DDeeppaarrttmmeenntt ooff AAggrriiccuullttuurree,, GGoovveerrnnmmeenntt ooff MMaahhaarraasshhttrraa,,
CCCooommmppprrreeehhheeennnsssiiivvveee DDDiiissstttrrriiicccttt AAAgggrrriiicccuuullltttuuurrraaalll PPPlllaaannn
Of
AAAhhhmmmeeedddnnnaaagggaaarrr (C-DAP) 2007-08 to 2011-12
Prepared by
DDiissttrriicctt SSuuppeerriinntteennddiinngg AAggrriiccuullttuurree OOffffiicceerr
AAhhmmeeddnnaaggaarr Coordinated by
GGookkhhaallee IInnssttiittuuttee ooff PPoolliittiiccss aanndd EEccoonnoommiiccss
(Deemed University)
PPuunnee 441111000044
i
ACKNOWLEDGEMENT
Concerned by the slow growth of agriculture and allied sector, the National Development
Council (NDC) in its meeting held on 29th
May, 2007 envisaged for rejuvenating agricultural
and allied sector during the XI th Five Year Plan Period by achieving a growth rate of 4% per
annum .In this regard Comprehensive District Agriculture Plan for the Ahmednagar District was
prepared for XI plan period which was quite helpful to achive the targeted growth rate for
agriculture and allied sector in Ahmednagar district. The concerned allied departments at district
were oriented about the importance of Comprehensive District Agriculture Plan. Ahmednagar
is one of the largest districts in the state of Maharashtra. It is divided into fourteen tahsils.
Except Akole tahsil of Ahmednagar district all remaining thirteen tahsils falls under drought
prone area. The total area under cultivation is about 12.56 lakh hectares. Ahmednagar is
predominantly a agricultural based district. The majority of cultivable area is depend upon
monsoon i.e. rainfed. Due to availability of irrigation facilities the productivity of agriculture is
comparatively more in irrigated areas than rainfed areas. Hence total agricultural growth in both
the rainfed and as well as irrigated areas is required to improve in the XII th Five Year Plan
Period.
The present document is prepared taking into consideration the present status agriculture
and allied sector in Ahmednagar district, potential areas of improvement, available resources and
additional infrastructure required for achieving expected 4% growth rate per annum. This
document also focuses on the budget required for implementation of various programmes and
activities proposed during the plan period. The regional and location specific needs are taken
into consideration with present constraints in the development. The purpose of the
Comprehensive Agricultural Development Plan is to generate a common development
perspective of Ahmednagar district. It also focuses on human, infrastructure and optimal
utilization of the available resources for achieving higher levels of livelihood especially for
women and underprivileged.
While preparing of this comprehensive plan document we have been guided and
supported by District Collector Ahmednagar and all progressive farmers of districts. I must
thank for them sincerely. The allied department officers put the their innovative programmes to
make it more farming system driven. The staff of Agriculture Department was engaged for
collecting and consolidating talukawise data. They deserve appreciation for responding
positively for these changes in Agriculture planning process. I must thankful to Shri.Shivajirao
Amle, Project Director ATMA, &Shri Raosaheb Bendre, Agri Marketing Expert.Ahmednagar
for their enthusiasm in making this document more live and fruitful.
I must personally extend my sincere thanks to Shri Umesh Lagad ,MD ,SEVA ,NGO for
refining and finishing the C-DAP of Ahmednagar District.
Ankush Mane
District Superintending Agricultural Officer
Ahmednagar (M.S.)
ii
Contents
Foreword i
Preface ii
List of Tables vii
List of Figures/Boxes xi
List of Maps xi
List of Abbreviations xii
List of Annexure xiv
Executive Summary
Introduction
Innovative Schemes
Special Programmes and the Ongoing Projects in the District
Vision of the Next Plan
District Plan at a Glance
Consultation Process
Conclusion
xv
Chapter 1 Introduction
1.1 Backdrop
1.2 Rashtriya Krishi Vikas Yojna
1.3 Objectives of RKVY
1.4 Areas of Focus under RKVY
1.5 Comprehensive District Agricultural Plan
1.6 Methodology:
1.7 Organization of report
Chapter 2 General Description of the Satara District
2.1 Introduction
2.2 District at a Glance
2.2.1 Location and Geographical Units
2.2.2 Demographic Profile
iii
2.2.3 Topography and Agro-Climatic Conditions
2.2.4 Land Use Pattern and Land holdings
2.2.5 Irrigation and Groundwater
2.2.6 Cropping Pattern
2.2.7 District Income
2.3 Development Vision and Strategy
Chapter 3 SWOT Analysis of the Satara District
3.1 Introduction
3.2 SWOT Analysis of the District
3.2.1 Strengths
3.2.2 Weaknesses
3.2.4 Threats
3.3 Accommodating SWAOT- Addressing Issues Emerging
out of SWOT Analysis
3.4 Sectoral /Regional Growth Drivers of the District
Chapter 4 Development of Agriculture Sector
4.1 Introduction
4.2 Land Use
4.3 Soil Health
4.4 Water Resources and Management
4.5 Major Crops and Varieties in the District
4.6 Input Management
4.7 Farm Mechanization/ Farm Projects
4.8 Special Programmes and the Ongoing Projects in the District
4.9 Constraints Analysis
4.10 Recommended interventions of the district with detailed
action plan with costs
4.11 Projected outcome and growth during the next plan
period
4.12 Researchable Issues
iv
Chapter 5 Allied Agricultural Sectors
5.1 Introduction
5.2 Horticultural Development
5.2 Sericulture Development
5.3 Animal Husbandry
5.5 Fishery Development
5.6 Watershed Development
5.7 Social Forestry Development
5.8 Agro-based Rural Development Programme
5.9 Food Processing Units
5.10 Development of Rural Industries
5.11 Agriculture Marketing
5.12 Agriculture Credit
5.13 Special Programmes and the Projects on Going in the District
5.14 Constraints Analysis
5.15 Recommended interventions of the district with detailed
action plan
5.16 Projected outcome and growth during the next plan
period
Chapter 6 Ahmednagar District Plan
6.1 Introduction
6.2 Growth Drivers
6.3 Innovative Schemes
6.4 Vision of the Next Plan
6.5 District Plan
Annexure I
Annexure II
Annexure III
i
List of Tables
Table
No.
Title Page
ii
List of Figures/Boxes/Charts
Figure
No.
Figures Page
List of Maps
Map
No.
Map Page
1 Location Map of Maharashtra and Ahmednagar in India 08
2 Road map of Satara district 09
i
List of Abbreviations
A.I. Artificial Insemination
A.I.C. Artificial Insemination Centre
APMC Agricultural Produce Market Committee
ATMA Agriculture Technology Management Agency
BAPU Block Agriculture Planning Unit
BPL Below Poverty Line
CB Cross Breed
C-DAP Comprehensive District Agriculture Plan
DAPU District Agriculture Planning Unit
DDP District Development Plan
DFL Disease Free Laying
DIC District Industries Centre
DPAP Drought Prone Area Programme
DPC District Planning Committee
DRDA District Rural Development Authority
DSAO District Superintending Agriculture Officer
EGS Employment Guarantee Scheme
FFS Farmers Field School
GCA Gross Cropped Area
GDP Gross Domestic Product
GIA Gross Irrigated Area
GoI Government of India
GP Gram Panchayat
GVO Gross Value of Output
Ha Hectare
HYV High Yielding Variety
IADP Integrated Agricultural Development Plan
INM Integrated Nutrient Management
IPM Integrated Pest Management
KVI Khadi and Village Industries
KVK Krishi Vigyan Kendra
NDC National Development Council
NDP Net Domestic Product
ii
NGOs Non Government Organizations
NHM National Horticulture Mission
NIA Net Irrigated Area
NPK Nitrogen, Potassium and Potash
NWDPRA National Watershed development Programme for Rainfed Areas
PPP Public Private Partnership
Prod Production
Prodvty Productivity
PVC Primary Veterinary Center
RKVY Rashtriya Krishi Vikas Yojna
SAU State Agricultural Universities
SC Scheduled Castes
SHG Self Help Group
SRR Seed Replacement Ratio
ST Scheduled Tribes
SWOT Strength, Weakness, Opportunity and Threat
TAC Technical Appraisal Committee
VAPU Village Agriculture Planning Unit
ZRS Zonal Research Stations
i
List of Annexure
Annexure
No.
Title Page
I Composition of District Agriculture Planning Unit/Block Agriculture
Planning Unit/Village Agriculture Planning Unit
II Production of Horticultural Crops
III Taluka wise Cropwise Yield Gap Analysis
1
CHAPTER –I.
INTRODUCTION
1.1 Backdrop:
Sustained growth in India’s agricultural sector is essential for overall stability of the
economy. Agricultural development is also a key to a number of national goals, such as reducing
rural poverty, providing food and nutritional security, supplying raw materials for major
industries such as textiles, earning foreign exchange through exports and opening up avenues for
employment by promoting agro-processing units. Growth in the agricultural sector by
contributing to increased rural incomes can also build a strong foundation for consumer demand
in rural areas, which in turn can stimulate growth in secondary and tertiary sectors of the
economy.
Concerned by the slow growth of agriculture and allied sector, the National Development
Council (NDC) in its meeting held on 29th
May, 2007 envisaged for rejuvenating agricultural
and allied sector during the XI th Five Year Plan Period for achieving a growth rate of 4% per
annum.
Agriculture has always been India’s dominant economic sector and the Green, Blue,
White and Yellow revolutions brought about vast changes in the agrarian scene since
independence. While the agricultural sector has witnessed many success stories, the economic
potential of this economic activity leaves much to be desired and has a long way to go. The
growth rate in the agricultural sector has always lagged behind the overall growth rate of the
economy. During the Tenth Plan period, while the rate of growth of gross domestic product was
7.8 per cent per annum, the agricultural sector experienced a miniscule growth rate of 2.5 per
cent per annum. Indian agriculture is presently at cross roads and one of the major challenges is
to reverse deceleration in agricultural growth rates so as to successfully achieve a higher broad-
based growth. The state of Maharashtra, like most states in India has witnessed sharp
deceleration in agricultural growth rate and rapid economic development in this state has led to
continuous decline in the contribution of the agricultural sector to the economy of Maharashtra.
A more disturbing feature is that the contribution of agriculture to State Domestic
Product is shrinking rapidly from 28 per cent in 1980-81 to 14.2 per cent in 2000-01 as
compared to the All India figure of 26 per cent in 2000-01. The growth rate in this sector is also
showing a declining trend. While the growth rate during the period 2000-01 to 2006-07 in the
agricultural sector was only 0.78 per cent per annum, the secondary and tertiary sector grew at a
little more than 9 per cent per annum during the corresponding period. This crisis in the
2
agricultural sector that is manifesting itself in the form of negligible growth rate and low labour
productivity requires urgent attention.
1.2 Rashtriya Krishi Vikas Yojna:
In order to address the issue of deceleration in agricultural growth rate in the state, the
National Development Council (NDC) conceived a special Additional Central Assistance
Scheme -Rashtriya Krishi Vikas Yojna (RKVY) which is a State Plan scheme administered by
the Union Ministry of Agriculture. The main purpose of the scheme is to supplement state
specific strategies with a view to rejuvenate agriculture. More specifically, the NDC aimed at
achieving a growth rate of 4 percent per annum in the 11th
Five Year Plan as growth in this
sector will make overall economic growth more broad based and inclusive. The pattern of
funding under this scheme is 100 percent Central grant.
A number of factors have been held responsible for deceleration in agricultural growth
rate such as declining public investment in agriculture combined with inefficiency of institutions
providing inputs and extension services, technology fatigue, degradation of natural resources,
land fragmentation, inappropriate input pricing policies, market imperfections and mal practices
in marketing of agricultural produce and lack of rural infrastructure.
In order to overcome the above weaknesses and give a major boost to the agricultural
sector, the RKVY aims at providing assistance to the state to ensure a holistic development of
agriculture.
1.3 Objectives of RKVY:
The RKVY aims at achieving 4 per cent growth in agriculture during the 11th
Plan period. The
broad objectives of the scheme are:
(i) To provide incentive to the states so as to increase public investment in agriculture
and allied sectors. The growth rate of per hectare expenditure (Revenue account) on
agriculture and allied activities in Maharashtra is negative since last two decades
and per hectare expenditure which was Rs 653/- in 1991-92 (constant prices)
declined to Rs 499/- per hectare in 2005-06. The expenditure on agriculture and
allied activities as percentage of total budget declined from 9.4 per cent in 1991-92
to 4.1 per cent in 2005-06 and its share in Economic services declined from 29.26
percent to 23.22 per cent during the corresponding period. This data clearly reveals
that the agricultural sector in the state is suffering from lack of investment and this
3
issue needs to be addressed. Under the RKVY, therefore assistance will be
available to states to mobilize resources for investment in agriculture.
(ii) To provide flexibility and autonomy to states in the process of Planning and
execution of schemes related to Agriculture and allied sectors. The RKVY
encourages convergence with other programmes such as NREGS, SGSY, etc.
(iii) To ensure the preparation of Agriculture Plan for each district in the state and for
the state as a whole. In fact, the need for integrated local area plans, based on
specific endowments and needs of each area, was given great emphasis from the
beginning of the era of planning in India. However, only sporadic efforts and
isolated cases of such planning could be located. The Government of India (GoI)
therefore felt an urgent need to prepare “District Plan” which should be an integral
part of the 11th
Five Year Plan. The District Plan must focus on the needs and
potential of the district. All stakeholders in the district must be taken into
consideration while preparing the District Plan and the ultimate aim of the Plan
must be to achieve sustainable agricultural growth with food security and a
cropping pattern that will augment the income of the farmers.
(iv) In case of most crops, the potential yield is far lower than actual yield. The RKVY
therefore aims at providing assistance for various schemes that will provide the
necessary inputs, technology and extension services to farmers so as to maximize
yields.
(v) The assistance provided by RKVY must maximize returns to farmers.
(vi) The Allied sector is equally important and allied activities such as livestock,
poultry, fishery and forestry have great potential for catalyzing Maharashtra’s rural
economy. Change in food consumption patterns, from cereals to high protein diet,
which includes meat, fish, eggs and dairy products, can give a boost to the
livestock and fishery sectors. Forestry, besides creating employment and generating
revenue also maintains ecological balance in the state. Hence RKVY aims at
promoting the allied sector so that both the agricultural as well as allied sector will
grow in an integrated manner.
1.4 Areas of Focus under RKVY:
The main areas of focus under RKVY are:
(i) Integrated development of major food crops such as wheat, paddy coarse cereals,
minor millets, pulses, oilseeds: Assistance can be provided for making available
certified seeds/HYV seeds to farmers, production of breeder seeds, etc. Assistance
for extension service to farmers through Farmers Field Schools can also be provided.
4
(ii) Agricultural Mechanization: Assistance can be provided for gender friendly
implements and other equipment’s which increase productivity. However,
tractors will not be covered.
(iii) Improvement of Soil Health: Assistance can be provided to the states to
strengthen soil testing and fertilizer testing laboratories and setting up new ones,
improving soil health and promoting organic farming.
(iv) Development of rainfed farming systems in and outside watershed areas and also
Integrated Development of watershed areas, wastelands, river valleys:
Assistance for development of land, horticulture and generating livelihood for
farmers Below Poverty Line will be provided.
(v) Support to state seed farms: Funds are provided to state farms involved in
research and seed production for land development, creation of irrigation
facilities, upgrading technology. Etc. However, new land acquisition is not
permitted.
(vi) Integrated Pest Management Schemes: This would mainly involve training of
farmers through Farmers Field Schools on pest management and other extension
services.
(vii) Encouraging non-farm activities: Assistance is provided to Agri-
entrepreneurs/Agri-graduates to set up Agri-clinics/Agri-business centres.
(viii) Strengthening of Market Infrastructure and marketing development: Assistance
for setting up cold storage, cold chains godown, etc will be provided. Assistance
to PRIs/SHGs will also be provided for collecting agricultural produce and sale to
mandis/government agencies.
(ix) Strengthening Infrastructure to promote Extension services: This would include
new initiatives for skill development and training in the farming community and
to revamp the existing state agricultural extension systems.
(x) Activities related to promoting horticulture and use of micro irrigation systems:
Assistance will be provided for development of nurseries, horticultural activities
and encouraging use of micro irrigation systems.
(xi) Animal Husbandry and fisheries development activities: Assistance will be
provided for fodder production, genetic upgradation of cattle and buffaloes,
enhancement of dairy development, improvement of health of livestock, poultry
development, etc.
(xii) Special schemes for beneficiaries of land reforms: Assistance will be provided to
beneficiaries of land reforms to make their agriculture more viable.
5
(xiii) Undertaking concept to completion projects: Undertaking specific projects under
agriculture/horticulture/allied sectors in a concept to completion mode with
attention given to all components will be encouraged. Beneficiaries under such
projects should be BPL farmers. Projects in risk-prone, underdeveloped,
agriculturally distressed, remote, hilly and tribal areas are especially encouraged.
(xiv) Study tours of farmers: Assistance can be provided for study tours to farmers to
places of interest to them, especially to research institutions.
(xv) Organic and bio-fertilizers: Support will be provided for decentralized
production at the village level of organic manures, Vermicomposting and
introduction of superior technologies for better production.
(xvi) Innovative schemes: Schemes that are innovative and can promote development
of agriculture/allied activities can also be proposed.
1.5 Comprehensive District Agricultural Plan:
In order to get assistance from the RKVY scheme, it is mandatory for every state to
prepare a ‘Comprehensive District Agricultural Plan” (C-DAP) for every district in the state and
finally prepare a comprehensive State Plan. C-DAP is a document that encompasses the vision
for development of the district in a holistic manner and also the strategies to achieve the same so
that there is human development, infrastructure development and higher growth rates that will
generate more employment. More specifically:
(i) C-DAP is an initiative taken in response to the main theme of the Five-Year Plan,
mainly to achieve 4 per cent growth in the agricultural sector. The district is taken
up as the planning unit, with the plan process starting from below so that all
stakeholders in the district are incorporated. Essentially, the main aim of C-DAP
is to prepare an agricultural development plan from Gram Panchayats upward to
the District level.
(ii) C-DAP will include along with the schemes, the incremental income and
employment effect of the proposed schemes. This will be worked out for the
working schemes as well as new innovative schemes.
(iii) C-DAP shall clearly identify the main causes for backwardness of the district and
address these issues.
(iv) C-DAP will also conduct a SWOT analysis so that the drivers of growth in the
district are identified and full potential of the district is realized.
6
1.6 Methodology:
The process of initiating the targeted growth rate for agriculture and allied sector is
initiated in Ahmednagar district by organizing district workshop for all stakeholders of district.
The concerned allied departments at district were oriented about the importance of
Comprehensive District Agriculture Plan
The present document is prepared taking into consideration the present status agriculture
and allied sector in Ahmednagar district, potential areas of improvement, available resources and
additional infrastructure required for achieving expected 4% growth rate per annum. The
purpose of the Comprehensive Agricultural Development Plan is to generate a common
development perspective of Ahmednagar district. It also focuses on human, infrastructure and
optimal utilization of the available resources for achieving higher levels of livelihood especially
for women and underprivileged.
The important sectors/programmes are animal husbandry, horticulture, sericulture,
watershed, minor irrigation, agricultural marketing, technology and extension, rural credit and
indebtedness. The CDAP for XII five-year plan period is prepared keeping XI Five-Year Plan
parameters as a benchmark.. The intensive discussion with officers of the Department of
Agriculture at the state level on the draft plan gave useful inputs and suggestions from time to
time. The discussion with the officials of Agro-Economic Research Centre of Gokhale Institute
of Politics and Economics, Pune has been immensely helpful for upgrading the CDAP.
1.7 Organization of report:
The final report of C-DAP is organized into six chapters. Chapter I, is an introduction
that gives brief account of Rashtriya Krishi Vikas Yojna (RKVY) its objectives, focus areas of
RKVY, Comprehensive District Agriculture Plan (C-DAP) and methodology of organization
Chapter II presents the general description of the district. A SWOT analysis is conducted in
Chapter III and the development of the agricultural sector in Ahmednagar district is discussed in
Chapter IV. The relevance of allied sectors to the districts is discussed in Chapter V. The district
plan so as to achieve 4 per cent growth rate is presented in last Chapter.
8
Chapter II
GENERAL DESCRIPTION OF THE AHMEDNAGAR DISTRICT
2.1 Introduction
Ahmednagar district is the largest district in the state of Maharashtra. The total geographical area
of the district is 17.02 lakh hectares, constituting 5.66 per cent of the state’s geographical area.
Ahmednagar District is surrounded by Ahmednagar district in the west, Nasik district in the north,
Aurangabad district in the north-east, Beed district in the south-east and Solapur district in the south.
Ahmednagar district has a glorious history. Being a drought prone area in the state of Maharashtra, the
district gets an annual rainfall of over 500 mm. Sugarcane, bajra, jawar and wheat are the main crops.
The district has historical heritage. The name of the district Ahmednagar has come from the name of the
founder of the town Ahmednagar by Ahmed Shah Nizam Shah. The District place Ahmednagar has
many places of Historical importance including Ahmednagar fort where many national heroes of Indian
freedom struggle including Late Pandit Jawaharlal Nehru were detained during Indian freedom
movement. Pandit Jawaharlal Nehru wrote his famous book "Discovery of India" in Ahmednagar Fort.
Ahmednagar is Maharashtra’s most advanced district in many ways. It has the maximum number of
sugar factories, perhaps to spread the message of “Rural Prosperity through Cooperation” it gave the
country half a century ago. The first cooperative sugar factory in Asia was established at Pravanagar.
Role Model of water conservation work can be seen at Ralegan-Siddhi and Hivare Bazar which are also
called ideal Villages. Newase where Dnyaneshwari was written, Shri Saibaba’s Shirdi, one of
Ashtavinayaks at Siddhatek, the famous Kanifnath temple, attract devotees. The Palace of Chandbibi, the
Bhandardara dam, the Maldhok (Indian Bustard) sanctuary and the Rehkuri sanctuary are some of the
places of tourist attraction. There other worth visiting places in the district which include Devgad, Tank
Museum, Mohta Devi, Mula Dam, Shani Shingnapur, Madhi and Vriddheshwar.
Map 1: Location Map of Maharashtra and Ahmednagar in India
9
Maharashtra
India
2.2 District at a Glance
2.2.1 Location and Geographical Units:
Ahmednagar district lies between 18.2 to 19.9 degree North latitude and 73.9 to 75.5 degree
eastern longitude. The district comprises of 14 talukas namely Ahmednagar, Parner, Pathardi,Shewgaon,
Karjat, Shrigonda,Jamkhed, Shrirampur, Newasa,Akole, Sangamner, Kopergaon,Rahuri, Rahta. The
district is divided into four subdivsion, namely Shrirampur, Sangamner, Karjat, Nagar, with a total of
1585 villages and 1296 Gram Panchayats. It is at a distance of about 285 kms from Mumbai.
10
2.2.2 Demographic Profile:
As per the Census 2011, the total population of the Ahmedngar district was 40.41/41.24 lakh
with a population density of 232 per square kilometer. It consists of 32.37 lakh of rural population and
80.37 lakh of urban population. The ratio of female population per thousand of male was 941. Out of the
total population 12.00 percent belong to SC and 7.51 percent to ST communities (Table 2.1). The district
is with high literacy level of 75.30 percent.
It is important to understand the workforce involved in agriculture in the state before analysing
the development of various aspects of agriculture. An analysis on the workforce would not only reveal
the share of rural population relying on agriculture for livelihood but also help in making a proper
agriculture policy for the district. The structure of workforce in Ahmednagar district reveals that 69.70
percent of workers are in the agricultural sector. While about 44.34percent are cultivators, 25.3 percent
are agricultural labourers. The total number of persons in the workforce in Ahmednagar district was
18.57 lakhs (main plus marginal workers). However the contribution of this sector to District Domestic
Product is 27 percent. It can thus be observed that agriculture is the dominant activity in Ahmednagar
district.
Table 2.1: Taluka-wise area, Number of villages, Gram Panchayats and Population of Ahmednagar
Map 2: Road map of Ahmednagar district
11
Sr.N
o.
Taluka
General
Population (2011)
(lakh) % to District total
Area
(sq.K.M.
)
% to
total
No.
of
reven
ue
villag
es
No. of
G.P.
Male
Femal
e
Total
Tota
l
S.C.
(%)
S.T.
(%)
1 A,nagar 1605.74 8.99 104 1.33 1.22 2.55 6.07 13.05 1.68
2 Parner 1930.28 11.17 131 1.40 1.33 2.74 2.47 6.67 4.90
3 Pathardi 1214.10 7.04 134 1.20 1.10 2.30 2.15 9.55 1.26
4 Karjat 1503.61 8.92 121 1.06 0.99 2.23 2.06 13.53 1.12
5 Jamkhed 878.62 5.24 86 0.65 0.59 1.24 1.34 11.97 1.40
6 Shrigonda 1603.81 9.60 114 1.48 1.36 2.84 2.77 12.34 2.67
7 Shrirampur 569.87 3.03 54 1.02 0.96 1.98 2.56 18.99 5.47
8 Shevgaon 1031.85 6.51 112 1.26 1.19 2.45 2.94 13.75 1.61
9 Newasa 1343.43 7.73 129 1.85 1.72 3.57 3.27 14.01 4.81
10 Rahata 759.19 4.11 58 1.34 1.26 2.61 2.88 16.02 5.35
11 Sangamner 1705.06 10.20 169 2.07 1.94 4.01 4.41 8.08 9.36
12 Akole 1505.08 9.01 191 2.82 1.43 1.39 2.67 4.21 45.59
13 Kopargaon 725.16 4.34 79 1.23 1.14 2.37 2.77 12.74 9.91
14 Rahata 759.19 4.11 58 1.34 1.26 2.61 2.88 16.02 5.35
Total 17410.91 100.0
0 1540 1310 18.77 17.52 36.30
41.2
4 12.00 7.51
Source: District ocial & Economic Review- 2012-13
The taluka-wise area, number of villages, gram panchayats and population of Ahmednagar
district is presented in Table 2.1. It can be seen from the table that The population of the district was
41.24 lakhs with 14.71 percent of the population in Ahmednagar taluka which has only 8.99 percent of
area of the district (see Figure 2.1). The next most populous taluka is Sangamner which accounts for
10.70 percent of the population of the district. Thus, one quarter of the district’s population is located in
these tow talukas. The sex ratio of the population is almost equally shared by male and female, consists
of 50.42 percent male and 49.58 percent female population. The Akole taluka is having largest number of
S.T. population of 45.59 percent. Ahmednagar district has 1 municipal corporations, 8 nagarparishad, 1
nagar panchayat and 1cantonment boards. Aas mentioned earlier, the district is extended over 14 blocks
having 1540 villages and 1310 gram panchayats.
12
2.2.3 Topography and Agro-Climatic Conditions:
The whole district lies on the elevated table land of the Deccan which has a general slope from
west to east. The western sub-division of Akola, which abuts on the Sahyadris, is the highest part of the
district, and indeed of the Deccan, averaging 2500 feet above the sea-level. The plain of Shevgaon which
lies to the extreme east of the district is not more than 1500 feet above the sea. The Sahyadri mountains
form, for a distance of about twenty- five miles, a continuous natural boundary between the Ahmadnagar
and Thana districts. When viewed from the west or low level of the Konkan the appearance of this range
is that of a mighty wall of rock, 2000 to 3000 feet high, of dark hue relieved by narrow horizontal belts of
grass and evergreen forest, surmounted by isolated peaks and rocky bluffs rising in many places to a
further height of 1000 to 1500 feet. The three hill-forts of Kulang, Ratangad, and Harishchandragad are
among the most striking of these masses of rock within Ahmadnagar limits. These mark the points of
divergence from the main line of the Sahyadris of three great spurs, Kalsubai, Baleshvar, and
Harishchandragad, which stretch far across the district, gradually decreasing in height as they pass
eastwards.
There are various landforms in Ahmednagar district. There are hilly offshoots of the Sahyadris in
the western part of he district. They are called Kalsubai, Adula, Baleshwar and Harishchandragad hill
ranges. Kalsubai, the highest peak in the Sahyadris, lies in Ahmednagar district. Harishchandragad,
Ratangad, Kulang and Ajuba are some other peaks in the district. We see the Vita ghat on the way to
13
Randha falls and the Chandanpuri ghat on the Ahmednagar-Sangamner road. In the northern part of the
district, plains are found along the banks of the rivers Godavari and Pravara and the southern part, along
the rivers Bhima, Ghod and Sina.The different landforms in a region constitute its physical setup. If we
consider the physical setup of Ahmednagar district we see that there are three physical divisions.
1. Western Hilly Region: Akole Taluka and of Sangamner Taluka are included in this region. The hill
ranges of Adula, Baleshwar and Harishchandragad lie in this region and various high peaks are found in
the same region. Kalsubai of height of 5427 feet, the highest peak in the Sahyadris, lies in this Region.
2. Central Plateau Region: Parner and Ahmednagar Taluka and parts of Sangamner, Shrigonda and
Karjat Taluka are included in this region.
3. The Region of Northern and Southern plains: This region includes northern Kopargaon, Rahata,
Shrirampur, Rahuri, Newasa, Shevgaon and Pathardi Taluka. This is the region of the Godavari and the
Pravara river basins. Parts of the southern Taluka of Shrigonda, Karjat, and Jamkhed are also included in
this physical division.
Agro climatic Zones:
Ahmednagar district is divided into three agro-climatic zones viz., Ghat (Hilly) zone, Plain (Transition)
zone and Scarcity zone
The characteristic features of Agro climatic Zones are as follows:
(A) Scarcity zone: This zone is spread over the whole district except one Taluka i.e.Akole, the remaining
13 Taluka are under this zone.
Climate: The western hilly region receives more rainfall, but as one goes towards the east, the amount of
rainfall deceases. The average rainfall of this zone ranges from 500 to 700 mm received in 40 to 45 days.
About 70-80% of annual rainfall is received during monsoon period (June to September). The maximum
temperature of this zone goes up to 40-41"C during April & May while minimum temperature is 10-15°C
during December – January.
Soil: Soil colour varies from reddish brown to dark gray and commonly grouped as light to medium
black soil. In very few places along the river basin, deep black soil is also observed. Soils are potentially
productive but soil moisture is the most limiting factor affecting productivity in dry lands. Erratic nature
of rainfall affects the moisture content in the soil, therefore, this zone is commonly known as drought
prone area. Cropping pattern: Major crops grown in this zone are pearl millet (Bajra), sorghum (Rabi
Jowar), safflower, chickpea, wheat, sugarcane etc.
(B) Plain (Transition) Zone: This zone is confined only to eastern part of Akole Taluka consisting only
about 4% of geographical area of the district.
Climate: The rainfall in this zone is 700 to 1250 mm annually which is well distributed.
Soils: Soils are grayish black with varying texture and depth.
14
Cropping pattern: The main crops grown in this region are pearl millet, Mung gram and wheat. Pravara
river which flows from this zone is a major source of irrigation through lift irrigation schemes which is
responsible for changing the scenario in this zone. Milk production is another profitable profession
among the farmers. Due to irrigation facility, farmers are growing. Vegetables like tomato, gourds and
fruit crops like pomegranate. Sugarcane is also grown wherever irrigation facility is available.
(C) Ghat (Hilly) Zone: This zone is situated in northwestern part of the district in western part of Akole
Taluka. Geographically this zone has only 4% of the district area. This zone spread along with crest of
Sahyadri ranges is having mostly tribal population with smallholdings and are economically backward.
Climatic: Very high rainfall which ranges from 1500 to 3000 mm and mostly covered by deciduous/semi
deciduous forests. The maximum temperature ranges from 31 to 39"C and minimum from 10 to 18°C.
Forests:
The western hilly part of Ahmednagar district has forests. Teak, babul, dhavada, haldu and neem
are trees found in these forests. Fruit trees like Mango, Tamrind, Amala, Ber are also found in the district.
Agro Ecological Situations (AES)
On the basis of soil types and sources of irrigation, the district has been categorized into eight
Agro Ecological Situations viz. assured and unassured irrigation system in command area with medium
and light soil and the rainfed area with black cotton, medium As well as light soils. The existing farming
Map 3: Agro-Climatic Zones- Ahmednagar District
15
systems being adopted by majority of farmers in rainfed area of district are characterizes by existence of
food grain crops including mostly Bajra, Jowar as cereals and Mung, Udid, and Tur as pulse crops in
combination with dairy and animal husbandry . The analysis of the farming systems in command areas
indicates the dominance of sugarcane as a cash crop with dairy as an inseparable combination and it is
being supplemented by either vegetables and food grain crops or horticultural crops.
Rainfall and Temperature:
The climate of the district is hot and dry on whole extremely genial and is characterised by a hot
summer and general dryness during major part of the year except during south-west monsoon season. In
the hilly western part of the district ,the climate is slightly cool. Bhandardara is hill station in the Akole
taluka. In the cold season which lasts from November to February the air is dry and invigorating. The
period from March to the first week of June is the hot season. It is followed by the south- west monsoon
season which lasts till the end of September. October and November constitute the post-monsoon or the
retreating south-west monsoon season. The western hilly region receives more rainfall, but as one goes
towards the east, the amount of rainfall decreases. May is the hottest month & that December is the
coldest month and temperature varies from 19.92 to 36.380 c. On few occasions thin film of fog is being
observed in the early mornings of December & January. In scarcity zone the maximum temperature is
around 40°C (during April and May) and minimum temperature around 11° C (during Dec.)
Table 2.2: Data on Weather-Ahmdenagar district
Sr.
No.
Name of
Taluka
Rainfall Temperature (0 c) Humidity (%)
No.of
rainy days
Average
rainfall (mm)
Minimum Maximu
m
Minimum Maximum
1 A,nagar 52 626 15 44 58 95
2 Parner 60 765 14 43 58 95
3 Pathardi 35 831 13 41 35 75
4 Karjat 45 573.3 14 33 55 72
5 Jamkhed 38 675 15 33 42 75
6 Shrigonda 79 517 15 43 17 81
7 Shrirampur 77 487 14 35 21 25
8 Shevgaon 33 537 14 41 35 78
9 Newasa 77 505 15 35 21 25
10 Rahuri 67 621 14 40 21 92
11 Sangamner 67 379 14 40 60 95
12 Akole 25 570 15 40 25 90
13 Kopargaon 48 466 15 40 21 92
14 Rahata 65 436.31 14 40 30 85
It can be seen from the table that average rainfall of the district is 436.31 mm and 65 rainy days.
The minimum and maximum temperature ranges between 14 degree centigrade to 44 degree centigrade
16
(Table 2.2). The percentage of humidity normally ranges between 20 to 95 percent. The number of rainy
days are less in Akole, Shevgaonand Pathardi talukas, which are predominantly rainfed areas resulted in
limiting agricultural cropping season. The short period of rainfall distribution pattern in these talukas
affects crop growth at maturity stage due to shortage of soil moisture in soil and also for subsequent
crops in the rabi season demanding efficient water conservation measures to to store the rainwater.
Therefore, monsoon rain plays a critical role in the development of agriculture. The average rainfall of
the district is lower than the state average and the variation in rainfall across different blocks within the
district as well as over different years is one of the major constraints in district’s agriculture. An analysis
shows that the productivity of agricultural commodities goes down sharply whenever there is a reduction
in rainfall. This is because of the fact that foodgrains and other crops are cultivated predominantly under
rainfed condition.
The district receives an average annual rainfall of 566 mm. It can broadly be categorized into
three separate zones namely Scarcity zone (receiving 500-700 mm rainfall); Transition zone (receiving
700-1250 mm rainfall) and hilly zone (receiving 1250-3250 mm rainfall). The scarcity zone occupies 13
out of 14 blocks in the district. However, Akole block consists of two zones namely the transition zone
and hilly zone. Except Akole block, the entire Ahmednagar district falls under drought prone area. The
rainfall in this region is uncertain, erratic and unassured in nature. There are four major categories of soil
in the district namely coarse shallow soil; medium black soil; deep black soil and reddish soil occupying
about 38, 41, 13 and 8 percent of the cultivated area respectively. In the first two categories, soil moisture
is the predominant limiting factor affecting productivity of crops particularly under rainfed condition.
Though heavy near the Sahyadris in Akola & plentiful in the hilly parts of Sangamner, Rahuri, Shevgaon
& Jamkhed, the rainfall is uncertain. In the plains the early rains are often scanty and the late rains
capricious, so that droughts, especially in the Bhima basin, appear to form the rule and good year the
exception.
Table 2.3: Taluka-wise Monthly Normal Rainfall (in mm.)
Sr. Block/Taluk
a Jan Feb Mar
Ap
r
Ma
y June July Aug Sept Oct
No
v Dec
Tota
l
1 A,nagar 0 0 45 0 0 29 31 105 354 129 0 0 693
2 Parner 0 0 1 0 0 15 18 68 208 79 0 0 389
3 Pathardi 0 0 62 0 0 65 22 107 361 70 0 0 687
4 Karjat 0 0 31 0 0 22 66 99 516 60 0 0 794
5 Jamkhed 0 0 14 0 0 51 60 143 376 85 0 0 729
6 Shrigonda 0 0 0 0 0 5 21 137 241 44 0 0 448
7 Shrirampur 0 0 18 0 0 12 103 104 263 21 0 0 521
8 Shevgaon 0 0 47 0 0 65 43 71 262 54 0 0 542
9 Newasa 0 0 12 0 0 90 79 154 244 24 0 0 603
10 Rahuri 0 0 20 0 0 17 93 80 397 64 0 0 671
17
11 Sangamner 0 0 0 0 0 25 64 86 304 8 0 0 487
12 Akole 0 0 0 0 0 91 153 218 459 85 0 0 1006
13 Kopargaon 0 0 0 0 0 7 25 85 262 22 0 0 401
14 Rahata 0 0 0 0 0 4 14 100 232 35 0 0 385
Total 0 0 250 0 0 476 792 1557 4479 780 0 0 8334
Total Average 0 0 17.9 0 0 34 56.6 111 320 55.7 0 0 595
Source –www.agri.mah.nic.in
It can be seen from the Table 2.3 that maximum rainfall receives in the district is during the
months during June to September. Out of total rainfall receives in the district, 3-5 percent receives as pre-
monsoon rains, 5-10 percent in the month of June; 10-15 percent in the month of July; 18-20 per cent in
the month of August, 53-55 per cent in the month of September and 9-10 per cent in the month of
October. This monsoon distribution pattern indicates that the kharif season in Ahmednagar district not
much assured because of low percentage of rainfall often resulted into low production or sometimes crop
failures to due to long moisture stress experienced. In the months of August and September it get higher
percentage of rainfall. The rainfall received in these months is helpful for Rabi cropping season
suggesting the suitability of rainfall in the district fir rabi based cropping. Over 67 percent of cropped
area is cultivated under rainfed condition in the district. Therefore, monsoon rain plays a critical role in
the development of agriculture. The average rainfall of the district is lower than the state average and the
variation in rainfall across different blocks within the district as well as across different years is one of
the major constraints in district’s agriculture. An analysis shows that the productivity of agricultural
commodities goes down sharply whenever there is a reduction in rainfall. This is because of the fact that
foodgrains and other crops are cultivated predominantly under rainfed condition.
Map 4: DPAP Talukas of Ahmednagar district
18
Soil Type:
The soil types of the district are broadly divided into four categories namely coarse shallow soil;
medium black soil; deep black soil and reddish soil occupying about 38, 41, 13 and 8 percent of the
cultivated area respectively. In the first two categories, soil moisture is the predominant limiting factor
affecting productivity of crops particularly under rainfed condition.
Land Capability Classification:
The taluka-wise land use capability classification of Ahmednagar district is presented in Table
2.4. It can be seen from the table that about 24.73 percent of land falls under class –II, 15.87 percent of
land in Class –III type, 38.53 of land in class-IV type and class- VI type land covers 8.81 percent lands.
Class –VII and class- VIII types lands occupied 10.39 percent and 2.03 percent. Lands of the district are
not suitable for any cultivation and mostly covers the soils from Ahmednagar, Pathardi, Sangamner and
Akole talukas that are predominantly rainfed areas. The class III to class –IV type soils are spread in all
Map 5: Geological Map of Ahmednagar district
19
the talukas supporting cultivation of all types of crops. Except few hectares, Rahata, Shrirampur and
Kopargaon talukas having more land of cultivable type.
Table 2.4: Taluka-wise Land Use Capability Classification of Ahmednagar District
Sr.
No. Taluka
Class
- I
Class -
II
Class -
III
Class -
IV
Class
- V
Class -
VI
Class
- VII
Class
- VIII
Total
surveye
d area
1 A,nagar - 40304 27739 46299 0 10100 9454 768 134664
2 Parner - 10895 20416 53802 0 16273 10680 0 112066
3 Pathardi - 20354 10736 27947 0 8633 7781 602 76053
4 Karjat - 6253 5429 17132 0 3269 2976 0 35059
5 Jamkhed - 7356 4825 12770 0 1136 479 0 26566
6 Shrigonda - 12139 8314 14521 0 5611 5099 0 45684
7 Shrirampur - 7942 7223 2682 0 89 0 0 17936
8 Shevgaon - 20468 10225 26698 0 1236 590 0 59217
9 Newasa - 11775 7848 7699 0 211 244 0 27777
10 Rahuri - 12878 6184 14808 0 7147 5941 0 46958
11 Sangamner - 36264 12058 51894 0 4652 27117 725 132710
12 Akole - 15773 11033 37504 0 19055 20875 15643 119883
13 Kopargaon - 7284 3466 8377 0 0 0 0 19127
14 Rahata - 4436 3906 16316 0 0 23 0 24681
Total - 214121 139402 338449 0 77412 91259 17827 878470
Notes: Class I - Very good cultivable land, Class II - Good cultivable land, Class III -Moderately good
cultivable land, Class IV-Fairly good land, suited for occasional cultivation-, Class V - Nearly level land
not suitable for cultivation because of stoniness, wetness, etc., Class VI -Steep slopes, highly erosion
prone with shallow soils, Class VII -Steep slope with sever soil erosion resulting in eroded stony and
rough soil surfaces with shallow soil , Class VIII- hilly area very steep slope , uncultivable
Source: District Soil survey & Soil Testing Office, Ahmednagar
20
Soil Fertility Indices:
Soil fertility refers to the inherent capacity of the soil to supply nutrients in adequate amounts
and in suitable proportions for crop growth and crop yield. The trend in increasing the yield by adopting
high yielding varieties has resulted in deficiency of nutrients in soils and has reflected as deficiency
symptoms in plants. Hence, it is required to know the fertility status of the soils of the district applying
the required dosage of fertilisers and planning the regional distribution of fertilizers. The soil fertility
indices of PH, E.C., available organic carbon, available phosphorus and available Potash, analyzed from
4670 total samples collected from different talukas of the district is presented in Table 2.5. It can be seen
from the table about 98 percent of the soil in the district fall under category with neutral PH status. About
95 percent of soil in the district falls under category of low Electrical Conductivity and about 85 percent
of soil contain low Organic Carbon. The available phosphorus and potash status in the soils of
Ahmednagar district shows that more than 78 percent of soil in the district is low in phosphorus and most
of the soil in the district is high potash (about 95 percent of soil). The critical analysis status of district
Map 7: Soil and Land Use Capability Classification Map of Ahmednagar District
21
indicates low organic carbon content of majority of soils in almost in all talukas. The fertility status of all
soils is degrading due to indiscriminate application of chemical fertilizers.
Table 2.5: Soil Fertility Indices-Ahmednagar district
Taluka
No of
Soil
Sampl
es
analys
ed
PH E.C.(ds/m) Organic Carbon
(%)
Available
Phosphorus
(Kg/ha.)
Available
Potash (Kg/ha.) A
cid
ic
Neu
tral
Alk
alin
e low
Med
ium
Hig
h
low
Med
ium
Hig
h
low
Med
ium
Hig
h
low
Med
ium
Hig
h
A,nagar 772 1 749
2
2 733 39 - 194 290 288 597 84 91 17 8 747
Parner 301 - 301 - 292 8 1 67 134 100 220 36 45 7 3 291
Pathardi 695 - 685
1
0 665 28 2 237 240 218 599 53 43 6 13 676
Karjat 442 - 436 6 437 4 1 196 160 180 344 52 46 25 22 395
Jamkhed 74 - 74 - 66 6 2 37 20 17 63 6 5 7 3 64
Shrigonda 406 - 389
1
7 389 15 2 83 176 147 337 32 37 14 10 382
Shrirampu
r 158 - 157 1 158 - - 42 66 50 136 14 12 - 2 156
Shevgaon 471 - 466 5 440 23 8 240 164 67 388 46 37 24 13 434
Newasa 652 - 644 8 607 45 - 219 246 287 530 65 57 6 11 635
Rahuri 139 - 135 4 136 2 1 89 35 15 106 14 19 8 9 122
Sangamne
r 57 - 57 - 57 - - 5 33 19 42 7 7 - - 57
Akole 30 - 30 - 30 - - 24 6 - 30 - - - - 30
Kopargao
n 309 - 291
1
8 291 18 - 57 137 115 218 36 55 2 5 302
Rahata 164 - 162 2 151 12 1 50 52 62 70 33 61 2 3 159
Total 4670 1
457
6
9
3
445
2
20
0
1
8
154
0
155
9
137
1
367
7
47
8
51
5
11
8
10
2
445
0
Source- District Soil Survey & Soil Testing Office, Ahmednagar
Map 8: Soil Fertility Index of Available Nitrogen (on the basis of Organic Carbon %)
of Ahmednagar District
22
Map 9: Soil Fertility Index of Available Phosphorus of Ahmednagar District
Map 10: Soil Fertility Index of Available Potassium of Ahmednagar District
23
Map 11: Soil Electrical Conductivity of Ahmednagar District
Map 12: Soil Reaction pH - Ahmednagar District
Map 13: Soil Available Micronutrient Status- Ahmednagar District
24
Micronutrient Status
Because of wide spread deficiencies in soils leading to reduced crop yields, an emphasis is given
on soil micronutrient sufficiency /deficiency and are being intensively studied in recent times. The
deficiencies are caused due to use of chemically pure and micronutrient free fertilisers, cultivation of
improved crop varieties with high nutrient requirements and intensive cultivation of crops.
Table 2.6: Micronutrient Status in the Soil of Ahmednagar district
Sr.
No
.
Name of
the Taluka
No of Soil
Samples
Analyzed
Copper (Cu) Iron (Fe) Manganese
(Mn) Zinc (Zn)
S D S D S D S D
1 A,nagar 17 17 - 16 1 17 - 17 -
2 Parner - - - - - - - - -
3 Pathardi 24 24 - 24 - 24 - 20 4
4 Karjat - - - - - - - - -
5 Jamkhed - - - - - - - - -
6 Shrigonda 31 31 - 31 - 30 1 31 -
7 Shrirampur 1 1 - 1 - 1 - 1 -
8 Shevgaon 14 14 - 14 - 14 - 14 -
9 Newasa 44 44 - 42 2 44 - 22 22
10 Rahuri 1 1 - 1 - 1 - 1 -
11 Sangamner 190 190 - 187 3 188 2 184 6
12 Akole 2 2 - 2 - 2 - 2 -
13 Kopargaon 16 16 - 16 - 16 - 15 1
14 Rahata 12 12 - 12 - 12 - 10 2
Total 352 352 - 346 6 349 3 317 35
25
Note: S- Sufficient, D-Deficient
Source- District Soil Survey & Soil Testing Office, Ahmednagar
The soil samples analyzed for micro-nutrient status of Ahmednagar district is indicated in the
Table 2.6. From the table it can been seen that the soils in all talukas are sufficient in copper, iron, zinc
and manganese content.
Rivers:
Two main rivers, the Godavari and the Bhima drain the district a tributary of the Krishna. The
Watershed line is the great spur of the Sahyadris that branches off at Harichandragad and stretches
completely across the district from west to east. The important rivers flowing through the district are
Paravara, Mula, Sina and Dhora. Pravara is tributary of the river Godavari. Waters of the river Pravara
fall from a great height, creating the Randha Falls. The Godavari, which drains by far the larger part of
the district, including the Tahsils of Kopargaon, Sangamner, Akole, Rahuri, Newasa, Shevgaon the
northern half of Parner and parts of Nagar and Jamkhed, rises near Trimbak in Nashik on the eastern
slope.
The Pravara rises on the eastern slopes of the Sahayadris between Kulang and Ratangad. After
the sinuous course of twelve miles in an easterly direction, near the village Ranad, it falls into rocky
chasm 200 feet deep, and then winds for eight miles through a deep narrow glen which opens wider
Valley East of and below the central plateau on which the town of Rajur stands. Total Length of Pravara
is 120 miles. The Dam Bhandardara is constructed across the river at Bhandardara, near by are the
Randha falls.
The Adhala rises in north of Akole on the Slopes of Patta and Mahakali.It flows for fifteen miles
in an easterly direction between two ranges of hills which encloses the Samsherpur valley; then falling
into the rocky chasm some 150 feet deep it winds between rugged and precipitous hill-sides for couple of
miles, when, debouching in to the plain of Sangamner,it turns south and falls into the Pravara three miles
west of the town of Sangamner.The Mahalungi rises on the southern and eastern slopes of Patta and
Aundha.After the course of three miles it passes east into the Sinnar subdivision of Nashik.It reenters
Ahmednagar after taking bend to south. The Mula rises on the eastern slopes of the Sahaydris between
Ratangad and Harichandragad for first twenty miles it flows parallel to Pravara draining the southernmost
or Kotul valley of Akole subdivision. Passing the town of Kotul it takes a bend to Baleshvar.It then
crosses through Sangamner, Parner. The Dam Mula is constructed across the river at Baragaon Nandur.
The Dhora rises on the slopes of the hill east of the town of Ahmendagar.It flows northeasterly, draining
Shevgaon and part of Newasa. The Bhima river drains the whole of the southern portion of the district,
comprising the greater part of the Parner and Nagar subdivisions, the whole Shrigonda and Karjat, and
nearly the whole of Jamkhed. The Sina has two chief sources, one near Jamgaon fourteen miles west of
the town of Ahmednagar, near, Jeur ten miles to the northeast. The town of Ahmednagar is built on left
26
bank of the river, which there takes southeasterly course. Leaving the district boundary it enters Solapur
and ultimately falls into the Bhima.
