1
CANAL BED WIDTH SECTION (AT Z - Z) R = D SCALE: 1:100 DETAILS OF RADIUS OF CURVATURE AND (SCALE 1:25) PROFILE WALL & LOCATION OF CONSTRUCTION JOINT 200 150 T2 T1 R = D O 200x150 CC SLEEPERS IN M15 BELOW CONSTRUCTION JOINT ALONG CANAL FLOW DIRECTION A CONSTRUCTION JOINT CC LINING IN M15 FOR BED AND SIDE WITH PAVER CC LINING IN M15 FOR BED AND SIDE WITH PAVER 250x150 PROFILE WALL IN CC M15 AT 8750 C/C IN CURVE PORTION AND AT 17500 C/C IN STRIGHT PORTION CNS LAYER 150 200 14 11 STRAIGHT FACE SPECIAL HOT POUR SEALING COMPOUND AS PER IS:5256-1992 200x150 CC SLEEPERS IN M15 BELOW CONSTRUCTION JOINT ALONG CANAL FLOW DIR 100 ONE COAT OF PRIMER CONFORMING TO IS: 3384-1985 (AS PER IS: 5256-1992) DETAILS AT 'A' 14 DETAILS AT 'C' 11 100 SPECIAL HOT POUR SEALING COMPOUND AS PER IS:5256-1992 DETAILS OF CONSTRUCTION JOINT DETAILS AT EXPANSION JOINT 100 SPECIAL HOT POUR SEALING COMPOUND AS PER IS:5256-1992 AT STRUCTURE LOCATION 75 25 25 12 ONE COAT OF PRIMER CONFORMING TO IS: 3384-1985 (AS PER IS: 5256-1992) PREFORMED JOINT FILLER TBL FSL C.C. LINING IN BED IN M15 GRADE MAX CONSTRUCTION JOINTS SPACING NOT MORE THAN 35000 C/C 550 CONSTRUCTION JOINTS SPACING NOT MORE THAN 35000 C/C CBL C.C. LINING FOR SIDE SLOPES IN M15 GRADE 250x150 PROFILE WALL IN C.C. M15 GRADE @ 8750 C/C IN CURVE PORTION AND 17500 C/C IN STRAIGHT PORTION 1.5 1 200x150 C.C. BED SLEEPER IN M15 GRADE AT LOCATION OF CONSTRUCTION JOINT 750 250 SLOPE 1.5:1 250 550 1 1.5 SLOPE 1.5:1 250x150 PROFILE WALL IN C.C. M15 GRADE @ 8750 C/C IN CURVE PORTION AND 17500 C/C IN STRAIGHT PORTION 250x150 PROFILE WALL IN C.C. M15 GRADE @ 8750 C/C IN CURVE PORTION AND 17500 C/C IN STRAIGHT PORTION NOT MORE THAN 2000 IN SLOPE NOT MORE THAN 5000 NOT MORE THAN 5000 NOT MORE THAN 5000 BED PANEL SIZE NOT MORE THAN 5000 x 5000 NOT MORE THAN 5000 CONSTRUCTION JOINT AT THE END DAYS WORK CONSTRUCTION JOINT AT 35000 C/C PLAN SCALE: 1:100 Z Z 300 TREAD 150 RISE BED LINING IN C.C. M15 CNS LAYER MIN 1500 300 300 PLAN DETAILS OF STEPS IN CANAL SIDE LINING P P SECTION P-P CAST-IN-SITU C.C LINING FOR MAIN CANALS. CANAL BED G.I. PIPE RAIL DETAILS OF CONTRACTION JOINT (SCALE 1:25) C LOCATION OF CONSTRUCTION AND CONTRATION JOINT IN CANAL BED (SCALE 1:25) CC LINING IN M15 FOR BED AND SIDE WITH PAVER CONSTRUCTION JOINT 200x150 CC SLEEPERS IN M15 BELOW CONSTRUCTION JOINT ALONG CANAL FLOW DIRECTION CNS LAYER 150 200 150 150 DETAIL 'A' C MAX CONSTRUCTION JOINTS SPACING 35000 C/C MAX CONSTRUCTION JOINTS SPACING 35000 C/C CANAL BED WIDTH 100 33 BED / SIDE SLOPE LINING 100 BED / SIDE SLOPE LINING A 250 250 t TYPICAL DRAWING FOR EXPANSIVE SOILS. t t t 85 150 TO 300 FOR DIFFERENT SWELLING PRESSURE BY ACTUAL EXPERIMENTS BOTH IN FIELD HOWEVER, OPTIMUM THICKNESS OF CNS MATERIALS NEEDS TO BE DETERMINED AND LABORATORY IF REQUIRED. NOTE:- 300 TO 500 100 cm (min.) THICKNESS OF CNS MATERIALS THICKNESS OF CNS LAYER CARRYING CAPACITY OF 2 cumec AND MORE SWELL PRESSURE 2 kn/m OF SOILS 50 TO 150 TABLE: 1B 0.03 TO 0.30 75 30 40 