014 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.36 NA NA N Y N NA NA2679 2019
O
76263
Wel Fold Glue MachinesNo.P-12, 3rd Cross, III Stage, PIE,
Bengaluru-560058III Stage I
MS Carton folding & Gluing machines 28 G-93
Manufacturing of nuts and boltswith cold
Small Green 1.4.2015 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.22 NA NA N Y N NA NA2680 2019
O
75925
Precision RivetsNo.C-430, 1st Cross, I Stage, PIE,
Bengaluru-560058I Stage I
Aluminium revets with cold forging 25 G-93
Manufacturing of nuts and bolts with cold
Small Green 2.6.2016 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA NA2681 2019
O
79991
Seshaasai E Forms Pvt LtdNo.GF-1, 6th Cross, I State, PIE,
Bengaluru-560058I Stage I
Bank cheque books, letter heads offset & digital printing
1254 O-59
Printing press &/or Screen Printing
Large Orange 1.4.2016 BA 30.09.2023
Y 30.09.2024 N NA NA NA NA NA NA NA 1.44 NA NA N Y N NA Yes2682 2019
O
79253
Maruthi Fab Tech Unit-IINo.526/A, IV Phase, PIA, Bengaluru-
560058IV Phase I
Road Machinary components 199 G-78
Panel Board switches without electroboard
Small Green 10.1.2012 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 1 NA NA N Y N NA Yes2683 2019
O
75783
Sahara SolutionsNo.B-206, II Stage, PIE, Bengaluru-
560 058 II Stage I
CNC Machine guards88 G-78
Panel Board switches without electroboard
Small Green 10.1.2012 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 1 NA NA N Y N NA NA2684 2019
O
80041
Seven Hills International No.347, 348, 9th Cross, IV Phase,
PIA, Bengaluru-560058IV Phase I
Cutting & Stitching of ready made garments 1923 G-72
Garment Stitching/ Stitching ofshoe uppers/
Large Green 01.05.2019 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 12 NA STP N N N NA Yes2685 2019
O
77637
IPA Pvt Ltd No.447, IV Phase, PIA, Bengaluru-560
058, IV Phase I
Assmbly &testing of Electronic indication 67 O-62
Spray painting, paint baking, paint
Small Orange 1.3.2019 BA 30.09.2023
N NA N NA NA NA NA NA NA NA 1.44 NA NA N Y N NA Yes2686 2019
O
76042
Pushpagiri Punch Forms, No.331 & 322, II Stage, PIE,
Bengaluru-560058IV Phase I
Manuf of Sheet Metal Enclosed 486 G-78
Panel Board switches without electroboard
Small Green 3.1.2017 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.5 NA NA N Y N NA NA2687 2019
O
76014
Unique precisionNo.547A, IV Phase, PIA, Bengaluru-
560058IV Phase I
Manu of Machined components 76 G-78
Panel Board switches without electroboard
Small Green 2.11.2016 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.94 NA NA N Y N NA NA2688 2019
O
78227
VKC Footprints Global Pvt Ltd
No.26 A, II Phase, PIA, Bengaluru-560058
II Phase ICutting synthetic rexin sole 595 G-90
Polyurethane foam extrusion as an allied
Medium Green 1.10.2018 BA 31.12.2033
N NA N NA NA NA NA NA NA NA 2.16 NA NA N Y N NA Yes2689 2019
O
80497
S.S Tools No.P-6/240, III Stage, PIE, Bengaluru-
560058III Stage I
Automobile injection moulding components 70 G-32
Polythene and plastic processed products
Small Green 06.06.2013 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA NA2690 2019
O
75855
Chaithanya Hi-Tech Engineering
No.289, IV Phase, PIA, Bangalore, IV Phase ICNC Machining & grinding of Automobile spare parts
708 G-93
Manufacturing of nuts and bolts with cold
Medium Green 24.01.2011 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA Yes2691 2019
Total Power Conditioners Pvt No.522, 10th Main, 4th Cross, IV Assembly and testing
Panel Board switches 2691 2019
O
76100
Total Power Conditioners Pvt Ltd
No.522, 10th Main, 4th Cross, IV Phase, PIA, Bengaluru-560058
IV Phase IAssembly and testing of UPS solar 124 G-78
switches without electroboard
Small Green 14.10.2009 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.6 NA NA N Y N NA NA2692 2019
O
80306
Seshaasai Business Forms Pvt Ltd
No.S1/C, 1st Cross, I State, PIE, Bengaluru-560058
I Stage IBanking service smart cards 1394 O-59
Printing press &/or Screen Printing
Large Orange 20.05.2015 BA 30.09.2028
Y 30.09.2024 N NA NA NA NA NA NA NA 2.1 NA NA N Y N NA Yes
2693 2019O
76862
Sunglow IndustriesNo.72, 6th Main Road, III Phase, PIA,
Bengaluru-560058III Phase I
Aluminium aerospace components 62 G-93
Manufacturing of nuts and bolts with cold
Small Green 1.7.2015 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2694 2019
O
76289
Sri Shivasakthi IndustriesNo.B-82/1, 2nd Cross, I State, PIE,
Bengaluru-560058I Stage I
MS Piston rods148 G-93
Manufacturing of nuts and bolts with cold
Small Green 1.7.2015 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2695 2019
O
76916
Akshaya Creations No.183, III Phase, PIA, Bengaluru-
560058III Phase I
Ready made garments226 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 1.7.2018 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 6 NA NA N Y N NA Yes2696 2019
O
76266
Vasu Industries No.B-18/2, 1st Cross, I State, PIE,
Bengaluru-560058I Stage I
MS Piston rods106 G-93
Manufacturing of nuts and bolts with cold
Small Green 1.7.2015 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2697 2019
O
76631
Wavell Investments Pvt LtdNo.A3, I Cross, PIE, II State, PIE,
Bengaluru-560058II Stage I
Aluminium hydraulic components 343 G-78
Panel Board switches without electroboard
Small Green 14.10.2009 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.6 NA NA N Y N NA Yes2698 2019
O
76180
Guru ElectricalsNo.M-14/A, 7th Cross, I State , PIE,
Bengaluru-560058I Stage I
Repair and aervice of electrical motor 10 G-93
Manufacturing of nuts and bolts with cold
Micro Green 9.1.2010 WA 31.12.2100
N NA N NA NA NA NA NA NA NA 0.18 NA NA N Y N NA NA2699 2019
YTC
80171
Jindo Chemical Solutions Pvt Ltd
No.M-18, 9th Cross, I Stage, PIE, Bengaluru-560058
I Stage IR & D for textiles and leather industry 686 R-83
Research and Analytical laboratories
Medium Red 1.7.2020 BA 30.6.2025
N NA N NA NA NA NA NA NA NA 0.9 1 NA N Y Y NA Yes2700 2019
O
78851
Primex No.1-A, I-BI, III Stage, PIE,
Bengaluru-560058III Stage I
Automobile seatbelt buckle 227 O-36
Heat treatment using oil fired furnace
Small Orange 01.05.2019 BA 30.09.2028
N NA N NA NA NA NA NA NA NA 0.14 NA NA N Y N NA Yes2701 2019
O
75830
Aditi Precision TechnologyNo.3B/415/32, II Phase, PIA,
Bengaluru -560058II Phase I
CNC & other machine parts 209 G-7
Brass and bell metal utensilsmanufacturi
Small Green 1.1.2018 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.3 NA NA N Y N NA NA2702 2019
O
75786
Nascent Ventures Pvt LtdNo.B-258/2, 6th Main Road, II Stage,
PIE, Bengaluru-560058II Stage I
Fabrication & Assmb of conveyors 52 G-93
Manufacturing of nuts and bolts with cold
Small Green 01.11.2014 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.32 NA NA N Y N NA NA2703 2019
O
75725
KNS Engineering Technology Pvt Ltd
No.451, 12th Cross, IV Phase, PIA, Bengaluru -560058
IV Phase IM.S fabrication &assembly of heavy m/c parts
543 G-93
Manufacturing of nuts and bolts with cold
Small Green 01.02.2014 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.32 NA NA N Y N NA NA2704 2019
O
75918
Vasavi Inonnovations No.P.21, III Stage, PIE, Bengaluru-
560058III Stage I
Modular Kitchen cabinets and Furniture’s with cutting & Assembly
177 G-10Carpentry & wooden furniture manufactirin
Small Green 22.10.2009 BA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.36 NA NA N Y N NA Yes2705 2019
O
77288
G.M.IndustriesNo.C-333 &334, 7th Main, II Stage,
PIE, Bengaluru-560058II Stage I
Aluminium/ MS Aerospace/Automobil
e components with CNC machining &
401 G-78Panel Board switches without electroboard
Small Green 01.10.2017 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.55 NA NA N Y N NA NA2706 2019
O
81804
T S International No.C-200 &C-201, 4th Cross, I Stage,
PIE, Bengaluru-560058I Stage I
Assembly & testing of Reactor for CFD panels and transfermers for cnc
288 G-85Transformer assembly unit
Small Green 01.07.2012 BA 31.12.2033
N NA N NA NA NA NA NA NA NA 1.9 NA NA N Y N NA Yes2707 2019
O
76000
Yashas Industries, No.39/1, 4th Main, III Phase, PIA,
Bengaluru -560058III Phase I
MS/SS precision engineering components
44 G-93
Manufacturing of nuts and bolts with cold
Small Green 02.11.1995 BA 31.12.2033
N NA N NA NA NA NA NA NA NA 1.9 NA NA N Y N NA Yes2708 2019
O
77794
Shreyas Machine ToolsNo.92/93, 7th Main, III Phase,PIA,
Bangalore-560058III Phase I
MS/SS precision engineering components
136 G-93
Manufacturing of nuts and bolts with cold
Small Green 01.12.2017 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.84 NA NA N Y N NA NA2709 2019
O
8115
Cloudwave Technologies Pvt Ltd
No.18, 5th Main, III Phase,PIA, Bangalore-560058
III Phase IMS/SS Enclosure
108 G-7
Brass and bell metal utensilsmanufacturi
Small Green 13.08.2014 BA 31.12.2033
N NA N NA NA NA NA NA NA NA 1.9 NA NA N Y N NA Yes2710 2019
O
77146
Hi-Tech CNC TechnologiesNo.8, 10th Cross, I Stage, PIE,
Bangalore-560058I Stage I
Al Precision components with CNC M/c
336 G-93
Manufacturing of nuts and bolts with cold
Small Green 01.04.2017 BA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.6 NA NA N Y N NA Yes2711 2019
O
75849
Shri Krishna PlasticsNo.C340/A, 7th Main, II Stage, PIE,
Bengaluru-560058II Stage I
Plastic moulded components with virgin plastic granules
10 G-32
Polythene and plastic processed products
Micro Green 25.05.2017 WA 31.12.2100
N NA N NA NA NA NA NA NA NA 0.16 NA NA N Y N NA NA2712 2019
O
-
Arrow MetalsNo.47, 4th Main, III Phase, PIA,
Bengaluru-56058III Phase Others
Import and Trading of Iron & steel scrap listed in Part-D of Schedule-III of the
NAHW
ImporterHWM - Reg
ImporterSmall White 30.05.2017 NA NA
Y One time N NA NA NA NA NA NA NA NA NA NA N NA N NA NA2713 2019
O81760
Intech DMLS Pvt LtdNo.239, 11th Main, III Phase, PIA,
Bengaluru-560058III Phase I
Ferrous & Non ferrous aerospace components 3D printing
2033 G-95
Shell Moulding withoutgenerating
Large Green 01.07.2019 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 1.92 NA NA N Y N NA NA2714 2019
O
76305
Indvac PumpsNo.B167/1, II Stage, PIE, Bengaluru-
560058II Stage I
Vacum pumps/systems assembly of A, GI & alloy
13 G-77
Manufacturing of motor & pumps without
Small Green 10.02.2014 WA 31.12.2028
N NA N NA NA NA NA NA NA NA 0.5 NA NA N Y N NA NA2715 2019
O
81431
Synpack Slide N Zip Pvt LtdNo.A-156, 3rd Cross, I Stage, PIE, Bengaluru-560058
I StageI LDPE slider container
for integral packaging 299 G-32
Polythene and plastic processed products
Small Green 22.12.2012 WA 31.12.2033
N NA N NA Y NA NA NA NA NA 0.72 NA NA N Y N NA NA81431 products N NA N NA Y NA NA NA NA NA 0.72 NA NA N Y N NA NA2716 2019
O
81371
Synpack Zipper Bags Pvt Ltd,. No.156/1, 3rd Cross, I Stage, PIE, Bengaluru-560058
I StageI LDPE Zip lock
container for integral packaging
247 G-32
Polythene and plastic processed products
Small Green 19.01.2001 WA 31.12.2033
N NA N NA Y NA NA NA NA NA 0.62 NA NA N Y N NA NA2717 2019
O
80984
Supra TechnologiesNo.B-78, 2nd Cross, I Stage, PIE, Bengaluru-560058
I StageI Hydraulic cylinder
precision components with CNC M/c
182 G-93
Manufacturing of nuts and bolts with cold
Small Green 01.08.2015 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.43 NA NA N Y N NA NA2718 2019
OSeshaasai E Forms Pvt Ltd
No.C-261, 6th Cross, I Stage, PIE, Bengaluru-560068
I StageI Paper envelops for
dispatching bank documents
261 G-9Cardboard or corrugated box and
Small Green 01.03.2019 WA 31.12.2034
N NA N NA NA NA NA NA NA NA 0.96 NA NA N Y N NA NA2719 2019
O
80483
Hycom Engineering India Pvt Ltd., No.40, 4th Main Road, III Phase, PIA,
Bengaluru-560058III Phase
I Design,Assm,&Test of CI hydraulic valves of earth moving equipment
1641 G-77Manufacture of motor and pumps without
Large Green 28.01.2019 WA 31.12.2034
Y 31.12.2034 N NA NA NA NA NA NA NA 1.68 NA NA N Y N NA NA2720 2019
O
77184
Prema Engineering WorksNo. 18, 5th Main, III Phase, PIA, Bengaluru-560058
III PhaseI SS hoppers for
Pharmaceuticals using CNC M/c.
