Presentation OutlinePresentation OutlineIntro to the Case Study Project
Intro to the Living Building Challenge
Review how the Case Study scores in the Living Building Challenge system
Discussion of the Implementation and Philosophy of certification systems - the Living Building Challenge in particular.
CARBONDALE
What is a Multi-tenant Non-profit Center?
Mountain Valley Developmental Services Opening Celebration
$9.75per SF
33,000 SF net leasableAffordable rents$4.2M remodel
Why Living Building?
Cochran Gardens housing complex, St. Louis.1953 - 2008.
Photo: Ecology of Absense, blog by Michael Allen
The Living Building Challenge:The Metaphor of a Flower
Rooted in place and yet...
•harvests all it’s own energy + water•is adapted to climate + site•operates pollution free•promotes health + well-being•is comprised of integrated systems•is beautiful.
quoted from Cascadia GBC Living Building Challenge
Rules of Living Building
Prerequisites not Points
Compliance is certified on 12 months of operation, not modeling and projections.
Exceptions
Living Building Challenge
The Challenge:Tracking the info
Carbondale Council for Arts and Humanities Fundraiser Fashion
Show
It’s a challenge, not a piece of cake
Living Building Challenge
SITEDESIGN
1 RESPONSIBLE SITE SELECTION
image from Google Earth
SITEDESIGN 2 LIMITS TO GROWTH
We were compliant with an existing building, previously developed site
SITE DESIGN 3 HABITAT EXCHANGE
Living Building Challenge
ENERGY 4 NET ZERO ENERGY
ENERGY 4 NET ZERO ENERGY
ENERGY 4 NET ZERO ENERGY
ENERGY 4 NET ZERO ENERGY
ENERGY 4 NET ZERO ENERGY
ENERGY 4 NET ZERO ENERGY
ENERGY 4 NET ZERO ENERGY
Living Building Challenge
MATERIALS 5 MATERIALS RED LIST
Cadmium
Chlorinated or Chlorosulfonated Polyethylene
CFCs and HCFCs
Chloroprene (Neoprene)
Formaldehyde
Halogenated retardants
Lead or Mercury
Petrochemical fertilizers and pesticides
Phthalates
PVC
Creosote, Arsenic or Pentachlorophenol
images courtesy Pharos
MATERIALS 6 CONSTRUCTION CARBON FOOTPRINT
MATERIALS 7 RESPONSIBLE INDUSTRY
MATERIALS 8 APPROPRIATE MATERIALS/SERVICES RADIUS
250 miles-heavy, high density
500 miles-medium weight and density
1,000 miles-light, low density
95%-metals
95%-paper and cardboard
100%-soil and biomass
90%-rigid foam, carpet, insulation
80%-all other
MATERIALS 9 LEADERSHIP IN CONSTRUCTION WASTE
Living Building Challenge
WATER 10 NET ZERO WATER
10 NET ZERO WATERWATER
11 SUSTAINABLE WATER DISCHARGE
WATER
VS
Living Building Challenge
INDOOR ENVIRONMENTAL
QUALITY
12 CIVILIZED WORK ENVIRONMENT
INDOOR ENVIRONMENTAL
QUALITY
13 HEALTHY AIR-SOURCE CONTROL
INDOOR ENVIRONMENTAL
QUALITY
14 HEALTHY AIR-VENTILATION
California Title 24
Living Building Challenge
BEAUTY & INSPIRATION 15 BEAUTY AND SPIRIT
Suite 155Community Gardens
BEAUTY & INSPIRATION
16 INSPIRATION AND EDUCATION
Pho
tos
cour
tesy
Sol
ar E
nerg
y In
tern
atio
nal
PetalPetal Can We?Can We? Cost IncrementCost Increment Cost Driver:Cost Driver:SiteSite Yes! $15 k + Habitat Exchange plus.
EnergyEnergy Maybe $1.7 milDepends on load reduction,
incentives, financing strategies.
MaterialsMaterials MaybeMaybe $550 k +20-40% material premium,
research, onsite, supervision.
WaterWater No $3.2 mil Hard costs Harvesting & Living Machine.
Indoor QualityIndoor Quality Exception Exception ReqReq’’dd $290 k + HVAC changes, 50 doors,
exception on windows.
Beauty & Beauty & InspirationInspiration Yes! $50 k +
Controls, Displays, Signage, Light & Plants. Anything is up
from existing.
Living Building cost for a renovation, over base budget:
Cost Totals: Not a cakewalk.
Budget:Budget: Dollar amountDollar amount Cost per SFCost per SF
Basic renovationBasic renovation $4.2 Million $93.00/sf
Increase needed to Increase needed to meet LBCmeet LBC $5.8 Million* $128.00/sf
Total for a Living Total for a Living Building renovationBuilding renovation $10.0 Million $222.00/sf
Area:45,100 sf
Gross,Existing
The Realities of Third StreetChallenges of a Remodel
Small Building, Small Firms
Many things to many people
Cascadia & LBCHelpful Conditions:TemperateNearby resourcesLots of WaterSubstantial incentivesSocial inclination
Challenges:Cloud cover Cheap energy
Arid-Mountain & LBCHelpful Conditions:SunshineDecent incentivesSocial inclination
Challenges:Scarce waterFar from manufacturing Access to materialsCheap energyExtreme temperatures
LBC Financial Feasibility
borrowed with permission from Cascadia GBC
Radically affects the payback period.Incentives are critical.
Institutional clients build high quality, long life buildings. Initial budget for base building higher, increment to Living Building is lower.
Cost of Energy + Water
Client
Extremes in temperature.Amount and regularity of rainfall.
Climate
User actions + interface will be critical.Willingness to adapt / change behavior.Client / Occupant buy-in and advocacy.
Area’s building culture affects willingness to pursue bleeding edge green.Designer’s past experience.Contractor’s past experience.
Occupants
Team Familiarity
First costs are much higher for small and very small buildings.Floor area to roof area ratios radically affect PV and water collection.
Size Does Matter
The Big QuestionsPragmatist vs. Idealist
The regionalization of building economies
Support of USGBC
Regionalizing Economies
Diversified manufacturing
A flourishing of regionally appropriate design solutions.
Would regions develop carrying capacities?
image from strangemaps.wordpress.com, original concept from Joel Garreau, ‘Nine Nations of North America’
Blog + Dialogue
Living Building Financial study
All things Living Building
Presentation Authors:• Gavin Brooke, Sara Plesset, Andrea Korber
Land + Shelter, Inc. (Team Role: Development Partner)
• Jeff Dickinson, Angela LoughryEnergy & Sustainable Design (Team Role: Architects)
• Laura Kirk, Charlie KeesDHM Design (Team Role: Landscape Architects)
Credits:Town of Carbondale
Alpine BankManaus Fund
SCoRIndividual Donors
•Land + Shelter
Energy & Sustainable DesignRoaring Fork CDCWork in Progress
B & H General ContractorDHM DesignSol Energy
Mike Thele P.E. Structural Engineering
Sopris EngineeringResource Engineering Group
The Boulder Engineering CompanyGobbel Hays PartnersRising Sun EnterprisesBenya Lighting Design