CASE STUDY: LITANI LOWER BASIN Progress. Gumpoldskirchen 18-20 May 2006. The Litani Lower Basin. Intro. The river basin. Stakeholders. WP05. Landuse change. WRM. Obj/Const. Instruments. Conc. LEGEND. 700. 701- 900. Update of the TS daily data. Intro. The river basin. - PowerPoint PPT Presentation

Citation preview

Page 1: CASE STUDY: LITANI  LOWER BASIN  Progress

CASE STUDY: LITANI LOWER BASIN Progress

Gumpoldskirchen 18-20 May 2006

Page 2: CASE STUDY: LITANI  LOWER BASIN  Progress

The Litani Lower Basin

NAME

Average flow (m3/sec; 2002-

2003)*

Average flow

(m3/sec; 2003-2004)

Qelia - 3.57Khardale 25.4 7.82

Gandouriye 34 8.4Qasmiye 31.41 8.9

290Total Karaoun-Qasmiyye (Mm3)

Intro. The river basinThe river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 3: CASE STUDY: LITANI  LOWER BASIN  Progress

LEGEND

700 701-900

Update of the TS daily data

Intro. The river basinThe river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 4: CASE STUDY: LITANI  LOWER BASIN  Progress

Demographic Change

2.16-2.2 % yearly demographic increase •105567 capita•104 communities,5 caza.

•7 towns having a population greater than 3000

Intro. The river basinThe river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 5: CASE STUDY: LITANI  LOWER BASIN  Progress

River use

Intro. The river basinThe river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 6: CASE STUDY: LITANI  LOWER BASIN  Progress

Litani Irrigation Canal

Qasmiyye

Total: 22 Millions m3/year (Litani water Authority)

•62km2 (Citrus)•55km2 (banana)

Intro. The river basinThe river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 7: CASE STUDY: LITANI  LOWER BASIN  Progress

0

0.2

0.4

0.6

0.8

1

1.2Ja

nu

ary

Feb

ruar

y

Mar

ch

Ap

ril

May

Jun

e

July

Au

gu

st

Sep

tem

ber

Oct

ob

er

No

vem

ber

Dec

emb

er

Time (month)

wat

er d

eman

d (

m3/

sec)

Water demand for Banana

Water demand for citrustrees

ELARD, 2001

Agriculture

Intro. The river basinThe river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 8: CASE STUDY: LITANI  LOWER BASIN  Progress

Institutional Framework*Institutional Framework*

MINISTRY OF ENERGY AND WATER

South Lebanon Water & WastewaterEstablishment

Litani Water Authority

Water Authorities (Jabal Aamel)

Planning/Supervision

•INFRASTRUCTUREIrrigation (Qasmiyye canal, Litani canal 900)

Recreational

Rep

ort

s to

Rep

ort

s to

Rep

ort

s to

•WATER FLOW•WATER QUALITY

•DOMESTIC WATER from Litani River

* * “Decrees 5469/1 -5469/16- 5469/25- 5469/40 (1966); Law 121/2001”

Intro. The river basin StakeholdersStakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 9: CASE STUDY: LITANI  LOWER BASIN  Progress

Stakeholders

Workshop in september 2005Workshop report sent to all the stakeholdersUpdate of stakeholders’ list and information/ (27 qs and 56 stakeholders)Analysis of proposed objectives and constraints from the workshopPresentation of the Project progress scheduled with the Litani AuthorityFollow up second workshop in August 2006

NGO

Pub. Auth

Intro. The river basin StakeholdersStakeholders WP05 Obj/ConstLanduse change Conc. WRM Instruments

Page 10: CASE STUDY: LITANI  LOWER BASIN  Progress

WP05: GIS DATA

Land Use 1998 Res. 10m

Land Use 2005 IKONOS Res. 1m

Point features:

a) Villagesb) Springsc) Wellsd) Gauging stations

Line features:

a) Drainage networksb) Road networksc) Contourd) Faults

Polygon features:

a) Area location (basin image)b) Cadastral boundariesc) Hydrogeologyd) Geologye) Soil_gezef) Rainfallg) LUC ( land cover/use)

Change in Land Use land cover was done based on :

- Level (100, 200, 300, 400...)- Individual crop at 3rd level

Intro. The river basin Stakeholders WP05WP05 Obj/ConstLanduse change Conc. WRM Instruments

Metadata Input

Page 11: CASE STUDY: LITANI  LOWER BASIN  Progress

Land Use Change (level)

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Landuse change Conc. WRM Instruments

