Upload
ramawiwaha
View
238
Download
0
Embed Size (px)
Citation preview
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 1/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 LantaiLokasi : Kab Bogor Jawa BaratSatuan Kerja : Penyediaan Perumahan Kementerian Perumahan RakyatKegiatan : Penyediaan Rumah SusunTahun Anggaran : 2014
No.JUMLAH HARGA
( Rp. )
DURASI
( minggu )
Bobot
( % )
Minggu ke
1
Minggu ke
2
I. PEKERJAAN PERSIAPAN 37,324,962.05Rp 2 3.11 0.278 0.28
II. PEKERJAAN STRUKTUR 405,636,442.86Rp
A. 130,387,260.25Rp
A. PEKERJAAN STRUKTUR BAWAH 79,453,604.00Rp 6.62 2.200 2.20
A. PEKERJAAN STRUKTUR LANTAI DASAR 50,933,656.25Rp 4.24
B 102,298,027.11Rp 8.52
C 85,278,856.95Rp 7.11
D 62,388,108.32Rp 5.20
E 14,453,340.38Rp 1.20
F. 10,830,849.85Rp 0.90
III. PEKERJAAN ARSITEKTUR 402,414,423.90Rp
A. 117,548,919.40Rp 9.80
B. 95,711,295.61Rp 7.98
C. 52,025,558.45Rp 4.34
D. 24,453,275.93Rp 2.04
E. 44,460,869.72Rp 3.71
F. 29,568,525.08Rp 2.46
PEKERJAAN LANTAI
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN PLAFOND DAN PERAPIHAN BETON EKSPOSE
CASH FLOW DAN KURVA S
JENIS PEKERJAAN
PEKERJAAN LANTAI DASAR
PEKERJAAN STRUKTUR LANTAI 2
PEKERJAAN STRUKTUR LANTAI 3
PEKERJAAN STRUKTUR LANTAI ATAP
PEKERJAAN PENUTUP ATAP
PEKERJAAN STP / BIO-SEPTICK
PEKERJAAN SANITAIR
PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
PEKERJAAN STRUKTUR LANTAI DAK
Halaman :1/33 CAH FLOW, KURVA S
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 2/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 LantaiLokasi : Kab Bogor Jawa BaratSatuan Kerja : Penyediaan Perumahan Kementerian Perumahan RakyatKegiatan : Penyediaan Rumah SusunTahun Anggaran : 2014
No.JUMLAH HARGA
( Rp. )
DURASI
( minggu )
Bobot
( % )
Minggu ke
1
Minggu ke
2
CASH FLOW DAN KURVA S
JENIS PEKERJAAN
G. 24,715,716.68Rp 2.06
H. 2,145,948.86Rp 0.18
I. 1,544,614.17Rp 0.13
J. 10,239,699.99Rp 0.85
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 354,638,385.94Rp
A. 59,368,877.61Rp 4.95
B. 14,984,557.77Rp 1.25
C. 5,859,026.52Rp 0.49
D. 50,219,979.00Rp 4.18
A. 63,455,999.96Rp 5.29
B. 49,580,213.87Rp 4.13
C. PEKERJAAN INSTALASI PEMADAM KEBAKARAN RINGAN ( APAR ) 1,296,237.73Rp 0.11
D. PEKERJAAN INSTALASI FIRE ALARM 50,622,558.55Rp 4.22
E. PEKERJAAN INSTALASI TV 5,421,338.56Rp 0.45
F. PEKERJAAN INSTALASI PENANGKAL PETIR 38,249,689.95Rp 3.19
G. PEKERJAAN INSTALASI TELEPON Tidak Ditawarkan
PEKERJAAN MEKANIKAL
PEKERJAAN PENGECATAN
PEKERJAAN DRAINASE
PEK PERKERASAN DI DALAM & KELILING BAGIAN LUAR BAN
PEKERJAAN LISTRIK
INSTALASI AIR KOTOR DAN AIR BEKAS
PEKERJAAN PANEL
STP / BIO-SEPTICK
PEKERJAAN ENTRANCE
INSTALASI AIR HUJAN
PEKERJAAN ELEKTRIKAL
INSTALASI AIR BERSIH
Halaman :2/33 CAH FLOW, KURVA S
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 3/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 LantaiLokasi : Kab Bogor Jawa BaratSatuan Kerja : Penyediaan Perumahan Kementerian Perumahan RakyatKegiatan : Penyediaan Rumah SusunTahun Anggaran : 2014
No.JUMLAH HARGA
( Rp. )
DURASI
( minggu )
Bobot
( % )
Minggu ke
1
Minggu ke
2
CASH FLOW DAN KURVA S
JENIS PEKERJAAN
H. PEKERJAAN PENYAMBUNGAN DAYA PLN 11,696,061.20Rp 0.97
I. PEKERJAAN SISTEM PENTANAHAN 3,883,845.23Rp 0.32
J. PEKERJAAN INSTALASI TATA UDARA Tidak Ditawarkan
K. Tidak Ditawarkan
SUB TOTAL I + I I + I II + IV : 1,200,014,214.74Rp 100
TOTAL (DIBULATKAN) : 1,200,000,000.00Rp
2.478 2.478
2.478 4.955
Rencana/minggu
Cumulative
Realisasi
Deviasi
PEKERJAAN GENSET
Halaman :3/33 CAH FLOW, KURVA S
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 4/33
Minggu ke
3
Minggu ke
4
Minggu ke
5
Minggu ke
6
Minggu ke
7
Minggu ke
8
Minggu ke
9
Minggu ke
10
Minggu ke
11
Minggu ke
12
Minggu ke
13
Minggu ke
14
Minggu ke
15Progress
0.28 0.28 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 100.00%
2.22
2.12 2.12
2.84 2.84 2.84
1.78 1.78 1.78 1.78
2.60 2.600.40 0.40 0.40
0.90
1.63 1.63 1.63 1.63 1.63 1.63
1.33 1.33 1.33 1.33 1.33 1.33
1.45 1.45 1.45
1.02 1.02
1.24 1.24 1.24
1.23 1.23
Halaman :4/33 CAH FLOW, KURVA S
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 5/33
Minggu ke
3
Minggu ke
4
Minggu ke
5
Minggu ke
6
Minggu ke
7
Minggu ke
8
Minggu ke
9
Minggu ke
10
Minggu ke
11
Minggu ke
12
Minggu ke
13
Minggu ke
14
Minggu ke
15Progress
1.03 1.03
0.18 50.00%
0.13
0.85
1.24 1.24 1.24 1.24
0.62 0.620.49
1.05 1.05 1.05 1.05
1.32 1.32 1.32 1.32
2.07 2.07
0.11
1.05 1.05 1.05 1.05
0.45
1.59 1.59
Halaman :5/33 CAH FLOW, KURVA S
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 6/33
Minggu ke
3
Minggu ke
4
Minggu ke
5
Minggu ke
6
Minggu ke
7
Minggu ke
8
Minggu ke
9
Minggu ke
10
Minggu ke
11
Minggu ke
12
Minggu ke
13
Minggu ke
14
Minggu ke
15Progress
0.975
0.324 0.00%
4.620 5.241 5.375 5.853 7.944 5.520 9.851 8.682 5.297 10.692 9.060 10.139 6.768
9.575 14.816 20.191 26.044 33.989 39.509 49.360 58.041 63.339 74.031 83.091 93.230 100.000
Halaman :6/33 CAH FLOW, KURVA S
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 7/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah SusunTahun Anggaran : 2014
I. PEKERJAAN PERSIAPAN
I. PEKERJAAN PERSIAPAN 37,324,962.05
1 Pengukuran dan Pemasangan Bouwplank 39.80 M' 23,106.54 919,640.13
2 Direksi Keet 8.75 M2 617,775.31 5,405,533.95
3 Gudang Kerja 12.00 M3 222,303.05 2,667,636.60
4 Papan Nama Proyek 1.00 Buah 122,867.06 122,867.06
5 Foto Proyek 3 Fase (warna) 3.00 Set 158,046.11 474,138.33
6 Air Kerja 1.00 LS 6,825,839.49 6,825,839.49
7 Listrik Kerja 1.00 LS 9,500,000.00 9,500,000.00
8 Pagar Seng Keliling Proyek 39.80 M' 205,427.49 8,176,014.10
9 Pekerjaan Sondir sebanyak 3 titik diagonal (in 3.00 ttk 1,077,764.13 3,233,292.39
HARGA
SATUAN (
Rp. )
JUMLAH
HARGA ( Rp.
)
Termasuk Laporan Penyelidikan Tanah yang
dikeluarkan oleh Institusi resmi
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N P E R S I A P A N
NO. U R A I A N P E K E R J A A N VOL. SAT.