50 - 150 kn/m THICKNESS OF CNS LAYER CARRYING CAPACITY LESS THAN 2 cumec AS PER THE CLAUSE 5, 5.1, 5.2 OF IS : 9451-1994 THICKNESS OF CNS LAYER IN cm (min.) SWELL PRESSURE cumec 0.30 TO 0.70 0.70 TO 1.40 1.40 TO 2.00 DISCHARGE IN TABLE: 1A SWELL PRESSURE MORE THAN 150 kn/m 40 50 2 60 50 60 75 11. THE CONCRETE LAID FOR CC LINING SHOULD BE CURED FOR 28 DAYS STARTING AS PER CLAUSE 5.9.2 OF IS 3873 - 1998 IN CASE LINING IS LAID BY MECHANICAL PAVER, PVC WATER STOP ARE TO BE PLACED AT THE STRUCTURE LOCATIONS. FROM 12 HOURS AFTER LAYING OF CC LINING AS PER IS : 3873-1993. 12. 1500 MINIMUM WIDE STEPS ARE TO BE PROVIDED IN CC M 10 GRADE AT 300M C/C STAGGERED ON EITHER SIDE OF THE CANAL VIDE IS: 3873-1993 AND 3000 WIDE STEPS TO BE PROVIDED AT VILLAGE AND AT STRUCTURE LOCATIONS. 13. SUITABLE CURVATURE OF RADIUS EQUIVALENT TO DEPTH OF WATER ON EITHER SIDE AT BOTH ENDS OF BED CONNECTING BED LINING AND SIDE LINING IS 14. APPROVED AIR ENTRAINING AGENTS TO EFFECT AIR ENTRAINMENT ARE TO BE USED 15. WHILE LAYING CANAL LINING CONCRETE CARE SHALL BE TAKEN TO PREVENT INGRESS OF CONCRETE INTO THE FILTER MEDIA OR POROUS PLUGS, TO MAKE THE FILTER MEDIA EFFECTIVE BY POLYTHENE SHEETS OF ANY OTHER SUITABLE 16. REQUIRED SURFACE DRAINAGE ARRANGEMENTS OF THE CANAL BANKS SHALL BE COMPLETED SOON AFTER THE COMPLETION OF THE LINING OPERATIONS SO AS TO PREVENT SURFACE AND SUB GRADE EROSION AND CONSEQUENT DAMAGE TO CANAL 17. ALL MATERIALS AND WORKMANSHIP SHOULD CONFORM TO RELEVANT IS CODES LIKE IS 10430-2000, IS 4558-1995, IS9451-1994, IS3873-1993, IS 5256-1992, IS 383-1983, THICKNESS OF CAST IN - SITU CONCRETE LINING FOR CANALS SHALL BE FREE BOARD IN CANALS SHALL CONFORM TO CL 8.2 OF IS 10430 - 2000 SIDE SLOPES IN CANALS SHALL CONFORM TO CL 8.1 OF IS 10430 - 2000. PROVIDED AS PER TABLE 1 OF I.S 3873 -1993 FOR DIFFERENT CANAL CAPACITIE 21. 19. 20. ISS456-2000, IS 13143-1991 ETC. AND DEPTH OF WATER. 18. LINING AS PER CLAUSE 5.8 OF IS: 3873-1993. METHODS. TO BE PROVIDED FOR PAVER FINISHING. WHEREVER REQUIRED. ARE IN MILLIMETERS ONLY UNLESS OR OTHERWISE SPECIFIED 250 WIDE X 150 DEEP PROFILE WALLS ARE TO BE PROVIDED IN CC M 15 GRADE USING 40MM MAX. SIZE OF MACHINE CRUSHED HARD BROKEN GRADED GRANITE CEMENT AS PER MIX DESIGN.MIXED IN BATCHING PLANT USING CONCRETE CAST IN SITU BED AND SIDE LINING IN CC M 15 GRADE USING 40/20MM MAX. SIZE OF MACHINE CRUSHED HARD BROKEN GRANITE METAL AND USING PREPARATION OF THE SUB GRADE SHALL CONFORM TO SPECIFICATION OF IS: 387 PLACING, FINISHING AND CURING OF LINING CONCRETE SHALL BE DONE AS PER IS SITU SLEEPERS OF 200MM WIDTH X 150MM DEPTH IN M15 GRADE CONCRETE SHALL BE PROVIDED WHEREVER NECESSARY IN BED UNDER POROUS CONCRETE SLEEPERS SHALL BE PROVIDED IN THE BED OF CANAL AND LAID WITH FILTER MATERIAL AS SHOWN IN THE DRAWING METAL AT 17500 C/C IN STRAIGHT REACHES AND 8750 C/C IN CURVED PORTION OF 9. EXPANSION JOINTS SHALL BE PROVIDED WHERE A STRUCTURE INTERSECTS THE CANAL LINING. EXPANSION JOINTS OF 12MM THICKNESS ARE TO BE SEALED WITH PREFORMED JOINT FILLER AND SEALING COMPOUND AS PER IS: 5256-92. 