Case study GESP Project at The Treasury

Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Case study

GESP Project at The Treasury

Page 2: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Scope of Sharing

• Background

• ECMs

• Energy Savings

• Learning Points

Page 3: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Treasury Building

Treasury building

• GFA 47,047 sqm, 11 storey, office space from L2 to L11

• 6 Ministries and 2 Commercial tenants

• Occupancy – 1200 pple

• Daily visitors – 300 pple

• Average monthly electricity consumption – 649,484 (kWh)

(Before GESP implementation)

Treasury has been awarded :

•Energy Smart Office in 2007

•Green Mark Gold award in 2009

Page 4: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Why ?

• Treasury’s commitment To Reducing Carbon Emission

• FCM on Public Sector to take the lead on Environmental

Sustainability

Page 5: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

GESP Tender

• Pilot energy saving project under the ED initiative using

Guaranteed Energy Saving Performance (GESP)

Contracting Services:• Investment cost by client / owner

• Energy Service Company (ESCO)

– Guaranteed the annual savings for a fixed period

– Guaranteed Return of Investment (ROI)

Page 6: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Milestones

• GESP tender was called in Jan 08

• Energy Audit conducted in Sep 08

• Implementation started from Jul 09

• Project completed in Feb 10

• Guaranteed annual saving commence in Apr 10

Page 7: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Project Cost and Saving

• Consultancy fee - $35K

• Investment cost - $1.3M

• Guaranteed annual saving of $260k per year

for 5 years - ROI of 20%

Page 8: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Energy Conservation Measures

(ECMs)

Page 9: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Energy Conservation Measures (ECMs)

• ECM 1 – Chiller system

• ECM 2 – AHU system

• ECM 3 – Mechanical Ventilation system

Page 10: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

CHILLER SYSTEM CONFIGURATION (After GESP)

Page 11: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Site Implementation

ECM 1 – Chiller System

• Replaced the 650RT and 200RT chillers with new

efficient 700RT and 120RT chillers

• Replaced 4 sets of the chilled water pumps and 4

sets condenser water pumps

• Replaced 3 cooling towers’(CT) motors

• Provided common header of condenser water

•Provided Variable Frequency Drives(VFD) for all

pumps and CT motor with optimisation

Page 12: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

New Efficient Chiller (Day)

• Capacity – 700RT

• Refrigerant – R134a

• Chiller Efficiency – 0.519 kW/RT

2. SITE IMPLEMENTATION

New Efficient Chiller (night)

• Capacity – 120RT

• Refrigerant – R410A

• Chiller Efficiency – 0.643 kW/RT

Page 13: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

New Efficient Pumps

• Chilled Water Pumps

• Condenser Water Pumps

2. SITE IMPLEMENTATION

Page 14: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

CIRCULATING PUMPS VFD

New Variable Frequency Drives for

• Chilled Water Pumps

• Condenser Water Pumps

2. SITE IMPLEMENTATION

Page 15: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

COOLING TOWERS

2. SITE IMPLEMENTATION

• High efficient fan motor

and VFD control Cooling

Towers 1, 2 & 3

VFD

Efficient Motor

Page 16: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

COMMON HEADERS FOR

CONDENDER WATER

• Cooling Towers 1, 2 & 3 at Roof Top

2. SITE IMPLEMENTATION

AfterBefore

• All chillers at B3 outside chiller plant room

Page 17: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

2. SITE IMPLEMENTATION

• New Electro-Magnetic In-

line flow meter at Chilled

Water Return Header

• New Hi-accuracy

Platinum PT-100

Temperature sensors at

Chilled Water Supply &

Return header

• High Accuracy Monitoring Devices

Page 18: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

POWER ANALYZER

• New 3 sets Power Analyzer

at Chiller Plant System

MCC incoming 1, 2, & 3

(2500A / 2500A / 600A)

2. SITE IMPLEMENTATIONS

ENERGEY CALCULATOR AND DATA

COLLECTOR

• Chiller Plant System efficiency calculator at

B3 chiller Plant room control room

• Continuous trend data collector at L1 BMS

room

Page 19: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Energy Master - Efficiency & Energy Monitoring

2. MONITORING DEVICES

Basement 3 – Energy

Master Energy &

Efficiency Calculator

Hi Accuracy In-Line

Electromagnetic Flowmeter

Hi Accuracy 4-wired

Temperature Sensors

Hi Accuracy Power

Analyzer

Level 1 – Control Room

Building Management

System

Page 20: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Site Implementation

ECM 2 – AHUs (21 nos.)