62 G-7
Brass and bell metal utensilsmanufacturi
Small Green 01.03.2016 WA 31.12.2034
N NA N NA NA NA NA NA NA NA 0.28 NA NA N Y N NA NA2721 2019
O
82947
Enginium Designs Private Limited No. 39/1, First Floor, 4th main road,
III Phase, PIA, Bengaluru-560058III Phase
I Assembly & Testing of Aluminum/SSDefense equipment enclosures & racks
103 G-1
Aluminium utensils from aluminium circles by
Small Green 20.08.2019 WA 31.12.2034
N NA N NA NA NA NA NA NA NA 0.46 NA NA N Y N NA NA2722 2019
O
82829
Seshaasai Business Forms Pvt Ltd Plot No. S1/D, 1st Cross, I Stage, PIE,
Bengaluru-560068 I Stage
I smart card & Radio-frequency identification cards (RFID) & Allied
770 G-18
Digital printing on PVC clothes
Medium Green 15.10.2019 BA 31.12.2034
N NA N NA NA NA NA NA NA NA 2.8 NA NA N Y N NA Yes2723 2019
O
75973
Specitech No 138/A,8th main,III Phase, PIA, Bengaluru-560058 III Phase
I MS/SS Machine precession components
85 G-93
Manufacturing of nuts and bolts with cold forging
Small Green 08.09.2017 WA 31.12.2034
N NA N NA NA NA NA NA NA NA 0.67 NA NA N Y N NA NA2724 2019
O
75858
Protech Engineers No.B-15, I Stage, PIE, Bengaluru-560068 I Stage
I Machinery components like filter head, weld flangers, check valves
136 G-93
Manufacturing of nuts and bolts with cold forging
Small Green 10.08.2017 BA 31.12.2034
N NA N NA NA NA NA NA NA NA 0.57 NA NA N Y N NA Yes2725 2019
O
81682
Precision Tools and Implements Co No.35/10, 1st Main Road, II
Phase,PIA, Bengaluru-560058 II Phase
IAlloy steel press tools & injection moulds
1016 G-7
Brass and bell metal utensilsmanufacturi
Large Green 01.03.2019 BA 31.12.2033
N NA N NA NA NA NA NA NA NA 1.2 NA NA N Y N NA Yes2726 2019
O
82163
Dynatech Tools & Devices(Bengaluru) Pvt Ltd No.42-43, 4th Main, III Phase, PIA,
Bengaluru-560058III Phase
I SS Precision M/c tool components 1108 G-93
Manufacturing of nuts and bolts with cold forging
Large Green 12.05.2019 BA 31.12.2034
N NA N NA NA NA NA NA NA NA 1.24 NA NA N Y N NA Yes2727 2019
O
81733
Adso Naturals Pvt LtdNo.N-436, 10th Main, 14th Cross, II Stage, PIE, Bengaluru-560068
II StageI Formulation of Herbal
Ayurvedic products 84 G-2
Ayurvedic and homeopathic medicine
Small Green 01.10.2019 BA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.24 NA NA N Y N NA Yes2728 2019
O
80990
Unique Panel ProcessorsNo.C-291, 8th Cross, I Stage.PIE, Bengaluru-560068
I StageI Modular wooden
furniture for kitchen 188 G-10
Carpentry & wooden furniture manufacturing (excluding saw mill)
Small Green 01.03.2016 BA 31.12.2034
N NA N NA NA NA NA NA NA NA 0.33 NA NA N Y N NA Yes2729 2019
O
83029
Kaveri TechnicsNo.S-1(i), 1st Cross, I Stage.PIE, Bengaluru-560068
I StageI grit blasting of ms, ss,
cast iron and aluminum fabricated items on
139 G-92
Shot blasting operation
Small Green 01.03.2016 BA 31.12.2034
N NA N NA NA NA NA NA NA NA 0.36 NA NA N Y N NA Yes2730 2019
O
82779
Synpack Flexibles Pvt LtdNo.A-302 (a), 7th Main, II Stage, Peenya Industrial Estate, Bengaluru-560058
II StageI LDPE/LLDPE
multilayers plastic air bubble bags > 50 micron
446 G-32
Polythene and plastic processed products manufacturing (virgin plastic)
Small Green 01.03.2016 WA 31.12.2033
N NA N NA NA NA NA NA NA NA 0.62 NA NA N Y N NA NA2731
2019 O82219
N.K. PackNo. 205/B-3,, III Phase, PIA, Bengaluru-560058
III PhaseI
Paper back support for shirt packing for garments
349 G-79Plastic sack bags, woven sack with HDPE,
Small Green 07.01.2017WA
31.12.2034N N N N N N N NA NA NA 0.2 N NA N Y N NA NA
2732 2019O
76297
Zonje Solar Llp#522, 10th main , 4th cross, IV Phase, PIA, Bengaluru-560058
IV PhaseI Assembly of Solar
Photovoltaic Panels with cutting andLamination fixing of
374 G-114
Solar power generation through, solar photovoltaic cell, wind, power and mini hydel power
Small Green 01.07.2017 BA 31.12.2028
N N N N N N N NA NA NA 2.1 N NA N Y N NA Yes2733 2019
O
81231
SV Power Control A-253(a), 6th Main Road, 2nd Stage, .PIE, Bengaluru-560068
II StageI Electrical Control
Panel Assembly with wiring
72 G-78
Panel Board switches without electroboard
Small Green 01.07.2017 BA 31.12.2033
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2734 2019
O
83314
Ethereal Machines Pvt LtdNo.202, 12th Main, III Phase, PIA, Bengaluru-560058
III PhaseI Design,
Assmb,3DPrnt and prottype small machines
284 G-95
Shell moulding without generating waste water
Small Green 01.04.2017 WA 31.12.2034
N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2735 2019
O
76510
Accutech EnterprisesNo.480/A-2, 1st Cross, III Stage, PIE, Bengaluru-560058
III StageI Aerospace
components with CNC M/c
1665 G-93
Manufacturing of nuts and boltswith cold
Large Green 01.09.2018 BA 31.12.2033
N N N N N N N NA NA NA 4 N NA N Y N NA Yes2736 2019
O
83234
Gee Pee Fortune IndustriesNo.A-42, 2nd Main Road, II Stage, PIE, Bengaluru-560058
II StageI Hydraulic pressing of
alloy steel components
296 G-93
Manufacturing of nuts and boltswith cold
Small Green 6.10.2019 BA 31.12.2033
N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes2737 2019
O
82158
Sprout Tech Toolings[S]No. 117/6, Opp A-12, 1st main road, 2nd stage Peenya Industrial Estate, Bengaluru - 560058
II StageI Mould &dies,fixture
m/c of components 46 G-93
Manufacturing of nuts and boltswith cold
Small Green 13.04.2019 WA 31.12.2033
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2738 2019
O
82159
Saanvi Technologies[S] No.117/3, II Stage, PIE, Bengaluru II StageI Mould &dies,fixture
m/c of components 162 G-93
Manufacturing of nuts and boltswith cold
Small Green 17.10.2014 WA 31.12.2033
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2739 2019
O
83062
Vividh TechnologiesNo.39/1, 4th Main, III Phase, PIA, Bengaluru-560058
III PhaseI SS steam urbines,
blades with CNC M/c 60 G-93
Manufacturing of nuts and boltswith cold
Small Green 16.5.2017 WA 31.12.2033
N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2740 2019
Concord United Products Pvt No.A-157, 3rd Cross, I Stage, PIE, I Manufacturing of
Manufacturing of nuts 2740 2019
O
76128
Concord United Products Pvt Ltd[S]
No.A-157, 3rd Cross, I Stage, PIE, Bengaluru
I StageI Manufacturing of
EDM machines 676 G-93ng of nuts and boltswith cold
Medium Green 28.1.2000 BA 31.12.2033
N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes2741 2019
YTC
83546
Fedex Healthcare Pvt. LtdNo.536, 537, IV Phase, PIA, Bengaluru-560058
IV PhaseI Sterile Adhesive
dressing 110 G-91
Manufacture of Adhesives andadhesive
Small Green 1.8.2020 BA 7.11.2024
N N N N N N N NA NA NA 4 N NA N Y N NA Yes
2742 2019O
83404
Birdy Exports Pvt LtdNo.473A, 12th cross, IV Phase, PIA, Bengaluru-560058
IV PhaseI Readymade Garment
stitching 2456 G-98
Garment Stitching/ Stitching ofshoe uppers/
Large Green 1.9.2019 BA 31.12.2033
Y 31.12.2023 N N N N N NA NA NA 9.8 N NA N Y N NA Yes2743 2019
O
78035
Aeramic Aerospace (India) Pvt Ltd No.B-173, 4th Cross, II Stage, PIE,
Bengaluru-58II Stage
I Manufacture of Aerospace components
72 G-78
Panel Board switches without electroboard
Small Green 1.2.2019 BA 31.12.2033
N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes2744 2019
O
75676
S S S EngineeringNo.B-382/1, 7th Cross, 4th Main, I Stage, PIE, Bengaluru-58
I StageI Precision
Components 124 G-93
Manufacturing of nuts and boltswith cold
Small Green 15.1.2015 WA 31.12.2033
N N N N N N N NA NA NA 0.18 N NA N Y N NA N2745 2019
CL
80829
Envigreen Biotech India Pvt Ltd No.14, Plot No.9E, II Phase, PIA,
Bengaluru-58II Phase
I Manufacturing of biodegradable granules from natural starch & vegetable
482 G-30
Packing materials manufacturing
Medium Green 1.7.2019 BA 31.12.2033
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2746 2019
O
76906
Indigotech Building Solution (I) Pvt Ltd No.248, 8th Main, 3rd Cross, III
Phase, PIA, Bengaluru-58III Phase
I Manufacturing of fire rated metal doors 1343 G-40
Rolling mill ( gas fired) and coldrolling mill
Large Green 30.12.2015 BA 31.12.2033
N N N N N N N NA NA NA 1.1 N NA N Y N NA Yes2747 2019
O
84656
V3 TechnologyNo.B-196, 5th Main Road, II Stage, PIE, Bengaluru-58
II StageI Aluminium & Ferrous
metal components with CNC machining
oprs
458G-93
Manufacturing of nuts and boltswith cold
Small Green 01.08.2017 WA31.12.2033
N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2748 2019
O
84722SS Automation Solutions Pvt
LtdNo.1 &2, 12th Cross, IV Phase, PIA,
Bengaluru-58
IV PhaseI Automation and
robotics solution machines
164 G-46 Steel furniture without spray
Small Green 01.11.2019 BA31.12.2034
Y 31.12.2024 N N N N N NA NA NA 1.7 N NA N Y N NA Yes2749 2019
O84832 Smart Technologies
Plot No.B-128, 3rd Cross, I State, Peenya Industrial Estate, Bengaluru-
560058
I Stage I Precision turned components
452G-93
Manufacturing of nuts and boltswith cold
Small Green 15.13.2013 BA31.12.2034
N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes2750 2019
O 84814 Ujjwala GarmentsPlot No.V-2,3 Ground, I & Mezzanine Floor, I State, Peenya Industrial Estate, Bengaluru-560058
I StageI Stitching of ready
made garments 43 G-72
Garment Stitching/ Stitching ofshoe uppers/
Small Green 05.11.2017 BA 31.12.2033
N N N N N N N NA NA NA 1.62 N NA N Y N NA Yes2751 2019
O
82750
Power One Micro Systems Pvt Ltd Unit-II
No.C-332, 3rd Main, 8th Cross, I Stage, PIA, Bengaluru-58
I StageI Assembling of
Stabilizer 18 G-78
Panel Board switches without electroboard
Micro Green 01.05.2019 WA 31.12.2099
N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2752 2019
O
84829
Vishwas LodgeNo.C-324/1, 3rd Main, I Stage, PIE, Bengaluru
I StageHospital
ityHotel with 25 rooms
