Upload
ravi-srivastava
View
213
Download
0
Embed Size (px)
Citation preview
8/6/2019 Case Study 123
1/5
8/6/2019 Case Study 123
2/5
Company Profile ; Zydus Cadila is an innovative global pharmaceutical company that discovers,
develops, manufactures and markets a broad range of healthcare products
Situation; The company want to improve operational excellence by
End to end operations.
Continuous material movement, no in process storage.
Full visibility of all operations, preferably on same floor.
Each process should be pull system instead of conventional produce and push system.
In short only when one batch is completely produced next batch can be taken.
No in process quarantine.
Inspection and QC are non Value added activities (so time taken for inspection and quality
control activities to be minimized).
Any process is in trouble, rest of the resources pours in to solve it immediately.
With the elimination of most departmental barriers, communication was enhanced.
Cellular diagram
8/6/2019 Case Study 123
3/5
8/6/2019 Case Study 123
4/5
8/6/2019 Case Study 123
5/5
Results.
Value added time(% Total Time) 40%
Cycle Time 80 Hrs
(Dispensing to Packing)
Distance Traveled by Batch 73 mts
(Dispensing to Packing)
Distance traveled by QC
Sample 0
Statement of recommendation;
By implementing value stream mapping we can reduce the lead time of the operation and as
well elimination of seven Mudas in the operation.