3kWOff-gridcelltowerinNewman,WesternAustralia

Page 2: Case Study: 3kW cell tower Western Australia

Location– Irradiation

Ø Hypotheticaltelecomoff-gridsiteinNewman,WA• Latitude23° 21,75’S• Longitude119° 40,22’E• Scaledannualaverageirradiation:6,23kWh/m2/day

4/18/16 2

Page 3: Case Study: 3kW cell tower Western Australia

ConsumerLoadProfile

Ø Continuous48Vdc-load• Average:3kW• Peak:3,54kW• ScaledannualAverage:72kWh/day• Annualload:26.280KWh

4/18/16 3

Page 4: Case Study: 3kW cell tower Western Australia

Systemset-up

Ø 1unitofTigerPower’sStorager withfollowingkeycomponents:• TigerPower’sEnergyManagementSystemincl.RemoteMonitoring• Rainwatercatchmentsystemof15m2(equalstoca. 4600ltr/yr)• (Rain)watertank1.000ltr• 2.000L/helectrolyser withrainwaterinletfilter• 5kWFuelCellsystem• 4HydrogenStoragetanksof850L• Receptionfacilityfor24H2-cylinersat200bar(back-up)

Ø 4unitsofTigerPower’sproprietarySunfolds• Total installedsolarpanels:18,8kWp• 48Vdcbatterybankswithatotalnominalcapacityof76,8Kwh

4/18/16 4

Page 5: Case Study: 3kW cell tower Western Australia

EnergyGeneration

Ø Atthegivenlocation4Sunfolds havetogetherfollowingproductiondata:• Ratedcapacity:18,8kWp• MeanOutput:4,5kW• MeanDailyOutput:108,5kWh• CapacityFactor:24,056%• MaximumOutput:18,7kW• HoursofOperation:4.388h/yr

4/18/16 5

Page 6: Case Study: 3kW cell tower Western Australia

Shorttermenergystorage

Ø Thesystemisequippedwitha48Vdcbatterybanktoprovideshorttermenergystorage• Nominalcapacity:76,8Kwh• Usablenominalcapacity:38,4kWh(tolimitDODto50%)• Autonomy:ca.12hours

Ø AnnualStateofChargegraph:

4/18/16 6

Page 7: Case Study: 3kW cell tower Western Australia

Long-termenergystorage

Ø ThesystemisequippedwithaHydrogencycletoprovideforlong-termenergystorage:

Ø On-siteHydrogenStorage:• capacity:9,2kg• Tankautonomy:306kWhorca.102hrs

Ø Thebelowgraphsshowsthetankleveltroughtheyear:

4/18/16 7

Page 8: Case Study: 3kW cell tower Western Australia

Self-sustainability

Ø AnnualDCload=26.280kWhØ AnnualElectricityProduction:

• PVarray:39.617kWh(directconsumption+battery+on-siteelectrolyser )• FuelCell:2.594KWh

Ø AnnualH2 consumption:165kg• On-siteelectrolyser :149kgor91%• Back-upH2-supply:15kgor9%(duringmonthswithlowerirradiation)

4/18/16 8

Ø Energy-wisethesystemhasaself-sustainability ratioof99,2%!Ø ExternalsupplyofH2 islimitedtoone truckdeliveryperyearwith2racks

of8xB50bottles!