39
Career & College: Ready, Set, Go! NC’s Race to the Top (RttT) Initiative State Board of Education April 7, 2011

Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

Embed Size (px)

Citation preview

Page 1: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

Career & College: Ready, Set, Go!

NC’s Race to the Top (RttT) Initiative

State Board of Education

April 7, 2011

Page 2: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

2

Webinar Overview1. Reiterate General RttT Requirements &

Process for LEAs/Charters (“Local”)

2. Clarify State Plan & Implications for Local Plans

• Science, Technology, Engineering, & Math (STEM)

• NC Education Cloud

3. Address Questions

Key Take Away = Know how to move forward with your local RttT plan!

Page 3: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

3

General RttT Requirements

1. For 2011-12 submission to DPI…Local DSWs must include plans (i.e., a completed row on the spreadsheet) for implementing all RttT Required Activities

2. Local RttT detailed budgets (in BUD) must match Local DSWs (talk to your Finance Officer!)

3. Complete local DSWs must be submitted to DPI by August 3, 2011 (same process as last fall…but much more time to develop plans)

Page 4: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

4

General RttT Requirements

2010-11 (Nov. 8, 2010) 2011-12 (Aug. 3, 2011)

Submission of Local DSW to DPI…

www.ncpublicschools.org/rttt/district/ www.ncpublicschools.org/docs/rttt/state/plan/state-dsw.pdf

Page 5: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

5

RttT Guidance Documents

Page 6: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

6

State DSW

Page 7: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

2011-12 DSW Submission Timeline

DPI Finance Informational Webinars (2)

•Requirements for submission of budget and detailed plans

DPI Informational Webinars focused on RttT State Initiatives

•LEAs & Charters combined

•Review Requirements for Local RttT Plans

•Provide LEAs/Charters with greater detail regarding State Plan (by Initiative)

Regional Support & Planning Meetings

•LEAs & Charters combined

•Review Webinar Info

•Review Approval process

•Support Updated local DSWs

•Support Implementation

All Local Plans submitted to DPI

All Plans reviewed by DPI

DPI staff follow up with

LEAs/Charters to resolve any outstanding

issues

All Plans Final

(posted to RttT

Website)

Sept. 1Feb 10, 2011 March & April June 1-27 August 3 - 11

August 12-22

Page 8: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

8

Purpose of STEM

Attract students to choose careers in science, technology, engineering, and mathematics

Page 9: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

NC’s Seven Economic Regions

9

Page 10: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

10

RttT STEM Goals• Offer rigorous course of study in STEM to face

“Grand Challenges for Engineering”

• Cooperate with community partners to:

– Prepare & assist teachers in integration of STEM

– Promote effective & relevant instruction for students

– Offer applied learning opportunities and careers in STEM

• Prepare more students for advanced study and careers in STEM

– Include underrepresented groups of women and girls

– Include more students from “turnaround schools”

Page 11: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

11

Grand Challenges for EngineeringBy the Committee of the National Academy of Engineering:

• Make solar energy economical• Provide energy from fusion• Develop carbon sequestration methods• Manage the nitrogen cycle• Provide access to clean water• Restore and improve urban infrastructure• Advance health informatics• Engineer better medicines• Reverse-engineer the brain• Prevent nuclear terror• Secure cyberspace• Enhance virtual reality• Advance personalized learning• Engineer the tools of scientific discovery

www.engineeringchallenges.org

Page 12: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

12

New Schools ProjectAerospace

Craven County

Biotechnology Agriscience

Washington County

City of MedicineDurham County

Pre-engineeringWake County

Network Schools

Network SchoolsNetwork Schools

Network Schools

AnchorSchool

AnchorSchool

AnchorSchool

AnchorSchool

New Schools Project

Illustrative example of 16 networked schools linked with 4 anchor schools

Page 13: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

13

New Schools Project• Teachers

– Professional Development

– School visits - (In and out of State)

– Coaching

– Internships

– Summer employment for curriculum development

– Extended employment for four teachers

• Principals– Professional Development

– School visits - (In and out of State)

– Leadership facilitator to assist

• Equipment– $20,000 per school (approximately four classrooms)

Page 14: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

14

RttT Resources for STEMNC

$400 M

State $200 M

Great Teachers & Leaders

Operations

$6.3 M

NSP $10 M

LEAs $165M

20 Schools $3.7 M

Virtual Public

Schools

STEM Virtual

Courses

Mathematics

MEngineering

E Technology

TScience

S

STEM Initiatives

~$45 M

CTE Academies

New Schools Project

PLTW

Cloud $35M

Page 15: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

15

STEM Partners

• Students

• Teachers

• School Administration

• Communities/Parents

School Communities

• Science

• Technology/Instructional

• Engineering - CTE

• Mathematics

• Turnaround Schools

• Virtual Public Schools

• Support Curriculum

– Art

– World languages

– English– Social Studies

• Business/Industry

• External National

Partners

• Innovators

• Legislature

• New Schools Project

• NC STEM Collaborative

• Postsecondary

Education

• Others: museums , etc.