8. -IN- 7. CAST CONSTRUCTION / EXPANSION JOINTS. 4. 6. -1993. :3873 1993 & IS 9451-1994. PAVER FINISHING SHALL BE USED THICKNESS AS PER IS 3873. 3. CANAL NOTE: 1. 2. ALL DIMENSIONS - 1 22. CLAUSE 5.2 OF IS : 9451-1994, THIS TREATMENT IS INEVITABLE IF EXPANSIVE SANDWICHED BETWEEN THE SOILS AND THE SAND CUSHION AS PER DEPENDING ON THE SWELLING PRESSURE OF EXPANSIVE SOILS TO BE IF THE SUB-GRADE OF SOILS MET WITH UNDER THE LINING ARE OF B.C. SOILS OR OF OTHER SWELLING SOILS, CNS MATERIALS OF REQUIRED THICKNESS SOILS ARE MET WITH DURING EXECUTION. 2 F.S.D = D BED AND SIDE SLOPES OF CANAL SHALL BE MADE TO REQUIRED STANDARDS BEFORE LAYING OF LINING. 5. BEFORE SEALING COMPOUND IS POURED INTO THE JOINTS. THE GROOVE SIDES SHO AND TRANSVERSELY AT INTERVALS NOT MORE THAN 35000 C/C. CURING PERIOD IS OVER. CONSTRUCTION JOINT SHALL BE PROVIDED LONGITUDINAL BE SPRAYED OR BRUSHED WITH A PRIMER AND THESE SHOULD BE TAKEN AFTER THE GROOVES SHALL BE THOROUGHLY CLEANED OF DUST 5000 C/C MAXIMUM TRANSVERSELY OR LONGITUDINALLY AS PER SITE CONDITIONS. 3873-1993. THE CONTRACTION JOINTS MAY BE PROVIDED AT INTERVALS OF ABOUT GROOVES [CONTRACTION JOINTS] ARE TO BE PROVIDED AS PER CLAUSE 6.2.1 OF IS: 10. WHERE LINING OPERATIONS ARE CONTINUOUS, LONGITUDINAL AND TRANSVERSE DETAILS OF BOTTOM RAILS CNS LAYER CANAL BED CI.S.C.C.LINING POLYETHYLENE SHEET 75 th. SAND CUSHION G.I PIPE BOTTOM POROUS CONCRETE SLEEPER CAST INSITU ON EITHER SIDES OF CANAL BED GI PIPE RESTED OVER RAILS. CNS LAYER CI.S.C.C.LINING SIDE SLOPE 33 INNER SLOPE O T1 = T2 2:1 1.5 : 1 1:1 33.69° 26.57° 45.00° D Tan (26.57/2) (33.69/2) (45.00/2) D Tan D Tan POLYETHYLENE SHEET 75 th. SAND CUSHION WHERE D = FSD IN THE CANAL SOFFIT 50MM THICK IN CC M15 GUIDE WALL GUIDE WALL 75 th. SAND CUSHION POLYETHYLENE FILM ABOVE SAND CUSHION 1500 6000 1500 75MM THICK SAND CUSHION CNS LAYER CONTRACTION JOINT AT 5M INTERVALS SLEEPER AT THE TOE OF CANAL BED G.I PIPES 50MM PERFORATED LONGITUDINAL SLEEPER CONTRACTION JOINT 3000 3000 SLOPE 1.5:1 NOT MORE THAN 5000 3000 SLOPE 1.5:1 NOT MORE THAN 5000 3000 BED PANEL SIZE NOT MORE THAN 5000 x 5000 NOT MORE THAN 5000 NOT MORE THAN 5000 POROUS CONCRETE SLEEPER CONSTRUCTION JOINT 200x150 C.C BED SLEEPER SLOPE POROUS CONCRETE SLEEPER 6000 CONSTRUCTION JOINT 200x150 C.C BED SLEEPER 200 200 ABOVE SAND CUSHION POLYETHYLENE FILM LONGITUDINAL SLEEPERS P.VIJAYA KUMAR A.E A.S.N.REDDY D.E MD.TAYAB SHAREEF E.E M.V.RAMA RAO S.E.(B&C I.S.N.RAJU C.E./C.D. CE/CDO/EE/C1/NSP/LINING/63/2006 NAGARJUNASAGAR PROJECT IMPROVEMENT PROJECT (APWSIP) GOVERNMENT OF ANDHRA PRADESH IRRIGATION & CAD DEPARTMENT ANDHRA PRADESH WATER SECTOR REHABILITATION & MODERNISATION OF G R O U P TAHAL Drg.No. associates aarvee Consultants FOR 100 THICK LINING (SCALE 1:25) FOR 100 THICK LINING FOR 100 THICK LINING 30000 3000 CONSTRUCTION JOINT 6000 C/C 6000 C/C 50 MM PERFORATED G.I.PIPES OF CANAL BED SLEEPER AT THE TOE 6000 C/C 6000 C/C