75 G-52
The Hotels/Resorts havingmore than 20
Small Green 15.8.2017 BA 31.12.2033
N N N N N N N NA NA NA 1.62 N NA N Y N NA Yes2753 2019
O
84841
Akshaya Minerals & Fee Supplements
No.172/A3, 11th Main, III Phase, PIA, Bengaluru-58
III PhaseI Poultry feed & cattle
feeds 91 O-30
Fish feed, poultry feed and cattle feed
Small Orange 17.10.2017 BA 30.09.2029
N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes2754 2019
O
84933
V.G.Industries, No.12, 4th Cross, I Stage, PIE, Bengaluru-58
I StageI Manufacturing of Jigs & Fixture
40 G-78
Panel Board switches without electroboard
Small Green 2.6.2016 WA 31.12.2033
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2755 2019
O 76980 Essen & CoNo.92, 7th Main, III Phase, PIA, Bengaluru
III PhaseI Analysis of Water and
Waste water samples for physic chemical & biological parameters
148 R-83
Research and Analyticallaboratories
Small Red 06.05.2013 BA 30.06.2024
N N N N N N N NA NA NA 0.9 0.015 NA N Y Y NA Yes2756 2020
O 84899 Kunal Pipe IndustriesNo.B-379, 8th Cross, I Stage, PIE, Bengaluru-58
I StageI HDPE/LDPE Irrigation pipes
60 G-79
Plastic sack bags, woven sack -- 10 10 15 -- 15 10
Small Green 2.7.2013 WA 31.12.2033
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2757 2020
O 85140 System InfotechNo.165, 10th Main Road, III Phase, PIA, Bengaluru
III PhaseI Assembling of
Electric panel Boards 119 G-78
Panel Board switches without electroboard
Small Green 1.1.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.96 N NA N Y N NA NA2758 2020
O 85101 Krishna Lodge No.16/A, I Stage, PIE, Bengaluru I StageHospital
ityHotel with 30 rooms
68 G-52
The Hotels/Resorts havingmore than 20
Small Green 01.7.2017 BA 31.12.2034
N N N N N N N NA NA NA 9.6 N NA N Y N NA Yes2759 2020
O 77811 Klassic LabelsNo. 213/1-2, 1st Cross, 3rd Phase, Peenya Industrial Area
III PhaseI Cutting & rolling of
jumbo craft roll papers
130 G-9
Cardboard or corrugated box and
Small Green 15.3.2019 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA
0.55 NA NA NA Y N NA NA2760 2020
O 84670 Island Hydraulics (I) Pvt Ltd No.A29, III Stage, PIE, Bengaluru III StageI MS, SS hydraulic/
pneumatic cylinder for earth moving equipment
186 G-78Panel Board switches without electroboard
Small Green 3.1.2019 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA
1.2 NA NA NA Y N NA NA2761 2020
O 85302Power One Micro Systems Pvt Ltd Unit-III
No.75, 6th Main, III Phase, PIA III PhaseI
CNC Machining components
171 G-78Panel Board switches without electroboard
Small Green 05.02.2019 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA
0.48 NA NA NA Y N NA NA2762 2020
O 85327 Smart Solutions No.171/A, III Phase, PIA, Bengaluru III PhaseI
Maching of CNC components
44 G-93Manufacturing of nuts and boltswith cold
Small Green 15.6.2017 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA
0.48 NA NA NA Y N NA NA2763 2020
O 85307 Jyothi EnterprisesN1/2, 4th Cross, I Stage, Peenya Industrial Estate, Bengaluru
I StageI
Machining of components
70 G-93Manufacturing of nuts and boltswith cold
Small Green 06.10.2017 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA
0.72 NA NA NA Y N NA NA2764 2020
O 85315 Roofing India SystemsNo.A326, 7th Main, II Stage, PIE, Bengaluru
II StageI
Roof sheet profiling & fabrication
223 G-93Manufacturing of nuts and bolts
Small Green 10.07.2017 BA 31.12.2034 NA NA NA NA NA NA NA NA NA NA
0.12 NA NA NA Y N NA Yesand boltswith cold
0.12 NA NA NA Y N NA Yes2765 2020
O 85007 Island Hydraulics (I) Pvt Ltd No.C-71, III Stage, PIE, Bengaluru III StageI Processing of MS/ SS hydraulic cylinder for earth moving equipment
84 G-78
Panel Board, Switches withoutelectroplatin
Small Green 1.1.2020 WA 31.12.2033
Y NA2766 2020
O
89318
Stalwart Elevators Products Pvt Ltd
No.296/297,5th main, 4th phase,Peenya Industrial area, Bengaluru-560058,
IV PhaseI fabrication and
assembling of elevators
394 G-78Panel Board switches without electroboard
Small Green 1.7.2018 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA
1.7 NA NA NA Y N NA NA2767
2020 O 75577 TejatNo. 25, 5th main, III Phase Peenya Industrial Area,Bengaluru-560058
III Phase I Machinery equipments
90 G-63Brass and bell metal utensilsmanufacturi
Small Green 15.2.2017 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA
0.24 NA ST & SP NA N N NA NA2768 2020
O
85500
J.K. Engineering EquipmentsNo.B-71, 2nd cross. Ist Stage, PIE, Bengaluru-560 058
I StageI M/c of CNC
components on job work
441 G-78Panel Board switches without electroboard
Small Green 21.7.2018 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA
0.33 NA NA NA Y N NA NA2769 2020
O84528 R.R Industries No.848, 4th Cross, I Stage, PIE,
Bengaluru I StageI Turned components
sleeves 43 G-93Manufacturing of nuts and boltswith cold
Small Green 25.1.2001 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA
0.16 NA NA NA Y N NA NA2770 2020
O84830
TDJG electrical IndustriesNo.SB-52/1, 4th Cross, I Stage, PIE,
BengaluruI Stage
I Transformers assembly 16 G-85
Transformer assembly unit(industrial
Micro Green 18.1.2011 WA 31.12.2099 NA NA NA NA NA NA NA NA NA NA
0.24 NA NA NA Y N NA NA2771 2020
O 84672MSA Global Optoelectronics
Pvt LtdNo.7, 5th Main, PIA, Bengaluru III Phase
I Precision components457 G-93
Manufacturing of nuts and boltswith cold
Small Green 12.11.2019 WA 31.12.2034 NA NA NA NA NA NA NA NA NA NA
0.24 NA NA NA Y N NA NA2772 2020
O 79034 Shaurya Polymers Pvt Ltd No.253/254, III Phase, PIA, Bengaluru III PhaseI Plastic cane
516 G-32
Polythene and plastic processedproducts
Small Green 30.6.2014 WA 31.12.2033 NA NA NA NA NA NA NA NA NA NA
0.192 NA NA NA Y N NA NA2773 2020
O85587
Sun Manufacturing solutionsNo.151, 11th Main, III Phase, PIA,
BengaluruIII Phase
I Special purpose machine fixtures 57 G-93
Manufacturing of nuts and boltswith cold
Small Green 22.10.2015 WA 31.12.2033
N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2774 2020
O84837
Evirocor Packaging India Pvt Ltd
No.142, 9th Main, III Phase, PIE, Bengaluru
III PhaseI Corrugated boxes for
food packing 417 G-9Cardboard or corrugated box and
Small Green 6.07.2018 WA 31.12.2024
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2775 2020
O85340
Varuni Industries No.138/B, 9th Main, III Phase, PIA,
BengaluruIII Phase
I Manufacture of Ply wood boxes and
pallets59
G-78 Panel Board switches without
electroboard
Small Green 01.07.2017 WA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2776 2020
O85605
R.R HydraulicsNo.177 & 178, 11th Main, III Phase,
PIA, BengaluruIII Phase
I Hydraulic baling press & baling m/c200 G-93
Manufacturing of nuts and boltswith cold
Small Green 5.10.2017 WA 31.12.2033
N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2777 2020
O85405
Ramph IndiaNo.172/A2, 11th Main, III Phase, PIA,
BengaluruIII Phase
I Hydraulic pressed components61 G-93
Manufacturing of nuts and boltswith cold
Small Green 01.07.2018 BA 31.12.2033
N N N N N N N NA NA NA 0.6 N NA N Y N NA Yes2778 2020
O85704 Sri Sai Industries Unit-2
No.40-A, II Phase, PIA, Bengaluru II PhaseI Metal fabrication &
powder coating without pre treatment
2270 G-97
Activity of Powder Coating onsurface of
Large Green 01.02.2019 BA 31.12.2034
N N N N N N N NA NA NA 2.4 N NA N Y N NA Yes2779 2020
O84977 Aceinotech Manufacting Pvt
LtdNo.465, IV Phase, PIA, Bengaluru
IV PhaseI Precision components
1453 G-93Manufacturing of nuts and boltswith cold
Large Green 01.04.2014 BA 31.12.2033
N N N N N N N NA NA NA 2.9 N NA N Y N NA Yes2780 2020
O85130 3D Concept Tooling Pvt Ltd
(Unit-II)No.B-383, 6th Cross, I Stage, PIE,
Bengalur I StageI Manufacting of dies
& moulds 128 G-93Manufacturing of nuts and boltswith cold
Small Green 01.07.2019 BA 31.12.2034
N N N N N N N NA NA NA 0.75 N NA N Y N NA Yes2781 2020
O85131 3D Concept Tooling Pvt Ltd
(Unit-III)No.C-271, 6th Cross, I Stage, PIE,
Bengalur I StageI Manufacting of dies
& moulds 186 G-93Manufacturing of nuts and boltswith cold
Small Green 01.07.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2782 2020
O 85770
S V Engineering Works No.C-80, III Stage, PIE, Bengaluru-560058 III Stage
I Machining of CNC components 68 G-93
Manufacturing of nuts and boltswith cold
Small Green 26.3.2019 WA 31.12.2033
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2783 2020
O 85762
Vickram Tecser No.C81/1, 3rd Cross, III Stage, PIE, Bengaluru-560058
III Stage I Machining of CNC components
84 G-93
Manufacturing of nuts and boltswith cold forging
Small Green 26.3.2019 WA 31.12.2033
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2784 2020
O 85678
Garitha Enterprises No.V-1(B), 4th Cross, I Stage, PIE, Bengaluru-560058
I Stage I Transformers tank body & accessories, turbine base plates230 G-93
Manufacturing of nuts and boltswith cold
Small Green 01.07.2014 BA 31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2785 2020
O 85007
Island Hydraulics (I) Pvt Ltd No.C-71, III Stage, PIE, Bengaluru III Stage I hydraulic/pneumatic cylinders for earth moving equipments
84 G-93Manufacturing of nuts and boltswith cold
Small Green 01.01.2020 WA 31.12.2033
N N N N N N N NA NA NA 1.2 N NA N Y N NA NA2786 2020
O 77812
Mahalasshmi Adhesive Tapes Industry
No.213/1, Ist Cross, III Phase, PIA, Bengaluru-58
III Phase I Adhesive tapes76 G-91
Manufacture of Adhesives andadhesive
Small Green 01.08.2017 WA 31.12.2033
N N N N N N N NA NA NA 0.3 N NA N Y N NA NA2787 2020
O
83441
Kaizen CNC Center Pvt Ltd., No.49/B-1, 3rd Cross, II
Phase, PIA, Bengaluru-58II Phase
I Engineering activity29 G-93
Manufacturing of nuts and boltswith cold
