  • Alexey Panchenko02.02.2010

    OverDriveCasing Running and Drilling System Expect More

  • 1 2010 Weatherford. All rights reserved.

    Warning

    The content of this presentation is an exclusive property of Weatherford. Any distribution of information without company authorization is prohibited.

    Warning

  • 2 2010 Weatherford. All rights reserved.

    Content

    2

    3

    Introduction11

    General components overview, Models of TorkDrive Systems & other features

    Experience globally and in Russia

  • 3 2010 Weatherford. All rights reserved.

    IntroductionCommercial video

  • 4 2010 Weatherford. All rights reserved.

    Introduction

    OverDrive System helps to expand capabilities of your top drive and use its rotational power for tubular make ups

    OverDrive System completely replaces conventional set of casing running equipment (elevator, slips, power tong, fill up & circulation tool, weight compensator)

    Incorporated swivel allows string rotation and push down casing while running, circulating, reciprocating or cementing

    Integrated TorkSub measuring shaft gives more precise torque readings

  • 5 2010 Weatherford. All rights reserved.

    Introduction

    Removes personnel from the derrick and rig floor Removes equipment / scaffolding from rig floor Reduced risk exposure

    Client Value - Safety

  • 6 2010 Weatherford. All rights reserved.

    Flat Time Reduction / Hazard mitigation

    Increased Drilling Performance(casing running & reaming)

    Reduces potential for differential sticking Potentially eliminate dedicated wiper/reamer trips

    Increased Drilling Performance (Drilling w/ Casing - DwC)

    Eliminates drill pipe and bottom hole assembly Reduced well bore exposure/damage Improved borehole quality Improved cement jobs

    Push down or reciprocate while rotating or circulating

    Getting casing to bottom

    Introduction

  • 7 2010 Weatherford. All rights reserved.

    Content

    2

    3

    Introduction

    2

    1

    Experience globally and in Russia

    General components overview, Models of TorkDrive Systems & other features

  • 8 2010 Weatherford. All rights reserved.

    Job History Data

    Total casing run (million ft.) 3.5Total Countries (global) 23Total Clients (global) 54

    Experience globally and in Russia

  • 9 2010 Weatherford. All rights reserved.

    Experience globally and in RussiaJob History Data

  • 10 2010 Weatherford. All rights reserved. 10

    OverDrive System Current Geographic Spread

    UK 9 UK 9 Norway 1 Norway 1 Germany 2 Germany 2

    Russia 5 Russia 5

    Kazakhstan 2 Kazakhstan 2

    Azerbaijan 5 Azerbaijan 5

    Angola 1 Angola 1

    Indonesia 5 Indonesia 5

    UAE 1 UAE 1

    Australia 1 Australia 1

    Peru 2 Peru 2

    USA 13 USA 13

    Ecuador 1 Ecuador 1

    Colombia 5 Colombia 5

    Brasil 4 Brasil 4 Libya 1 Libya 1

    67 Current total 67 Current total

    Oman 2Oman 2

    India 1 India 1 Tunis 2 Tunis 2 Algeria 2 Algeria 2

    Mexico 2 Mexico 2

    Experience globally and in Russia

  • 11 2010 Weatherford. All rights reserved. 11

    OverDrive System Real Results

    Petrobras Marianas: ran 18 and 9 5/8 on first Deepwater well in Colombia. Saved (8) hours of rig time compared to conventional run times

    Petrobras Marianas: ran 18 and 9 5/8 on first Deepwater well in Colombia. Saved (8) hours of rig time compared to conventional run times

    Bp Caspian: remote operated equipment eliminated manual handling of conventional casing running equipment. Running on (5) rigs. Improved run rates by 15%.

    Bp Caspian: remote operated equipment eliminated manual handling of conventional casing running equipment. Running on (5) rigs. Improved run rates by 15%.

    Exxon Heritage: floated in 18,000, 28,000 9 5/8 casing strings. Rotated entire string.

    Exxon Heritage: floated in 18,000, 28,000 9 5/8 casing strings. Rotated entire string.

    Shell Brent: ran 18,208 casing in 80deviation. Previously took (3) weeks to remove drill string. No hole cleaning.