Cast-In-situ Cc Lining(13!12!2006) 2

Embed Size (px)

DESCRIPTION

CC LINING DRAWING TYPICAL

Citation preview

Page 1: Cast-In-situ Cc Lining(13!12!2006) 2

CA

NA

L BE

D W

IDTH

SE

CT

ION

(AT

Z - Z)R = D

SC

ALE

: 1:100

DE

TA

ILS O

F R

AD

IUS

OF

CU

RV

ATU

RE

AN

D

(SC

ALE

1:25)

PR

OFILE

WA

LL & LO

CA

TION

OF C

ON

STR

UC

TION

JOIN

T

200

150

T2T1

R = D O

200x150 CC

SLE

EP

ER

S IN

M15 B

ELO

WC

ON

STR

UC

TION

JOIN

T ALO

NG

CA

NA

L F

LOW

DIR

EC

TION

AC

ON

STR

UC

TION

JOIN

T

CC

LININ

G IN

M15 FO

RB

ED

AN

D S

IDE

WIT

H P

AVE

R

CC

LININ

G IN

M15 FO

RB

ED

AN

D S

IDE

WIT

H P

AVE

R

250x150 PR

OFILE

WA

LL IN C

C

M15 A

T 8750 C/C

IN C

UR

VE

P

OR

TION

AN

D A

T 17500 C/C

IN

STR

IGH

T P

OR

TION

CN

S LA

YER

150

200

14

11

STR

AIG

HT FA

CE

SP

EC

IAL H

OT P

OU

R

SE

ALIN

G C

OM

PO

UN

D

AS

PE

R IS

:5256-1992

200x150 CC

SLE

EP

ER

S IN

M15 B

ELO

WC

ON

STR

UC

TION

JOIN

T ALO

NG

CA

NA

L F

LOW

DIR 100

ON

E C

OA

T OF P

RIM

ER

C

ON

FO

RM

ING

TO

IS: 3384-1985

(AS

PE

R IS

: 5256-1992)

DE

TA

ILS A

T 'A'

14

DE

TAILS

AT 'C

'

11

100

SP

EC

IAL H

OT P

OU

R

SE

ALIN

G C

OM

PO

UN

D

AS

PE

R IS

:5256-1992

DE

TA

ILS O

F CO

NS

TRU

CTIO

N JO

INT

DE

TA

ILS A

T EX

PA

NS

ION

JOIN

T

100

SP

EC

IAL H

OT P

OU

R

SE

ALIN

G C

OM

PO

UN

D

AS

PE

R IS

:5256-1992

AT

ST

RU

CTU

RE

LOC

ATIO

N

75 25

2512O

NE

CO

AT O

F PR

IME

R

CO

NF

OR

MIN

G T

O IS

: 3384-1985 (A

S P

ER

IS: 5256-1992)