Halaman :7/33 RAB PERSIAPAN
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 8/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
II. PEKERJAAN STRUKTUR 405,636,442.Rp
A. LANTAI DASAR 130,387,260.Rp
A.1 PEKERJAAN STRUKTUR BAWAH 79,453,6
1 Pekerjaan Tiang Pancang
- Test PDA 1.00 ls 4,052,471.02 4,052,4
- Mobilisasi dan Demobilisasi Alat Pancang 1.00 ls 1,350,823.67 1,350,8
- Tiang Pancang Segi empat 25X25 p=9 m (TERPASANG) 243.00 m' 121,945.39 29,632,7
-
2 Pekerjaan Pondasi Pi le Cap -
TIPE PC 1 , 7 bh -
- Beton K-250 1.75 M3 509,429.02 891,5
- Besi beton 135.11 Kg 6,140.11 829,5
- Bekisting 8.40 M2 57,802.69 485,5
-
TIPE PC 2, 10 bh -
- Beton K-250 4.20 M3 509,429.02 2,139,6
- Besi beton 477.14 Kg 6,140.11 2,929,6- Bekisting 23.52 M
2 57,802.69 1,359,5
-
3 Pekerjaan Pondasi Batu Kali -
- Additional Pondasi Batu Kali 0.89 m3 383,085.60 341,9
-
4 Tie Beam / Sloof TB1 20X40 L = 5,4 m, unit : 5 bh -
- Beton K-250 2.16 M3 509,429.02 1,100,3
- Besi beton 363.15 Kg 6,140.11 2,229,7
- Bekisting 21.60 M2 61,858.01 1,336,1
5 Tie Beam / Sloof TB1 20X40 L = 4,2 m, unit : 6 bh -
- Beton K-250 2.02 M3 509,429.02 1,027,0
- Besi beton 415.00 Kg 6,140.11 2,548,1
- Bekisting 27.50 M2
61,858.01 1,701,06 Tie Beam / Sloof TB1 20X40 L = 2 m, unit : 1 bh -
- Beton K-250 0.08 M3 509,429.02 40,7
- Besi beton 12.00 Kg 6,140.11 73,6
- Bekisting 27.50 M2 61,858.01 1,701,0
7 Tie Beam / Sloof TB2 20X30 L = 3,0 m, unit : 3 bh -
- Beton K-250 0.54 M3 509,429.02 275,0
- Besi beton 155.00 Kg 6,140.11 951,7
- Bekisting 7.40 M2 61,858.01 457,7
8 Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 9 bh -
- Beton K-250 1.08 M3 509,429.02 550,1
- Besi beton 198.09 Kg 6,140.11 1,216,2
- Bekisting 10.80 M2 61,858.01 668,0
- 9 Tie Beam / Sloof TB2 20X30 L = 1,8 m, unit : 2 bh -
- Beton K-250 0.22 M3 509,429.02 112,0
- Besi beton 39.62 Kg 6,140.11 243,2
- Bekisting 2.16 M2 61,858.01 133,6
10 Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 1 bh, additional area belakang -
- Beton K-250 0.12 M3 509,429.02 61,1
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 9/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
- Besi beton 14.41 Kg 6,140.11 88,4
- Bekisting 0.41 M2 61,858.01 25,3
-
11 Galian tanah dibawah Pondasi -
TIPE PC 1 , 7 bh 4.29 M3 25,245.84 108,2
TIPE PC 2, 10 bh 12.69 M3 25,245.84 320,3
12 Galian tanah dibawah Tie- beam -
Tie Beam / Sloof TB1 20X40 L = 5,4 m, unit : 5 bh 7.70 M3 25,245.84 194,2
Tie Beam / Sloof TB1 20X40 L = 4,2 m, unit : 6 bh 7.18 M3 25,245.84 181,3
Tie Beam / Sloof TB2 20X30 L = 3,0 m, unit : 3 bh 2.30 M3 25,245.84 57,9
Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 9 bh 4.59 M3 25,245.84 115,8
Tie Beam / Sloof TB2 20X30 L = 1,8 m, unit : 2 bh 0.92 M3 25,245.84 23,1
Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 1 bh, additiona 0.51 M3 25,245.84 12,9
13 Urug pasir dibawah Pondasi -
TIPE PC 1 , 7 bh 3.03 M3 107,209.13 324,3
TIPE PC 2, 10 bh 2.19 M3 107,209.13 234,5
14 Urug pasir dibawah Tie Beam t=10 cm -
Tie Beam / Sloof TB1 20X40 L = 5,4 m, unit : 5 bh 0.54 M3 107,209.13 57,8
Tie Beam / Sloof TB1 20X40 L = 4,2 m, unit : 6 bh 0.50 M3 107,209.13 54,0
Tie Beam / Sloof TB2 20X30 L = 3,0 m, unit : 3 bh 0.18 M
3 107,209.13 19,2
Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 9 bh 0.40 M3 107,209.13 42,8
Tie Beam / Sloof TB2 20X30 L = 1,8 m, unit : 2 bh 0.07 M3 107,209.13 7,7
Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 1 bh, additiona 0.04 M3 107,209.13 4,0
15 Lantai kerja dibawah Pile Cap t=10 cm -
TIPE PC 1 , 7 bh 3.03 M3 436,947.19 1,321,7
TIPE PC 2, 10 bh 2.19 M3 436,947.19 955,8
16 Lantai kerja dibawah Tie Beam t=10cm -
Tie Beam / Sloof TB1 20X40 L = 5,4 m, unit : 5 bh 0.54 M3 436,947.19 235,9
Tie Beam / Sloof TB1 20X40 L = 4,2 m, unit : 6 bh 0.50 M3 436,947.19 220,2
Tie Beam / Sloof TB2 20X30 L = 3,0 m, unit : 3 bh 0.18 M3 436,947.19 78,6
Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 9 bh 0.40 M3 436,947.19 174,7
Tie Beam / Sloof TB2 20X30 L = 1,8 m, unit : 2 bh 0.07 M3 436,947.19 31,4
Tie Beam / Sloof TB2 20X30 L = 2,0 m, unit : 1 bh, additiona 0.04 M3
436,947.19 16,617 Urugan tanah kembali bekas galian 199.67 M
3 8,396.24 1,676,4
18 Tanah urug peninggian lantai t=45 cm (dalam banguna 56.02 M3 27,530.53 1,542,2
19 Pasir urug diatas tanah urug t=10 cm (dalam bangunan 12.61 M3 107,209.13 1,351,9
-
-
-
-
A.2 PEKERJAAN STRUKTUR LANTAI DASAR - 50,933,6
1 Kolom K1 : 30x40, 10 unit -
- Beton K-250 5.82 M3 509,429.02 2,964,8
- Besi beton 1,051.75 Kg 6,140.11 6,457,8
- Bekisting 59.53 M2 107,666.07 6,409,3
2 Kolom K2 : 30x30, 7 unit - - Beton K-250 4.41 M
3 509,429.02 2,246,5
- Besi beton 1,229.53 Kg 6,140.11 7,549,4
- Bekisting 60.60 M2 107,666.07 6,524,5
3 Kolom K3 : 20x20, 2 unit -
- Beton K-250 0.27 M3 509,429.02 138,5
- Besi beton 168.68 Kg 6,140.11 1,035,7
- Bekisting 5.60 M2 107,666.07 602,9
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 10/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
-
4 Cor beton lantai dasar K-225 t=10 cm 12.61 M3 107,666.07 1,357,6
5 Pembesian Pelat (Wiremesh 2 layer) 1,108.16 Kg 6,442.83 7,139,6
6 Tangga -
- Beton K-250 2.03 M3 509,429.02 1,034,5
- Besi beton 389.74 Kg 6,140.11 2,393,0
- Bekisting 21.32 M2 106,752.20 2,275,8
7 Dudukan Pot Bunga, 2 unit -
- Beton K-250 0.58 M3 509,429.02 293,4
- Besi beton 113.31 Kg 6,140.11 695,7
- Bekisting 13.16 M2 137,824.00 1,813,7
-
B. LANTAI 2 Elev. +3.35 - 102,298,027.Rp
-
1 Kolom K1 : 30x40, 10 unit -
- Beton K-250 4.08 M3 509,429.02 2,078,4
- Besi beton 916.21 Kg 6,140.11 5,625,6
- Bekisting 50.00 M2 107,666.07 5,383,3
2 Kolom K2 : 30x30, 7 unit -
- Beton K-250 2.14 M
3 509,429.02 1,090,1
- Besi beton 629.59 Kg 6,140.11 3,865,7
- Bekisting 29.82 M2 107,666.07 3,210,6
3 Kolom K3 : 20x20, 2 unit -
- Beton K-250 0.27 M3 509,429.02 138,5
- Besi beton 168.68 Kg 6,140.11 1,035,7
- Bekisting 5.60 M2 107,666.07 602,9
4 Balok B1 dim 30x45, L = 5.4 m -
- Beton K-250 3.65 M3 509,429.02 1,856,8
- Besi beton 981.98 Kg 6,140.11 6,029,4
- Bekisting 41.85 M2 109,665.18 4,589,4
5 Balok B2 dim 25x40, L = 4.2 m -
- Beton K-250 1.34 M3 509,429.02 684,6
- Besi beton 297.03 Kg 6,140.11 1,823,7- Bekisting 20.80 M
2 109,665.18 2,281,0
6 Balok B2 dim 25x40, L = 3.0 m -
- Beton K-250 0.48 M3 509,429.02 244,5
- Besi beton 147.93 Kg 6,140.11 908,3
- Bekisting 6.87 M2 109,665.18 753,4
Balok B2 dim 20x40, L = 2.0 m -
- Beton K-250 0.46 M3 509,429.02 234,3
- Besi beton 123.70 Kg 6,140.11 759,5
- Bekisting 44.23 M2 109,665.18 4,850,4
7 Balok B3 dim 20x35, L = 2.0 m -
- Beton K-250 0.70 M3 509,429.02 356,6
- Besi beton 151.68 Kg 6,140.11 931,3
- Bekisting 11.70 M2 109,665.18 1,283,08 Balok B3 dim 20x35, L = 0.95 m -
- Beton K-250 0.26 M3 509,429.02 130,6
- Besi beton 69.10 Kg 6,140.11 424,2
- Bekisting 2.01 M2 109,665.18 220,1
Balok B4 dim 20x40, L = 2,0 m -
- Beton K-250 0.44 M3 509,429.02 224,1
- Besi beton 136.70 Kg 6,140.11 839,3
- Bekisting 6.50 M2 109,665.18 712,8
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 11/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
9 Balok B4 dim 20x40, L = 4.2 m -
- Beton K-250 0.44 M3 509,429.02 224,1
- Besi beton 136.70 Kg 6,140.11 839,3
- Bekisting 6.50 M2 109,665.18 712,8
10 Balok B4 dim 20x40, L = 3.0 m -
- Beton K-250 0.15 M3 509,429.02 76,4
- Besi beton 116.23 Kg 6,140.11 713,6
- Bekisting 5.78 M2 109,665.18 633,8
11 Balok B4 dim 20x40, L = 1.8 m -
- Beton K-250 0.29 M3 509,429.02 146,7
- Besi beton 67.61 Kg 6,140.11 415,1
- Bekisting 4.64 M2 109,665.18 508,8
12 Plat lantai t = 12 cm -
- Beton K-250 15.14 M3 509,429.02 7,712,7
- Besi beton 1,564.45 Kg 6,140.11 9,605,8
- Bekisting 124.16 M2 137,824.00 17,112,2
13 Tangga -
- Beton K-250 1.25 M3 509,429.02 637,4
- Besi beton 365.98 Kg 6,140.11 2,247,1
- Bekisting 13.88 M
2 106,752.20 1,481,7
14 Dudukan Pot bunga Bagian belakang, 2 Unit -
- Beton K-250 0.43 M3 509,429.02 219,0
- Besi beton 113.31 Kg 6,140.11 695,7
- Bekisting 8.02 M2 137,824.00 1,105,3
Dudukan Pot Bunga bagian depan, 1 unit -
- Beton K-250 0.86 M3 509,429.02 438,1
- Besi beton 226.62 Kg 6,140.11 1,391,4
- Bekisting 16.04 M2 137,824.00 2,210,6
-