Map 15: Surface Reservoir Map of Ahmednagar District
Map 14: Watershed Map of Ahmednagar District
27
2.2.4 Land Use Pattern and Land holdings:
Land use pattern explains how effectively land resources are utilised for different purposes in a
state. Development in irrigation and growth in population are the two important factors, which mostly
decide the land use pattern of any region/state. Table 2.7 presents the detailed land use pattern of the
Ahmednagar district. It can be seen from the table that out of geographical area, about 23 percent of land
is under non agricultural usage i.e. forest, land under non-agricultural use, cultivable waste, permanent
pasture and miscellaneous trees and groves. About 7.5 percent land is as current and other fallow and
about 71.10 percent of land is sown. Thus, altogether about 9.22 percent of land is available in the form
of cultivable waste, current as well as other follows, which can be brought under productive use with a
proper wasteland development programme. The cropping intensity of the district is 111 percent, which is
lower than the state average (127.9 percent).
Table 2.7: Land Utilization Pattern of Ahmednagar District,
Sr
.
N
o.
Taluka
Geo
gra
ph
ica
l A
rea
(% t
o
dis
tric
t)
Percentage to total Geographical Area
Fo
rest
Are
a B
arre
n
and
Un
cult
iva
ble
are
a L
and
un
der
No
n-a
gri
.
Use
C
ult
ivab
l
e W
aste
Cu
rren
t
fall
ow
s
Oth
er
Fal
low
Net
So
wn
Are
a A
rea
So
wn
Mo
re
than
Once
G
ross
Cro
pp
ed
Are
a
Cro
pp
ing
Inte
nsi
ty
(%)
1 Akole 9.02 27.7
2 8.28 0.46 0.00 0.66 2.08
60.7
9 2.60
63.3
9 104.28
2 Sangmner 8.14 0.84 15.3 0.08 4.35 1.91 2.15 75.3 7.09 82.4 109.40
28
0 7 6
3 Kopargaon 4.23 0.00 4.16 2.39 5.70 9.20 5.62 72.9
3
15.1
5
88.0
8 120.77
4 Rahata 4.12 0.00 2.30 1.20 14.3
1 7.26 1.28
73.6
6
10.0
2
83.6
8 113.61
5 Shrirampu
r 3.03 0.00 5.08 2.02 0.00
11.1
2 8.68
73.1
1
17.5
7
90.6
8 124.04
6 Newasa 7.75 1.13 11.6
5 0.60 0.00 2.76 0.21
83.6
4
15.1
7
98.8
1 118.13
7 Shewagao
n 6.52 1.06 9.97 0.58 0.13 2.66
12.4
1
73.1
7 8.35
81.5
2 111.42
8 Pathardi 7.06 5.46 9.50 0.53 2.35 4.65 3.25 74.2
8 8.35
82.6
2 111.24
9 Nagar 9.01 8.76 8.61 1.34 1.17 1.31 2.34 76.4
7 3.54
80.0
1 104.63
10 Rahuri 6.10 15.4
5
12.8
2 0.50 1.05 2.88 5.69
61.6
1 6.01
67.6
2 109.75
11 Parner 11.20 10.0
6
15.4
3 0.50 0.38 0.26 5.66
67.7
1
17.2
8
84.9
9 125.52
12 Shrigonda 9.62 9.48 4.72 0.48 1.52 5.27 9.50 69.0
3 1.93
70.9
6 102.79
13 Karjat 8.94 8.76 22.1
4 0.02 0.00 6.34 0.00
62.7
4 5.95
68.6
9 109.48
14 Jamkhad 5.25 4.31 14.8
7 0.17 0.00 0.07 1.27
79.3
1 7.00
86.3
0 108.82
District 100.0 7.89 11.1
4 0.65 1.72 3.36 4.14
71.1
0 8.41
79.5
2 111.83
Source: District Socio-Economic Review, 2006-07 Ahmednagar District.
The land holding pattern of Ahmednagar district for the year 2001 is presented in Table 2.4. As
per the agricultural census of 2001, the total land holdings in district were 6.81 lakh and area was about
13.48 lakh ha. It can be seen from the table that about 31.42 % of farmers have land holding below 2
hectares i.e. marginal and small farmers 35.14 % having total land holding up to 2 hectares. However,
23.20 % & 9 % are semi- medium and medium land holdings respectively. Large farmers cover only
1.20% of total land holdings in the district. The small and marginal land holdings together cover 66.57 %
land in the district. The agricultural extension and development activities are being focused for these land
holdings.
29
31
Table 2.8: Land holding pattern of Ahmednagar District, 2001 (Percentage to total)
Sr.
No. Taluka
Marginal Farmers
(< 1 ha)
Small Farmers
(1– 2 ha)
Other
Farmers ( Above
2.0 Ha)
Total Av. Land
Holding
in ha. No. Area No. Area No. Area No. Area
1 Nagar 39639 18691.81 21026 30022.63 17391 60824.85 78056 109539.3 1.40
2 Parner 34167 16185.07 24283 35043.37 25579 98816.59 84029 150045 1.79
3 Shrigonda 39438 24966.65 26550 38576.57 20466 68318.14 86454 131861.3 1.53
4 Karjat 30683 17166.25 23480 35037.91 21468 75418.69 75631 127622.9 1.69
5 Jamkhed 19524 10309.55 13280 19894.44 13370 48610.71 46174 78814.7 1.71
6 Shevgaon 30138 15810.86 21406 28933.84 11929 37792.17 63671 82536.87 1.30
7 Pathardi 45403 21360.30 21656 29089.96 14002 44331.31 81061 94781.57 1.17
8 Newasa 38491 22455.94 34288 49281.61 14452 42587.08 87231 114324.6 1.31
9 Rahuri 30383 16255.08 19472 26736.7 8954 29921.62 58809 72913.4 1.24
10 Sangamner 47560 25806.37 24536 33506.88 16038 54197.7 88134 113511 1.29
11 Akola 25897 12635.09 14683 21061.14 14873 64353.04 55453 98049.27 1.77
12 Kopargaon 16994 9996.61 15125 22212.44 8267 26777.28 40386 58986.33 1.46
13 Rahata 20854 10615.26 13153 18614.71 7128 26728.23 41135 55958.2 1.36
14 Shrirampur 14481 7799.27 10313 15191.82 5706 25312.2 30500 48303.29 1.58
Dist. Av.
Group-wise 433 652 230054 283449 403204 199623 703989.6 916724 1337248 1.46
Source: Agriculture Census
Cropping Pattern:
The maximum area of Ahmednagar district is categorized as scarcity zone and agriculture is
dependent mainly on monsoons. Hence rabi crops dominate the cropping pattern. The area under rabi crops
was more than 60 per cent, while that under kharif crops is more than 39 percent. The area under summer
crops is negligible. The cropping pattern in Ahmednagar district and Maharashtra state is presented in
Table 2.9.
Table 2.9: Cropping Pattern in Ahmednagar and Maharashtra 2012-13
Crops
Ahmednagar Maharashtra
Area (00 ha) % to GCA Area (00 ha) % to GCA
Rice 80 0.56 15087 6.46
Wheat 893 6.21 7557 3.23
Jowar 5551 38.61 47561 20.35
Bajra 2405 16.73 15289 6.54
Other Cereals 322 2.24 6605 2.83
32
Total Cereals 9251 64.34 92099 39.41
Gram 617 4.29 8299 3.55
Tur 122 0.85 10740 4.60
Other pulses 347 2.41 14815 6.34
Total Pulses 1086 7.55 33854 14.49
Total Foodgrains 10337 71.89 124953 53.47
Groundnut 148 1.03 4160 1.78
Safflower 208 1.45 2519 1.08
Soybean 355 2.47 21022 9.00
Sunflower 137 0.95 3207 1.37
Total Oilseed 903 6.28 33252 14.23
Cotton 159 1.11 28395 12.15
Sugarcane (H) 170 1.18 3269 1.40
Fruits* 206 1.43 4692 2.01
Vegetables* 303 2.11 3170 1.36
GCA 14378 100.00 233675 100.00
Note: *relates to 2011-12
Source: Office of the Commissionerate of Agriculture, Maharashtra State, Ahmednagar
Area, Production & Productivity of Major Crops
Kharif:
During the period 2011-12 to 2012-13, the area under kharif crops constituted more than 32 percent
of GCA. The area under kharif crops was mostly dominated by foodgrains, especially cereals. Out of the
total area under kharif crops, cereals constituted 60.88 per cent while pulses constituted only 8.55 percent
(Table 2.10). Hence together, cereals and pulses constituted 69.43 percent of total area under Kharif crops.
Among cereals, bajra was the main crop and 95 percent of area under cereals was under bajra. Further,
bajra constituted 58 percent of the area under Kharif crops and more than 18 percent of GCA.
Table 2.10: Production and Productivity of Main Kharif Crops in the Ahmednagar District- TE 2012-13
Sr.
No. Name of Crop
Area
(00 ha)
Production
(00 mt)
Productivity
(Kg/ha)
1 Paddy 63 52.92 840
2 Maize 65 74.82 1151
3 Bajara 2704 1679.18 621
4 Other cereals 24 14.52 605
Total Kharif Cereals 2856 1821.44 3217
1 Mung 188 71.06 378
2 udid 37 13.99 378
33
3 Tur 176 78.85 448
Total Kharif Pulses 401 163.9 1204
Total Kharif Foodgrains 3257 1985.34 4421
1 Soyabean 102 119.75 1174
2 Groundnut 66 52.6 797
3 Sunflowar 102 38.25 375
Total Kharif Oilseeds 270 210.6 2346
Sugarcane 1030 61800 60000
Cotton 134 29.21 218
Kharif Season 4691 64025.15 66985
Among oilseeds, the main crop cultivated were soybean and sunflower. The other oilseed crop
grown in the district was groundnut. Besides foodgrains and oilseed crop, two commercial crops viz.
sugarcane and cotton were grown in the district, which accounts for 25 percent of Kharif area and about 8
per cent gross cropped area.
Rabi:
As mentioned earlier, agriculture in Ahmednagar district is dominated by rabi crops and 60 percent
of GCA is under rabi crops during 2012-13. The area under rabi crops is dominated by foodgrains and as
much as 95 percent of area under rabi crops is under foodgrains. Major area (91 percent) under foodgrains
is under cereals (Table 2.11). The main foodgrain crop in the rabi season is jowar and about 82 percent of
area under rabi cereals is under rabi jowar. Further, rabi jowar constitutes 34 percent of GCA. Wheat is
also a rabi crop and constitutes about 7 percent of GCA. The main pulse crop is gram which constitutes 4
percent of GCA. Rabi oilseeds are negligible and constitute hardly 2.5 percent of GCA. The major area
under rabi oilseeds is under safflower.
Table 2.11: Production and Productivity of Main Rabi Crops in the Ahmednagar District - TE 2012-13
Sr.
No. Name of Crop
Area
(00 ha)
Production
(00 mt)
Productivity
(Kg/ha)
1 Wheat 1021 1427.36 1398
2 R. Jowar 4998 1749.3 350
3 Maize 107 142.95 1336
Total Rabi Cereals 6126 3319.61 3084
1 Gram 601 331.15 551
Total Rabi Pulses 601 331.15 551
Total Rabi Foodgrains 6727 3650.76 3635
1 Sunflowar 71 47 662
2 Safflower 290 138.04 476
Total Rabi Oilseeds 361 185.04 1138
Total Rabi Season 7088 3835.8 4773
Summer:
34
Summer crops in Ahmednagar district are negligible and constitute hardly 0.09 percent of GCA.
The main pulse crop is moog and groundnut is the main oilseed crop cultivated in summer (Table 2.12).
Table 2.12: Production and Productivity of Summer Crops in Ahmednagar District - TE 2012-13
Sr.
No. Name of Crop
Area
(00 ha)
Production
(00 mt)
Productivity
(Kg/ha)
1 mug 1 0.6 600
Summer Pulses 1 0.6 600
Summer Foodgrain 1 0.6 600
1 Groundnut 11.6 20.04 1728
Summer Oilseeds 11.6 20.04 1728
Summer Season 12.6 20.64 2328
Overall, it can be concluded that in Ahmednagar district, about 68 percent of GCA is under
foodgrains with 62 percent under cereals and about 7 percent under pulses. Rabi jowar is the main cereal
crop accounting for 34 percent of GCA, followed by kharif bajra which occupies 19 percent of GCA. Rabi
jowar and Kharif Bajra together account for 53 percent of GCA. The area under oilseeds is 4.4 percent of
GCA.
Horticulture:
Ahmednagar district has horticulture as a major allied activity. Area under horticulture is
increasing in the district. Due to diversified agro-ecological situation and available irrigation facilities
various vegetable crops are grown throughout the year. The otal area under cultivation of vegetables,
flowers and Aromatic and medicinal plant was about 17449 ha. The vegetable crops which are having large
area under cultivation in the district are onions, tomato, brinjal and cabbage. Under spices crop, chilli crop
is having more area followed by garlic, coriander and ginger. Under floriculture merigold, chrysanthemum,
roses and aster are important flower crops under cultivation. The total area under horticultural plantation in
the district was 67763 ha out of which 55945 ha area was with irrigation facilities and remaining was
rainfed. The major rainfed horticultural crops planted in the district include ber, custard apple and jamun.
The productivity of major horticultural crop is improving due to propagating precision farming practices in
the district.
Sericulture:
Sericulture is emerging as the virtual economic lifeline for farmers in Ahmednagar District.
Sericulture-related activity is spread across only 468 hectares in the district. It is one of the supplementary
enterprises recently being adopted by number of farm families as a major source of employment generating
activity perticularly in the talukas of Parner, Shrigonda, Ahmednagar and Newasa. The process begins with
farmers planting Mulberry saplings in the shade. Once these samplings grow sufficiently, government
officials are called in to inspect the tree and the leaves.
Animal Husbandry:
35
Animal husbandry is closely interwoven with agriculture and obviously plays an important role in
the national/state economy and also in the socio-economic development of rural households. This is the
sector where the poor contribute to growth directly instead of getting benefit from growth generated
elsewhere. The livestock sector (animal husbandry and poultry) is one of the important allied activities of
agriculture. By providing substantial income to rural households especially in the areas where agricultural
growth is poor, it helps to reduce the rural poverty. Ahmednagar district is very rich in case of animal
population. As per 17th Livestock Census 2003, the district has 1513926 bovines, 394994 sheep, 1055767
goat. Overall milk collection of the district is about 2907.65 lakh liters per year. Also 2139029 poultry
birds are being reared by the farmers. Ahmednagar district is also known for fish production (1955 mt
production in 2012-13).
Table 2.13: Livestock Population of Ahmednagar and Maharashtra, 2013
Particulars
Livestock Population (‘000) % share of
Ahmednagar Ahmednagar Maharashtra
Cattle 1315 16738 7.86
Buffalo 199 6084 3.27
Total Bovine 1514 22822 6.63
Sheep 395 3175 12.44
Goat 1056 10449 10.10
other 35 612 5.72
Total Livestock 3000 37058 8.09
Poultry 2139 34596 6.18
Source: 18th Livestock Census, 2007
Allied activities in the form of animal husbandry and dairy development play a very important role
for rural households. Besides providing additional employment, these sectors also supplement income and
enhance nutritional security. It is well known that dietary patterns are gradually shifting towards livestock
and dairy products with increase in income levels. Hence Animal Husbandry and Dairy development can
play a major role as activities allied to agriculture.
Dairy Development:
Govt. Milk Scheme : 16
Co-op. Dudh Sangh : 14
Registered Pvt. Milk Projects : 55
Registered Primary Milk Co opratives : 2858
Overall per Day Milk Collection : 17 lakh liters
Overall per Day Milk Distribution :
Registered Milk Producing Societies- :
Active Milk Producing Societies :
No. of Milch Cattle (Cows & Buffaloes)- :
Milk Collection from outside of District :
36
No. of MILK Chilling Centre : 77
Total Chilling Capacity (LPD) : 2850 lakh liters/day
Per capita Milk Consumption : 397.22 ml/day
Source- District Dairy Development Officer, Ahmednagar
Fisheries Development:
Length of Rivers in District : 587 Kms.
Water spread Area Favorable for Fisheries : 18182 ha.
Fish Production in 2012-13 : 1955 MT
No. of Fish seed farms/hatcheries : 01
Source- District Fishery Development Officer, Ahmednagar
Agriculture Marketing Centers:
All the APMC’s from the district are the major centers of marketing. These centers are supported
by Maharashtra State Agriculture Marketing Board, Ahmednagar, various co-operative marketing societies
& private agencies among the district. The number of marketing centres in the district are as below:
APMC - 14
Co-operative Sugar factory - 19
Milk Co-op Societies - 2913
Rice mills - 0
Oil mills - 0
Cold Storage & Pre Cooling Centres - 0
Winery - 0
Co-operative Development in the District
The district economy is mainly dependant on co-operative sector. Late Padmashree Dr. Vitthalrao
Vikhe Patil started the first co-operative sugar factory in the district at Pravaranagar during the year 1949,
which was the first of its kind in the Asian continent. Ahmednagar is a pioneer district in co-operative
development and in upliftment of sugarcane cultivators through the sugar factories. Similarly dairy co-
operatives have also developed as a secondary movement for the benefit of the dairy farmers. Fourteen
co-operative sugar factories, 9310 co-operative societies, 1281 co-operatives dairy societies and 4 fruit and
vegetable co-operative societies are the backbone of the district providing impetus to the rural economy.
The irrigation water co-operatives and transports co-operatives are also playing an important role in the
district. The problem related to credit inputs and marketing has been addressed to a great extent that has
made the farming community free from the clutches of middlemen and private lenders through the dynamic
leadership of the co-operative movement. Thus, co-operative sector in the district is dealing with all types
37
of needs of the farming community, village prosperity and all-round socio-economic development of the
district.
2.2.5 Irrigation and Groundwater:
Ahmednagar district has a net sown area (NSA) of 11.86 lakh hectares of which net irrigated area
accounts for 4.32 lakh hectares. This indicates that only 36.43 per cent of net sown area is irrigated. The
percent of rea irrigated in Ahmednagar district was 44.95 percent during 2011-12, which very high as
compared to the state average (17 percent). Out of total net irrigated area, 78 percent area irrigated through
well irrigation (including lift) and remaining as surface irrigation, i.e. canal irrigation.
Table 2.14: Sources of Irrigation and Groundwater in Ahmednagar district
(Area in ’00 ha)
Year Surface
Irrigation
Well
Irrigation
Net
Irrigated
Area
(NIA)
Gross
Irrigated Area
(GIA)
Percentage
of GIA to
GCA
% of groundwater
Irrigation to NIA
1960-61 464 894 1358 1545 11.66 65.83
1970-71 439 1149 1588 1856 14.44 72.36
1980-81 642 1271 1913 2806 22.08 66.44
1990-91 941 1973 2914 3507 27.37 67.71
2000-01 922 2688 3610 3939 28.24 74.46
2001-02 890 2475 3365 3687 29.81 73.55
2004-05 960 3360 4320 5960 44.94 77.78
Source: Season and Crop Report, various issues.
The takulawise source wise area irrigated in Ahmednagar district is presented in Table 2.15. It can
be seen from the table that irrigation intensity of the district is 135 percent. Shevgaon taluka has reported
highest irrigation intensity in the district
Table2.15: Takulawise Source wise Area Irrigated in Ahmednagar district 2012(Area in Ha)
S.N
o Taluka Surface Wells
Total Net
irrigated
area
Total Gross
irrigated
area
Irrigation
IIntensity (%)
1 A,nagar 335 20129 20464 23430 114.49
2 Parner 2023 15634 17657 27864 157.81
3 Pathardi 669 10514 11183 14430 129.04
4 Karjat 1352 19355 20707 24948 120.48
5 Jamkhed 1290 6840 8130 10400 127.92
6 Shrigonda 2625 35475 38100 60786 159.54
7 Shrirampur 3711 27669 31440 31680 100.76
38
8 Shevgaon 1700 10673 12373 20747 167.68
9 Newasa 13378 25344 38722 61778 159.54
10 Rahuri 13408 28985 42393 60226 142.07
11 Sangamner 1768 19076 20844 24533 117.70
12 Akole 1100 8484 9584 11006 114.84
13 Kopargaon 11739 15384 27123 30955 114.13
14 Rahata 4239 11240 15479 22317 144.18
Total 59397 254802 314199 425100 135.30
Source:------------------
Map 16: Groundwater Potential in Ahmednagar district
Map 17: Major, Medium and Minor Irrigation Projects and Flood Affected Area in
Ahmednagar district
39
Map 18: Groundwater Estimation in Maharashtra
40
2.2.6 District Income:
The sector-wise income in Ahmednagar District can be observed from Table 2.16. The per capita
income in Satara district is lower than 1.36 times the state average. The sector wise distribution of income
indicates that out of the total district income, about 26 percent comes from the Primary sector. It was noted
earlier that about 70 percent of the workforce is engaged in the agricultural sector. However, the
contribution of this sector to the District income is only 24.83 percent which is very low as compared to
other sectors. This indicates that productivity in the primary sector is very low. The secondary sector
contributed about 19 percent to District income and in case of tertiary sector it was around 56 percent. The
overall picture leads us to conclude that half of the income of the district is derived from the tertiary sector.
Table 2.16: Sector wise district income and per capita income of Ahmednagar district for the year 2010-11
& 2011-12 (as per 1999-00 Prices)
(figures in lakh)
Sr.
No.
Sector Year 2010-11 Year 2011-12
Gross
Income
Net
Income
Gross Income Net
Income
1.1 Agriculture 235750 224929 254716 243025
1.2 Forestry 6489 6318 6421 6252
1.3 Fisheries 571 498 571 498
1.4 Mines & Minerals 14 11 12 11
Total Primary Sector 242824
(25.82)
231756
(27.05)
261720
(25.52)
249786
(26.74)
2.1 Reg. Industries 68289 52718 81379 62824
2.2 Un-reg. Industries 51174 37647 54193 39868
2.3 Construction 48341 46983 54640 53105
2.4 Elect., Gas & Water Supply 6614 4372 4763 3149
Total Secondary Sector 174418
(18.54)
141720
(16.54)
194975
(19.01)
158946
(17.02)
3.1 Railway 1890 1507 2049 1641
3.2 Transport & Storage 32076 25659 34633 27704
3.3 Communication 30682 26424 34197 29450
3.4 Trade & Restaurants 153362 149233 169602 165037
3.5 Banking & Insurance 95544 91698 103594 99424
3.6 Professional Services 84247 76333 88133 79854
3.7 Public Admin. 46182 39569 52417 44911
3.8 Other Services 79314 72754 84170 77208
Total Tertiary Sector 523297
(55.64)
483177
(56.40)
568795
(55.47)
525228
(56.24)
41
Total District Income 940538 856653 1025491 933959
Per Capita Income (Rs) 22266 20280 23991 21850
Total State Income 31083689 27733929 33942498 30295239
Per Capita Income State (Rs) 30306 27040 32587 29085
% of district Income to State Income 3.03 3.09 3.02 3.08
Note: Figures in brackets are percentage to total district income.
Source- District Social & Economic Review, 2012-13.
2.2.7 Intra-District Growth Differentials:
Table No. 2.17 Intra district Growth Regions of Ahmednagar District
Type of growth region Talukas
Vibrant growth region Kopargaon ,Rahata,Shrirampur,Rahuri, Newasa
Medium growth region Shrigonda, Parner,Karjat & Sangamner
Slow growth region Pathardi, Shevgaon, Nagar,Jamkhed & Akole
42
The different growth regions of the district are characterized by the following factors
Vibrant Growth Region
The vibrant growth region covering Kopargaon, Rahata, Shrirampur, Rahuri & Newasa. The following
indicators of development characterize vibrant growth region in Ahmednagar district.
1.Availability of Irrigation water facilities to the farmers from command area s of
Major, Medium and Minor projects. Irrigation is also available from rivers and
irrigation projects backwater especially in Newasa and Shevgaon talukas.
2. Predominance of Sugarcane Cultivation, gross irrigated area to gross cultivable
area is more than 20% in these talukas.
3. Horticulture development especially fruits & vegetable production is picking up.
4. Good network of Co-operative credit structure and Co-operative societies in this
area especially for Co-operative sugarcane factories and Milk Co-operatives.
5.Diversified and cropping system. Dairy as an important supplementary
enterprise.
6. Growing interest among farmers towards commercial farming.
7.Scope for Sericulture development.
8. The talukas have well-established APMC
9. Network of NGOs and SHGs exists in the talukas.
10.Scope for Agro- processing units due to availability of good infrastructure
facilities
Medium Growth Region
The medium growth region covering Shrigonda, Parner,Karjat & Sangamner talukas and are characterized by
the following indicators of development.
1.Availability of Irrigation water facilities to the farmers from command area s of
Major, Medium and Minor projects. Some agricultural cultivation depends on
rainfall.
2. Sugarcane Cultivation in command area of irrigation projects.
3. Horticulture development especially dryland fruits crop like pomegranate
production is picking up.
4. Good network of Co-operative credit structure and Co-operative societies in this
area especially for Co-operative sugarcane factories and Milk Co-operatives.
5.Diversified and cropping system.
43
6. Dairy as an important supplementary enterprise.
7. Sericulture development is picking up
8.Soils are medium to light undulating and terrain lands limiting agricultural
cultivation.
9.Good Scope for Soil & Water Conservation activities that are undertaken on
larger scale showing visible results of activities.
Slow Growth Region
The slow growth region covering Pathardi, Shevgaon, Nagar, Jamkhed & Akole talukas are characterized by the
following indicators of development.
1.The slow growth region talukas are characterized by the scarcity zone that receives 500 mm to
700 mm of rainfall except for Akole block, the entire talukas fall under drought prone area of the
district.
2. Thus, watershed programmes, ground water recharge and rainwater harvesting assume
significant importance in the district and must be given priority.
3.Irrigation projects are pending must be completed so that more area can be brought under
irrigation.
4.Rainfed farming depending upon vagaries of nature limiting crop production and crop
productivity.
5.Soils are medium to light undulating and terrain lands limiting agricultural cultivation.
6.Good Scope for Soil & Water Conservation activities that are undertaken on larger scale
showing visible results of activities.
As mentioned earlier, Ahmednagar District comprises of 14 tehsils. The per capita income in
Ahmednagar district is 1.4 times lower than state average. However, the important point that emerges is
that about 56 percent of the District Domestic Product comes from the service sector while 19 percent
come from the secondary sector. However, the agricultural sector that employs 70 percent of the
workforce in the district contributes only about 26 percent to the District Domestic Product. In all other
tehsils, agriculture and allied activities are the predominant activities.
44
2.3 Development Vision and Strategy:
As stated earlier, the Comprehensive District Agriculture Plan is to achieve an over all growth
rate of 4.0 percent in the agriculture sector during XIIth plan period, by ensuring a holistic development
of agriculture and allied sectors. Accordingly, each district has to formulate a district plan by including
resources available from the existing schemes. The district has to project requirements for the
development of agriculture and allied sector through vision and strategy to achieve 4 percent agriculture
rate of growth. On the basis of above discussion, the following the developments plan and strategies are
drawn.
To achieve a sustainable growth rate for the agriculture and allied sector of 7 % per annum
during the end of 12th Five-Year Plan.
Ahmednagar district has a huge rural population . A major portion of the income of the district
is derived from tertiary sector.
In today’s context, Ahmednagar is most advanced district having maximum number of sugar
factories, perhaps to spread the message "rural prosperity through cooperation". The
first cooperative sugar factory in Asia was established at Pravara Nagar. Role Model of
water conservation work can be seen at Ralegan-Siddhi and Hivare Bazar that are also called
ideal Villages. Ahmednagar district has 19 sugar factories. -------
The place like Shri Saibaba’s Shirdi, one of Ashtavinayaks at Siddhatek, the famous Kanifnath
temple, attract devotees and therefore creates huge demand for flowers in these temples. There
is also huge international demand for flowers during colder months due to festival season
(Christmas, etc). Ahmednagar with infrastructure facilities increasing exports of flowers by
promoting hi-tech floriculture is envisioned in the 12th Plan.
Enhancement of milk production from the present 22 lakh litters to 32 lakh litters at the end of
12th Plan. The district has a conducive climate and well-developed infrastructure for promoting
dairy activities by the cooperative as well as private sector. The issues addressed in the 12th
Plan will aim at promoting veterinary centres that provide health care to facilitate dairy
development. Strengthening of milk collection centres and processing schemes in cooperative
sector may be strengthened.
Provision of good class infrastructure (farm roads, internal roads, uninterrupted power supply,
water) for agro-based industries including food processing industry
The district has great potential in poultry development especially in Parner ,Shrigonda and
Parner Taluka. With close proximity to Mumbai and large number of Corporates in the
poultry sector, there is tremendous scope for further promoting contract farming.
Encourage contract farming in vegetables (area expansion, processing etc.)
Increase in irrigation facility in DPAP areas and promotion of consumptive use of water in
these areas.
45
Development of post harvest management facilities (pack houses, cold stoppages. cold chain,
onion storage structures etc.)
Establishment of soil health up to taluka level.
Promotion of organic farming through farmers groups.
Human resource development through imparting high-tech knowledge in agriculture and allied
sectors.
47
Chapter III
SWOT Analysis of the Ahmednagar District
3.1 Introduction
The major sources of livelihood in Ahmednagar District are agriculture and related
activities. Sustenance of farmers became very difficult during drought that was very acute
during last few years. The major crops cultivated in kharif season are Bajra, Tur, Mung, and
Soyabean, sunflower, cotton and paddy in Akole block. The major crops grown in rabbi
season are Jowar, Wheat, Gram, Safflower, Sunflower, and vegetables including onion.
Summer Groundnut and fodder crops are grown in summer season if irrigation water is
available. Sugarcane is cultivated as Adsali, Pre-seasonal and Suru. The area under sugarcane
ratoon is about 40 percent
SWOT analysis is a powerful technique for understanding the Strengths, Weaknesses
and for capitalizing on the Opportunities and Threats faced in a business unit. SWOT analysis is
a basic straightforward model that provides direction and can serve as a basis for the district
plan. Since it concentrates on issues that potentially have a major impact, SWOT analysis is
useful when a very limited amount of time is available to address a complex situation. It is an
important step in planning and also helpful in accomplishing the objectives of a District plan and
obtaining the desired results by maximizing the potential of the strengths and opportunities and
minimizing the impact of weakness and threats. Hence, while developing the plan of
Ahmednagar District, a SWOT analysis has been conducted.
3.2 SWOT Analysis of the District:
3.2.1 Strengths:
1. Ahmednagar district is characterized by three agro-climatic zones viz; Scarcity zone,
Plain (Transition) zone, and Ghat (hilly) zone. The scarcity zone predominates almost
entirely in the district, with average rainfall of 500 to 700mm. However, the district has
32 percent of gross cropped area (GCA) under irrigation, which is double of the state
average. Well irrigation is possible because of successful watershed programmes and 78
percent of irrigated area is under well irrigation. The district is able to recharge ground
water despite scanty rainfall. Water Users Associations are also formed by the Irrigation
Department for equitable distribution of irrigation water with more efficient utilization of
48
available water for crop production and to increase the net area under irrigation. About
62 percent area available for watershed development is treated. Besides there are also 6
major, 7 medium and 2 minor irrigation projects in the district and 22 percent area is
under canal irrigation. Further, drip irrigation is also popular for horticultural crops.
There are 47 polyhouses in the district which facilitate cultivation of flowers and
vegetables under controlled conditions.
2. The district hosts a state agricultural university –Mahatma Phule Agricultural University
, situated at Rahuri. Extension services can thus be easily transferred to farmers from the
research Centre. Krishi Vigyan Mandals, Farmers’ Organizations etc. play a useful role
in disseminating extension and farm related services.
3. The GCA of the district is 13.12 lakh hectares .The area under fruits and vegetables is
about 9.5 percent of GCA. Nearly half the district domestic product from agriculture is
obtained from horticulture. Further the contribution of fruits and vegetables to GVO
from agriculture and allied activities is 37 percent during 11th
Plan period. This shows
the immense potential of horticulture in the district. The entire area under fruits and
vegetables is under drip irrigation.
4. Onion is a major horticultural crop in the district and 76 percent of the area under
vegetables is under onions. The district has 2527 onion storage structures with a capacity
of 63900 tones. The structures can thus help to store onions and withdraw the glut in the
market immediately after harvest.
5. The district has 8 cold storage’s with a capacity of 18000 tones. This enables the district
to store horticultural produce.
6. The district is strategically located near major cities like Mumbai, Pune, Hyderabad,
which provide a huge urban demand for fresh agricultural produce which can be easily
transported.
7. The district is also well connected by railway to cities like Delhi, Kolkatta and
Bangalore. Thus, a suitable communication system can provide markets for agricultural
produce.
49
8. The district has 14 APMCs, 26 sub-market yards and 325 village mandies through which
marketing of agricultural produce is done. There are 80 storage Godowns with a capacity
of 45000 MT.
9. Sugarcane is an important crop in the district and occupies about 7.8 percent of GCA and
contributed about 10 percent of GVO from agriculture during 11th
Plan period.
Cooperative sugarcane factories are established in every block as an assured market for
sugarcane.
10. With respect to allied activities, dairy is most important. Out of the total GVO from
allied activities the contribution of dairy is 71.5 percent. The contribution of the dairy
sector to GVO from agriculture and allied activities is 11 percent. The daily collection
of milk is 15 lakh liters per day.
11. The dairy sector is further strengthened by the availability of milk cooperatives for
marketing the produce. The district has 1497 dairy cooperatives and 78 milk-chilling
centres. Veterinary services are also available in the villages. Further, green fodder and
sugarcane tops are available as cattle feed. There are 5 milk-processing units.
12. There are six livestock markets in the district where quality animals are available. The
district is one of the main sources for the availability of Cross Bred cows. Further AI
services are available and there is also a cattle-breeding farm under Animal Husbandry
Department.
13. Labour is available for planting important crops like sugarcane and onion. Machines for
farm operations such as tractors are owned by cultivators or hired which helps in speedy
farm operations. The tractor population in the district is 21964 which means that on an
average 16.55 tractors are available per 1000 hectares. This is above state average. The
use of harvesters for harvesting is also being popularized.
14. Biomass is available from livestock and crop residue is available for composting.
15. The Seed Replacement rate (SRR) is very high and is 100 percent in case of several
crops. The district has 1105 seed distribution centres, 1128 fertilizer distribution centres
and 1016 insecticide/pesticide distribution centres.
50
16. The district has 1317 Primary Agricultural Credit Societies.There are also 231 branches
of nationalized banks providing loans for agricultural purposes.
17. The district is very well known for holy places such as Shirdi and Shani- Shinganapur.
Hence, a large number of devotees visit the district. There is thus scope to promote the
service and other sectors
18. Kalsubai, the highest peak in the Sahyadri lies in Ahmednagar district. There are also
other peaks in the district. Further, the district is well known for the Randha Falls. Thus
there is great scope for tourism in the district.
19. District has different types of fertile soils with well irrigation facility (more than 35
percent of total cultivable area, following multiple cropping systems. Also, district has
hard working farming community with high aspiration towards adoption of new
technologies.
20. District has well-developed co-opertaive sector and high potential for agro and agro
based enterprise.
3.2.2 Weaknesses:
1. The structure of workforce in Ahmednagar district reveals that 70 percent of workers are
in the agricultural sector. While 45 percent are cultivators, 25 percent are agricultural
labourers. However the contribution of this sector to District Domestic Product is 27
percent. The productivity of the agricultural sector is thus very low.
2. Although the district has 32 percent of GCA under irrigation, which is above state
average, the cropping intensity is barely 112 percent, which is below state average.
3. In Ahmednagar district although 68.32 percent of GCA is under cereals, its contribution
to GVO from agriculture in 10th
Plan period was only 11.5 percent and it was 9.8 percent
from GVO from agriculture and allied activities. While pulses occupied 7.6 percent of
GCA, its contribution to GVO from agriculture was 2.7 percent during 10th
Plan period.
This indicates that the cropping pattern in Ahmednagar district is dominated by low
value cereals and pulses.
51
4. While 5 percent of GCA is occupied by oilseeds, its contribution to GVO (10th
Plan
period) from agriculture was 2.2 percent. Thus productivity is very low in case of
oilseeds.
5. The district has 32.40 percent of GCA under irrigation that is above state average.
However, about 60 percent of irrigation water is being utilized solely for sugarcane.
Indiscriminate use of water has lead to soil salinity and water logging. Further, lack of
recommended crop rotations in sugarcane cropping system has led to decline in
productivity and pest infestation.
6. About 38 percent of the GCA is under Rabi jowar. However, the yield of rabi jowar in
Ahmednagar district is far lower than that of other districts in the state. While the yield
of Rabi jowar was 350 kg per hectare in 2004-05, the state average yield was 566 kg per
hectare in the corresponding year.
7. The soils are becoming deficient in micro-nutrients. Scientific agricultural techniques are
not being followed leading to low productivity.
8. The district receives an average rainfall of 566 mm. The scarcity zone which receives 50
to 700 mm rainfall is occupied by 13 out of 14 talukas in the district. Except Akole
taluka, the entire Ahmednagar falls under drought prone area. The rainfall in this region
is erratic, uncertain and unassured. The district is thus characterized by several droughts.
9. Allied activities that play a major role in providing complementary and supplementary
income to farmers contribute only 15 percent to GVO from agriculture and allied
activities.
10. Allied activities are mainly in the Dairy sector. Poultry sector has not made much
progress in this district and its contribution to GVO from allied activities in 10th
Plan
period was only 10 percent. The district has close proximity to major cities like Mumbai
and Pune where a huge demand for poultry products exists. This potential has thus not
been tapped.
11. The major and most dominant post harvest activity in the district is with respect to
sugarcane. The other food and fruit processing sector has yet to be developed.
52
12. The farmers in the district do not have access to suitable extension services and
infrastructure bottlenecks exist. Many of the villages are not connected with all weather
roads. There is also acute shortage of electricity.
13. Low productivity of major crops in the district as compared to state average (which
itself is lower than national average) and FLD is major weakness in the growth of
agriculture in district.
3.2.3 Opportunities:
1. There is scope to promote horticulture in the district. Horticultural crops have a strong
potential to raise returns to land, labour and capital and are pro- small farmers. In
Ahmednagar district the land holding pattern reveals that 66.5 percent farmers are small
and marginal. Cultivation of horticultural crops therefore provides opportunity to them to
raise their incomes.
2. Fruits and vegetables occupy about 9.5 percent of the GCA. The share of fruits and
vegetables has been undergoing a major change in the food basket of the urban and rural
consumer over the years. The share of fruits and vegetables in urban food expenditure
increased from 12 percent in 1983 to 15.8 percent in 2004-05. In case of rural food
expenditure this share increased from 9.3 percent in 1983 to 14.5 percent in 2004-05.
This increase in demand for fruits and vegetables provides an opportunity for
Ahmednagar district to increase production of these horticultural crops.
3. Agro-processing in case of fruits is very negligible in the district. Rahata taluka is
famous for quality guavas. Hence there is scope to set up agro-processing units for such
fruits.
4. The district also has the opportunity to develop post harvest infrastructure facilities.
5. Dairy is an important allied activity. As per Animal Husbandry department, there is
backlog in establishing 97 new veterinary dispensaries and in upgrading 154 veterinary
institutions. The district must therefore gear up its infrastructure so as to maximize
potential in dairy sector.
53
6. The development of the poultry sector is very limited. The district is situated close to
Mumbai, Pune and other major cities. There is thus scope to promote this sector.
Contract farming in poultry can also be undertaken in a big way.
7. Water shed programmes have been considerably successful in Ahmednagar distict. In
view of 13 talukas in the district falling in the scarcity zone, such programmes must be
encouraged so that ground water resource potential can be fully exploited and rain water
can be harvested.
8. Irrigation projects that are pending must be completed so that more area can be brought
under irrigation facilities. Increase in area under irrigation will help to increase
productivity and increase cropping intensity.
9. Generation of electricity by windmills is being implemented in the district. The
topography, velocity of wind in the district has been found to be suitable for setting wind
mills. Thus generation of electricity by wind- mills must be promoted.
3.2.4 Threats:
1. The productivity of several crops in the district is below state average. About 60 percent
of available irrigation water is consumed by sugarcane crop leading to soil salinity and
water logging. Unless water is used in a judicious manner, the productivity of crops will
not increase.
2. The district has 13 talukas that are in the scarcity zone and drought prone. Shortage of
water is likely to be a major constraint.
3. Any delay in completion of irrigation projects will be harmful for agriculture as
productivity of crops will be affected.
4. The shallow and medium deep soils in and along the hilly areas of western ghats are
prone to erosion.
5. About 68.32 percent of GCA is under low value cereals. The contribution of agriculture
to District Domestic Product is thus very low.
54
6. While 70 percent of workforce is in agriculture, the contribution of this district to District
Domestic Product is only 26.7 percent.
7. Only 17 percent of the District Domestic product is obtained from industrial sector. Thus
agriculture is not providing raw material for promotion of industrial activities.
8. Rural infrastructure has a very important role to play for the development of agriculture.
With increase in production of horticultural products, lack of post harvest infrastructure
and agro- processing units may lead to huge post harvest losses.
9. Roads, markets, communication, electricity, and other such infrastructure are equally
important and lack of such facilities will be an impediment to agricultural growth.
3.3 Accommodating SWOT – Addressing Issues Emerging out of SWOT analysis:
Ahmednagar district broadly consists of three zones, viz.; Scarcity zone, Transition zone and
Hilly zone. The scarcity zone that receives 500 mm to 700 mm of rainfall occupies 13 out of 14
talukas in the district. Except for Akole block, the entire district falls under drought prone area
of the district. Thus, watershed programmes, ground water recharge and rainwater harvesting
assume significant importance in the district and must be given priority. Irrigation projects that
are pending must be completed so that more area can be brought under irrigation.
Horticulture contributes almost half the District Domestic Product from agriculture. There is
also huge urban demand for horticultural produce. Thus promotion of horticulture by improving
post harvest infrastructure and transport facilities will augment the incomes of farmers and give
boost to agricultural sector. Further, industrial growth is very limited in Ahmednagar district and
cultivation of horticultural crops can help to promote agro-processing industries. Horticulture
will also promote secondary industries such as grading, packaging, transport, etc. This will
generate additional employment and stimulate the rural economy of Ahmednagar.
Allied activities such as poultry play a very limited role in Ahmednagar district. Due to its close
proximity to major cities such as Mumbai and Pune, the district has a ready urban market for
poultry products. Contract farming can be promoted in the district. Dairy is an important allied
activity in the district. Veterinary services must be further strengthened in the district.
55
The productivity of cereals that occupy 68.5 percent of GCA is very low. Appropriate extension
services must be delivered to farmers so that productivity can improve.
3.4 Sectoral /Regional Growth Drivers of the District:
Table 3.1: Growth regions of Ahmednagar District
Block Crop Horticulture Animal husbandry Sericulture
Nagar Jowar, Mung Onion,Santra Buffalo,Goat Mulberry plantation
increasing Biovoltine
Cocoon rearing
Parner Jowar Onion, Pea, Tomato Cross Bread Cow,
Sheep,Goat
---Do---
Pathardi S.cane, Cotton,
Jowar
Mosambi Cross Bread Cow, Goat ---Do---
Karjat Jowar, Gr.Nut,
Udid, S.cane,
Lemon Cross Bread Cow, Goat ---Do---
Shrigonda S.cane,Jowar Onion, Tomato,
Pomogranate,
Lemon,Banana
Cross Bread Cow,
Goat,Buffalo
---Do--- Area under
mulberry plantation is
increasing
Jamkhed Jowar,udid
Lemon Goat -----
Rahuri S.cane,
Soyabean, Gram,
Wheat
Brinjal,
Onion,Pomogranate
Cross Bread Cow,
Sheep
---Do---
Shrirampur S.cane,
Soybean,Wheat,
Gram,Cotton,
Maize
Onion Cross Bread Cow ---Do---
Rahata S.cane, Wheat,
Soyabean
Pomegranate, Grape,
Guava,floriculture
Cross Bread Cow. ---Do---
Newasa S.cane,Wheat,Jo
war,Gram,
Bajara
Onion,Banana Cross bred
Cow,Buffalo
---Do---
Shevgaon Cotton,jowar,S.c
ane,Gram
Onion Crossbred Cow,Goat ----
Kopargaon S.cane, Wheat,
Gram,
Cotton,Soyabean
Tomato,Onion,Grape,
Pomogranate
Crossbred Cow ---Do---
Sangamner Bajara, S.cane,
Wheat, Gram
Tomato,Gourd
Vegetable,Pomegrana
te,Onion
Crossbred Cow,Goat ---Do---
Akola Paddy,Bajara Tomato,Gourd
vegetable,
Pomogranate
Crossbred Cow -----
57
Growth Regions of Ahmednagar District
Intra district Growth Regions of Ahmednagar District
Type of growth region Talukas
Vibrant growth region Kopargaon ,Rahata,Shrirampur,Rahuri, Newasa
Medium growth region Shrigonda, Parner,Karjat & Sangamner
Slow growth region Pathardi, Shevgaon, Nagar,Jamkhed & Akole
58
The different growth regions of the district are characterized by the following factors
Vibrant Growth Region
The vibrant growth region covering Kopargaon, Rahata, Shrirampur, Rahuri &
Newasa. The following indicators of development characterize vibrant growth region in
Ahmednagar district.
1.Availability of Irrigation water facilities to the farmers from command area s of
Major, Medium and Minor projects. Irrigation is also available from rivers and
irrigation projects backwater especially in Newasa and Shevgaon talukas.
2. Predominance of Sugarcane Cultivation, gross irrigated area to gross cultivable
area is more than 20% in these talukas.
3. Horticulture development especially fruits & vegetable production is picking up.
4. Good network of Co-operative credit structure and Co-operative societies in this
area especially for Co-operative sugarcane factories and Milk Co-operatives.
5.Diversified and cropping system. Dairy as an important supplementary enterprise.
6. Growing interest among farmers towards commercial farming.
7.Scope for Sericulture development.
8. The talukas have well-established APMC
9. Network of NGOs and SHGs exists in the talukas.
10.Scope for Agro- processing units due to availability of good infrastructure facilities
Medium Growth Region
The medium growth region covering Shrigonda, Parner,Karjat & Sangamner talukas
and are characterized by the following indicators of development.
1.Availability of Irrigation water facilities to the farmers from command area s of
Major, Medium and Minor projects. Some agricultural cultivation depends on
rainfall.
2. Sugarcane Cultivation in command area of irrigation projects.
3. Horticulture development especially dryland fruits crop like pomegranate
production is picking up.
4. Good network of Co-operative credit structure and Co-operative societies in this
area especially for Co-operative sugarcane factories and Milk Co-operatives.
5.Diversified and cropping system.
6. Dairy as an important supplementary enterprise.
7. Sericulture development is picking up
59
8.Soils are medium to light undulating and terrain lands limiting agricultural
cultivation.
9.Good Scope for Soil & Water Conservation activities that are undertaken on larger
scale showing visible results of activities.
Slow Growth Region
The slow growth region covering Pathardi, Shevgaon, Nagar, Jamkhed & Akole talukas are
characterized by the following indicators of development.
1.The slow growth region talukas are characterized by the scarcity zone that receives 500 mm to
700 mm of rainfall except for Akole block, the entire talukas fall under drought prone area of the
district.
2. Thus, watershed programmes, ground water recharge and rainwater harvesting assume
significant importance in the district and must be given priority.
3.Irrigation projects are pending must be completed so that more area can be brought under
irrigation.
4.Rainfed farming depending upon vagaries of nature limiting crop production and crop
productivity.
5.Soils are medium to light undulating and terrain lands limiting agricultural cultivation.
6.Good Scope for Soil & Water Conservation activities that are undertaken on larger scale
showing visible results of activities.
60
Chapter IV
Development of Agriculture Sector in
Ahmednagar District
4.1. Introduction:
Due to increasing population and decreasing per capita availability of land for
agriculture, the pressure on land has increased for production of more food grains,
oilseeds, pulses fruits, vegetables and also for fodder and fuel. In view of these
limitations on horizontal expansion of land for agriculture, only alternative left is the
vertical expansion through combination various farm enterprises required less space
and time but giving high productivity and ensuring periodic income for small and
marginal farmers located in rainfed areas, dry lands, hilly and tribal areas. Thus, the
farming system development assumes greater importance for sound management of
farm resources to enhance farm productivity, reduce degradation of environmental
quality and maintain sustainability in production and productivity.
As noted earlier, the agricultural and allied sector’s contribution to the economy
was about 26 percent while that of industrial and tertiary sector was about 19 percent
and 55 percent respectively (2005-06). In contrast, 69.70 percent of the workforce is
dependent on the agricultural sector as an economic activity. This clearly speaks of low
productivity in the agricultural sector. Fostering more rapid rural development,
particularly raising the productivity and competitiveness of crops and accelerating the
growth of the agricultural sector is critical for inclusive growth. More rapid growth in the
primary sector will directly as well as indirectly contribute to generating greater
opportunities for employment and income growth. Increase in rural incomes will
stimulate growth in the secondary and tertiary sector as demand for industrial good and
services will increase. However, for this to happen, appropriate policy measures have
to be formulated and public expenditure in the agricultural sector has to be directed
towards more productivity enhancing investments so as to stimulate growth and further
encourage private investment. Realizing the importance of agricultural growth, the
RKVY was implemented so as to give a major boost to the agricultural sector in the 11th
Plan.
61
The existing farming systems being adopted by majority of farmers in rainfed
area of Ahmednagar district are characterizes by existence of food grain crops
including mostly Bajra, Jowar as cereals and Mung, Udid, and Tur as pulse crops in
combination with dairy and animal husbandry as these combinations of enterprises are
complementary to each other in case of income generation, resources utilization and for
recycling of farm waste. Contribution of different crops or enterprises towards annual
income of farm family under each existing farming system studied. Further, the farming
systems were analyzed for identifying the specific problems in each crop or enterprise
to suggest the appropriate solution and strategy to address the problem taking into
consideration the reasons behind the problems.
In this chapter an overview of the development of the agricultural sector is
presented and constraints in yield gaps are noted. The recommended interventions for
the district and action plan are outlined. The projected growth rate during the 11th Plan
is calculated and researchable issues are discussed.
4.2 Land Use:
As we have seen earlier chapter that that out of geographical area, about 23
percent of land is under non agricultural usage i.e. forest, land under non-agricultural
use, cultivable waste, permanent pasture and miscellaneous trees and groves. About
7.5 percent land is as current and other fallow and about 71.10 percent of land is sown.
Thus, altogether about 9.22 percent of land is available in the form of cultivable waste,
current as well as other follows, which can be brought under productive use with a
proper wasteland development programme. The cropping intensity of the district is 111
percent, which is lower than the state average (127.9 percent).