PR

EF

OR

ME

D JO

INT FILLE

R TB

L

FS

L

C.C

. LININ

G IN

BE

D IN

M

15 GR

AD

E

MA

X C

ON

ST

RU

CT

ION

JOIN

TS S

PA

CIN

G N

OT

MO

RE

THA

N 35000 C

/C

550

CO

NS

TR

UC

TIO

N JO

INTS

SP

AC

ING

NO

T M

OR

E TH

AN

35000 C/C

CB

L

C.C

. LININ

G F

OR

SID

E

SLO

PE

S IN

M15 G

RA

DE

250x150 PR

OFILE

WA

LL IN

C.C

. M15 G

RA

DE

@ 8750

C/C

IN C

UR

VE

PO

RTIO

N

AN

D 17500 C

/C IN

S

TRA

IGH

T PO

RTIO

N

1.51

200x150 C.C

. BE

D S

LEE

PE

R IN

M15

GR

AD

E A

T LOC

ATIO

N O

F C

ON

STR

UC

TION

JOIN

T

750

250

SLOPE 1.5:1

250

550

1 1.5

SLOPE 1.5:1

250x150 PR

OFILE

WA

LL IN C

.C. M

15 G

RA

DE

@ 8750 C

/C IN

CU

RVE

PO

RTIO

N

AN

D 17500 C

/C IN

ST

RA

IGH

T P

OR

TION

250x150 PR

OFILE

WA

LL IN C

.C. M

15 G

RA

DE

@ 8750 C

/C IN

CU

RVE

PO

RTIO

N

AN

D 17500 C

/C IN

ST

RA

IGH

T P

OR

TION

NO

T MO

RE

TH

AN

2000IN

SLO

PE

NO

T M

OR

E

TH

AN

5000NOT MORE THAN 5000

NO

T M

OR

E

TH

AN

5000

BE

D P

AN

EL S

IZE

NO

T M

OR

E TH

AN

5000 x 5000

NOT MORE THAN 5000

CO

NS

TRU

CTIO

N JO

INT A

T T

HE

EN

D D

AY

S W

OR

KC

ON

STR

UC

TION

JOIN

T A

T 35000 C

/C

PLA

NS

CA

LE: 1:100

ZZ

300 TRE

AD

150 RISE

BE

D LIN

ING

IN C

.C.

M15

CN

S LA

YER

MIN 1500

300300PLA

ND

ET

AILS

OF

STE

PS

IN C

AN

AL S

IDE

LININ

G

PP

SE

CT

ION

P-P

CA

ST-IN

-SITU

C.C

LININ

G FO

R M

AIN

CA

NA

LS.

CA

NA

L BE

D

G.I. P

IPE

RA

IL

DE

TA

ILS O

F CO

NT

RA

CTIO

N JO

INT

(SC

ALE

1:25)

C

LOC

ATIO

N O

F CO

NS

TR

UC

TIO

N A

ND

CO

NTR

ATIO

N JO

INT IN

CA

NA

L BE

D(S

CA

LE 1:25)

CC

LININ

G IN

M15 FO

RB

ED

AN

D S

IDE

WIT

H P

AVE

R

CO

NS

TRU

CTIO

N JO

INT

200x150 CC

SLE

EP

ER

S IN

M15 B

ELO

WC

ON

STR

UC

TION

JOIN

T ALO

NG

CA

NA

L F

LOW

DIR

EC

TION

CN

S LA

YER

150

200

150

150

DE

TAIL 'A

'C

MA

X C

ON

STR

UC

TION

JOIN

TS S

PA

CIN

G 35000 C

/CM

AX

CO

NS

TRU

CTIO

N JO

INTS

SP

AC

ING

35000 C/C

CA

NA

L BE

D W

IDTH

100

33

BE

D / S

IDE

SLO

PE

LININ

G

100

BE

D / S

IDE

SLO

PE

LININ

G

A

250

250

t

TYPIC

AL D

RA

WIN

G FO

R E

XPA

NS

IVE S

OILS

.

t

t

t

85150 TO

300

FOR

DIFFE

RE

NT S

WE

LLING

PR

ES

SU

RE

BY

AC

TUA

L EXPERIM

ENTS BO

TH IN

FIELD

HO

WE

VE

R, O

PTIM

UM

THIC

KN

ES

S O

F CN

S M

ATER

IALS NEED

S TO BE D

ETERM

INED

AN

D LA

BO

RA

TOR

Y IF R

EQU

IRED

.

NO

TE:- 300 TO 500

100

cm (m

in.)

THIC

KN

ES

S O

F CN

SM

ATE

RIALS

THIC

KN

ES

S O

F CN

S LA

YE

R C

AR

RY

ING

CAPAC

ITY OF 2 cum

ec AND

MO

RE

SW

ELL P

RESSU

RE

2kn/m

OF S

OILS

50 TO 150

TAB

LE: 1B

0.03 TO 0.30

75 3040

50 - 150 kn/m

THIC

KN

ES

S O

F CN

S LA

YE

R C

AR

RY

ING

CA

PACITY LESS TH

AN 2 cum

ecA

S P

ER

THE

CLA

US

E 5, 5.1, 5.2 O

F IS : 9451-1994

THIC

KN

ES

S O

F CN

S LAYER

IN cm

(min.)