C. LANTAI 3 Elev. +6.35 - 85,278,856.Rp
-
1 Kolom K1a : 30x30, 10 unit -
- Beton K-250 3.06 M3
509,429.02 1,558,8- Besi beton 633.21 Kg 6,140.11 3,887,9
- Bekisting 42.60 M2 107,666.07 4,586,5
2 Kolom K2a : 25x25, 5 unit -
- Beton K-250 1.06 M3 509,429.02 539,9
- Besi beton 308.20 Kg 6,140.11 1,892,4
- Bekisting 17.63 M2 107,666.07 1,897,6
3 Kolom K3 : 15x15, 2 unit -
- Beton K-250 0.26 M3 509,429.02 129,9
- Besi beton 117.68 Kg 6,140.11 722,5
- Bekisting 5.59 M2 107,666.07 601,8
4 Balok B1 dim 30x45, L = 5.4 m -
- Beton K-250 2.48 M3 509,429.02 1,263,3
- Besi beton 981.98 Kg 6,140.11 6,029,4- Bekisting 24.00 M2 109,665.18 2,631,9
5 Balok B2 dim 20x40, L = 4.2 m -
- Beton K-250 1.34 M3 509,429.02 684,6
- Besi beton 297.03 Kg 6,140.11 1,823,7
- Bekisting 20.80 M2 109,665.18 2,281,0
6 Balok B2 dim 20x40, L = 3.0 m -
- Beton K-250 0.48 M3 509,429.02 244,5
- Besi beton 147.93 Kg 6,140.11 908,3
- Bekisting 6.87 M2 109,665.18 753,4
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 12/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
7 Balok B3 dim 20x35, L = 2.0 m -
- Beton K-250 0.46 M3 509,429.02 234,3
- Besi beton 123.70 Kg 6,140.11 759,5
- Bekisting 44.23 M2 109,665.18 4,850,4
8 Balok B3 dim 20x35, L = 3.0 m -
- Beton K-250 0.46 M3 509,429.02 234,3
- Besi beton 123.70 Kg 6,140.11 759,5
- Bekisting 5.94 M2 109,665.18 651,4
9 Balok B3 dim 20x35, L = 0.95 m -
- Beton K-250 0.26 M3 509,429.02 130,6
- Besi beton 69.10 Kg 6,140.11 424,2
- Bekisting 2.01 M2 109,665.18 220,1
10 Balok B4 dim 20x40, L = 4.2 m -
- Beton K-250 0.44 M3 509,429.02 224,1
- Besi beton 136.70 Kg 6,140.11 839,3
- Bekisting 6.50 M2 109,665.18 712,8
11 Balok B4 dim 20x40, L = 3.0 m -
- Beton K-250 0.15 M3 509,429.02 76,4
- Besi beton 116.23 Kg 6,140.11 713,6
- Bekisting 5.78 M
2 109,665.18 633,8
12 Plat lantai t = 12 cm -
- Beton K-250 15.13 M3 509,429.02 7,707,6
- Besi beton 1,546.56 Kg 6,140.11 9,496,0
- Bekisting 131.41 M2 137,824.00 18,111,4
13 Dudukan Pot bunga Bagian belakang, 2 Unit -
- Beton K-250 0.43 M3 509,429.02 219,0
- Besi beton 113.31 Kg 6,140.11 695,7
- Bekisting 8.02 M2 137,824.00 1,105,3
Dudukan Pot Bunga bagian depan, 1 unit -
- Beton K-250 0.86 M3 509,429.02 438,1
- Besi beton 226.62 Kg 6,140.11 1,391,4
- Bekisting 16.04 M2 137,824.00 2,210,6
- D LANTAI DAK - 62,388,108.Rp
-
1 Kolom K3 : 20x20, 10 unit -
- Beton K-250 0.91 M3 509,429.02 464,5
- Besi beton 289.09 Kg 6,140.11 1,775,0
- Bekisting 15.20 M2 107,666.07 1,636,5
2 Balok B1 dim 30x45, L = 5.4 m -
- Beton K-250 1.18 M3 509,429.02 601,1
- Besi beton 392.79 Kg 6,140.11 2,411,7
- Bekisting 11.41 M2 109,665.18 1,251,2
3 Balok B2 dim 20x40, L = 3.0 m -
- Beton K-250 0.45 M3 509,429.02 229,2
- Besi beton 135.46 Kg 6,140.11 831,7- Bekisting 4.10 M2 109,665.18 449,6
4 Balok B3 dim 20x35, L = 2.0 m -
- Beton K-250 0.10 M3 509,429.02 50,9
- Besi beton 24.74 Kg 6,140.11 151,9
- Bekisting 1.19 M2 109,665.18 130,5
5 Balok B3 dim 20x35, L = 0.95 m -
- Beton K-250 0.26 M3 509,429.02 130,6
- Besi beton 69.10 Kg 6,140.11 424,2
- Bekisting 2.01 M2 109,665.18 220,1
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 13/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
6 Balok B4 dim 20x40, L = 3.0 m -
- Beton K-250 0.24 M3 509,429.02 122,2
- Besi beton 46.79 Kg 6,140.11 287,3
- Bekisting 3.76 M2 109,665.18 412,3
7 Balok B5 dim 25x40, L = 2.0 m -
- Beton K-250 0.80 M3 509,429.02 407,5
- Besi beton 162.01 Kg 6,140.11 994,7
- Bekisting 6.48 M2 109,665.18 710,3
8 Balok B5 dim 25x40, L = 4.2 m -
- Beton K-250 2.52 M3 509,429.02 1,283,7
- Besi beton 430.88 Kg 6,140.11 2,645,6
- Bekisting 33.96 M2 109,665.18 3,724,2
9 Balok B5 dim 25x40, L = 3 m -
- Beton K-250 0.90 M3 509,429.02 458,4
- Besi beton 168.63 Kg 6,140.11 1,035,4
- Bekisting 12.30 M2 109,665.18 1,348,8
10 Plat lantai t = 12 cm -
- Beton K-250 5.84 M3 509,429.02 2,977,2
- Besi beton 596.84 Kg 6,140.11 3,664,6
- Bekisting 226.82 M
2 137,824.00 31,261,2
11 Balok KS dim 30x45, L = 0.52 m -
- Beton K-250 0.11 M3 509,429.02 57,8
- Besi beton 18.91 Kg 6,140.11 116,1
- Bekisting 1.10 M2 109,665.18 120,4
-
E LANTAI ATAP - 14,453,340.Rp
-
1 Kolom K4 : 15x15 -
- Beton K-250 0.09 M3 509,429.02 43,5
- Besi beton 39.10 Kg 6,140.11 240,1
- Bekisting 2.37 M2 107,666.07 255,1
2 Balok R1 dim 15X30, L = 6,36 m, 3 Unit -
- Beton K-250 0.86 M3
509,429.02 437,3- Besi beton 194.23 Kg 6,140.11 1,192,5
- Bekisting 17.44 M2 109,665.18 1,912,7
3 Balok R2 dim.20x30, L = 4.2 m -
- Beton K-250 0.96 M3 509,429.02 489,0
- Besi beton 192.16 Kg 6,140.11 1,179,8
- Bekisting 8.96 M2 109,665.18 982,6
4 Balok R2 dim.20x30, L = 2.0 m -
- Beton K-250 0.36 M3 509,429.02 183,3
- Besi beton 75.15 Kg 6,140.11 461,4
- Bekisting 6.24 M2 109,665.18 684,3
5 Rangka Atap Baja Ringan 72.80 M2 87,789.26 6,391,0
-
F PEKERJAAN STP / BIOSEPTIC 1 Unit - 10,830,849.Rp-
Pekerjaan STP / Bioseptic 1 (satu) Unit -
1 Galian tanah -
Galian tanah STP 13.82 M3 25,245.84 348,9
2 Urug pasir dibawah -
Urugan pasir bioseptic (STP) 2.01 M3 107,209.13 215,2
3 Lantai kerja t=5 cm -
Lantai Kerja Bioseptic (STP) 0.77 M3 436,947.19 335,5
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 14/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
4 Dudukan Bioseptic (STP) t = 20 cm ( bawah ) -
- Beton K-350 2.460 M3 578,026.87 1,421,9
- Besi 346.315 kg 6,140.11 2,126,4
- Bekisting Pelat 0.984 m2 137,824.00 135,6
5 Penutup Bioseptic (STP) t = 12 cm ( atas ) -
- Beton K-350 1.181 M3 578,026.87 682,5
- Besi 60.586 kg 6,140.11 372,0
- Bekisting Pelat 9.840 m2 137,824.00 1,356,1
Urugan tanah kembali 20.17 M3 8,396.24 169,3
Pasangan bata Bak Kontrol Bioseptic (STP) 1.000 Unit 713,966.00 713,9
Pipa PVC + galian (terpasang) 2.000 M 48,549.69 97,0
Rumah Blower uk 120 x 120 cm (lengkap terpasang) 1.000 Unit 2,855,864.00 2,855,8
-
-
G ATAP BAJA RINGAN - 0.
Rangka atap baja ringan - M2 116,326.57 0.
-
L PEKERJAAN GROUND TANK DAN RUMAH POMPA - 0.
-
1 Pekerjaan Pondasi Telapak -
TIPE P1 = 3 Unit -
- Beton K-350 M3 626,079.22 0.
- Besi beton Kg 12,358.79 0.
- Bekisting M2 67,101.68 0.
2 Kolom Pedestal Pondasi -
uk .30x40 -
- Beton K-350 M3 626,079.22
- Besi beton Kg 12,358.79
- Bekisting M2 139,408.79
2 Tie Beam / Sloof TB 25X45 L = 3.2 m, unit : 3 bh -
- Beton K-350 M3 626,079.22 0.
- Besi beton Kg 12,358.79 0.
- Bekisting M2
72,597.78 0.3 Tie Beam / Sloof TB 25X45 L = 2.5 m, unit : 2 bh -
- Beton K-350 M3 626,079.22 0.
- Besi beton Kg 12,358.79 0.
- Bekisting M2 72,597.78 0.
4 Galian tanah -
Galian Tanah Pondasi P1 M3 72,597.78 0.
Galian Tanah Tie Beam L = 3.2 m M3 72,597.78 0.
Galian Tanah Tie Beam L = 2.5 m M3 72,597.78 0.
5 Urug tanah ruang pompa -
Urugan pasir ruang pompa GWT M3 140,887.00 0.
Urugan Pasir Pondasi P1 M3 140,887.00 0.
Urugan Pasir Tie Beam L = 3.2 m M3 140,887.00 0.
Urugan Pasir Tie Beam L = 2.5 m M3 140,887.00 0.6 Lantai kerja dibawah Pile Cap t=5 cm -
Lantai Kerja ruang pompa GWT M3 512,763.87 0.
Lantai Kerja Pondasi P1 M3 512,763.87 0.
Lantai Kerja Tie Beam L = 3.2 m M3 512,763.87 0.
Lantai Kerja Tie Beam L = 2.5 m M3 512,763.87 0.
7 Cor Plat dasar groundtank t=25 cm -
- Beton K-350 M3 - 0.
- Besi beton Kg - 0.
- Bekisting M2 - 0.
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 15/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
8 Cor beton dinding t=20 cm (uk. 3.2 x 3.2 m) -
- Beton K-350 M3 -
- Besi beton Kg -
- Bekisting M2 -
9 Cor beton dinding t=20 cm (uk.2.5 x 3.2 m) -
- Beton K-350 M3 - 0.
- Besi beton Kg - 0.
- Bekisting M2 - 0.
10 Cor beton atap + tutup groundtank t=12 cm -
- Beton K-350 M3 - 0.
- Besi beton Kg - 0.
- Bekisting M2 - 0.
11 Cor Kolom K1-30x30 ruang pompa -
- Beton K-350 M3 - 0.
- Besi beton Kg - 0.
- Bekisting M2 - 0.
12 Balok B1-25x45 L = 3.2 m -
- Beton K-350 M3 - 0.
- Besi beton Kg - 0.
- Bekisting M
2 - 0.
13 Balok B1-25x45 L = 2.5 m -
- Beton K-350 M3 - 0.
- Besi beton Kg - 0.
- Bekisting M2 - 0.
14 Balok B2-25x45 -
- Beton K-350 M3 - 0.
- Besi beton Kg - 0.
- Bekisting M2 - 0.
15 Pekerjaan Finishing Arsitektur ground Tang -
Pasangan Batako R. Pompa M2 76,120.98 0.
Plester + aci dinding batako M2 62,473.05 0.
Perapihan dinding bagian luar GWT / Exterior M2 16,643.00 0.
