CASE HISTORY PIPE-LAYING VESSEL DE HE 5000T

CASE HISTORY PIPE-LAYING VESSEL DE HE 5000T · 2020. 8. 26. · Case History PIPE-LAYING VESSEL DE HE 5000T Project duration: 2014 - 2018 Location: Goriziane Group, Italy, Yantai

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CASE HISTORY PIPE-LAYING VESSEL DE HE 5000T · 2020. 8. 26. · Case History PIPE-LAYING VESSEL DE HE 5000T Project duration: 2014 - 2018 Location: Goriziane Group, Italy, Yantai

CASEHISTORYPIPE-LAYING VESSEL DE HE 5000T

Page 2: CASE HISTORY PIPE-LAYING VESSEL DE HE 5000T · 2020. 8. 26. · Case History PIPE-LAYING VESSEL DE HE 5000T Project duration: 2014 - 2018 Location: Goriziane Group, Italy, Yantai

Ca

se

His

tory

PIPE-LAYING VESSEL DE HE 5000T

Project duration: 2014 - 2018

Location: Goriziane Group, Italy, Yantai and Shanghai, China

Scope of work: project management, engineering, construction, on-site

assembly, commissioning, after sales service of:

» pipe handling system

» welding system

» on-board safety plant system

» stinger and stinger handling system

for the pipe-laying vessel DE HE 5000T of Yantai Salvage Bureau.

Scope of work: project management, engineering, construction,

on-site assembly, commissioning and after-sales service of:

PHE for OD pipe range 6”-60”, length range 12-24 [m], made up of:

» Pipe Elevators

» Walking Beams

» Longitudinal Conveyors

» Transfer vehicles (Transversal Conveyors)

» Line-up and Pipe Rotators for DJ prefabrication

» Line-up in Firing Line

» Firing Line Rollers

» Hyd. Power Units 6x110kW

PHS

Page 3: CASE HISTORY PIPE-LAYING VESSEL DE HE 5000T · 2020. 8. 26. · Case History PIPE-LAYING VESSEL DE HE 5000T Project duration: 2014 - 2018 Location: Goriziane Group, Italy, Yantai

FEATURES

» Triangular shape cross section with variable width

» First section upper chords spacing 18.28 m

» First section handling bar spacing 28.22 m

» Typical longitudinal roller spacing 8.00 m

» Sections joined by hinged connections at the upper chords

» Variable Lenght linkage connecting the lower chords

» Last frame of all sections suitable for vertical roller

15.000 hours of engineering

290 days of construction

SHS HPU MAIN DATA

» Power installed 3x110 kW

» Oil flow 350 l/min

» Maximum pressure 350 bar

» Working pressure 310 bar

» Water cooled

VLL 1-2 MAIN DATA

» Total stroke 4000 mm

» Step 800 mm

» Maximum static load 3000 t

» Maximum jacking capacity 1500 t

SENSORS AND

INSTRUMENTATION

VLL 2-3 MAIN DATA

» Total stroke 2800 mm

» Step 700 mm

» Maximum static load 600 t

» Maximum jacking capacity 400 t

Rigid bar operated through a push-pull system made up of

beams and rails

JACKING SYSTEM MAIN DATA

Total stroke ab. 20 m

Step 750 mm

Maximum static load 3000 t (each)

Maximum jacking capacity 2500 t (each)

No. pulling cylinder 4

Cylinder stroke 770 mm

Working pressure 300 bar

Maximum pressure 350 bar

Total travelling time 60 min approx.

VLL

The linkage works as structural connection between stinger ramps 1-2

and ramps 2-3, and allows their relative angular position to be modified,

thus it controls pipe exit angle from the stinger at the end of ramp 3.

It is basically made up of one female beam, one male beam, two hydraulic

cylinders and a fixing system. It is provided with a local hydraulically

operated step by step length adjustment mechanism.

SAW WELDING EQUIPMENT for DOUBLE JOINT FACILITY

Goriziane engineered and manufactured a unique solution for double joint

welding system consisting in welding control ID/OD, joint tracking ID/OD,

welding devices ID/OD flux system ID/OD, pipe transportation system

(PHE interface), welding beam, operation and monitoring, communication

to external systems.

UMBILICAL MANAGEMENT SYSTEM“ASPO” FOR FIRING LINE

The machine has been designed to be part of a S-lay laying plant.

It is able to interlock the internal line-up clamps that are operating on

the firing line, power them, and recover them in case of any failure.

STINGER HANDLING SYSTEM

VARIABLE LENGTH LINKAGE

Ca

se

His

tory

STINGERSTRUCTURE

» Section 1

» Section 1 + section 2

» Section 1 + section 2 + section 3

» Section 1 + section 2 + section 3 + section 4

Section Length (m) N. of Roller Boxes1 52.0 62 32.0 43 23.5 34 15.5 21+2+3+4 123.0 15

SectionWeights (t)

Structure Roller Boxes Total1 850 65 9152 280 45 3253 160 40 2004 130 30 1601+2+3+4 1420 180 1600

Stinger Configuration – Laying Configuration R80 - R800

Variable Length Link Beams

Hydraulic cylinders

Rear block

Locking pins

Rectangular shaped holes

Machine foundations(HPU and Switchboard Rooms)

Linking bar

Front block

Rail

Max laying water depth: from 50 to 3,000 m

Page 4: CASE HISTORY PIPE-LAYING VESSEL DE HE 5000T · 2020. 8. 26. · Case History PIPE-LAYING VESSEL DE HE 5000T Project duration: 2014 - 2018 Location: Goriziane Group, Italy, Yantai

GORIZIANE GROUP S.P.A.

34070 Villesse (GO) - Italy

Via Aquileia, 7

Ph. +39 0481 91511

Fax +39 0481 91490

[email protected]

www.goriziane.it