SW

ELL P

RESSU

RE

cumec

0.30 TO 0.70

0.70 TO 1.40

1.40 TO 2.00

DIS

CH

AR

GE IN

TAB

LE: 1A

SW

ELL P

RESSU

RE

MO

RE

THA

N 150 kn/m

40 50

2

60

50 60 75

11. TH

E CO

NCRET

E LAID

FOR C

C LIN

ING

SHO

ULD

BE CURED

FOR 28 D

AYS STARTING

AS

PE

R C

LAU

SE

5.9.2 OF IS

3873 - 1998 IN C

AS

E LIN

ING

IS LAID BY M

ECH

ANIC

ALP

AV

ER

, PV

C W

ATE

R S

TOP

AR

E TO

BE

PLA

CE

D AT TH

E STRU

CTU

RE LO

CATIO

NS.

FRO

M 12 H

OU

RS A

FTER

LAYIN

G O

F CC LIN

ING AS PER IS : 3873-1993.

12. 1500 MIN

IMU

M W

IDE ST

EPS ARE T

O B

E PRO

VIDED

IN CC M

10 GRAD

E AT 300M C/C

STAG

GER

ED O

N EIT

HER

SIDE O

F TH

E CAN

AL V

IDE IS: 3873-1993 AN

D 3000 W

IDE

STEPS T

O B

E PRO

VID

ED A

T V

ILLAG

E AN

D AT STRU

CTURE LO

CATIONS.

13. SUIT

ABLE C

URVATU

RE O

F RAD

IUS EQ

UIVALEN

T TO D

EPTH O

F WATER O

N

EITH

ER SID

E AT B

OTH

END

S OF B

ED C

ON

NEC

TIN

G B

ED LIN

ING AN

D SID

E LININ

G IS

14. APPR

OVED

AIR

ENTRAIN

ING

AG

ENTS T

O EFFEC

T AIR EN

TRAINM

ENT ARE TO

BE USED

15. WH

ILE LAYIN

G C

AN

AL LIN

ING

CO

NCRET

E CARE SH

ALL BE TAKEN TO

PREVENT

ING

RESS O

F CO

NCRET

E INTO

TH

E FILTER

MED

IA OR PO

ROUS PLU

GS, TO

MAKE TH

E

FILTER

MED

IA EFFEC

TIV

E BY PO

LYTH

ENE SH

EETS OF AN

Y OTH

ER SUITABLE

16. REQ

UIR

ED SU

RFA

CE D

RAIN

AG

E ARRAN

GEM

ENTS O

F THE CAN

AL BANKS SH

ALL BE

CO

MPLET

ED SO

ON

AFT

ER T

HE C

OM

PLETIO

N O

F THE LIN

ING O

PERATIONS SO

AS TO

PREV

ENT SU

RFA

CE A

ND

SUB G

RAD

E ERO

SION

AND CO

NSEQ

UEN

T DAM

AGE TO

CANAL

17. ALL M

ATER

IALS A

ND

WO

RKM

AN

SHIP SH

OU

LD C

ON

FORM

TO RELEVAN

T IS CODES LIKE

IS 10430-2000, IS 4558-1995, IS9451-1994, IS3873-1993, IS 5256-1992, IS 383-1983,

THIC

KN

ES

S O

F CA

ST IN

- SITU

CO

NC

RE

TE LIN

ING

FOR

CAN

ALS SHALL BE

FRE

E B

OA

RD

IN C

AN

ALS

SH

ALL C

ON

FOR

M TO

CL 8.2 O

F IS 10430 - 2000

SID

E S

LOP

ES

IN C

AN

ALS

SH

ALL C

ON

FOR

M TO

CL 8.1 O

F IS 10430 - 2000.

PR

OV

IDE

D A

S P

ER

TAB

LE 1 O

F I.S 3873 -1993 FO

R D

IFFEREN

T CAN

AL CAPAC

ITIES

21.

19.

20.

ISS456-2000, IS 13143-1991 ETC.

AN

D D

EP

TH O

F WATER

.

18.

LININ

G A

S PER C

LAU

SE 5.8 OF IS: 3873-1993.

MET

HO

DS.

TO

BE PR

OVID

ED FO

R PA

VER FINISH

ING.

WH

EREV

ER R

EQU

IRED.