Small Green 11.202017 BA 31.12.2033
N N N N N N N NA NA NA 2.2 N NA N Y N NA Yes2788 2020
O
83545
Chemicals & AssocitesNo.B-230/1 (A), II Stage, PIE, Bengaluru
II StageI Adhesive tapes
44 G-91
Manufacture of Adhesives andadhesive
Small Green 25.11.2019 WA 31.12.2033
N N N N N N N NA NA NA 0.08 N NA N Y N NA NA83545 adhesive N N N N N N N NA NA NA 0.08 N NA N Y N NA NA2789 2020
OPrecision Engineering
Products Pvt Ltd No.94/95, III Phase, PIA, Bengaluru-58
III PhaseI CNC components
92G-78 Panel Board
switches without
electroboard
Small Green 20.8.2019 WA 31.12.2034
N N N N N N N NA NA NA 1.6 N NA N Y N NA NA
2790 2020O
85909
Subbaiah EnterprisesNo.37/7, II Phase, PIA, Bengaluru II Phase
I Induction hardening & flame hardening of m/c components
510 G-24
Heat treatment with any of the
Medium Green 25.11.2018 WA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2791 2020
O
85696
PneudraulicsNo.N-1/4, 4th Cross, I Stage PIE, bengaluru-58
I StageI CNC M/c components
53 G-78Panel Board switches without electroboard
Small Green 14.5.2017 BA 31.12.2033
N N N N N N N NA NA NA 0.38 N NA N Y N NA Yes2792 2020
O
84235
Techno vision ToolsNo.#3B/415/13, II Phase, PIA, Bengaluru
II PhaseI Press components
375 G-93Manufacturing of nuts and boltswith cold
Small Green 20.4.2017 BA 31.12.2033
N N N N N N N NA NA NA 1 N NA N Y N NA Yes2793 2020
O
85179
Geetha EngineeringNo.143, III Phase, PIA, Bengaluru III Phase
I Engineering components on job work
88 G-93Manufacturing of nuts and boltswith cold
Small Green 15.8.2017 WA 31.12.2033
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2794 2020
O
85701
Jai Enterprises No.1, 4th Cross, I Stage, PIE, Bengaluru
I Stage I Sheet metal components 104 G-93
Manufacturing of nuts and boltswith cold
Small Green 15.6.2017 WA 31.12.2033
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2795 2020
O84506 V-Texwash No.252, 11th Main, 2nd Cross, III
Phase, PIA, Bengaluru-58 III PhaseI Washing of
readymade garments 495 O-50Mechanized laundry using oil fired
Small Orange 16.6.2015 BA 30.09.2029
N N N N N N N NA NA NA 2.25 0.5 NA N Y Y NA Yes2796 2020
O
85918
RNS CNC Centre No.P-5/A, III Stage, PIE, BengaluruIII Stage
I CNC turning components 80 G-93
Manufacturing of nuts and boltswith cold
Small Green 01.07.2017 WA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2797 2020
O86039 Aim Tooling systems No.B120/2, 3rd Main Road, II Stage,
PIE, Bengaluru II StageI Cutting tools
425 G-78Panel Board switches without electroboard
Small Green 22.4.2016 WA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2798 2020
O
85394
Viwin SolutionNo.1/2, 4th Cross, I Stage, PIE,Bengaluru
I StageI Engineering activity
57 G-78Panel Board switches without electroboard
Small Green 01.10.2017 WA 31.12.2033
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2799 2020
OManjunatha Engineering
Works, No.C-312, 9th Cross, I Stage, PIE, I StageI CNC Machinery
Earch Moving components
117 G-78Panel Board switches without electroboard
Small Green 01.08.2018 WA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2800 2020 O 86253 Burji Speed on Clutches No.C 247, 5th Cross, I Stage, PIE,
Bengaluru-58I Stage I Automobile parts 47
G-78Panel Board switches without electroboard
Small Green06.12.2016
WA 31.12.2033
N N N N N N N NA NA NA 0.16 N NA N Y N NA NA2801 2020 O 77040 Trio Tech Manufacturing
SystemsNo.848/5, 4th Cross, I Stage, PIE,
Bengaluru-58I Stage I Engineering
components68 G-78 Panel Board
switches without
electroboard
Small Green 31.12.2034 BA31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2802 2020 O 84569 Venkateswara Packagings No.329/330, 4th Phase, PIA,
Bengaluru-58IV Phase I Corrugated box 74 G-78 Panel Board
switches without
electroboard
Small Green 01.04.1979 WA 31.12.2033
N N N N N N N NA NA NA 0.45 N NA N Y N NA NA2803 2020 O 85352 RVS Machine Tools No.315, IV Phase, PIA, Bengaluru IV Phase I Jigs & fixture 94 G-78 Panel Board
switches without
electroboard
Small Green 10.3.1995 BA 31.12.2033
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2804 2020 O 86447 Aradhana Fibreglass
TechnologiesNo.295/2, 8th Cross, IV Phase, PIA,
Bengaluru-58IV Phase I Manufacturing of
FRP products339 G-78 Panel Board
switches without
electroboard
Small Green 01.01.2019 BA 31.12.2033
N N N N N N N NA NA NA 0.19 N NA N Y N NA Yes2805 2020
O86122 Srinivasa Engineering No. 2, 1st Stage, Peeny Industrial
Estate, Bengaluru I StageI CNC Machinery tools
components 73 G-93Manufacturing of nuts and boltswith cold
Small Green01.08.2018 WA
31.12.2033
N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2806 2020
O85721 Precis Pharma Containers
No.341, 9th Cross, IV Phase, PIA, Bengaluru
IV PhaseI Manufacture of plastic
bottles using injection moulding
253G-78 Panel Board
switches without
electroboard
Small Green10.2.2020 WA
31.12.2033
N N N N N N N NA NA NA 1 N NA N Y N NA NA2807 2020 O 86197 Auto Enterprises No.N-1/5, 4th Cross, I Stage, PIE,
Bengaluru I StageI CNC machine
components 79 G-93Manufacturing of nuts and boltswith cold
Small Green1.7.2017 WA
31.12.2034
N N N N N N N NA NA NA 0.28 N NA N Y N NA NA2808 2020
O79661 Hamsi Products No.C292, 8th Cross, I Stage, PIE,
Bengaluru-58I Stage I Hydraulic fittings
120G-78 Panel Board
switches without
electroboard
Small Green10.2.2020 WA
31.12.2033
N N N N N N N NA NA NA 1 N NA N Y N NA NA2809 2020
O
83034
Abone Surgicals Pvt Ltd.No.27, III Stage, PIE, Bengaluru-560 058
III StageI SS/Titanium implants
for surgical orthopedic application
270G-93 Brass and
bell metal utensils
manufacturi
Small Green10.2.2020 BA
31.12.2033
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2810 2020
O
86097
Comet Environs Pvt LtdNo.V-34/B, 7th Main, II Stage, PIE Bengaluru-560058
II StageI Environmental test
chamber, subzero, oil recooler
158 G-93
Manufacturing of nuts and boltswith cold
Small Green 01.12.2019 BA31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2811 2020
O
85493
Mac Precitec IndiaNo.B-291(a), 7th Main Road, II Stage, PIE, Bengaluru-58
II StageI Manufacturin of CNC
Machinery cutting tools
110 G-93
Manufacturing of nuts and boltswith cold
Small Green BA31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2812
2020 O
86655
Micro CNC Systems Ltd No.C-427, I Cross, I Stage, Peenya Industrial Estate, Bengaluru-560058 I Stage
I Manufacturin of CNC Machinery cutting tools
112 G-93
Manufacturing of nuts and boltswith cold
Small Green 4.5.2015 WA 31.12.2034
N N N N N N N NA NA NA 0.48 N NA N Y N NA NA86655 tools with cold N N N N N N N NA NA NA 0.48 N NA N Y N NA NA2813 2020
O
86182
Nimishamba Engineering Steel Fabricating Works No.161/B, 10th Main Road, III Phase,
PIA, Bengaluru-560058III Phase
I Manufacturing of stopper, washer 84 G-93
Manufacturing of nuts and boltswith cold
Small Green 30.7.2014 WA31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2814 2020
O
86440
Alpha Design Technologies Pvt Ltd - II Unit No.3B/415/12, II Phase, PIA,
Bengaluru -560058II Phase
I Combat Net Radio466 G-93
Manufacturing of nuts and boltswith cold
Small Green 15.3.2020 BA31.12.2034
N N N N N N N NA NA NA 1.45 N NA N Y N NA Yes2815 2020
O
86853
Fine craftsNo.250, III Phase, PIA, Bengaluru-560 058
III PhaseI CNC turning
components 320 G-93
Manufacturing of nuts and boltswith cold
Small Green 01.07.2017 BA31.12.2034
N N N N N N N NA NA NA 0.16 N NA N Y N NA Yes2816 2020
O
86858
ABB Power Products & Systems India Ltd No.4A, 5 & 6, II Phase, PIA,
Bengaluru-560058II Phase
I Electrical equipment - relay, capacitors, panel
7190 O-25
DG set of capacity >1MVA but <
Large Orange 01.06.2020 BA 30.09.2029
Y 30.09.2025 N N N N N NA NA NA 220.003 (pre trt
facl) STP at ABB unit N N N NA Yes2817 2020
YTC
76664
4R Recycling Pvt LtdNo.P6, III Stage, PIE, Bengaluru III Stage
I Refurbishment & sale of electrical & electronic components
406 R-44
ndustry or process involvingmetal
Small Red 01.12.2018 BA -
N N N N N N N NA NA NA 0.22 N NA N Y N NA Yes2818 2020
O
86898
Lakshmi EnterprisesNo.18-C/7, II Phase, PIA, Bengaluru II Phase
I Manufacturing of Ice cream 844 G-106
Ice cream (Without boilers /oven for
Medium Green 14.08.2020 BA 31.12.2024
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2819 2020
O
84197
Athena India Hitech Components
No.309/4, 8th cross, IV Phase, Peenya Industrial Area
IV PhaseI Manufacturing of anti
vibration dampers and non asbestos gaskets
923 O-63
/ Steel and steel products using
Medium Orange 01.01.2020 BA 30.09.2028
N N N N N N N NA NA NA 1.72 N NA N Y N NA Yes2820 2020
O Visat Tools Pvt Ltd No.198, III Phase, PIA, Bengaluru-58 III PhaseI Manufacturing of
plastic automotive parts
171 G-78
Panel Board switches without electroboard
Small Green 01.05.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2821 2020
O 87420 Chandan EnterprisesNo.848, 4th Cross, I Stage, PIE, Bengaluru
I StageI Manufacturing of
CNC Machine components
45 G-78
Panel Board switches without electroboard
Small Green 01.04.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2822 2020
O
87525
Max Milan Tooling Pvt Ltd 180/A, III Phase, PIA, Bengaluru III PhaseI Manufacturing of
cutting tools 122 G-78
Panel Board switches without electroboard
Small Green 28.11.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2823 2020
O
87612
SLN Vibro Finishers No.332, 1/1, 4th Cross, I Stage, PIE I StageI Vibro polishing of
MS/SS metals components
40 O-42
Industry or processes involvingfoundry
Small Orange 01.03.2020 BA 30.09.2029
N N N N N N N NA NA NA 0.32 0.1 NA N Y Y NA Yes2824 2020
O
87670