4.3 Soil Health:
As seen earlier, soils of the district are broadly divided into four categories
namely coarse shallow soil; medium black soil; deep black soil and reddish soil
occupying about 38, 41, 13 and 8 percent of the cultivated area respectively. In the first
two categories, soil moisture is the predominant limiting factor affecting productivity of
crops particularly under rainfed condition. Out of total land, about 79 per cent land
(Class II to IV) is available for cultivation. Lands of the district are not suitable for any
62
cultivation and mostly covers the soils from Ahmednagar, Pathardi, Sangamner and
Akole talukas that are predominantly rainfed areas. Soil fertility indices shows that out
of 4670 sample, about 98 percent of the soil in the district fall under category with
neutral PH status, 95 percent of soil with low Electrical Conductivity and about 85
percent of soil contain low Organic Carbon. Also more than 78 percent of soil in the
district is low in phosphorus and most of the soil in the district is high potash (about 95
percent of soil). The critical analysis status of district indicates low organic carbon
content of majority of soils in almost in all talukas. The reclamation and development of
saline/Alkali soils in Ahmednagar district is presented in Table 4.1. It can be observed
from the table that 5098 hectares are under saline/Alkali soils and this area has not yet
been treated. Reclamation of saline and alkaline soils requires a long-term effort to
bring the soils under normal production levels. This problem is mainly found in irrigation
command areas of the district. The Area under saline and alkali soil is increasing due to
improper soil and water management, which requires efficient drainage system to drain
excess water carrying salts which hold otherwise get accumulated in the soils. Crop
rotations and application of soil amendments like gypsum is used to neutralize the soils.
Shrirampur and Koparagon taluka are having more such affected area together
covering 62.46 percent of the total district area.
Table 4.1: Reclamation and Development of saline/ Alkali soils in Ahmednagar district
Sr.No
Taluka Area under Saline / Alkaline Soil(ha)
Area treated (ha) up to 2006-7
Balance Area (ha)
1 A,nagar 405 0 405
2 Parner 0 0 0
3 Pathardi 117 0 117
4 Karjat 0 0 0
5 Jamkhed 0 0 0
6 Shrigonda 375 0 375
7 Shrirampur 2135 0 2135
8 Shevgaon 0 0 0
9 Newasa 575 0 575
10 Rahuri 0 0 0
11 Sangamner 442 0 442
12 Akole 0 0 0
13 Kopargaon 1049 0 1049
14 Rahata 0 0 0
Total 5098 0 5098
Source: District Soil Survey and Soil Testing Office, Ahmednagar
63
Organic agricultural activities are implemented in the district from the year 2001-
2002 including construction of vermicompost production units, Vermicompost culture
production centers and bringing compact area under organic cultivation practices by
certification of organic cultivation area. Organic cultivation is practices are followed on
350 Ha areas in the district construction of 364 Vermiculture centers, 7993
vermicompost units and 5000 biodynamic compost heaps were completed. Special
campaigns are being organized in villages to popularize the importance of organic
cultivation practices to reduce cost of production and to improve soil health status.
Total 9200 farmers were trained regarding locally preparation of organic compost and
botanical pesticides like Dashparni Ark (An extract of leaves of ten plants having
insecticidal properties), Jeevamrut and other inputs with available resources with the
farmers. Farmers are again promoted to use biopesticides like Trichoderma,HNPV,
HNPV viruses and biofertilizers like Azotobactor, Rhizobium, Phosphate solubilizing
Bacteria and composting culture.
4.4 Water Resources and Management:
As we have noted in earlier chapter that Ahmednagar district has a net sown
area (NSA) of 11.86 lakh hectares of which net irrigated area accounts for 4.32 lakh
hectares. This indicates that only 36.43 per cent of net sown area is irrigated. The
percent of area irrigated in Ahmednagar district was 44.95 percent during 2004-05,
which very high as compared to the state average (17 percent). Out of total net irrigated
area, 78 percent area irrigated through well irrigation (including lift) and remaining as
surface irrigation, i.e. canal irrigation
The information regarding major, medium and minor Irrigation projects in
Ahmednagar district is presented in Table 4.2. The canal system is confined to some
parts of the district. In the northern part of the district there are 3 major irrigation
projects namely upper Godavari, Pravara and Mula having 2, 18 and 28 percent of the
irrigated areas. In the south-western part of the district there are two command projects
(namely Ghod & Kukadi) which are having 15 percent of the irrigated area. Besides
this, there are 7 medium projects and 90 minor projects covering 16 and 5 percent of
the total irrigated areas (Table 2.15). In non-command areas, the ground water
potential is generally low, particularly in central and northern part of the scarcity zone.
64
However it is relatively better in the southern parts of the above zone and much better
in transition zone and hilly zone.
Table 4.2: Major, Medium and Minor Irrigation projects in Ahmednagar district
Sl Project Water storage
TCM
Kharif area
Rabi area
Summer area
No. of wells
Area irri. By wells
Blocks
Major project
1 Darana, Gangapur 617.74 5267 8313 1748 8214 17378 Kopargaon
2 Bhandardara 304.40 11186 15235 6072 13084 20592 Sangamner, Rahata,
Shrirampur, Rahuri
3 Mula 608.81 21254 49225 5393 12190 45465 Rahuri,Newasa,
Shevagao,Pathardi
4 Urdhva Godavari 336.29 1661 781 0 110 360 Kopargaon
5 Ghod 154.80 10300 10900 2600 3798 4750 Shrigonda
6 Kukadi 864.39 75948 80330 0 9763 21199 Parner, Shrigonda,
Karjat
Total (Major) 2886.43 125616 164784 15813 47159 109744
Medium projects
1 Bhojapur 10.31 600 480 0 125 426 Sangamner
2 Adhala 27.61 780 3914 0 1444 220 Sangamner
3 Mandohol 8.78 240 2266 0 78 283 Parner
4 Ghatshil pargaon 8.50 250 1660 0 291 333 Pathardi
5 Sina 52.30 3192 4748 0 497 200 Karjat
6 Khairi 13.74 192 341 0 334 135 Jamkhed
7 Visapur 25.61 2774 2934 2200 1042 1310 Shrigonda
Total (Medium) 145.14 8028 16343 2200 3811 2907
Minor Projects
1 Godavari valley (26) 40.08 485 23179 0 410 405
2 Krishna valley (68) 98.31 9277 18024 0 1564 790
Total (Minor) 138.39 9762 41203 0 1974 1195
The water analysis is important to know the condition of water for safety
purpose. The number of water samples analyzed in the Ahmednagar district is
presented in Table 4.3. It can be seen for the table that out of total 834 samples, hardly
0.5 percent samples are safe for agricultural purposes i.e. permissible for irrigating the
crops, about 26 percent are moderately safe, 55 percent are moderately unsafe and
renaming are unsafe.
65
Table 4.3: Water Analysis Report of Ahmednagar district
Name of the Taluka
No of Water samples analyzed
Permissible C – 1
Moderately Safe C – 2
Moderately unsafe C – 3
Unsafe C – 4
A,nagar 257 4 74 136 42
Parner 62 - 17 42 3
Pathardi 76 - 25 47 4
Karjat 27 - 7 18 2
Jamkhed 11 - 7 3 1
Shrigonda 89 - 36 51 2
Shrirampur 6 - - 1 5
Shevgaon 25 - 8 14 3
Newasa 148 - 19 75 54
Rahuri 6 - 2 3 1
Sangamner 83 - 6 48 29
Akole 21 - 13 6 2
Kopargaon 11 - - 10 1
Rahata 12 - 2 8 2
Total 834 4 216 462 152
Source: District Soil Survey and Soil Testing Office, Ahmednagar
The number of Soil Testing Laboratories in Ahmednagar district is presented in
Table 4.4. During the year 2007-08, there were 11 Soil testing laboratories with an
annual analyzing capacity of 57200 have analyzed 49895 samples. It can be observed
that 9 laboratories are in Cooperative and Public undertaking, one each in private and
Government sector.
Table 4.4: Soil Testing Laboratories in Ahmednagar district -Year 2007-08
Soil Testing Laboratories Under
No of Soil Testing Laboratories
Annual Analysing Capacity
No. of Samples Analysed
No of Soil Testing Laboratories having Annual Analysing
System Static Mobile Total
Govt. Sector
1 0 1 5000 4670 1
Co-operative & Public U-taking
7 2 9 49200 42546 9
Private Sector 1 0 1 3000 2679 1
Total 9 2 11 57200 49895 11
Source:
66
Table No 4.5 present the yearwise area to be covered with micro-irrigation
system including drip and sprinkler and also total expenditure required during the XI
Plan Period. It is seen from the above table that total 24125 ha area will be covered by
micro-irrigation by investing Rs. 5109.98 lakhs, of which 18670 ha area will be covered
by drip irrigation with an expenditure of Rs.4720.76 lakhs and 5455 ha area by sprinkler
irrigation with Rs. 389.22 lakhs. Table No 4.6 presents the yearwise community tanks
proposed to be completed during XI Plan Period in Ahmednagar district. Total 1123
community tanks would be constructed with a capacity of 11055 ha area under
irrigation and total expenditure proposed for completing these tanks is of Rs. 5374.3
lakhs. The community tanks are found very useful for farmers to irrigate the crops with
available water mostly through micro-irrigation as life saving irrigation sustaining crops
and livestock also. Table No 4.7 presents the crop area to be brought under micro-
irrigation during the XIth Five-Year Plan. The micro-irrigation includes the drip as well
as sprinkler irrigation to fruit, vegetable, sugarcane and field crops. Total 18670 sets
are proposed to be installed and 6400 sprinkler set are also proposed to be installed
The farmers well adopted the drip irrigation technology and area under drip
irrigation showing increasing trend. Area under drip irrigation in the district has
increased from 132 hectares in 2002-03 to 4557 hectares in 2005-06. The amount
expenditure & area covered in the last five year confirming the trend. About 90 percent
area under horticulture and vegetable crop is under drip. In DPAP area, drip has given
boost to diversification towards horticulture. Though farmers adopted technology for
horticulture still the potential for large area under other crops like sugarcane & cotton
remained unutilized. In the sugarcane area excess use of water deteriorating the soil
health so it is necessary to educate farmers to adopt drip & sprinkler in s cane. In cotton
belt during monsoon late start & long breaks affecting yield of cotton very badly. If drip
technology used in this area the yield will be assured. The potential for use of sprinkler
remained unutilized due to lack of proper technology transfer. It is found that use of
sprinkler in crop like onion, pea, soyabean wheat, gram & sugarcane increase the yield
apart from managing electricity shortage & water efficiency.
Following action needed to popularize the drip
The dealer net work need to expand by training rural youth in drip technology.
Easy availability of loan towards farmers share apart from subsidy need to be
ensured.
67
Needed to mobilize farmer for installation of drip in groups to reduce the cost
because of small farm size.
Rigorous training of the farmers regarding drip technology & there exposure visit to
successful farms
Training to the farmers regarding post installation maintenance like acid treatment,
leak proofing, calculating water requirement, irrigation scheduling is required to
ensure its continuous functioning
Need to take policy decision, which in command area water will be distributed only
on volumetric basis. It will promote the use of drip.
while giving permission to lift irrigation & water user association it is needed to make
mandatory that 100 % area will be brought under irrigation in the phase manner
Need to take pilot project for 100% distribution of irrigation water of minor & medium
project by drip irrigation method, adopting participatory approach.
Awareness of farmers requires, reg the services made mandatory for drip
companies after installation.
Increasing Outlay for farm pond in horticulture mission will increase the area under
drip irrigation
Popularizing irrigation through drip will increase the effectiveness of the drip with
economy & efficiency in fertilizer use.
Awareness regarding soil health in command area & ill effect of excess irrigation will
promote use of drip irrigation.
68
Table 4.5: Perspective Micro Irrigation Plan
(Phy. In ha and Fin. In lakh Rs.)
Activity
Actual coverage up to March 2006 (ha)
Area coverage in 2006 – 2007 (ha)
Unit Size
Unit Cost
2007-08 2008-09 2009-10 2010-11 2011-12 Total
Phy Fin Phy Fin Ph Fin Phy Fin Phy Fin Phy Fin
Drip Irrigation
3395 858.58 3562 900.65 3733 943.85 3905 987.36 4075 1030.32 18670 4720.76
Sprinkler Irrigation
992 70.78 1040 74.20 1091 77.85 1142 81.48 1190 84.91 5455 389.22/ 3892.22
TOTAL
4387 929.36 4602 974.85 4824 1021.7 5047 1068.84 5265 1115.23 24125
5109.98/8612.98
Table 4.6: Protective (Community Tanks) Irrigation Plan
(Area in ha and Investment in lakh Rs.)
Type
Existing Community Tanks (2006-07)
2007-08 2008-09 2009-10 2010-11 2011-12
No.
Are
a
Investm
e
nt
No.
Are
a
Investm
e
nt
No.
Are
a
Investm
e
nt
No.
Are
a
Investm
ent
No.
Are
a
Investm
ent
No.
Are
a
Investm
e
nt
10000 CuM
54 365 179 144 1440 699.8 175 1750 850.5 200 2000 972 250 2500 1215 300 3000 1458
69
Table 4.7 : Perspective Crowise Micro Irrigation Plan
Sr. No.
Crops
Actual coverage
up to March 2006
Area coverage
in 2006 - 2007
Proposed coverage
2007-08 2008-09 2009-10 2010-11 2011-12 Total
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A Drip Irrigation
1 Mango 200 18.00 200 18.00 200 18.00 200 18.00 200 18.00
2 Tamarind 20 1.80 20 1.80 20 1.80 20 1.80 20 1.80
3 Ber 1.00 0.13 1.00 0.13 1.00 0.13 1.00 0.13 1.00 0.13
4 Pomegranate 400 65.60 400 65.60 400 65.60 400 65.60 400 65.60
5 Sapota 60 5.40 50 4.50 75 6.75 75 6.75 50 4.50
6 Guava 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
7 Papaya 20 5.50 20 5.50 20 5.50 20 5.50 20 5.50
8 Grapes 20 4.02 20 4.02 20 4.02 20 4.02 20 4.02
9 Banana 40 11.00 40 11.00 40 11.00 40 11.00 40 11.00
10 Citrus 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
11 C.apple 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
12 Fig 10 1.64 10 1.64 10 1.64 10 1.64 10 1.64
13 Amala 20 2.50 20 2.50 20 2.50 20 2.50 20 2.50
14 Vegetables 500 137.50 800 220.00 900 247.50 1000 275.00 1200 330.00
15 Lime 250 37.75 250 37.75 200 30.20 100 15.10 200 30.20
Total Drip
1601 299.9 1891 381.5 1966 403.7 1966 416.1 2241 483.95 9665 1985.15
70
Table 4.8: Area Expansion under Micro Irrigation (Horticulture Crops)
Area in hectors
Rs. Lakh
Sr. No. Name of Crop
Planting
Distance M.
Rate of
Subsidy
Rs/he.
07-08 08-09 09-10 10-11 11-12
Area Amt. Area Amt. Area Amt. Area Amt. Area Amt.
1 Mango 10 X 10 9000 200 18 200 18 200 18 200 18 200 18
2 Pomegranate 5X 5 16400 400 65.6 400 65.6 400 65.6 400 65.6 400 65.6
3 Banana 1.5 X 1.5 27500 40 11 40 11 40 11 40 11 40 11
4 Cust Apple 5 X 5 16400 20 3.28 20 3.28 20 3.28 20 3.28 20 3.28
5 Amala 7 X 7 12500 20 3.5 20 2.5 20 2.5 20 2.5 20 2.5
6 Tamarind 10 X 10 9000 20 1.8 20 1.8 20 1.8 20 1.8 20 1.8
7 Guava 6 X 6 15100 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
8 Grapes 3 X 1.5 20100 20 4.02 20 4.02 20 4.02 20 4.02 20 4.02
9 K- Lime 6 X 6 15100 250 37.75 250 37.75 200 30.2 100 15.1 200 30.2
10 Sapota 10 X 10 9000 60 5.4 50 4.5 75 6.75 75 6.75 50 4.5
11 Fig 5 X 5 16400 10 1.64 10 1.64 10 1.6 10 1.64 10 1.64
12 Sweet orange 6 X 6 15100 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
13 Papaya 1.5 X 1.5 27500 20 5.5 20 5.5 20 5.5 20 5.5 20 5.5
14 Ber 7 X 7 12500 1 0.13 1 0.13 1 0.13 1 0.13 1 0.13
15 Vegetables 1.5 X 1.5 27500 500 137.5 800 220 900 247.5 1000 275 1200 330
Drip Total 1601 300.16 1891 381.76 1966 403.96 1966 416.36 2241 484.21
Veg. Sprinkler 7135 1000 71.35 1200 85.62 1300 92.76 1400 99.89 1500 107.03
Total Horticulture. 2601 371.51 3091 467.38 3266 496.72 3366 516.25 3741 591.24
71
4.5 Major Crops and Varieties in the Ahmednagar District:
The crops are grown in three seasons in the districts, i.e Kharif, Rabi and
Summer. The cropping pattern of the Ahmednagar district is identical with the state as
well as most of the districts in the state. Kharif is the predominant season, in which
Bajra crop account major share in area. As we have seen earlier, about 34 percent of
gross cropped area is under jowar, followed by bajara, which has about 19 percent
share. The major crops and varieties grown in Ahmednagar district is presented in
Table 4.9.
Table 4.9: The major crops and varieties grown in Ahmednagar district
Sr. No
Major Crop Varieties
1 Paddy Karjat 84, Jaya, R-24, Indrayani, Sahyadri
2 Kharif Jowar CSH 5, CSH 9, CSH 14, CSH 16 CSH 17 CSH 18, Phule Amruta
3 Bajara ICTP-8203, Hybrid- Rhrbh-8609, Rhrbh-8924
4 Rabi Jowar CSH 5, CSH 9, CSH 14, CSH 16, M 35-1, CSH 18, Phule Amruta, Mauli, Phule Yashoda, Selection 3
5 Wheat HD 2189/ N 59, N 5489 / Godavari Panchavati / Lok-1, NIAW 301 / MACS-2846 / MACS- 2496, NI 5439 / NIAW -34
6 Tur BDN- 1.2, IOPL-87, ICPL 87110, BSMR-733, ATK-884
7 Bean Varun, Arka Komal, Contender, Local
8 Soybean MACS 450, D 228, PK 1029, IS 335
9 Gram Vijay, Vishavas, Virat, Vishal
10 Groundnut M 13, TMV 10, JL 24, SB 11, TAG 24, JL-286
11 Cotton Varieties
Improved
Hybrid
LR 5166, Verlaxmi, H- 4
12 Sugarcane CO-714, CO-8014 CO-86032, CO 7527, CO-88121, CO-94012, CO-265
13 Potato Kupri, Chamdrmukhi, Kupri Joyti
14 Onion N-53, Basvant-780, N-2-H, N- 257
15 Turmeric Rajapuri Waigaon, Krishna, Selem. Kadappa.
16 Ginger Mahm, Acc-116, ACC-
17 Tomato Pusa rub, Dhanshri, Bhagyeshri, Rajshri
72
4.6 Input Management-
The growth and level of agricultural output to a large extent is determined by the
pattern of resource structure or input mix in the agricultural sector. Technological
developments shift the production function up and to the right enabling the farmers to
make grater use of yield increasing inputs. As is well known, the pace of agricultural
development in India increased with the introduction of new production technology. An
increase in per hectare yield and total production of a crop over a period of time is due
to increased use of inputs like land, irrigation, chemical fertilizers and high yielding
varieties of seeds. The planting material production plan of Ahmednagar district for next
five year is presented in Table 4.10.
Table 4.10 presents the information about horticultural planting materials i.e.
grafts and seedlings plan in Ahmednagar district. It is seen from the data that there are
total 39 horticultural nurseries in the district. Out of 39 nurseries, 5 nurseries are
government nurseries and 34 are in private sector. In case of government nurseries,
the total proposed area under mother plants up to the year is of about 487 ha and total
production of planting materials is of about 970 lakh grafts /seedlings. In case of private
sector nurseries, the proposed area under mother plants is of 1560 ha and total
production of is about 3086 lakh grafts /seedlings. The total production of horticultural
planting material at the end of XI th Five-Year Plan is of 8020 lakh grafts /seedlings.
The area under horticultural plantation is increasing due to effective implementation of
Employment Guarantee Linked programme of Horticultural Development and under
National Horticulture Mission programmes. The availability of quality planting material is
required to establish orchards. The planting material produced at these nurseries is
being utilized in the district.
The existing seed replacement ratio of different food grain, vegetable and fruit
crops of Ahmednagar district is presented in Table 4.11. In case of bajra, sunflower,
cotton, sugarcane and fruit crop thers is 100 percent seed replacement where as in
case crops there is more than 50% seed replacement.
73
Table 4.10: Planting Material Production Plan
(Area in ha, production of plants grafts in numbers)
Existing facilities ( 2006-07)
2007-08 2008-09 2009-10 2010-11 2011-12
Total
No. of
Nurseries
Area under moth
er plants
Production
of seedlings / grafts
Area under
mother plants
Production of seedlings / grafts
Investment for
development
Area under
mother plants
Production of seedlings / grafts
Investment for
development
Area under
mother plants
Production of seedlings / grafts
Investment for
development
Area unde
r moth
er plant
s
Production of
seedlings / grafts
Investment for
development
Area under
mother plants
Production of
seedlings / grafts
Investment
for developme
nt
Area unde
r moth
er plant
s
Production of
seedlings / grafts
Investment for development
Govt Nurseries
5 26.97 5.08 32.97 5.5 87.87 34.47 6 50.4 36.97 8 28.5 37.9 9 23.35 38.77 10 10.7 487 970 1913
Private Nurseries
34 65.3 55.99 58.6 63.57 32.48 66.4 85.46 48 72.4 134.6 115 66.4 136 52.35 77.5 138 53.8 1560 3086 6107
Total
39 92.27 61.07 91.57 69.07 120.4 100.9 91.46 98.4 109.4 142.6 144 104 145 75.7 116.3 148 64.5 2047 4056 8020
74
Table 4.11: Planning of Agriculture Inputs in the District – Seed Sr. No. Name of the Crop Area under Crop (ha)2007-08 Present SRR %
Kharif
1 Bajara 2704 100 %
2 Mug 188 50%
3 Sun flower 71 100%
3 Tur 176 60%
4 Udid 47 50%
5 Cotton 370 100%
6 Kharif Jawar 4 65%
7 Soyabean 502 60%
Rabi & summer
1 Jowar 4988 65%
2 Wheat 800 70%
3 Gram 601 50%
5 Groundnuts 11 50%
7 Sugarcane 790 100%
8 Maize 107 60%
Total Vegetable crops 778 80%
Total Fruit Crops 670 100%
Strategy for Achieving 33% Seed Replacement Ratio:
The seed village programme was initiated under Maharashtra Agricultural
Productivity Improvement Programme in the district. The seed production programme
was undertaken for the crops like wheat, Gram, Redgram, Jowar, peas and
Soyabean. The breeder and foundation seed was procured from MPKV, Rahuri.
Mahabeej, also 100 quintals of breeder seed of Arkel variety of pea was procured
from Jawaharlal Agricultural University, Jabalpur, Madhya Pradesh. About 100 ha.
area was covered for foundation seed production and about 400 quintals of
foundation seed was produced. Farmers Organizations and Farmers Commodity
Groups from different Krishi Vigyan Mandals were involved in seed production
programme. After starting of MAHAPIK CAMPAIGN, the krishi vigyan mandals were
involved in seed production. In this programme farmers were trained in seed
production, certification & marketing. 3000 quintals of gram, 3000 quintals of wheat,
1000 quintals of jowar and 500 quintal pea seed was produced. Farmers now
adopting the skill of production of seed. The projection for seed required in the district
is given below.
75
Table 4.12: Crop wise seed produced and requirement in Ahmednagar District (Quantity in Qtls.)
Stage wise Requirement of Seed
S.No.
Crop Year 2007-08 Year 2011-12 Breeder Seed Requirement
F/S Seed Requirement
C/S Seed Requirement
Total Breeder Seed Requirement
F/S Seed Requirement
C/S Seed Requirement
Total
1 Paddy 1 12 400 413 1 20 680 701
2 Maize 1 22 3375 3397 1 24 3450 3474
3 Bajra 8 80 7200 7288 8 80 7125 7213
4 Wheat 65 1600 25750 26350 110 2800 48000 51600
5 Jowar 1 75 4990 5066 2 150 9980 10132
6 Green Gram 1 10 675 686 1 15 953 1068
7 Black Gram 1 12 450 463 1 15 525 540
8 Tur 1 17 1020 1038 1 20 1330 1350
9 Gram 55 700 9300 10000 100 1100 15470 16470
10 Soyabean 200 2400 31500 34100 220 2800 37800 40600
11 Groundnut 4 35 390 429 14 138 1320 1458
12 Sunflower 2 17 1600 1619 2 20 1890 1912
13 Safflower 1 2 145 148 1 6 600 607
TOTAL 341 4982 86795 90997 462 7188 129123 137125
76
Table 4.13: Crop wise seed requirement in Ahmednagar District
Seed Village Programme Mssc & Private Sector. (Seed Quantity in Qtls.)
Sr.
No.
Crop Year 2007-08 Year 2011-12 Certified Seed
Requirement
M.S.S.C/ Privet
Sector
From Seed village Programme Certified Seed
Requirement
M.S.S.C/
Privet Sector
From Seed village Programme
Quintal Area Ha. Quintal Area Ha.
1 Paddy 400 200 200 10 680 380 300 30
2 Maize 3375 2775 600 30 3450 3000 450 50
3 Bajra 7200 7200 0 0 7125 7125 0 0
4 Wheat 25750 20000 5750 287 48000 28000 20000 1000
Table 4.14 : Infrastructure Available on Taluka Seed Farm / Trial cum Demonstration Farm
Taluka Name of the TSF
Total area (ha)
Cultivable area (ha)
Irrigated area (ha)
Infrastructure available
Animals (Nos)
Implements (Nos)
Open well
Tube well
Pumpset Machinery Threshers Seed Proces. plant (Nos)
Godown capacity (tonnes)
Temporary Shed Average sq. ft.
Other Buildings
Nagar Savedi 30.92 24.06 1.00 2 51 1 1 2 1 1 0 10 1120 6
Pathardi Pathardi 18.21 14.5 5.00 2 4 2 1 3 1 1 0 10 200 1
Karjat Patharwadi 44.52 36.20 5.00 6 4 2 1 3 1 1 0 10 560 1
Jamkhed Arangaon 42.90 38.42 0.40 6 12 2 1 3 1 1 0 20 200 1
Shrirampur Gondhawani 43.36 37.58 36.58 3 25 2 1 3 2 1 0 25 896 4
Shevgaon Th'pimpalgaon
33.35 28.23 0.20 2 4 3 0 3 2 1 0 20 620 1
Parner Bhalawani 48.83 45.75 10.00 4 6 2 1 3 1 1 0 20 500 1
Rahuri Rahuri 30.92 29.41 29.41 4 12 1 1 2 1 1 1 25 500 2
Rahuri D'prawara 12.85 10.95 10.15 4 6 1 1 2 3 1 0 20 280 1
Sangamner Kokangaon 46.14 24.28 1.00 4 5 1 1 2 5 1 0 20 800 1
Kopergaon Kopergaon 30.79 28.33 28.33 2 2 2 1 3 3 1 0 20 750 1
Newasa Kukana 43.8 32.55 32.55 6 5 3 0 3 1 1 0 25 650 1
426.59 350.26 159.62 45 136 22 10 32 22 12 1 225 7076 21
77
Table 4.15: Seed Production at TSF / TCD
Sr. No
Name of the TSF / TCD
Total area (ha)
Cultivable area (ha)
Irrigated area (ha)
Crop Seed production
during 2006-07 (qtls)
Proposed Seed Production (qtls)
2007-08 2008-09 2009-10 2010-11 2011-12
1 Nagar Jawar 10 12 12 12 12 12
Seed 30.92 24.06 1 Wheat 20 20 30 40 80 100
Farm Gram 10 30 30 30 30 35
Savedi Bajara 15 15 20 45 45 45
Mug 8 8 8 20 20 25
Total
63 85 100 147 187 217
2 Pathardi 18.21 14.5 5 soybean 18 18 18 20 30 30
Bajara 30 30 30 30 30 30
Jowar 30 30 45 45 45 45
Gram 20 20 20 20 20 20
Wheat 20 20 40 40 40 40
Total
118 118 153 155 165 165
3 Karjat 44.52 36.2 5 Udid 5 5 5 8 8 8
Patharwadi Bajara 50 45 45 60 60 60
Tur 12 10 12 15 15 15
Gram 20 18 30 30 30 30
Total
87 78 92 113 113 113
4 Shrirampur 43.36 37.58 36.58 Soybean 30 70 80 80 80 80
Gondhawani Bajara 20 20 30 30 30 30
Gram 10 12 20 20 25 30
Jawar 10 10 10 15 20 20
Total
70 112 140 145 155 160
5 Parner 48.83 45.75 10 Bajra 50 50 60 70 70 80
78
Bhalawani Mung 5 5 5 7 8 10
Soybean 15 15 15 20 20 20
Tur 12 12 12 12 15 15
SunFlower 20 20 20 25 30 30
Jawar 70 80 80 90 100 100
Gram 20 22 22 25 30 30
Total
192 204 214 249 273 285
6 Rahuri 30.92 29.41 29.41 Soybean 120 120 130 125 140 150
Wheat 160 180 175 190 200 210
Gram 24 24 25 25 30 30
Total
304 324 330 340 370 390
7 Kopargaon 30.77 28.26 28.26 Soybean 60 60 60 70 75 80
Wheat 40 40 60 60 75 75
Jawar 15 20 20 20 25 30
Total
115 120 140 150 175 185
8 Newasa 43.8 32.55 32.55 Soybean 0 0 0 30 30 30
Kukana Tur 10 12 42 50 60 65
Sunflower 0 0 69 75 80 80
Bajra 20 0 12 15 15 20
Wheat 0 0 0 40 60 80
Jawar 15 15 15 20 30 30
Gram 15 15 20 30 30 40
Total
60 42 158 260 305 345
9 Sangamner 46.14 24.28 1 soybean 0 0 0 20 20 20
Kokangaon Bajara 0 0 0 10 10 20
Jowar 25 25 30 30 30 30
Gram 5 5 5 10 10 10
Total
30 30 35 70 70 80
10 Jamkhed 42.9 38.42 0.4 Udid 5 5 5 8 8 8
Arangaon Bajara 50 45 45 60 60 60
79
Tur 12 10 12 15 15 15
Gram 20 18 30 30 30 30
Total 87 78 92 113 113 113
11 Shevgaon 33.35 28.33 0.2 Udid 0 15 20 25 25 25
Thakur Bajara 30 10 10 20 20 20
Pimpalgaon Tur 20 25 25 25 25 25
Gram 25 30 30 35 35 35
Total 75 80 85 105 105 105
12 Devlali pravara 12.85 10.95 10.15 Soybean 100 100 35 120 120 150
Rahuri Wheat 40 40 40 60 60 60
Gram 10 10 20 20 20 30
Total 150 150 95 200 200 240
G. Total 426.6 350.29 159.55 1351 1421 1634 2047 2231 2398
80
Table No 4.14 presents the taluka wise seed farms of Ahmednagar district and the
area of each seed farm with area under irrigation. It can be seen from the table that
different infrastructural facilities provided for different taluka seed farms.The total area
of the seed farms is 426.59 ha out of that the cultural area is 350.26 ha and area
under irrigation is about 159.62 ha. Draft power, electical pumpsets for lifting water from
wells and tube wells are provided. There are four seed processing plants. Godown
facilities are provided at every seed farm with total capacity of all godowns is about 225
M.T. There are permanent as well temporary buildings are constructed for various
purposes. The strengthening of these seed farms is proposed in the plan period to meet
the different requirements of crop production and make the units self sustaining in the
near future.
Table 4.15 presents the information regarding the seed produced during last few
years and also proposed seed production during the XI th Five-Year Plan at different
farms in district. The seed production is undertaken for major crops like jowar, wheat,
bajra, gram, mung,udid,,soyabean & sunflower. The seed production is taken on the
farms source seed available from Agricultural Universities.During the year 2006-07,
2007-08 & 2008-09 total seed production of varoius crop was 1351 qtls, 1421qtls &
1634 qtls. The seed production for next three years is given in the table. The seed
produced on the farms helpin seed requirement of the farms and also to provide to the
farmers.
The talukawise total fertiliser consumption and crop-wise nitrogen, phosphorus
and potassium consumption in Ahmednagar district during 2006-07 . It is observed that
the highest consumption of NPK was in Newasa taluka. This is possibly because of
cultivation of sugarcane and wheat crop
The planning of fertilizer requirement planning of plant protection chemicals
requirements, cropwise plant protection chemicals requirements is presented in Table
4.16 to 4.18.
81
Table 4.16: Use of Fertilizer in Ahmednagar District And Proposed Plan for Kharif Season ( Metric Tone )
Sr. No.
Type of Fertilizer Existing
use 2006-07
Proposed Quantity
2007-08 2008-09 2009-10 2010-11 2011-12
1 Urea 51158 55000 60000 65000 68000 70000
2 Ammonium Sulphate 1031 1100 1200 1250 1300 1500
3 Calcium Sul. 974 1000 1200 1300 1400 1500
4 Sulphate of Potash 0 50 75 100 125 150
5 Muriate of Potash 5082 6112 7750 8000 9000 10000
6 DAP 13824 15694 16500 18500 20500 21500
7 SSP 15053 16000 17500 18000 19500 20500
8 10:26:26 13881 14000 15000 16500 17500 18000
9 12:32:16 1908 2000 2200 2300 2400 2500
10 15:15:15 9425 10800 11800 12500 13000 14000
11 19:19:19 4318 5000 5500 6000 6500 7000
12 20:20:00 8933 9000 10000 12000 14000 16000
13 23:23:00 1939 2000 2500 3000 3500 4000
14 18:18:10 1845 1950 2050 2150 2200 2500
15 20:20:00 1434 1500 1600 1700 1800 2000
TOTAL 130805 141206 154875 168300 180725 191150
Table 4.17: Use of Fertilizer in Ahmednagar District And Proposed Plan for Rabbi Season
( Metric Tone )
Sr. No.
Type of Fertilizer Existing Use
2006-07 Proposed Quantity
2007-08 2008-09 2009-10 2010-11 2011-12
1 Urea 64346 70775 77200 83635 90000 96495
2 Ammonium Sul. 564 620 695 750 785 850
3 Calcium Sul. 527 579 631 683 735 790
4 Sulphate of Potash 30 33 36 39 42 45
5 Muriate of Potash 12244 13468 14692 15916 17141 18350
6 D.A.P. 11134 12247 13360 14473 15586 16700
7 S.S.SP. 27314 30045 32776 35507 38239 40970
8 10:26:26 25345 27876 30407 32938 35479 38000
9 12:32:16 3429 3773 4117 4461 4805 5150
10 15:15:15 17757 19535 21314 23094 24872 26650
11 19:19:19 8638 9500 10362 11225 12086 12950
12 20:20:00 4111 4522 4933 5344 5755 6165
13 23:23:00 4254 4678 5102 5526 5950 6375
14 18:18:10 4400 4840 5280 5720 6160 6600
15 20:20:00 3088 3397 3705 4015 4324 4632
TOTAL 187181 205888 224610 243326 261959 280722
82
The planning of fertilizer requirement and planning of plant protection chemicals
requirements is presnted in Table 4.18.
Table 4.18: Planning of Fertiliser Requirement
Sr. No.
Taluka Fertiliser Grade Use of fertiliser (tonnes) during 2006-07
2007-08 2008-09 2009-10 2010-11 2011-12
1 Nagar Urea 300 320 330 340 350 350
DAP 600 650 700 750 800 800
MOP 250 300 325 350 375 400
SSP 250 300 325 350 375 400
Total complexes 500 600 650 700 750 800
Total mixtures 600 650 700 750 800 850
2 Parner Urea 10150 11000 11500 11000 10150 10000
DAP 1500 1550 1600 1600 1650 1720
MOP 112 120 130 150 175 185
SSP 432 450 500 520 530 550
Total complexes 450 460 480 500 510 520
Total mixtures 1300 1350 1400 1410 1400 1430
3 Pathardi Urea 5000 5250 5325 5450 5575 5700
DAP 3100 3200 3300 3400 3500 3600
MOP 1900 1950 2000 2050 2100 2150
SSP 2500 2550 2600 2650 2700 2750
Total complexes 8000 8025 8050 8075 8100 8125
Total mixtures 7000 7025 7050 7075 7100 7125
4 Karjat
Urea 4107 3980 4100 4500 4500 4200
DAP 1680 1875 1900 2000 2200 2200
MOP 18 17 19 20 22 22
SSP 520 390 390 410 417 423
Total complexes 1375 1200 1200 1340 1480 1500
Total mixtures
5 Jamkhed Urea 1400 1450 1500 1600 1550 1600
DAP 800 825 835 850 870 895
MOP 600 615 625 635 650 660
SSP 1100 1120 1150 1165 1175 1185
Total complexes 900 910 915 918 925 935
Total mixtures 1100 900 600 550 500 375
6 Shrigonda Urea 12000 13000 13500 13800 14000 14200
DAP 1250 1300 1350 1400 1475 1520
MOP 1850 1970 2050 2180 2230 2310
SSP 2550 2610 2690 2770 2820 2890
Total complexes 21000 22000 22050 23010 23070 24010
1050 1090 1130 1190 1270 1350
7 Shrirampur Urea 4700 4750 4810 4850 4900 4960
DAP 2000 2050 2105 2150 2200 2245
MOP 600 650 710 760 800 840
83
SSP 2000 2050 2100 2160 2200 2275
Total complexes 4000 4050 4109 4170 4200 4250
Total mixtures 1500 1560 1600 1650 1700 1745
8 Shevgaon Urea 250 300 300 300 275 271
DAP 125 150 150 150 200 125
MOP 125 150 250 250 200 175
SSP 200 250 250 250 300 260
Total complexes 450 500 500 500 510 490
Total mixtures 250 300 300 300 290 265
9 Nevasa Urea 250 300 300 300 275 271
DAP 125 150 150 150 200 125
MOP 125 150 250 250 200 175
SSP 200 250 250 250 300 260
Total complexes 450 500 500 500 510 490
Total mixtures 250 300 300 300 290 265
10 Rahuri Urea 1500 1725 1950 2175 2400 2625
DAP 1200 1380 1560 1740 1920 2100
MOP 400 460 515 575 640 705
SSP 800 920 1040 1160 1285 1410
Total complexes 2400 2760 3120 3480 3840 4200
Total mixtures 800 930 1050 1175 1295 1420
11 Sangamner Urea 1860.25 1950 2050 2180 2280 2300
DAP 617 536 852 955 1015 1100
MOP 725.4 628 680 710 720 750
SSP 660 560 580 610 650 680
Total complexes 2316 2320 2370 2410 2425 2500
Total mixtures 2266 2275 2305 2350 2400 2450
12 Akole Urea 6500 8200 9250 10500 11200 13500
DAP 6000 7000 8500 9000 9700 10300
MOP 1500 1850 2200 2700 3500 3900
SSP 2000 2500 2100 3200 3000 4100
Total complexes -- -- -- -- -- --
Total mixtures 1500 2250 3500 3700 3900 4200
13 kopergaon Urea 850 900 950 1000 1100 1150
DAP 640 750 760 810 850 940
MOP 250 260 280 300 310 340
SSP 50 70 90 110 115 125
Total complexes 450 460 480 500 510 525
Total mixtures 550 560 600 610 640 645
14 Rahata Urea 20000 20400 20600 20800 208000 21000
DAP 7000 71 40 7210 7280 7280 7350
MOP 5500 5610 5665 5720 5720 5775
SSP Powder aran
4000/10000 4080/10200
4120/10300
4160/10400
4160/10400
4200/10500
Total complexes 40000 40800 41200 41600 41600 42000
Total mixtures 50000 51000 51500 52000 52000 52500
Grand Total 273178.65 285606 294860 304048 495939 317807
84
MICRO-NUTRIENT STATUS OF SOIL OF AHMEDNAGAR DISTRICT: Biopesticides Production laboratory:
Soil Testing Laboratory, Ahmednagar has initiated production of Biopesticides
under National Horticulture Mission. It was established mainly for propagating the
application of biopesticides and to minimizing the application of chemical insecticides to
reduce the residues of harmful chemicals. Up till now 4000 Kgs of trichoderma viridae
has been produced and distributed to farmer through Extension workers for the seed
treatment and Soil application under the various crop demonstrations. The laboratory is
also equipped for production of biofertilizers i.e. Azotobactor, PSB, Acetobacctor,
Rhizobium. It will be useful increasing the Soil health and sustainable agricultural
production.
Table 4.19:
Block No. of Samples Analyze
Fe Mn Zn Cu
Rang
e
Deficie
ncy
%
Rang
e
Deficie
ncy
%
Rang
e
Deficie
ncy
%
Rang
e
Deficie
ncy
%
Ahmednagar 86 1.78-13.3 55 2.56-30.6 0 .36-2.40 44 0.92-5.58 0
Parner 32 1.22-4.72 96 2.0-12.5 0 0.25-0.97 53 1.96-5.30 0
Pathardi 41 0.80-8.36 83 2.22-22.2 0 0.22-0.82 70 1.4-4.54 0
Shrigonda 42 1.97-8.65 50 6.92-38.0 0 0.28-1.74 45 2.25-13.0 0
Karjat 71 0.64-5.94 91 0.68-41.4 16 0.16-1.36 87 0.74-4.24 0
Jamkhed 60 2.0-6.44 76 2.08-33.0 0 0.34-1.18 83 0.84-4.32 0
Rahuri 185 1.60-17.7 34 2.16-59.0 0 0.18-1.45 67 2.25-6.51 0
Shevgaon 46 2.22-9.06 28 6.98-45.83 0 0.10-2.82 58 2.04-1.38 0
Newasa 105 3.20-13.3 5 7.72-22.8 0 0.11-2.82 80 1.30-4.60 0
Shrirampur 109 3.64-19.4 7 4.80-32.4 0 0.32-1.69 52 0.62-3.72 0
Sangamner 250 1.04-4.96 65 1.52-19.22 0 0.40-3.38 58 0.92-4.78 0
Kopargaon 121 2.40-12.0 2 5.54-30.8 0 0.12-3.56 59 1.04-6.06 0
Akola 62 1.76-40.2 48 2.0-47.4 0 0.26-2.90 56 0.36-17.1 0
Total 1210 0.64-40.2 49 0.68-59.0 1 0.11-4.38 62 0.25-17.10 0
85
Table 4.20:
Crop
Requirement of Micronutrient
Rhizobium Azotobactor P.S.B. Trichoderma
2006-07 2011-12 2006-07 2011-12 2006-07 2011-12 2006-07 2011-12 2006-
07 2011-
12
Paddy 95 285 0 0 4 17 7 17 1 4
Maize 256 510 0 0 25 125 30 125 5 25
Bajara 0 0 0 0 30 178 0 0 0 0
Wheat 3468 14000 0 0 500 1500 500 1500 100 300
Jowar 0 0 0 0 50 200 0 0 0 0
Green Gram 0 25 10 25 0 0 5 25 2 5
Black Gram 0 25 6 32 0 0 10 32 2 5
Tur 0 40 100 408 0 0 102 408 20 80
Gram 1022 3000 100 408 0 0 100 408 20 80
Soyabean 153 1050 250 1000 0 0 250 1000 50 200
G.Nut 10 40 12 34 0 0 6 34 2 6
Sunflower 20 50 0 0 0 0 10 47 0 1
Safflower 0 0 0 0 5 15 0 0 1 3
S.cane 3502 10000 0 0 1000 3000 1000 3000 2000 6000
Cotton 228 1100 0 0 300 1200 300 1200 80 240
Vegetable 3825 10000 0 0 0 0 500 2500 100 500
Horticulture 11900 15000 0 0 0 0 500 2500 100 500
Total 24479 19025 478 1907 614 2035 1020 3596 203 709
Source:
4.7 Farm Mechanization/ Farm Projects-
The availability of improved farm equipments and machines also one of the
important indicators of agricultural growth of the district. It can be seen from the
Annexture Table 24 that the availability of improved farm machinery equipments is very
low ,this is proposed to overcome through the comman facility center through FIGs.
Farm Machinery Status and Projection Present Status (Nos) and projected expenditure
is presnted in Table 25 and 26.
86
4.8 Special Programmes and the Ongoing Projects in the District-
The major Extension and developmental schemes in the district are executed by
agricultural department, (state government) which receives funds from both state and
central government. In the present system, the schemes are planned and designed at
the state and central level and implemented at district level. The agricultural department
Zilla Parishad also executes some of the state/central schemes. Part of cess funds
available with Zilla Parishad is used for designing the schemes at district level as per
the need of agriculture in the district.
ONGOING EXTENSION & DEVELOPMENTAL ACTIVITIES.
Table 4.27:
S.N. Department Name of the scheme Extension Component
1 Agriculture
Centrally Sponsored Oil 1. Demonstrations
Seed Development Scheme. 2. Mulching Demonstration
3. Farmers School
4. Bio-Control Demonstration
5. Farmers Training
6. Gram seed production
7. Contingency expenditure
Centrally Sponsored Pulses Development Scheme.
1. Block Demonstration
2. Farmers School
3. Bio-Control Demonstration
4. Farmers Training
5. NPV Demonstration
6. Village Seed Production.
Centrally Sponsored Cereal Development Scheme
1. Farmers Farmer School
2. Field Crop Demonstration
3. Farmers Training
4. Publication / Leaflets
5. TOF
6. Field Visits
Centrally Sponsored Maize 1. Block Demonstration
87
Agriculture
Development Scheme 2. Village seed Production.
3. Farmers Training
4. Contingency
Centrally Sponsored Cotton Development Scheme
1. IPM FLD
2. Bio-chemical Prod. TSF
3. Farmers Field School
4. Disease Survey
5. Pheromone Traps
6. Bio-chemical Supply
7. Drip set
8. Implements, FSD
9. Electronic Print media
10. Contingency
Centrally Sponsored Sugarcane Development Scheme
1. Farm Demonstration
2. Farmers Training
3. Field visits
4. Green manuring
5. Poly shed
6. Foundation seed
7. Certified seed
8. Officers Training
9. Drip set
10. Contingency
Strengthening Training Institute (C.S.)
1. Training
2. Training Materials
3. Maintenance
Shetkari Magazine Membership
Membership
Farm Women participation in Agriculture.
1. Demonstration / Exhibition
2. Village Training
3. Training materials
4. Honorarium /TA
5. Ladies discussions
88
Agriculture
EGS- Horticulture Programme Development
1. Mango
2. Chikku
3. Guava
4. Pomegranate
5. Jamun
6. Mosambi
7. Ber
8. Custard Apple
9. Lemon
10. Amala
11. Tamarind
12. Fig
13. Jatropha
14. Coconut
15. Bamboo
Organic Farming 1. Vermicompost unit
2. Bio dynamic compost
3. Organic farming block
4. Certification
5. Workshop
6. Demonstration
7. Publication
8. Training
9. Exhibition
Maharashtra Water Sector Improvement Project (MWSIP)
1. Establishment of Village Support Groups& KVM
2. Preparation of project plan / Annual plan
3. Establishment of district training Centre
4. Agril polyclinic strengthening
5. Human Resource Development
6. Crop demonstration
National Horticulture Mission Plantation Infrastructure & Development
a) Public sector
89
Production of planting material i) Model Nursery (4 ha.)
ii) Small Nursery (1 ha.)
iii) Rehabilitation of existing tissue culture units
iv) Rehab of Tissue culture Laboratories and related units in SAUs
b) Private sector
i) Model Nursery (4 ha.)
ii) Small Nursery (1 ha.)
iv) vegetable seed production
a) Public Sector (SAUs & State Depts. MSSC.)
b) Private Sector i) Seed
ii) Seedling
v) Seed infrastructure
a) Public sector
b) Private sector
Establishment Of New Gardens
i) Fruits (Perennials)
a) EGS Programmes
i)Pomegranate
ii)Lime
b) Other perennials (grapes)
ii) Fruits (Non-Perennials) (bananas )
iii) Flowers
a) Cut Flowers
a. Small Scale Farmers
b. Other Farmers
b) Bulbous Flowers
a. Small Scale Farmers
b. Other Farmers
c) Loose Flowers
a. Small Scale Farmers
b. Other Farmers
iv) Spice & Aromatic Plants
a) Spice Plants
90
b) Aromatic Plants
Rejuvenation / Productivity Enhancement
Creation of water resources
Community tanks or farm ponds or farm water reservoirs with use of plastics – 100% assistance
Agriculture Protected cultivation 1.A. Green House (Hitch)
a. Small & Marginal Farmers
b. Other Farmers
1.B. Green House (Normal)
a. Small & Marginal Farmers
b. Other Farmers
2. Mulching
3. Shade Net
4. Plastic Tunnel
Precision farming development and extension through PFDCs
a) GIS remote Sensing
b) Other programmes for disaster forecast & mapping
Promotion of INM / IPM i.a. Sanitary and Phytosanitory Laboratory (Public Sector)
i.b. Strengthening Phytosanitory Certification authorities
i.c. subsidy on fee of pesticides residue sample testing
ii. Promotion of IPM
iii. Disease forecasting units (PSUs)
iv. Boi-control labs
a) Public Sector
b) Private Sector
v. Plant Health clinics
a) Public Sector
b) Private Sector
vi. Leaf / Tissue analysis labs. (PSUs)
a) Public Sector
b) Private Sector
Organic Farming 1. Adoption of organic farming
2. Vermi compost units
3. Certification
HRD including horticulture a) Farmers training
91
institute i) One day
ii) Three days
iii) Five days
b) Farmers Study tour
c) Officers training
i) One day
ii) Three days
iii) Five days
Agriculture HRD including horticulture institute
iv) Two weeks
v) One month
vi) Three months
d. Training of gardeners, supervisors & entrepreneurs
i. Training of gardeners
ii. Training of Supervisors
iii. Training of entrepreneurs
e. Foreign Study tour
f. HRD Training in AEZ
g. HRD Training for export
Bee Keeping
Pollination support through bookkeeping
Technology Dissemination through demonstration / front line demonstration
1. Font line Demonstration
a) Public sector (Dept. / SAU / Mktg. Board / KVK)
2. General Technology Demonstration on farmers field
3. Good Agricultural Practices (GAP) demonstrations on Farms
Post Harvest Management 1. Pack houses
2. A. Cold storage units (General)
B. Cold storage (flower)
3. Sorting Grading (flower)
4. Pre cooling (flower)
5. Refer Vans / containers
6. Market Intelligence
92
7. Buy back intervention (Contract Farming)
7.a. Contract farming workshop
8. Est. of Marketing Infrastructure for horticultural produce in Govt / Private / Cooperative sector
a) Wholesale markets i. General areas
b) Rural markets / Apni Mandis / direct markets
c) Functional infrastructure for collection, grading etc.
d) Extension, quality awareness & market led extension
Innovative Projects Including Ongoing Programme
a) Self employment and Value addition on field asst. to processor or for common facilities, Self employment in hort. (cashew processing, aromatic distillation, spices grinding units, backyard nutritional gardens, etc.)
b) Activities for promotional measures
c) Asst. for participation in International exhibition
d) Meeting challenges of WTO
e) Strengthening of Hort. Nurseries (Exp. on Govt. Nursery)
f) Udyan Pandit Puraskar
g) Horticulture exhibitions / shows
h) IT Technology dissemination
Agriculture Innovative Projects Including Ongoing Programme
i) Technology Dissemination
j) Market facilitation centre
k) Import of Planting material for grapes
l) Shed net House
Mission Management
i) State & Districts Mission Structure including additional manpower & project preparation cost
ii) Support to cooperatives for infrastructural requirement
iii) Institutional strengthening, hire / purchase of vehicles, hardware / software
iv) Technical Support Group (TSG)
v) Collaboration with international agencies like FAO, World bank etc.
