Owner SMC Consolidated Power Corporation Client Formosa Heavy Industries Corporation, Taiwan Chimney EPC Contractor Zelan BEC Consortium Lining System SCR-Ten 2 Project Participants Challenges x Rack Limited site space available x Tight construction timelines Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works. SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction in Bataan. The new 900 MW power facility will provide energy to help boost the Luzon grid and address the tight power supply in the region. San Miguel Corporation was constructing a 2 x 150 MW coal-fired power station in Bataan, Limay, Philippines. The main EPC contractor for the chimney was BEC. SMC LIMAY PROJECT CASE STUDY SMC LIMAY (K1AU3) PROJECT UNITS 1 + 2 BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966 Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]

CASE STUDY SMC LIMAY (K1AU3) PROJECT UNITS 1 + 2 Limay (K1AU3... · 2019-05-15 · SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CASE STUDY SMC LIMAY (K1AU3) PROJECT UNITS 1 + 2 Limay (K1AU3... · 2019-05-15 · SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction

Owner

SMC Consolidated Power Corporation

Client

Formosa Heavy Industries Corporation, Taiwan

Chimney EPC Contractor

Zelan BEC Consortium

Lining System

SCR-Ten 2

Project

Participants

Challenges Rack Limited site space available

Tight construction timelines

Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works.

SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction in Bataan. The new 900 MW power facility will provide energy to help boost the Luzon grid and address the tight power supply in the region.

San Miguel Corporation was constructing a 2 x 150 MW coal-fired power station in Bataan, Limay, Philippines. The main EPC contractor for the chimney was BEC.

SM

C L

IMA

Y P

RO

JE

CT

CASE STUDY SMC LIMAY (K1AU3)

PROJECT UNITS 1 + 2

BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966

Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]

Page 2: CASE STUDY SMC LIMAY (K1AU3) PROJECT UNITS 1 + 2 Limay (K1AU3... · 2019-05-15 · SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction

Chimney Data

Height 100m

No. of internal steel flue 2

No. of internal platforms 5

Diameter of internal flue 3.9m

External concrete diameter 14.68m-11.98m

Piles 165 x 600 dia

Pile Cap 28080 dia x 4000 thk

Limay Project 1 + 2 Stack elevation

Windshield slip form Rig erection in progress

Steelwork Fabrication

Page 3: CASE STUDY SMC LIMAY (K1AU3) PROJECT UNITS 1 + 2 Limay (K1AU3... · 2019-05-15 · SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction

Owner

SMC Consolidated Power Corporation

Client

Formosa Heavy Industries Corporation, Taiwan

Chimney EPC Contractor

Balanced Engineering and Construction Pte Ltd

Lining System

SCR-Ten 2

Project

Participants

Challenges Limited site space available

Tight construction timelines

Detail of work by BEC BEC was awarded the Design & Build package for the chimney, including piles, pilecap, slipform, heavy lifting of roof, floors and flue, installation of internal rack and pinion hoist, AWLs, internal lighting, lightning conductor, earthing works and internal liners.

SMC Limay 3 + 4 Project SMC has proposed a 2 x 150 MW coal fired power station for construction in Bataan. The new 900 MW power facility will provide energy to help boost the Luzon grid and address the tight power supply in the region.

San Miguel Corporationn was constructingf a 2 x 150 MW coal-fired power station in Bataan, Limay, Phillipines. The main EPC contractor for the chimney was Formosa Heavy Industries Corporation..

SM

C L

IMA

Y P

RO

JE

CT

CASE STUDY SMC LIMAY (K1AU3)

PROJECT UNITS 3 + 4

BEC Group of Companies c/o 18 Boon Lay Way #10-159/162 TradeHub 21 Singapore 609966

Tel: +65 6778 6858 Fax: +(65) 6690 9259 Website: www.be-con.com Email: [email protected]

Page 4: CASE STUDY SMC LIMAY (K1AU3) PROJECT UNITS 1 + 2 Limay (K1AU3... · 2019-05-15 · SMC Limay 1 + 2 Project SMC has proposed a 2 x 150 MW coal fired power station for construction

Chimney Data

Height 100m

No. of internal steel flue 2

No. of internal platforms 3

Diameter of internal flue 3.9m

External concrete diameter 14.68m-11.98m

Piles 165 x 600mm dia

Pile Cap 28080mm dia x 4000mm thk

Limay Project 3 + 4 Stack elevation

Completed chimney Rig erection in progress

Steelwork Fabrication