Dantal Hydraulics Pvt Ltd No.238, 8th Main, 3rd Cross, 3rd Phase, Peenya Industrial Area, Bangalore - 560058
III PhaseI Spray painting activity
466 O-62
Spray painting, paint baking, paint
Small Orange 2.10.2019 BA 30.09.2029
N N N N N N N NA NA NA 1 N NA N Y N NA Yes2825 2020
O
87450
Ten Onyxx Prici Tech Pvt LtdNo.A, 16, 1st Cross, III Stage, PIE, Bengaluru
III Stage I washing machine & electric motor components
367 O-32
Ferrous and Non- ferrous metalextraction
Small Orange 01.07.2019 BA 30.09.2029
N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes2826 2020
CL
85166
Ananya MouldingsNo.225, 2nd Cross, 8th Main, III Phase, PIA, Bengaluru
III PhaseI Manufacturing of Pet
bottles 44 G-78
Panel Board switches without electroboard
Small Green 16.12.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA N2827 2020
O 87171
Gokul Industries No.498/3, IV Phase, PIA, BegaluruIV Phase
I Blending of industrial and automotive lubricants
175 G-27
Lubricating oil, greases orpetroleum
Small Green 1.1.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA N2828 2020
O
89319
ThermotechN0.149/B, 9th Main, III Phase, PIA, Bengaluru
III PhaseI Manufacture of
Radiators 393 G-78
Panel Board switches without electroboard
Small Green 19.09.2017 BA 31.12.2034
N N N N N N N NA NA NA 2 N NA N Y N NA Yes2829 2020
O
87912
Bioamrit Mediscience No.151, 9th Main, III Phase, Bengaluru
III PhaseI blending, refilling of
disinfectant 30 O-57
Potable alcohol ( IMFL) by blending,
Small Orange 25.10.2019 BA 30.09.2029
N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes2830 2020
O
86445
Jayanth EnterprisesNo.B-211, 5th Main, II Stage, PIE , Bengaluru-58
II StageI Manufacturing of
components for components
9 G-78
Panel Board switches without electroboard
Small Green 7.7.2018 WA 31.12.2100
N N N N N N N NA NA NA 0.36 N NA N Y N NA N2831 2020
O
85202
Srinivasa Heat Tech No.A-196, 4th Cross, I Stage, PIE, Bengaluru I Stage
I Heat treatment of components 297 O-36
Heat treatment with any of the
Small Orange 01.01.2020 BA 30.09.2029
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2832 2020
O
76873
Kulpak Steel And Forgings Pvt Ltd
123, 7th Main, 3rd Phase, PIA, Bengaluru
III Phase I Forging of ferron and non ferrous metals 106 O-32
Forging of ferrous and non- ferrous metals
Small Orange 15.6.2018 BA 30.09.2028
N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes2833 2020
O
87954
Likhith EnterprisesNo.353-A, II Phase, PIA, Bengaluru II Phase
I Cutting & Stitching of shirts & PPE Kits 225 G-72
Garment Stitching/ Stitching of shoe uppers/
Small Green 10.2.2019 BA 31.12.2034
N N N N N N N NA NA NA 5.6 N NA N Y N NA Yes2834 2020
O77187 Pro Sim R & D Pvt Ltd, No.B-378/1, I Stage, Bengaluru-58 I Stage I R & D on engineering
design services204 G-84 Software
units generatingwastewater
Small Green 1.1.2018BA 31.12.2034
N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes2835 2020
O
76863
Suresh Precision ToolsNo.C-434, I Cross, I Stage, PIE, Bengaluru-58
I StageI Manufacturing of
Automative sheet metal parts
180 G-78
Panel Board switches without electroboard
Small Green 1.9.2018 WA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA N2836 2020
O
87796
AMS Engineering Industries India Pvt Ltd No.121, 7th Main road, III Phase, PIA,
Bengaluru-58III Phase
I Manufacturing of MS brackets 109 G-78
Panel Board switches without electroboard
Small Green 01.04.22018 BA 31.12.2034
N N N N N N N NA NA NA 0.9 N NA N Y N NA Yes2837 2020 Vishwa safety glass Pvt Ltd
No.93, 3rd Cross, III Stage, PIE, I Glass cutting &
Fiber glass molding, 2837 2020
O
82929
Vishwa safety glass Pvt Ltd No.93, 3rd Cross, III Stage, PIE, Bengalore-58
III StageI Glass cutting &
cleaning 149 G-108molding, Fiber Glass 10 -- 10 - -- --
Small Green 01.11.2019 BA 31.12.2034
N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes2838 2020
O 87127
Excel Industries No.329/A, I Stage, PIE, Bengaluru-58I Stage
I MS/SS tool components 36 G-93
ng of nuts and boltswith cold
Small Green 29.4.2008 WA 31.12.2034N N N N N N N NA NA NA 0.25 N NA N Y N NA N
2839 2020O
88181
Vibgayor Interiors A14, I Cross, III Stage, PIA, Bengaluru-58
III StageI Modular kitchen and
wardrobes 317 O-51
Modular wooden furniture from particle
Small Orange 01.02.2020 BA 30.09.2029
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2840 2020
O
86458
Value B Infra No.306/2, IV Phase, PIA, Bengaluru-58 IV Phase
I Engineering of fabrication and tensile fabric welding
378 O-62
Spray painting, paint baking, paint
Small Orange 01.03.2019 BA 30.09.2028
N N N N N N N NA NA NA 1.6 N NA N Y N NA Yes2841 2020
O 87722
Durga Tech NO SB 44, 1st Cross,I Stage, PIE, Bengaluru-58 I Stage
I Mild steel precision turned components 301 G-93
Manufacturing of nuts and boltswith cold
Small Green 30.3.2015 BA 31.12.2034
N N N N N N N NA NA NA 0.72 N NA N Y N NA Yes2842 2020
O 84615
Accuspirals No.B40, 2nd Cross, III Stage, PIE, Bengaluru III Stage
I Manufacture of gear and transmission parts 169 G-93
Manufacturing of nuts and boltswith cold
Small Green 01.06.2019 BA 31.12.2034
N N N N N N N NA NA NA 0.35 N NA N Y N NA Yes2843 2020
YTC
98466
HPLA IndustriesNo.134, 8th Main, 3rd Cross, III Phase, PIA, Bengaluru
III PhaseI Manufacture of aluminium and copper ingots
78 O-17
Aluminium & copper extraction from scrap
Small Orange 18.8.2020 BA 25.8.2025
N N N N N N N NA NA NA 0.32 N NA N Y N NA Yes2844 2020
O
88049
G.D Packaing B-143,3rd Cross 1st Stage PIE Bangalore-58
I StageI manufacturing of
LDPE /HDPE bags for industrial packaging using virgin
90 O-35
Gravure printing, digital printing on
Small Orange 20.7.2017 BA 30.09.2029
N N N N N N N NA NA NA 0.29 N NA N Y N NA Yes2845 2020
O
86451
Prad AutomotiveNo.66/2, B-235, I Stage, PIE, Bengaluru-58
I StageI SS/MS components
97 G-93
Manufacturing of nuts and boltswith cold
Small Green 10.5.2017 WA 31.12.2034
N N N N N N N NA NA NA 0.54 N NA N Y N NA NA2846 2020
O 98700
Sharp InotechNo.B-38, 2nd Cross, III Stage, PIE, Bengaluru
III StageI Sheet metal processing
181 G-93
Manufacturing of nuts and boltswith cold
Small Green 22.6.2014 WA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2847 2020 O 87706 Incresol Incresol Engineering
Solutions Private LimitedM-14, 7th Cross, Peenya Industrial
Estate, I StageI Stage I Low inductive
laminated bus bar393 G-93 Manufacturi
ng of nuts and boltswith cold
Small Green 25.11.2019 WA31.12.2034
N N N N N N N NA NA NA 0.43 N NA N Y N NA NA2848 2020
O 87433
Raghavendra Spectro Metallurgical Laboratory
No.326, 9th Cross, IV Phase, PIA, Bengalore IV Phase
I Analytical services testing of metal alloy & water samples
401 R-83
Research and Analytical laboratories
Small Red1.4.1998 BA 30.06.2024
N N N N N N N NA NA NA 0.9 0.015 NA N Y Y NA Yes2849 2020
O
98373
Motherland Garments Pvt Ltd No. 40-B, 2nd Phase, Peenya Industrial Area, Bangalore - 560058 II Phase
I Washing of readymade garments 273 O-50
Mechanized laundry using oil fired
Small Orange 01.05.2020 BA 30.09.2029
N N N N N N N NA NA NA 1.6 25 ETP NA Y N NA Yes2850 2020
OMaruthi Engineering
Enterprises No.A-7, I Stage, PIE, Bengaluru-560058
I StageI MS/SS Automatic
machine & its spare parts
173 G-93Manufacturing of nuts and boltswith cold
Small Green01.09.2017 BA 31.12.2034
N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes2851 2020
OSri Lakshmi Industries
No.72, 6th Main Road, III Phase, PIA, Bengaluru-560058
III PhaseI Powder coating of
MS/AL (3 in one chemicals)
24 G-97
Activity of Powder Coating onsurface of
Small Green 26.6.2017 BA 31.12.2034
N N N N N N N NA NA NA 0.28 N NA N Y N NA Yes2852 2020
OFine crafts
No.C-349, I Main, I Stage, PIE, Bengaluru-560058
I StageI MS/SS Components
with CNC machining G-93Manufacturing of nuts and boltswith cold
Small Green02.09.2019 BA 31.12.2034
N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2853 2020
OTrichem Laboratories
No.63/2, III Phase, PIA, Bengaluru-560058
III PhaseI Blending & repacking
of animal feed supplements
129 G-81
Research laboratories notinvolving
Small Green 15.9.2018 WA 31.12.2034
N N N N N N N NA NA NA 0.36 N NA N Y N NA NA2854 2020
OSaraswathi Industries
No.7E, 7th Main, III Phase, PIA, Bengaluru-58
III PhaseI CNC machining of
Al/MS/CI metal components
175 G-93Manufacturing of nuts and boltswith cold
Small Green07.6.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA NA2855 2020
O
86948
S.S Fab Tech No.93, 7th Cross, III Phase, PIA, Bangalore – 560 058 III Phase
I Mild Steel & stainless structure/ fixtures 367 G-93
Manufacturing of nuts and boltswith cold
Small Green6.7.2011 BA 31.12.2034
N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2856 2020
OUniversal Hands
No.V12(a), II Stage, PIE, Bengaluru-560058
II StageI Aluminium sliding
doors 31 G-93Manufacturing of nuts and boltswith cold
Small Green25.9.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2857 2020
OSouthern Enterprises No.410/A, 11th Cross, IV Phse, PIA,
BengaluruIV Phase I Fabrication of
transformer boxes, gates, reills
33 G-93Manufacturing of nuts and boltswith cold
Small Green11.7.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.25 N NA N Y N NA NA2858 2020
OEntuple Emobility Private
LimitedNo. C-98, 10th Main, 3rd Cross, III
Stage, PIA III StageI Electric motors
G-93Manufacturing of nuts and boltswith cold
Small Green14.10.2020 WA 31.12.2034
N N N N N N N NA NA NA 1 N NA N Y N NA NA2859 2020
OJayadiv Engineering Company No.P-26(A), 3rd Cross, III Stage, PIE,
III StageI Engineering activity
415 G-93Manufacturing of nuts and boltswith cold