2 Fisheries 1) Establishment of fish farm unit
10 days training for members of fisheries co-operatives @ Rs.600 per trainee
2) Fish farming in impounded waters
93
3) Assistance for fishery requisites
Supply of fish seed, feed and equipment on 50 % subsidy, max. Limit Rs.6000 per unit
4) Fish farmers development agency
5) Development of fisheries co-operative societies 6)Training for fishermen youths
Construction of fish tank @ 20 % subsidy max. Limit Rs.40, 000. for SC/ST person the amount of subsidy is
7)Fisheries development scheme
25 % /Rs. 50,000 per unit
Fish seed production and supply
Fish seed stocking and fish production
Nylon Twins
Boats
Construction of Ponds, Input Supply & Training
Share Capital and managerial subsidy
3 Sericulture Mulberry plantation and cocoon production
Demonstration on rearing of silk worms and production of cocoons.
Selection of farmers Development of sericulture industry
Supply of mulberry seed 1. Production of silk cocoon
Supply of Silkworm DFLs 2. Mulberry plantation
Purchase of cocoon 3. Input support
Guidance to farmers - Training and exposure visits
4 Animal Husbandry
Foot & Mouth Disease 50% subsidy for preventive vaccination for BPL families.
Feed assistance for small marginal farmers / Agril laborers
50% subsidy on feeds for farmers and 67% for landless families who are rearing improved / crossbred heifers.
Assistance for Life saving drugs to agencies
Assistance @ Rs 12 / animal (sheep & goat) for deworming.
Infertility Diagnosis camps Assistance up to Rs 5000/ camp for diagnosis, free check up and medicines.
Promotion of fodder cultivation Assistance up to Rs 400 /farmer for 0.10 Ha plot
94
4.9. Constraint Analysis:
The productivity/yield of major crops is an important factor determining the
agricultural development of a region. The yield of major crops in Ahmednagar district for
the year 2006-07 which was a normal year has been analysed in comparison with the
national and state level yields. The gap has been worked out as shortage compared to
the national/state average. It can be seen from Table 4.28 that the district yields
however of all the major crops except sugarcane are lower than the state and national
average.. There are many factors which determine the yield level of crops - one of them
is adoption gaps of the technology, which has been discussed in detailed in the
following section.
Table 4.28: Production and Productivity of Important Crops in Ahmednagar and Maharashtra 2006-07
Crops
Production ('00 tones)
District share (% to State
production)
Productivity (Kg/ha) Yield Gap (kg/ha) to national average A’nagar
Maha. A’nagar
Maha.
India
Rice 66 25697 0.26 786 1680 2131 -1345
Wheat 2481 18710 13.26 1682 1520 2708 -1026
Jowar 2741 37817 7.25 519 819 844 -325
Bajra 1489 10586 14.07 611 729 886 -275
Total Cereals 7461 105886 7.05 763 1101 1815 -1052
Gram 657 9251 7.10 683 707 845 -162
Tur 66 8146 0.81 507 726 650 -143
Total Pulses 895 23048 3.88 597 602 612 -15
Total Foodgrains 8357 128933 6.48 741 959 1756 -1015
Groundnut 179 4038 4.43 1243 898 866 377
Safflower 93 1686 5.52 546 606 631 -85
Sunflower 72 1978 3.64 490 549 567 -77
Total Oilseed 1002 37251 2.69 1002 965 916 86
Sugarcane 61378 662774 9.26 66 78 69 -3 Notes: Production of cotton in’00 bales of 170 kg each and Productivity of Sugarcane in tones per hectare Source: Office of the Commissionerate of Agriculture, Pune.
95
Analysis of Gaps in Technology adoption by Farmers.
Table 4.29: Crop Yield Gap Analysis- FLD and Actual Yield Gap
S.No Name of Crops Average yield (q/ha) Yield gap (with respect to
FLD ) District State Frontline
Demonstration
1 Bajra 6.21 6.8 14.5 57.2
2 Mung 3.78 3.3 6.23 39.3
3 Tur 4.48 6.25 12.4 63.9
4 Udid 3.78 2.5 7.28 48.1
5 Paddy 8.4 14.5 20.54 59.1
6 soyabin 11.74 9.14 25.64 54.2
7 Jawar Rabi 3.5 5.5 15.32 77.2
8 Wheat 13.98 13.45 35.13 60.2
9 Gram 5.51 5.6 20.65 73.3
10 sunflower 6.62 7 12.36 46.4
11 sugarcane 60MT 50MT 100MT 40.0
12 cotton 2.18 3 8.25 73.6
Table No .27 presents the district, state and frontline demonstration average
crop yiled averages and existing yield gaps in respect of major crops of Ahmednagar
district. It is seen from the data that the bajra, tur, paddy jowar, gram and cotton yield is
lower as compared to state averages. Mung, udid and soyabean in kharif season crops
average yield averages in more than states averages and lower than frontline
deonstration averages. Wheat and sugarcane is also having more yield averages than
state.
Pearl Millet (Bajra):
Bajra is an important kharif season food grain crop grown in Nagar, Parner,
Shrigonda, Karjat, Jamkhed, Shevgaon and Sangamner blocks of Ahmednagar district.
The Sangamner block is having highest area under Bajra cultivation. The total area
under Bajra cultivation in the district is about 266100 Ha. and productivity is only 630
Kgs. per Ha. The reasons for low productivity and gaps in technology adoption by
farmers are analyzed for Bajra which are enlistedbelow:-
S.N. Gaps in Technology adoption by Farmers (Pearl Millet (Bajra))
1 Sowing of Bajra crop on light to very light soils
2 Land preparation without considering natural slope
3 Negligence towards In-situ-soil moisture conservation practices
96
4 Improper seed bed preparation leading to low germination
5 Non-adoption of recommended plant spacing as per soil types
6 No application of organic manures
7 No application of basal fertilizers
8 No seed inoculation with biofertilizers
9 Delay in sowing due to arrival of rains
10 No protective irrigation
Sorghum (Rabi Jowar):
Jowar is one of the important food grain crops grown in rabi season mainly
available residual soil moisture. It is also a major source of fodder for cattle in scarcity
areas of Ahmednagar district. The crop suffers for moisture in its grain filling and
maturity stage due to depletion of available soil moisture. The area under rabbi Jowar
in the district is about 438900 Ha. The per hectare productivity is only 550 Kilograms
that is low as compared to the state productivity. The following production reasons and
gaps in technology adoption by farmers were identified.
Wheat:
It is a major rabbi season food grain crop taken on larger areas particularly in all
command areas of the district. It is also taken in areas where well irrigation facilities are
available. The area under wheat cultivation in the district is about 109753 Ha. The per
S.N. Gaps in Technology adoption by Farmers (Sorgum)
1 Sowing of Jowar on light type of soils
2 Negligence towards in-situ-soil moisture conservation activities
3 No adoption of recommended sowing spacing and plant population
4 No seed treatment and seed inoculation
5 No seed inoculation with biofertilizers
6 No availability of improved variety & pure seed,
7 No application of organic manures
8 No application basal fertilizers doses at sowing
9 No of protective irrigation
10 No timely interculturing operations
11 Negligence towards timely plant protection
97
productivity of wheat in the district is about 1400 Kgs. The demand for wheat as a food
grain crop is increasing with increasing urbanization in .The demand is expected to rise
in the future. Hence it is necessary to increase the area and production of wheat. There
is scope to increase production & also productivity of wheat from present level of 1400
Kgs to 1900 Kgs. Recently evolved wheat varieties and production technologies will
help to harvest potential yields of this crop. The main gaps in technology adoption of
wheat were identified as below:
S.No. Identified Gaps in Technology adoption by Farmers (Wheat)
1 Less application of recently released of improved variety seed.
2 Sowing of wheat on light to light medium soils
3 No adoption of integrated nutrient management
4 No water management as per critical growth stages
5 Lack of weed management
Paddy:
Paddy is cultivated in Akole block of Ahmednagar district. The total area under
paddy cultivation is 8000 Ha. The per hectare productivity of paddy is about 850 Kg The
major gaps in technology adoption for wheat crop identified enlisted below.
S.No. Identified Gaps in Technology adoption by Farmers (Paddy)
1 Less adoption of improved & high yielding hybrid varieties
2 No adoption of four point planting technology in paddy
3 No application of biofertilizers for paddy.
4 Imbalance fertilizer application & low application organic manure
5 Low application of nitrogenous fertilizers
6 Low yield due to leaching of fertilizers from paddy field
7 Low plant protection measures for paddy
8 Low yield due to high plant population
Mung Bean (Green Gram, Mung):
Mung is a short duration pulse crop sown in kharif season. It is mainly taken as a
rainfed crop in major parts of Nagar, Parner, Pathardi, Karjat, Jamkhed and Sangamner
98
blocks of Ahmednagar district. It is also taken as intercrop in other food grain crops.
The sowing of this crop is depending on timely arrival of monsoon. The rainfall situation
affects the sowing of crop and area under cultivation. The area under Mung Bean is
about 22900 Ha. The productivity of Mung Bean is only 380 Kgs per hectare. Gaps in
technology adoption identified are listed below:
S.No. Identified Gaps in Technology adoption by Farmers (Mung)
1 No adoption of in-situ-soil moisture conservation measures
2 No availability of good quality improved variety seed
3 No adoption of recommended seed rate
4 No seed treatment with fungicides and seed inoculation with biofertilizers
5 No of interculturing operations followed
6 No protective irrigation facilities during water stress situation.
7 No timely plant protection measures followed.
Pigeon Pea (Tur):
Tur is cultivated as a rainfed crop in kharif season. It is a major kharif season
pulse crop. The area under Pigeon Pea in Ahmednagar district is of 19600 hectares.
The present productivity of Pigeon Pea crop is about 480 Kgs. The reasons for low
productivity are listed below
S.No. Identified Gaps in Technology adoption by Farmers (Tur)
1 No adoption of in-situ-soil moisture conservation measures
2 Unavailability of good quality improved variety seed
3 No of seed treatment and seed inoculation with biofertilizers followed
4 No application of organic manures and basal chemical fertilizers
5 No protective irrigation facilities during dry spells.
6 No adoption of integrated pest management
7 No adoption of recommended intercropping.
8 No adoption of recommended plant populations and spacing as per
particular variety.
9 Non Adoption of timely interculturing operations like hoeing and weeding.
99
Chick pea (Gram):
It is a major source of pulse crop cultivated in rabbi season. The area under
gram cultivation in the district is 101200 Ha. The productivity is 700 Kgs per hectare.
Gram contributes about 43% of the total pulse requirement. Per capita consumption of
pulse is only 31 Gms whereas it is recommended about 71 Gms. As per 2001 census,
total population of Ahmednagar district was 4088077. Considering 2% rate of
population growth, the population of district is expected to increase about 5502622 in
the year 2016. Considering the present consumption, there is a short fall of 25 to 30
Gms. Hence, there is an urgent need to raise the productivity of gram. The rainfall plays
major role in production and productivity.
S.No. Identified Gaps in Technology adoption by Farmers (Gram)
1 Non adoption of soil selection and recommended land preparation
2 Poor germination due traditional methods of sowing
3 Late sowing of crop
4 No adoption of recommended plant population and spacing
5 No seed treatment with fungicides
6 No seed inoculation with biofertilizers
7 Application of basal chemical fertilizer no followed
8 No protective irrigation is given
9 No availability of good quality improved variety seed
10 Integrated pest management practices not followed.
Soyabean:
During recent years the area under Soyabean cultivation is increasing because
of good marketing rates, effective dissemination of Soyabean production technology by
extension functionaries and also due to village seed production programme undertaken
by department as a part of MAHAPIC. It is being cultivated as rotational crop after
harvest of sugarcane. Soyabean covers maximum area in kharif season. The area
under Soyabean in Ahmednagar district is 56000 Ha and productivity is 1132 Kgs/Ha.
Indian Tobacco Company (ITC), through its E-choupal operating in Shrirampur and
Newasa blocks the district concentrating on certain potential villages for technology
dissemination and marketing. It will be helpful for farmers in many ways. The following
100
production constraints and gaps in technology adoption by Soyabean cultivators were
identified.
S.No. Identified Gaps in Technology adoption by Farmers (Soybean)
1 Sowing of Soyabean on light soils
2 Soyabean is taken as rainfed crop
3 No availability of good quality certified seed
4 No application of organic manures and basal fertilizers
5 No timely sowing, seed rate and plant population/spacing
6 No seed treatment with fungicide
7 No seed inoculation with R. japonicum
8 Lack of protective irrigation during critical growth stages
9 Lack of timely interculturing
10 Integrated pest management is not followed.
Groundnut:
It is a more important oil seed crop grown in kharif and summer season. The
total area under groundnut cultivation in Ahmednagar district is 11600 Ha.The
groundnut is cultivated over 6400 Ha in kharif season and per hectare productivity is
only 1025 Kgs. The area under summer groundnut is more than kharif season. Summer
groundnut is being cultivated over 9500 Ha area particularly on light to medium type
soils of Kukadi and some parts of Mula command areas where supplementary well
irrigation available. The productivity of summer groundnut is 1229 Kgs /Ha. The present
production and productivity can be improved by dissemination of recommended
production technology like poly- mulch and micro- irrigation. The major gaps in
technology adoption in groundnut are listed below:
S.No. Identified Gaps in Technology adoption by Farmers (Groundnut).
1 Unavailability of improved high yielding variety pure seed
2 Recommended layout for sowing not adopted
3 Integrated nutrient management practices are not followed.
4 Traditional method of sowing, improper seed rate ,spacing and plant
101
population
5 No seed treatment with fungicides
6 No seed inoculation with biofertilizers
7 Delay in sowing that leads to late harvest in monsoon and causes losses
due to sprouting
8 No application of soil amendments like gypsum
9 No application of micro nutrients as per soil testing
10 Timely interculturing and weed management not followed.
11 Water management during critical growth stages is not followed that causes
reduction in yield
Sunflower:
Sunflower is cultivated in kharif season. The area under sunflower in
Ahmednagar district is 16800 Ha and productivity is about 430 Kgs. The productivity in
kharif season is low as compared to Rabi season. The area under sunflower in kharif
season is 11900 and in Rabi season it is 4900 Ha.The major gaps in technology
adoption identified are given below:
S.No. Identified Gaps in Technology adoption by Farmers (Sunflower)
1 Sowing of sunflower on light soils
2 Non application of recommended quantity of organic matter
3 No application of basal chemical fertilizer doses and micronutrients
4 Severe infestation of pest like hairy catter pillar
5 Integrated pest management practices not followed.
6 Poor water management & no protective irrigation at critical growth stages
7 Hand pollination is not followed
Safflower:
It is a Rabi season oilseed crop. Area under safflower in Ahmednagar district is
10600 Ha. Due to increased irrigation facilities in the district, area under safflower is
decreasing and is being taken by other cash crops. The average per hectare
102
productivity of safflower is 400 Kgs. The major production constraints identified for low
productivity of safflower crop are given below:
S.No. Identified Gaps in Technology adoption by Farmers (Safflower).
1 No availability of improved variety pure seed.
2 No adoption of Insitu soil moisture conservation measures
3 Low application of organic matter
4 No fertilizer management followed
5 Very poor timely plant protection
6 No thinning is done to maintain plant population
7 No interculturing in safflower is practiced.
8 Low interculturing practices followed on time
9 Integrated pest management practices not followed.
Sesamum:
It is a kharif season oil seed crop. Area under Sesamum is 900 Ha.The
productivity of Sesamum is very low i.e. 260 Kgs per hectare. The gaps in technology
adoption at farmers level are identified and listed below-
S.No. Identified Gaps in Technology adoption by Farmers (Sesamum)
1 Negligence towards proper land preparation
2 No adoption of improved variety seed
3 No application of fertilizers as per recommendations
4 No seed treatment with fungicides
5 Infestation by phyllody
6 Lack of protective irrigation
Niger:
It is a secondary oil seed crop. It is mainly used for culinary purposes. The area
under Niger in Ahmednagar district is 2600 Ha with productivity of about 280 Kgs per
hectare. The major gaps in technology adoption for Niger crop is given below-
103
S.No. Identified Gaps in Technology adoption by Farmers (Niger)
1 Non- availability of improved variety pure seed
2 Traditional method of sowing without any plant spacing, seed rate and plant
population
3 No availability of improved cultivation practices.
4 No application of chemical fertilizers
5 No protective irrigation facilities are available
6 Plant protection practices are not followed.
Cotton:
Cotton is cultivated over 38400 Ha areas in kharif season, particularly in rainfed
areas. It is a major source of cash crop for small and marginal farmers in rainfed areas.
The success of cotton cultivation depends on vagaries of nature .Timely arrival of
monsoon rains plays major role in its production and productivity. Productivity of cotton
in Ahmednagar district is 216 Kgs per hectare. The constraints limiting production and
productivity of cotton in the district are identified and listed below
S.No. Identified Gaps in Technology adoption by Farmers (Cotton)
1 Maximum area under cotton cultivation is in kharif season depends upon
monsoon arrivals
2 Sowing depends on sufficient rainfall, many times swing is late
3 Sowing cotton on light to medium light soils limiting soil moisture
4 Low of adoption of improved cultivation practices
5 No Insitu moisture conservation practices
6 Less plant population per hectare
7 Protective irrigation facilities are not available
8 No application of organic manures
9 No application of basal fertilizers as per soil test
10 No adoption of integrated pest management
11 No application of micro nutrients
104
12 Sowing of Bt. Cotton on light soils
13 No seed treatment with biofertilizers & biopesticides
14 No application of integrated cotton cultivation practices
15 Lack of awareness about clean picking and storage
16 Lack of grading and admixture of dirt,dust,leaves etc in cotton during storage
and marketing
17 No group approach in marketing
18 No intercropping in cotton
19 No crop rotations followed after cotton
20 No awareness about organic cultivated cotton practices
21 No availability of extra long staple varieties.
Sugarcane:
Sugarcane is an important cash crop in Bhandardara, Mula and Kukadi
command areas of Ahmednagar district. It is also cultivated on large area in Jayakwadi
back water. Ahmednagar is a major sugarcane cultivating district in the state .There
are 18 sugarcane factories with daily crushing capacity of 48900 MT. Due to
satisfactory rains received during last two years the area under sugarcane cultivation
has increased. During the year 2006-2007, area under it was about 113770 Ha
including Suru, Pre-seasonal, Adsali and Ratoon.During last few years the productivity
of sugarcane is decreasing fast. The present productivity is around 67 tones. The
production constraints identified in planted sugarcane and Ratoon crop are listed below.
S.No. Identified Gaps in Technology adoption by Farmers (Sugarcane)
1 Selection not suitable for sugarcane plantation
2 No recommended land preparation
3 Indiscriminate application of irrigation water
4 No of proper crop rotations
5 Non application of required quantity of organic manures to soil for sugarcane
cultivation
6 No application of green manuring
7 Untimely sugarcane planting other than recommended seasons
105
8 Lack of availability of improved variety good planting material
9 Use of over aged planting material
10 Lack of sett treatment with fungicides and biofertilizers
11 No fertilizer management , indiscriminate ,untimely faulty method of
application
12 No paired row planting method
13 Traditional method of planting ,closed planting ,more plant population
14 No timely weed management
15 No water drainage in sugarcane fields.
16 Recommended earthing up operations not followed
17 No adoption of intercrops like potato,onion,cabbage etc
S.No. Identified Gaps in Technology adoption by Farmers (Sugarcane Ratoon)
1 Improper cutting of crop
2 No selection of variety suitable for Ratoon
3 No gap filling in planted sugarcane crop
4 No fertilizer management followed for ratoon crop
3
No timely harvesting of crop i.e. before February.
Crop harvested after February not suitable for ratooning
4 No planting management of planting sugarcane crop
suitable for ratooning
5 No of proper water drainage in sugarcane fields
6 No timely weed management in ratoon crop
7 Late harvesting of Ratoon crop
106
Major issues identified regarding Soil Health and Nutrition Management are
enlisted below:-
S.N. Identified Gaps in Technology Adoption
1 Farmers are not convinced about importance of soil and water testing
2 No awareness about soil fertility index
3 No technical knowledge about taking soil and water samples
4 No technical knowledge for understanding of analyses report.
5 Decreasing carbon content of cultivable land
6 Deteriorations of soil physical properties
7 Decreasing fertility of soil under cultivation
8 Accumulation of hazardous elements in the soil
9 Reduction of soil microflora in cultivable lands
10 Poor drainage of soils due to obstructions to drainage
11 Deterioration of well water quality for crop irrigation
107
4.10. Recommended Interventions:
The proposed extension strategies are designed to bring overall 4% annual
growth rate of agricultural sector in the district.. The following major extension
strategies are proposed for developing agriculture, livestock and dairy, fisheries and
sericulture in the district.
CEREALS:
1. In situ moisture Conservation
2. Adopting proper spacing,plant population as per soil type
3. Intercroping of pulses with cereal
4. Seed treatment with Azotobactor,PSB,Trichoderma
5. Increasing fertilizer use efficiency by usin fertidrill
6. Conserving soil & moisture by using Compartment bunding & farm pond
7. FFS for INM & IPM
8. Seed village scheme for popularizing research variety
9. Increasing awareness reg crop insurance scheme
10. Organizing piolot project for integrated crop management
11. Developing storage structure at farmers field for protection from rats & pest
12. Training farmer for drying,grading & marketing
PULSES:
1. Increasing area of pulses in medium & heavy soil
2. In situ moisture conservation
3. Maintaining proper seed rate by adopting dibbling method of sowing or by using
ferti seed drill
4. Seed treatment by Rhizobia, Trichoderma, PSB
5. Developing area by compartment bunding & farm pond
6. FFS for Integrated Pest Management & Integrated Crop Management
7. Promoting Sprinkler irrigation for efficient use of water at critical growth stage
8. Seed village program for promotion of improved variety
9. Increasing awareness reg crop insurance scheme
10. Organizing pilot project for integrated crop management
11. Developing storage structure at farmers field for protection from rats & pest
12. Training farmer for drying, grading & marketing
108
13. Training farmers for grain storage & taking advantage of pledge facility
14. Establishing mini dal mill for processing
OILSEED
1. Popularizing BBF method of sowing
2. Saving seed cost by adopting dibbling method of sowing
3. Seed treatment by Rhizobia, Trichoderma, PSB
4. INM by using micronutrient like zinc, Sulpher,molybdenum,gypsum etc
5. Promoting Sprinkler for efficient use of water at critical growth stage
6. FFS for INM & IPM
7. Promoting contract farming with mill owners
8. Promoting Seed village scheme for increasing seed availability, area
expansion,& reducing cost of seed
9. Increasing area of soyabean in kharif, sunflower in rabbi,& g. nut in summer
COTTON
1. Promoting area expansion in suitable soil type
2. Training farmer for integrated crop management
3. Farm Pond program for increasing protective irrigation
4. Increasing area under drip irrigation
5. FFS for INM,IPM & organic practices
6. Pilot project for demonstrating Integrated Crop Management
7. Recycling cotton Plant residue to increase soil health
8. Increasing use of micronutrient for yield & quality improvement
9. Clean cotton campaign for increasing Quality & rate of produce
10. Adopting one village one variety program
11. Increasing awareness among farmer for quality consciousness
12. Promoting value addition from cotton to cloth by developing cotton processing
cluster
13. Encouraging contract farming.
SUGARCANE
1. Increasing use of improved variety
2. Encouraging farmer for developing there own seed material
3. Distribution of tissue culture seedling for developing own mother stalk
109
4. For this purpose establishment of tissue culture lab
5. Promoting one bud & strip method of plantation for reducing cost on seed
6. Promoting farmer for adopting drip & sprinkler irrigation for increasing water use
efficiency
7. Training farmer for adopting practices like in situ trash composting & green
mannuring
8. Organizing FFS for adoption of Integrated Crop management practices
9. Training farmer for adopting soil & water testing for efficient fertilizer use
10. Capacity building of sugar factories for planing of planting as per crushing
schedule
11. Demonstrating intercropping for increasing net income.
12. Organizing FFS for ratoon management.
ONION
1. Training farmer for nursery management
2. Encouraging farmer for adopting sprinkler irrigation
3. Demonstrating broad bed plantation insted of ridged & furrows
4. Training farmer for post harvest management, grading & marketing
5. Promoting onion storage structure at every onion growing farmer
6. Onion seed production program
HORTICULTURE
1. Establishment & improvement of nurseries for easy availability of disease free
improved variety plants
2. Developing clusters of pomegranate, lemon, guava, grape, banana & sitaphal
3. To reduce cost & improving quality adopting organic farming practice
4. Training farmer for Post Harvest Management,Processing,Marketing
5. Developing basic infrastructure like cold storage, processing,mareketing in
cluster area
6. Bringing 100 % horticulture area under drip irrigation
7. Organizing FFS for INM & IPM
8. Promoting farm pond for good bahar management, protective irrigation &
assured yield
9. Promoting contract farming for export & processing
110
10. Establishing growers organization & there capacity building for marketing,
processing & export
11. Promoting green house & net house cultivation of flowers & vegetables
12. Preparing Bankable projects & perusing bankers for financing horticulture
projects
DRYLAND FAMING
1. Developing watershed in DPAP area by proper planning & by taking advantage
of various central programme like Haryali, NREGA etc
2. Encouraging Dryland Horticulture
3. Crash programme for Farm Pond
4. Organizing training program for youths & women group to develop service sector
5. Promoting organic farming for reducing cost of cultivation in dryland area
6. Promoting fodder cultivation by using available irrigation for developing animal
husbandry
FARMERS ORGANIZATION
1. Building farmers interest group
2. Converting established group in to commodity group
3. Providing training for e awareness & providing e connectivity to groups & making
available the information
4. Establishing the federation of the group
5. Capacity building of group for post harvest management & marketing
6. Capacity building of group for technology dissemination & participation in
extension program
SOIL HEALTH IMPROVEMENT
1. Establishing well equipped soil & water testing laboratory
2. Establishment of FIAC for advising soil test based fertilizer management
3. Promoting organic practices like composting ,green manuring, vermicompost,
use of bio fertilizer
4. Organizing training for creating soil health awareness among farmers
5. To improve soil health in command area promoting drip irrigation & training
farmer for water use efficiency
111
6. Creating awareness among farmers for use of micronutrient & its impact on yield
& quality.
ESTABLISHMENT OF SEED INFRASTRUCTURE
1. Training farmer for seed prduction
2. Adopting seed village programme
3. Establishing block wise seed grower farmers organization
4. Creating seed saling & distribution ascility with help of these societies & KVM
5. Giving aid to the seed grower organization for the establishment of seed
processing unit
6. Training farmer for high value horticulture crop like onion & vegetable & making
service contract with seed production companies for seed production
7. Establishing vegetable nurseries under protected condition for quality & disease
free planting material
8. Increasing production of breeder seed at Agri.University
ORGANIC FARMING
1. Promoting organic farming in vegetables & horticulture
2. Giving subsidy for composting, use of bio fertilizer, vermi composting & bio pesticide
3. Organizing organic growers group & encouraging them for organic certification
4. Developing ICS system for reducing cost of certification
5. Training farmers for developing organic inputs on the farm only
6. Branding Of organic produce & promoting organic sale counter
7. Developing contract farming system for marketing of organic practice
STRENGTHENING WOMEN IN AGRICULTURE
1. Organizing farm women group for there empowerement
2. Skill improvement of farm women by training & FFS
3. Encouraging farm women for organic input production like compost, vermi
compost, bio fertilizer, bio pesticide etc
4. Organizing exposure visit of farm women
5. Training farm women in post harvest management & value addition
6. Establishment of farm women cluster in value addition
7. Development & training for women friendly farm machinary
112
8. Training farm women in Animal husbandry, Dairy & clean milk production
9. Developing & establishment of market for products of women group
MARKETING
1. Training farmers group & KVM for marketing & value addition of Agri produce
2. Creating growers organization of vegetable, fruits & flowers.Trainig & encourage
them for marketing, export & value addition.
3. Creating godown infrastructure at every village for cleaning, grading & storage
4. Using this godown reciept for pledge loans
5. Seeking approvals of these godowns from banks & commodity markets
6. Capacity building of co op socieites,KVM & growers organization in market
intelliginace by providing them e connectivity & market information
7. Promoting farmers organization for contract farming
QUALITY CONTROL OF AGRI INPUTS
1. Training farmers for identification of quality input
2. Training agro service centers for maintaining quality of inputs & consultancy
3. Developing system for quality certification of agro sercice centers
4. Training agro service centers for technology consultancy based input marketing
5. Developing & monitoring system for organic & bio input quality
6. Developing seed testing laboratory at every district
7. Frequent sampling & testing of inputs & strict vigilance in market for controlling
spurious inputs
AGRICULTURE CREDIT
1. Linking Agri credit with adoption of technology & market
2. Popularizing concept of Kisan Credit Card
3. Popularizing Agri Insurance scheme
4. Providing credit card to women SHG members, encouraging them for saving
5. Facilitating for advance against godown reciept
6. Canvassing & mobilizing banks to develop schemes for restructuring of bad agri
loans
113
MASS MEDIA SUPPORT
1. Broadcasting success stoies & technology using FM chanel,Doordarshan
2. Local Print media for disseminating technology & success stories & Govt
schemes
3. Using audio visual aid,CD PPT electronic material for improving training
4. PPP for technology dissemination, marketing, contract farming
5. Providing e connectivity to KVM for information & tech updation
6. Using mobiles for dissemination of market information,
STRENGTHENING EXISTING EXTENSION SYSTEM
1. Establishment and strengthening of Agri polyclincs in all blocks of Ahmednagar
district.
2. Establishing infrastructural facilities i.e. audio-visual –aids, training hall, dormitory for
farmers at all existing and proposed Agri-polyclinics in Ahmednagar District
3. Selection of Resource Personnel from the existing Extension staff of Ahmednagar
District for utilizing their knowledge and skill as subject Matter Specialists to impart
training during the various technical trainings organized at Agri- polyclinics.
4. Identification of farmers specialized in particular crop production with communication
skill and utilizing their experiences in extension activities.
5. Identification of special model Agricultural farms in Ahmednagar district and
organizing training , field visits and demonstrations at such farms
6. Preparing FAQs, literature for different crops to be distributed to farmers for fast
dissemination of technology.
7. Preparing slides/VCD of different crops for imparting effective trainings
8. Organizing frequent meetings of Krishi Vigyan Mandal Sanghtak for disseminating
technical messages and schemes.
9. Preparing health cards for different crops, indicating crop physiology, critical stages
and different management required.
10. Preparing inventory of service providers from Govt. offices, Research scientists,
market etc.
11. Preparing websites of Ahmednagar District and uploading all technical data
supporting services related to information.
12. Identifying successful farming systems of the area for its large scale replications
114
13. Identifying locally validated technologies for good yields and for taking care of
local problems.
14. Identifying crop rotations models of the in good and scarcity years of rainfall
15. Identifying venturous farmers who succeed in crop rotations and farming systems
on sustainable in the area for its replications
16. Working out economics of different farming systems and cropping systems for its
dissemination to farmers.
Watershed models, based on Hivare Bazar.
The village Hivare Bazar in Ahmednagar District is recognized as a role model village in
watershed development . The expertise of the department in working in the area of
developing such watershed in combating draught situation can very well used in other
areas.
1. Preparing good watershed plan base on the data from Remote Sensing Agency.
2. Preparing Perspective plan of watershed in the district by dividing its into small
unit of the size 500 ha.
3. Focusing water conservation on hill slopes by deep CCT, Plantation & cement
nala bunding.
4. Main feature of the future watershed development work will be land grading &
shaping compartment bunding & Farm pond on individuals farmers land which
will facilitate in situ moisture conservation.
5. Group building in watershed by farming watershed users association & there
capacity building for future maintenance of watershed.
6. Implementing suitable crop plan forming system using water saving devices like
drip, sprinkler for maximum utilization & productivity of conserved water.
7. In the cropping pattern importance will be give in for dry land horticulture,
vegetable cultivation. & Animal Husbandry .
8. Organic practice will be gives the main thrust in cropping pattern for soil health
improvement and maintenance.
9. Utilization of local leaders wisdom in developing watershed, for good
participation of the village.
Command Area Development :
1. Formation and strengthening of Water Users Association.
115
2. Educating farmers and Association for utilization and payment of irrigation
charges on volumetric basis.
3. Reducing dominance of sugarcane base cropping system by demonstrating
alternative beneficial and sustainable cropping system.
4. Encouraging farmer to develop Animal Husbandry to bring diversification by
bringing some under fodder.
5. Promoting model of Farm Pond for storage of canal water during rotation and its
utilization by sprinkler and drip for maximum water productivity.
6. Developing model irrigation schedule by computer programming for efficient
delivery & rotation of canal water
7. Preparing three year cropping plan of area under water user associable &
educating farmer to adopt that plan
8. Introducing horticulture, vegetable, floriculture in the cropping system & plan
9. Demonstrating farmers regular utilization of water measuring devices
10. Educating farmers regarding water requirement & critical growth stages of the
crop to utilize water judiciously at measured quantity & at right time
11. Educating farmers regarding ill effects of excess water use on soil & ground
water for this introducing soil & water health scheme for every farmer
12. Implementation of Farmer pond scheme command & using it as storage &
drainage treatment
13. Implementing community based drainage improvement scheme by laying drains
& applying soil amendments
Precision Farming Campaign
1. Demonstrating the farmer regarding area to be brought under different crop
considering the water availability to get maximum benefits
2. Marketing sprinkler & drip irrigation system mandatory for maximum water
productivity
3. Educating farmers regarding proper maintenance of plant population considering
soil type, crop it’s variety, season for obtaining maximum yield per unit of area.
4. Adopting INM practice by placing fertilizer in the active root zone at right
quantity, right place in the right form for maximum fertilizer use efficiency
5. Educating farmers to keep economics of farming to know cost of cultivation &
cost benefit ratio which will improve the decision making capability of the farmers
116
6. IPM practices should follow for better control of pest & diseases
7. Educating farmers to prepare crop plan well in advance of cropping season for
timely procurement of inputs
8. Adopting suitable crop rotation so as to use recourses like land, labour, water &
capital in judicious manner to give maximum net returns, continuous employment
with out compromising soil & water health
9. Educating farmer to draw layout plan of the cropping, sowing & preparing
schedule of operation for easy execution.
10. Educating farmer to adopt Precision Farming Technique for good crop yield by
promoting suitable condition to each plant in the field
117
Major issues identified regarding Soil Health and Nutrition Management are enlisted below:-
S.N. Identified Gaps in Technology Adoption
1 Farmers are not convinced about importance of soil and water testing
2 No awareness about soil fertility index
3 No technical knowledge about taking soil and water samples
4 No technical knowledge for understanding of analyses report.
5 Decreasing carbon content of cultivable land
6 Deteriorations of soil physical properties
7 Decreasing fertility of soil under cultivation
8 Accumulation of hazardous elements in the soil
9 Reduction of soil microflora in cultivable lands
10 Poor drainage of soils due to obstructions to drainage
11 Deterioration of well water quality for crop irrigation
4.10 Recommended Interventions.
The proposed extension strategies are designed to bring overall 4% annual growth
rate of agricultural sector in the district.. The following major extension strategies are
proposed for developing agriculture, livestock and dairy, fisheries and sericulture in
the district.
Cereals:
1. In situ moisture Conservation
2. Adopting proper spacing,plant population as per soil type
3. Intercroping of pulses with cereal
4. Seed treatment with Azotobactor,PSB,Trichoderma
5. Increasing fertilizer use efficiency by usin fertidrill
6. Conserving soil & moisture by using Compartment bunding & farm pond
7. FFS for INM & IPM
8. Seed village scheme for popularizing research variety
9. Increasing awareness reg crop insurance scheme
10. Organizing piolot project for integrated crop management
118
11. Developing storage structure at farmers field for protection from rats & pest
12. Training farmer for drying,grading & marketing
Pulses:
1. Increasing area of pulses in medium & heavy soil
2. In situ moisture conservation
3. Maintaining proper seed rate by adopting dibbling method of sowing or by
using ferti seed drill
4. Seed treatment by Rhizobia, Trichoderma, PSB
5. Developing area by compartment bunding & farm pond
6. FFS for Integrated Pest Management & Integrated Crop Management
7. Promoting Sprinkler irrigation for efficient use of water at critical growth stage
8. Seed village program for promotion of improved variety
9. Increasing awareness reg crop insurance scheme
10. Organizing pilot project for integrated crop management
11. Developing storage structure at farmers field for protection from rats & pest
12. Training farmer for drying, grading & marketing
13. Training farmers for grain storage & taking advantage of pledge facility
14. Establishing mini dal mill for processing
Oilseed:
1. Popularizing BBF method of sowing
2. Saving seed cost by adopting dibbling method of sowing
3. Seed treatment by Rhizobia, Trichoderma, PSB
4. INM by using micronutrient like zinc, Sulpher,molybdenum,gypsum etc
5. Promoting Sprinkler for efficient use of water at critical growth stage
6. FFS for INM & IPM
7. Promoting contract farming with mill owners
8. Promoting Seed village scheme for increasing seed availability, area
expansion,& reducing cost of seed
9. Increasing area of soyabean in kharif, sunflower in rabbi,& g. nut in summer
119
Cotton:
1. Promoting area expansion in suitable soil type
2. Training farmer for integrated crop management
3. Farm Pond program for increasing protective irrigation
4. Increasing area under drip irrigation
5. FFS for INM,IPM & organic practices
6. Pilot project for demonstrating Integrated Crop Management
7. Recycling cotton Plant residue to increase soil health
8. Increasing use of micronutrient for yield & quality improvement
9. Clean cotton campaign for increasing Quality & rate of produce
10. Adopting one village one variety program
11. Increasing awareness among farmer for quality consciousness
12. Promoting value addition from cotton to cloth by developing cotton
processing cluster
13. Encouraging contract farming.
Sugarcane:
1. Increasing use of improved variety
2. Encouraging farmer for developing there own seed material
3. Distribution of tissue culture seedling for developing own mother stalk
4. For this purpose establishment of tissue culture lab
5. Promoting one bud & strip method of plantation for reducing cost on seed
6. Promoting farmer for adopting drip & sprinkler irrigation for increasing water
use efficiency
7. Training farmer for adopting practices like in situ trash composting & green
mannuring
8. Organizing FFS for adoption of Integrated Crop management practices
9. Training farmer for adopting soil & water testing for efficient fertilizer use
10. Capacity building of sugar factories for planing of planting as per crushing
schedule
11. Demonstrating intercropping for increasing net income.
12. Organizing FFS for ratoon management.
Onion:
120
1. Training farmer for nursery management
2. Encouraging farmer for adopting sprinkler irrigation
3. Demonstrating broad bed plantation insted of ridged & furrows
4. Training farmer for post harvest management, grading & marketing
5. Promoting onion storage structure at every onion growing farmer
6. Onion seed production program
Horticulture:
1. Establishment & improvement of nurseries for easy availability of disease
free improved variety plants
2. Developing clusters of pomegranate, lemon, guava, grape, banana & sitaphal
3. To reduce cost & improving quality adopting organic farming practice
4. Training farmer for Post Harvest Management,Processing,Marketing
5. Developing basic infrastructure like cold storage, processing,mareketing in
cluster area
6. Bringing 100 % horticulture area under drip irrigation
7. Organizing FFS for INM & IPM
8. Promoting farm pond for good bahar management, protective irrigation &
assured yield
9. Promoting contract farming for export & processing
10. Establishing growers organization & there capacity building for marketing,
processing & export
11. Promoting green house & net house cultivation of flowers & vegetables
12. Preparing Bankable projects & perusing bankers for financing horticulture
projects
Dryland Faming:
1. Developing watershed in DPAP area by proper planning & by taking
advantage of various central programme like Haryali, NREGA etc
2. Encouraging Dryland Horticulture
3. Crash programme for Farm Pond
4. Organizing training program for youths & women group to develop service
sector
5. Promoting organic farming for reducing cost of cultivation in dryland area
121
6. Promoting fodder cultivation by using available irrigation for developing
animal husbandry
Farmers Organization:
1. Building farmers interest group
2. Converting established group in to commodity group
3. Providing training for e awareness & providing e connectivity to groups &
making available the information
4. Establishing the federation of the group
5. Capacity building of group for post harvest management & marketing
6. Capacity building of group for technology dissemination & participation in
extension program
Soil Health Improvement:
1. Establishing well equipped soil & water testing laboratory
2. Establishment of FIAC for advising soil test based fertilizer management
3. Promoting organic practices like composting ,green manuring, vermicompost,
use of bio fertilizer
4. Organizing training for creating soil health awareness among farmers
5. To improve soil health in command area promoting drip irrigation & training
farmer for water use efficiency
6. Creating awareness among farmers for use of micronutrient & its impact on yield
& quality.
Establishment Of Seed Infrastructure:
1. Training farmer for seed prduction
2. Adopting seed village programme
3. Establishing block wise seed grower farmers organization
4. Creating seed saling & distribution ascility with help of these societies & KVM
5. Giving aid to the seed grower organization for the establishment of seed
processing unit
6. Training farmer for high value horticulture crop like onion & vegetable &
making service contract with seed production companies for seed production
122
7. Establishing vegetable nurseries under protected condition for quality &
disease free planting material
8. Increasing production of breeder seed at Agri.University
Organic Farming:
1. Promoting organic farming in vegetables & horticulture
2. Giving subsidy for composting, use of bio fertilizer, vermi composting & bio
pesticide
3. Organizing organic growers group & encouraging them for organic
certification
4. Developing ICS system for reducing cost of certification
5. Training farmers for developing organic inputs on the farm only
6. Branding Of organic produce & promoting organic sale counter
7. Developing contract farming system for marketing of organic practice
Strengthening Women In Agriculture:
1. Organizing farm women group for there empowerement
2. Skill improvement of farm women by training & FFS
3. Encouraging farm women for organic input production like compost, vermi
compost, bio fertilizer, bio pesticide etc
4. Organizing exposure visit of farm women
5. Training farm women in post harvest management & value addition
6. Establishment of farm women cluster in value addition
7. Development & training for women friendly farm machinary
8. Training farm women in Animal husbandry, Dairy & clean milk production
9. Developing & establishment of market for products of women group
Marketing:
1. Training farmers group & KVM for marketing & value addition of Agri produce
2. Creating growers organization of vegetable, fruits & flowers.Trainig &
encourage them for marketing, export & value addition.
3. Creating godown infrastructure at every village for cleaning, grading &
storage
4. Using this godown reciept for pledge loans
123
5. Seeking approvals of these godowns from banks & commodity markets
6. Capacity building of co op socieites,KVM & growers organization in market
intelliginace by providing them e connectivity & market information
7. Promoting farmers organization for contract farming
Quality Control Of Agri Inputs:
1. Training farmers for identification of quality input
2. Training agro service centers for maintaining quality of inputs & consultancy
3. Developing system for quality certification of agro sercice centers
4. Training agro service centers for technology consultancy based input
marketing
5. Developing & monitoring system for organic & bio input quality
6. Developing seed testing laboratory at every district
7. Frequent sampling & testing of inputs & strict vigilance in market for
controlling spurious inputs
Agriculture Credit:
1. Linking Agri credit with adoption of technology & market
2. Popularizing concept of Kisan Credit Card
3. Popularizing Agri Insurance scheme
4. Providing credit card to women SHG members, encouraging them for saving
5. Facilitating for advance against godown reciept
6. Canvassing & mobilizing banks to develop schemes for restructuring of bad
agri loans
Mass Media Support:
1. Broadcasting success stoies & technology using FM chanel,Doordarshan
2. Local Print media for disseminating technology & success stories & Govt
schemes
3. Using audio visual aid,CD PPT electronic material for improving training
4. PPP for technology dissemination, marketing, contract farming
5. Providing e connectivity to KVM for information & tech updation
6. Using mobiles for dissemination of market information,
124
Strengthening Existing Extension System
1. Establishment and strengthening of Agri polyclincs in all blocks of Ahmednagar
district.
2. Establishing infrastructural facilities i.e. audio-visual –aids, training hall,
dormitory for farmers at all existing and proposed Agri-polyclinics in Ahmednagar
District
3. Selection of Resource Personnel from the existing Extension staff of
Ahmednagar District for utilizing their knowledge and skill as subject Matter
Specialists to impart training during the various technical trainings organized at
Agri- polyclinics.
4. Identification of farmers specialized in particular crop production with
communication skill and utilizing their experiences in extension activities.
5. Identification of special model Agricultural farms in Ahmednagar district and
organizing training , field visits and demonstrations at such farms
6. Preparing FAQs, literature for different crops to be distributed to farmers for fast
dissemination of technology.
7. Preparing slides/VCD of different crops for imparting effective trainings
8. Organizing frequent meetings of Krishi Vigyan Mandal Sanghtak for
disseminating technical messages and schemes.
9. Preparing health cards for different crops, indicating crop physiology, critical
stages and different management required.
10. Preparing inventory of service providers from Govt. offices, Research
scientists, market etc.
11. Preparing websites of Ahmednagar District and uploading all technical data
supporting services related to information.
12. Identifying successful farming systems of the area for its large scale
replications
13. Identifying locally validated technologies for good yields and for taking care of
local problems.
14. Identifying crop rotations models of the in good and scarcity years of rainfall
15. Identifying venturous farmers who succeed in crop rotations and farming
systems on sustainable in the area for its replications
125
16. Working out economics of different farming systems and cropping systems for
its dissemination to farmers.
Watershed models, based on Hivare Bazar.
The village Hivare Bazar in Ahmednagar District is recognized as a role model
village in watershed development . The expertise of the department in working in the
area of developing such watershed in combating draught situation can very well used in
other areas.
Preparing good watershed plan base on the data from Remote Sensing Agency.
Preparing Perspective plan of watershed in the district by dividing its into small
unit of the size 500 ha.
Focusing water conservation on hill slopes by deep CCT, Plantation & cement
nala bunding.
Main feature of the future watershed development work will be land grading &
shaping compartment bunding & Farm pond on individuals farmers land which
will facilitate in situ moisture conservation.
Group building in watershed by farming watershed users association & there
capacity building for future maintenance of watershed.
Implementing suitable crop plan forming system using water saving devices like
drip, sprinkler for maximum utilization & productivity of conserved water.
In the cropping pattern importance will be give in for dry land horticulture,
vegetable cultivation. & Animal Husbandry .
Organic practice will be gives the main thrust in cropping pattern for soil health
improvement and maintenance.
Utilization of local leaders wisdom in developing watershed, for good
participation of the village.
Command Area Development:
Formation and strengthening of Water Users Association.
Educating farmers and Association for utilization and payment of irrigation
charges on volumetric basis.
126
Reducing dominance of sugarcane base cropping system by demonstrating
alternative beneficial and sustainable cropping system.
Encouraging farmer to develop Animal Husbandry to bring diversification by
bringing some under fodder.
Promoting model of Farm Pond for storage of canal water during rotation and its
utilization by sprinkler and drip for maximum water productivity.
Developing model irrigation schedule by computer programming for efficient
delivery & rotation of canal water
Preparing three year cropping plan of area under water user associable &
educating farmer to adopt that plan
Introducing horticulture, vegetable, floriculture in the cropping system & plan
Demonstrating farmers regular utilization of water measuring devices
Educating farmers regarding water requirement & critical growth stages of the
crop to utilize water judiciously at measured quantity & at right time
Educating farmers regarding ill effects of excess water use on soil & ground
water for this introducing soil & water health scheme for every farmer
Implementation of Farmer pond scheme command & using it as storage &
drainage treatment
Implementing community based drainage improvement scheme by laying drains
& applying soil amendments
Precision Farming Campaign:
Demonstrating the farmer regarding area to be brought under different crop
considering the water availability to get maximum benefits
Marketing sprinkler & drip irrigation system mandatory for maximum water
productivity
Educating farmers regarding proper maintenance of plant population considering
soil type, crop it’s variety, season for obtaining maximum yield per unit of area.
Adopting INM practice by placing fertilizer in the active root zone at right
quantity, right place in the right form for maximum fertilizer use efficiency
Educating farmers to keep economics of farming to know cost of cultivation &
cost benefit ratio which will improve the decision making capability of the farmers
IPM practices should follow for better control of pest & diseases
127
Educating farmers to prepare crop plan well in advance of cropping season for
timely procurement of inputs
Adopting suitable crop rotation so as to use recourses like land, labour, water &
capital in judicious manner to give maximum net returns, continuous employment
with out compromising soil & water health
Educating farmer to draw layout plan of the cropping, sowing & preparing
schedule of operation for easy execution.
Educating farmer to adopt Precision Farming Technique for good crop yield by
promoting suitable condition to each plant in the field
Processing, Storage and Marketing Gaps-
1. Lack of extension services to the farmers group & KVM for marketing & value
addition of agricultural produce;
2. Unavailability of sufficient growers organization of vegetable, fruits & flowers and
training to encourage them for marketing, export & value addition;
3. Godown infrastructure, cold storage chain is very limited in every village for
cleaning, grading & storage;
4. There is no facility for using godown receipts for pledge loans;
5. Capacity building of co op societies, KVM & growers organization in market
intelligence is needed for providing them e-connectivity & market information;
6. Contract farming which promotes backward and forward linkage is still at an
infant stage;
7. Unawareness about marketing strategy.
8. There often exists a huge gap between price paid by consumer and that
received by farmer which reveals that there are huge marketing margins that are
appropriated by middlemen.
