2 Manufacturing Facility
3 Production Process and Quality
4 Technical Expertise
5 Project References
6 Conclusion
Background 1
Histrolically Process, Material Handling focussed business Delivering large scale projects in remote area’s
Full cross border E,C&I turnkey provider
Unique project approach methodology
Major spotlight on Streamlining Project Process’ – get off site
Expanded Energy sector focus business unit with Renewables portfolio Delivered projects in both Round I and II of the REIPP program Actively involved in bid submissions for various aspects for renewable projects in
the REIPPP Experienced design, manufacture and support teams for the renewable projects
8000sqm floor space under roof 20 and 10 ton overhead cranes Direct loading/offloading onto flatbed
and superlink trucks
Capability of eight (8) units/week Stringent safety and quality procedures
Re-validation of ISO 9001:2008 certificate
CONTAINER NO: QCP - Floor Installation QCP No: Rev. No:
M01 1 Page of Pages 1 1
CBI Electric Details (A) CBI Electric ( Workshop ) Details (B) Client Details (C) CBI Electric Solutions CBI Electric Solutions ( Workshop ) 2022 LENCHEN SOUTH AVENUE 320 West Street CENTURION Argo Business Park 0046 Boksburg Industrial Site Tel: 012 741 2090 Tel: Supplier Order No: Client Project No: Client Contract No: CBI Electric Project No: Client Order No: Project Description: Project Allocation:
Inspection Intention Details H Hold for witness and/or clearance to proceed V Verify W Witness S Surveillance by random inspection or documentation check but no work stoppage R Review
Action No: Activity Description Work Instruction; Procedure
or Drawing No. Doc Ref no: Action / Hold Verification Signature and date
A Sign Date B Sign Date C Sign Date 1 Approved Drawings Available 2 Approved Specifications Available 3 All Floor Plates Secure 4 Screws on Floor Flushing 5 All Bolts Fastened and Torqued 6 Washers on all Bolts 7 Locknuts on all Bolts (if Spring Washer is not used) 8 9
10 Compiled By: Patson Marime CBI Electric Approval (A) CBI Electric Approval (B) Client Approval (C)
Sign: Sign: Sign: Sign: Name: Name: Name: Name: Date: Date: Date: Date:
CONTAINER NO: QCP - Container Equipment Installation QCP No: Rev. No:
S01 1 Page of Pages
1 1 CBI Electric Details (A) CBI Electric ( Workshop ) Details (B) Client Details (C)
CBI Electric Solutions CBI Electric Solutions ( Workshop ) 2022 LENCHEN SOUTH AVENUE 320 West Street CENTURION Argo Business Park 0046 Boksburg Industrial Site Tel: 012 741 2090 Tel: Supplier Order No: Client Project No: Client Contract No: CBI Electric Project No: Client Order No: Project Description: Project Allocation:
Inspection Intention Details H Hold for witness and/or clearance to proceed V Verify
W Witness S Surveillance by random inspection or documentation check but no work stoppage
R Review
Action No: Activity Description Work Instruction; Procedure or Drawing No. Doc Ref no:
Action / Hold Verification Signature and date A Sign Date B Sign Date C Sign Date
1 Approved Drawings Available 2 Approved Specifications Available 3 Inverter Panel Installed 4 AC Switch Panel Installed 5 Metering Panel Installed 6 Auxiliary Transformer and Enlosure Installed and Secure 7 LVDB installed 8 Auxiliary and IT Panel Installed 9 Step up Transformer and Enclosure Installed and Secure
10 RMU installed and secure 11 Lights and Light Switches installed 12 Socket Outlets Installed 13 Fan unit and Controller Installed 14 Fire System and Accessories Installed 15 Fire extinguisher 16 Warning signs 17 Welding Socket Installed 18 Doors Installed and Locking properly 19 Panel Walls Erect and Secure 20 Roof Installed and Secure 21 Push bars on door Installed 22 23
Compiled By: Patson Marime CBI Electric Approval (A) CBI Electric Approval (B) Client Approval (C) Sign: Sign: Sign: Sign: Name: Name: Name: Name: Date: Date: Date: Date:
Mechanical and structural design Engineers Low Voltage and Medium Voltage design Engineers
Solid Edge, Autocad and E-plan resources
In-house Electrical PrEng approvals and sign-offs
Core manufacturing team with CBI-electric affliated contractors to extend
capacity Grid Code Compliance understanding - Solar Inverter and PPC Grid Code
30 x 1250kVA Inverter Stations LV, MV and Dry-type Transformer Sections Custom-built skid Purpose designed wall panels Busbar electrical integration of equipment
26 x 1250kVA Inverter Stations LV, MV and Dry-type Transformer Sections 12m Container Design Optimised ventilation design Cable electrical integration of equipment
Concept Design – “Sea Transportable“ LV, MV and Dry-type Transformer Sections 12m Container Design Ventillation design Cable electrical integration of equipment
Concept Design – Wind Farm LV, MV and Oil-type Transformer Sections 6m Container Design Integrated bund design Cable electrical integration of equipment
Experienced technical team to offer valuable “renewables project“ design input Critical equipment:
Biggest underroof manufacturing capacity with Cranes Supplier selection (local and international) Local content consideration Specification compliance Supplier QCP validations Supplier contractual warranty and guarentee
Project Manaufacture:
Detailed engineering to migitage assembly risks (cable bending radius, ventilation, lighting, etc.) Quality driven manufacture, backed by stringent QCP‘s Site team to support installation and commissioning
Dynamic capacity to expedite project in order to achieve developer payment
milestones
CBI-electric Solutions managing your risk.....