Small Green14.7.2020 BA 31.12.2034
N N N N N N N NA NA NA 1.5 N NA N Y N NA Yes2860 2020
OSapnis Innovations, No.315B, 8th Cross, II Stage, PIE
II StageI CNC Mechanical
components 182 G-93Manufacturing of nuts and boltswith cold
Small Green07.6.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.32 N NA N Y N NA NA2861 2020
OHi-Tech CNC Technologies No. 3/B, Site No. 4, II Phase, KIADB
Main Road, Opp. BWSSB , Peenya 1st Stage, Bengaluru - 560 058
II PhaseI Alunimuim
components 395 G-93Manufacturing of nuts and bolts
Small Green10.5.2017 WA 31.12.2034
N N N N N N N NA NA NA 0.7 N NA N Y N NA NAStage, Bengaluru - 560 058 and boltswith cold
N N N N N N N NA NA NA 0.7 N NA N Y N NA NA2862 2020
OAkshaya Crop Care No, A103(A), 3rd Main, II Stage, PIE,
Bengaluru II StageI Micronutrients &
Fertilizers 124 G-93Manufacturing of nuts and boltswith cold
Small Green 15.8.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2863 2020
O
99258
Synpack Zipper Bags Pvt Ltd No.C-292, 8th Cross, I Stage, PIE, Bengaluru I Stage
I gloves ( HMHDPE) and ldpe ziplock bags > 50 micron thickness
207 G-32
Plastic sack bags, woven sack with HDPE,
Small Green 1.5.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2864 2020
O
88151
Magnum Engineers, No.M6-(A), 7th Cross, I Stage, PIE, Bengaluru I Stage
I TRIBO Meters & Testing Rigs 210 G-93
Manufacturing of nuts and boltswith cold
Small Green 17.11.2019WA 31.12.2034
N N N N N N N NA NA NA 0.96 N NA N Y N NA NA2865
OAccurate Panel Processors
No. SB-58, 2nd Cross, I stage Peenya, Bengaluru
I StageI Modular Wooden
Furniture 36 G-64
Modular wooden furniture from
Small Green1.10.2015 BA 31.12.2034
N N N N N N N NA NA NA 0.24 N NA N Y N NA Yes2866 2020 O V.R.Engineering, No.A-186, 4th Cross, I Stage, PIE,
Bengaluru I StageI CNC/VMC
Machinging 417 G-93Manufacturing of nuts and boltswith cold
Small Green15.2.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2867 2020
OKaamadhenu Industries , C-202, 4th Cross, 1st Stage, Peenya
Industrial Estate, Bengaluru - 560 058 I StageI Polyrethane footwear
145 G-93Manufacturing of nuts and boltswith cold
Small Green 1.3.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.9 N NA N Y N NA NA2868 2020
OSai Samruddhi Apparels , No. 9E/26, 2nd Phase, Peenya
Industrial Area, Bengaluru - 560 058 II PhaseI Stitching of Garments
547 G- Medium Green 15.10.2019 BA 31.12.2034
N N N N N N N NA NA NA 7 N NA N Y N NA Yes2869 2020
OSri Maruthi Metals (Formerly
Gajanana Enterprises),No.338, 9th Cross, IV Phase, Peenya Industrial Area, Bengaluru -560058 IV Phase
I grit blasting of ms, ss, components 45 G-93
Manufacturing of nuts and boltswith cold
Small Green1.10.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes2870 2020
O
75729
Fillenpac Industries Pvt Ltd No.322/A, 7th Main, II Stage, PIE, Bengaluru-58 II Stage
I PET preforms of different colors from virgin plastic granules
1035 G-32Polythene and plastic processed products
Large Green17.10.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2871 2020
OWell Thought Chemicals No.355, 9th Cross, IV Phase,
Bengaluru-58 IV PhaseI Refilling, repacking,
blending of chemicals 260 G-93Manufacturing of nuts and boltswith cold
Small Green17.10.2012 WA 31.12.2034
N N N N N N N NA NA NA 0.24 N NA N Y N NA NA2872 2020
OUnique Inc No.C-289, 9th Cross, I Stage, PIE,
Bengaluru-560058 I StageI MS/SS/Al
components 150 G-93Manufacturing of nuts and boltswith cold
Small Green29.10.2005 BA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2873 2020
OM&M Manufacturing
SolutionsNo.490/B/1, IV Phase, PIA,Bengaluru-
560058 IV PhaseI Precision machined
components 204 G-93Manufacturing of nuts and boltswith cold
Small Green02.02.2007 WA 31.12.2034
N N N N N N N NA NA NA 0.57 N NA N Y N NA NA2874 2020
OGlobetch Engineers , No. 410A, 11th Cross, 4th Phase,
KIADB Industrial Area, Peenya , Bengaluru - 560 058
IV PhaseI Jigs & fixture
14 G-93Manufacturing of nuts and boltswith cold
Small Green4.4.2007 WA 31.12.2034
N N N N N N N NA NA NA 0.11 N NA N Y N NA NA2875 2020
ODivine Auto VNC No.411, 11th Cross, IV Phase, PIA,
Bengaluru-560058 IV PhaseI CNC Machining
components 180 G-93Manufacturing of nuts and boltswith cold
Small Green16.1.2004 WA 31.12.2034
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2876 2020
OZigma Engineering A 275 (B), II Stage, PIE, bengaluru
II StageI Bio mass gasifiers,
manual operated soil block machine & fabrication
36 G-93Manufacturing of nuts and boltswith cold
Small Green8.4.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2877 2020
YTCMean Well India Electronics
Private LimitedNo. 9C, Peenya Industrial Area, II
Phase, BengaluruII Phase I L E D driver (l p v, x l
g, a p c series) 1256 G-93Manufacturing of nuts and boltswith cold
Large GreenFeb-20 BA 20.10.2025
N N N N N N N NA NA NA 0.5 N NA N Y N NA NA2878 2020
OSunlight Machine Tools No.3B, II Phase, PIA, Bengaluru
II PhaseI Precision components
446 G-93Manufacturing of nuts and boltswith cold
Small Green01.12.2019 WA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2879 2020
OSri Matha Engineering &
Power EquipmentNo.559, IV Phase, PIA, Bengaluru
IV PhaseI engineering industry
with powder coating activity
72 G-97 Activity of
Powder Coating on surface of
Small GreenOct-09 BA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2880 2020
OMetal Build Tech (P) Ltd No.SB55, 2ned Cross, I Stage, PIE,
Bengaluru I StageI Precision machining
parts 68 G-93Manufacturing of nuts and boltswith cold
Small Green01.10.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes2881 2020
O
99822
PADM Laboratories Pvt Ltd No. C-139, 2nd C-Main, 2nd stage, Peenya Industrial Estate II Stage
I Testing of Pharmaceutical products
183 R-58
Pharmaceutical (Bulk drug &Active
Small Red 3.11.2020 BA 30.6.2025
N N N N N N N NA NA NA 0.4 0.05 NA N Y Y NA Yes2882 2020
O Unite Industries #342-B, 4th Phase, 9th Cross, Peenya
Industrial Area, Bangalore-560058. IV PhaseI Primary current
sensor & voltage transfermor
96 G-93Manufacturing of nuts and boltswith cold
Small Green1.11.1991 BA 31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2883 2020
O ALUTOP No.146/A, 3rd Cross, I Stage, Peenya
Industrial Estate, Bengaluru-560058 I StageI Aluminium ROPP
250 G-93Manufacturing of nuts and boltswith cold
Small Green9.11.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2884 2020
O Yoga Apparels No.471/A-2, 12th Cross, IV Phase,
Peenya Industrial Area, Bengaluru-560058
IV PhaseI Stitching of ready
made garments 266 G-72Garment Stitching/ Stitching ofshoe uppers/
Small Green01.11.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2885 2020
O Machine Elements No.48, II Phase, Peenya Industrial
Area, Bengaluru-560058 II PhaseI Manufacturing of
machinery spares 224 G-93Manufacturing of nuts and boltswith cold
Small Green25.3.1991 BA 31.12.2034
N N N N N N N NA NA NA 1.1 N NA STP N N NA Yes2886 2020 Surface Tech No.C-130/1, B Main Road, II Stage, I Abrasive blasting activity Small Green2886 2020
O Surface Tech No.C-130/1, B Main Road, II Stage,
Peenya Industrial Estate, Bengaluru-560058
II StageI Abrasive blasting activity
78 G-78
Panel Board
Small Green01.10.2018 BA 31.12.2034
N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes2887 2020
O S.L.N Industries No.A-46/1, 2nd Main, II Stage, PIE,
Bengaluru II StageI CNC M/c components
457 G-93Manufacturing of nuts and boltswith cold
Small Green4.3.2011 BA 31.12.2034
N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes
2888 2020O
Chromachemie Laboratory Pvt Ltd,
No.103, 14 th Cross, IV Phase, PIA, Bengaluru IV Phase
I refilling of stevia chemicals
207G-109
Refilling, Repacking
and blending of chemicals
Small Green 9.11.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2889 2020
O
99757
S V Silvary Textiles Private Limited,
No. N-2, 4th cross, 1st stage, Peenya Industrial Area I Stage
I Twisting of yarns and warping of polyester
and cotton yarns123 G-91
Manufacture of Adhesives and adhesive tapes &/ or
Large Green 1.6.2020 WA 31.12.2034
N N N N N N N NA NA NA 1 N NA N Y N NA NA2890 2020
O Inventask Pvt ltd No.342/A, 9th Cross, IV Phase, PIA,
Bengaluru IV PhaseI Fabrication of steel
furniture & structures 66 G-93Manufacturing of nuts and boltswith cold
Small Green 01.11.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.64 N NA N Y N NA NA2891 2020
OFine crafts
No.470-B, IV Phase, PIA, Bengaluru IV PhaseI Micro meter with
turning, milling 203 G-93Manufacturing of nuts and boltswith cold
Small Green 01.1.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.2 N NA N Y N NA Yes2892 2020
O
100187
Hari Om PlasticsNo.C-184, 5th Cross,2nd Stage, PIE, Bangalore-560058
II StageI reprocessing of plastic
and production of granules & powder
71 O-60
Reprocessing of waste plasticincluding
Small Orange 26.8.2013 WA 30.09.2030
N N N N N N N NA NA NA 0.2 N NA N Y N NA NA2893 2020
OMAP System (India) Pvt Ltd
No.5/1, 12th Main, III Phase, PIA, Bengaluru-560058
III PhaseI Aerospace Ms/SS
components 186 G-93
Manufacturing of nuts and boltswith cold
Small Green 01.11.2010 WA 31.12.2034
N N N N N N N NA NA NA 0.28 N NA N Y N NA NA2894 2020
OSLN Hitech Laser
No.A-46, 2nd Main, II Stage, PIE, Bengaluru
II StageI fabrication of metal
sheets 302 G-78
Panel Board switches without electroboard
Small Green 07.02.2010 WA 31.12.2034
N N N N N N N NA NA NA 0.41 N NA N Y N NA NA2895 2020
ORanganatha Engineering
Works, No.P4, III Stage, PIE, Bengaluru-58
III StageI engineering avtivity
78 G-78
Panel Board switches without electroboard
Small Green 07.02.2010 WA 31.12.2034