9. Limited transport facilities.
128
Table 4.31: Growth rate of crop wise GVA (at constant 1999-2000 prices)-Tenth Five
year Plan (2002-03 to 2006-07)
Sr. No.
Crop Growth Rate-2002-03 to 2006-07 (per cent)
Growth Rate-11th Five Year Plan (per cent)
1 Cereals -2.22
2 Pulses 0.4
3 Oil seeds 0.66
4 Sugar -6.6
5 Fibre -44.83**
6 Drugs & Narcotics -10.30
7 Condiments & Spices -7.11
8 Fruits & Veg. 21.74***
9 Fodder 1.2*
10 Byproducts -0.38
11 Floriculture 14.08***
12 Kichen Garden 1.04*
TOTAL AGRICULTURE 6.13**
ANIMAL HUSBANDRY
1 Milk -1.89
2 Meat & Meat Products 1.55
3 Poultry & Poultry Products -8.22***
4 Others -4.98**
VALUE OF OUTPUT -2.34
Fisheries -2.67
Agriculture+ Allied Sectors 5.08* Notes : $- 10
FYP Period-data available 2002-03 to 2005-06, *,** and *** are significant at 10, 5 and 1 percent level, remaining
figures are non significant.
4.16 Recommended interventions of the district with detailed action plan with costs:
TOTAL AGRICULTURE (Stream I )
Table 4.32:
TOTAL AGRICULTURE (Stream II )
Table 4.33:
129
Table 4.34: Total Agriculture
Sr.
No.
Stream
2007-
08
2008-
09
2009-
10
2010-
11
2011-
12
Total
outlay for
Five years
(Rs. in
Lakhs)
1 Total Agriculture (Stream I )
2 Total Agriculture (Stream II )
Total Agriculture
4.11 Projected outcome and growth during the next plan period:
The projected overall growth rate for agriculture and allied sector is presented in table
4.45 and the crop diversification plan for next five years in Ahmednagar District is presented in
Table 4.46.
Table 4.45: Projection of Overall Growth Rate (GVA) in Agriculture and Allied Sector-Ahmednagar
District
Sr.
no
Name of Crop
Yearwise Total Value in Rupees in Lakh 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 Compound
Growth
rate (2007-
08 to
2011-12)
1 Total Cereals
130
2 Total Pulses
3 Total Oil Seeds
4
Total Cash
Crops
5
Total Fruits &
Vegetables
6 Total Flower
7 Total Spices
Primary Total
Note **- Significant at 1 percent level.
131
Table 4.46: Crop Diversification Plan in Next Five Years- Ahmednagar District
S.No Existing Cropping Pattern 2006-07
Crop Diversification Proposed Area 00 ha (Area in Lakh ha.)
2007-08 2008-09 2009-10 2010-11 2011-12
Crop Group
Area Area under crop
Change in area with
reference to 06-07 ( +/-)
Area under crop
Change in area with
reference to 06-07 ( +/-)
Area under crop
Change in area with
reference to 06-07 ( +/-)
Area under crop
Change in area with reference to 06-07 ( +/-)
Area under crop
Change in area with reference to
06-07 ( +/-)
1 Cereals 8982.00 9292.00 310.00 9293.00 311.00 9278.00 296.00 9338.00 356.00 9411.00 429.00
2 Pulses 1003.00 1213.00 210.00 1230.00 227.00 1249.00 246.00 1269.00 266.00 1309.00 306.00
3 Total Food grains
9985.00 10505.00 520.00 10524.00 539.00 10527.00 542.00 10608.00 623.00 10720.00 735.00
4 Oilseeds
642.00 1266.00 624.00 1269.00 627.00 1308.00 666.00 1330.00 688.00 1352.00 710.00
5 Sugarcane
1030.00 730.00 -300.00 700.00 -330.00 665.00 -365.00 665.00 -365.00 665.00 -365.00
6 Cotton 134.00 400.00 266.00 450.00 316.00 460.00 326.00 470.00 336.00 480.00 346.00
8 Total 11791.00 12901.00 1110.00 12943.00 1152.00 12960.00 1169.00 13073.00 1282.00 13217.00 1426.00
9
Fruit crops
227.95 322.00 94.05 367.00 139.05 442.00 214.05 507.00 279.05 616.00 388.05
10 Vegetable Crops
776.34 862.00 85.66 915.00 138.66 1000.00 223.66 1072.00 295.66 1192.00 415.66
11 Flower Crops
8.85 12.28 3.43 20.00 11.15 31.00 22.15 44.00 35.15 57.00 48.15
13
Medicinal and Aromatic Plants
2.00 4.00 2.00 6.00 4.00 8.00 6.00 9.00 7.00 10.00 8.00
14
Total Horticulture Crops
1015.14 1200.28 185.14 1308.00 292.86 1481.00 465.86 1632.00 616.86 1875.00 859.86
GRAND TOTAL
12806.14 14101.28 1295.14 14251.00 1444.86 14441.00 1634.86 14705.00 1898.86 15092.00 2285.86
132
Table No 4.46 present the present area under different crops in Ahmenagar district and proposed yearwise area diversification under
differentcrops in the plan period. The area for diversification is proposed taking into consideration the area under different crops in the base year
of 2006-07. The area under food grain is proposed to increase from present area of about 998500 ha to 1072000 ha with an increase of 75500 ha.
The area under oilseeds, sugarcane and cotton together is proposed to increase from 1179100 ha to 1321700 ha with an increse of 142600 ha.
The present area under different horticultural crop is 101514 ha and is proposed to increase to 187500 ha with net increase of about 85986 ha
during the plan period. It is seen from the table that the area under sugarcane cultivation is proposed to be diverted towards other crop area of
food grains oilseeds and horticultural crops.
Table 4.47: Information on Natural Calamities
Sr.
No. Name of Taluka
Occurence of
drought / flood /
cyclone
year in which effected
( since last 10 yrs.)
Severity
M / S / VS
% Cropped area
affected
Livestock mortality
( No.of animals )
% of farm
families
affected
1 2 3 4 5 6 7 8
1 A,nagar
Drought 2003-04/2004-05 S 100% --- 75000
Drought 1996-1997 Mild 100% 0 20%
Drought 1999-2000 Mild 45% 0 20%
2 Parner
Drought 2003-2004 Severe 70% 0 55%
Floud 2005-2006 Mild 0.001% 0 0.001%
Floud 2006-2007 Mild 0.001% 0 0.001%
3 Pathardi Drought 2003 S 75 0 35
Floud 2006 m 20 0 1
4 Karjat Drought 2003-04 S 90% 1130% 80%
2004-05 M 10% 5600% 7%
133
Floud 2004-05 M 10 0 7%S
5 Jamkhed Drought 2003-04 S 60% 1375 70%
Drought 2004-2005 S 51% 910 55%
6 Shrigonda
Flood 2002-03 M 70% 0 70%
Drought 2003-04 S 80% 0 80%
Drought 2004-05 S 90% 0 90%
Flood 2006-07 S 90% 0 90%
7 Shrirampur
Drought 2003-04 M 50 Nil 50
Drought 2004-05 M 50 Nil 50
Flood 2006-07 M 50 Nil 10
8 Shevgaon Drought 2003 2003-04 Servere 60 0 70
9 Newasa
Drought 2002-03 Mild 25 0 15
Drought 2003-04 Servere 55 0 40
Flood 2005 Servere 0.7 4 0.5
Flood 2005 Servere 0.7 4 0.5
Flood 2006 very Servere 3 12 2.5
10 Rahuri Drought 2003-04 Mild 35% -- --
Flood 2006-07 Servere 45% 512 1725
11 Sangamner
Drought 2002-2003 S 67% --- 80%
Drought 2003-2004 V.S. 75% --- 50%
Flood 2005-2006 S 2% --- 3%
134
Flood 2006-2007 S 1% --- 2%
Hail Storm 2006-2007 S 0.05% 63 0.02%
12 Akole
Flood, 1996-97 vs 90% 1338 90%
1997-98 vs 91% 1539 91%
1998-99 vs 90% 1320
90%
1999-2000 vs 90% 1334 90%
2000-2001 vs 90% 1319 90%
2001-2002 vs 90% 1260 90%
2002-2003 sva 80% 1236 90%
2003-2004 vs 85% 1136 91%
2004-2005 vs 90% 1338 90%
2005-2006 vs 91% 1539 91%
2006-2007 vs 90% 1338 90%
13
Kopargaon
Drought 2002-2003 s 60% 72% 35%
Drought 2003-2004 vs 40% 20% 26%
Flood 2006-2007 s 22% 54% 21%
14 Rahata Flood -- -- -- -- --
Mild 2006-07 Severe 20% -- --
Drought - - - -
Mild 1986-87 M 60% -- --
M - Mild S - Severe VS - Very Severe
135
Table No. 12 presents the Takukawise and yearwise occurrence of natural calamities in Ahmednagar district. Except Akole taluka rest of the
talukas are drought prone area. It can be observed from the table that frequent droughts are experienced in the district. These droughts are because
of delayed monsoon, insuffiicient rains.uneven distribution resulted into crop failures and severe scarcity of water is experienced. During last few
years miled to severe droughts were occurred in the district. During such critical situations large number of rural population get unemployed
threatening the very sustenanceof rural life. They have to depend on government help in the form of EGS Works. The cattles have to be shifted to
various cattle camps. The major rivers of Godavari, Pravara, Mula,Sina nad Ghod flows from the Ahmednagar district. Heavy rains during short
periods causes floods situations acroos the riverbanks of the major rivers floodwater get inundated in the fields and damages the standing crops.
Table 21 : Service Centres in the District (Agriculture & Allied Sectors) Sr.
No. Agro-service
Centre
No. of Agro-service Centres
Nag
ar
Par
ner
Pat
har
di
Kar
jat
Jam
kh
ed
Sh
rig
ond
a
Sh
rira
mpu
r
Sh
evgao
n
New
asa
Rah
uri
San
gam
ner
Ak
ole
Ko
per
gao
n
Rah
ata
To
tal
1 Seed Distribution
Centres
98 115 45 114 60 64 28 55 93 60 140 108 49 76 1105
Seed Distribution
Centres (Fish)
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Fertilizer Distribution
centres
105 87 24 107 62 43 17 39 93 60 225 110 77 79 1128
3 Insecticide/ pesticide
Distribution centres
98 61 30 100 32 64 28 55 93 60 140 110 49 96 1016
4 T S Farm/ Trial Cum-
demonstration (TCDs)
1 1 1 1 1 1 1 1 1 2 1 -- 1 -- 13
5 Agropolyclinic Centres 1 0 1 1 0 1 1 0 1 1 1 -- 1 -- 9 6 IPM Laboratories 1 0 0 1 0 0 0 0 0 2 1 -- -- -- 5 7 Co-Operative
Societies
1224 104 98 37 47 85 54 82 156 111 131 143 123 69 2464
Co-Ope Societies(Fish) 0
8 Nationalised Banks
( Branches)Providing
47 15 16 9 6 7 13 5 39 10 27 3 15 19 231
136
Agriculture Loans 9 Dairy Co-per Societies 47321 143 15 65 146 185 7 66 131 91 167 -- 150 10 1497
Government 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Co-Operative 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Private 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total 0 10 Milk Chilling Centres 3 5 4 15 8 14 7 7 1 3 3 2 3 3 78 11 Poultry Farms Govt 0
Poultry Farms private) 45 15 4 7 2 8 4 5 20 5 57 1 76 4 253 12 IPM Laboratories 1 0 0 0 0 0 0 0 1 0 1 0 0 0 3 13 Training Centres (
Agri. & allied sectors)
3 2 1 1 0 4 1 0 1 1 1 1 1 2 19
Sericulture 0 Fishery 0
14 Other than above
Agri. & Allied sectors ) 7821
Agro-service centres play an important role in farming by way of making available the different farm inputs like seed, fertilizers,
pesticides/insecticides, growth hormones, small machinaries and implements.The centres are also helpful for making available poultry,cattle and
fish feeds. There are Dairy Co-operatives’milk processing and chilling centres.The agro-service provider also important in agricultural
communication as they communicate new technological innovations and inputs to farmers within very short time .Hence they are the most
influential private extensionist in agricultural development.The role played by them cannot be overlooked. So They should be the part of public –
private extension co-ordination.It is seen from the above table that there are 7821 numbers of different vAgro-service centres operating in the
district.Some of these are in public.private and government sectors.
137
Table 24: Area, Production and Yield of Major Crops in Irrigated/ Rain fed Conditions during Kharif Season
Crops Taluka /District
Area(ha) Production(q) Yield(q/ha)
Irrigated % Rainfed % Total Irrigated
% Rainfed % Total Irrigated Rainfed Average
Kharif Season
Cereals
Kharip Paddy 0 0 6927 100 6927 0 0 11958149.37 11958149.37 0 1726.31 1726.31
Kharip Jowar 0 0 0 0 0 0 0 0 0 0 0 0 0
Bajara 0 0 234561 1400 234561 0 0 162534193.4 162534193.4 0 10273.84 10273.84
Ragi / Nachani
0 0 2645 100 2645 0 0 1166445 1166445 0 441 441
Other Cereals 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Kh. Cereals 0 0 244133 1600 244133 0 0 175658787.77 0 175658787.77 0 12441.15 12441.15
Pulses
Redgram 0 0 15345 1400 15345 0 0 7851569 0 7851569 0 7824.89 7824.89
Green Gram 0 0 21897 1000 21897 0 0 14139928 0 14139928 0 5477.99 5477.99
Black Gram 0 0 14250 1100 14250 0 0 5942318 0 5942318 0 6361.37 6361.37
Other Pulses 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Kh. Pulses 0 51492 3500 51492 0 0 27933815 0 27933815 0 19664.25 19664.25
Total Kh. Foodgrains
Oilseeds
Groundnut 0 0 5249 1400 5249 0 0 4735535.9 4735535.9 0 13930.97 13930.97
Sunflower 0 0 8161 1300 8161 0 0 8769719 8769719 0 13071 13071
Soyabean 0 0 33065 1400 33065 0 0 47131885 47131885 0 15903.16 15903.16
other oil seed 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Kh.Oilseeds
138
Table 24: Area, Production and Yield of Major Crops in Irrigated/ Rain fed Conditions during Kharif Season 2007-08
Crops Taluka Area Production Yield
(ha) (q) (q/ha)
Irrigated % Rainfed % Total Irrigated % Rainfed % Total Irrigated Rainfed Average
Nagar Bajara ---//--- 0 0.00 11500 100.00 11500 0.00 6582600.00 6582600.00 0.00 572.40 572.40
Mung ---//--- 0 0.00 7500 100.00 7500 0.00 3126225.00 3126225.00 0.00 416.83 416.83
Sunflower ---//--- 0 0.00 650 100.00 650 0.00 650000.00 650000.00 0.00 1000.00 1000.00
Tur ---//--- 0 0.00 600 100.00 600 0.00 242496.00 242496.00 0.00 404.16 404.16
Cotton ---//--- 71 244.83 29 29.00 100 74514.50 20843.75 95358.25 1049.5 718.75 953.58
Udid ---//--- 0 0.00 300 100.00 300 0.00 132300.00 132300.00 0.00 441.00 441.00
Groundnut ---//--- 0 0.00 350 100.00 350 0.00 426450.50 426450.50 0.00 1218.43 1218.43
Soyabeen ---//--- 0 0.00 850 100.00 850 0.00 901850.00 901850.00 0.00 1061.00 1061.00
Parner 71 21779 21850
Bajara ---//--- 0 0.00 24500 100.00 24500 0.00 21124390.0
0
21124390.0
0
0.00 862.22 862.22
Mung ---//--- 0 0.00 5600 100.00 5600 0.00 6434960.00 6434960.00 0.00 1149.10 1149.10
Sunflower ---//--- 0 0.00 250 100.00 250 0.00 240500.00 240500.00 0.00 962.00 962.00
Tur ---//--- 0 0.00 1200 100.00 1200 0.00 739404.00 739404.00 0.00 616.17 616.17
Cotton ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Udid ---//--- 0 0.00 400 100.00 400 0.00 315400.00 315400.00 0.00 788.50 788.50
Groundnut ---//--- 0 0.00 400 100.00 400 0.00 311100.00 311100.00 0.00 777.75 777.75
Soyabeen ---//--- 0 0.00 400 100.00 400 0.00 392000.00 392000.00 0.00 980.00 980.00
Pathardi 0 32750 32750
Bajara ---//--- 0 0.00 37110 100.00 37110 0.00 21255494.7
0
21255494.7
0
0.00 572.77 572.77
Mung ---//--- 0 0.00 950 100.00 950 0.00 417601.00 417601.00 0.00 439.58 439.58
Sunflower ---//--- 0 0.00 450 100.00 450 0.00 483750.00 483750.00 0.00 1075.00 1075.00
Tur ---//--- 0 0.00 1800 100.00 1800 0.00 923490.00 923490.00 0.00 513.05 513.05
Cotton ---//--- 3500 36.36 9625 73.33 13125 3794000.00 8193281.25 11987281.2
5
1084.00 851.25 913.32
Udid ---//--- 0 0.00 740 100.00 740 0.00 461760.00 461760.00 0.00 624.00 624.00
Groundnut ---//--- 0 0.00 650 100.00 650 0.00 866450.00 866450.00 0.00 1333.00 1333.00
Soyabeen ---//--- 0 0.00 200 100.00 200 0.00 204600.00 204600.00 0.00 1023.00 1023.00
Karjat 3500 51525 55025
139
Bajara ---//--- 0 0.00 10700 100.00 10700 0.00 5750394.00 5750394.00 0.00 537.42 537.42
Mung ---//--- 0 0.00 1450 100.00 1450 0.00 1102000.00 1102000.00 0.00 760.00 760.00
Sunflower ---//--- 0 0.00 2600 100.00 2600 0.00 2860000.00 2860000.00 0.00 1100.00 1100.00
Tur ---//--- 0 0.00 1100 100.00 1100 0.00 492096.00 492096.00 0.00 447.36 447.36
Cotton ---//--- 400 72.73 550 57.89 950 388800.00 409530.00 798330.00 972.00 744.60 840.35
Udid ---//--- 0 0.00 1100 100.00 1100 0.00 671000.00 671000.00 0.00 610.00 610.00
Groundnut ---//--- 0 0.00 110 100.00 110 0.00 158400.00 158400.00 0.00 1440.00 1440.00
Soyabeen ---//--- 0 0.00 100 100.00 100 0.00 99000.00 99000.00 0.00 990.00 990.00
Jamkhed 400 17710 18110
Bajara ---//--- 0 0.00 10500 100.00 10500 0.00 4457775.00 4457775.00 0.00 424.55 424.55
Mung ---//--- 0 0.00 1820 100.00 1820 0.00 1055891.20 1055891.20 0.00 580.16 580.16
Sunflower ---//--- 0 0.00 2510 100.00 2510 0.00 2838810.00 2838810.00 0.00 1131.00 1131.00
Tur ---//--- 0 0.00 4760 100.00 4760 0.00 1233125.60 1233125.60 0.00 259.06 259.06
Cotton ---//--- 750 32.75 2290 75.33 3040 699750.00 1655670.00 2355420.00 933.00 723.00 774.81
Udid ---//--- 0 0.00 10400 100.00 10400 0.00 3493048.00 3493048.00 0.00 335.87 335.87
Groundnut ---//--- 0 0.00 180 100.00 180 0.00 190357.20 190357.20 0.00 1057.54 1057.54
Soyabeen ---//--- 0 0.00 120 100.00 120 0.00 101400.00 101400.00 0.00 845.00 845.00
Shrigonda 750 32580 33330
Bajara ---//--- 0 0.00 7250 100.00 7250 0.00 4660227.50 4660227.50 0.00 642.79 642.79
Mung ---//--- 0 0.00 2250 100.00 2250 0.00 1049985.00 1049985.00 0.00 466.66 466.66
Sunflower ---//--- 0 0.00 1400 100.00 1400 0.00 1379000.00 1379000.00 0.00 985.00 985.00
Tur ---//--- 0 0.00 1250 100.00 1250 0.00 548750.00 548750.00 0.00 439.00 439.00
Cotton ---//--- 10 0.00 0 0.00 10 17000.00 0.00 17000.00 1700.00 987.00 1700.00
Udid ---//--- 0 0.00 400 100.00 400 0.00 256000.00 256000.00 0.00 640.00 640.00
Groundnut ---//--- 0 0.00 40 100.00 40 0.00 53680.00 53680.00 0.00 1342.00 1342.00
Soyabeen ---//--- 0 0.00 40 100.00 40 0.00 39520.00 39520.00 0.00 988.00 988.00
Shrirampu
r
10 12630 12640
Bajara ---//--- 0 0.00 4850 100.00 4850 0.00 5593505.00 5593505.00 0.00 1153.30 1153.30
Mung ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Sunflower ---//--- 0 0.00 115 100.00 115 0.00 118680.00 118680.00 0.00 1032.00 1032.00
Tur ---//--- 0 0.00 75 100.00 75 0.00 44202.75 44202.75 0.00 589.37 589.37
Cotton ---//--- 55 25.00 220 80.00 275 72655.00 165312.40 237967.40 1321.000 751.42 865.34
Udid ---//--- 0 0.00 10 100.00 10 0.00 4460.00 4460.00 0.00 446.00 446.00
Groundnut ---//--- 0 0.00 100 100.00 100 0.00 109324.00 109324.00 0.00 1093.24 1093.24
Soyabeen ---//--- 0 0.00 9694 100.00 9694 0.00 22739700.5
0
22739700.5
0
0.00 2345.75 2345.75
140
Newasa 55 15064 15119
Bajara ---//--- 0 0.00 18095 100.00 18095 0.00 18546832.1
5
18546832.1
5
0.00 1024.97 1024.97
Mung ---//--- 0 0.00 282 100.00 282 0.00 66975.00 66975.00 0.00 237.50 237.50
Sunflower ---//--- 0 0.00 12 100.00 12 0.00 11664.00 11664.00 0.00 972.00 972.00
Tur ---//--- 0 0.00 1652 100.00 1652 0.00 1318411.64 1318411.64 0.00 798.07 798.07
Cotton ---//--- 1300 149.08 872 40.15 2172 1690325.00 773464.00 2463789.00 1300.25 887.00 1134.34
Udid ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Groundnut ---//--- 0 0.00 302 100.00 302 0.00 315816.50 315816.50 0.00 1045.75 1045.75
Soyabeen ---//--- 0 0.00 5560 100.00 5560 0.00 5888040.00 5888040.00 0.00 1059.00 1059.00
Sheogaon 1300 26775 28075
Bajara ---//--- 0 0.00 14900 100.00 14900 0.00 14602596.0
0
14602596.0
0
0.00 980.04 980.04
Mung ---//--- 0 0.00 65 100.00 65 0.00 27570.40 27570.40 0.00 424.16 424.16
Sunflower ---//--- 0 0.00 55 100.00 55 0.00 61875.00 61875.00 0.00 1125.00 1125.00
Tur ---//--- 0 0.00 470 100.00 470 0.00 229858.20 229858.20 0.00 489.06 489.06
Cotton ---//--- 5500 25.94 21200 79.40 26700 7315000.00 20358572.0
0
27673572.0
0
1330.00 960.31 1036.46
Udid ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Groundnut ---//--- 0 0.00 42 100.00 42 0.00 29006.88 29006.88 0.00 690.64 690.64
Soyabeen ---//--- 0 0.00 72 100.00 72 0.00 74304.00 74304.00 0.00 1032.00 1032.00
Rahuri 5500 36804 42304
Bajara ---//--- 0 0.00 12000 100.00 12000 0.00 6765240.00 6765240.00 0.00 563.77 563.77
Mung ---//--- 0 0.00 1200 100.00 1200 0.00 216000.00 216000.00 0.00 180.00 180.00
Sunflower ---//--- 0 0.00 70 100.00 70 0.00 81900.00 81900.00 0.00 1170.00 1170.00
Tur ---//--- 0 0.00 815 100.00 815 0.00 769099.20 769099.20 0.00 943.68 943.68
Cotton ---//--- 160 320.00 50 23.81 210 175040.00 24812.50 199852.50 1094.00 496.25 951.68
Udid ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Groundnut ---//--- 0 0.00 625 100.00 625 0.00 224600.00 224600.00 0.00 359.36 359.36
Soyabeen ---//--- 0 0.00 10150 100.00 10150 0.00 10517937.5
0
10517937.5
0
0.00 1036.25 1036.25
Sangamne
r
160 24910 25070
Bajara ---//--- 0 0.00 50130 100.00 50130 0.00 20885160.6
0
20885160.6
0
0.00 416.62 416.62
Mung ---//--- 0 0.00 780 100.00 780 0.00 642720.00 642720.00 0.00 824.00 824.00
Sunflower ---//--- 0 0.00 40 100.00 40 0.00 36200.00 36200.00 0.00 905.00 905.00
Tur ---//--- 0 0.00 950 100.00 950 0.00 1104375.00 1104375.00 0.00 1162.50 1162.50
141
Cotton ---//--- 145 35.80 405 73.64 550 160080.00 344250.00 504330.00 1104.00 850.00 916.96
Udid ---//--- 0 0.00 410 100.00 410 0.00 249690.00 249690.00 0.00 609.00 609.00
Groundnut ---//--- 0 0.00 625 100.00 625 0.00 561681.25 561681.25 0.00 898.69 898.69
Soyabeen ---//--- 0 0.00 3500 100.00 3500 0.00 3024000.00 3024000.00 0.00 864.00 864.00
Akola 145 56840 56985
Bajara ---//--- 0 0.00 17910 100.00 17910 0.00 22317113.7
0
22317113.7
0
0.00 1246.07 1246.07
Mung ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Sunflower ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Tur ---//--- 0 0.00 512 100.00 512 0.00 113280.00 113280.00 0.00 221.25 221.25
Cotton ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Udid ---//--- 0 0.00 405 100.00 405 0.00 311850.00 311850.00 0.00 770.00 770.00
Groundnut ---//--- 0 0.00 1530 100.00 1530 0.00 1216074.60 1216074.60 0.00 794.82 794.82
Paddy ---//--- 0 0.00 6927 100.00 6927 0.00 11958149.3
7
11958149.3
7
0.00 1726.31 1726.31
Soyabeen ---//--- 0 0.00 150 100.00 150 0.00 146100.00 146100.00 0.00 974.00 974.00
Nagli ---//--- 0 0.00 2645 100.00 2645 0.00 1166445.00 1166445.00 0.00 441.00 441.00
Kopergao
n
0 30079 30079
Bajara ---//--- 0 0.00 8250 100.00 8250 0.00 7305375.00 7305375.00 0.00 885.50 885.50
Mung ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Sunflower ---//--- 0 0.00 5 100.00 5 0.00 4420.00 4420.00 0.00 884.00 884.00
Tur ---//--- 0 0.00 120 100.00 120 0.00 82560.00 82560.00 0.00 688.00 688.00
Cotton ---//--- 750 22.19 3380 81.84 4130 1075072.50 3271840.00 4346912.50 1433.43 968.00 1052.52
Udid ---//--- 0 0.00 80 100.00 80 0.00 44080.00 44080.00 0.00 551.00 551.00
Groundnut ---//--- 0 0.00 120 100.00 120 0.00 122970.00 122970.00 0.00 1024.75 1024.75
Soyabeen ---//--- 0 0.00 1074 100.00 1074 0.00 1604727.84 1604727.84 0.00 1494.16 1494.16
Rahata 750 13029 13779
Bajara ---//--- 0 0.00 6866 100.00 6866 0.00 2687489.72 2687489.72 0.00 391.42 391.42
Mung ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
Sunflower ---//--- 0 0.00 4 100.00 4 0.00 2920.00 2920.00 0.00 730.00 730.00
Tur ---//--- 0 0.00 41 100.00 41 0.00 10420.56 10420.56 0.00 254.16 254.16
Cotton ---//--- 130 127.45 102 43.97 232 174070.00 90066.00 264136.00 1339.00 883.00 1138.52
Udid ---//--- 0 0.00 5 100.00 5 0.00 2730.00 2730.00 0.00 546.00 546.00
Groundnut ---//--- 0 0.00 175 100.00 175 0.00 149625.00 149625.00 0.00 855.00 855.00
Soyabeen ---//--- 0 0.00 1155 100.00 1155 0.00 1398705.00 1398705.00 0.00 1211.00 1211.00
130 8348 8478
142
Table No 24 presents the major kharif crops include bajra, mung, udid, tur, soyabean and cotton. The talukawise area under cultivation of
kharif crops, percentage area under irrigation with productivity and yield is presented in the table.It is seen from the table that the total area under
kharif season in the district is about 393594 ha .The data from the table indicates that in kharif season 96.75 % area is under rainfed condition and
very few area i.e. 3.25 % is under irrgation.The productivity of most of kharif crops in Ahmednagar is low as comparesd to the state productivity
averages.Hence there is need to improve the productivity of these crops by dissemination of crop production technology efficiently and effectiviely
Table 25: Area, Production and Yield of Major Crops in Irrigated/Rain fed Conditions during Rabi Season
Sr.No Crops Taluk Area Production Yield
(ha) (q) (q/ha)
Irrigate
d
% Rainfed % Total Irrigated % Rainfed % Total Irrigated Rainfed Average
Nagar
1 Jwar ---//--- 850 1.07 78650 98.93 79500 1031534.50 48340649.50 49372184.00 1213.57 614.63 621.03
2 Wheat ---//--- 7000 100.00 0 0.00 7000 17482500.00 0.00 17482500.00 2497.50 0.00 2497.50
3 Gram ---//--- 7400 100.00 0 0.00 7400 6493500.00 0.00 6493500.00 877.50 0.00 877.50
4 Safflower ---//--- 0 0.00 1950 100.00 1950 0.00 1231815.00 1231815.00 0.00 631.70 631.70
5 Sunflower ---//--- 250 100.00 0 0.00 250 137500.00 0.00 137500.00 550.00 0.00 550.00
Parner 15500 301.07 80600 198.93 96100 25145034.50 0 49572464.50 0 74717499.00 5138.57 1246.33 5177.73
1 Jwar ---//--- 1500 1.51 98000 98.49 99500 1912530.00 48140540.00 50053070.00 1275.02 491.23 503.05
2 Wheat ---//--- 6800 100.00 0 0.00 6800 11388640.00 0.00 11388640.00 1674.80 0.00 1674.80
3 Gram ---//--- 3800 100.00 0 0.00 3800 2268334.00 0.00 2268334.00 596.93 0.00 596.93
4 Safflower ---//--- 0 0.00 8500 100.00 8500 0.00 4577250.00 4577250.00 0.00 538.50 538.50
5 Sunflower ---//--- 110 100.00 0 0.00 110 72710.00 0.00 72710.00 661.00 0.00 661.00
Pathardi 12210 301.51 106500 198.49 118710 15642214.00 0 52717790.00 0 68360004.00 4207.75 1029.73 3974.28
1 Jwar ---//--- 970 2.43 39000 97.57 39970 891430.00 17546880.00 18438310.00 919.00 449.92 461.30
2 Wheat ---//--- 6150 100.00 0 0.00 6150 8681955.00 0.00 8681955.00 1411.70 0.00 1411.70
3 Gram ---//--- 8650 100.00 0 0.00 8650 5288350.50 0.00 5288350.50 611.37 611.37
4 Safflower ---//--- 0 0.00 940 100.00 940 0.00 690900.00 690900.00 735.00 735.00
5 Sunflower ---//--- 390 100.00 0 0.00 390 226980.00 0.00 226980.00 582.00 582.00
Karjat 16160 302.43 39940 197.57 56100 15088715.50 0 18237780.00 0 33326495.50 3524.07 1184.92 3801.37
1 Jwar ---//--- 2500 3.16 76700 96.84 79200 3535175.00 31660226.00 35195401.00 1414.07 412.78 444.39
2 Wheat ---//--- 8900 100.00 0 0.00 8900 14995076.00 0.00 14995076.00 1684.84 0.00 1684.84
143
3 Gram ---//--- 3000 100.00 0 0.00 3000 2214900.00 0.00 2214900.00 738.30 738.30
4 Safflower ---//--- 0 0.00 3500 100.00 3500 0.00 1780625.00 1780625.00 0.00 508.75 508.75
5 Sunflower ---//--- 100 100.00 0 0.00 100 55000.00 0.00 55000.00 550.00 550.00
Jamkhed 14500 303.16 80200 196.84 94700 20800151.00 0 33440851.00 0 54241002.00 4387.21 921.53 3926.28
1 Jwar ---//--- 600 0.86 68900 99.14 69500 636090.00 28499107.00 29135197.00 1060.15 413.63 419.21
2 Wheat ---//--- 2900 100.00 0 0.00 2900 4332513.00 0.00 4332513.00 1493.97 0.00 1493.97
3 Gram ---//--- 2615 100.00 0 0.00 2615 1214406.00 0.00 1214406.00 464.40 0.00 464.40
4 Safflower ---//--- 0 0.00 1500 100.00 1500 0.00 1050000.00 1050000.00 0.00 700.00 700.00
5 Sunflower ---//--- 450 100.00 0 0.00 450 283950.00 0.00 283950.00 631.00 631.00
Shrigonda 6565 300.86 70400 199.14 76965 6466959.00 0 29549107.00 0 36016066.00 3649.52 1113.63 3708.58
1 Jwar ---//--- 4100 5.65 68500 94.35 72600 4713688.00 28115825.00 32829513.00 1149.68 410.45 452.20
2 Wheat ---//--- 9000 100.00 0 0.00 9000 16590240.00 0.00 16590240.00 1843.36 0.00 1843.36
3 Gram ---//--- 3650 100.00 0 0.00 3650 3321062.00 0.00 3321062.00 909.88 0.00 909.88
4 Safflower ---//--- 0 0.00 50 100.00 50 0.00 22775.00 22775.00 0.00 455.50 455.50
5 Sunflower ---//--- 50 100.00 0 0.00 50 37100.00 0.00 37100.00 742.00 742.00
Shrirampu
r
16800 305.65 68550 194.35 85350 24662090.00 0 28138600.00 0 52800690.00 4644.92 865.95 4402.94
1 Jwar ---//--- 3000 69.44 1320 30.56 4320 2847000.00 765402.00 3612402.00 949.00 579.85 836.20
2 Wheat ---//--- 10500 100.00 0 0.00 10500 24783360.00 0.00 24783360.00 2360.32 0.00 2360.32
3 Gram ---//--- 8500 100.00 0 0.00 8500 6128500.00 0.00 6128500.00 721.00 0.00 721.00
4 Safflower ---//--- 0 0.00 20 100.00 20 0.00 9000.00 9000.00 0.00 450.00 450.00
5 Sunflower ---//--- 45 100.00 0 0.00 45 38250.00 0.00 38250.00 850.00 850.00
Newasa 22045 369.44 1340 130.56 23385 33797110.00 0 774402.00 0 34571512.00 4880.32 1029.85 5217.52
1 Jwar ---//--- 9000 39.96 13525 60.04 22525 7288740.00 7446188.75 14734928.75 809.86 550.55 654.16
2 Wheat ---//--- 18651 100.00 0 0.00 18651 42825120.63 0.00 42825120.63 2296.13 0.00 2296.13
3 Gram ---//--- 7250 100.00 0 0.00 7250 5876560.00 0.00 5876560.00 810.56 0.00 810.56
4 Safflower ---//--- 0 0.00 1601 100.00 1601 0.00 912570.00 912570.00 0.00 570.00 570.00
5 Sunflower ---//--- 340 100.00 0 0.00 340 241400.00 0.00 241400.00 710.00 710.00
Sheogaon 35241 339.96 15126 160.04 50367 56231820.63 0 8358758.75 0 64590579.38 4626.55 1120.55 5040.85
1 Jwar ---//--- 1750 9.94 15850 90.06 17600 1440215.00 7706428.50 9146643.50 822.98 486.21 519.70
2 Wheat ---//--- 2840 100.00 0 0.00 2840 4958469.60 0.00 4958469.60 1745.94 1745.94
3 Gram ---//--- 3480 100.00 0 0.00 3480 2033607.60 0.00 2033607.60 584.37 584.37
4 Safflower ---//--- 0 0.00 151 100.00 151 0.00 87580.00 87580.00 0.00 580.00 580.00
5 Sunflower ---//--- 75 100.00 0 0.00 75 64125.00 0.00 64125.00 855.00 855.00
Rahuri 8145 309.94 16001 190.06 24146 8496417.20 0 7794008.50 0 16290425.70 4008.29 1066.21 4285.01
1 Jwar ---//--- 9950 68.79 4515 31.21 14465 6546702.00 989507.40 7536209.40 657.96 219.16 521.00
2 Wheat ---//--- 10900 100.00 0 0.00 10900 36785320.00 0.00 36785320.00 3374.80 0.00 3374.80
3 Gram ---//--- 6516 100.00 0 0.00 6516 4229991.72 0.00 4229991.72 649.17 0.00 649.17
144
4 Safflower ---//--- 0 0.00 96 100.00 96 0.00 53856.00 53856.00 0.00 561.00 561.00
5 Sunflower ---//--- 117 100.00 0 0.00 117 90090.00 0.00 90090.00 770.00 770.00
Sangamne
r
27483 368.79 4611 131.21 32094 47652103.72 0 1043363.40 0 48695467.12 5451.93 780.16 5875.97
1 Jwar ---//--- 3100 32.63 6400 67.37 9500 1804851.00 1663552.00 3468403.00 582.21 259.93 365.10
2 Wheat ---//--- 16400 100.00 0 0.00 16400 26745120.00 0.00 26745120.00 1630.80 0.00 1630.80
3 Gram ---//--- 8600 100.00 0 0.00 8600 5779200.00 0.00 5779200.00 672.00 0.00 672.00
4 Safflower ---//--- 0 0.00 75 100.00 75 0.00 33825.00 33825.00 0.00 451.00 451.00
5 Sunflower ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00
Akola 28100 232.63 6475 167.37 34575 34329171.00 0 1697377.00 0 36026548.00 2885.01 710.93 3118.90
1 Jwar ---//--- 150 50.00 150 50.00 300 85800.00 40800.00 126600.00 572.00 272.00 422.00
2 Wheat ---//--- 3750 100.00 0 0.00 3750 6203625.00 0.00 6203625.00 1654.30 0.00 1654.30
3 Gram ---//--- 5750 100.00 0 0.00 5750 3632045.00 0.00 3632045.00 631.66 631.66
4 Safflower ---//--- 0 0.00 10 100.00 10 0.00 5760.00 5760.00 0.00 576.00 576.00
5 Sunflower ---//--- 0 0.00 0 0.00 0 0.00 0.00 0.00 0.00 0.00
Kopergao
n
9650 250.00 160 150.00 9810 9921470.00 0 46560.00 0 9968030.00 2857.96 848.00 3283.96
1 Jwar ---//--- 2100 23.20 6952 76.80 9052 2220750.00 4190457.04 6411207.04 1057.50 602.77 708.26
2 Wheat ---//--- 9000 100.00 0 0.00 9000 18124200.00 0.00 18124200.00 2013.80 0.00 2013.80
3 Gram ---//--- 8900 100.00 0 0.00 8900 6126760.00 0.00 6126760.00 688.40 0.00 688.40
4 Safflower ---//--- 0 0.00 10 100.00 10 0.00 7550.00 7550.00 0.00 755.00 755.00
5 Sunflower ---//--- 150 100.00 0 0.00 150 96000.00 0.00 96000.00 640.00 640.00
Rahata 20150 323.20 6962 176.80 27112 26567710.00 0 4198007.04 0 30765717.04 4399.70 1357.77 4805.46
1 Jwar ---//--- 1100 56.12 860 43.88 1960 859188.00 285004.00 1144192.00 781.08 331.40 583.77
2 Wheat ---//--- 8160 100.00 0 0.00 8160 13693622.40 0.00 13693622.40 1678.14 0.00 1678.14
3 Gram ---//--- 6200 100.00 0 0.00 6200 5673000.00 0.00 5673000.00 915.00 0.00 915.00
4 Safflower ---//--- 0 0.00 100 100.00 100 0.00 57800.00 57800.00 0.00 578.00 578.00
5 Sunflower ---//--- 160 100.00 0 0.00 160 106560.00 0.00 106560.00 666.00 0.00 666.00
15620 356.1224 960 143.87755 16580 20332370 0 342804 0 2.1E+07 4040.22 909.4 4420.9114
Table No 25 presents the talukawise irrigated and rainfed area under cultivation in Rabi season in Ahmednagar district. The major crops
cultivated in Rabi season are jowar, wheat, gram, safflower and sunflower. Rabi is the major crop-growing season in Ahmednagar district as the
district receives maximum rainfall in the months of August and September from the rtreating monsoon. The available soil mosture is utilized for
145
Rabi crops. Jowar, gram and safflower are the major crops grown on available soil mosture. The total area sown under different crops in Rabi
season in Ahmednagar district is about 745994 ha and out of that 248169 ha area is under irrigation facilities i.e. 33.27 %.
The productivity of most of the Rabi season crops is improving perticularly wheat and gram because of effective and efficiently
dissemination and implementation of National Food Security Mission Components in the district. Seed rplacement is increased due to availability
of certified improved seed varieties in wheat and gram. The productivity of jowar is also increasing by initiating the village ssed production
programme on large area in major jowar growing talukas of the district. Hence, due to increase availablity of cetified seed of improved crop
varierieties, effefective extension of improved production technology through Farmers Field Shools helped for improving crop productivity. In case
of jowar the productivity is low as compared to state averages.
146
Agro-service centres play an important role in farming by way of making available the different farm inputs like seed, fertilizers,
pesticides/insecticides, growth hormones, small machinaries and implements.The centres are also helpful for making available poultry,cattle and
fish feeds. There are Dairy Co-operatives’milk processing and chilling centres.The agro-service provider also important in agricultural
communication as they communicate new technological innovations and inputs to farmers within very short time .Hence they are the most
influential private extensionist in agricultural development.The role played by them cannot be overlooked. So They should be the part of public –
private extension co-ordination.It is seen from the above table that there are 7821 numbers of different vAgro-service centres operating in the
district.Some of these are in public.private and government sectors.
Table 28: Area, Production and Productivity Trend of Main Crops in the Distri
(Area – ha, Production – q, productivity – q/ha)
Sl. No. Name of
Crop
Normal 2004-05 to 2006-07 2007-08
(Projected)
2008-09 (Projected) 2009-10 (Projected) 2010-11 (Projected) 2011-12 (Projected)
Area Production (P) Productivity A P Y A P Y A P Y A P Y A P Y
Kharif Season
Cereals 1
Paddy 63.00 52.92 840.00 64.00 55.64 869.40 65.00 58.49 899.83 66.00 61.47 931.32 66.50 64.10 963.92 67.00 66.84 997.66
2 Maize 65.00 74.82 1151.00 200.00 280.00 1400.00 221.00 353.60 1600.00 222.00 399.60 1800.00 225.00 427.50 1900.00 230.00 460.00 2000.00
3 Bajara 2704.00 1679.18 621.00 2672.00 1736.80 650.00 2641.00 1776.73 672.75 2611.00 1827.70 700.00 2580.00 1935.00 750.00 2500.00 2000.00 800.00
4 Other cereals
24.00 14.52 605.00 23.72 14.85 626.18 23.45 15.20 648.09 23.17 15.55 670.77 22.91 15.90 694.25 22.64 16.27 718.55
Total Kh. Cereals 2856.00 1821.44 3217.00 2959.72 2087.30 3545.58 2950.45 2204.02 3820.67 2922.17 2304.31 4102.10 2894.41 2442.50 4308.17 2819.64 2543.11 4516.21
Pulses 0.00 103.72 0.00 94.45 0.00 66.17 0.00 38.41 0.00 -36.36 0.00
1 Mung 188.00 71.06 378.00 270.00 104.10 385.56 273.00 109.20 400.00 278.00 118.15 425.00 282.00 126.90 450.00 286.00 143.00 500.00
2 udid 37.00 13.99 378.00 97.00 38.80 400.00 98.40 44.28 450.00 99.00 49.50 500.00 101.00 55.55 550.00 111.00 66.60 600.00
3 Tur 176.00 78.85 448.00 225.00 102.82 456.96 228.00 114.00 500.00 231.00 127.05 550.00 235.00 141.00 600.00 250.00 175.00 700.00
Total Kh. Pulses 401.00 163.90 1204.00 592.00 245.72 1242.52 599.40 267.48 1350.00 608.00 294.70 1475.00 618.00 323.45 1600.00 647.00 384.60 1800.00
Total Kh. Foodgrains 3257.00 1985.34 4421.00 3551.72 2333.01 4788.10 3549.85 2471.50 5170.67 3530.17 2599.01 5577.10 3512.41 2765.95 5908.17 3466.64 2927.71 6316.21
Oilseeds 0.00 191.00 0.00 198.40 0.00 207.00 0.00 217.00 0.00 246.00 0.00
1 Soyabean 102.00 119.75 1174.00 700.00 840.00 1200.00 713.00 891.25 1250.00 727.43 945.66 1300.00 741.00 1000.35 1350.00 756.00 1058.40 1400.00
2 Groundnut
66.00 52.60 797.00 67.29 54.71 812.94 66.93 56.89 850.00 69.96 62.96 900.00 71.33 67.76 950.00 72.00 72.00 1000.00
3 Sunflowa 102.00 38.25 375.00 125.00 47.81 382.50 110.49 49.72 450.00 129.00 64.50 500.00 132.00 72.60 550.00 135.00 81.00 600.00
147
r
Total Kh.Oilseeds 270.00 210.60 2346.00 892.29 942.52 2395.44 890.43 997.87 2550.00 926.39 1073.12 2700.00 944.33 1140.71 2850.00 963.00 1211.40 3000.00
0.00 622.29 0.00 620.43 0.00 656.39 0.00 674.33 0.00 693.00 0.00
0.00 622.29 0.00 620.43 0.00 656.39 0.00 674.33 0.00 693.00 0.00
S’cane 1030.00 61800.00 60000.00 730.00 44895.0
0
61500.00 700.00 45500.00 65000.00 665.00 46550.00 70000.00 665.00 49875.00 75000.00 665.00 59850.00 90000.00
Cotton 134.00 29.21 218.00 400.00 89.38 223.45 450.00 103.07 229.04 460.00 115.00 250.00 470.00 129.25 275.00 480.00 144.00 300.00
Total 1164.00 61829.21 60218.00 1130.00 44984.3
8
61723.45 1150.00 45603.07 65229.04 1125.00 46665.00 70250.00 1135.00 50004.25 75275.00 1145.00 59994.00 90300.00
Total Kharif Season 4691.00 64025.15 66985.00 5574.02 48259.9
1
68906.99 5590.28 49072.43 72949.71 5581.56 50337.14 78527.10 5591.74 53910.92 84033.17 5574.64 64133.11 99616.21
Cereals 1 Wheat 1021.00 1427.36 1398.00 1230.00 1783.50 1450.00 1250.00 1875.00 1500.00 1260.00 1953.00 1550.00 1350.00 2160.00 1600.00 1500.00 2550.00 1700.00
2 Jowar 4998.00 1749.30 350.00 4995.56 1789.53 358.23 4993.00 1872.38 375.00 4990.00 1996.00 400.00 4988.00 2244.60 450.00 4985.00 2492.50 500.00
3 Maize 107.00 142.95 1336.00 106.95 146.24 1367.40 99.74 149.60 1500.00 106.00 169.60 1600.00 106.00 180.20 1700.00 106.74 192.13 1800.00
Total Rabi Cereals 6126.00 3319.61 3084.00 6332.51 3719.27 3175.62 6342.74 3896.98 3375.00 6356.00 4118.60 3550.00 6444.00 4584.80 3750.00 6591.74 5234.63 4000.00
Pulses 0.00 206.51 0.00 216.74 0.00 230.00 0.00 318.00 0.00 465.74 0.00
1 Gram 601.00 331.15 551.00 620.00 352.55 568.63 630.00 362.25 575.00 640.00 384.00 600.00 650.00 422.50 650.00 660.00 462.00 700.00
Total Rabi Pulses 601.00 331.15 551.00 620.00 352.55 568.63 630.00 362.25 575.00 640.00 384.00 600.00 650.00 422.50 650.00 660.00 462.00 700.00
Total Rabi
Foodgrains
6727.00 3650.76 3635.00 6952.51 4071.83 3744.25 6972.74 4259.23 3950.00 6996.00 4502.60 4150.00 7094.00 5007.30 4400.00 7251.74 5696.63 4700.00
1 Sunflowa
r
71.00 47.00 662.00 71.34 48.88 685.17 72.62 50.84 700.00 72.03 54.02 750.00 72.38 57.90 800.00 72.73 65.46 900.00
2 Safflower 290.00 138.04 476.00 291.40 143.56 492.66 292.81 149.30 509.90 294.22 155.28 527.75 295.64 161.49 546.22 297.00 178.20 600.00
Total Rabi Oilseeds 361.00 185.04 1138.00 362.74 192.44 1177.83 365.43 200.14 1209.90 366.25 209.30 1277.75 368.02 219.39 1346.22 369.73 243.66 1500.00
Total Rabi Season 7088.00 3835.80 4773.00 7315.25 4264.27 4922.08 7338.17 4459.37 5159.90 7362.25 4711.90 5427.75 7462.02 5226.69 5746.22 7621.47 5940.29 6200.00
Pulses 1
mug 1.00 0.60 600.00 1.50 1.13 750.00 1.58 1.20 757.00 1.65 1.26 764.00 1.74 1.34 771.00 2.00 1.80 900.00
Total Summer Pulses 1.00 0.60 600.00 1.50 1.13 750.00 1.58 1.20 757.00 1.65 1.26 764.00 1.74 1.34 771.00 2.00 1.80 900.00
Total Summer Foodgrains
1.00 0.60 600.00 1.50 1.13 750.00 1.58 1.20 757.00 1.65 1.26 764.00 1.74 1.34 771.00 2.00 1.80 900.00
Oilseeds Groundnu
t
11.60 20.04 1728.00 11.71 20.85 1779.84 14.00 25.67 1833.24 16.00 30.21 1888.23 18.00 35.01 1944.88 20.00 44.00 2200.00
Total Summer
Oilseeds
11.60 20.04 1728.00 11.71 20.85 1779.84 14.00 25.67 1833.24 16.00 30.21 1888.23 18.00 35.01 1944.88 20.00 44.00 2200.00
Total Summer season 12.60 20.64 2328.00 13.21 21.97 2529.84 15.58 26.86 2590.24 17.65 31.47 2652.23 19.74 36.35 2715.88 22.00 45.80 3100.00
Table No.28 presents the saesonwise and cropwise existing area and production and productivity of major crops of Ahmednagar district.It is also seen from the table the seasonwise ,cropwise proposed area ,production and productivity of major crops of district.