Perapihan dinding bagian dalam GWT / interior M2
16,643.00 0. Perapihan pelat + canopy + dak beton M
2 16,643.00 0.
Screed lantai 1:3 tebal 35 cm termasuk aci di R. Pompa M2 39,917.88 0.
Cat dinding bag. Luar (exterior) M2 39,865.19 0.
Cat dinding bag. Dalam (interior) M2 33,930.82 0.
Cat plafond expose M2 33,930.82 0.
Cat canopy + dak beton M2 33,930.82 0.
Waterproofing (membrane) pada daerah bak air & dak beton M2 106,133.28 0.
Kusen Aluminium + Louver aluminium (terpasang) type JL 40x50 cm Unit 334,769.60 0.
Kusen Aluminium + Louver aluminium (terpasang) type JL 60x80 cm Unit 552,481.60 0.
Kusen Aluminium + Louver aluminium (terpasang) type JL 60x120 c Unit 869,281.60 0.
Kusen Rangka CNP + Daun Pintu Plat Baja T = 1,5 mm (terpasang) t Unit 2,684,083.79 0.
R. GWT : -
- Pasang lantai keramik 30x30 ad.5 cm (kasar) M2 164,285.66 0. - Pasang keramik dinding 30x30, T = 2,10 m diruang pompa & gens M
2 164,285.66 0.
- Waterproofing (liquit/coating) lantai dan dinding t=3m luar dala M2 93,922.35 0.
-
H PEKERJAAN STP / BIO-SEPTICK UNTUK 2 BUAH - 0.
-
Pekerjaan Sipil STP / BIO-SEPTICK Biotech 1 (satu) Unit - 0.
1 Galian tanah -
Galian tanah STP M3 39,250.00 0.
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 16/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
II. PEKERJAAN STRUKTUR
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N S T R U K T U R
NO. URAIAN PEKERJAAN VOLUME UNIT
HARGA
SATUAN
( Rp. )
JUMLAH HARGA
Rp. )
2 Urug pasir dibawah
Urugan pasir septictank M3 204,730.00 0.
3 Lantai kerja t=5 cm
Lantai Kerja septictank M3 745,123.04 0.
4 Dudukan STP / BIO-SEPTICK Biotech t = 20 cm ( bawah )
- Beton K-350 M3 0.
- Besi kg 0.
- Bekisting Pelat m2 0.
5 Penutup STP / BIO-SEPTICK Biotech t = 12 cm ( atas )
- Beton K-350 M3 0.
- Besi kg 0.
- Bekisting Pelat m2 302,581.95 0.
Urugan tanah kembali M3 41,583.33 0.
Pasangan bata Bak Kontrol STP / BIO-SEPTICK Biotech Unit 1,250,000.00 0.
Pipa PVC + galian (terpasang) M 85,000.00 0.
Rumah Blower uk 120 x 120 cm (lengkap terpasang) Unit 5,000,000.00 0.
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 17/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
III. PEKERJAAN ARSITEKTUR
A. PEKERJAAN PASANGAN DAN PLESTERAN SUB TOTAL 117,548,919Rp
A.1 PEK PASANGAN DAN PLESTERAN LANTAI DASAR 36,332,200Rp
1 Pek. Dinding bata tebal 1/2 bata, 1 Pc : 4 Ps 120.10 m2 63,818.82 7,664,641Rp
2 Pek. Dinding Toilet bata tebal 1/2 bata, 1pc : 2 Ps 24.93 m2 101,277.70 2,524,853Rp
3 Pek. Plester dan Acian (Eksterior dan Interior) 241.66 m2 42,862.30 10,358,082Rp
4 Kolom dan Balok Praktis, termasuk di opening kusen dan jendela 1.05 m3 2,121,793.37 2,228,779Rp
5 Perapihan Opening Pintu / Jendela 17.51 m2 15,553.10 272,289Rp6 Perapihan pelat beton bawah semua tangga + bordes 8.65 m2 15,553.10 134,466Rp
7 Perapihan balok Kolom Struktur utama 47.73 m2 15,553.10 742,287Rp
8 Perapihan bak bunga (planter box) 8.40 m2 15,553.10 130,646Rp
9 Perapihan main entrance 8.82 m2 15,553.10 137,178Rp
10 Pas. besi Black Steel railling tangga finish cat anti korosi 12.76 m' 183,132.28 2,337,216Rp
11 Finish Kolom Depan dan Kanopi Teras 1.00 ls 1,036,143.16 1,036,143Rp
12 Pek. Besi Hollow Exterior 6.80 m2 1,034,006.61 7,031,245Rp
13 Pekerjaan Bak Bunga (bagian depan, t=0,35 m) 14.30 m' 121,284.97 1,734,375Rp
-
-
A.2 PEK PASANGAN DAN PLESTERAN LANTAI DUA - 35,014,329Rp
1 Pek. Dinding bata tebal 1/2 bata, 1 Pc : 4 Ps 104.10 m2 63,818.82 6,643,540Rp
2 Pek. Dinding Toilet bata tebal 1/2 bata, 1pc : 2 Ps 37.95 m2 101,277.70 3,843,489Rp
3 Pek. Plester dan Acian (Eksterior dan Interior) 199.39 m2 42,862.30 8,546,314Rp
4 Kolom dan Balok Praktis, termasuk di opening kusen dan jendela 1.03 m3 2,121,793.37 2,179,893Rp
5 Perapihan Opening Pintu / Jendela 17.12 m2 15,553.10 266,269Rp
6 Perapihan pelat beton bawah semua tangga + bordes 8.46 m2 15,553.10 131,613Rp
7 Perapihan balok Kolom Struktur utama 42.16 m2 15,553.10 655,719Rp
8 Perapihan bak bunga (planter box) 2.80 m2 15,553.10 43,549Rp
9 Pas. besi Black Steel railling tangga finish cat anti korosi 12.35 m' 15,553.10 192,155Rp
10 Pek. Railling Teras 17.40 m' 183,132.28 3,186,502Rp
11 Pek. Besi Hollow Exterior 9.00 m2 1,036,143.16 9,325,288Rp
-
-
A.3 PEK PASANGAN DAN PLESTERAN LANTAI TIGA - 31,544,147Rp
1 Pek. Dinding bata tebal 1/2 bata, 1 Pc : 4 Ps 104.10 m2 63,818.82 6,643,540Rp
2 Pek. Dinding Toilet bata tebal 1/2 bata, 1pc : 2 Ps 37.95 m2 101,277.70 3,843,489Rp
3 Pek. Plester dan Acian (Eksterior dan Interior) 199.39 m2 42,862.30 8,546,314Rp
4 Kolom dan Balok Praktis, termasuk di opening kusen dan jendela 1.03 m3 2,121,793.37 2,179,893Rp
5 Perapihan Opening Pintu / Jendela 17.12 m2 15,553.10 266,316Rp
6 Perapihan pelat beton bawah semua tangga + bordes 8.46 m2 15,553.10 131,613Rp
7 Perapihan balok Kolom Struktur utama 31.25 m2 15,553.10 486,073Rp8 Perapihan bak bunga (planter box) 2.80 m2 15,553.10 43,549Rp
9 Pek. Railling Teras 17.40 m' 183,132.28 3,186,502Rp
10 Pek. Besi Hollow Exterior 6.00 m2 1,036,143.16 6,216,859Rp
Sat
HARGA
SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N A R S I T E K T U R
NO URAIAN PEKERJAAN VOLUME
17 RAB Arsitek Pe
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 18/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
III. PEKERJAAN ARSITEKTUR
Sat
HARGA
SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N A R S I T E K T U R
NO URAIAN PEKERJAAN VOLUME
-
-
A.4 PEK PASANGAN DAN PLESTERAN LANTAI DAK - 12,278,827Rp
1 Pek. Dinding Ujung h = 1.2 m 68.68 m2 63,818.82 4,382,822Rp
2 Pek. Plester dan Acian 118.12 m2 42,862.30 5,062,895Rp
3 Kolom praktis & balok praktis dinding sopi-sopi As 2 dan As 5 0.52 m3 2,121,793.37 1,093,254Rp
4 Perapihan ornamen (20 x 90) 80.00 bh 15,553.10 1,244,248Rp5 Perapihan kolom / ring beton 2.70 m2 15,553.10 41,993Rp
6 Peninggian plat dibawah tanki air 30cm -
- Beton K-225 0.51 m3 643,518.65 326,264Rp
- Besi M4 32 Kg/M3 16.22 kg 7,849.57 127,351Rp
-
A.5 PEK PASANGAN DAN PLESTERAN AREA BELAKANG AS C4-C5 - 2,379,416Rp
1 Pek. Pasangan Bata (double Bata) dari Atas ke Bawah di AS C'-4 dan C 11.15 m2 127,637.65 1,423,415Rp
2 Pek. Plester dan Acian dari Atas ke Bawah di AS C'-4 dan C'-5 22.30 m2 42,862.30 956,001Rp
-
B. PEKERJAAN LANTAI DAN KERAMIK - 95,711,296Rp
B.1 PEKERJAAN LANTAI DASAR - 26,951,563Rp
-
1 Pasang keramik lantai 30x30 95.90 m2 143,117.73 13,725,348Rp
2 Step Nozing 16.20 m' 47,608.55 771,259Rp
3 Pasang lantai keramik km/wc 20x20 16.14 m2 135,815.81 2,192,067Rp
4 Pasang keramik dinding km/wc 20x25 48.40 m2 120,919.88 5,852,583Rp
5 List Keramik Wc 10x20 43.24 m' 30,741.10 1,329,245Rp
6 Pas. plin di area selasar & unit hunian uk. 10 x 30 cm (keramik potongan 49.60 m' 29,499.78 1,463,189Rp
7 Roster 9.60 m2 168,528.43 1,617,873Rp
-
B.2 PEKERJAAN LANTAI DUA - 29,636,685Rp
1 Pasang keramik lantai 30x30 95.90 m2 143,117.73 13,725,348Rp
2 Step Nozing 16.20 m' 47,608.55 771,259Rp
3 Pasang lantai keramik km/wc 20x20 16.14 m2 135,815.81 2,192,067Rp
4 Pasang keramik dinding km/wc 20x25 48.40 m2 120,919.88 5,852,583Rp
5 List Keramik Wc 10x20 43.24 m' 30,741.10 1,329,245Rp
6 Pas. plin di area selasar & unit hunian uk. 10 x 30 cm (keramik potongan 49.60 m' 29,499.78 1,463,189Rp
7 Roster 9.60 m2 168,528.43 1,617,873Rp
8 Waterproofing (daerah km/wc) 28.02 m2 87,111.97 2,441,208Rp
9 Waterproofing bak bunga 2.80 m2 87,111.97 243,914Rp
-
B.3 PEKERJAAN LANTAI TIGA - 28,200,804Rp
