Jack Marrano of Downsview Heating Our company has installed approximately 800 Hi-Velocity Systems in the greater Toronto area in the last 2 years. We chose the Hi-Velocity Systems for the Daniel's Beach Home Project because of, ease of installtion, space saving and proper air distribution, especially to the third floor. There is no doubt in our minds that this system offers superior features over other traditional residential systems. ESP 506.01 Case Study 506.01

Case Study 506.01 Jack Marrano of Downsview Heating · 2013-07-27 · Jack Marrano of Downsview Heating Our company has installed approximately 800 Hi-Velocity Systems in the greater

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Case Study 506.01 Jack Marrano of Downsview Heating · 2013-07-27 · Jack Marrano of Downsview Heating Our company has installed approximately 800 Hi-Velocity Systems in the greater

Jack Marrano of Downsview HeatingOur company has installed approximately 800 Hi-Velocity Systems in the greater Toronto area in the last 2years. We chose the Hi-Velocity Systems for the Daniel's Beach Home Project because of, ease of installtion,space saving and proper air distribution, especially to the third floor. There is no doubt in our minds that thissystem offers superior features over other traditional residential systems.

ESP 506.01

Case Study 506.01