148
In case of total area under kharif cereals the area under paddy and maize is proposedt obe increased whereas the areaunder bajra and other cerals is proposed to be reduced. The area under kharif season pulses like mung, tur and udid is proposed to be increased. The area under kharif season oilseeds like soyabean, sunflower nad groundnut is also proposed to be increased.The present area under sugarcane cultivation is about 103000 ha.The area under sugarcane cultivation is proposed to be diverted to other crops like vegetables nad fruit crops also irrigated cotton. The area under cotton is proposed to be increased from present area of about 48000ha.The aera under wheat and gram is proposed to be increased.The productivity of all the crops is proposed to be increased by effective implementation extension programmes.
149
Table 41: Planning of Soil Survey Programme (Year 2007 -08 to 2011 – 12)
Sr.
No.
Watershed No Name
of the
Taluka
Geographical area of
Watershed
Area surveyed Since
beginning upto Mar 2007
Area to be deleted
from survey area
Area to be surveyed in year 2007 - 08 to
2011 - 12
No of
Villages
Area
( Ha )
No of
Villages
Area
( Ha )
No of
Villages
Area
( Ha )
Month No of
Villages
Area
( Ha ) 1 A.nagar Not Related
Total
1 Pathardi Not Related
Total
1 S.A.-12 Karjat 87 149190 26 35882 49 95303 Jun,Aug 12 17768
Total 87 149190 26 35882 49 95303 12 17768
1 S.A.-14
Jamkhed
4 5381 4 5381 - - 07-08 - -
2 S.A.-17 19 24886 2 2428 - - 08-09 17 22458
3 S.A.-18 16 16684 16 16684 - - 09-10 - -
4 S.A.-19 23 34109 2 2816 2 2391 10-11 19 28902
Total 62 81060 24 27309 2 2391 36 51360
1 S.A.-5
Shrigonda
2 4074 2 4074 - - - - -
2 S.A.-11 12 17762 12 17762 - - - - -
3 B.M.-15 9 13751 - - 2 4618 - - -
4 B.M.-16 3 5738 - - 3 5738 Apr-Mar. 7 9133
5 B.M.-28 11 15674 - - 11 15674 - - -
-6- -B.M.-29 8 25658 4 13156 4 12502 - - -
-7 B.M.-30 11 27469 4 8269 7 19200 - - -
8 B.M.-31 13 21903 1 1348 12 20555 - - -
9 B.M.-32 1 2519 1 2519 - - - - -
10 B.M.-33 16 25727 - - 16 25727 - - -
Total 86 160275 24 47128 55 104014 - 7 9133
1 G.V.-37
Shrirampur
14 17383 10 13555 4 3828 - - -
-2- G.V.-38 9 11658 3 2245 6 9413 - - -
3 G.V.-119 8 6623 2 2050 6 4573 - - -
4 G.V.-122 14 16767 4 6055 10 10712 - - -
5 G.V.-123 1 1023 2 - 1 1023 - - -
Total 46 53454 19 23905 27 29549 - - -
1 G.V.-56
Shevgaon
8 14401 8 10937 - - 1 3464
2 G.V.-128 15 11814 1 1203 14 10154 - -
3 G.V.-129 16 11656 1 1420 12 8523 09-10 3 1713
4 G.V.-130 10 7735 - - 10 7735 - - -
5 G.V.-132 19 17566 12 14097 7 3289 - - -
6 G.V.-134 20 20876 14 13695 6 7176 - - -
150
7 G.V.-135 20 13655 20 13655 - - - - -
8 G.V.-136 7 7376 6 5197 1 2179 - - -
9 G.V.-137 5 5724 1 1027 4 4703 - - -
Total 120 110803 63 61225 54 43759 - 4 5177
1 Newasa Not Related
Total
1 Rahuri Not Related
Total 1 G.V.-22
S’ner
8 11189 8 11189 - - - - -
2 G.V.-25 2 5243 2 5243 - - - - -
3 G.V.-29 12 14276 12 14276 - - - - -
4 G.V.-101 3 2657 3 2657 - - - - -
5 G.V.-102 3 4085 3 4085 - - - - -
6 G.V.-105 6 5501 1 838 - - 09-12 5 4663
7 G.V.-106 11 11434 11 11434 - - - - -
8 G.V.-107 13 10003 13 10003 - - - - -
9 G.V.-108 13 15956 4 9986 - - 09-12 9 597
10 G.V.-109 15 11207 15 11207 - - - - -
11 G.V.-110 11 8348 11 8348 - - - - -
12 G.V.-111 16 11495 8 7277 8 4076 - - -
13 G.V.-112 21 23713 16 20422 5 3187 - - -
14 G.V.-113 9 14522 9 14522 - - - - -
15 G.V.-120 6 7522 6 7522 - - - - -
16 G.V.-123 1 487 - - 1 487 - - -
Total 150 157638 122 139009 14 7760 - 14 10633
1 B.M.-1
Akola
4 6880 9 6880 - - - - -
2 G.V.-18 1 566 1 566 - - - - -
3 G.V.-22 2 5276 2 5276 - - - - -
4 G.V.-100 35 30279 35 30279 - - - - -
5 G.V.-101 13 21213 13 21213 - - - - -
6 G.V.-102 22 18213 22 18213 - - - - -
7 G.V.-103 22 18506 22 18506 - - - - -
8 G.V.-104 16 12238 16 12238 - - - - -
9 G.V.-105 29 24857 3 1339 - - 09-12 26 23518
10 G.V.-106 5 9711 5 9711 - - - - -
11 G.V.-107 2 1292 2 1292 - - - - -
12 G.V.-108 1 1217 - - - - - 1 1217
151
Total 157 150248 130 125513 - - - 27 24735
G.Total- 708 862668 407 461076 228 307521 - 73 94071
Table No .41 presents the talukawise watersheds, number of villages and area of watersheds in ha of Ahmednagar district. Upto March 2009
total 407 villages with 461076 ha area was surveyed in the district. Area to be deleted from survey area is also presented in the table. During the
period from 2007-08 to 2011 –12 total 73 villages with 94074 ha is proposed to be completed in the district
Table 44 : Planning of Soil Testing Programme ( Year 2007 -08 to 2011 – 12)
Sr.
No. Sample Types No of Villages Total Samples to be analysed
Total Soil Health Cards to be
distributed ( 2007 -08 to 2011 – 12)
1 General Soil sample
600 6000 4087
2 Special soil sample
1591 500 1886
3 Micro nutrient soil sample
1591 1000 1402
4 Soil survey sample - 500 -
5 Water sample
- 500 834
6 Tissue (leaf &petiole)sample
- - -
Total
1591 8500 8209
Table No 44 presents the number of villages to be covered for analysing different types of soil samples and water samples and total soil
health cards to be distributed during the period from 2007-08 to 2011 –12. It is proposed to analysed 8500 nuber of samples and 8209 soil health
card to be distributed from 1591 villages of Ahmednagar diatrict.
152
Table 48 : Varietal Demonstration in Next Five Year (Phy Area covered in ha/No.) (Fin – Rs. In lakh)
Name of crop
Average Area per demon-stration
(ha.)
Present Area under
Varietal demon.
(ha)
Varietal Demonstrations In 2006-07
Varietal Demonstration Projection (Phy in No)
07-08 08.09 09.10 10-11 11-12
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin No. of Demos
conducted
Area covered (ha)
Paddy 0.40 932 4 1.60 3 0.06 480 9.60 545 1.09 550 11.00 600 12.00
Red gram 200 30 30.00 8 0.24 30 0.40 55 1.65 60 1.80 70 2.10
K.jawar 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bajara 0.40 1282 73 29.20 26 0.52 80 1.60 455 9.10 480 9.60 500 10.00
R. Jawar 0.40 5163 106 42.40 24 0.48 1369 27.38 1017 20.34 1100 22.00 1150 23.00
Wheat 0.40 1346 91 36.40 16 0.32 570 9.43 600 12.00 650 13.00 700 14.00
K & S Gr.Nut 1.00 200 4 6.00 2 0.02 235 3.09 300 9.00 350 1050 400 12.00
Sunflower 1.00 400 5 5.00 18 0.54 0 0 33 0.99 40 1.20 50 1.50
Soyabean 1.00 555 55 55.00 26 0.78 381 6.22 400 12.00 450 13.50 500 15.00
Gram 1.00 890 166 166.00 9 0.27 484 6.45 500 15.00 550 16.50 600 18.00
Mung 1.00 60 0 0 31 0.93 0 0 0 0 0 0 0 0
Sugarcane 0.50 768 112 421.80 873 43.05 98 6.68 6.30 47.25 600 48.75 700 52.50
Cotton 0.40 593 9 9.00 8 0.32 491 7.25 290 6.60 250 7.50 500 9.00
Maize 1.00 202 6 6.00 7 0.12 90 3.60 75 3.00 80 3.20 90 3.60
Total 8.1 12591 661 808.4 1051 47.65 4308 81.7 4276.3 138.02 5160 1198.0
5 5860 172.7
153
Table 49: Farmers Field Schools Projection in Next Five Year
Name of
Crop
Average
Area ha.
Present Area
Under IPM in
ha.
IPM of Demons in 2006-07
IPM Projection Financial Outlay
No of
Demos Conduc
ted
Area covered ha.
2007-08 2008.09 2009-10 2010-11 2010-11 2007-08 2008.09 2009-10 2010-11 2010-11 Total
No of
Demo
Area
No of
Demo
Area ha.
No of
Demo
Area ha.
No of
Demo
Area ha.
No of
Demo
Area
ha. Fin Fin Fin Fin Fin Fin
Jowar 515200 230 150 600 242 242 360 360 525 525 750 750 1250 1250 1.21 1.80 2.62 3.75 6.25 15.63
Oilseed 65900 2402 160 160 703 703 874 874 1347 1347 1797 1797 2142 2142 3.51 4.37 6.73 8.98 10.71 34.30
Pulses 109100 1392 640 640 1092 1092 1598 1598 2038 2038 2838 2838 3278 3278 5.46 7.99 10.19 14.19 16.39 54.22
S,cane 5300 175 175 175 95 95 250 250 425 425 850 850 1125 1125 0.475 1.25 2.125 4.25 5.625 13.725
Cotton 13300 200 50 50 80 80 100 100 140 140 160 160 200 200 0.40 0.50 0.70 0.80 1.00 3.40
Total 708800 4399 1175 1625 2212 2212 3182 3182 4475 4475 6395 6395 7995 7995 11.055 15.91 22.365 31.97 39.975 121.275
Table No 49 presents the average area under jowar, oilseeds, pulses, sugarcane and cotton crops in Ahmednagar district, present area under
IPM demonstrationa and nuber of demonstrations conducted in the year 2006-07. During the year 2006-07 total 1175 number of IPM
demonstrations with an areaof about 1625 ha were arranged in the district. The yearwise projections with financial outlays during XI PlanPeriod are
given in the table. It is seen from the data that the total 24259 number of IPM demonstations are proposed to be arranged covering an area of about
24259 ha. The total financial outlay of Rs.121.275 lakh is proposed.
154
Table 50 : Additional area to be brought / under Organic Farming in Next Five Years
Sr. No.
Taluka Present area under Organic Farming
Area to be brought under Organic Farming Total
2007-08 2008-09 2009-10 2010-11 2011-12
1 A,nagar 500.00 100.00 200.00 300.00 400.00 500.00 1500.00
2 Parner 2250.00 3000.00 3500.00 4000.00 4500.00 5000.00 20000.00
3 Pathardi 1500.00 250.00 250.00 300.00 400.00 500.00 1700.00
4 Karjat 80.00 250.00 350.00 550.00 650.00 800.00 2600.00
5 Jamkhed 89.00 300.00 700.00 1000.00 1300.00 1500.00 4800.00
6 Shrigonda 40.00 45.00 60.00 75.00 90.00 100.00 370.00
7 Shrirampur 60.00 750.00 1000.00 1250.00 1500.00 2000.00 6500.00
8 Shevgaon 500.00 600.00 700.00 800.00 1000.00 2000.00 5100.00
9 Newasa 120.00 150.00 200.00 250.00 300.00 400.00 1300.00
10 Rahuri 110.00 210.00 280.00 350.00 450.00 550.00 1840.00
11 Sangamner 60.00 100.00 150.00 200.00 250.00 300.00 1000.00
12 Akole 500.00 500.00 550.00 600.00 600.00 650.00 2900.00
13 Kopargaon 250.00 250.00 300.00 350.00 400.00 450.00 1750.00
14 Rahata 200.00 300.00 400.00 500.00 600.00 650.00 2450.00
Total 6259 6259.00 6805.00 8640.00 10525.00 12440.00 15400.00
Table No 50 indicates the talukawise present area under organic cultivation and proposed area to be covered during the Plan Period.
The organic farming is promoted under State Extension Work Plan wherein vermicompost, biodynamic compost preparation, green manuring and
certification of oganic cultivation activities are implemented. Organic cultivation is being promoted to increase the soil health to lower dependence
on chemical fertilizers and plant protection chemicals for crop production to reduce the chemical residues in food and also to environmental
degradation for making agricultural production on sustainable basis. The growing concern about the chemical residues in food and its bad effect
on human health there is increase demand for organically produce.
155
It is seen from the table that present area under organic cultivation is of about 6259 ha and at the end of this present plan period it is the
area under organic cultivation is proposed to increase to 15400 ha i.e. 40.65 % increase over the present area.
Table 73. Group Organizations in the District
S.
No
Taluka Farmers Clubs Krishi Vigyan Mandals Commodity groups
/FIG/Fos
Self Help Groups (SHGs) No of Villages
Covered
Nos. Members Nos. Members Nos. Members Nos. Members
1 Nagar 3 140 98 98000 0 0 2 30 -
2 Parner 3 60 97 97000 0 0 1 50 -
3 Pathardi 3 60 97 97000 0 0 2 30 -
4 Karjat 2 50 84 84000 0 0 1 30
5 Jamkhed 2 50 54 54000 0 0 2 40 -
6 Shrigonda 4 80 84 84000 0 0 2 40 -
7 Shrirampur 1 25 64 64000 0 0 1 30 -
8 Shevgaon 1 20 101 101000 0 0 2 40 -
9 Newasa 2 50 99 99000 0 0 3 60 -
10 Rahuri 2 40 59 59000 0 0 2 40 -
11 Sangamner 5 100 101 101000 15 150 12 110 -
12 Akole 2 40 84 84000 0 0 1 20 -
13 Kopargaon 2 40 68 68000 0 0 2 40 -
14 Rahata 2 40 62 62000 0 0 1 20
Total 34 795 1152 1152000 15 150 34 580
Tablec No 73 indicates the talukawise Farmers Clubs, Krishi Vigyan Mandals, Commodity / Farmers Interest Groups and Self-Helf Groups
formed for various agricultural commodities by agricultural department. The main purpose is to organize the farmers having common interest in
adoption of production technology, post- harvest management and domestic aswell as export marketing marketing. Some of farmers groups are
organized for seed production, processing and marketing of various foods- grain crops in district. There are 34 Farmers Clubs, 1152 Krishi Vigyan
Mandals, 15 Commodity Groups 34 SHGs formed under the guidance of agricultural department. There total 1153525 farmer members registered
under these groups.The improved agricultural production technologies , new programmes and schemes ,seed production programme ,soil health
156
improvement, seed treatment campaigns are disseminated to other farmers by disseminating to the groups through village level agricutural
extension functionaries. Thus, effective dissemination of programes and schemes and feedback system is being strengthen by farmer led
extension.
157
Chapter V
Allied Agricultural Sector
5.1. Introduction:
The Farming system includes the agricultural and allied farm based enterprises
practiced by the farmers. Farming system therefore, refers to the farm as an entity of
inter-dependent farming enterprises carried out on the farm. The income from cropping
alone is not sufficient to sustain the farm families. A judicious mix of any one or more of
the enterprises like horticulture, dairying, animal husbandry or agro-forestry and
sericulture with the agronomic crops complement the farm income and help in recycling
the farm residues. It is expected that the different farm enterprises should ensure the
periodic income to the farm family. Such diversified farm enterprises reduces the risk of
crop failure due to various reasons especially for small and marginal farmers. Dairy
farming, poultry farming, sheep, goat, pig rearing etc. play a very important role in the
lives of the rural households. These are not only a major source of employment &
supplementary income, but also help in enhancing the intake of nutritional food by the
rural poor. Historically, dairy, farming has been, and continues to be a popular activity in
rural India.
Animal husbandry & dairy development is second major sector which comes
after Agri business Dairy farming is a very popular activity among the farmers in
Ahmednagar district. It is carried out in the co-operative as well as private sector. As
per 17th Livestock Census 2003, the district has 1513926 bovines, 394994 sheep,
1055767 goat. Overall milk collection of the district is about 2907.65 lakh liters per year.
Also 2139029 poultry birds are being reared by the farmers. The major gap in milk
production is low yield per animal, miss-management of dairy animal and low
productivity of animal. It will be improved by developing exotic blood better training to
the farmers about dairy management and importance. Sheep & goat rearing activity is
generally popular among families living below poverty line & with small/marginal
farmers. The present fish production in the district is 1955 mt during the year 2006-07
and in the view of availability of irrigation dams in the district, reservoir fisheries could
be taken up on large scale. The production from these reservoirs can be effectively
158
used for inland aquaculture through pond culture in the marginal areas of reservoirs,
cage culture & pen culture within the reservoirs, besides offering sustainable capture.
Sericulture-related activity is picking up in the district and spread across 468
hectares in the district. It is one of the supplementary enterprises recently being
adopted by number of farm families as a major source of employment generating
activity particularly in the talukas of Parner, Shrigonda, Ahmednagar and Newasa. The
process begins with farmers planting Mulberry saplings in the shade. Once these
samplings grow sufficiently, government officials are called in to inspect the tree and
the leaves.
5.2. Horticultural Development:
Ahmednagar district offers a very conductive climate for growing variety of
horticultural and plantation crops. Horticulture activities not only provide additional
income to the farmers, but also create employment opportunities in the rural areas. The
Horticulture Development is widely progressing in the district.
Yield gap Analysis of Major Horticultural Crops
Vegetables:
The major vegetable crops cultivated in Ahmednagar district are onion, tomato,
chilly, brinjal, cabbage, cauliflower, bitter guard, bottle guard, and cucumber and other
vegetables but area under onion, tomato and brinjal is more than other vegetables.
Recently under National Horticulture Mission, vegetable growers are encouraged to
cultivate vegetables in shade net houses. These shade net houses are erected in
groups to save the initial cost of erection and cultivation. The technical training and
consultancy given by Horticultural Training Centre, Pune. The vegetable cultivators are
exposed to the shade net house vegetable cultivating farmers of Aurangabad District.
Farmers Groups are formed in Newasa & Shrirampur Shevgaon blocks and farmers
training were organized under Agricultural Support Services Component of
Maharashtra Water Sector Improvement Project being implemented in Mula Command
Area of these blocks. Production planning for capsicum, cucumber & cut flowers is
initiated in shade net houses. This is an opportunity for small farmers for adopting high
value crops and to utilize the available land and water resources efficiently for quality
159
production. Agreement for marketing with retail markets and related discussions are at
progressive stage.
Onion: Onion is one of the major vegetables crop cultivated in all block of
Ahmednagar district. The area under onion cultivation is about 54505 Ha. Average
production of onion in the district is of 100,000 tones/ year. It is the only vegetable crop
having maximum area under cultivation in kharif as well as in rabi season. The
productivity of onion crop is 170 quintals per hectare.
Onion Storage Structures: 70% Onion production arrives in the markets during months
of March to May. More arrival of onion in the market likely to fall the rates for onion.
During the shortages of onion in the markets, consumers have to purchase the onion at
higher rates. Hence, Onion is required to be stored during the months from June to
October. Onion Research Station, Rajguru, Dist, Pune made available technology for
Onion Storages. It is now possible to store onion in the month of May and to bring it in
the markets up to the months of October. 1404 Storage Structures constructed with
41265 Mt Storage Capacity.
S.No. Identified Gaps in Technology adoption by Farmers (Onion)
1 Nursery management practices for production seedlings not followed
2 More application of N fertilizers leading more vegetative growth and low
quality bulb production having low keeping quality
3 No application of sulpher, biofertilizers and micronutrients reducing quality
and yield of onion.
4 Application of excess irrigation water to onion
5 Non application of weedicides as per recommendations
6 Adoption of onion varieties having low keeping quality
7 Proper curing period in field for onion after harvest is not observed
8 Poor post harvest management for onion
9 Less onion storage capacity of onion
10 NO proper grading of onion
11 Low returns to onion grower in existing marketing system
12 No processing is followed
13 High cost of onion production and low returns
160
Garlic:
S.No Identified Gaps in Technology adoption by Farmers
1 No proper layout preparation for Garlic
2 No availability of good quality planting material
3 No adoption of integrated nutrient management
4 No adoption of integrated nutrient management
5 No adoption of integrated nutrient management
6 No adoption of integrated nutrient management
Cabbage & Cauliflower:
S.No Identified Gaps in Technology adoption by Farmers
1 No availability pure seed in public sector
2 Poor water management
3 Poor nutrient management in cabbage/cauliflower
4 Poor nutrient management in cabbage/cauliflower
5 Poor nutrient management in cabbage/cauliflower
Bottle gourd:
S.No. Identified Gaps in Technology adoption by Farmers
1 Unavailability of good quality pure seed
2 Non adoption of Bower system
3 Poor water management practices
4 Poor nutrient management practices
5 No technical knowledge regarding fruit setting
6 Improper plant protection
7 No grading, packaging is followed.
161
Bitter gourd/ Ridge gourd:
S.No. Identified Gaps in Technology adoption by Farmers.
1 No availability of pure seed
2 Poor trailing system
3 Poor plant protection
4 Poor grading and packaging
Cucumber:
S.No. Identified Gaps in Technology adoption by Farmers.
1 Lack of availability of pure seed
2 Poor technical knowledge of fruit setting.
3 Poor fertilizer management
4 Poor water management
5 Poor plant protection
Okra:
S.No. Identified Gaps in Technology adoption by Farmers
1 No availability of pure seed material
2 No availability of virus resistant varieties
3 Poor fertilizer management
4 Indiscriminate use of insecticides /pesticides
5 Lack of grading
6 No integrated pest management
Ginger:
S.No. Identified Gaps in Technology adoption by Farmers.
1 Improper selection of soil and layout
2 No availability good quality planting material & high cost of planting material
3 No adoption of integrated nutrient management
4 Lack of integrated nutrient management
5 Poor Water management practices
6 Infestation of rhizome fly and root rot
162
7 Poor Plant protection measures undertaken
8 Lack of storage, grading value addition and processing
Tomato: It is a major vegetable crop grown in the district. The total area under tomato
cultivation in Ahmednagar district is of 3716 Ha. It is just next to the onion in terms
of its area under cultivation. It is cultivated in almost all the blocks of the district but
cultivation is mainly concentrated in the blocks of Sangamner, Akole, Parner and
Shrigonda.Cultivation of tomato in these blocks is mainly marketed in metro cities in
groups by farmers. They have developed the transport and marketing networks. It is
being marketed mostly through middlemen in metro markets. Only private company
hybrid seed varieties are being cultivated. The market rates highly fluctuating to its
extremes and even sometimes farmers could not get the rates to meet the transport
expenditures. Identified major gaps in technology adoption are given below.
S.N. Identified Gaps in Technology adoption by Farmers (Tomato)
1 Recommended nursery management practices not followed
2 No fertilizer management
3 Poor water management
4 Severe yield losses due to spotted wilt virus
5 No integrated pest management followed
6 No training and support to tomato crop
7 Poor grading practices
8 Lack of genuine seed material in public sector & depend more on private sector
9 No facility for cold storage & cooling chain
10 No processing facilities
11 Poor weed management
12 Indiscriminate use of insecticides /pesticides
13 Severe yield losses due to leaf curl & spotted wilt virus
Pea: A green pea is major cash crop in Parner and adjoining areas of Ahmednagar
District. Pea is grown over an area of about 5000 Ha. It is grown in kharif as well in
rabbi season also. The annual sale of pea seed is of nearly Rs. 5.0 crores. But due to
unavailability of pea seed locally, the farmers have to depend on private seed being
163
brought from other particularly north Indian states. Many times the seed is not pure in
genetically. Pure seed is a critical input in green production. The special emphasis is
given under MAHAPIC on locally production of certified and foundation seed of Arkel
pea Variety. The production of green pea can improve by adoption of improved
production technology. Presently following gaps in technology adoption at farmer’s level
have been identified in pea productions that are enlisted below.
S.N Identified Gaps in Technology Adoption (Pea)
1 Unavailability of pure seed of Arkel Pea variety
2 No soil testing for fertilizer management
3 No insitu soil moisture conservation measures
4 Less application of organic manures
5 No seed treatment for pea seed
6 No inoculation of pea seed with biofertilizers
7 No adoption of recommended plant spacing & plant population
8 No integrated fertilizer management
9 No integrated pest management
10 Indiscriminate spraying of insecticides/ fungicides
11 No water management
12 Lack of value addition and processing for green peas.
Other Vegetables: Vegetable crops are grown where irrigation facilities are available.
Vegetables are mainly cultivated by farmers having seasonal or permanent well
irrigation water. Area under other vegetables is about 24850 ha and average per
hectare productivity is around 240 quintals. Crop wise production constraints and gaps
in technology adoption are given below.
S.No. Identified Gaps in Technology adoption by Farmers (other vegetables)
1 No recommended fertilizer management
2 Recommended water management not followed
3 Heavy infestation of nematode
4 Recommended nursery management practices not followed
5 Indiscriminate application of insecticides /pesticides on Brinjal
6 No integrated pest management followed
164
Fruit Crops:
Guava, Mango, Mosambi, Santra, Chikku, Banana and Pomegranate is major
fruit crop cultivated on an area of about 7318 Ha. It is` mainly grown in light to medium
type of soils of Parner, Sangamner, Akole and on few areas in other block of district.
Recently the productivity of pomegranate crop is threatened due a complex of
diseases. The present productivity is about 350 quintals per hectare. Guava is mainly
cultivated in Kopargaon, Rahata and area adjoining to Shirdi. The area under guava is
3000 Ha and productivity is only 120 quintals per hectare. Recently introduced
rejuvenation technique proving hopeful to improve its productivity. Banana cultivation
started recently replacing area under sugarcane in command areas of Mula. The trend
is of planting of tissue culture seedling and installation of micro-irrigation for banana.
National Horticulture Mission has really encouraged farmers for banana plantation. The
area under banana is 319 Ha. And productivity is of 380 quintals per hectare. The crop
wise gaps in technology adoption are given below.
K. Lime:
The total area under K.Lime cultivation in district is about 6000 Ha and it is
mainly.Sangamner, Shrigonda, Karjat, Jamkhed & Pathardi are the main K.Lime
cultivating block of district where the planation is of more than eight years old.K.Lime
crop is a sure source of income to the small and marginal farmers in dry land areas.
The old planted orchards are mostly having local selections of K.Lime. Now improved
high yielding Sai Sarbati variety is available other than local varieties.K.lime old
orchards are being rejuvenated and certified into organic under National Horticulture
Mission. The major technological gaps identified in adoption of recommended
technology by farmers are enlisted below.
S.N. Identified Gaps in technology Adoption
1 Lack of water and soil sampling and fertilizer application
2 Non application of micro-nutrients
3 Dense plantation close to ground branches, more infection of pests and diseases
4 Old plantation in soils with higher PH values
5 Close plantation than recommended planting distance
6 Flow irrigation method is followed, contact of water to stem resulting infection of
fungal diseases
165
7 Non adoption of integrated nutrient and also integrated pest management practice
S.N. Identified Gaps in technology Adoption
1 Frequent pest & disease incidence
2 Unavailability and higher cost of skilled labour
3 Lack of local processing units
4 Pink berry, water berry, sterility of vines and lack of tissue analysis
5 Unavailability of Pink berry resistant grape varieties
6 Water scarcity experienced after April pruning operations
7 Indiscriminate application of chemical fertilizers and pesticides resulting into
higher percentage of residues in fruits
8 Increasing infection of powdery mildew, downy mildew and anthracnose leaf
spots on grapes vine
9 Increasing attack by major grape vine pests like mealy bugs ,leaf eating
caterpillar, borer and mites
10 Leaf chlorosis, immature cane, uneven maturity of gapes, shot berries are more
serious problems
Santra & Mosambi:
S.No. Identified Gaps in Technology adoption by Farmers.
1 Improper selection of soil
2 Unavailability of good quality seedlings/ cultivars
3 Dense planting
4 Lack of proper watering methods
5 Imbalanced fertilizer application
6 Lack of application of micronutrients
7 Lack of proper bahar treatment
8 Lack of proper training and pruning operations
9 High mortality due to decline and die back
166
Guava: The total area under guava plantation in the district is about is 4221 Ha.
Variety. This plantation is concentrated in the Rahata, Kopargaon and Shrirampur block
of Ahmednagar district. Most of these are old orchards. Under EGS linked Horticulture
Development Scheme the plantation of guava is also increasing. Majority of area under
guava is under Lucknow- 49. Under the guidance of Scientists from Central Guava
Research station, Lucknow the capacity building programmes of guava growers were
organized. Rejuvenation of old guava orchards is initiated under National Horticulture
Mission. The major gaps in technology adoption identified at farmers’ level in guava
cultivation are.
S.No. Identified Gaps in Technology adoption
1 Lack of soil testing
2 No fertilizer management
3 Low bahar treatment techniques
4 Reduced productivity of old orchards due to lack of pruning
5 Lack of water management
6 Inadequate plant protection measures
7 No clean cultivation practices
8 No technical knowledge of rejuvenation
9 No storage and cold storage facilities
10 No of Fruit processing
11 No drainage facilities in guava orchard.
Pomegranate: Area in the district is about 6300 ha mainly in blocks of Sangamner,
Shrigonda, Karjat, Kopargaon, Pathardi, Shrirampur, Newasa and Rahuri.
Polypackaging technology available for pomegranate fruit. Area under Bhagava variety
of Pomegranate for export production. During the year 2005-06 2760 MT of
Pomegranate fruits exported. To meet the shortage of planting material of Bhagava
Pomegranate variety, 16 Nurseries are registered. Training of farmers under the
guidance of experts. Application of bio-fertilizers and bio-pesticides for pomegranate.
Regular subscription of farmers for Technical Magazine of Dalimbrutt. Technical
guidance to pomegranate cultivators for management of Oily spot disease. Dieback
infested Pomegranate orchards selected under Pomegranate rejuvenation activities.
167
Integrated nutrient management activity included under Precision Farming Frontline
demonstrations.
S.N. Identified Gaps in technology Adoption
1 Improper land selection
2 Improper planting distance
3 No adoption of recommended varieties
4 No clean cultivation practices followed
5 Lack of bahar treatment
6 Severe yield losses & reducing quality due to oily spot disease
7 No fertilizer management
8 Losses due to nematode infection
9 Lack of pruning techniques
10 No water management
11 No proper interculturing
12 Heavy attack of fruit fly
Chikku: The area under Chikku plantation is of 3092.0 Ha.It is one the major
horticultural crop in the district. Due to least pest and disease problems most of farmers
are planting it where irrigation facilities are available. Due to good market demand it
gives better remunerative to the growers. The major gaps in technology adoption in
case of Chikku are given below.
S.No. Identified Gaps in Technology adoption by Farmers.
1 No proper land selection
2 Poor water management
3 Poor fertilizer management
4 Poor technical knowledge of bahar treatment
5 Problem of stem and stone borer
6 Lack of grading and packaging
7 Unavailability of root stock
8 Poor plant protection
9 Attack of sapota fruit borer
168
Papaya: Papaya cultivated by farmers as an alternative crop to sugarcane.Taiwaan786
variety under cultivation. Supply of viral free seedlings tested by Virological laboratory,
Pune.
S.No. Identified Gaps in Technology adoption by Farmers.
1 Unavailability of quality seed material for papaya
2 Lack of water management
3 Lack of fertilizer management
4 Attack of yellow vein mosaic and reduction in yield
5 Lack value addition and processing
Mango: Mango is an important dry land horticultural crop in the district. The area under
mango plantation is about 3521 Ha in the district. Most of the mango orchards are
planted under EGS linked Horticulture Development Scheme of State Government. The
plantation is of Keshar and other grafted varieties. The major identified gaps in
technology adoption are enlisted below.
S.N. Identified Gaps in technology Adoption
1 Close planting of mango orchard
2 Low fertilizer application
3 Low application of organic matter
4 Poor water management in mango orchard
5 Low interculturing in mango
6 Poor and improper plant protection in mango
7 Lack of preventive plant protection before flowering
8 No grading and packaging
9 No processing in mango
Banana: Recently the area under banana is increasing in Ahmednagar district. Total
area under banana plantation is of 238.0 ha. Previously the banana was cultivated on
small areas in some pockets of the district. The planting was done mainly through
suckers and cultivation practices were traditional. Many times the yield was not
economical due severe infestation of diseases which was carried through planting
material. It was not possible for multiple harvesting by maintaining ratoon crop were
169
main constraints for area under banana expansion. Due to advancement in
biotechnology tissue cultured banana seed lings are available that solved all the
problems related with traditional plantion.Market demand is also increasing. This has
created favorable situation for increasing banana plantation. Under National
Horticulture Mission subsidies are being given for banana plantations. Drip irrigation is
also provided under Micro-irrigation scheme. Farmers are now adopting liquid
fertilizers. Banana is the best example of precision farming. There is much opportunity
to increase the yield of banana. Presently the area under banana is increasing but
planting material is not available in public sector and growers have to depend on private
companies. Some of the identified gaps in technology adoption are listed below.
S.N. Identified Gaps in technology Adoption
1 No recommended soil selection
2 No recommened planting distance
3 Improper water management
4 Poor fertilizer management
5 Unavailability of genuine planting material
6 No clean cultivation practices followed.
7 Lack of group marketing
8 Lack of value addition and processing
9 Market fluctuations.
Custard Apple
S.No. Identified Production Constraints
1 No proper panting distance followed in plantation of custard apple
2 No bahar treatment in custard apple.
3 No of fertilizer management
4 No water management practices followed
5 Unavailability of irrigation during summer season
6 Negligence towards control of mealy bugs affecting quality and rates
170
7 Lack of grading and packaging
8 Lack of value addition and processing
Fig:
S.No. Identified Production Constraints
1 Improper land selection
2 Lack of water management
3 No application of organic manures.
4 Lack of fertilizer management
5 No timely plant protection
Floriculture:
The cultivation of flower crops is concentrated in Parner, Ahmednagar,
Shrigonda, Shrirampur, Sangamner, Kopargaon and Rahata blocks of Ahmednagar
district. The major flower crops grown are chrysanthemum, marigold, Gallardia,
gladiolus and roses. Recently Green House cultivation is also started in the district.
Three Green houses have been started each of 1000 sq mts of .The Green house
cultivation includes flower production of Gerbera, Carnation, Rose as cut flowers
marketed in metro cities like Pune,Mumbai and Hyderabad. Holy places of Shani
Shinganapur in Newasa, Siddhtek in Shrigonda and Mohota in Pathardi blocks are
having good flower demand round the year. The cultivation of flowers like marigold,
Gallardia, chrysanthemum, gladiolus and roses with improved technology will be helpful
in providing employment opportunities to farmers. Under National Horticulture Mission
247.0 Ha area is brought under floriculture in the district
Marigold:
S.N. Identified Gaps in Technology adoption
1 No nursery management for seedling preparation
2 No recommended land preparation
3 Low application of organic fertilizers
4 No recommended spacing plant population
171
5 No recommended layout
6 No adoption of improved seed, use of local seed.
7 Low basal fertilizer application
8 Poor water management practices in marigold.
Tuberose:
S.No. Identified Gaps in Technology adoption
1 Unavailability of good planting material
2 No recommended land preparation
3 Low application of organic fertilizers
4 No recommended spacing plant population
5 No selection of recommended variety planting material
6 Low basal fertilizer application
7 Poor water management practices in marigold.
8 Low interculturing operations
9 Inadequate plant protection measures
Chrysanthemum:
S.No Identified Gaps in Technology adoption
1 No recommended land preparation and layouts
2 Low application of organic manures
3 No basal fertilizer application
4 Poor water management for chrysanthemum
5 Unavailability of improved variety planting material .
6 Poor fertilizer management practices in chrysanthemum
7 Low interculturing in chrysanthemum
Gallardia:
S.N. Identified Gaps in Technology adoption
172
1 No recommended nursery management for seedling preparation of Gallardia
2 No recommended land preparation and layout
3 No recommended spacing and plant population
4 Low fertilizer application, & organic manures
5 Poor fertilizer management
6 Poor water management
7 Inadequate plant protection
Rose:
S.N. Identified Gaps in Technology adoption
1 No proper land selection and its layouts
2 No recommended plant spacing and population
3 Low application of organic manures and basal fertilizers
4 Poor water management
5 Inadequate fertilizer application
6 Low plant protection measures
7 No recommended cutting ,grading and packaging
Aromatic Plants Cultivation and Processing:
During last few years, cultivation of aromatic plants mostly Citronella and its
processing was started by individual entrepreneurs in Parner, Pathardi, Shrirampur,
Kopargaon, Rahuri, Jamkhed and Newasa blocks in Ahmednagar district. Presently
there are seven processing plants operating by individual farmers and two plants are in
operation one each at MPKV, Rahuri and Krishi Vigyan Kendra (KVK), Babhaleshwar.
During the year 2003-2004 these entrepreneurs were trained at Central Institute for
Medicinal & Aromatic Plants (CIMAP) Lucknow, by ATMA. The initiation has been taken
by ATMA, Ahmednagar for registering and federating all these units for group
marketing. Few entrepreneurs started citronella oil based products like mosquito
repellants. Citronella oil is one of basic components of soaps, detergents, mosquito
repellants, perfumes and other similar industries. The soil and agro climatic situation in
the district are favorable for cultivation of citronella grass. This crop requires less water
173
than sugarcane and other crops even seasonal cultivation is also possible during
availability of irrigation or well water. There is good scope for expansion of area under
citronella grass cultivation. But presently some of major constraints identified for
expansion of this enterprise is given below.
Aromatic Plants Cultivation and Processing
S.No. Identified Gaps in Technology adoption
1 Unavailability of pure planting material in the district
2 Low recovery of oil from present variety due to admixture
3 No package of practices for citronella cultivation
4 No standardized processing technology
5 No sufficient area under citronella plantation for economically operating
installed processing unit.
6 No value addition and distillation facilities available
7 No marketing facilities available for marketing citronella oil
8 Fluctuating citronella oil markets
9 Marketing is concentrated in private sector
10 Marketing is depending on middlemen.
11 Lack of group processing and marketing
Projected increase in Area and production of major horticultural crop:
The takulawise area, production and yield of major horticultural crops in
Ahmednagar district is presented in Table 5.2 to 5.4. It can be seen from the data
presented in tables that total area under horticultural plantation was 67763 ha, out of 83
percent area was provided with irrigation facilities. The major rainfed horticultural crops
planted in the district include ber, custard apple and jamun. The productivity of major
horticultural crop is improving due to propagating precision farming practices. Due to
diversified agro-ecological situation and available irrigation facilities, various vegetable
crops are grown throughout the year. The total area under cultivation of vegetables,
flowers and aromatic and medicianl plant was about 17449 ha. The major vegetable
crops grown in the district are onions, tomato, brinjal and cabbage. Chilli is major crop
174
grown under spices followed by garlic, coriander and ginger. Merigold, chrysanthemum,
roses and aster are important flower crops under cultivation in the distrcit.
Horticultural development is considered as one of major sectors for promoting the
overall agricultural growth rate in the ongoing plan period. It is the most promising
agricultural areas to boost the economic growth. Due to suitable agro-climatic situations
in the district, effective implementation of ongoing EGS linked horticultural development
programme and National Horticultural Mission components in the district, the area
under different horticultural crops is increasing. Post–harvest infrastructure, farm ponds,
grading and packing supported activities, micro-irrigation like facilities are provided to
horticultural development. The projected increase in area and production of major
horticultural crops in Ahmednagar district is presented in table 5.5 and table 5.6
presents rejuvenation plan of horticultural crops. The total area under horticultural crops
is about 106216 ha. Out of which, area under fruit crops was 22797 ha, 885 ha was
under flower crops, vegetables accounts 78134 ha and spices were grown on 4400 ha.
During the XI Plan Period it proposed to increase the area under these crops from
106216 ha to 131161 ha, i.e.23.48 percent. Rejuvenation of K.lime, pomegranate and
guava is being implemented under National Horticultural Mission programmes for old
orchards in Ahmednagar district. Table 5.6 presents the yearwise projection of
rejuvenation activities for these fruit crops for improving crop productivity. About 2800
ha area is proposed for rejuvenation of fruit crops in the plan period. During the year
2006-07, about 200 ha area of K. Lime, Pomegranate and guava was covered by
rejuvenation programme. During the XI Plan Period, total 2600 ha area will be
additionally proposed for rejuvenation with expenditure of Rs.390 lakh.
Post Harvest Management
S.N. Identified Gaps in Technology adoption 1 15 -20% post harvest losses due to lack of proper handling fruits & vegetables.
2 No pack houses on farms for proper packaging
3
No facilities for for grading
4
Low prices due to lack of sorting of fruits and vegetables
5
No storage facilities for storage fruits and vegetables for short period
6 No possible to maintain quality standards for export marketing
7 No possible to maintain Eurep gaps specifications
175
176
Table 5.2: Area, Production and Yield of Major Horticulture Crops (Fruits) in Ahmednagar district Sr. No.
Crop Area Production Yield t/ha
Irrigated % Rainfed % Total Irrigated % Rainfed % Total Irrigated Rain-fed Average
1 Grape 1309.7 100 0 0 1309.7 30553 100 0 0 30553 23.33 0 23.33
2 Banana 706.61 100 0 0 706.61 30457 100 0 0 30457 43.10 0 43.10
3 Mango 13044 100 0 0 13043.6 35242 100 0 0 35242 2.70 0 2.70
4 Mandrine 808.79 100 0 0 808.79 6456 100 0 0 6456 7.98 0 7.98
5 Orange 3103.8 100 0 0 3103.77 34125 100 0 0 34125 10.99 0 10.99
6 Coconut 1076.6 100 0 0 1076.6 2441 100 0 0 2441 2.27 0 2.27
7 K.lime 12424 100 0 0 12423.8 172836 100 0 0 172836 13.91 0 13.91
8 Pomegranate 6480.6 100 0 0 6480.63 30644 100 0 0 30644 4.73 0 4.73
9 Guava 4799.7 100 0 0 4799.72 147217 100 0 0 147217 30.67 0 30.67
10 Papaya 412.8 100 0 0 412.8 25057 100 0 0 25057 60.70 0 60.70
11 Sapota 10169 100 0 0 10168.6 59962 100 0 0 59962 5.90 0 5.90
12 Ber 0 0 3298.75 100 3298.75 0 0 10072 100 10072 0.00 3.0533 3.05
13 C.Apple 0 0 4508.49 100 4508.49 0 0 13913 100 13913 0.00 3.086 3.09
14 Tamarind 0 0 3975.6 100 3975.6 0 0 14516 100 14516 0.00 3.6513 3.65
15 Ramphal 5 0 0 0 5 42 100 0 0 42 8.40 0 8.40
16 Fig 312.95 100 0 0 312.95 2872 100 0 0 2872 9.18 0 9.18
17 Anola 1292.8 100 0 0 1292.77 5734 100 0 0 5734 4.44 0 4.44
18 Jamun 0 0 34.8 100 34.8 0 0 242 100 242 0.00 6.954 6.95
Total 55945 11817.64 67763 583638 1600 38743 400 622381 10.43 3.28 13.71
177
Table 5.3: Area, Production and Yield of Major Horticulture Crops (Vegetables) in Ahmednagar district
Sr No. Crop
Area Production Yield t/ha
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Average
1 Onion 45120 0 45120 740314 0 740314 16.41 0 16.41
2 Tomato 1828 0 1828 50526 0 50526 27.64 0 27.64
3 Potato 481 0 481 8549 0 8549 17.77 0 17.77
4 Sweet Potato 20 0 20 30 0 30 1.5 0 1.5
5 Brinjal 1277 0 1277 24813 0 24813 19.43 0 19.43
6 Cauliflower 323 0 323 4807 0 4807 14.88 0 14.88
7 Cabbage 628 0 628 11640 0 11640 18.54 0 18.54
8 Ladies Finger 507 0 507 5775 0 5775 11.39 0 11.39
9 Cluster Beans 30 0 30 80 0 80 2.67 0 2.67
10 Beans 206.25 0 206.25 2825 0 2825 13.7 0 13.7
11 Methi 753 0 753 5735 0 5735 7.62 0 7.62
12 Drumstick 20 0 20 40 0 40 2 0 2
13 Capsicum 35 0 35 1348.8 0 1348.8 38.54 0 38.54
14 Carrot 251.11 0 251.11 7582 0 7582 30.19 0 30.19
15 Radish 89.1 0 89.1 1073 0 1073 12.04 0 12.04
16 Cucumber 395.66 0 395.66 5831 0 5831 14.74 0 14.74
17 R. Gourd 184.95 0 184.95 2245 0 2245 12.14 0 12.14
18 B. Gourd 194.87 0 194.87 3099 0 3099 15.9 0 15.9
19 Gourd 283.65 0 283.65 3941 0 3941 13.89 0 13.89
20 Tondli 2 0 2 1 0 1 0.5 0 0.5
21 Padwal 9 0 9 90 0 90 10 0 10
22 Peas 6079 0 6079 24120 0 24120 3.97 0 3.97
23 Leafy veg. 294.52 0 294.52 2169 0 2169 7.36 0 7.36
TOTAL VEG. 59012.1 0 59012 906633.8 0 906633.8 15.36 0 15.36
178
Table 5.4: Area, Production and Yield of Major Horticulture Crops (Spices and Flowers) in Ahmednagar district
Sr No. Crop
Area Production Yield t/ha
Irrigated Rainfed Total Irrigated Rainfed Total Irrigated Rainfed Average
1 Coriander 225 0 225 780 0 780 3.47 0 3.47
2 Chilly 1753 0 1753 17443 0 17443 9.95 0 9.95
3 Turmeric 0 0 0 0 0 0 0 0 0
4 Ginger 44 0 44 4885 0 4885 111.02 0 111.02
5 Garlic 732 0 732 404 0 404 0.55 0 0.55
TOTAL SPICES 2754 0 2754 23512 0 23512 8.54 0 8.54
1 Merigold 804.35 0 804.35 59.1 0 59.1 0.07 0 0.07
2 Aster 223 0 223 386 0 386 1.73 0 1.73
3 Shevanti 381 0 381 3168 0 3168 8.31 0 8.31
4 Mogra 16.2 0 16.2 33.7 0 33.7 2.08 0 2.08
5 Nishigand 65 0 65 108.5 0 108.5 1.67 0 1.67
6 Rose 255.35 0 255.35 1341.75 0 1341.75 5.25 0 5.25
TOTAL FLOWERS 1744.9 0 1744.9 5097.05 0 5097.05 2.92 0 2.92
179
Table 5.5: Area Expansion Plan of Horticultural Crops. ( Area 00 in ha)
Sr. No. Crops Year
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
A Fruit Crop
1 Mango 32.51 34.50 36.00 38.00 40.00 42.71
2 Pomogranet 60.93 64.00 68.00 72.00 76.00 80.00
3 Banana 3.00 3.40 3.80 4.20 4.60 5.00
4 Custarda Apple 12.00 12.20 12.40 12.60 12.80 13.00
5 Anola 5.00 5.20 5.40 5.60 5.80 6.00
6 Tamriend (Chinch) 10.00 10.20 10.40 10.60 10.80 11.00
7 Guava 20.09 20.40 20.80 21.20 21.60 22.00
8 Grapes 8.00 8.20 8.40 8.60 8.80 9.00
9 Lemon 32.00 34.50 37.00 39.00 40.00 42.00
10 Fig 1.50 1.60 1.70 1.80 1.90 2.00
11 Sapota 30.92 31.50 32.00 32.75 33.50 34.00
12 Sweet Orange 6.00 6.20 6.40 6.60 6.80 7.00
13 Papaya 2.00 2.20 2.40 2.60 2.80 3.00
14 Jamun 0.02 0.34 0.50 1.00 1.20 1.50
15 Ber 4.00 4.00 4.00 4.00 4.00 4.00
Total 227.97 238.44 249.2 260.55 270.6 282.21
B Flower Crops
1 Marigold 3.99 4.00 4.01 4.05 4.06 4.10
2 Galardia 1.10 1.15 1.16 1.17 1.18 1.20
3 Chrysanthemum 2.72 2.78 2.80 2.84 2.88 3.00
4 Aster 0.09 0.12 0.15 0.20 0.26 0.33
5 Rose 0.35 0.46 0.59 0.77 1.00 1.30
6 Tube Rose 0.60 0.62 0.64 0.66 0.68 0.70
Total 8.85 9.12 9.35 9.69 10.06 10.63
C Vegetable Crops
180
1 Leady finger 5.00 10.15 10.60 10.85 9.85 11.31
2 Brinjal 14.00 14.20 14.20 14.40 14.80 15.00
3 Tomato 22.00 22.20 22.40 22.70 22.80 23.00
4 Bhendi 10.00 10.20 10.40 10.70 10.80 11.00
5 Onion 650.00 660.00 670.00 680.00 690.00 700.00
6 Chillii 18.00 18.20 18.40 18.60 18.80 19.00
7 Leafy vegitable 11.00 11.20 11.40 11.60 11.80 12.00
8 Cabbage 3.16 3.20 3.25 3.30 3.35 3.40
9 Cauliflower 4.81 4.83 4.85 4.90 4.95 5.00
10 Green peas 2.22 2.25 2.40 2.60 2.80 3.00
11 Potato 11.15 11.20 11.40 11.60 11.80 12.00
12 Cucerbits 2.00 2.10 2.21 2.32 2.43 2.55
13 Watermelon 20.00 20.10 20.20 20.40 20.70 21.00
14 Muskmelon 5.00 5.10 5.20 5.30 5.40 5.50
15 Ginger 1.00 1.02 1.07 1.12 1.50 2.00
16 Garlic 2.00 2.02 2.12 2.23 2.34 3.00
17 Total 781.34 797.97 810.10 822.62 834.12 848.76
D Spices
1 Turmeric 0 0 0 0 20 20
2 Ginger 44 60 90 100 120 150
3 Total 44 60 90 100 140 170
Grand Total 1062.16 1105.53 1158.65 1192.85 1254.78 1311.61
181
Table 5.6: Rejuvenation Plan of Horticultural Crops
( Area in ha)
Crops
Area brought under Rejuvenation
Yearwise Area Proposed under Rejuvenation
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial Physical Financial
K. Lime 200 30 0 0 200 30 300 45 300 45 400 60
Pomegranate 0 0 0 0 0 0 200 30 250 37.5 300 45
Guava 0 0 100 15 100 15 100 15 150 22.5 200 30
Total 200 30 100 15 300 45 600 90 700 105 900 135
182
Table 5.7: Area Expansion under Micro Irrigation-Horticulture Crops
Area hectare Rs. Lakh
Sr. No.