Internal (DPI)Partners

ExternalPartners

Page 16: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

16

STEM Contact Information

Rebecca Payne

Director, Science, Technology, Engineering and Mathematics (STEM) Education and Leadership

NCDPI

[email protected]

Page 17: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

17

NC Education Cloud UpdateMonday, April 11, 2011

Page 18: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

18

NC Education Cloud end game…

• LEAs pay substantially less as part of a buyers’ consortium

• A shift in emphasis from technology support to instructional support

• Increased IT efficiency – fewer more highly utilized servers and other resources

• Increased service reliability – servers hosted in professional data centers with backup, disaster recovery, and service level guarantees

Page 19: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

19

SHARED SERVICES

Attributes:•Aggregate demand and procure/statewide license•Buy services versus build infrastructure•Pay for use infrastructure model(s); sustainable/sharedResults in:•Equity of access to resources•Scale based on aggregate demand•Consistent high performance, reliability •Infrastructure & platforms to support 21st century education•Reduced, sustainable operating costs

Page 20: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

20

Some Really Important Things

• NC Ed Cloud is all about migrating to services• Migrating to services:

• Is not free• Is not always easy• Is not always hard• Requires a well-thought-out contract• Must include a service level agreement with teeth

• LEAs are not all the same so the benefits of cloud accrue differently

• Business intelligence and analytics tools will be important to the sustainability of broad cloud deployments

Page 21: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

21

Cloud

Build/Migrate Operate

Total Cost of Ownership

Capital InvestmentOne-time migrate

E-Rate Eligible ServicesCollaborative ProcurementCost AvoidanceCost ReductionFlexible Funding Models

Page 22: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

22

The NC Education Cloud

Page 23: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

23

Shared Infrastructure

Where “X” is Infrastructure or Software or Desktop or …

Page 24: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

24

A Platform for All RttT Initiatives

Page 25: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

25

Cloud Plan Development Process

LEA Webinars

LEA Region

Meetings

LEA Site Interviews

NC Education Cloud Proposed Plan

Industry Best

Practices

LEA Working Groups

Gather Inform

ationD

efin

e Pr

oble

m

PlanDevelopment

Page 26: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

26

How Are LEAs Involved in the Process?

• Round 1 of LEA Site Interviews; 54 completed May 13.

• Advisory and Working Groups• 52 community participants in our Cloud Advisory process

• Shared Services Advisory Group, 16 members• Identity and Access Management, Data Collection &

TCO Analysis, and Consortium Buying Working Groups: each with about 12 members

• When all projects are underway, nearly 100 LEA participants will be engaged in the process.

• In all groups, each region is represented, and assigned based on interest and subject matter expertise.

Page 27: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

27

Cloud Projects

• Identity & Access Management• Data Collection & TCO Analysis• Consortium Buying• Instructional Resources & Digital Content

Management Systems• Enterprise Infrastructure & Applications• iSeries RFP

Page 28: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

28

Site Interviews

• Objectives• Communications/community education• Data collection to support NC Education Cloud

plan development• Community buy-in

Page 29: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

29

Site Interviews

• DPI Regional Instructional Consultants schedule site interviews

• Distribute link to survey to LEAs• LEAs review the survey prior to the site

interview• Conduct site interviews – complete data

collection • Interview team typically - Dave Furiness, DPI

Instructional Consultant, Contractor - Systems Consultant, NC Ed Cloud Leadership Team

• LEA participants – CTO/Technology Director, designated staff, Instructional leadership

Page 30: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

30

Site Interview Status

• 36 of 48 Phase 1 site interviews completed – remaining 12 (Regions 7 & 8) to be competed by April 21st

• Phase 2 site interviews (six largest LEAs) scheduled to be completed May 13th

• Phase 3 site interviews (remaining LEAs and 10-15 charter schools) will begin May 16th

• Although phase 3 site interviews will collect identical information to phase 1 and 2, on-site discussions will focus on service and process validation

Page 31: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

31

Site Interview Insights – Service Considerations

• LEA and charter school challenges and initiatives

• Understanding the LEA and charter school IT and instructional technology environment

• “Full plate syndrome”• Managing hidden costs (e.g. service migration

costs)

• Economic/financial data and considerations• Where and how is money spent

• Service requirements• Functional• Service management

Page 32: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

32

A Few Early Examples

• iSeries RFP and Plan• Changes in State E-Rate filing process

• Firewall• Content Filtering

Page 33: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

33

What’s next?

• Updates and conversation at Regional Technology Directors’ Meetings in late April and May

• Complete Phase 1 site interviews and assemble feedback and findings to “inform” the projects and the Implementation Plan

• Assemble community needs into Cloud Project recommendations and vet with Advisory Process and industry leaders

• Align all levels of planning with other pillars, especially IIS and NCVPS

Page 34: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

34

Some conversation…

• We want to hear from you:• What are we not doing?• What are your concerns?• What are your pain points?

[email protected]

Page 35: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

35

RttT & E-Rate

1. Previous Funding Request

Must have used an appropriate competitive process and simply need to keep that documentation on file to present if audited by USED regarding use of RttT dollars. In other words, all E-rate and state and local procurement rules apply. While supplanting with RttT funds is not specifically prohibited, to be justified, the expenditures must enable new or expanded capacity that the LEA otherwise would not have had in the absence of the RttT dollars.

2. Future Funding Request

In addition to the “non-supplant” requirement, don’t forget the Interactive Purchasing System (IPS) state requirement for goods or services over $5,000.

Page 36: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

36

Sole Sourcing

• Can a local education agency (LEA) or charter school sole-source for a technology product or with a technology vendor?• LEAs should strive to use competitive bidding

procedures, but certain technology purchases can be sole sourced

• LEAs/charters MUST follow the guidelines posted at

http://snurl.com/ncrtttss

Page 37: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

37

Neill KimreyDirector, Instructional [email protected]

NC Education Cloud Site: cloud.fi.ncsu.edu

Page 38: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

38

Questions?

Page 39: Career & College: Ready, Set, Go! NCs Race to the Top (RttT) Initiative State Board of Education April 7, 2011

39

Webinar Summary1. Reiterated General RttT Requirements &

Process for LEAs/Charters (“Local”)

2. Clarified State Plan & Implications for Local Plans

• Science, Technology, Engineering, & Math (STEM)

• NC Education Cloud

3. Addressed Questions

Key Take Away = Know how to move forward with your local RttT plan!