1 Pasang keramik lantai 30x30 95.90 m2 143,117.73 13,725,348Rp
2 Pasang lantai keramik km/wc 20x20 16.14 m2 135,815.81 2,192,067Rp
3 Pasang keramik dinding km/wc 20x25 48.40 m2 120,919.88 5,852,583Rp
18 RAB Arsitek Pe
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 19/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
III. PEKERJAAN ARSITEKTUR
Sat
HARGA
SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N A R S I T E K T U R
NO URAIAN PEKERJAAN VOLUME
4 List Keramik Wc 10x20 21.62 m' 30,741.10 664,623Rp
5 Pas. plin di area selasar & unit hunian uk. 10 x 30 cm 49.60 m' 29,499.78 1,463,189Rp
6 Roster 9.60 m2 168,528.43 1,617,873Rp
7 Waterproofing (daerah km/wc) 28.02 m2 87,111.97 2,441,208Rp
8 Waterproofing bak bunga 2.80 m2 87,111.97 243,914Rp
-
B.4 PEKERJAAN LANTAI DAK - 10,922,243Rp1 Waterproofing daerah dak atap & dudukan roof tank. 88.84 m2 87,111.97 7,739,027Rp
2 Screed lantai daerah dak atap & dudukan roof tank. (ad. 1:3, t =3.5 cm 42.12 m2 75,574.92 3,183,216Rp
-
C. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES - 52,025,558Rp
C.1 PEKERJAAN KUSEN LANTAI DASAR - 16,856,859Rp
1 Jendela Type J1 3.00 unit 1,902,005.42 5,706,016Rp
2 Jendela Type J2 1.00 unit 1,219,202.42 1,219,202Rp
3 Pintu Type P1 1.00 unit 2,795,907.08 2,795,907Rp
4 Pintu Type PS 2.00 unit 2,625,188.08 5,250,376Rp
5 Pintu Toilet Type PV 5.00 unit 377,071.41 1,885,357Rp
-
C.2 PEKERJAAN KUSEN LANTAI DUA - 16,856,859Rp
1 Jendela Type J1 3.00 unit 1,902,005.42 5,706,016Rp
2 Jendela Type J2 1.00 unit 1,219,202.42 1,219,202Rp
3 Pintu Type P1 1.00 unit 2,795,907.08 2,795,907Rp
4 Pintu Type PS 2.00 unit 2,625,188.08 5,250,376Rp
5 Pintu Toilet Type PV 5.00 unit 377,071.41 1,885,357Rp
-
C.3 PEKERJAAN KUSEN LANTAI TIGA - 16,856,859Rp
1 Jendela Type J1 3.00 unit 1,902,005.42 5,706,016Rp
2 Jendela Type J2 1.00 unit 1,219,202.42 1,219,202Rp
3 Pintu Type P1 1.00 unit 2,795,907.08 2,795,907Rp
4 Pintu Type PS 2.00 unit 2,625,188.08 5,250,376Rp
5 Pintu Toilet Type PV 5.00 unit 377,071.41 1,885,357Rp
-
C.4 PEKERJAAN KUSEN LANTAI DAK + RANGKA HOLLOW BELAKANG - 1,454,982Rp
1 Tangga service Aluminium (portable) 1.00 ls 1,454,981.58 1,454,982Rp
-
D PEKERJAAN PENUTUP ATAP - 24,453,276Rp
1 Atap genteng metal 80/70 179.62 m2 121,138.94 21,758,753Rp
2 Nok genteng (termasuk jurai) 13.08 m' 66,666.58 871,999Rp
3 Listplank GRC 2/30 49.92 m' 36,509.63 1,822,525Rp
-
-
-
19 RAB Arsitek Pe
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 20/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
III. PEKERJAAN ARSITEKTUR
Sat
HARGA
SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N A R S I T E K T U R
NO URAIAN PEKERJAAN VOLUME
E PEKERJAAN SANITAIR - 44,460,870Rp
E.1 PEKERJAAN SANITAIR LANTAI DASAR - 7,715,579Rp
1 Closed jongkok 2.00 unit 823,292.04 1,646,584Rp
2 Pasang kran type double + shower (terpasang) 3.00 unit 1,029,644.44 3,088,933Rp
3 Pasang stop kran di bawah shower 3.00 unit 105,950.93 317,853Rp
4 Pasang kran 9.00 bh 91,347.08 822,124Rp
5 Pasang floor drain 7.00 bh 262,869.30 1,840,085Rp-
E.2 PEKERJAAN SANITAIR LANTAI DUA - 28,938,365Rp
1 Closed jongkok 2.00 unit 823,292.04 1,646,584Rp
2 Pasang kran type double + shower (terpasang) 3.00 unit 1,240,535.48 3,721,606Rp
3 Pasang stop kran di bawah shower 3.00 unit 1,240,535.48 3,721,606Rp
4 Pasang kran 9.00 bh 1,240,535.48 11,164,819Rp
5 Pasang floor drain 7.00 bh 1,240,535.48 8,683,748Rp
-
E.3 PEKERJAAN SANITAIR LANTAI TIGA - 7,715,579Rp
1 Closed jongkok 2.00 unit 823,292.04 1,646,584Rp
2 Pasang kran type double + shower (terpasang) 3.00 unit 1,029,644.44 3,088,933Rp
3 Pasang stop kran di bawah shower 3.00 unit 105,950.93 317,853Rp
4 Pasang kran 9.00 bh 91,347.08 822,124Rp
5 Pasang floor drain 7.00 bh 262,869.30 1,840,085Rp
-
E.4 PEKERJAAN SANITAIR TAMAN DAN PLANTER BOX - 91,347Rp
1 Pasang kran taman dan planter box 1.00 bh 91,347.08 91,347Rp
-
F PEKERJAAN PLAFOND DAN PERAPIHAN BETON EKSPOSE - 29,568,525Rp
F.1 PEKERJAAN PLAFOND LANTAI DASAR - 8,478,650Rp
1 Plafond Gypsum Rangka Hollow 40x40 dan 20x40 75.06 m2 64,768.07 4,861,492Rp
2 Plafond Calciboard Rangka Hollow 40x40 dan 20x40 16.20 m2 74,041.52 1,199,473Rp
3 List Gypsum 90.50 m1 24,315.41 2,200,545Rp
4 Plafon ekspose entrance 9.36 m2 23,198.87 217,141Rp
-
F.2 PEKERJAAN PLAFOND LANTAI DUA - 8,261,509Rp
1 Plafond Gypsum Rangka Hollow 40x40 dan 20x40 75.06 m2 64,768.07 4,861,492Rp
2 Plafond Calciboard Rangka Hollow 40x40 dan 20x40 16.20 m2 74,041.52 1,199,473Rp
3 List Gypsum 90.50 m' 24,315.41 2,200,545Rp
-
F.3 PEKERJAAN PLAFOND LANTAI TIGA - 8,261,509Rp
1 Plafond Gypsum Rangka Hollow 40x40 dan 20x40 75.06 m2 64,768.07 4,861,492Rp
2 Plafond Calciboard Rangka Hollow 40x40 dan 20x40 16.20 m2 74,041.52 1,199,473Rp
3 List Gypsum 90.50 m' 24,315.41 2,200,545Rp
-
20 RAB Arsitek Pe
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 21/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
III. PEKERJAAN ARSITEKTUR
Sat
HARGA
SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N A R S I T E K T U R
NO URAIAN PEKERJAAN VOLUME
F.4 PEKERJAAN PLAFOND LANTAI DAK - 4,566,857Rp
1 Penutup plafond kalsiboard + rangka hollow (plafon miring, kantilever de 40.79 m2 74,041.52 3,020,154Rp
2 List gypsum Profil C-7 63.61 m' 24,315.41 1,546,703Rp
-
G PEKERJAAN PENGECATAN - 24,715,717Rp
G.1 PEKERJAAN PENGECATAN LANTAI DASAR - 7,517,586Rp
1 Cat Tembok Exterior Weather Shield 127.09 m2 22,928.04 2,913,925Rp2 Cat Tembok Interior 123.22 m2 20,445.39 2,519,181Rp
3 Cat Plafond 91.26 m2 16,794.43 1,532,659Rp
4 Cat list plafond gypsum & kalsiboard (interior) 26.99 m2 20,445.39 551,821Rp
-
G.2 PEKERJAAN PENGECATAN LANTAI DUA - 6,653,370Rp
1 Cat Tembok Exterior Weather Shield 127.09 m2 22,928.04 2,913,925Rp
2 Cat Tembok Interior 80.95 m2 20,445.39 1,654,964Rp
3 Cat Plafond 91.26 m2 16,794.43 1,532,659Rp
4 Cat list plafond gypsum & kalsiboard (interior) 26.99 m2 20,445.39 551,821Rp
-
G.3 PEKERJAAN PENGECATAN LANTAI TIGA - 6,476,607Rp
1 Cat Tembok Exterior Weather Shield 127.09 m2 22,928.04 2,913,925Rp
2 Cat Tembok interior 72.30 m2 20,445.39 1,478,202Rp
3 Cat Plafond 91.26 m2 16,794.43 1,532,659Rp
4 Cat list plafond gypsum & kalsiboard (interior) 26.99 m2 20,445.39 551,821Rp
-
G.4 PEKERJAAN PENGECATAN LANTAI DAK - 4,068,153Rp
1 Cat Tembok Exterior Weather Shield / Dinding Sekeliling 137.35 m2 22,928.04 3,149,213Rp
2 Cat plafond Flat Pull system kalsiboard + rangka hollow (plafon miring, 40.79 m2 16,794.43 685,045Rp
3 Cat List gypsum Profil C-7 11.44 m2 20,445.39 233,895Rp
-
H PEKERJAAN ENTRANCE - 2,145,949Rp
1 Waterproofing daerah canopy 8.82 m2 87,111.97 768,328Rp
2 Cat pelat beton dan kolom utama 12.42 m2 22,928.04 284,766Rp
3 Plafon ekspose entrance 9.36 m2 42,862.30 401,191Rp
4 Plester + aci dinding penebalan kolom exterior sesuai gambar 11.13 m2 42,862.30 477,057Rp
5 Cat dinding bag. Luar / exterior (weather shield) 9.36 m2 22,928.04 214,606Rp
-
I PEK. PERKERASAN DI DALAM & KELILING BAGIAN LUAR BANG. - 1,544,614Rp
I.1 PEKERJAAN PERKERASAN DILUAR BANGUNAN - 399,818Rp
1 Tanah Urugan 11.36 m3 35,195.28 399,818Rp
-
I.2 PEKERJAAN GRILL BESI JALAN MASUK KE BANGUNAN - 1,144,796Rp
1 Pekerjaan Grill besi siku 5 cm diarea entrance, Jalan Masuk Ke Bangun 1.00 M2 1,144,795.80 1,144,796Rp
-
21 RAB Arsitek Pe
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 22/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
III. PEKERJAAN ARSITEKTUR
Sat
HARGA
SATUAN
(Rp.)
JUMLAH HARGA
(Rp.)