Name of Crop Planting Distance
Mts.
Rate of Subsidy Rs/ha.
2011-12 2012-13 2013-14 2014-15 2015-16
Area Amt. Area Amt. Area Amt. Area Amt. Area Amt.
1 Mango 10 X 10 9000 200 18 200 18 200 18 200 18 200 18
2 Pomegranate 5X 5 16400 400 65.6 400 65.6 400 65.6 400 65.6 400 65.6
3 Banana 1.5 X 1.5 27500 40 11 40 11 40 11 40 11 40 11
4 Cust Apple 5 X 5 16400 20 3.28 20 3.28 20 3.28 20 3.28 20 3.28
5 Amala 7 X 7 12500 20 3.5 20 2.5 20 2.5 20 2.5 20 2.5
6 Tamarind 10 X 10 9000 20 1.8 20 1.8 20 1.8 20 1.8 20 1.8
7 Guava 6 X 6 15100 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
8 Grapes 3 X 1.5 20100 20 4.02 20 4.02 20 4.02 20 4.02 20 4.02
9 K- Lime 6 X 6 15100 250 37.75 250 37.75 200 30.2 100 15.1 200 30.2
10 Sapota 10 X 10 9000 60 5.4 50 4.5 75 6.75 75 6.75 50 4.5
11 Fig 5 X 5 16400 10 1.64 10 1.64 10 1.6 10 1.64 10 1.64
12 Sweet orange 6 X 6 15100 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
13 Papaya 1.5 X 1.5 27500 20 5.5 20 5.5 20 5.5 20 5.5 20 5.5
14 Ber 7 X 7 12500 1 0.13 1 0.13 1 0.13 1 0.13 1 0.13
15 Vegetables 1.5 X 1.5 27500 500 137.5 800 220 900 247.5 1000 275 1200 330
Drip Total 1601 300.16 1891 381.76 1966 403.96 1966 416.36 2241 484.21
Veg. Sprinkler 1000 71.35 1200 85.62 1300 92.76 1400 99.89 1500 107.03
Total Horticulture. 2601 371.51 3091 467.38 3266 496.72 3366 516.25 3741 591.24
183
Table 5.8 : Perspective Drip-irrigation Plan for Horticultural Crops
Sr. No.
Crops Actual coverage
up to March 2011
Area coverage
in 2011 - 2012
Proposed coverage
2012-13 2013-14 2014-15 2015-16 2016-17 Total
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
A Drip Irrigation
1 Mango 200 18.00 200 18.00 200 18.00 200 18.00 200 18.00
2 Tamarind 20 1.80 20 1.80 20 1.80 20 1.80 20 1.80
3 Ber 1.00 0.13 1.00 0.13 1.00 0.13 1.00 0.13 1.00 0.13
4 Pomegranate 400 65.60 400 65.60 400 65.60 400 65.60 400 65.60
5 Sapota 60 5.40 50 4.50 75 6.75 75 6.75 50 4.50
6 Guava 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
7 Papaya 20 5.50 20 5.50 20 5.50 20 5.50 20 5.50
8 Grapes 20 4.02 20 4.02 20 4.02 20 4.02 20 4.02
9 Banana 40 11.00 40 11.00 40 11.00 40 11.00 40 11.00
10 Citrus 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
11 C.apple 20 3.02 20 3.02 20 3.02 20 3.02 20 3.02
12 Fig 10 1.64 10 1.64 10 1.64 10 1.64 10 1.64
13 Amala 20 2.50 20 2.50 20 2.50 20 2.50 20 2.50
14 Vegetables 500 137.50 800 220.00 900 247.50 1000 275.00 1200 330.00
15 Lime 250 37.75 250 37.75 200 30.20 100 15.10 200 30.20
Total Drip 1601 299.9 1891 381.5 1966 403.7 1966 416.1 2241 483.95 9665 1985.15
184
Table 5.9 : Perspective Sprinkler Micro Irrigation Plan
Sr. No.
Crops Actual coverage
up to March 2011
Area coverag
e in 2011 - 2012
Proposed coverage under Sprinkler Irrigation
2012-13 2013-14 2014-15 2015-16 2016-17 Total
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Leafy Vegetables / Flowers / Others
1000 71.35 1200 85.62 1300 92.76 1400 99.89 1500 107.03 6400 456.64
2 Cereals/ Pulses/ Oilseeds etc.
1000 71.35 1200 85.62 1300 92.76 1400 99.89 1500 107.03 6400 456.64
Total Sprinkler
2000 142.7 2400 85.62 2600 185.52 2800 199.78 3000 214.06 12800 913.28
185
186
Table 5.7 présents the area expansion under Micro Irrigation-horticulture crops and table
5.8 presents yearwise installation of drip irrigation system for horticultural crops during
XI Plan Period in Ahmednagar district. It can be seen from the table that the différent
fruit crops and vegetable crops will be covered under drip irrigation system. Drip
irrigation system is most useful for fruits and vegetable crops. The installation of drip
irrigation system will in net saving of irriagation water, increase area under irrigation
,improved production a with quality. Moreover, the system is also helpful in efficient
utilization of inputs like fertilizers ,pesticides and other application of chemicals. During
the XII Plan Period the drip irrigation system will be installed over an area of 9665 ha
area with the proposed investment of Rs. 1985.15 lakhs. Table 5.9 presents the
yearwise area to be covered by means of sprinkler irrigation system in Ahmednagar
district. Sprinkler irrigation system is particularly useful for efficient utilization of
available irrigation water for leafy vegetables, onion, flower crops, cereal pulses and oil
seed crops. The proposed yearwise physical and financial targets are also given in the
table. It is seen from data that total 12800 sprinkler irrigation sets are proposed to
installed with expenditure of Rs. 913.28 lakh.
5.3. Sericulture Development:
Mulberry plantation and rearing of silk worm cocoon is a non traditional activity
for farmers of the district. But due to state government initiatives for expansion
sericulture enterprise as an employment generating farm based activity particularly for
farm women is getting slow momentum in the district. The procurement of cocoon by
Government has promoted for farmers to adopt sericulture. The new high yielding
mulberry varieties, biovoltine strains, simple rearing methods and mulberry production
technologies are now available for farmers. Area under mulberry plantation in
Ahmednagar district is of 180 Ha with 268 farmers. The total cocoon production during
the year 2006-2007 is of 30 tones. The major identified gaps in technology adoption are
listed below.
S.No. Identified Gaps in Technology adoption Sericulture
1 Low yield due to lack of technical know how being non traditional Crop in the district
2 Low yield due to under utilization of mulberry leaves for feeding the recommended silkworm larvae.
3 Low production, low quality and low rates due to non adoption of recommended sterilization and sanitation practices in cocoon rearing
187
4 Scope for intensification of area under mulberry plantation and cocoon rearing enterprise
5 Promoting for diversification of area under mulberry plantation
Table: 5.10: Sericulture Plantation during XI th Five year Plan period-Ahmednagar
district
Sr. No.
Year Village Mulberry Plantation Varieties
Farmer Area (Acre)
V-1 M-5 S-36
1 2007-08 70 104
2 2008-09 123 193
3 2009-10 158 241
4 2010-11 196 305
5 2011-12 268 449
Source: DSAO, Ahmednagar
Table 5.11: Supply of CSR, DFLs and Cocoon Production during Tenth Plan period-
Ahmednagar district
Sr. No.
Year Area (Acre) Dfls Supply Cocoon Production
(Kg)
Yield per 100
Dfls(Kg)
DFLs Consumption
Per Acre
1 2007-08 104 78753 27607
2 2008-09 193 61539 17653
3 2009-10 241 51471 10267
4 2010-11 305 80050 26275
5 2011-12 449 125016 41004
188
Table 5.13: Production planof Sericulture in - Ahmednagar district
Sr. No
Particular
Unit 2013-14
2014-15
2015-16 2016-17 Total
1 No of beneficiaries No 367 517 667 817 2368
2 Plantation acre 550 700 800 850 2900
3 Dfls to be reared
(thousand)
Lac
Nos
240 297.5 330 355 1222.5
4 Cacoon production Mt ton 96 119 132 142 489
Source: Same as in table 5.1.
Table 5.12: Sericulture Information(2012-2013)
Sr. No.
Taluka No. of
units
Area under
Mulberry (ha)
Average Cocoon production (kg/ha)
GAP in yield (kg/ha)
Reasons for GAP in yield
District State Dfls
District level
State level
1 Ahmednagar 51 74.5 116 - 46302 - - 1.Lack of infrastructure in training
2 Newasa 64 101 110 - 18906 - - 2. Non traditional crop.
3 Parner 165 218 149 - 50188 - - 3. Lack of new technology
4 Shrigonda 51 74.5 127 - 19276 - - 4. Lack of Bivotine silk worm rearing.
Total 331 468 127 - 134672 - - -
Source; Strategy for Developing Sericulture:
Mulberry plantation and rearing of silk worm cocoon is a non traditional activity
for farmers of the district. But due to state government initiatives for expansion
sericulture enterprise as an employment generating farm based activity particularly
for farm women is getting slow momentum in the district. The procurement of cocoon
by Government has promoted for farmers to adopt sericulture. The new high
yielding mulberry varieties, biovoltine strains, simple rearing methods and mulberry
production technologies are now available for farmers. Area under mulberry
plantation in Ahmednagar district is of 180 ha with 268 farmers. The total cocoon
production during the year 2011-2012 is of 30 tones.
Table No 5.13 presents the number of sericulture units in operation, area under
mulberry plantation, average cocoon production in kg per hactare in Ahmednagar
district. It is also seen from the table the talukawise average production of cocoons that
189
ranges between 110 kg to 149 kgs per hectare. There is big gap identified between the
district and average yield obtained under Front Line Demonstrations in per hectare
cocoon production in the district. The reasons for this yield gaps is mentioned in the
table.
The area under Tuti plantation is 221 ha at 146 farmers. It will be increased
upto 830 ha at 550 farmers. The supply of eggs will be increased from 125016 to
559000. The production of cacoon will be increased from 41 tons to 280 tons 0f
which the worth value will be Rs. 58 Lakh & Rs. 406 Lakh respectively. The
additional income will be Rs. 348 Lakh
Organizing farmers training on mulberry plantation
Organizing farmers training on silkworm rearing technology
Organizing exposure visits of farmers to success stories.
Convergence with ongoing schemes.
Promoting for establishing Chowky rearing centre fulfilling demand of egg
masses for the sericulture farmers
Intensification of area under mulberry cultivation in the potential blocks where
mulberry cultivation is already introduced
Sericulture is one of the supplementary enterprises recently being adopted by
number of farm families as a major source of employment generating activity
perticularly in the talukas of Parner, Shrigonda, Ahmednagar and Newasa. Table No
5.14 presents the proposed yearwise physical and financial targets during XII th Plan
Period under Stream –I for sericultural activities in Ahmendnagar district. It is proposed
to increase the area under mulberry plantation to 500 ha during the plan period. The
investment proposed for development of sericulture entreprise in the district is of
Rs.185.17 lakh.
190
Table 5.14 : Proposed Physical and Financial Targets for Sericulture for XII Plan Rs. in Lakhs
S. No
Items 2012-13 2013-14 2014-15 2015-16 2016-17 Total
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
Sericulture Stream - I
1 Support for mulberry plantation. 0 0 50 1.38 100 2.75 150 4.12 200 5.5 500 13.8
2 Assistance for irrigation &other water conservation
0 0 10 1 30 3 40 4 50 5 130 13
3 Rearing house 0 0 25 13.8 35 16.5 45 21 50 23.8 155 75
4 Chawki rearing center 0 0 2 3.44 4 6.88 6 10.3 8 13.8 20 34.4
5 Support for construction of vermicompost sheds 0 0 10 0.7 30 2.1 40 2.8 50 3.5 130 9.1
6 Realing unit 0 0 0 0 0 0 2 13 5 19 7 32
7 Contractual staff 0 0 4 1.44 6 2.16 6 2.16 6 2.16 6 7.92
Total (Stream I) 21.7 33.4 57.4 72.7 185
Sericulture Stream - II
1 Mulberry plantation cuttings supply Rs. 1500 / acre
- - - - - - - - - - - -
2 Training for farmers Rs. 2000 / farmer - - - - - - - - - - - -
3 Eggs (Dfls) supply Rs. 3 / Dfls. - - - - - - - - - - - -
4 Cocoon purchase avg. cost / kg. Rs. 125/- - - - - - - - - - - - -
5 Farmers study tour Rs. 2000 / farmer - - - - - - - - - - - -
6 Reeling unit - - - - - - - - - - - -
7 Demonstration farm - - - - - - - - - - - -
Total (Stream II) - - - - - - - - - - - -
Total (Stream I and II) 0 0 0 21.71 0 33.39 0 57.4 0 72.67 0 185.17
191
192
5.4. Animal Husbandry:
Live-stock still plays a pivotal role in the agricultural economy of the district and
also constitutes one of the valuable possessions of the farmer. Among various
livestock, cross breed cows occupies the most important place. Due to the network of
milk co-operative societies at village level and payment to the dairymen at regular
intervals of 15 days, most of the farmers have adopted dairy as an important
supplementary enterprise in irrigated farming system. Farmers are interested in cross
breed cows because of more milk production and less inter-calving period. So local
cows are crossed with exotic animals by means of artificial insemination and produced
cross breeds at farm level. So milk production has increased. Because of successful
cross breeding, number of local cows have reduced and number of cross breed cows
increased. Sheeps are reared in specific areas of the district. It is mainly concentrated
in dry land and non command areas where land is available for free grazing. These
sheep flocks are migrating depending upon availability of free grazing land in near by
areas. The sheeps are reared for meat and milk purpose. As goat is dual purpose it for
milk production and meat. Goat meat has more market price as compare to broiler.
These goats are reared partially on free grazing and partially on stall feed.In non-
command zone; there is availability of free grazing land. Back yard poultry is being
looked after only by family women. These are reared partially by free grazing and only
night caging. The eggs production from back yard poultry supports family income.
Table 5.15 presents the talukawise area under fodder crops and grazing lands
that supports the livestock population of Ahmednagar district. It also gives the
information about talukawise cross-bed & indigenous cattle population, buffaloes, goats
and sheep population in the district. It cane be seen from the table the about 48.33 lakh
livestock population is available in the district that supports agriculture by means
drought power and also as a supplementary enterprises. Poultry is also one of the
important enterprises and district has 19.68 lakh number of broilers.
193
Table 5.15: Taluka-wise Livestock Population in Ahmednagar district 2007
Taluka
Area under Fodders (ha) Cattle (Nos.) Buffaloes (Nos)
Sheep Goats
Poultry -Broiler (Nos)
Total Livestock
Fodder crops
Grazing Land
CB Ind Total Imp Ind Total
Parner 123083 29739 51860 64918 116778 14020 91271 96178 309863 628110
Shrigonda 83489 8340 51750 67809 119559 21459 31123 95639 178420 446200
Karjet 31914 33047 32127 33373 65500 6840 39088 52409 119201 283038
Jamkhed 61470 13161 22820 33388 56208 10234 4134 36322 75736 182634
Newasa 45302 15058 57770 59104 116874 24259 29259 93396 151186 414974
Shevgoan 61903 10843 20364 52886 73250 15263 11836 67017 130911 298277
Shrirampur 22344 2569 35351 14158 49509 7196 5665 35627 94668 192665
Kopargoan 39141 2940 47965 17978 65943 11148 6701 49597 131843 265232
Pathirdi 84769 11184 32444 67302 99746 25331 20200 90461 125659 361397
Nagar 104144 12935 41243 38370 76613 23158 22848 74674 200723 398016
Rahuri 32898 13041 88944 23858 112802 8243 27073 86232 128516 362866
Rahata 28803 1581 56005 8144 64149 5009 14480 49690 136478 269806
Sangamner 69322 20770 102464 39957 142421 5507 66014 83264 184951 482157
Akole 39496 12450 33841 61430 95271 14529 1609 50199 86431 248039
District 4833411
Source: Livestock census 2007.
Gaps in Technology Adoption:
Cows- Cross Breeds
S.N Identified Gaps in Technology Adoption
1 Repeat breeding due to malnutrition, inbreeding, infections.
2 Reducing trend of productivity due to indiscriminate and poor quality Artificial
Insemination service
3 No clean milk production
4 Poor housing management for milk cattle
5 Ecto and endo parasite infection
6 Inadequate forage production and its availability
7 No balanced ration and feed supplement
8 No sufficient dry fodder
9 Frequent sickness in lactation
194
Buffaloes:
S.N Identified Gaps in Technology Adoption
1 Long inter-calving period due to inadequate care and nutrition management in
pregnancy and after lactation period
2 Deterioration of genetic status due to use of N.D natural service
3 Low conception rate in buffaloes due to salient heat, imbalance ration.
4 Mortality in buffalo calves due to improper care of calves
5 Decreasing production due to improper feed and fodder management, lack of
concentrate, minerals, vitamins in diet
Goat / sheep:
S.N Identified Gaps in Technology Adoption
1 Slow weight gain and low productive due to indiscriminate breeding practices
2 Non-availability of graded bucks for natural service,
3 Lack of concentrates, vitamins and minerals
4 Warm land due to free grazing, negligence towards animals
5 Foot & mouth disease & foot rot disease due to lack of preventive vaccination
and hygiene management practices
6 Low income in Goat enterprise due to Kid mortality due to mineral deficiencies
Strategies to improve production:
Cows Cross breed
Organizing training on feeding, breeding and health care management.
Educating about hygienic clean housing for dairy chattels
Promoting for timely vaccination
Promoting for diversification of Animal Husbandry & Dairy enterprise
Promoting for deworming and seasonal vaccination for sheep and goat
herds
Educating farmers for better management of animals for higher returns
Promoting for forage crop cultivation by introducing high yielding forage
crops
195
Promoting for adoption of recommended management practices and
timely vaccinations
Utilization of available livestock biomass for generating electricity in rural
areas
Buffaloes
Organizing training on feeding, breeding and health care management.
Educating about hygienic clean housing for dairy chattels
Promoting for timely vaccination
Promoting for diversification of Animal Husbandry & Dairy enterprise
Promoting for deworming and seasonal vaccination for sheep and goat
herds
Educating farmers for better management of animals for higher returns
Promoting for forage crop cultivation by introducing high yielding forage
crops
Promoting for adoption of recommended management practices and
timely vaccinations
Goat / sheep
Organizing training on feeding, breeding and health care management.
Educating about hygienic clean housing for dairy chattels
Promoting for timely vaccination
Promoting for diversification of Animal Husbandry & Dairy enterprise
Promoting for deworming and seasonal vaccination for sheep and goat
herds
Educating farmers for better management of animals for higher returns
Promoting for forage crop cultivation by introducing high yielding forage
crops
Promoting for adoption of recommended management practices and
timely vaccinations
1) Artificial insemination in cows & buffaloes.
Declaring two villages as NIYAT KENDR per veterinary hospital
Providing year round supply facility for BA3 container & LN2 to every
dispensary
Monitoring health of 50 animals per village
196
Organizing health check camp every village every month
Providing semen of superior genetic bull for insemination to private
practitioners.
Giving facility of artificial insemination coverage for at least 60%
animals
2) Increasing Production of milk –
Scientific rearing of calves.
Providing deforming, mineral supplement & preventive vaccine to calve
Reducing infertility by scientific approach
1. Developing proficiency in Artificial Insemination for increasing success
2. Making availability of green fodder
3. Scientific approach towards malformation
4. Providing nutritious feed supplement
Fooder Development
1.Supply of fodder minikit to growers including seed, fertilizer, bio fertiser.
2. Demonstration of fodder plot
Providing milk animals
1. Designing scheme for supply of 3 milk animal for a family
2. Adoption of milk animal for its care and to achieve targeted milk
production at 200 cows/buffalos per veterinary hospital
Strategy for Dairy Development:
Ahmednagar is leading district in dairy development. Majority of production is
marketed in Mumbai. The collection of milk, processing and transport gives
employment to about 5000 people. So it is now becoming prime enterprise than
secondary one. In the district, there are 15 milk federation having 3003 dairy co-
operatives with 183171 members, collecting 17 lakh liters of milk daily. Out of which,
private milk collection is 7.38 lakh liters & co-operative government dairy collecting 9
lakh liters. The total number of chilling plants in the district are 85, out of which govt –
16, Private-55, Co-opertaive-14 with total chilling capacity of 23.50 lakh liters per day.
The registered primary milk co-operative societies are 2858. There are 5 milk
processing units with 4.40 lakhs liters per day. The availability of per capita milk for the
197
district is 397.22 ml/day(State average – 169 ml/day). The strategies for dairy
development are as follows:
Mobile milk testing van
Computerization of dairy societies
Training women for clean & hygienic milk production
Providing Bulk cooler for dairy societies
Training of office bearers of Co op
HACCP certification of dairy federation & processing centers
Increasing milk processing & branding of product.
Creating Outlate for marketing of milk & milk product
Training SHG for processing in milk
------
Artificial insemination is being carried out by both public and private sector its
required improving of quality of semen and A.I. services for breed up gradation
Improving quality of free zed semen, liquid semen its availability which is
affecting the expected programme of by A.I.
Removing infertility in productive Cows and buffaloes by scientific treatments
Promoting by A.I. for production of high milking generation of cows and buffaloes
Promotion breeding for production of useful bullock draft and Breeds.
Promoting higher production of green and dry fodder as per number of animals
and available land
Educating farmers for efficient utilization of crop residues for converting it into
palatable ration
Promoting farmers for increasing productivity of green fodder.
Creating awareness among farmers for vaccination programme.
Educating farmers for vaccination of animals before and after monsoon
Promoting farmers for taking benefits of venture capital scheme for dairy and
poultry.
Convincing and co-ordination among service providers for quality semen and
A.I. services for breed up gradation
Undertaken necessary steps and quality control measures for improving quality
of free zed semen, liquid semen its availability
198
Infertility Diagnosis camps and treatments
Capacity building of extension officers
Training to paravets for A.I for exotic blood regulation.
Fodder fortification with minerals & vitamaines in Dryland area
Supply of Kadaba Kutti machine to farmers from weaker section s/small
/marginal farmers in dry land areas for effective utilization of available fodder.
Demonstration on improve high yielding forage crops
Assistance for Life saving drugs to agencies
Infertility Diagnosis camps
Use of mass media for dissemination information.
Out State Exposer Visit
Table 5.16 presents the talukawise veterinary institutions established in
Ahmednagar district. There are total 327 veterinary institutions established supporting
the animal husbandry and dairy enterprise.
Table 5.16: Taluka wise Existing Veterinary Institutions
Taluka Institutions (Nos) No. of GP without any veterinary institutions
VH VD MVC PVC AIC KVS sub -centre
Diagn-ostic Labs
PEC Total
Parner 1 20 9 30
Shrigonda 17 5 22
Karjet 12 3 15
Jamkhed 11 3 14
Newasa 15 6 21
Shevgoan 15 4 19
Shrirampur 1 10 5 16
Kopargoan 1 12 5 18
Pathirdi 16 5 21
Nagar 1 20 6 27
Rahuri 1 15 8 24
Rahata 1 15 9 25
Sangamner 24 9 33
Akole 1 28 1 12 42
Total 7 230 1 89 327
Notes: VH-Veterinary Hospital, VD-Veterinary Dispensary, MVC – Mobile Veterinary Centres, PVC – Proposed Veterinary Centres, AID – AI Centres, PEC – Source: District livestock department
199
Table 5.17 and 5.18 presents production plan of Animal Husbandry for XIth plan.
Proposed physical and financial achievement of animal husbandry and diary
department is presented in Table 5.19 and 5.20.
200
Table 5.17: Proposed Production Plan for XIIth Five Year Plan for Animal Husbandry in Ahmednagar district
Sr. No.
Enterprise/Activities
2011-2012 2016-2017
Present No. Present
Productivity Kg/day (Milk)
Present Production MT
Present Gross Value RS
Production MT Gross
Value (Rs. Million)
1 COW Cross Bred 241744 6.423 566743.425 3967203974 775627.5108 5429
Non Discript 95714 1.448 50586.7633 354107343 69231.47859 484
Total 337458
617330.188 4321311317 844858.9894 5914
2 BUFFALOES Improved 66779
Indigenous 53450 Total 120229 3.599 157937.022 57647013181 216147.7208 78893
3 GOAT milk 344637 0.211 26542.2186 132711092.8 36324.85884 181
meat 205812 12 kg net meat 2469.744 29636928 3245.592136 38
4 SHEEP meat 363399 12 kg net meat 4360.788 261647280 5730.690808 343
Wool 363399 0.8 kg/year 290.7192 4360788 340.1003447 5
5 POULTRY LAYER Desi 392253 70eggs/ year 27457710 27457710 34664726.25 34
LAYER Improved 39043 200eggs/ year 7808600 7808600 9858177.59 9
Total 431296
35266310 35266310 44522903.84 44
BROILER 201240 1.3 kg/bird 261612 6278688 306049.0379 7
Source:
201
Table 5.18: Production Plan of Livestock during the Next Five Years
Name of commodity
Baseline (2011-12) 2012-13 2013-14
Nos Prod..in M.Tons
Product-ty Per year kg./
No. Nos
Prod.in M.Tons
Product-ty Per year kg./
No. Nos.
Prod.in M.Tons
Productivity Per year kg./
No.
Milk 1) Crossbreed-Cow
241744 566743
251744 596455
26744 626845
2) Indigenous-Cow 95714 50586 96345 50586 97718 50586
3) Buffalo 120229 159763 130229 189763 140229 199763
Total
Eggs 431296 35266310 431296 35266310 431296 35266310
Broiler 201240 261612 201240 261612 201240 261612
Meat 1) Cattle Beef - - -
2) Buffalo Beef - - -
3) Sheep & Goat 363399 2769 363399 2769 363399 2769
Total
2014-15 2015-16 2016-17
Milk 1) Crossbreed-cow 271744 646342 281744 666768 291744 686231
2) Indigenous-Cow 98724 50586 99312 50586 100678 50586
3) Buffalo 150229 219763 160229 259763 170229 279763
Total
Eggs 431296 35266310 431296 35266310 431296 35266310
Broiler 201240 261612 201240 261612 201240 261612
Meat 1) Cattle Beef - - -
2) Buffalo Beef - - -
3) Sheep & Goat 363399 2769 363399 2769 363399 2769
Total
Source: District Dy. Commissioner Animal Husbandry, Ahmednagar.
202
Table 5.19: Proposed Physical and Financial Programmes of Animal Husbandry Department (Phy – Number, Rs. In lakh)
Sr. No.
Name of Scheme 2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Animal Husbandry Stream -I
1 Increase in milk production 0 500 500 223 7000 1223
2 Establishment of Hatcheries at I.P.D. Block
1 105 0 0 1 105
3 Fodder production 0 15 16 8 38
4 Strenthening of TMPC
0 21 42 59 7 108
5 Development of sheep and goat 0 276 300 300 0 876
6 Infertility reduction 0 5 10 13 0 28
TOTAL (Stream I)
0 922 868 603 7 2379
Animal Husbandry Stream -II
1 Fodder development programme
2 Scientific Tackling of Infertility in Dairy Animals
3 Demonstration of Scientific calf rearing
NIL
4 Up gradation existing mini-polyclinics veterinary dispensaries
5 Certified fodder seed marketing subsidy
TOTAL (Stream II)
Animal Husbandry - I 922 868 603 2379
Animal Husbandry - II 0 0 0 0
Total (Animal Husbandry) 922 868 603 2379 Source:
203
Table 5.20: Proposed Physical and Financial Programmes of Diary Department
Sr. No.
Item’s 2012-13 2013-14 2014-15 2015-16 2016-17 Total
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Dairy Stream I
1 Providing milk testers. 0 0 71 19.88 59 16.52 59 16.52 59 16.52 248 69.44
2 Computerized milk acceptance
0 0 84 105 84 105 83 103.75 83 103.75 334 417.5
3 Subsidy to primary dairy cooperative
0 0 145 26.10 133 23.94 133 23.94 132 23.76 543 97.74
4 Milk processing 0 0 5 2472.15 5 2206 5 2206 5 2206 20 9090.19
5 Bulk coolers 0 0 67 599.65 67 599.65 68 608.28 60 547.42 262 2355
6 NDDB Adulteration kit 0 0 57 1.42 57 1.42 58 1.45 57 1.42 229 5.72
7 Market insulation vehicle
0 0 1 15 2 30 2 30 2 30 7 105
Total 0 0 3239.21 2982.57 2989.92 2928.91 1643 12140.63
Dairy Stream II
1 Directors Training 0 0 1144 8.58 1036 7.77 1032 7.76 0 0 3215 24.112
2 Secretary Training 0 0 164 18.45 164 18.45 136 15.30 0 0 464 52.20
3 Milk testers Training 0 0 78 1.092 80 1.12 78 1.092 0 0 236 3.304
4 Clean milk production training
0 0 1913 5.739 1913 5.739 1913 5.739 0 0
5739 17.216
5 Farmer Training 0 0 2209 16.56 1950 14.62 1952 14.65 0 0 6111 45.85
Total 0 0 5508 50.421 5143 47.69 5111 44.541 0 0 15765 142.68
Dairy - I 0 0 3239.21 0 2982.57 0 2989.92 0 2928.91 0 12140.63
Dairy -I I 0 0 50.421 0 47.69 0 44.541 0 0 0 142.68
TOTAL Dairy 0 0 3289.64 0 3030.264 0 3034.46 0 2928.919 0 12283.286
Source:
204
5.5. Fisheries Development: :
Fishery is an important farm based activity capable of supporting farm families
by utilizing available resources with few modifications in existing structures and
adoption of recommended technologies. Due to satisfactory rains received during last
two years in the district all the storage structures are having good water storage. This
can be utilized for fish farming. Under National Horticulture Mission and Maharashtra
Rural Employment Guarantee Scheme, the farmers are constructing farm pond for
storing water during requirement. These ponds can be utilized for fish rearing.
Length of Rivers in District : 587 Kms.
Water spread Area Favorable for Fisheries : 18182 ha.
Fish Production in 2006-07 : 1955 MT
No. of Fish seed farms/hatcheries : 01
Total Irrigation Tanks : 72 (0-20 ha- 20 ponds, 20-200 ha-58
ponds and above 200 ha- 04 ponds)
Area covered under tanks : 10580.77 ha
Source- District Fishery Development Officer, Ahmednagar
To rear fish in this area, 142.78 lakh fingerlings are necessary which would result
in fish production about 4151 MT. To achieve 6 percent growth rate, 180.17 lakh
fingerlings are require from which 5240.80 mt fish production is expected to achieve.
Fisheries seed production center is at Mula Dam with production capacity of 300 lakh
fingerling. In the district there are 63 co op fisherman societies with 4547 members. In
the district 4292 fisherman, 250 fish rearing ponds,250 fish retailers are present. Near
about 15000 people are surviving on the fishing enterprise. There are 14 fish collection
centers, 14 Sale points & 20 small sale centers with 30 wholesalers are engaged in fish
treading. The total water spread area under pesciculture is Ponds-10, Tanks – 58,
Reservoir – 4 (Total 72 structures with 10581 ha). It is estimated that area will be
increased upto 20710 ha. The fish seed & fish production will increased from 143 and
4151 tons upto 180 & 5241 tons respectively ( 26%). The private aqua culturist will be
increased from 250 to 281. For this the infrastructure will be increased as 20 co-op
societies,1020 fisherman, 41 fisher traders ,410 persons engaged in allied activities, 8
205
each of fish collection centers & wholesale market, 15 each of mini market, retail market
will be developed. The additional income will be of (Rs. 2096 Lakh -1660 Lakh) 436
Lakh (20.80%)
The source-wise water spread areas available for fishing in the district is
presented in the Table 5.21. The water spread areas are available with
Granpanchayats and with department tanks. There are 296 units of waterspread areas
having less than 40 ha, with total 1547 ha under Grampanchayats and 34 water-spread
units of having more than 40 ha areas with total 3516 ha are with department available.
There are 3 major reservoirs in the district with total water spread area of 7127 ha.
Apart from this there are 200 community farm ponds constructed under National
Horticulture Mission programme in the district having scope for fishing.
Table 5.21: Source wise Water Spread Area (WSA) in the Ahmednagar District
Taluk
Grama Panchayat Tanks
Department Tanks
Reservoirs Rivers < 40 ha > 40 ha
No W.S.A (ha) No W.S.A(ha) No W.S.A (ha) No km
A,nagar 21 79 9 516 0 0 0 0
Parner 58 366 2 207 0 0 0 0
Pathardi 28 105 4 320 0 0 0 0
Karjat 40 172 7 1376 0 0 0 0
Jamkhed 34 229 4 434 0 0 0 0
Shrigonda 34 101 5 384 1 2632 0 0
Shrirampur 9 43 1 93 0 0 0 0
Shevgaon 9 43 1 93 0 0 0 0
Newasa 3 6 0 0 0 0 0 0
Rahuri 18 50 1 52 1 3511 0 0
Sangamner 28 206 0 0 0 0 0 0
Akole 14 117 1 134 1 984 0 0
Kopargaon 0 0 0 0 0 0 0 0
Rahata 0 0 0 0 0 0 0 0
Total 296 1547 34 3516 3 7127 0 0
Source:
Constraints in Fish Farming:
S.N. Constraints
1 No technical knowledge of fish farming
2 Unutilization of available water bodies for fish
3 Poor management of existing fish farms farming.
4 Unavailability of fisherlings
206
5 No technical information regarding pond construction
Table 5.22 presents the talukawise inland fisheries unit in operation, fish
species cultured, average yield per hectare expected yield per hectare yield and
existing gap in per hectare production in Ahmednagar district. The reasons for existing
gap in expected fish production is also mentioned in the table. It is seen from the table
that only inland fishery is important in the district. There are total 333 inland fisheries
unit in the district with average production of 700 tones per hectare. There are 3 major
reservoirs in the district where fishing is practiced with 225 boat net units.
Table 5.25 presents the yearwise proposed fish production, seed required to
stocked and hatcheries & fish nurseries for improving fish production in the district. The
total fish production is projected to be 11978 MT. The seed to be stocked is proposed
to be of 712.86 lakh. At present, there is one fish hatchery and two fish nursery units in
the district. During XII th Plan Period total 16.08 fisherings will be prepared to meet the
demand of fish rearing farmers.
Table 5.26 presents the financial targets achieved by Fisheries sector during
XIth Paln Period in Ahmednagar district. The major schemes implemented during the
XIth Plan Period were related for development of fisheries enterprise in the district. The
major schem components consisted of fish seed production, stocking of fish seed,
organizing and strengthening of fish farmers. The total outlay was Rs. 23.64 lakh and
expenditure incurred was Rs.13.10lakhs. It is seen from the table that 55.42 % targets
achieved by fisheries sector.
Table 5.27 presents the proposed fisheries development activities under Stream
–I and II during XII th Plan Period in Ahmednagar district by Fisheries Department.
207
Table 5.22: Fisheries Information in Ahmednagar district
Source:
Sr. No.
Taluka Details of Fisheries Units
Inland Ponds Rivers Reservoirs
Nos. Units
Species Cultured
Average yield
per ha.
Expected yield per
ha.
Gap in
Yield (kg)
Reasons for gap in
yield
Boat &
Net Units
Species Harves
ted
Average Catch
per boat (kg)
Gap in catch
per boat (kg)
Reasons for
gap in yield
Nos. No. of boat and net
units
Species Harveste
d per boat unit
(kg)
Average catch
per boat in kg
Expected catch per boat
(kg)
Gap in yield catch per
boat (kg)
Reasons for gap in yield
1 Nagar
30 Major carp
700 1500 800
Lack of culture, Knowledge poor, Financial condition of fisher man, & cannot fulfill the optimum Stating of fish
0 0 0 0 0 0 0 0 0 0 0
net net net
2 Rahuri
20 Major Carp
700 1500 800 0 0 0 0 0 1 100 10 15 20 5
3 Shirampur 10 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
4 Shrigonda 40 Major carp
700 1500 800 0 0 0 0 0 1 50 12 15 20 5
5 Parner
60 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
6 Karjat 47 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
7 Pathardi 32 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
8 Jamkhed
38 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
9 Sangamner
28 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
10 Akole 16 Major carp
700 1500 800 0 0 0 0 0 1 75 10 15 20 5
11 Kopergoan -- 0 0 0 0 0 0 0 0 0 0 0
12 Newasa 3 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
13 Shevgoan 9 Major carp
700 1500 800 0 0 0 0 0 0 0 0 0 0 0
14 Rahata -- 0 0 0 0 0 0 0 0 0 0 0
Total 333 8400 18000 9600 3 225 32 45 60 15
208
Table 5.23: Fisheries Resources
Sr.No. Item Present area in ha Proposed Area in ha
2012-13 2013-14 2014-15 2015-16 2016-17
Number ha
1 Total water spread Area suitable
(A) Ponds below 20 Ha 10 137.60 745.82 154.56 163.83 173.66
(B) Tanks 21 Ha to 200 Ha 58 3091.06 3276.52 3473.11 3681.49 3902.37
(C) Reservior Above 200 Ha 4 7352.11 7793.23 8260.82 8756.46 9281.84
Total 72 10580.77 11815.57 11888.49 12601.78 20709.98
2 Total water spread Area under Preciculture
(A) Ponds 10 137.60 145.82 154.56 163.83 173.66
(B) Tanks 58 1091.06 3276.52 3473.11 3681.49 3902.37
(C) Reservior 4 7352.23 7793.23 8260.82 8756.46 9281.84
Total 72 10580.77 11215.57 11888.49 12601.78 20709.98
Source:
Table 5.24: Fish Production Potential
Sr. No Category of Tank
2011-12
2016-17
Fish seed Fish
Production Fish seed Fish seed Fish
Production
1 Ponds 6.88 207 7.29 8.67 261.32
2 Tanks 88.64 2701 93.95 111.9 3410.27
3 Reservoirs 47.26 1243 50.07 59.62 1569.21
Total 142.8 4151 151.31 180.2 5240.8 Source:
209
Table 5.25: Projections for Fish Production, Seed to be stocked and Hatchery Requirement for XI IPlan Period.
a) Fish Production ( in Tonnes)
Year
Production at different yields from different areas
@2000kg/hect for 500hect @500kg/hect for 2000hect @100kg/hectare
6000 hectare Total
2012-13 1500 711 2211
2013-14 1560 740 2300
2014-15 1622 770 2392
2015-16 1687 801 2488
2016-17 1754 833 2587
Total 10623 6355 11978
b) Seed to be stocked advance fingerlings 50 mm size in lakhs
Year
2012-13 70 40 110
2013-14 77.35 53.2 130.56
2014-15 85 58 143
2015-16 93.5 63.8 157.3
2016-17 102 70.18 172
Total 427.85 285.18 712.86
C) Year Hatchery required (Assumption 0.6 ha of hatchery can produce 20 Lakh fingerling and 40 Lakh fingerlings required per ha )
Present 1 Hatchery & 2 Nursery
2012-13 -- 1
2013-14 1 Nursery unit 3.26
2014-15 1 Nursery unit 3.57
2015-16 -- 3.93
2016-17 -- 4.32
16.08
210
Table 5.26: Financial Targets and Achievements during XI Plan for Fisheries Development in the District
Schemes 2007-08 2008-09 2009-10 2010-11 2011-12
T A T A T A T A T A
Establishment of fish seed production center
0.53 0.46 0.25 0.25 0.83 0.83 1.27 1.27 1.3 1.3
Stocking of fish seed in impounded water
0.28 0.28 1.93 1.93 - - 0.15 0.15 0.2 0.2
Fish Farmer Development Agency
0.5 0.3 0.15 0.15 - 0.02 0.01 0.01 0.4 0.4
Susidy for supply of fisheries requisites
1.5 1.23 1.38 1.38 0.35 0.21 1.16 1.25 1.33 1.33
Srengthening of fisheries Co-operatives
- - 0.03 0.06 - - - - 0.09 0.09
Total
2.81 2.27 3.74 3.77 1.18 1.06 2.59 2.68 3.32 3.32
Notes: T- Target and A-Achievement Source:
211
Table 5.27: Projected Outlay for Fisheries Development during XI Plan-Ahmednagar district
Annual Expenditure incurred Proposed Outlay (Rs.in lakh)
2012-13 2013-14 2014-15 2015-16 2016-17 Total
phy fin phy fin phy fin phy fin phy fin phy fin
Stream I
Establishment of fish seed production centre
0 0 0 0 0
60
0
60
0
80
0
200 stocking of fish seed 0 0 0 0 0 0 0 0
Fish farmer development agency 0 0 0 0 0 0 0 0
Strengthening of fishery cooperative 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 60 60 80 200
Stream II
Training ongoing schemes 0 0 0 0 0 8 0 8 0 8 0 24
Training 0 0 0 0 0 10 0 10 0 10 0 .30
Total 0 0 0 0 0 18 0 18 0 18 0 54
Fishery – I 0 0 0 0 0 60 0 60 0 80 0 200
Fishery -I I 0 0 0 0 0 18 0 18 0 18 0 54
Total Fishery
0 0 0 0 0 78 0 78 0 78 0 254
212
5.6 Watershed Development:
Watershed conservation is widely recognized as a major strategy for rural
development throughout the developing world. In India, the apparent success of
participatory approaches to watershed development resulted in a decentralization of
project planning, implementation, and management to local communities at the village
scale. Comprehensive Watershed Development Programme is being implemented
since 1983 which is now followed by Jal Sandharan Programme through out the
Maharashtra State since 1996 onwards.
Table 5.28 presents talukawise geographical area, area suitable and suitable for
watershed development in Ahmednagar district. Talukawise watershed area already
treated and balanced area is also given in the table. It can be seen from the table that
the proposed talukawise area to be completed in the district. So far
Strategy for Watershed Development Work:
1) To create protective irrigation facility in adverse scarcity conditions, so as to enable
the farmers to harvest at least one crop in a year.
2) To protect and strengthen existing drinking water sources and to bring the
sustainability in supply of drinking water in villages.
3) To promote concepts of NGO’s & peoples participation in the rural area.
4] To imbibe concepts of “Water Planning” and “Water Budgeting” in the minds of rural
masses so as to inoculate the confidence about water resources.
Ahmednagar district is pioneer in watershed work. The success stories of
Ralegan Sidhi & Hivare Bazaar are torch bearer to the nation in implementing the
watershed development work. 10 blocks of the district come under DPAP which
receives rainfall of less than 500 mm rainfall. The rainfall is also erratic & not
sustainable .After every three to four year scarcity & draught occurs creating hardship
to the farmer. To mitigating the drought the water shed development is the only answer.
The work done in this reg through employment guarantee scheme is very remarkable.
Because of good implementation of work now the following results are observed
Even after receipt of 500 mm of well distributed rainfall, farmers are growing two
crop due to water conserved from watershed development work.
Because of protective irrigation availability farmers diversifying from traditional crop
to high value crop like vegetable, horticulture & floriculture.
213
Because of fodder availability from water shed work the animal husbandry flourished
& milk collection increased which brought stabilization in the farmers economy.
Because of increased agriculture activity farmers are getting employment on there
own field, resulted decreasing labor attendance on EGS works.
By using remote sensing technology the delineation of the watershed work has
been completed. The total districts major watershed declared by GSDA delineated in to
micro watershed up to 500 ha. The perspective plan for the watershed development
work on the basis of watershed atlas is also completed. Because of good watershed
work the scope for drainage line treatment is nearly exhausted. Still there is good scope
for Cement Nala Bunding activity. There is huge demand from farmers and people
representative for this activity because of its immediate effect by water availability.
There is big scope for in situ soil moisture conservation which will conserve water on
farm. For this purpose activity like compartment bunding, well recharging, farm pond,
CCT are very useful. The sufficient outlay is also available for this work through various
schemes like NREGA, EGS, western ghat development, river valley project, Hariyali,
DPAP, Tribal sub plan, DPDC, Rashtriy Sam Vikas, Backward Region Grant Fund.
Presence of good NGO like WOTR, Social Center, Bosco gramin kendra, Hind swaraj
trust, Yashawant gramin vikas kendra & other NGO are performing well in ensuring
peoples participation in the watershed development work.
The five year plan of soil and water conservation work in the district is presented
in Tables 5.28 to 5.31. The above activities will be completed through State & Central
Govt. schemes as E.G.S, MREGS, DPDC, TSP, OTSP, Jalsandharan Mahamandal,
NWDP, NWDP, WGDP, RVP, and RSVY & DPAP Hariyali
Expected Benefits:
1] The on going 766 watersheds those have completed 75% will be 100 % completed.
2] The on going 912 watersheds those have completed 50% will be 100 % completed.
3] The on going 247 watersheds those have completed 25% will be 100 % completed.
4] New watersheds no. 605 will be started & 100 % completed.
Total 2530 Watersheds will be 100 % completed through above plan. The
benefits of completed watershed will result in crop production, fodder production,
Timber production.
214
Table 5.28 : Area Available for Watershed Development and Plan
(Area in ha)
Name of the Taluka
Geograph-cal Area (ha)
Area not Suitable
for watershed
(ha)
Area available for
w/w develop-ent
(ha)
Area treated so far (ha)
Balance Area (ha) 2012-13 2013-14 2014-15 2015-16 2016-17
A,nagar 150956 0 150956 100021.16 50934.84 7360.33 12270.83 12206.17 10126.17 7743.17
Parner 186072 0 186072 111363.16 74708.84 15459.17 18662.17 16333.33 14149.67 10104.50
Pathardi 119381 0 119381 73039.00 46342.00 6524.00 11439.67 10592.67 9310.17 8435.50
Karjat 149157 28021 121136 12433.00 108703.00 26380.13 24490.68 23438.97 20957.26 13435.96
Jamkhed 87525 2125 85400 7773.75 77626.25 8358.40 12139.78 12291.26 12209.44 11672.34
Shrigonda 160445 0 160445 122670.56 37774.44 4586.66 8630.82 9512.15 8089.49 6955.32
Shrirampur 56107 1207 54900 50169.16 4730.84 571.33 1233.84 1278.50 965.00 682.17
Shevgaon 108498 10422 98076 43995.46 54080.54 6058.42 14453.49 13226.34 11914.04 8428.25
Newasa 126226 0 126226 117366.50 8859.50 926.50 1816.67 1617.67 1420.00 1162.50
Rahuri 101778 66778 35000 20765.84 14234.16 2199.83 3620.83 3473.88 2735.00 2204.62
Sangamner 167394 10963 156431 112585.50 43845.50 9679.67 10252.83 8772.00 8767.67 6373.33
Akole 150400 0 150400 68826.84 81573.16 17849.21 16165.00 15563.08 15529.98 16465.89
Kopargaon 70807 0 70807 66494.00 4313.00 694.76 1367.86 1122.94 688.09 439.35
Rahata 65196 0 65196 59504.16 5691.84 944.17 1265.83 1281.67 1024.50 1175.67
Total
1699942 119516 1580426 967008.09 613417.91 107592.58 137810.3 130710.63
117886.48
95278.57
Source :
215
Table 5.29: District five year plan of Soil and Water Conservation work (Amount in lakhs)
Sr. No
Item Phy. Fin. Increase in irr.area ha.
Wells to be benefited No.
T.C.M. Watershed to be completed
1 C.C.T. 57509 ha 5750.90 23004 11502 11502 75 % to 100 % =766
50 % to 100 % =912 25 % to 100 %
= 247
2 C.B. 364095 ha 8736.04 72819 36410 36410
3 Terracing 500 ha 210.00 100 100 100
4 N.B. 4313 10782.50 43130 21565 21565
5 C.N.B 3152 9456.00 47280 22064 22064
6 Farm pond 5000 1750.00 5000 5000 3500
7 Other 2538.17
Total 39223.61 191333.00 96641 95141 1925
Table 5.30: Proposed 5 year plan of water conservation works 2012-13 to 2016-17 (Area in ha)
Sr. No Activity Physical Amount Lakh Rs
1 CCT 57509 5750.90
2 Waste land plantation 700 133
3 Terracing 500 210
4 Reclamation of salty soil 200 26
5 Compartment bunding 364095 8736.04
6 Loose bolder 53984 1079.68
7 Earthen structure 25959 324.49
8 Gabion structure 1000 200
9 Diversion bund 50 50
10 Farm pond 5000 1750
11 Nala bandh 4313 10782.5
12 CNB 3152 9456
13 Recharging trench 150 225
Total 38723.6
216
Table 5.31: Soil & Water conservation [ year & activitywise ] District five year plan 2012-13 to 2016-17 [ Amount in lakhs ].
Year CCT
C.B
Terracing
N.B
C.N.B
Farm pond
LBS
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
2012-13 9000 900.00 60500 1451.40 50 21.00 530 1325 247 741 1000 350 9500 190
2013-14 12000 1200.00 72500 1739.28 125 52.50 1157 2892 725 2175 1000 350 11500 230
2014-15 12000 1200.00 72500 1739.28 125 52.50 1150 2875 725 2175 1000 350 11500 230.
2015-16 13509 1350.90 72500 1739.28 125 52.50 831 2077 725 2175 1000 350 12500 250
2016-17 11000 1100.00 86095 2066.82 75 31.50 645 1612 730 2190 1000 350 8984 179
Total 57509 5750 364095 8736 500 210 4313 10782 3152 9456 5000 1750 53984 1079
Year
Earthen
structure
Recharing
trench
Sustainable dry land
Diversion bund
Gabiyan str.
West land vegetation
Reclamation of saline soils
Total
Phy. Fin. hy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Fin.