Page 12: CASE STUDY: LITANI  LOWER BASIN  Progress

Land Use Change

Type Area km2 (2005) Area km2 (1998) Difference (1998-2005)Not identified 7.52 74 -66.375Urban Fabric 369.93 42 327.486Agricultural terrains 11.49 19 -7.217Woodedland 4.60 259 -254.890Grassland 6.65 2 4.933Non productive lands 6.09 10 -3.936

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

Not identif ied Urban Fabric Agricultural terrains Woodedland Grassland Non productive lands

Type of LU-LC

Are

a (k

m2)

2005 1998

Increase in Urban Fabric

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Landuse change Conc. WRM Instruments

Page 13: CASE STUDY: LITANI  LOWER BASIN  Progress

Land Use Change (Banana/Citrus)

1998

2005

Decrease in citrus and banana

S_VALUE AREA Area (2000; km2) Area (2005; km2)224 46850.47 1.969868561 7.62547535224/211 39780.28 1.672596381 2.593459469224/225 38215.98 1.606824074 0.613283915224/231 648678.7 27.27425931 19.37302301

Citrus 32.52354833 30.20524174225 76311.59 3.208587088 0.322521179225/224 33110.34 1.392152849 1.334591607225/231 96080.58 4.039791232 2.869502752

Banana 8.640531168 4.526615539

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Landuse change Conc. WRM Instruments

Page 14: CASE STUDY: LITANI  LOWER BASIN  Progress

1998

2005

Land Use Change (Olives)

Area (2000) Area (2005)66.80 65.80

Decrease in Olives

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Landuse change Conc. WRM Instruments

Page 15: CASE STUDY: LITANI  LOWER BASIN  Progress

WRM Baseline Scenario

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRMWRM Instruments

Page 16: CASE STUDY: LITANI  LOWER BASIN  Progress

Rainfall Runoff Model (15 subcatchments)

Problems with the calibration data

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRMWRM Instruments

Page 17: CASE STUDY: LITANI  LOWER BASIN  Progress

Criteria (based on issues qs and ws)Infrastructural Manageme

ntLegislative Awareness

Increase of surface water and ground water pollution

Waste water treatment plants

Compliance monitoring plans

Enforce standards

Capacity building for local water authorities

Increase in irrigation demands

Newchannels/dams

Decision from the Council of Ministries

Increase of domestic demand (increase of urbanization)

Awareness Campaigns

Incorrect exploitation of the river in Tourism/ violations

Monitoring and control

Improve permitting system

Awareness campaigns

Losses to the sea (winter)

Newchannels/dams

Development of the Agricultural sector

Training on new techniques for irrigation

Intro. The river basin Stakeholders WP05 Obj/ConstObj/ConstLanduse change Conc. WRM Instruments

Page 18: CASE STUDY: LITANI  LOWER BASIN  Progress

•Environmental Level flow in the river in some portions (especially at the coast)•Supply meeting consumption demand

•CONSTRAINTS

•OBJECTIVES

•Increase water demand efficiency•Better exploitation of the River (balanced exploitation)•Control sources of pollution•Decrease losses to the sea

Intro. The river basin Stakeholders WP05 Obj/ConstObj/ConstLanduse change Conc. WRM Instruments

Page 19: CASE STUDY: LITANI  LOWER BASIN  Progress

•Irrigation canal (8.05m3/sec agricultural use and 0.64 m3/sec domestic) cost of 132Million Euros•2 Dams (128 Millions m3)•Waste water treatment plant(s)•Hydroelectrical plant(s)•Hill lakes

•Infrastructure

•Update legislation/improve enforcement•Decrease violations on River

•Legal

•Management •Water pricing•Improvement of the canalization (decrease of losses)

•Awareness campaigns

•Irrigation technologies (surface irrigation to drip or sprinkle)•Alternative crops (less water consuming)

INSTRUMENTS

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Conc. WRM InstrumentsInstruments

Page 20: CASE STUDY: LITANI  LOWER BASIN  Progress

PROBLEMS

•RRM model (daily data for control points on subcatchment, data cannot be calibrated to a control station)• Water Quality (Stream cannot be used since there were no levels of BOD detected during sampling in the River; potential campaign in summer(?))

FUTURE WORKS

•Finalize Baseline scenario (data, economic information, etc.)•Input to WP04 (Instruments and water technologies, cost of infrastructure on the River •Optimization runs•Second workshop to quantify constraints, validate scenarios, in August 2006 after the progress report

Intro. The river basin Stakeholders WP05 Obj/ConstLanduse change Conc. Conc. WRM Instruments