CaseStudy– utilisingbiogasforprocessheat
BiogasfromHeatusingFoodProcessingWaste/AgResiduesBioenergyAustraliaBiogasWorkshops
PresentationContent
• ManagingH2S– doyouneedpretreatment?• Gastrain– whatsafetydevicesarerequired?• Dualfuelboiler– howtooperatethroughoutcycle?
WheredoesH2Scomefrom?
• Q- WhatcausesH2S?• A– SulphurcompoundswhenanaerobicallydigestedwithasourceofhydrogenandsulphatereducingbacteriawillpreferentiallydecomposetohydrogensulphidebeforemethanogenicbacteriacanmakemethaneorCO2.
• Q– Wheredothesulphurcompoundscomefrom?• A– DigesterFeedstock(cellularmatter,solubleforms),CIPchemicals
• Q– Howtominimisepriortoconsideringpretreatment?• A– MinimisesulphurcompoundsinCIPchemicals,sourcesegregateveryhighstreamsifpossible.
TypicalbiogasH2Sconcentrations
• Brewerywastewater– 2,000ppm(1,000ppmwithacampaigntoreducesulphurinCIPchemicals)• Pulpandpaperwastewater– 15,000– 25,000ppm• Municipalsludgedigestion– 1,000– 3,000ppm• Dairy– 1,000– 4,000ppm• Abattoirbiogas– 1,000– 10,000+ppm(highlydependentonprocessingandanimal)• Agriculturalwastebiogas(highlydependentonfeedstock)– 3,000–10,000ppm
• IfH2Sisconsistentlyabove2,000ppm,pre-treatmentisadvisable
UnderstandingSOx corrosion• Keycombustionequationsforbiogas
1.)CH4 +2O2 ->CO2 +2H2O2.)H2S+O2 ->SO2 +H2O3.)SO2 +H2O->H2SO3
CorrosionoccurswhenH2SO3 condensestoH2SO4(Sulphuricacid)
• CorrosionissueswithbiogasatH2Sconcentrationsof2,000ppmcanbemanagedifburnsequenceiscontrolled
• However- CheckthatstackemissionSOx limitsarenotexceeded
• Understandingsulfuricaciddewpointminimum~130Cfromgraphabove.
• ExtremelyimportantforheatrecoverymoduleinCHP– H2Spretreatment iscriticaltopreventcorrosionbyexhaustgases
DualFuelBoiler– startup sequence
• Dualfuelisidealastheinitial1hourofoperationutilisesaH2Sfreefueltogetthestacktemperatureabove130C.
SO2 +H2O->H2SO3(remainsingasphase)
• Oncestacktemperatureisabove130Csulfuricacidwillnotcondense– switchfuelsourcetobiogas• Boilerbackupfuelsourcerequiredregardlessforredundancy• LPG,LNG,CNGallgoodoptions
DualFuelBoiler– shutdownsequence
• Iffuelisblendedinasingleburner,ensurebiogasisnotusedoverthelast30minutestopurgeanyremainingSox inline• Ideallyalsopurgethebiogaslinewithnaturalgastopreventdamagetofeedpipeworkwhenoffline• Flarebiogaswhenbiogasisavailableandheatorpowerisnotrequired• SameconsiderationsforCHPengineapplications– exhaustgastemperatureinheatrecoverymoduleshouldnotbebroughtdowntoolowwithoutcompletepre-treatmentforH2Sremoval.
KeyBiogasTrainequipment
• BoilersandburnermanagementsystemsareregulatedunderAS2593,AS1228.Therearesomeconcessionsifitisahotwaterratherthansteamboiler• OtherdevicescoveredbyTypeBAS3814• Biogastrainfromthecollectionpointtoboilershouldinclude:condensatetrap,biogasblower,biogasregulator,flowmeter,pressuretransmitter,isolationvalves,doubleblockvalvewithleakdetection• Chillingmayberequiredtoreducedewpointhowevercanbemanagedifpipingdistancebetweenblowerandboilerisshortandapositivedisplacementblowerisused• IfH2Sisgreaterthan2,000ppm,pretreatment likelyadvisableviaeitherThiopaq,ironspongeoractivatedcarbon(dependingonconcentration)
ThankYou
• Pleasecomeandsayhelloafterwards!
• Anyquestions/enquiries- Digestionequipment,biogastreatment,CHP
engines,wastewatertreatment,turnkey
projects