    Shell Brent: ran 18,208 casing in 80deviation. Previously took (3) weeks to remove drill string. No hole cleaning.

    BP Liberty: scheduled to run 6,200 20, 19,00016 and 36,000 11 7/8 casing stringsBP Liberty: scheduled to run 6,200 20, 19,00016 and 36,000 11 7/8 casing strings

    Nexen Scott: ran 17,286 9 5/8 casing in 75deviation. Severe losses, sticky hole during BHA trip out. 40 hours working casing string.

    Nexen Scott: ran 17,286 9 5/8 casing in 75deviation. Severe losses, sticky hole during BHA trip out. 40 hours working casing string.

    Eni Black Tip: DwC entire surface and intermediate casing stringsEni Black Tip: DwC entire surface and intermediate casing strings

    Ecopetrol: DwC 13 3/8Ecopetrol: DwC 13 3/8

    Eni, RWE: After conventional attempts to run casing unsuccessful, OverDrive used to get casing to TD

    Eni, RWE: After conventional attempts to run casing unsuccessful, OverDrive used to get casing to TD

    Bp: Rotated 13,000 13 3/8 casing string to TD Bp: Rotated 13,000 13 3/8 casing string to TD

    SEIC Sakhalin: ERD wells, extreme arctic environment.SEIC Sakhalin: ERD wells, extreme arctic environment.

    Devon Barnett Shale:running speeds up to 35 jts./hrDevon Barnett Shale:running speeds up to 35 jts./hr

    Experience globally and in Russia

  • 12 2010 Weatherford. All rights reserved.

    Experience globally and in Russia

    Currently OverDrive systems successfully supports only one offshore project on Piltun platform with Sakhalin Energy Company

    9 wells completed, 24 casing jobs totally without serious incidents or NPT

    Casing sizes from 18-5/8 to 5 , sections lenghts up to 4000 meters

    20 persons qualified to operate the system (10 Sakhalin personnel, 10 continental Russia for future projects)

    Russia operations

  • 13 2010 Weatherford. All rights reserved.

    Safety (reduced crew size, no personnel on rig floor, less manual operations) in severe northern conditions

    Abilityy to get casing to bottom mitigating formation hazards

    It turned out that OverDrive operations are faster than conventional comparing with Sakhalin Energy twin Lunskaya platform in spite of the fact that speed was never high importance criteria for choosing this system

    Three occasions when OverDrive System was utilized to rotate the string in order to pass tight spots. Absence of system would lead to casing pulling out, serious NPT figures and unplanned costs

    Why Sakhalin Energy chosen the system and what was achieved

    Experience globally and in Russia

  • 14 2010 Weatherford. All rights reserved.

    One more 500 ton Modular system for Sakhalin Energy Lunskaya platform

    Two Compact systems for application on continental

    Test facility construction on Noyabrsk base

    Plans for current yearExperience globally and in Russia

  • 15 2010 Weatherford. All rights reserved.

    Content

    2

    3

    Introduction

    2

    1

    2

    3

    Experience Globally and in Russia

    General components overview, Models of TorkDrive Systems & other features

  • 16 2010 Weatherford. All rights reserved.

    General Components Overview

    TorkDrive4 Models

    TorkSub Power Supply

    Service Loop with Multi-coupler Connectors

    OverDrive Control Panel

    Driller Remote Panel

    Electric Supply Hydraulic Power UnitRotary Mounted Slips

  • 17 2010 Weatherford. All rights reserved.

    Control Panel / ISIS

    Fully interlocked with spider

    Full communication with driller

    Single lever main control (ISIS)

    Fully Remote Control

    Built in weight compensator

    Fill up or circulation with air venting

    General Components Overview

  • 18 2010 Weatherford. All rights reserved.

    Hydraulic Power Unit

    Control panel

    400 V / 50 Hz or 460 V / 60 Hz operating voltage

    General Components Overview

  • 19 2010 Weatherford. All rights reserved.