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N A R S I T E K T U R
NO URAIAN PEKERJAAN VOLUME
J. PEKERJAAN DRAINASE - 10,239,700Rp
J.1 PEKERJAAN DRAINASE LUAR/SEKELILING BANGUNAN - 9,682,301Rp
1 Pasangan bata Saluran Keliling & taman ad 1 Pc : 4 , t=45mm 25.56 m2 63,818.82 1,631,209Rp
2 Pasangan buis beton 56.80 M1 91,201.04 5,180,219Rp
3 Lantai kerja ad. 1:3:5, t = 5 cm 1.42 M3 558,597.26 793,208Rp
4 Pasir urug t = 10 cm 2.84 M3 137,057.13 389,242Rp
5 Galian tanah saluran 45.44 M3 32,274.51 1,466,554Rp
6 Urugan tanah kembali 20.67 M3 10,733.83 221,868Rp
-
J.2 PEKERJAAN BAK KONTROL - 557,399Rp
1 Pasangan bata Bak Kontrol ( 6 unit BK ) ad 1 Pc : 4 Ps 4.80 M2 63,818.82 306,330Rp
2 Plester + aci 5.68 M2 22,928.04 130,231Rp
3 Pasir urug t = 5 cm 0.13 M3 137,057.13 17,543Rp
4 Lantai kerja ad. 1:3:5 t = 5 cm 0.13 M3 558,597.26 71,500Rp
5 Galian tanah 0.77 M3 32,274.51 24,787Rp
6 Urugan tanah kembali 0.65 M3 10,733.83 7,007Rp
-
22 RAB Arsitek Pe
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 23/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN MEKANIKAL
A. PEKERJAAN INSTALASI AIR BERSIH TOTAL 59,368,877.61Rp
A.1. PEK INSTALASI AIR BERSIH Lt. 1 / DASAR 5,238,498.35
1 Pipa Distribusi PPR PN 10 dia 32 mm 16.00 M 63,348.26 1,013,572.10
2 Pipa Distribusi PPR PN 10 dia 25 mm 16.00 M 41,085.50 657,367.97
3 Pipa Distribusi PPR PN 10 dia 32 mm (pipa taman) 12.00 M 63,348.26 760,179.07
4 Pipa Distribusi PPR PN 10 dia 15 mm 15.00 M 24,404.66 366,069.84
5 Gate valve dia. 32 1.00 bh 173,104.30 173,104.30
6 Gate value dia. 25 1.00 bh 135,004.48 135,004.48
7 Fitting - fitting 1.00 Lot 1,074,194.30 1,074,194.30
8 Material Bantu 1.00 Lot 537,097.15 537,097.15
9 Testing dan Kommisioning 1.00 Ls 521,909.15 521,909.15
-
-
A.2. PEK INSTALASI AIR BERSIH Lt. 2 - 5,238,498.35 -
1 Pipa Distribusi PPR PN 10 dia 32 mm 16.00 M 63,348.26 1,013,572.10
2 Pipa Distribusi PPR PN 10 dia 25 mm 16.00 M 41,085.50 657,367.97
3 Pipa Distribusi PPR PN 10 dia 32 mm (pipa taman) 12.00 M 63,348.26 760,179.07
4 Pipa Distribusi PPR PN 10 dia 15 mm 15.00 M 24,404.66 366,069.84
5 Gate valve dia. 32 1.00 bh 173,104.30 173,104.30
6 Gate valve dia. 25 1.00 bh 135,004.48 135,004.48
7 Fitting - fitting 1.00 Lot 1,074,194.30 1,074,194.30
8 Material Bantu 1.00 Lot 537,097.15 537,097.15
9 Testing dan Kommisioning 1.00 Ls 521,909.15 521,909.15
-
-
A.3. PEK INSTALASI AIR BERSIH Lt. 3 - 5,411,602.66
-
1 Pipa Distribusi PPR PN 10 dia 32 mm 16.00 M 63,348.26 1,013,572.10
2 Pipa Distribusi PPR PN 10 dia 25 mm 16.00 M 41,085.50 657,367.97
3 Pipa Distribusi PPR PN 10 dia 32 mm (pipa taman) 12.00 M 63,348.26 760,179.07
4 Pipa Distribusi PPR PN 10 dia 15 mm 15.00 M 24,404.66 366,069.84
5 Gate valve dia. 32 2.00 bh 173,104.30 346,208.60
6 Gate valve dia. 25 1.00 bh 135,004.48 135,004.48
7 Fitting - fitting 1.00 Lot 1,074,194.30 1,074,194.30
8 Material Bantu 1.00 Lot 537,097.15 537,097.15
9 Testing dan Kommisioning 1.00 Ls 521,909.15 521,909.15
-
-
-
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
Halaman :23/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 24/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
A.4. PERALATAN AIR BERSIH LANTAI ATAP (ROOF TANK) - 23,076,258.00
-
1 Roof Tank Kapasitas 3 m3 1.00 Buah 3,228,262.82 3,228,262.82
2 Pipa header PPR PN 10 dia. 32 (Pj 2 m) 2.00 Buah 63,348.26 126,696.51
3 PPR PN 10 dia. 32 (Pipa Drain) 8.00 M 63,348.26 506,786.05
4 pengadaan pompa boster kap. 100 liter/menit. 4.00 M 3,070,053.80 12,280,215.20
5 Gate valve dia. 32 10.00 bh 173,104.30 1,731,043.02
6 Strainer 32mm bh - Tidak Ditawarkan
7 Flexibel joint 32 bh - Tidak Ditawarkan
8 Check valve 32 bh - Tidak Ditawarkan
9 Booster pump 1.00 bh 3,070,053.80 3,070,053.80
10 Fitting - fitting 1.00 Lot 1,074,194.30 1,074,194.30
11 Material Bantu 1.00 Lot 537,097.15 537,097.15
12 Testing dan Kommisioning 1.00 Ls 521,909.15 521,909.15
-
A.5. POMPA AIR BERSIH - 20,404,020.24
-
1 Jet Pump 500 Watt, lengkap terpasang berikut pengeboran, pom 1.00 Unit 4,300,000.00 4,300,000.00
pemipaan / instalasi, Automatic radar, pengkabelan & Power pompa dll. -
2 1.00 Ls 8,500,000.00 8,500,000.00
-
3 Lift pump 1.00 Unit 3,070,053.80 3,070,053.80
4 Header dia 32 mm Buah - Tidak Ditawarkan
5 Gate Valve dia. 32 mm2 3.00 Buah 173,104.30 519,312.91
6 Check Valve dia 32 mm2 1.00 Buah 240,700.66 240,700.66
7 Floating Valve dia 32 mm2 2.00 Buah 240,700.66 481,401.31
8 Fleksible Joint dia 32 mm2 Buah - Tidak Ditawarkan
9 Strainer dia 32 mm2 Buah - Tidak Ditawarkan10 Fitting - fitting 1.00 Lot 1,847,094.95 1,847,094.95
11 Material Bantu 1.00 Lot 923,547.47 923,547.47
12 Testing dan Kommisioning 1.00 ls 521,909.15 521,909.15
-
B. PEKERJAAN INSTALASI AIR KOTOR DAN AIR BEKAS - 14,984,557.77Rp
-
B.1. PEK INSTALASI AIR KOTOR DAN AIR BEKAS LT. 1/DASAR - 5,768,833.47
-
1 Pipa PVC AW dia 100 mm ( pipa air kotor & air bekas ) 20.00 M 47,900.63 958,012.56
2 Pipa PVC AW dia 80 mm ( pipa air bekas ) 28.00 M 30,765.44 861,432.43
3 Pipa Vent PVC D dia 100 mm 12.00 M 32,045.52 384,546.24 4 Pipa Vent PVC D dia 50 mm 20.00 M 16,022.76 320,455.20
5 Pipa Vent PVC D dia 32 mm 6.00 M 13,148.72 78,892.33
6 Clean Out (CO) dia 100 mm 3.00 Buah 184,982.10 554,946.30
7 Clean Out (CO) dia 80 mm 3.00 Buah 133,965.98 401,897.95
Holding Tank ( Pengadaan penampung sumber air terdiri dari
tanki fiber kap. 2 x 2 m3, ditanam dan dilindungi dengan
pasangan dinding bata dan manhole, lengkap terpasang )
Halaman :24/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 25/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
8 Floor Drain (FD) dia 50 mm ( by Architecture ) 2.00 Buah 48,679.50 97,359.00
9 Fitting-fitting 1.00 Lot 1,074,194.30 1,074,194.30
10 Material Bantu 1.00 Lot 537,097.15 537,097.15
11 Testing dan Commisioning 1.00 Ls 500,000.00 500,000.00
-
B.2. PEK INSTALASI AIR KOTOR DAN AIR BEKAS LT. 2 - 4,875,450.99
-
1 Pipa PVC AW dia 100 mm ( pipa air kotor ) 24.00 M 47,900.63 1,149,615.07
2 Pipa PVC AW dia 80 mm ( pipa air bekas ) 4.00 M 30,765.44 123,061.78
3 Pipa Vent PVC D dia 100 mm 3.00 M 32,045.52 96,136.56
4 Pipa Vent PVC D dia 50 mm 15.00 M 16,022.76 240,341.40
5 Pipa Vent PVC D dia 32 mm 6.00 M 13,148.72 78,892.33
6 Clean Out (CO) dia 100 (air kotor) 3.00 Buah 184,982.10 554,946.30
7 Clean Out (CO) dia 80 mm (air bekas) 3.00 Buah 133,965.98 401,897.95
8 Floor Drain (FD) dia 50 mm ( by Architecture ) 2.00 Buah 48,679.50 97,359.00
9 Fitting-fitting 1.00 Lot 1,074,194.30 1,074,194.30
10 Material Bantu 1.00 Lot 537,097.15 537,097.15
11 Testing dan Commisioning 1.00 Ls 521,909.15 521,909.15
-
B.3. PEK INSTALASI AIR KOTOR DAN AIR BEKAS LT. 3 - 4,340,273.31
-
1 Pipa PVC AW dia 100 mm ( pipa air kotor ) 20.00 M 47,900.63 958,012.56
2 Pipa Vent PVC D dia 50 mm 20.00 M 16,022.76 320,455.20
3 Pipa Vent PVC D dia 40 mm 2.00 M 13,867.17 27,734.33
4 Pipa Vent PVC D dia 32 mm 20.00 M 13,148.72 262,974.45
5 Clean Out (CO) dia 100 2.00 Buah 184,982.10 369,964.20
6 Clean Out (CO) dia 80 mm 2.00 Buah 133,965.98 267,931.97
7 Fitting-fitting 1.00 Lot 1,074,194.30 1,074,194.30
8 Material Bantu 1.00 Lot 537,097.15 537,097.15
9 Testing dan Commisioning 1.00 Ls 521,909.15 521,909.15
-
C. PEKERJAAN INSTALASI AIR HUJAN - 5,859,026.52
-
1 Pipa PVC AW dia 100 mm di roof 10.00 M 47,900.63 479,006.28
2 Pipa PVC AW dia 100 mm pipa tegak 25.00 M 47,900.63 1,197,515.70
3 Pipa PVC AW dia 50 mm pipa tegak canopy 8.00 M 16,022.76 128,182.08
4 Pipa PVC AW dia 100 mm pipa ke saluran luar dari pipa tegak ca 6.00 M 47,900.63 287,403.77
5 Pipa PVC AW dia 100 mm pipa ke saluran luar 12.00 M 47,900.63 574,807.54