N N N N N N N NA NA NA 0.062 N NA N Y N NA NA2896 2020
OOmega Scientic Instruments
Pvt Ltd No.B-377, 10th Cross, I Stage, PIE, Bengaluru
I StageI SS Vessels for
pharmaceutical industry
203.8 G-78
Panel Board switches without electroboard
Small Green 08.8.2020 BA 31.12.2034
N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes2897 2020
O Priya IndustriesSite No. 3, 2nd Cross, Dead end (Near SBI), I Stage, Peenya Industrial Estate, Bangalore - 560058
I StageI Precision components
36 G-78
Panel Board switches without electroboard
Small Green 08.8.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.1 N NA N Y N NA Yes2898 2020
O Apex EngineeringSite No. 3/1, 2nd Cross, I Stage, Peenya Industrial Estate, Bangalore - 560 058
I StageI Precision components
36 G-78
Panel Board switches without electroboard
Small Green 08.8.2020 BA 31.12.2034
N N N N N N N NA NA NA 1.4 N NA N Y N NA Yes2899 2020
O Koshama Engineering Pvt Ltd No.398(a), I Stage, PIE, Bengaluru I StageI Industrial fans with
engineering activity 75 G-93
Manufacturing of nuts
Small Green 5.10.2015 BA 31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2900 2020
O Manjushree TechnologiesNo.21, 3rd main, II Phase, PIA, Bengaluru
II PhaseI Dry & wet vibro
polishing activity for automobilecomponents on job
216 O-63
Steel and steel products using
Small Orange 01.02.2010 BA 30.09.2030
N N N N N N N NA NA NA 0.48 N NA N Y N NA Yes2901 2020
O Gallant Electronic Controls No.C-313, 9th Cross, I Stage, PIE I StageI Power conversion
products 526 G-78
Panel Board switches without electroboard
Medium Green 1.1.2017 BA 31.12.2034
N N N N N N N NA NA NA 1.08 N NA N Y N NA Yes2902 2020
O Souza Engineering No.9E/4, II Phase, PIA, Bengaluru-58 II PhaseI CNC Machining components
291 G-78
Panel Board switches without electroboard
Small Green 1.7.2017 WA 31.12.2034
N N N N N N N NA NA NA 1.7 N NA N Y N NA NA2903 2020
O A T E Enterprises,Plot.No.A-422, Ist Cross, I Stage, Peenya Indutrial area, Bangalore - 560058
I StageI Industrial pre cooling
system 473 O-86 Foam manufacturing
Small Orange 1.4.2020 WA 30.09.2029
N N N N N N N NA NA NA 2 N NA N Y N NA NA2904 2020
O Bhumika Machine ToolsNo. 338, 9th Cross, IV Phase, PIA, Bengaluru
IV PhaseI Machine Components
133 G-78
Panel Board switches without electroboard
Small Green 24.11.2009 WA 31.12.2034
N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2905 2020
O Sri Shreyas Engineering No.263, II Stage, PIE, bengaluru II StageI Agriculture flanges
175 G-78
Panel Board switches without electroboard
Small Green 15.3.2010 BA 31.12.2034
N N N N N N N NA NA NA 1.12 N NA N Y N NA Yes2906 2020
OTejas Impex Pvt Ltd No.FF-7, III Stage, PIE, Bengaluru-58
III StageI Coffee/tea vending machine
77 G-78
Panel Board switches without electroboard
Small Green 1.1.2011 WA 31.12.2034
N N N N N N N NA NA NA 0.12 N NA N Y N NA NA2907 2020
O Shiva Precision FabricationsNo.198, 12th Cross, III Phase, PIA, Bengaluru
III PhaseI MS Furniture
37 G-78
Panel Board switches without electroboard
Small Green 14.12.2015 WA 31.12.2034
N N N N N N N NA NA NA 0.6 N NA N Y N NA NA2908 2020
OSinar Sheetmetal Solutions Pvt
LtdNo.A-153, 2nd C Main Road, II Stage, PIE, Bengaluru
II StageI Design & manufacturing of forming machine tools
42 G-93
Manufacturing of nuts
Small Green 1.6.2017 BA 31.12.2034
N N N N N N N NA NA NA 0.18 N NA N Y N NA Yes2909 2020
O KAR PolymersNo.18-C/5, II Phase, PIA, Bengaluru-58
II PhaseI Rubberised rollers &
pulleys 245 G-32
Polythene and plastic processedproducts
Small Green 14.12.2017 WA 31.12.2034
N N N N N N N NA NA NA 0.26 N NA N Y N NA NA2910 2020
O BSS CorporationNo.326, 9th Cross, IV Phase, PIA, Bengalore
IV PhaseI Manufacturing of
adhesive tapes with printing
49 O-59
Printing press and/ or Screen Printing
Small Orange 1.12.2016 BA 30.09.2029
N N N N N N N NA NA NA 0.5 N NA N Y N NA Yesprinting Printing N N N N N N N NA NA NA 0.5 N NA N Y N NA Yes2911 2020
OSanco Supports
No.199, 12th Main, III Phase, PIA, Bengaluru
III PhaseI MS/GI Metal cable
tray 46 G-78
Panel Board switches without electroboard
Small Green 1.1.2010 WA 31.12.2034
N N N N N N N NA NA NA 1 N NA N Y N NA NA2912 2020
OSri shankar Enterprises
No.108/A, 3rd Cross, I Stage, PIE, Bengaluru
I StageI Shot blasting of MS
components 33 G-78
Panel Board switches without electroboard
Small Green 1.3.2020 BA 31.12.2034
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2913 2020
OSri shankar Enterprises
No.293, IV Phase, PIA, Bengaluru IV PhaseI manufacturing of
precision components 133 G-78
Panel Board switches without electroboard
Small Green 1.10.2020 WA 31.12.2034
N N N N N N N NA NA NA 0.4 N NA N Y N NA NA2914 2020
OSri Lakshmi Profile No.471 D02, IV Phase, PIA, B-58
IV PhaseI Gas Cutting of MS
Plates 34 G-78
Panel Board switches without electroboard
Small Green 1.06.2017 BA 31.12.2034
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2915 2020
O
101072
EN ES Foams, 24, 3B, II Phase, PIA, BengaluruII Phase
I Polyrethane foam cushion 94 O-80
Foam manufacturing
Small Orange 15.2.2020 BA 30.09.2030
N N N N N N N NA NA NA 0.4 N NA N Y N NA Yes2916 2020
O
100771
Vinass Heat Treaters No.M-2/1, 5th Cross, I Stage, PIE, Bengaluru-58
I Stage I Heat treatment of components
174 O-36 Heat treatment using oil
fired furnace
Small Orange 15.10.2020BA 30.09.2029
N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2917 2020
OSuhaas Engineering No.17-G/A, II Phase, PIA, Bengaluru-
58II Phase I General engineering 455
G-78
Panel Board switches without electroboard
Small Green1.5.2010
BA 31.12.2035
N N N N N N N NA NA NA 0.3 N NA N Y N NA Yes2918 2020
OShree Om Engineering No.17-G/A, II Phase, PIA, Bengaluru-
58II Phase I General engineering 178
G-78
Panel Board switches without electroboard
Small Green1.1.2011
WA 31.12.2035
N N N N N N N NA NA NA 0.3 N NA N Y N NA NA2919 2020
OTexel Engineers No.B 228, 5th Main, II Stage, Peenya
Industrial Estate, Bengaluru-560058. II StageI Precision turned
components 134 G-78
Panel Board switches without electroboard
Small Green 1.6.2020 WA 31.12.2035
N N N N N N N NA NA NA 0.52 N NA N Y N NA NA2920 2020
OCambrian Bio Works LLP No.M-11, 7th Cross, I Stage, Peenya
Industrial Estate, B'lore-560058 I StageI Plastic spin column
tubes 223 G-78
Panel Board switches without electroboard
Small Green 11.1.2020 WA 31.12.2035
N N N N N N N NA NA NA 1.8 N NA N Y N NA NA2921 2020
OShree Ram Polypacks No.C-211, 4th Cross, I Stage, PIE,
Bengaluru-58 I StageI Stitching of HDPE/PP
woven poly sack bags 50 G-78
Panel Board switches without electroboard
Small Green 16.1.2019 WA 31.12.2035
N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2922 2020
ODelta Interconnect No.229, III Phase, Peenya Industrial
Area, Bengaluru III PhaseI Assembling of cable
harness , junction box /Panels
386 G-78
Panel Board switches without electroboard
Small Green 8.1.2009 BA 31.12.2035
N N N N N N N NA NA NA 0.65 N NA N Y N NA Yes2923 2020
OEsvee Industries No.B-233&234, 6th Cross, I Stage,
PIE, Bengaluru-58 I StageI Transformer Oil
sample collection kit 32 G-78
Panel Board switches without electroboard
Small Green 6.1.1980 BA 31.12.2035
N N N N N N N NA NA NA 0.8 N NA N Y N NA Yes2924 2020
ONisus Hitech Pvt Ltd, C-287, 8th Cross, I Stage, PIA,
Bengaluru-58 I StageI CNC machining
126 G-78
Panel Board switches without electroboard
Small Green 1.7.2017 WA 31.12.2035
N N N N N N N NA NA NA 0.8 N NA N Y N NA NA2925 2020
OUday Engineers C-287, 8th Cross, I Stage, PIA,
Bengaluru-58 I StageI Fabrication of
Transformer oil recovery filtering machine , MS Storage
27 G-78
Panel Board switches without electroboard
Small Green 15.10.2019 BA 31.12.2035
N N N N N N N NA NA NA 0.36 N NA N Y N NA Yes2926 2020
OHydrotherm Fluids Controls
Pvt LtdNo.280, 4th Main, IV Phase, PIA,
Bengaluru IV PhaseI Assembling of
hydraulic cylinders 286 G-78
Panel Board switches without electroboard
Small Green 15.5.2019 BA 31.12.2035
N N N N N N N NA NA NA 0.64 N NA N Y N NA Yes2927 2020
O 87865CICB Chemicon Pvt Ltd No.135, III Phase, PIA, Bengaluru
III PhaseI
1020 G-78
Panel Board switches without electroboard
Large Green 20.6.2019 BA
Yes2928 2020
OV Aim Group B-111, 11th Main, III Stage, PIE, Beng
III StageI Sheet Metal
fabrication, cabinet & racks fabrication
268 G-78
Panel Board switches without electroboard
Small Green 01.06.2018 WA 31.12.2034
N N N N N N NA NA NA NA 0.36 NA NA N Y NA NA NA2929 2020
OV Aim Group B-112, 11th Main, III Stage, PIE, Beng
III StageI Sheet Metal
fabrication, cabinet & racks fabrication
137 G-78
Panel Board switches without electroboard
Small Green 20.03.20017 WA 31.12.2034
N N N N N N NA NA NA NA 0.54 NA NA N Y NA NA NA2930 2020
OV Aim Group B-204, II Stage, PIE, Beng
II StageI Sheet Metal
fabrication, cabinet & racks fabrication
453 G-78
Panel Board switches without electroboard
Small Green 15.06.2020 WA 31.12.2034
N N N N N N NA NA NA NA 0.36 NA NA N Y NA NA NA2931 2020
OHigh Vacuum Technologies &
Products Pvt LtdNo.C-302, 9th Cross, I Stage, PIE
I StageI
Industrial vaccum pumps
440 G-78
Panel Board switches without electroboard
Small Green 1.07.2019 WA 31.12.2035
N N N N N N NA NA NA NA 0.6 NA NA N Y NA NA NA2932 2020
OSri Sapthagiri Industries No. A 196, 4th Cross, 1st Stage ,
Peenya Industrial Estate, Bengaluru-560058
I StageI
Assemly testing of CNC m/c
327 G-78
Panel Board switches without electroboard
Small Green 20.06.2018 WA 31.12.2035
N N N N N N NA NA NA NA 0.5 NA NA N Y NA NA N2933 2021
YTC
101742
Wistron Infocomm Manufacturing (India) Pvt.