    Models of TorkDrive SystemsTorkDrive 750 HD (Heavy Duty)

    TorkDrive 750 HD (Heavy Duty)

    Size Range(external gripping only) 7 14

    Torque Capacity (@ max. diameter) 80k ft-lbs

    Hoisting Capacity 750 tons (API 8C)

    Max. Push Down Force 60 tons

    Max. Circulating Pressure 3625 psi

    Applications:

    Safety driven operationsDeep wellsExtended reach wellsPremium threaded casing and tubing

  • 20 2010 Weatherford. All rights reserved.

    Grapple Assemblies

    Torque transfer byvertical surface

    Load transfer bybottom surface

    Casing

    FClamping Cyl.

    No vertical load on outer bowl

    Load & Torque TransmissionModels of TorkDrive Systems

  • 21 2010 Weatherford. All rights reserved.

    TorkDrive 750 HD

    System Components

    8 Grapple assemblies

    5 Grapple sizes

    covering 6 5/8 - 14

    9 Upper/lower pipe guide rings

    6 5/8 14

    Fill-up Tool6 5/8 8 5/8

    Fill-up Tool9 5/8 14

    Installation stand

    for fill-up tools

    Models of TorkDrive Systems

  • 22 2010 Weatherford. All rights reserved.

    TorkDrive 500M (Modular)

    Size RangeInternal 9 5/8 20External 4 1/2 10 3/4

    Torque Capacity (@max. diameter)

    Internal 60k ft-lbsExternal 60k ft-lbs

    Hoisting CapacityInternal 500 tons

    (API 8C)External

    Max. Push Down Force

    Internal 21 tonsExternal 60 tons

    Max. Circulating Pressure

    Internal3625 psi

    External

    Applications:

    Safety driven operationsDevelopment projectsTapered casing stringsPremium threaded casing and tubing

    Models of TorkDrive SystemsTorkDrive 500 M (Modular)

  • 23 2010 Weatherford. All rights reserved.

    TorkDrive 500 M (Modular)

    Actuator Module Exchangeable Clamping Modules9 5/8 10 11 - 14 16- 20

    Internal gripping

    4 - 10

    External gripping

    Models of TorkDrive Systems

  • 24 2010 Weatherford. All rights reserved.

    TorkDrive 500 M (Modular)

    System Components External Clamping Tool

    6 Grapple assemblies

    16 Grapple sizes 4 - 10

    9 Guide cages 4 - 10 Fill-up Tool

    4 5 Fill-up Tool

    6 5/8 8 5/8Fill-up Tool

    9 5/8 10 3/4

    Installation Standfor Fill-up Tools

    Models of TorkDrive Systems

  • 25 2010 Weatherford. All rights reserved.

    TorkDrive Compact

    Size RangeInternal 9 5/8 14External 3 1/2 9 5/8

    Torque Capacity (@ max. diameter)

    Internal 40k ft-lbsExternal 60k ft-lbs

    Hoisting CapacityInternal 500 tons (API 8C)

    External 350 tons (API 8C)

    Max. Push Down ForceInternal 10 tonsExternal 10 tons

    Max. Circulating Pressure Internal 3625 psi

    Internal Clamping Tool(ICT)

    Applications:

    Safety driven operations Smaller land rigs API threaded casing

    External Clamping Tool(ECT)

    Models of TorkDrive SystemsTorkDrive Compact

  • 26 2010 Weatherford. All rights reserved.

    Torque monitoring independent of top drive control system

    Wireless data and power transmission

    On board high resolution turns sensor

    Temperature range -40C -+90C

    ATEX certified

    Other FeaturesTorkSub Integral Load Cell

  • 27 2010 Weatherford. All rights reserved.

    Other FeaturesTorkSub Integral Load Cell

    TorkSub mounting position within the tool is unaffected by our own swivel torque, as wells as the mechanical losses and swivel torques within the top drive

  • 28 2010 Weatherford. All rights reserved.

    Other FeaturesMakeup Torque Monitoring - TorkSub

  • 29 2010 Weatherford. All rights reserved.

    Top Drive Control System

    4 20 mA output (same as JAMPro)

    Interface kit to connect to JAMPro

    Other FeaturesMakeup Torque Monitoring Top Drive

  • 30 2010 Weatherford. All rights reserved.

    Thank you