AR

E IN

MILLIM

ET

ER

S O

NLY

UN

LES

S O

R O

THE

RW

ISE

SP

EC

IFIED

250 WID

E X 150 D

EE

P P

RO

FILE W

ALLS

AR

E T

O B

E P

RO

VIDE

D IN

CC

M 15 G

RA

DE

U

SIN

G 40M

M M

AX. S

IZE

OF

MA

CH

INE

CR

US

HE

D H

AR

D B

RO

KE

N G

RA

DE

D G

RA

NITE

CE

ME

NT A

S P

ER

MIX D

ES

IGN

.MIX

ED

IN B

AT

CH

ING

PLA

NT U

SIN

G C

ON

CR

ETE

CA

ST IN

SIT

U B

ED

AN

D S

IDE

LININ

G IN

CC

M 15 G

RA

DE

US

ING

40/20MM

MA

X. S

IZE O

F MA

CH

INE

CR

US

HE

D H

AR

D B

RO

KE

N G

RA

NITE

ME

TAL A

ND

US

ING

PR

EP

AR

ATIO

N O

F THE

SU

B G

RA

DE

SH

ALL C

ON

FO

RM

TO S

PE

CIFIC

ATIO

N O

F IS: 3873

PLA

CIN

G, FIN

ISH

ING

AN

D C

UR

ING

OF LIN

ING

CO

NC

RE

TE

SH

ALL B

E D

ON

E A

S P

ER

IS

SIT

U S

LEE

PE

RS

OF 200M

M W

IDT

H X 150M

M D

EP

TH

IN M

15 GR

AD

E

CO

NC

RE

TE

SH

ALL B

E P

RO

VIDE

D W

HE

RE

VE

R N

EC

ES

SA

RY

IN B

ED

UN

DE

R

PO

RO

US

CO

NC

RE

TE S

LEE

PE

RS

SH

ALL B

E P

RO

VIDE

D IN

THE

BE

D O

F CA

NA

L AN

D

LAID

WIT

H FILT

ER

MA

TE

RIA

L AS

SH

OW

N IN

THE

DR

AW

ING

ME

TA

L AT 17500 C

/C IN

STR

AIG

HT R

EA

CH

ES

AN

D 8750 C

/C IN

CU

RV

ED

PO

RTIO

N O

F

9. EXPA

NSIO

N JO

INTS SH

ALL B

E PRO

VID

ED W

HER

E A STRUCTU

RE INTERSECTS TH

ECAN

AL LIN

ING

. EXPA

NSIO

N JO

INTS O

F 12MM

THICKN

ESS ARE TO BE SEALED

WIT

H PR

EFORM

ED JO

INT FILLER

AN

D SEA

LING

CO

MPO

UND AS PER IS: 5256-92.

8.

-IN-

7.C

AS

T

CO

NS

TR

UC

TIO

N / E

XP

AN

SIO

N JO

INTS

.

4.6.

-1993.:3873

1993 & IS

9451-1994.

PA

VE

R F

INIS

HIN

G S

HA

LL BE

US

ED

TH

ICK

NE

SS

AS

PE

R IS

3873.

3.

CA

NA

L

NO

TE:

1.2.

ALL D

IME

NS

ION

S

-

1

22.

CLA

US

E 5.2 O

F IS : 9451-1994, TH

IS TR

EA

TME

NT IS IN

EVITABLE IF EXPANSIVE

SA

ND

WIC

HE

D B

ETW

EE

N TH

E S

OILS

AN

D TH

E SAND

CU

SHIO

N AS PER

D

EP

EN

DIN

G O

N TH

E S

WE

LLING

PR

ES

SU

RE

OF EXPAN

SIVE SOILS TO

BE

IF THE

SU

B-G

RA

DE

OF S

OILS

ME

T WITH

UN

DE

R TH

E LININ

G AR

E OF B.C

. SOILS

OR

OF O

THE

R S

WE

LLING

SO

ILS, C

NS

MA

TER

IALS OF R

EQU

IRED

THIC

KNESS

SO

ILS A

RE

ME

T WITH

DU

RIN

G EXEC

UTIO

N.

2

F.S

.D =

D

BE

D A

ND

SID

E S

LOP

ES

OF C

AN

AL S

HA

LL BE

MA

DE

TO R

EQ

UIR

ED

STA

ND

AR

DS

BE

FO

RE

LAYIN

G O

F LININ

G.

5.

BEFO

RE SEA

LING

CO

MPO

UN

D IS PO

URED

INTO

TH

E JOIN

TS. THE G

ROO

VE SIDES SH

OULD

AN

D T

RAN

SVER

SELY A

T IN

TER

VALS N

OT M

ORE TH

AN 35000 C/C.

CU

RIN

G PER

IOD

IS OVER

. CO

NST

RU

CTIO

N JO

INT SH

ALL BE PRO

VIDED

LONGITU

DIN

ALLY

BE SPR

AYED

OR B

RU

SHED

WIT

H A

PRIM

ER A

ND TH

ESE SHO

ULD

BE TAKEN AFTER

TH

E GRO

OVES SH

ALL B

E TH

ORO

UGHLY CLEAN

ED O

F DUST

5000 C/C

MAXIM

UM

TRAN

SVER

SELY O

R LO

NG

ITU

DIN

ALLY AS PER SITE CONDITIO

NS.