6 Roof Drain dia 100 mm di roof 4.00 buah 100,591.32 402,365.28
7 Roof Drain dia 65 mm di roof buangan tanki air atas 1.00 buah 83,035.87 83,035.87
8 Roof Drain dia 50 mm di roof canopy 1.00 buah 79,964.19 79,964.19
9 Fitting-fitting & Klem klem 1.00 Lot 1,137,153.12 1,137,153.12
10 Material Bantu 1.00 Lot 568,576.56 568,576.56
11 Testing dan Commisioning 1.00 Ls 921,016.14 921,016.14
Halaman :25/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 26/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
-
D. PEKERJAAN STP / BIO-SEPTICK - 50,219,979.00
-
1 STP / BIO-SEPTICK 1.00 Unit 48,684,952.10 48,684,952.10
Kapasitas : 9 m3/hr Type Kotak. -
c/w : Unit Blower, Control Panel, Material Pemasangan -
Kondisi terpasang dan beroperasi -
2 Dudukan untuk STP / BIO-SEPTICK 1.00 ls - By Civil
3 Testing dan Commisioning 1.00 Ls 1,535,026.90 1,535,026.90
-
PEKERJAAN ELEKTRIKAL -
A. PEKERJAAN PANEL - 63,455,999.96
-
1 Panel PUTR 1.00 Unit 35,668,248.52 35,668,248.52
2 Panel KWH 1.00 Unit 4,732,426.27 4,732,426.27
3 DB-UNIT 3.00 Unit 4,732,426.27 14,197,278.82
4 Panel Unit Typical (BOX HAGGER) 6.00 Unit 101,448.08 608,688.47 5 Panel Pompa Air Bersih 1.00 Unit 6,407,325.60 6,407,325.60
6 Material Bantu 1.00 Lot 921,016.14 921,016.14
7 Testing Commisioning 1.00 Ls 921,016.14 921,016.14
-
B. PEKERJAAN LISTRIK - 49,580,213.87Rp
-
B.1. PEKERJAAN LAMPU DAN STOP KONTAK - 41,721,395.39
-
B.1.1 PEKERJAAN LAMPU DAN STOP KONTAK LT. DASAR - 28,805,005.98
1 Lampu PL e 27, 7 watt 12.00 buah 70,552.82 846,633.86
2 Lampu PL e 27, 7 watt +NB 3.00 buah 377,558.20 1,132,674.61
3 Lampu TL 1 x 18 watt v-shafe 2.00 Buah 54,391.23 108,782.46
4 Lampu TL 1 x 18 watt v-shafe +NB 1.00 buah 163,173.68 163,173.68
5 Lampu Baret isi TL Bulat-20 watt + NB 1.00 buah 140,651.30 140,651.30
6 Lampu Taman lengkap dengan tiang 8.00 Buah 2,920,770.00 23,366,160.00
7 Saklar Tunggal 7.00 Buah 24,794.09 173,558.64
8 Saklar ganda 2.00 buah 27,844.67 55,689.35
9 Stop Kontak 4.00 Buah 30,246.20 120,984.78
10 Instalasi Lampu 17.00 Titik 118,323.64 2,011,501.85
11 Instalasi Stop Kontak 4.00 Titik 138,898.84 555,595.36
12 Instalasi saklar 9.00 Titik 60,714.05 546,426.41
13 Material Bantu 1.00 Lot 307,005.38 307,005.38
14 Testing dan Commisioning 1.00 ls 122,802.15 122,802.15 -
B.1.2 PEKERJAAN LAMPU DAN STOP KONTAK LT. 2 - 6,285,479.84
-
1 Lampu PL e 27, 7 watt 12.00 buah 70,552.82 846,633.86
Halaman :26/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 27/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
2 Lampu PL e 27, 7 watt +NB 3.00 buah 377,558.20 1,132,674.61
3 Lampu TL 1 x 18 watt v-shafe 2.00 Buah 54,391.23 108,782.46
4 Lampu TL 1 x 18 watt v-shafe +NB 1.00 buah 163,173.68 163,173.68
5 Lampu Baret isi TL Bulat-20 watt + NB 1.00 buah 140,651.30 140,651.30
6 Saklar Tunggal 7.00 Buah 24,794.09 173,558.64
7 Saklar ganda 2.00 buah 27,844.67 55,689.35
8 Stop Kontak 4.00 Buah 30,246.20 120,984.78
9 Instalasi Lampu 17.00 Titik 118,323.64 2,011,501.85
10 Instalasi Stop Kontak 4.00 Titik 138,898.84 555,595.36
11 Instalasi saklar 9.00 Titik 60,714.05 546,426.41
12 Material Bantu 1.00 Lot 307,005.38 307,005.38
13 Testing dan Commisioning 1.00 ls 122,802.15 122,802.15
-
B.1.3 PEKERJAAN LAMPU DAN STOP KONTAK LT. 3 - 6,285,479.84
-
1 Lampu PL e 27, 7 watt 12.00 buah 70,552.82 846,633.86
2 Lampu PL e 27, 7 watt +NB 3.00 buah 377,558.20 1,132,674.61
3 Lampu TL 1 x 18 watt v-shafe 2.00 Buah 54,391.23 108,782.46
4 Lampu TL 1 x 18 watt v-shafe +NB 1.00 buah 163,173.68 163,173.68
5 Lampu Baret isi TL Bulat-20 watt + NB 1.00 buah 140,651.30 140,651.30
6 Saklar Tunggal 7.00 Buah 24,794.09 173,558.64
7 Saklar ganda 2.00 buah 27,844.67 55,689.35
8 Stop Kontak 4.00 Buah 30,246.20 120,984.78
9 Instalasi Lampu 17.00 Titik 118,323.64 2,011,501.85
10 Instalasi Stop Kontak 4.00 Titik 138,898.84 555,595.36
11 Instalasi saklar 9.00 Titik 60,714.05 546,426.41
12 Material Bantu 1.00 Lot 307,005.38 307,005.38
13 Testing dan Commisioning 1.00 ls 122,802.15 122,802.15
-
B.1.4 PEKERJAAN LAMPU LT. DAK - 345,429.73
-
1 Lampu TL 1 x 18 watt v-shafe 2.00 Buah 54,391.23 108,782.46
2 Instalasi Lampu 2.00 Titik 118,323.64 236,647.28
-
B.2. PEKERJAAN KABEL - 5,366,428.08
-
1 Kabel dari KWH Meter ke P-PLN NYY 4 x 50 mm2 + E-NYA 25 10.00 M 54,715.76 547,157.58
2 Kabel dari P-PLN ke PUTR NYY 4 x 50 mm2 + E-NYA 25 mm2 10.00 M 54,715.76 547,157.58
3 Kabel dari PUTR ke P - POMPA AIR BERSIH NYY 4 x 6 mm2 + 20.00 M 44,395.70 887,914.08
4 Kabel dari P-KWH Type 1 NYY 3 x 2.5 mm 25.00 M 9,281.56 232,038.95
5 Kabel dari P-POMPA AIR BERSIH ke P-KONTROL LP1 & 2 NYY 10.00 M 41,994.18 419,941.82
6 Proteksi Kabel dengan Pipa Gip Dia 100 10.00 M 165,769.92 1,657,699.24
7 Material Bantu 1.00 Lot 614,010.76 614,010.76
8 Testing Commisioning 1.00 Ls 460,508.07 460,508.07
Halaman :27/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 28/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
-
B.3. PEKERJAAN KABEL TRAY - 2,492,390.40
Pengadaan dan Pemasangan Kabel Tray lengkap dengan se- -
mua fitting, aksesoris, berikut material dan alat bantu pemasa- -
ngan lainnya sesuai diuraikan dalam Gambar dan Spesifikasi -
Teknis. -
-
B.3.1 LANTAI 1 - 830,796.80
-
1 Kabel Tray 100x50 20.00 M 41,539.84 830,796.80
2 Material Bantu 1.00 Lot - -
-
B.3.2 LANTAI 2 - 830,796.80
-
1 Kabel Tray 100x50 20.00 M 41,539.84 830,796.80
2 Material Bantu 1.00 Lot - -
-
B.3.3 LANTAI 3 - 830,796.80
-
1 Kabel Tray 100x50 20.00 M 41,539.84 830,796.80
2 Material Bantu 1.00 Lot - -
-
-
-
C. PEKERJAAN INSTALASI PEMADAM KEBAKARAN RINGAN ( APAR ) - 1,296,237.73
-
C.1 Lantai Dasar - -
-
1 Fire Extinguisher Class DCP 3,5 Kg 1.00 Buah 288,052.83 288,052.83
-
C.2 Lantai 2 & 3 (Typical) - -
-
1 Fire Extinguisher Class DCP 3,5 Kg 2.00 Buah 288,052.83 576,105.66
-
C.3 Ruang Pompa - -
-
1 Fire Extinguisher Class CO2 5 Kg 1.00 Buah 432,079.24 432,079.24
-
-
- -
-
-
-
Halaman :28/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 29/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
-
D. PEKERJAAN INSTALASI FIRE ALARM - 50,622,558.55Rp
-
D.1. PERALATAN UTAMA - 14,472,869.69
-
Pengadaan, Pemasangan dan PenGatesan Peralatan SesuaiGambar dan spesifikasi -
-
Main Control Panel - Fire Alarm ( MCFA ) 10 Zone 1.00 bh 11,461,361.10 11,461,361.10
Main Distribution Frame - Fire ( MDF - FA ) Alarm 10 Zone 1.00 bh 898,688.48 898,688.48
Terminal Box - Fire Alarm ( TB - FA - 1 s/d 3 ) Lt. 1 s/d Lt. 3 1.00 bh 181,736.80 181,736.80
Material Bantu 1.00 lot 101,967.33 101,967.33
Testing dan Kommisioning 1.00 ls 101,967.33 101,967.33
-
Kabel NYA 10x2x1.5 mm2 Dari MCFA ke MDF - FA 30.00 m 57,571.62 1,727,148.66
-
-
D.2. PEKERJAAN INSTALASI FA LT. 1 / DASAR - 13,250,430.09 -
Rate of Rise Heat Detector 1.00 bh 236,387.65 236,387.65
Smoke Detector 2.00 bh 320,830.36 641,660.72
Manual Break Glass Switch 1.00 bh 162,070.28 162,070.28
Alarm bell 1.00 bh 257,871.54 257,871.54
Lampu Indikator 1.00 bh 202,636.53 202,636.53
-
Kabel NYA 4x( 1 x 1.5 mm2 ) + Pipa Hi Conduit dia 3/4" : 30.00 m1 57,571.62 1,727,148.66
Instalasi Kabel NYA (1,5 x 2 mm2) + Pipa Hi Conduit dia 3/4" : 125.00 m1 57,571.62 7,196,452.75
-
instalasi Rate of Rise Heat Detector 1.00 ttk 141,819.61 141,819.61
instalasi Smoke Detector 2.00 ttk 141,819.61 283,639.22
instalasi Manual Break Glass Switch 1.00 ttk 353,672.79 353,672.79
instalasi Alarm bell 1.00 ttk 486,275.75 486,275.75
instalasi Lampu Indikator 1.00 ttk 486,275.75 486,275.75
Material Bantu 1.00 lot 614,010.76 614,010.76
Testing dan Kommisioning 1.00 ls 460,508.07 460,508.07
-
-
D.3 PEKERJAAN INSTALASI FA LT. 2 - 13,250,430.09
-
Rate of Rise Heat Detector 1.00 bh 236,387.65 236,387.65
