 Company: RIO NAPO Spud Date: 20-Jul-14 @ 17:00 Well: SACHA 473H Actual date: 25-Aug-14 @ 06:00 Rig: PDVSA -79 Estimated Termination date: 30-Aug-14 @ 15:11 Field: (If Applicable) SACHA 41 Release Date: 25-Aug-14 @ 06:00 Actual Depth (feet, MD) 10521 AFE Days Actual Time (Days): 35.54 Total Time Productive Time % Productive Time No productive Time % No Productive Time Total Time w/o NPT Rig days days days days 35.54 25.56 71.92% 10.92 30.72% 35.25 11427 Plan TD Planned Time Drilling: Tipo Horizontal 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44    D   e   p    t    h    (    f   e   e    t    ) Time [ Days ] Time vs Depth Real Time Clean Time Planned Time Drill 12 1/4" Hole Drill 16" Hole Drill 8 1/2" Hole 26 16 12 1/4 8 1/2 6 1/8 20 13 3/89 5/8 7 5 Liner 7" @ 10644 ft Hoyo de 6 1/8" @ 11427ft Casing/Liner  0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 -200 800 1800 2800    T    V    D     (    f    t    ) REAL PROPUESTA -3 -2 -1 0 1 2 3 Operational Progress -3.599 Dias Atras 0.29 0.96 9.67 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 NPT Dias No Pl aned DAYS PROBLEMS HOLE DAYS NPT RI G Casing 13 3/8" @ 6264 ft Casing 9 5/8" @ 10074 ft Direccional Plan (TVD) Drill 6 1/8" Hole Set 13 3/8" Csg Set 9 5/8" Csg Set 7" Liner NPT PDVSA (5.5Hr): 21-Julio de 2014 Se observa recalentamiento de generador # 3, Repara Generador. NPT PDVSA (0.5Hr): 23-Julio de 2014, Saca dos paradas, coloca botella de circulación, cambia O-ring del manguerote. NPT WEATHERFORD (1Hr): 26-Julio de 2014, Se observa fuga de aceite en las conexiones de ODS. NPT PDVSA (1Hr): 02-Agosto de 2014, Repara bomba #1 y Bomba # 3. 02 y 06-Agosto de 2014, Viajes no planificado, saca BHA a superficie BHA, por tiempo de exposicion de hoyo y trabajo en conglomerados. NPT PDVSA (0.5Hr): 12-Agosto de 2014, Realiza trabajo de suelda en camapana de pipe hanger. NPT SPERRY(29.5Hrs): 13-Agosto de 2014, Realiza Viaje no planificado, por cambio de BHA. NPT CIA TIW (201.5Hrs): 16-Agosto de 2014, Trabaja sarta para liberar setting tool de liner hanger sin exito.

CAPITULO 6 Curva de Halli

Embed Size (px)

DESCRIPTION

una curva de un pozo chevere

Citation preview

  • Company: RIO NAPO Spud Date: 20-Jul-14 @ 17:00

    Well: SACHA 473H Actual date: 25-Aug-14 @ 06:00

    Rig: PDVSA -79 Estimated Termination date: 30-Aug-14 @ 15:11

    Field: (If Applicable) SACHA 41 Release Date: 25-Aug-14 @ 06:00

    Actual Depth (feet, MD) 10521 AFE Days Actual Time (Days): 35.54

    Total Time Productive Time % Productive Time No productive Time % No Productive Time Total Time w/o NPT Rig

    days days days days

    35.54 25.56 71.92% 10.92 30.72% 35.25 11427 Plan TD

    Planned Time

    Drilling:

    Tipo Horizontal

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    11000

    12000

    0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44

    De

    pth

    (fe

    et)

    Time [ Days ]

    Time vs Depth

    Real Time Clean Time Planned Time

    Drill 12 1/4" Hole

    Drill 16" Hole

    Drill 8 1/2" Hole

    26 16 12 1/4 8 1/2 6 1/8

    20 13 3/8 9 5/8 7 5

    Liner 7" @ 10644 ft

    Hoyo de 6 1/8" @ 11427ft

    Casing/Liner

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000-200 800 1800 2800

    TV

    D (

    ft)

    REAL

    PROPUESTA

    -3 -2 -1 0 1 2 3

    Operational Progress

    -3.599 Dias Atras

    0.29

    0.96

    9.67

    0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0

    NPT Dias

    No Planed DAYS PROBLEMS HOLE DAYS NPT RIGCasing 13 3/8"

    @ 6264 ft

    Casing 9 5/8" @ 10074 ft

    Direccional Plan (TVD)

    Drill 6 1/8" Hole

    Set 13 3/8" Csg

    Set 9 5/8" Csg Set 7" Liner

    NPT PDVSA (5.5Hr): 21-Julio de 2014 Se observa recalentamiento de generador # 3, Repara Generador.

    NPT PDVSA (0.5Hr): 23-Julio de 2014, Saca dos paradas, coloca botella de circulacin, cambia O-ring del manguerote.

    NPT WEATHERFORD (1Hr): 26-Julio de 2014, Se observa fuga de aceite en las conexiones de ODS.

    NPT PDVSA (1Hr): 02-Agosto de 2014, Repara bomba #1 y Bomba # 3.

    02 y 06-Agosto de 2014, Viajes no planificado, saca BHA a superficie BHA, por tiempo de exposicion de hoyo y trabajo en conglomerados.

    NPT PDVSA (0.5Hr): 12-Agosto de 2014, Realiza trabajo de suelda en camapana de pipe hanger.

    NPT SPERRY(29.5Hrs): 13-Agosto de 2014, Realiza Viaje no planificado, por cambio de BHA.

    NPT CIA TIW (201.5Hrs): 16-Agosto de 2014, Trabaja sarta para liberar setting tool de liner hanger sin exito.