3873-1993. TH

E CO

NTRACTIO

N JO

INTS M

AY B

E PROVID

ED AT IN

TERVALS OF ABO

UT

GRO

OVES [C

ON

TRACTIO

N JO

INTS] A

RE T

O B

E PRO

VIDED

AS PER CLAUSE 6.2.1 O

F IS:

10. WH

ERE LIN

ING

OPER

ATIO

NS A

RE C

ON

TIN

UO

US, LO

NGITU

DIN

AL AND TRAN

SVERSE

DE

TA

ILS O

F B

OTTO

M R

AILS

CN

S LA

YER

CA

NA

L BE

DC

I.S.C

.C.LIN

ING

PO

LYETH

YLEN

E

SH

EE

T75 th

. SA

ND

C

US

HIO

N

G.I P

IPE

BO

TTO

M P

OR

OU

S C

ON

CR

ETE

SLE

EP

ER

CA

ST

INS

ITU

ON

EITH

ER

SID

ES

OF C

AN

AL

BE

D G

I PIP

E R

ES

TE

D O

VER

RA

ILS.

CNS LAYER

CI.S.C.C.LINING

SIDE SLO

PE

33

INN

ER

SLO

PE

OT

1 = T2

2:1

1.5 : 1

1:1

33.69°

26.57°

45.00°

D Tan

(26.57/2)

(33.69/2)

(45.00/2)

D Tan

D Tan

PO

LYETH

YLEN

E

SH

EE

T 75 th.S

AN

D C

US

HIO

N

WH

ER

E D

= F

SD

IN TH

E C

AN

AL

SO

FFIT 50M

M

TH

ICK

IN C

C M

15

GU

IDE

WA

LL

GU

IDE

WA

LL

75 th.S

AN

D C

US

HIO

NP

OLYE

THYLE

NE

FILM

AB

OVE

SA

ND

CU

SH

ION

1500

6000

1500

75MM

THIC

K S

AN

D C

US

HIO

NC

NS

LAYE

RC

ON

TRA

CTIO

N JO

INT

AT 5M

INTE

RVA

LS

SLE

EP

ER

AT

THE

TOE

OF C

AN

AL B

ED

G.I P

IPE

S50M

M P

ER

FO

RA

TED

LON

GITU

DIN

AL S

LEE

PE

R

CO

NT

RA

CTIO

N JO

INT

3000

3000

SLOPE 1.5:1

NO

T M

OR

E

TH

AN

5000

3000

SLOPE 1.5:1

NOT MORE THAN 5000

3000

BE

D P

AN

EL S

IZE

NO

T M

OR

E TH

AN

5000 x 5000

NOT MORE THAN 5000

NO

T M

OR

E

TH

AN

5000

PO

RO

US

CO

NC

RE

TE

SLE

EP

ER

CO

NS

TRU

CTIO

N JO

INT

200x150 C.C

BE

D S

LEE

PE

R SLO

PE

PO

RO

US

C

ON

CR

ET

E S

LEE

PE

R

6000

CO

NS

TRU

CTIO

N JO

INT

200x150 C.C

BE

D S

LEE

PE

R

200200

AB

OVE

SA

ND

CU

SH

ION

PO

LYETH

YLEN

E FILM

LON

GITU

DIN

AL S

LEE

PE

RS

P.V

IJAY

A K

UM

AR

A.E.E.

A.S

.N.R

ED

DY

D.E.E.

MD

.TAY

AB

SH

AR

EEF E.E-C1

M.V

.RA

MA

RA

O S.E.(B

&C

'S)

I.S.N

.RA

JU C

.E./C.D

.O.

CE/C

DO

/EE/C1/N

SP/LIN

ING

/63/2006

NA

GA

RJU

NA

SA

GA

R PR

OJE

CT

IMP

RO

VEM

EN

T PR

OJE

CT (A

PWS

IP)

GO

VE

RN

ME

NT O

F AN

DH

RA

PRA

DE

SH

IRR

IGA

TION

& C

AD

DE

PAR

TME

NT

AN

DH

RA

PRA

DE

SH

WA

TER

SE

CTO

R

RE

HA

BILITA

TION

& M

OD

ER

NIS

ATIO

N O

F

G R

O U

PTAH

AL

Drg

.No.

associates

aarvee

Con

sultan

ts

FO

R 100 T

HIC

K LIN

ING

(SC

ALE

1:25)F

OR

100 TH

ICK

LININ

G

FO

R 100 T

HIC

K LIN

ING

30000

3000

CO

NS

TRU

CTIO

N

JOIN

T

6000 C/C

6000 C/C

50 MM

PE

RFO

RA

TED

G.I.P

IPE

S

OF C

AN

AL B

ED

SLE

EP

ER

AT

THE

TOE

6000 C/C

6000 C/C