Smoke Detector 2.00 bh 320,830.36 641,660.72
Manual Break Glass Switch 1.00 bh 162,070.28 162,070.28
Alarm bell 1.00 bh 257,871.54 257,871.54 Lampu Indikator 1.00 bh 202,636.53 202,636.53
-
Kabel NYA 4x( 1 x 1.5 mm2 ) + Pipa Hi Conduit dia 3/4" : 30.00 m1 57,571.62 1,727,148.66
Instalasi Kabel NYA (1,5 x 2 mm2) + Pipa Hi Conduit dia 3/4" : 125.00 m1 57,571.62 7,196,452.75
Halaman :29/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 30/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
-
instalasi Rate of Rise Heat Detector 1.00 ttk 141,819.61 141,819.61
instalasi Smoke Detector 2.00 ttk 141,819.61 283,639.22
instalasi Manual Break Glass Switch 1.00 ttk 353,672.79 353,672.79
instalasi Alarm bell 1.00 ttk 486,275.75 486,275.75
instalasi Lampu Indikator 1.00 ttk 486,275.75 486,275.75
Material Bantu 1.00 lot 614,010.76 614,010.76
Testing dan Kommisioning 1.00 ls 460,508.07 460,508.07
-
D.4 PEKERJAAN INSTALASI FA LT. 3 - 9,648,828.68
-
Rate of Rise Heat Detector 1.00 bh 236,387.65 236,387.65
Smoke Detector 2.00 bh 320,830.36 641,660.72
Manual Break Glass Switch 1.00 bh 162,070.28 162,070.28
Alarm bell 1.00 bh 257,871.54 257,871.54
Lampu Indikator 1.00 bh 202,636.53 202,636.53
- -
Kabel NYA 4x( 1 x 1.5 mm2 ) + Pipa Hi Conduit dia 3/4" : 30.00 m1 57,571.62 2,661,000.00 Instalasi Kabel NYA (1,5 x 2 mm2) + Pipa Hi Conduit dia 3/4" : 125.00 m1 57,571.62 2,661,000.00
- -
instalasi Rate of Rise Heat Detector 1.00 ttk 141,819.61 141,819.61
instalasi Smoke Detector 2.00 ttk 141,819.61 283,639.22
instalasi Manual Break Glass Switch 1.00 ttk 353,672.79 353,672.79
instalasi Alarm bell 1.00 ttk 486,275.75 486,275.75
instalasi Lampu Indikator 1.00 ttk 486,275.75 486,275.75
Material Bantu 1.00 lot 614,010.76 614,010.76
Testing dan Kommisioning 1.00 ls 460,508.07 460,508.07
-
-
E. PEKERJAAN INSTALASI TV - 5,421,338.56Rp
-
E.1 PERALATAN UTAMA - 3,413,795.98
-
1 Coaxial 7C/2V, dari Antena ke Mixer + Pipa Hi Conduit dia 3/4" 30.00 M 25,378.25 761,347.38
2 Coaxial 7C/2V, dari mixer ke TB-Spliter-TV/lt.3 + Pipa Hi Conduit 90.00 M 25,378.25 2,284,042.14
3 Material Bantu 1.00 Lot 307,005.38 307,005.38
4 Testing dan Commisioning 1.00 Ls 61,401.08 61,401.08
-
E.2 PEKERJAAN INSTALASI TV LT. 1 / DASAR - 669,180.86
-
1 Outlet TV 1.00 Buah 43,422.11 43,422.11
2 Splitter 2 x 3 Port 1.00 Buah 93,075.20 93,075.20 3 TB-Splitter-TV/lt.1 1.00 Buah 231,649.51 231,649.51
4 Instalasi Outlet TV 1.00 Titik 25,378.25 25,378.25
5 Material Bantu 1.00 Lot 214,254.71 214,254.71
6 Testing dan Commisioning 1.00 Ls 61,401.08 61,401.08
Halaman :30/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 31/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
-
E.3 PEKERJAAN INSTALASI TV LT. 2 - 669,180.86
-
1 Outlet TV 1.00 Buah 43,422.11 43,422.11
2 Splitter 1 x 6 Port 1.00 Buah 93,075.20 93,075.20
3 TB-Splitter-TV/lt.2 1.00 Buah 231,649.51 231,649.51
4 Instalasi Outlet TV 1.00 Titik 25,378.25 25,378.25
5 Material Bantu 1.00 Lot 214,254.71 214,254.71
6 Testing dan Commisioning 1.00 Ls 61,401.08 61,401.08
-
E.4 PEKERJAAN INSTALASI TV LT. 3 - 669,180.86
-
1 Outlet TV 1.00 Buah 43,422.11 43,422.11
2 Splitter 1 x 6 Port 1.00 Buah 93,075.20 93,075.20
3 TB-Splitter-TV/lt.3 1.00 Buah 231,649.51 231,649.51
4 Instalasi Outlet TV 1.00 Titik 25,378.25 25,378.25
5 Material Bantu 1.00 Lot 214,254.71 214,254.71
6 Testing dan Commisioning 1.00 Ls 61,401.08 61,401.08
-
-
F. PEKERJAAN INSTALASI PENANGKAL PETIR - 38,249,689.95
-
1 Air Terminal Spitzen H=1200 mm sesuai gambar perencana 4.00 Unit 7,429,854.73 29,719,418.90
2 BC 50 mm2 menuju ke Bak Kontrol dalam Pipa PVC dia 2" 35.00 m 59,518.80 2,083,158.07
3 Peralatan penunjang pendukung Air terminal 2.00 Lot 921,016.14 1,842,032.28
Klem-klem , Wire Rope 3/8", Trekskur, Isolator Telor, -
Bracket, Seal , Test Box , dls -
4 Bak Kontrol 400 x 400 x 400 mm, dari Beton Bertulang, lengkap d 2.00 Unit 307,005.38 614,010.76
terminal dari plat tembaga electrode pentanahan sesuai dgn gambar -
perencana (impedansi 2 ohm). -
5 Biaya Instalasi 1.00 Unit 921,016.14 921,016.14
6 Testing & Comissioning 1.00 Ls 2,149,037.66 2,149,037.66
7 Material Bantu 1.00 Lot 921,016.14 921,016.14
-
G. PEKERJAAN INSTALASI TELEPON - Tidak Ditawarkan
-
TERMINAL BOX TELEPON -
-
Pengadaan dan pemasangan Peralatan Distribusi untuk Sis- -
tem Telepon & berikut alat / material bantu pemasangan lainnya - sesuai Gambar dan Spesifikasi Teknis. -
-
LANTAI -1 -
Box PT.Telkom ( 100 pairs ) Unit - Tidak Ditawarkan
Halaman :31/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 32/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
-
TELEPON OUTLET -
Pengadan dan pemasangan Telepon Outlet, breikut alat / mat- -
erial bantu pemasangan lainnya sesuai Gambar dan Spesifi- -
kasi Teknis. -
-
LANTAI -1 -
Outlet telepon, single Buah - Tidak Ditawarkan
-
INSTALASI OUTLET TELEPON -
Instalasi kabel Outlet Telepon menggunakan kabel - -
ITC 2 x 2 x 0,6 mm2 dalam conduit PVC HI dia.20 mm2 leng- -
kap dengan bobokan dan perapihan kembali, peralatan bantu -
dan aksesoris sesuai detail Gambar dan Spesifikasi Teknis. -
-
LANTAI -2 & 3 -
Outlet telepon, single (direct line) ttk - Tidak Ditawarkan
-
INSTALASI KABEL FEEDER TELEPON -
Instalasi Kabel Feeder Sistem Telepon menggunakan kabel -
ITC termasuk bobokan dan perapihan kembali berikut semua -
aksesoris, material / alat bantu pemasangan sesuai detail -
Gambar dan Spesifikasi Teknis -
-
Kabel dari PT.Telkom ke Box.Pt.Telkom -
SITE PLAN -
Jelly Armoured 3 x 2 x 0,6 mm2 m - Tidak Ditawarkan
-
Material Bantu lot - Tidak Ditawarkan
-
Testing & Commissioning lot - Tidak Ditawarkan
-
H. PEKERJAAN PENYAMBUNGAN DAYA PLN - 11,696,061.20
-
Penyambungan Daya Listrik 10,600 VA 1,103.40 11,696,061.20
Termasuk : Uang Jaminan Layanan ( UJL ) -
Councuil ( Gambar / Jaminan Instalasi, Biaya Perijinan + Pengurusan, dll ) -
Biaya perijinan + pengurusan -
-
-
-
-
-
-
Halaman :32/33 M-E
8/10/2019 Cash Flow, Kurva - s Jadi
http://slidepdf.com/reader/full/cash-flow-kurva-s-jadi 33/33
Pekerjaan : Pembangunan Rusunawa Pesantren Sangat Kecil 3 Lantai
Lokasi : Kab. Bogor Jawa Barat
Satuan Kerja : Penyediaan Perumahan Kementerian Perumahan Rakyat
Kegiatan : Penyediaan Rumah Susun
Tahun Anggaran : 2014
IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
Vol
D A F T A R K U A N T I T A S D A N H A R G A ( D K H )
P E K E R J A A N M EK A N I K A L D A N E L E K T R I K A L
NO URAIAN PEKERJAAN SAT. HARGA SATUAN
(Rp.)JUMLAH HARGA (Rp.)
I. PEKERJAAN SISTEM PENTANAHAN - 3,883,845.23
BANGUNAN I -
PEKERJAAN SISTEM PENTANAHAN -
Pentanahan (Grounding) Netral Sistem & Pentanahan Body -
-
Body Panel PUTR -
Body pada semua panel distribusi daya tegangan rendah -
Body Peralatan pada Sistem Elektronik -
-
Item SBB: -
Grounding Box 40x40x40 cm 2.00 bh 1,176,161.63 2,352,323.25
Grounding Rod GIP 1' ( 2 Ω ) 2.00 bh 242,618.63 485,237.26
Connector Test Box 2.00 set -
Termination R.Supporting Material 1.00 lot -
Kabel BC 50 mm2 15.00 m 59,518.80 892,782.03
Material Bantu 1.00 lot -
Testing & Commissioning 1.00 lot 153,502.69 153,502.69
-
J. PEKERJAAN INSTALASI TATA UDARA - Tidak Ditawarkan
-
J.1 Lantai Dasar -
- RF-1.1 s/d RF-1.2 bh - Tidak Ditawarkan
Kapasitas : 553 ft/min -
Type : Rotary Fan -
PI : 0,068 kw/220V/50 Hz/1ph -
-
- Material Bantu lot -
- Testing & Commissioning lot -
-
J.2 Lantai 2 & 3 (Typical) -
- RF-2.1 s/d RF-2.2 & RF-3.1 s/d RF-3.2 bh - Tidak Ditawarkan
Kapasitas : 553 ft/min -
Type : Rotary Fan -
PI : 0,068 kw/220V/50 Hz/1ph -
-
- Material Bantu lot -
- Testing & Commissioning lot -
-
K. PEKERJAAN GENSET - Tidak Ditawarkan
-
-