• Provide Pre-Cooled Coils to treat fresh air

• Fine tune FA damper to comply with SS 553

Pre-cooled

coils

Page 21: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Pre-Cooled Coil Installation

Page 22: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

ECM 3 – Ventilation System (8 sets)

Site Implementation

Temperature Sensors

VFD

• Install new Variable Frequency

Drives(VFD) and temperature sensor for

Mechanical Ventilation (MV) systems

• Optimise the operation of MV fan by

using VFD with temperature control

Page 23: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Projected Energy Savings

Page 24: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

ECM 1 - Chillers Plant

Notes:

DO – During Office Hours AO – After Office Hours

Period Performance

(kW/RT)

Average

Load

(RT)

Operating

hour

(Hours)

Daily Power

Consumption

(kWH/day)

Monthly Power

Consumption

(kWH/ mth)

Pre-Retrofit Consumption

Weekday (DO/AO) 1.01 / 1.91 579 / 66.6 12.5 / 3.5 7,755.1 (Peak)

1,017.6 (Off-Peak)

217,308

Sat 1.91 66.6 16 / 8 2,025.3 (Peak)

1017.6 (Off-peak)

Sun 1.91 66.6 16 / 8 2,025.3 (Peak)

1017.6 (Off-peak)

Post-Retrofit Consumption

Weekday (DO/AO) 0.647/ 0.845 579 / 66.6 12.5 / 3.5 4,698.4 (Peak)

405.6 (Off-Peak)

121,131

Sat 0.845 66.6 16 / 8 811.2 (Peak)

405.6 (Off-peak)

Sun 0.845 66.6 16 / 8 811.2 (Peak)

405.6 (Off-peak)

Monthly kWH Savings 96,177

Projected Energy Savings

Page 25: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Projected Energy Saving

ECM 2 - AHUs

Period Performance

(kW/RT)

Average

Load

(RT)

Operating

hour

(Hours)

Daily Power

Consumption

(kWH/day)

Monthly Power

Consumption

(kWH/ mth)

Pre-Retrofit Consumption

Weekday (DO/AO) 0.27 / 0.59 579 / 66.6 13.3 / 4.0 1,714.8 (Peak)

154.2 (Off-Peak)

43,021

Sat 0.59 66.6 3.5 / 4.0 137.4 (Peak)

154.2 (Off-peak)

Sun 0.59 66.6 3.5 / 4.0 137.4 (Peak)

154.2 (Off-peak)

Post-Retrofit Consumption

Weekday (DO/AO) 0.25 / 0.25 579 / 66.6 13.3 / 4.0 1,572.3 (Peak)

142.7 (Off-Peak)

38,241

Sat 0.25 66.6 3.5 / 4.0 58.3 (Peak)

66.7 (Off-peak)

Sun 0.25 66.6 3.5 / 4.0 58.3 (Peak)

66.7 (Off-peak)

Monthly kWH Savings 4,780Notes:

DO – During Office Hours AO – After Office Hours

Page 26: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

ECM 3 - MV Fans

Period Daily Power

Consumption

(kWH/day)

Monthly Power

Consumption

(kWH/ mth)

Pre-Retrofit Consumption

Weekday (DO/AO) 1,504.2 (Peak)

374.15 (Off-Peak)

51,759

Sat 1,254.6 (Peak)

374.15 (Off-peak)

Sun 784.7 (Peak)

139.2 (Off-peak)

Post-Retrofit Consumption

Weekday (DO/AO) 940.3 (Peak)

253.3 (Off-Peak)

33,510

Sat 890.1 (Peak)

253.3 (Off-peak)

Sun 524.0 (Peak)

97.6 (Off-peak)

Monthly kWH Savings 18,250

Projected Energy Saving

Page 27: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Estimated

(Based on Energy Audit

Report)

Projected

(Based on 1 week data after

Implementation)

Description

Proposed

Savings

(kWH/mth)

Proposed

%

Reduction

Projected

Savings

(kWH/mth)

Projected

%

Reduction

EMC 1 (Chiller) 95,044 43.7 96,177 44.3

EMC 2 (AHU) 4,780 11.1 4,780 11.1

EMC 3 (MV) 17,081 33.0 18,250 35.3

116,905 37.5% 119,207 38.2%

Projected Energy Saving

Page 28: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Learning Points

Page 29: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Learning PointsProject Stage

- Pre-survey of site prior to work commencement.

Eg. Removing of access slab for Hoisting of Chiller between

basement 3 plant room and Level 1 hoisting platform.

- Installation of in-line flow meter without disrupting the entire

chilled water system. Eg. Isolation valve faulty during the shutdown.

- Avoid positioning the inlet/discharge PVC chemical dosing pipes

facing the chiller control panel.

- Consider unexpected breakdown during installation stage.

Eg. during the installation of common header for condenser pipe,

consider unexpected breakdown of cooling tower.

Page 30: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

Learning Points

GESP Project

• use of high accuracy monitoring devices such as temperature sensors, flow meter, power meter, etc for better monitoring chiller plant system efficiency.

Monitoring Devices

– Hi Accuracy 4-wired Temperature Sensors

– Hi Accuracy In-Line Electromagnetic Flowmeter

– Hi Accuracy Power Analyzer

Hi Accuracy 4-wired

Temperature Sensors

Hi Accuracy In-Line

Electromagnetic Flowmeter

Basement 3 – Energy

Master Energy &

Efficiency Calculator

Hi Accuracy Power

Analyzer

Page 31: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

After GESP Measures

• Achieved the COP of 5.48

for Chiller system

• Installed monitoring

instrumentation for cooling

load, electrical power and

chiller efficiency reporting

Page 32: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

THANK YOU

Page 33: Case study GESP Project at The Treasury - e2singapore.gov.sg · • GFA 47,047 sqm, 11 storey, office space from L2 to L11 • 6 Ministries and 2 Commercial tenants ... •Energy

My contact:

Chew Ah Cheng

(Senior Associate, ASP)

Tel: 63327396

or

Email : [email protected]