LTd.,
Plot No. 30/A, II Phase, Peenya Indl. Area, Bengaluru-560058.
II Phase I Electronic
manufacturing services
474 O-100
STPs Established at Residential
Large Orange 1.10.2020 BA 03.02.2026
N N N N N N N NA NA NA 85 N NA STP N N NA Yes2934 2021
OCNC Technik, B-36, 10th Main, III Stage, PIE,
Bengaluru III StageI Precision machined
components 102 G-78
Panel Board switches without electroboard
Small Green 20.06.2008 WA 31.12.2035
N N N N N N N NA NA NA 0.8 N NA NA Y N NA NA2935 2021 Geometry Engineering No.B-66, III Stage, PIE, B-58 I Sheet metal
Panel Board switches 2935 2021
OGeometry Engineering
InnovationsNo.B-66, III Stage, PIE, B-58
III StageI Sheet metal
fabrication 115 G-78switches without electroboard
Small Green 10.09.2019 WA 31.12.2035
N N N N N N N NA NA NA 0.8 N NA NA Y N NA NA2936 2021
O
101591
M D PlasticsNo.190, 11th Main Road, III Phase, PIA, Bengaluru-58
III PhaseI Manufacturing of
Plastic granules 25 O-60
Reprocessing of waste plasticincluding
Small Orange WA 30.09.2030
N N N N N N N NA NA NA 0.24 N NA NA Y N NA NA
2937 2021O
Effee Induction Pvt Ltd No.14, IV Phase, Peenya Industrial Area, Bengaluru-560058
IV Phase IInduction hardening
equipments163 G-78
Panel Board switches without electroboard
Small Green 26.6.2019 WA 31.12.2035
N N N N N N N NA NA NA 6 N NA NA Y N NA NA2938 2021
O J V Enterprises No.491/8, Site No.1-B, 14th Cross,
Peenya Industrial Area, IV Phase, Bengaluru-560 058
IV PhaseI assembling of
accillary relays in numbers
108 G-78
Panel Board switches without electroboard
Small Green 07.01.2017 WA 31.12.2035
N N N N N N N NA NA NA 1.04 N NA NA Y N NA NA2939 2021
O Bhagyalakshmi Industrial
Corporation ,No.B-124, III Main, II Stage, PIE,
Bengaluru-58II Stage I Steering columns
25 G-78
Panel Board switches without electroboard
Small Green 08.03.2021 WA 31.12.2035
N N N N N N N NA NA NA 0.5 N NA NA Y N NA NA2940 2021
O Ayush Oils No.401, IV Phase, 4th main, PIA ,
Bengaluru-58 IV PhaseI Cold pressing of
edible oil, oil cake 85 G-29
Oil mill Ghani and extraction (no
Small Green 07.01.2017 WA 31.12.2100
N N N N N N N NA NA NA 0.04 N NA NA Y N NA NA2941 2021
O Charvik Technologies No.352, 4th Main, 9th Cross, IV
Phase, PIA IV PhaseI Machining componets
80 G-78
Panel Board switches without electroboard
Small Green 07.01.2017 WA 31.12.2035
N N N N N N N NA NA NA 0.12 N NA NA Y N NA NA2942 2021
O Jhalak Polywear 333, 9th Cross, 4th Main, IV Phase,
Peenya Industrial Area, Bengaluru - 560058
IV PhaseI PU footwear
18 G-78
Panel Board switches without electroboard
Micro Green 07.01.2017 WA 31.12.2100
N N N N N N N NA NA NA 0.4 N NA NA Y N NA NA2943 2021
O Pallakki NDT Excellence
Center Pvt Ltd.,No.411/A, 11th Cross, IV Phase, PIA,
Bengaluru-58 IV PhaseI Fabricated finished
goods 75 G-78
Panel Board switches without electroboard
Small Green 07.01.2017 WA 31.12.2035
N N N N N N N NA NA NA 0.36 N NA NA Y N NA NA2944 2021
O Givi Misure Pvt Ltd No.488, 14th cross, IV phase, PIA,
Bangalore-58 IV PhaseI Assembling of digital
optical linear 85 G-78
Panel Board switches without electroboard
Small Green 8.7.2003 WA 31.12.2035
N N N N N N N NA NA NA 0.32 N NA NA Y N NA NA2945 2021
O Madhu Enterprises No.446, IV Phase, PIA, B-58 IV Phase I Machined
Components 143 G-78
Panel Board switches without electroboard
Small Green 14.12.2004 WA 31.12.2035
N N N N N N N NA NA NA 1.04 N NA NA Y N NA NA2946 2021
O Fine Tools India Pvt Ltd No.275, 4th main, 4th Cross, IV Phase,
PIA, Bengaluru-58IV Phase I Plastic components
488 G-78
Panel Board switches without electroboard
Small Green 27-01-2020 WA 31.12.2035
N N N N N N N NA NA NA 1.2 N NA NA Y N NA NA2947 2021
OIndian Industrial Machines Pvt
LtdNo.3, 14th Cross, IV Phase, PIA,
Bengaluru-560058IV Phase I assembling of PLC
based automation m/c 112 G-78
Panel Board switches without electroboard
Small Green 15.6.2019 WA 31.12.2035
N N N N N N N NA NA NA 1.4 N NA NA Y N NA NA2948 2021
OBalaji Industries
No.504, IV Phase, PIA, Bengaluru-58 IV PhaseI
251 G-78
Panel Board switches without electroboard
Small Green 12.10.1992 WA
NA2949 2021
OMicron Machine Tools No.34/G, III Phase, 4th Main Road,
PIA, Bengaluru-58 III PhaseI Cast Iron machine
components with Tuning, Milling, drilling operation
74 G-78
Panel Board switches without electroboard
Small Green 5.2.2017 WA 31.12.2035
N N N N N N N NA NA NA 0.3 N NA NA Y N NA NA2950 2021
OMultitech Systems No.274, 4th Main, IV Phase, Peenya
Industrial Area, Bengaluru-58 IV PhaseO Battery dealers
- - - - - - - - - - - - - -
Y 9.3.2026 NA NA N N NA NA N N NA2951 2021
OTUV India Pvt Ltd No.105, III Stage, Peenya Industrial
Estate, Bengaluru-58 III StageI electrical &electronic product testing
1488 G-78
Panel Board switches without electroboard
Large Green 1.4.2021 BA 31.12.2035
N N N N N N N NA NA NA 2 N NA NA Y N NA Yes2952 2021
ORPS Industries,
No.180/A, 11th Main, III Phase, PIA, Bengaluru-58
III PhaseI chimney blower kitchen equipment
87 G-78
Panel Board switches without electroboard
Micro Green 1.4.2015 BA 31.12.2035
N N N N N N N NA NA NA 2 N NA NA Y N NA Yes2953 2021
OAmbit Power solutions Pvt Ltd No.4/1, II Phase, PIA, Bengaluru
II PhaseI Assembling of electrical control panels
232 G-78
Panel Board switches without electroboard
Small Green 26.2.2015 WA 31.12.2035
N N N N N N N NA NA NA 0.68 N NA NA Y N NA N2954 2021
OSidma Polymers
No.B-151, 5th Main Road, II Stage, PIE, Bengaluru
II StageI Polymer compounds & master batched (granules)
122 G-78
Panel Board switches without electroboard
Small Green 28.1.2020 WA 31.12.2035
N N N N N N N NA NA NA 0.3 N NA NA Y N NA Yes2955 2021
ODurga Control Systems India
Pvt LtdNo.488/B, IV Phase, PIA, Bengaluru
IV PhaseI Assembling of
electrical control panels
70 G-78
Panel Board switches without electroboard
Small Green 15.9.2007 WA 31.12.2035
N N N N N N N NA NA NA 0.2 N NA NA Y N NA N2956 2021
OStandard Automotive
Machines India Pvt Ltd,No. A 373, 4th Main, 6th Cross, 1
Stage, PIE, Bengaluru-58 I StageI
Small Green
N N N N N N N NA NA NA 0.3 N NA NA Y N NA N2957 2021
OCEJN Products IndiaLtd, No.1A, II Phase, PIA, Bengaluru-58
II PhaseI
176 G-78
Panel Board switches without electroboard
Small Green 11.9.2006 WA
N N N N N N N NA NA NA 0.3 N NA NA Y N NA N2958 2021
O
102553
Sleep Factory International Pvt Ltd No.A/371, I Stage, PIE, Bengaluru-58 I Stage
I matressess, pillows and cushions 273 G-78
Panel Board switches without electroboard
Small Green 1.4.2021 WA 31.12.2035
N N N N N N N NA NA NA 1.2 N NA NA Y N NA N2959 2021
OAnil CNC & Gears, No.B-229, 4th Cross, I Stage, PIE,
BengaluruI Stage I CNC M/c components
97 G-78
Panel Board switches without electroboard
Small Green 1.7.2017 WA
electroboard 2960 2021
OFly Vaccum Technologies Pvt
Ltd No.338, 9th Cross, IV Phase, Peenya Industrial Area, Bengaluru -560058
IV PhaseI M/c of vaccum systems and components
49 G-78
Panel Board switches without electroboard
Small Green 5.1.2017 WA 31.12.2035
N N N N N N N NA NA NA 0.18 N NA NA Y N NA N