CASEHISTORYPIPE-LAYING VESSEL DE HE 5000T
Ca
se
His
tory
PIPE-LAYING VESSEL DE HE 5000T
Project duration: 2014 - 2018
Location: Goriziane Group, Italy, Yantai and Shanghai, China
Scope of work: project management, engineering, construction, on-site
assembly, commissioning, after sales service of:
» pipe handling system
» welding system
» on-board safety plant system
» stinger and stinger handling system
for the pipe-laying vessel DE HE 5000T of Yantai Salvage Bureau.
Scope of work: project management, engineering, construction,
on-site assembly, commissioning and after-sales service of:
PHE for OD pipe range 6”-60”, length range 12-24 [m], made up of:
» Pipe Elevators
» Walking Beams
» Longitudinal Conveyors
» Transfer vehicles (Transversal Conveyors)
» Line-up and Pipe Rotators for DJ prefabrication
» Line-up in Firing Line
» Firing Line Rollers
» Hyd. Power Units 6x110kW
PHS
FEATURES
» Triangular shape cross section with variable width
» First section upper chords spacing 18.28 m
» First section handling bar spacing 28.22 m
» Typical longitudinal roller spacing 8.00 m
» Sections joined by hinged connections at the upper chords
» Variable Lenght linkage connecting the lower chords
» Last frame of all sections suitable for vertical roller
15.000 hours of engineering
290 days of construction
SHS HPU MAIN DATA
» Power installed 3x110 kW
» Oil flow 350 l/min
» Maximum pressure 350 bar
» Working pressure 310 bar
» Water cooled
VLL 1-2 MAIN DATA
» Total stroke 4000 mm
» Step 800 mm
» Maximum static load 3000 t
» Maximum jacking capacity 1500 t
SENSORS AND
INSTRUMENTATION
VLL 2-3 MAIN DATA
» Total stroke 2800 mm
» Step 700 mm
» Maximum static load 600 t
» Maximum jacking capacity 400 t
Rigid bar operated through a push-pull system made up of
beams and rails
JACKING SYSTEM MAIN DATA
Total stroke ab. 20 m
Step 750 mm
Maximum static load 3000 t (each)
Maximum jacking capacity 2500 t (each)
No. pulling cylinder 4
Cylinder stroke 770 mm
Working pressure 300 bar
Maximum pressure 350 bar
Total travelling time 60 min approx.
VLL
The linkage works as structural connection between stinger ramps 1-2
and ramps 2-3, and allows their relative angular position to be modified,
thus it controls pipe exit angle from the stinger at the end of ramp 3.
It is basically made up of one female beam, one male beam, two hydraulic
cylinders and a fixing system. It is provided with a local hydraulically
operated step by step length adjustment mechanism.
SAW WELDING EQUIPMENT for DOUBLE JOINT FACILITY
Goriziane engineered and manufactured a unique solution for double joint
welding system consisting in welding control ID/OD, joint tracking ID/OD,
welding devices ID/OD flux system ID/OD, pipe transportation system
(PHE interface), welding beam, operation and monitoring, communication
to external systems.
UMBILICAL MANAGEMENT SYSTEM“ASPO” FOR FIRING LINE
The machine has been designed to be part of a S-lay laying plant.
It is able to interlock the internal line-up clamps that are operating on
the firing line, power them, and recover them in case of any failure.
STINGER HANDLING SYSTEM
VARIABLE LENGTH LINKAGE
Ca
se
His
tory
STINGERSTRUCTURE
» Section 1
» Section 1 + section 2
» Section 1 + section 2 + section 3
» Section 1 + section 2 + section 3 + section 4
Section Length (m) N. of Roller Boxes1 52.0 62 32.0 43 23.5 34 15.5 21+2+3+4 123.0 15
SectionWeights (t)
Structure Roller Boxes Total1 850 65 9152 280 45 3253 160 40 2004 130 30 1601+2+3+4 1420 180 1600
Stinger Configuration – Laying Configuration R80 - R800
Variable Length Link Beams
Hydraulic cylinders
Rear block
Locking pins
Rectangular shaped holes
Machine foundations(HPU and Switchboard Rooms)
Linking bar
Front block
Rail
Max laying water depth: from 50 to 3,000 m