2012-13 4000 50.00 30 45 100 100 10 10.00 200 40 100 19 50 6.50 5248
2013-14 5500 68.75 30 45 100 100 10 10.00 200 40 150 28 50 6.50 8938
2014-15 5500 68.75 30 45 100 100 10 10.00 200 40 150 28 50 6.50 8920
2015-16 5500 68.75 30 45 100 100 10 10.00 200 40 150 28 50 6.50 8293
2016-17 5459 68.24 30 45 100 100 10 10.00 200 40 150 28. 0 0.00 7822
Total 25959 324 150 225 500 500 50 50 1000 200 700 133 200 26 39223
217
5.7 Social Forestry Development
Forests play an important role in maintaining the ecological balance of nature
and one of the major renewable sources of our state. They include harmonious cycling
of water resources, storage of soil & moisture, moderating influence of floods, control
over air, water and noise pollution moderation of temperature, better rainfall distribution,
providing decentralized rural employment and food supply to disadvantageous section
of population. Due to continued degradation and destruction of the forests in our State
in the past, the evil effects in the form of soil erosion, floods, increased run-off, loss of
genetic diversity etc. are manifested. The loss of forest cover is causing great concern
to ecology in general and environment in particular. Forest, being the precious natural
renewable resource, a sustainable management of this resource is most essential.
Over the last twenty years, large-scale planting of Eucalyptus, as a fast growing exotic,
has occurred in India, as part of a drive to reforest the subcontinent, and create an
adequate supply of fuel and timber for rural communities under the augur of ‘social
forestry’. Initially in response to the international community’s consternation regarding
deforestation, social forestry was, in its early days, largely a product of development aid
Government of Maharashtra decided to implement Wasteland Development
Programme on large scale over an area of 1.35 million ha vide its Resolution dated
3/6/1987, in which the F.D.C.M. Ltd. was also involved as line agency with Forest
Deptt. and Social Forestry.
Table 5.32 : Technologies for Insitu Soil -Moisture Conservation Plan (Area in ha )
Sr. No .
Name of Activity Total area covered (ha) up to 2006-07 2012-13 2013-14 2014-15 2015-16 2016-17
1 Contour Cultivation 65680 91935 110842 133595 147193
2 Dead Furrows 53150 60067 71227 82093 92103
3 Ridges & Farrows 34370 45805 49982 70305 75743
4 Other Activities 1615 1815 1912 2005 2613
Total 65680 91935 110842 133595 147193
Table 5.32 presents the yearwise insitu soil –moisture conservation activities to be
undertaken in Ahmednagar district. The activities proposed to be completed are of
contour cultivation, opening of dead furrows, ridges and furrows and other such
activities to conserve the available rains in the soils to support the growing crops during
kharif and rabi season for sustaining crop productivity. The insitu soil–moisture activities
useful for conserving rains as well as for avoiding the soil erosion due to excess rainfall
218
protecting the fertile top layer of soil. Table 5.33 presents action plan for social forestry
for XI Plan.
219
Table 5.33: Action Plan for Social Forestry for XI Plan (Rs. In lakh)
Sr. No.
Particulars Activity
year 2006-07
Total Programme 2012-13 2013-14 2014-15 2015-16 2016-17
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
1 Social Forestry Infrastructure Development
1 )Seedling prepration 0 0 158.69 0 0 0 39.67 0 39.67 0 39.67 0 39.67
2) Nursery modernization 0 0 300 0 0 0 70 0 70 0 70 0 90
3) Roadside Plantation 3yrs 0 0 1650 0 0 0 648 0 334 0 334 0 334
4) Roadside Plantation 15 mnt 0 0 837 0 0 0 186 0 279 0 279 0 93
Total (Stream I)
0 0 2945.69 0 0 0 943.67 0 722.67 0 722.67 0 556.68
C C T 0 0 370 0 0 0 148 0 92.5 0 92.5 0 37
Block plantation 0 0 306 0 0 0 126 0 72 0 72 0 36
Roadside Plantation 3yrs 0 0 324 0 0 0 162 0 162 0 0 0 0
Roadside Plantation 15 mnt 0 0 93 0 0 0 46.5 0 46.5 0 0 0 0
Total 0 0 1093 0 0 0 482.5 0 373 0 164.5 0 73
Social Forestry -I
0 0 0 943.67 0 722.67 0 722.67 0 556.68 0 2945.6
9
Social Forestry -I I 0 0 0 482.5 0 373 0 164.5 0 73 0 1093
TOTAL
0 0 0 1426.1
7 0
1095.67
0 887.17 0 629.68 0 4038.6
9
Source:
220
5.8 Agro-based Rural Development Programme:
The Rural Agro-Based Industrial Development Programme is charged with the
responsibility of researching into and developing small-scale manufacturing (usually
food processing techniques) using locally manufactured equipments. It is evident that
the Agro-Industrial Development programme has achieved some degrees of successes
especially in village Agri processing, Palm oil processing among others. The concern of
this plan is to develop strategies of small scale /agro industrial development. The
challenges, prospects and opportunities of the small –scale industrial development will
also be highlighted.
A. Apiculture-
Apiculture is one of the emerging important subsidiary occupations sponsored by
KVIC. Till today honey collection from forest area is livelihood activity in hilly areas of
Pune district. Scientific rearing of apiculture has a very wide scope in increasing
agricultural production up to 30 per cent by activating pollination process. Agro climatic
conditions of Ahmednagar district especially Akole taluka are suitable for commercial
implementation of this enterprise. KVIC organizes different scientific training
programme of commercial apiculture for the rural unemployed youth. Apis Melifera is a
new species having more disease resistance capacity than the existing local species
(Satari). Apiculture is eco-friendly enterprise which does not compete with any other
enterprise and hence, it has wide scope in district.
Activities organized by KVIC
1. Training-
Scientific training of honey bee rearing for10 days is being organized by KVIC.
During the training, Rs. 500/- stipend is also supplied to participating person.
2. Demonstrations-
Technical demonstrations of honey bee rearing are organized by KVIC across
the district.
3. Educational tour-
Intrastate and interstate educational tours are being organized by the KVIC to
encourage the people and popularize commercial honey bee rearing activity
among the rural people.
221
Sericulture
Sericulture is one of the most important trustworthy agro based subsidiary
enterprise leading sound economic gain to the farmer. Agro climatic conditions of
scarcity zone of the district are suitable for mulberry cultivation and silk worm rearing.
With a view to give thrust for the sector, a separate Directorate had been established
under the ministry of textile. Now Govt. had planned to expand the area under
Mulberry, in a planned manner. Under integrated cropping practices proposed by the
state, thrust has been given to mulberry cultivation and silk rearing in the district.
Table 5.34 indicates activities projected by Khadi and Village Industries under
stram-I & stream- II during XI th Plan
Table 5.34: Action Plans for (K.V.I) Khadi & Village Industries Programmes during XI Plan
Programmes
Unit cost (Rs)
No. of Beneficiary
Target (Rs. In lakh)
2012-13 2013-14 2014-15 2015-16 2016-17
Units Phy. Fin Phy. Fin Phy. Fin Phy. Fin Phy. Fin
Stream I
Training Infrastructure 155000 1 0 0 0 0 1 1.55 1 1.55 1 1.55
Total 155000 1 0 0 0 0 1 1.55 1 1.55 1 1.55
Stream II
Bee Keeping Training 2500 100 0 0 0 0 100 2.5 100 2.5 100 2.5
Bee Breeder Training Programme 1500 50 0 0 0 0 50 0.75 50 0.75 50 0.75
Training for capacity Building 1500 50 0 0 0 0 50 0.75 50 0.75 50 0.75
Distribution of Bee Boxes 50000 100 0 0 0 0 100 50 100 50 100 50
Total 300 0 0 0 0 300 54 300 54 300 54
Khadi & Village- I 0 0 0 0 - 1.55 - 1.55 - 1.55 - 4.65
Khadi & Village - II 0 0 0 0 300 54 300 54 300 54 900 162
Total 0 0 0 0 300 55.55 300 55.55 300 55.55 900 166.7
Source:KVIC Ahmednagar
5.9 Food Processing Units:
It is a well known fact that the processing of agricultural and horticultural
produce improves quality and life of the products, besides fetching a higher price by
value addition in it. Value addition is one of the two fronts in increasing net income of
222
the farmer. Hence, agro based industries assume great importance in providing
assured return to the farmers. Table 5.35 presents the taluka-wise information on agro-
processing facilities available in and outside the district but serving the need of the
district.
Table 5.35: Agro Processing Unit in the District (including Sugar, Milk, Silk, etc., related to Agriculture only) Sr. No.
Agro- Processing unit
Taluka No. of units
Per day capacity (tonnes),000 liters
Produce Processed 2006-07 (tonnes) lakh liters
1
Milk Processing
Nagar 2 110 216.44
Parner 2 20 138.19
Jamkhed 1 20 49.16
Karjet 2 30 212.67
Shrigonda 1 10 87.8
Shevgoan 1 10 44.29
Pathirdi 2 30 146.26
Shrirampur 1 0 31.04
Rahuri 1 0 98.45
Newasa 1 0 246.63
Kopargoan 1 100 399.08
Sangamner 1 100 810.6
Akole 2 20 194.34
Rahata 3 140 632.15
Total 21 590 5306.1
2 Silk Reeling Unit Newasa 1 60 kgs 6kgs
3
Sugarcane Processing
Nagar 1 2500 382090
Parner 1 1250 230070
Karjat 1 800 273687
Shrigonda 3 2500 1600000
Shevgoan 1 2500 397606
Pathirdi 1 2500 517664
Shrirampur 1 2600 546987
Rahuri 1 4250 844899
Newasa 2 4500 1740000
Kopargoan 3 2500 1700000
Sangamner 1 3500 116470
Akole 1 2500 440475
Rahata 1 4000 114782
Total 18 35900 8904730
Table 5.33 presents talukawise different agro-processing units present in
Ahmednagar district. The major agro- processing units include milk and sugarcane
processing. There is total 21 major milk processing units under private & public sector
control with capacity of 590000 litres per day of milk processing and total milk
223
processed by these units during the year 2011-12 was of 5306.1 lakh litres. There is
only one Silk Reeling unit under public sector in Ahmednagar district situated at Bhenda
vilage in Newasa taluka with reeling capacity of 60 kgs per day.
Co-operative sector is well established in Ahmednagar district. Milk and sugarcane
are major agricultural commodities being processed by Co-operative sector. There 17
Co-operative sugarcane processing factories and only one is operated under private
sector. The processing capacity of all sugarcane factories in Ahmednagar district is of
35900 MT /day.
5.10 Development of Rural Industries:
Besides adding the value, processing of agricultural and horticultural produce
improves quality and shelf life of the products. Value addition increases the net income
of the farmer by reducing cost of production. Therefore, agro based industries play a
major role in providing assured return to the farmers.
Table 5.36: Productwise number of SSI Units in the District
Sr. No
Category of Industry Nos. Investment (Rs.in lakh)
Employment
1 Manufacturing of food Product 414 639 3507
2 Manufacturing of Textile 38 40 441
3 Manufacturing Wearing apparel Dressing & Dyeing of Fur
28 113 176
4 Training & Dressing of Leather, Mfg. luggage hand Bags Sandal Harmless & Footwear
44 141 239
5 Manufacturing of Wood products Plating Material Except Furniture
143 165 644
6 Manufacturing of paper Products 120 21 1175
7 Manufacturing of Publishing Printing And Reproduction of Recorded Media
230 957 840
8 Manufacturing of chemical & Chemical Products
265 3245 1975
9 Manufacturing of Rubber & Plastic Products
240 217 1850
10 Manufacturing of other Non Metallic Mineral Products
320 250 4499
11 Manufacturing of Basic Metals 146 325 1510
12 Manufacturing of Fabricated Metal Products Except Machinery & Equipment
347 100 2043
13 Manufacturing of Machinery & Equipments
482 531 3248
14 Manufacturing of Electrical Machinery & Apparatus
99 178 806
15 Manufacturing of Radio television 33 123 343
224
Communication Equipment and Apparatus
16 Manufacturing of Medical 09 66 68
17 Manufacturing of Motor Vehicles Trailers & Semi Trailers
12 96 87
18 Manufacturing of Furniture 164 536 84
19 Maintenance & Repair of Motor Vehicles & Motor
30 58 277
20 Computer Related Activities 123 315 484
21 Other Business Activities 76 388 705
22 Other Service Activities 1190 1006 4874
Total 4553 9510 29875
Table 5.36 presents the productwise Small-Scale Industrial units established in
Ahmednagar district.There are total 4553 numbers of SSI units in operation and total
investment in these units is of Rs.9510 lakhs and have generated employment
opportunities by absorbing 29875 workers in the district. Table 5.37 indicates the
financial achievements by District Industries Centre during XIth Plan Period in
Ahmednagar district. DIC achieved the given targets under different components and
schemes for district in last Plan Period
Table 5.37: Progress during X IPlan under District Industrial Centre (Financial in lakh)
Programme 2007-08 2008-09 2009-10 2010-11 2011-12
T A T A T A T A T A
Seed Money Scheme
20 18.41 11.95 11.95 11.86 11.86 21.11 21.11 32.66 32.66
DIC Loan Scheme
2.5 10.41 1.31 1.31 0.92 0.92 1.47 1.47 3.5 3.5
PMRY
0 0 0 0 0 0 0 0 0 0
EDTP
0.30 0.30 2.89 2.89 0.16 0.16 1.39 1.39 1.5 1.5
Total
22.8 29.12 16.15 16.15 12.94 12.94 23.97 23.97 37.66 37.66
Notes: T-Target, A- Achievement
Table 5.38 presents the activities projected by District Industries Centre under stream-
II during XII th Plan Period for Ahmednagar district. The total project outlay under
ongoing schemes is of Rs. 264.6 lakhs.
225
Table 5.38: Action Plan of DIC for XII Plan ((Rs.in lakh))
Programme 2012-13 2013-14 2014-15 2015-16 2016-17 TOTAL
Phy. Fin Phy. Fin Phy. Fin Phy. Fin Phy. Fin Phy. Fin
District Industry Center- Stream II
Agro Processing Entrepreneurship
0 0 0 0 0 0 0 0 0 0 0 0
Co-op Industrial estate 0 0 0 0 0 0 0 0 0 0 0 0
Agro-park Incentive Scheme
0 0 0 0 0 0 0 0 0 0 0 0
Capital For Agro processing units
0 0 0 0 0 0 0 0 0 0 0 0
Scheme for Quality Standards
0 0 0 0 0 0 0 0 0 0 0 0
Agro Inform. Technology centre
0 0 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0 0 0
District Industry Center- Stream II
SMS Scheme 73 30 40 20 40 25 40 20 40 20 233 115
DIC Loan Scheme 02 3 5 1 5 10 5 1 5 1 22 7.00
EDTP 150 0.3 2249 67.3 833 25 833 25 833 25 4898 142.6
Total 225 33.3 2294 88.3 878 51.0 878 46 878 46 5153 264.6
DIC - I 0 0 0 0 0 0 0 0 0 0 0 0
DIC -I I 225 33.3 2294 88.3 878 51.0 878 46 878 46 5153 264.6
TOTAL DIC
225 33.3 2294 88.3 878 51.0 878 46 878 46 5153 264.6
5.11 Agriculture Marketing-
An efficient agriculture marketing system is indispensable for the overall
development of the district/state/country's economy. It requires a healthy environment,
smooth channels for the transfer of produce, physical infrastructure to support
marketing of the produce, easy cash support to widely scattered community of
producers and also promotes a sense of market orientation among the farmers. The
absence of rural road connectivity and other infrastructure, combined with improper
management, lack of marketing intelligence has resulted in a system that is unfavorable
to the farmers. The adverse impact of all theses is more pronounced in the case of the
small and marginal farmers who constitute about 70 % of the entire farming community.
Table 5.39 presents the talukawise marketing infrastructure available in Ahmednagar
district. It can be seen from the table that total number of rural godowns are 43 with
storage capacity of about 12650 MT. There are 8 cold storages with 18000 tones of
capacity. The onion is on the major agricultural cash crops grown throughout the district
covering almost all the talukas and in all the three seasons. During last few years the
2527 numbers of onion storage structures constructed by the farmers under the
subsidizedcomponent of agricultural department. Presently the storage capacity of
226
these structures is about 63900 MT. There are 14 main APMC market yards one at
each taluka and 29 sub-market in the district.
Table 5.39: Basic Marketing Infrastructure for Agriculture Produce (Post Harvest Management) (Capacity in tonnes)
Sr. No.
Taluka Storage Structures Markets (Numbers)
Rural Godowns Cold storage Onion Storage Main market
Sub market Nos. Capacity Nos. Capacity Nos. Capacity
1 A,nagar 7 3500 4 8000 262 6550 1 2
2 Parner 2 400 1 2000 296 7400 1 2
3 Pathardi 1 250 248 6200 1 4
4 Karjat 1 200 72 1800 1 3
5 Jamkhed 4 750 53 1325 1 1
6 Shrigonda 4 800 176 4400 1 2
7 Shrirampur 5 1250 1 2000 208 5200 1 2
8 Shevgaon 2 500 358 8950 1 3
9 Newasa 2 600 106 4000 1 1
10 Rahuri 2 400 62 1550 1 1
11 Sangamner 3 750 2 4000 308 7700 1 1
12 Akole 2 500 57 1425 1 3
13 Kopargaon 4 1250 165 4550 1 2
14 Rahata 4 1500 1 2000 102 2550 1 2
Total 43 12650 8 18000 2527 63900 14 29
Table 5.40 presents the storage capacities created during the year 2009-10 to
2011-12 and proposed plan for the next three years. It is seen from the table that at the
end of the present Five-Year Plan the total 8112 numbers of farm storage structure will
be created with total 240202.33 MT capacity. This farm storage structure will be helpful
in storage of farm produce.
Table 5.41 presents the talukawise existing marketing infrastructure established by
Agricultural Produce Marketing Committees in Ahmednagar district. Different
agricultural commodities are marketed in the APMC yards. There are total 14 main
markets and 28 numbers of sub-market yards in the distirict. Some APMC sub markets
have marketing facilities for certain commodities like foodgrains, fruits and vegetables.
227
Table 5.40: Farm Level Storage Plan
(Capacity in tonnes and investment Rs. In lakh)
Existing facilities
( 2006-07)
2012-13 2013-14 2014-15 2015-16 2016-17 Total
No. Capa Invest No. Capa Invest No. Capa Invest No. Capa Invest No. Capa Invest No. Capa Invest
Onion storage structures
1167 29175 875.25 1327 43175 1199.32 2527 63900 2260.92 1200 30000 1800 1500 37500 2250 7721 203750 8385.49
Zero energy chamber
32 25 2.07 37 28.90 2.39 40 31.25 2.58 42 32.81 2.71 44 34.37 2.84 195 152.33 12.59
43 12650 190.2 43 12650 190.2 20 2000 40 40 4000 80 50 5000 100 196 36300 600.40
TOTAL 1242 41850 1067.52 1407 55853.9 1391.91 2587 65931.25 2303.5 1282 34032.81 1882.71 1594 42534.37 2352.84 8112 240202.33 8998.48
228
Table 5.41: Marketing Infrastructure Plan
Sr. No Taluka Existing marketing facilities (2006-07)
Main markets Sub-Markets
1 Akole 1 0
2 Sangamner 1 5
3 Kopargoan 1 0
4 Rahata 1 2
5 Shrirampur 1 2
6 Newasa 1 4
7 Shevgoan 1 3
8 Pathirdi 1 4
9 Nagar 1 0
10 Rahuri 1 2
11 Parner 1 3
12 Shrigonda 1 1
13 Karjet 1 2
14 Jamkhed 1 0
Total 14 28
Source:
Strategies for Marketing:
In the district ,there are 14 agriculture produce market committee, 31 sub
markets & 325 madies. District has 52 co-operative agriculture produce and marketing
societies. The strategies & activities for marketing for better realization of agri produce
to increase the growth rate is as follows
Promoting farmers for producers to consumers direct marketing
Minimizing the middlemen chain in agricultural marketing
Promoting farmers for supply of clean and graded agricultural produce to
consumers as per demand.
Developing producers to consumers direct linkages
Promoting for contract farming
To encourage farmers to understand consumer preferences during marketing
Educating farmers to understand marketing trends
Educating farmers to provide quality products to consumers.
Promoting Group Approach for export marketing
Promoting cultivators for adoption of technical know-how for production of
exportable crop.
229
Promoting cultivators adoption of improved package of practices of post harvest
management for export.
Capacity building of cultivators regarding export marketing procedures and
practices
Promoting group approaches for production and export marketing.
Educating farmers about sanitary and Phyto-sanitory measures for export,
Eurepgaps and other quality standards
Creating Godown facilities in rural areas.
Promoting of Refer Van Facilities ,cold storage to establishing cold chain
Encouraging KVM, FIGs to have its own godown, storage and packaging
centers.
Developing SMS messaging system for FIG /KVM for market intelligence and
providing daily marketing prices of Agril..Commodities.
Promoting and educating Krishi Vigyan Mandals to provide market information at
village level.
Educating farmers about importance of branding and quality maintenance.
Providing residual testing facilities with the help of KVK, SAU/ ZRS etc
Activities for Marketing
Organizing Kisan Bazars for providing famers produce to consumers.
Mobilizing farmers for participation in Kisan Bazars
Providing common marketing place for marketing.
Training farmers for consumers’ preferences, packaging size and clean graded
produce.
Organising exposure visit to marketing Centres initiated and success Stories
Identification of cultivators for export marketing
Formation of Commodity Interest Group of cultivators
Organising training on exportable production
Identification of cultivators for export marketing
Formation of Commodity Interest Group of cultivators
Organising training on exportable production
Strengthening of Krishi Vigyan Mandals and formation of Commodity Interest
Groups for exportable commodity
230
Organising workshop by linking all stakeholders in export marketing
Establishment of spot markets with help of SNX, Safal ,National Exchanges
Converting KVM into Special commodity for the commodity prevailing in those
areas.
Exposure visits to Terminal Markets, Export Hub and grading, processing plants.
Arranging interactions of farmers with traders, processors and exporters.
Providing marketing information by Internet, E-mail Connectivity to Commodity
Interest Groups formed under Krishi Vigyan Mandals.
Organising workshop on branding, quality Maintenance with the help APEDA &
MSAMB experts.
Establishing residual testing facilities KVK, SAU/ ZRS.
Preparing Directory of Service Providers, Exporters, Refer Van, Transporters,
Cold storage units, Bankers, Market Agents and retailers.
5.12 Agriculture Credit:
Credit is one of the critical non-land inputs, has two-dimensions from the
viewpoint of its contribution to the argumentation of agricultural growth viz., availability
of credit (the quantum) and the distribution of credit. With the increasing application of
modern technology in agriculture, the requirement of agricultural credit has assumed
significant importance. Credit plays a crucial role in oiling the wheels of agricultural
production. The strategy based on intensive use of improved seeds, insecticides,
pesticides, irrigation etc. and taking allied activities, which are capital intensive. Lack of
adequate credit has been acknowledged as one of the most inhibiting serious factor in
modernization of traditional agriculture and as the key element behind the vicious circle
of poverty and low productivity.
The district has 118 credit institutions, 95 Primary Agricultural Credit Cooperative
Societies, 13 Cooperatives, and 10 commercial banks. Table 5.42 presents the different
credit institutions available in Ahmednagar district. It can be seen that there are 191
branches of commercial and 283 branches are working in Co-operative sector. There
are also 138 other credit institutions functioning in different talukas of Ahmednagar
district. Table 5.43 presents the talukawise Crop loans disbursed during the year 2007-
2008 by the Co-operative and Commercial Banks in Ahmednagar district. The data
shows that there were total 185730 number of loans disbursed with an amount of Rs.
59524 lakhs. The percentage coverage of loans by Co-operative sector in total loans
231
was about 81.35 % and that of commercial banks was 18.35% and amount coverd by
Co-operative sector was about 72.34% and that of commercial sector was of 27.66%.
Table 5.42: Details of Credit Institutions in the District
Name of Taluka
No. of Institutions
Total
Commercial Banks
RRBs Cooperative PACS Others
Ahmednagar 37 11 12 12 7
13 13 8
13 10 17 11 12 15
283
138
Parner
Pathardi
Karjat
Jamkhed
Shrigonda
Shrirampur
Shevgaon
Newasa
Rahuri
Sangamner
Akole
Kopargaon
Rahata
191 283 138
Source:
Table 5.43: Crop Loan disbursement in District (short term credit)
(Rs. In lakh)
Taluka
Loan disbursed in 2011-12
Coop. Banks Commercial Banks RRBs TOTAL
No. of loans
Amount No. of loans
Amount No. of loans
Amount No. of loans
Amount
A,nagar 10647 2440 2441 933 0 00 13088 3373
Parner 7345 3717 1684 1422 0 0 9029 5139
Pathardi 6278 1587 1439 607 0 0 7717 2194
Karjat 9009 2959 2065 1132 0 0 11074 4091
Jamkhed 7112 2002 1631 766 0 0 8743 2768
Shrigonda 10868 3907 2492 1494 0 0 13360 5401
Shrirampur 13832 3491 3171 1336 0 0 17003 4827
Shevgaon 10983 2963 2518 1133 0 0 13501 4096
Newasa 16249 4800 3725 1836 0 0 19974 6636
Rahuri 11842 3764 2715 1440 0 0 14557 5204
Sangamner 15535 3785 3562 1448 0 0 19097 5233
Akole 9316 2445 2136 935 0 0 11452 3380
Kopargaon 15749 3568 3610 1365 0 0 19359 4933
Rahata 6326 1627 1450 622 0 0 7776 2249
Total 151091 43054 34639 16470 0 0 185730 59524
Source:
232
Table 5.44: Loan Disbursement for investment credit during XII Five Year Plan
(Rs. In lakhs)
Sr. Taluka No.of farm
families
No.of member of PACS
No.of loany
farmers
Loan disbursed
during 2006-07
Loan distribution target in next five years
2012-13
2013-14
2014-15
2015-16
2016-17
1 A,nagar 18333 25990 30358 45537 68306 102458 153687
2 Parner 10978 4199 9002 13503 20255 30382 45573
3 Pathardi 9714 3388 5456 8184 12276 18414 27621
4 Karjat 12843 4550 7485 11227.5 16841 25262 37893
5 Jamkhed 10344 1323 5258 7887 11831 17746 26619
6 Shrigonda 16250 8482 19380 29070 43605 65408 98111
7 Shrirampur 18870 5356 9497 14245.5 21368 32052 48079
8 Shevgaon 15554 6329 6576 9864 14796 22194 33291
9 Newasa 22328 9100 32433 48649.5 72974 109461 164192
10 Rahuri 16359 4351 12549 18823.5 28235 42353 63529
11 Sangamner 22025 8193 15785 23677.5 35516 53274 79912
12 Akole 13966 2604 6376 9564 14346 21519 32279
13 Kopargaon 21490 5168 17359 26038.5 39058 58587 87880
14 Rahata 9622 6471 6982 10473 15710 23564 35346
District Total
680609 218676 95504 184496 276744 415116 622674 934011
Table 5.45: Credit plan for Ahmednagar District (Rs.Lakh)
Particular Achievement of 2011-12 Proposed 2012-13 Proposed 2016-17
Crop Loan 25279 59225 72000
Term Loan 14564 32054 38000
Total Agriculture. 39843 91579 110000
Small Scale 2887 7655 9000
Other Opportunity 12582 17858 20000
Total Priority Sector 55312 117092 139000
Agricultural crops are subjected to the vagaries of nature like untimely, uneven
and insufficient rainfall. Sometimes crops also suffered due to hail, storms, droughts
and floods, pest and disease infestations severely affecting the crop production and
productivity. Due tothis calamities the economy of farming community get restricted.
Table 5.46 presents the talukawise farmers covered under National Crop Insurance
Scheme.During the year 2006-07 total 140952 farmers were covered with an area of
about 161987 ha.
233
Table 5.46 : Agriculture Insurance Status
Sr. Name of Taluka Actual coverage of farmers upto 2011-12 Area coverage (ha) in 2011–12
1 A,nagar 22692 36288
2 Parner 26439 31520
3 Pathardi 20048 24239
4 Karjat 3307 3629
5 Jamkhed 7284 8965
6 Shrigonda 13909 16102
7 Shrirampur 3128 2829
8 Rahuri 2593 2237
9 Newasa 1011 1197
10 Shevgaon 4874 4398
11 Sangamner 17602 15774
12 Akole 9642 8166
13 Kopargaon 3184 2453
14 Rahata 5239 4190
District Total 140952 161987
5.13 Special Projects/Programmes on Going in the District- A) Dairy development schemes-
Sr. No
Name of the scheme Implementing authority
1 Improving AI delivery system District Deputy commissioner and District Animal Husbandry Officer, ZP
2 Establishment of small Ruminants market yard
District Deputy commissioner
3 Breed village scheme for Sheep and Goat
District Deputy commissioner and District Animal Husbandry Officer, ZP
4 Modernization of existing veterinary Hospitals
District Deputy commissioner
5 Establishment of small Ruminants slaughter house
District Deputy commissioner
6 Establishment of poultry dressing plant
District Deputy commissioner
7 certified Fodder Seed Marketing Subsidy
District Deputy commissioner
8 Scientific Tackling of Infertility in Dairy Animals
District Deputy commissioner
9 Demonstration of Scientific Calf Rearing
District Deputy commissioner
10 Upgradation of existing Mini polyclinic, Veterinary Dispensaries
District Deputy commissioner
Source- District Dairy Development Officer, Satara.
234
B) Programmes of Social Forestry-
1. Western Ghat Development Programme
2. Plantation on selected Watershed Programme.
3. Development of nurseries.
C) Sericulture development programmes-
Sericulture development programmes includes following aspects-
1. Supply of high yielding varieties.
2. Construction of rearing house.
3. Supply of disinfectant material.
4. Chawaky rearing centers.
5. Farmers training.
6. Sericulture polyclinics.
7. Support for improved cottage basin reeling units.
D) Apiculture Programmes-
1. Farmers Trainings.
2. Demonstrations.
3. Field visits.
E) Fishery Development Programmes-
1. Reservoir development
2. Establishment of training centre.
3. Supply of cold storage facility, transport facilities etc.
4. Establishment of mini wholesale markets.
235
Allied Agriculture Sector : Proposed under RKVY
Sr
No
Name of
department
Scheme Proposed Total Infrastru
cture &
Asset
Producti
on
Growth
A Agriculture
1
Soil Health Improvement-Establishment
& Strengthning Of Soil Test Lab. 250.00 250.00
2
Agri Mechanization-Community
implement service center 1000 1000
3 Agri clinics- Establishment 100 100
4 Integrated Pest Management 100 100
5 Women Farmer Field School 100 100
6
Infrastructure for Strenthening of District
Training Center 615 615
7
Surveillance & monitering of pest on
cotton, Soyabean and various crop 200 200
8 Human Resource Devlopment 4380 4380
9 Agriculture Tourism 140 140
10 Precision farming 50 50
11 Group/ Integrated Farming 50 50
12 Organic farming-end to end Project 50 50
9 Mahatma Phule Agriculture University 4882 2441 2441
10 Increasing Water use efficiency 1705 1705
Total 13622.00 6301.00 7321.00
B Water Conservation
1
Introducing Farm Pond and drip irrigation
for cotton crop 1500 1500
2 Development Of Rainfed Farming System 15500.00 15500.00
3 Insitu Conservation 100.00 100.00
Total 17100.00 17100.00 0.00
C Horticulture
1
Rejuvenation Of Lemon garden for
Productivity 50 50
2 Medow Orchad in Guava 25 25
3 pre cooling chambers 40*15 lakh 600 600
4 Ripening chambers 20*10lakh 200 200
Total 875 875 0
D Animal Husbandary
1
Improving Artificial insemensation
DeliverySystem 619 619
2 Breed Village System for Sheep &Gaot 70 70
3
Strenthening/mordenisation of existing
Veternery Dispenseries(g1) 431.87 431.87
4
Strenthening of Intensive poultry
devlopment blocks 75 75
5 Supply of mini hatheries to SHGs 22.53 22.53
Total 1218.4 1218.4 0
236
Allied Agriculture Sector : Proposed under RKVY
Sr
No
Name of
department
Scheme Proposed Total Infrastructure
& Asset
Prod
uctio
n
Grow
th
E Dairy Development
1
Capital subsidy to primary dairy co op
society 98 98
2 Providing milk tester 69 69
3
Providing coputerised milk acceptance
system 417 417
4 Providing N D D B adulteration kits 5 5
5 Market insulation vehicle 105 105
6 Installing milk product manufacturing units 9090 9090
7 Installing bulk coolers 2355 2355
8 IDFP- Dairy Farm Project 3824.1 3824.1
Total 15963.1 15963.1 0
F Fisheries
1
Enhance of fish poduction in agriculture
farm pond.Establishment of fish seed
production centre , stocking of fish seed,
Fish farmer devlopment agency,
Strenthning of fishery cooperative 200 200
G Sericulture
1 Mulberry Plantation 13.75 13.75
2 Assistance for irrigation 13 13
3 Rearing house 75 75
4 Chawki rearing center 34.4 34.4
5 Const of vermicompost shed 9.1 9.1
6 Reeling unit(post cacoon ) 32 32
7 Contractual staff 7.92 7.92
Total 185.17 163.5 21.67
H Social Forestry
1 seedling prepration 158 158
2 mordenisation of nerseries 300 300
3 Roadside Plantation(3yrs) 1650 1650
4 Roadside Plantation (15mon) 837 837
Total 2945 2787 158
I Minor irrigation
1 Drip &sprikler 6668 6668
J Cooperative &marketing Dept
1
market mordenisation system for fruits &
veg 159.5 159.5
2 cooprative society Godown Repairs 495.43 495.43
3 Export facility center 504.94 504.94
4 Onion Storage Structures 1292.38 1292.38
Total 2452.25 2452.25 0
H KVIC Bee Keeping 56.28 56.28
Grand Total 61285.20 53784.53
7500
.67
237
Allied Agriculture Sector : Ongoing schemes
Sr
No
Depar
tment
Scheme Proposed Total Infrastru
cture & Asset
Productio
n Growth
1 Agriculture
1 Cereals Development Programme 250 250
2 National Food Security Mission 2900 580 2320
3 Sugarcane Devlopment Project 510 510
4 Cotton development project 125 125
5 Organic farming 250 250
6 Pulses Devlopment 150 150
7 Oil seed Devlopment Programme 200 200
8 Maize Devlopment Programme 30 30
9 Cereals seed production in selected area 500 500
10
Womens Participation in agriculture
Training,Exibition, Marketing survey Training 100 100
11 NATP -ATMA 500 500
12 Strenthning of extension institutes 500 500
13 Imformation support in agriculture extension 200 200
14 Seed treatment Campaign 20 20
15 Agriculture Mechanisation 40 40
16 Strenthening of agropolyclinic 40 40
17 Strenthening of bio control lab 20 20
18 Accelarated pulse production 20 20
19 Maintaining Agriculture Statistics 20 20
20 strenthening of TSF 20 20
Total 6395 1200 5195
B Water Conservation
1 Farm Pond 5000 5000
2 Integrated watershed devlopment programme 10000 10000
3 Western ghat watershed Devlopment 1000 1000
4 soil reclamation 1000 1000
5 Nala bund 1000 1000
6 National Watershed Devlopment Programme 1000 1000
6 CNB 7000 7000
Total 26000 26000 0
C Horticulture
1 E G S Horticulture Area Expansion 2500 2500
2 NHM –Estb of new Nursery 100 100
3 Vegetable seedling production 50 50
4 Estb of new gardens 100 100
5 Farm ponds 3000 3000
6 NHM 2000 1000 1000
7 Strenthening of horticulture Nursery 40 40
10 Plant Protection 80 80
14 Value addition Units 50 50
15 Post Harvest Management 100 100
16 Marketing Infrastructure 50 50
17 BBD 1000 1000
Total 9070 6600 2470
D
Micro Irrigation
4000 4000
E Animal Husbandary (General ,TSP,OTSP) 400 400
238
Allied Agriculture Sector : Ongoing schemes
400
F Dairy Development
1 Training for secretaries 52 52
2 Training of milk producers 45 45
3 Training for milk testers 3 3
4 Training for director of societies 24 24
5 Training for clean milk production 17 17
Total 141 0 141
G Fisheries
1 Training ongoing schemes 25 25
2 Training 30 30
Total 55 0 55
H Sericulture
I Social Forestry
1 CCT 370 370
2 Plantation 306 306
3 Roadside Plantation 324 324
4 other 93 93
Total 1093 1000 93
J KVIC 28.89 28.89
Grand Total 47182.8
9
38828
.89 8354
239
TotalAllied Agriculture Sector:
Sr.
No.
Department Head Scheme Proposed under RKVY Ongoing Schemes Total
Total Infrastructure
& Asset
Production
Growth
Total Infrastructure
& Asset
Production
Growth
1 2 8 8 8
1 Agriculture 13622.00 6301.00 7321.00 6395.00 1200.00 5195.00 20017.00
2 Water conservation 17100.00 17100.00 0.00 26000.00 26000.00 0.00 43100.00
3 Horticulture 875.00 875.00 0.00 9070.00 6600.00 2470.00 9945.00
4 Micro Irrigation 0.00 0.00 0.00 4000.00 4000.00 0.00 4000.00
5 Animal Husbandry 1218.40 1218.40 0.00 400.00 0.00 400.00 1618.40
6 Dairy Development 15963.10 15963.10 0.00 141.00 0.00 141.00 16104.10
7 Fisheries 200.00 200.00 0.00 55.00 0.00 55.00 255.00
8 Minor irrigation 6668.00 6668.00 0.00 0.00 6668.00
9 Sericulture 185.17 163.50 21.67 0.00 0.00 0.00 185.17
10 Social Forestry 2945.00 2787.00 158.00 1093.00 1000.00 93.00 4038.00
11 Co-operation Department 2452.25 2452.25 0.00 0.00 2452.25
12 KVIC 56.28 56.28 0.00 28.89 28.89 0.00 85.17
Total 61285.20 53784.53 7500.67 47182.89 38828.89 8354.00 108468.09
Percentage 100 87.76 12.24 100 82.29 17.71 100
240
237
Chapter VI
Ahmednagar District Plan
6.1 Introduction:
Economic reforms initiated since 1991 have put the Indian economy on a higher growth
trajectory. Annual growth rate in the total Gross Domestic Product (GDP) has accelerated from
below 6 per cent during the initial years of reforms to more than 8 per cent in recent years. The
Planning Commission in its approach paper to the Eleventh Five-Year-plan has stated that 9 per
cent growth rate in GDP would be feasible during the Eleventh Plan period. However, the
agricultural sector which accounted for more than 30 per cent of total GDP at the beginning of
reforms, failed to maintain its pre-reform growth. On the contrary, it witnessed a sharp
deceleration in growth after the mid-1990s. This happened despite the fact that agricultural
productivity in most of the states was quite low as it were, and the potential for the growth of
agriculture was high.
The GDP of agriculture increased annually at more than 3 per cent during the 1980s.
Since the Ninth Five-Year Plan , India has been targeting a growth rate of more than 4 per cent
in agriculture, but the actual achievement has been much below the target. More than 50 per cent
of the workforce of the country still depends upon agriculture for it’s livelihood. Slow growth in
Agriculture and allied sectors can lead to acute stress in the economy because the population
dependent upon this sector is still very large. A major cause behind the slow growth in
agriculture is the consistent decrease in investments in the sector by the state governments.
While public and private investments are increasing manifold in sectors such as infrastructure,
similar investments are not forthcoming in Agriculture and allied sectors, leading to distress in
the community of farmers, especially that of the small and marginal segment. Hence the need for
incentivising states that increase their investments in the Agriculture and allied sectors has been
felt to achieve 4% growth rate of agriculture in the 12th
Plan period, which is a target fixed by
the government. Therefore to achieve this target an appropriate planning of area specific
cropping patterns, proper crop management techniques, sound marketing facilities, good export
technology and its awareness are the most essential targets before Indian Agriculture. For that
the Government has embarked on a district planning process in order to give direction to its
support and facilitation of agricultural economic development.
238
The present District Plan is prepared with an objective to achieve an overall growth rate
for agriculture and allied sector of 13.65 percent during the 12th Plan period (2012-13 to 2016 to
2017). More specifically, the 12th
Plan aims at achieving a growth rate of 11.29 per cent per
annum in agricultural sector and a growth rate of 21.91 per cent in the allied sector. This growth
rate was targeted after conducting a SWOT analysis and observing the potential that exists in the
district. Discussions have been held with all departments in the agriculture and allied sector at
district level. There were informal discussions at taluka level, village level and with ATMA
officials to understand the needs of the district which will help to stimulate growth. Based on
the outcome of this exercise, innovative schemes have been devised in this plan. This plan
reflects the completion of the situation assessment phase of the planning process. It covers:
• An initial review of existing resource-based information, leading to preliminary
conclusions on resource based opportunities and implications for strategy and policy.
• An initial industry analysis of the key agricultural sectors within the district.
• A consultation process with a broad range of interested parties who are involved directly or
indirectly in commercial activity, in agricultural enterprises for small farmers and in support of
rural livelihoods.
Thus the present comprehensive district agriculture plan aims at solving major
constraints faced by the agricultural sector in the district and attempts to capitalize on the
potential of agriculture with the help of new innovative schemes suggested under stream I.
6.2 Growth Drivers:
A number of initiatives have been taken with regard to the support of emerging farmers
in both the commercial and traditional areas in an attempt to promote and improve levels of
management and production. Some of these include:
1. Soil and water management and resting demonstrations aimed at improving
production and reducing degradation.
2. Livestock Improvement Scheme through conditional, supplementary funding of
participating communities.
3. Wool Production Development (Rams and Shearing Sheds)
4. Field crops, Fruit, vegetables and floriculture.
5. Soil health
6. Fertilizer testing laboratories
7. Insecticide residue testing laboratories.
239
8. Sericulture development
9. Fishery development.
10. Social forestry development.
11. Village cottage industry development, etc.
6.3 Innovative Schemes:
Strategy for achieving five year plan projections:
A) Agriculture Department
• Strengthening of Krishi Vigyan Mandal (Kvm)
• Organization of Agriculture Exhibition
• Establishing Contract Farming
• Development of Agro-tourism
• Reclamation of ill-drained Soil
• Agriculture Mechanization
• Establishment of Soil Testing Lab at Taluka Level
• Strengthening of Rameti
B) Dairy Department
• Revival of non functional DCSs
• Formation of SHGs & Shetkari Mandal
• Strengthening of existing DCSs
• Clean milk production promotion schemes
• Artificial Insemination Facility
• Improving green fodder supply to DCSs members
• Extension & Training Center
• Plant Machinery
• Civil Construction
C) Animal Husbandry Department
• Improving A.I. Delivering System
• Establishment of Hatcheries at block level
• Strengthening Distribution network of Govt. Hatcheries by involving producer
association
• Establishment of small ruminant market yard
• Breed village of Sheep/Goat
240
• Strengthening modernization of existing Vet. Hospital
D) Sericulture Department
• Infrastructure for training staff
• Infrastructure for training for farmers
• Consultancy Centers
• Cocoon purchase center
• Starting New reeling Center
• Subsidy for construction of rearing houses
E) Fishery Department
• Reservoirs Development for Fish
• Establishment of Training Centre
• Subsidy for Mechanized Crafts
• Subsidy for Fish Preservation, Transport & Marketing
F) District Industry Centre
• Agro processing Entrepreneurship
• Development of Cooperative industrial Estate
• Agro park incentive Scheme
• Capital for Agro-Processing unit
• Scheme for Quality standards
• Agro information Technology Center
• Food testing Lab
• Export promotion schemes for Agro units
6.4 Vision of the Next Plan
The envisaged vision for the 12th
Plan is as follows:
Crop Diversification during 2012-13 to 2016-17
Area under cropping to be increased by - 6.38 %
Area under Wheat & soyabean to be increased- 40000 ha
Area of Sugarcane to be reduced by - 17 %
Area under horticulture crop to be increased by – 11.34 %
Existing cropping intensity - 109.88 %
Proposed cropping intensity – 118.13 %
241
CROP PRODUCTION during 2012-13 to 2016-17
Food grain production to be increased by -12.09 % - ( 2.42 % per year )
Horticulture & Vegetable production to be increased by – 30.53 % ( 6.11% per year)
Overall agriculture production to be increased by – 27.93%- ( 5.58 % per year )
GROWTH VALUE ADDITION during 2012-13 to 2016-17
Agriculture to be increased by -23.39% ( 4.68 % per year )
Secondary sector to be increased by - 37.07% ( 7.42 % per year )
Overall of the district – 27.37% ( 5.47 % per year )
6.5 District Plan:
As mentioned earlier, the RKVY scheme aims at strengthening the agricultural sector
through innovative and ongoing schemes. In table 6.1, the sector-wise outlay under Stream I
and Stream II is presented.
Table 6.1: Sector-Wise Outlay for 12th
Plan
Sr. No.
Department Head
Scheme Proposed under RKVY Ongoing Schemes Total
Total Infrastructure & Asset
Production Growth
Total Infrastructure & Asset
Production Growth
1 2 8 8 8
1 Agriculture 13622.00 6301.00 7321.00 6395.00 1200.00 5195.00 20017.00
2 Water conservation 17100.00 17100.00 0.00 26000.00 26000.00 0.00 43100.00
3 Horticulture 875.00 875.00 0.00 9070.00 6600.00 2470.00 9945.00
4 Micro Irrigation 0.00 0.00 0.00 4000.00 4000.00 0.00 4000.00
5 Animal Husbandry 1218.40 1218.40 0.00 400.00 0.00 400.00 1618.40
6 Dairy Development 15963.10 15963.10 0.00 141.00 0.00 141.00 16104.10
7 Fisheries 200.00 200.00 0.00 55.00 0.00 55.00 255.00
8 Minor irrigation 6668.00 6668.00 0.00 0.00 6668.00
9 Sericulture 185.17 163.50 21.67 0.00 0.00 0.00 185.17
10 Social Forestry 2945.00 2787.00 158.00 1093.00 1000.00 93.00 4038.00
11 Co-operation Department
2452.25 2452.25 0.00 0.00 2452.25
12 KVIC 56.28 56.28 0.00 28.89 28.89 0.00 85.17
Total 61285.20 53784.53 7500.67 47182.89 38828.89 8354.00 108468.09
Percentage 100 87.76 12.24 100 82.29 17.71 100
242
6.6 Conclusion:
The proposed plan aims at an overall growth rate of 13.65 percent in the agricultural and
allied sector. Besides achieving this growth rate, the plan will also lead to improvement in
infrastructure in all sectors. This will give a major boost for sustained development of the
agricultural and allied sector.
243
244
Table 6.2: Area, Production and Productivity Trend of Main Crops in the Ahmednagar District ( Area - 00 ha. , Production - 00 MT, Productivity - Kg/ha. )
Sr. Name of Crop Normal 2009-10 to 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17
A P Y A P Y A P Y A P Y A P Y A P Y
Kharif Season
Cereals
1 Paddy 63 53 840 64 56 869 65 58 900 66 61 931 67 64 964 67 67 998
2 Maize 65 75 1151 200 280 1400 221 354 1600 222 400 1800 225 428 1900 230 460 2000
3 Bajara 2704 1679 621 2672 1737 650 2641 1777 673 2611 1828 700 2580 1935 750 2500 2000 800
4 Other cereals 24 15 605 24 15 626 23 15 648 23 16 671 23 16 694 23 16 719
Total Kh. Cereals 2856 1821 3217 2960 2087 3546 2950 2204 3821 2922 2304 4102 2894 2443 4308 2820 2543 4516
Pulses
1 Mung 188 71 378 270 104 386 273 109 400 278 118 425 282 127 450 286 143 500
2 udid 37 14 378 97 39 400 98 44 450 99 50 500 101 56 550 111 67 600
3 Tur 176 79 448 225 103 457 228 114 500 231 127 550 235 141 600 250 175 700
Total Kh. Pulses 401 164 1204 592 246 1243 599 267 1350 608 295 1475 618 323 1600 647 385 1800
Total Kh. Foodgrains 3257 1985 4421 3552 2333 4788 3550 2471 5171 3530 2599 5577 3512 2766 5908 3467 2928 6316
Oilseeds 0 191 0 198 0 207 0 217 0 246 0
1 Soyabean 102 120 1174 700 840 1200 713 891 1250 727 946 1300 741 1000 1350 756 1058 1400
2 Groundnut 66 53 797 67 55 813 67 57 850 70 63 900 71 68 950 72 72 1000
3 Sunflowar 102 38 375 125 48 383 110 50 450 129 65 500 132 73 550 135 81 600
Total Kh.Oilseeds 270 211 2346 892 943 2395 890 998 2550 926 1073 2700 944 1141 2850 963 1211 3000
Sugarcane 1030 61800 60000 730 44895 61500 700 45500 65000 665 46550 70000 665 49875 75000 665 59850 90000
Cotton 134 29 218 400 89 223 450 103 229 460 115 250 470 129 275 480 144 300
Total 1164 61829 60218 1130 44984 61723 1150 45603 65229 1125 46665 70250 1135 50004 75275 1145 59994 90300
Total Kharif Season 4691 64025 66985 5574 48260 68907 5590 49072 72950 5582 50337 78527 5592 53911 84033 5575 64133 99616
Rabi Season
Cereals
1 Wheat 1021 1427 1398 1230 1784 1450 1250 1875 1500 1260 1953 1550 1350 2160 1600 1500 2550 1700
2 Jowar 4998 1749 350 4996 1790 358 4993 1872 375 4990 1996 400 4988 2245 450 4985 2493 500
3 Maize 107 143 1336 107 146 1367 100 150 1500 106 170 1600 106 180 1700 107 192 1800
Total Rabi Cereals 6126 3320 3084 6333 3719 3176 6343 3897 3375 6356 4119 3550 6444 4585 3750 6592 5235 4000
Pulses
1 Gram 601 331 551 620 353 569 630 362 575 640 384 600 650 423 650 660 462 700
Total Rabi Pulses 601 331 551 620 353 569 630 362 575 640 384 600 650 423 650 660 462 700
245
Total Rabi Foodgrains 6727 3651 3635 6953 4072 3744 6973 4259 3950 6996 4503 4150 7094 5007 4400 7252 5697 4700
Oilseeds 0 0 0 0 0 0
1 Sunflowar 71 47 662 71 49 685 73 51 700 72 54 750 72 58 800 73 65 900
2 Safflower 290 138 476 291 144 493 293 149 510 294 155 528 296 161 546 297 178 600
Total Rabi Oilseeds 361 185 1138 363 192 1178 365 200 1210 366 209 1278 368 219 1346 370 244 1500
Total Rabi Season 7088 3836 4773 7315 4264 4922 7338 4459 5160 7362 4712 5428 7462 5227 5746 7621 5940 6200
Summer Season
Cereals
Total Summer Cereals 0 0 0 0 0 0 0 0 0 0 0 0
Pulses 0 0 0 0 0 0
1 mug 1 1 600 2 1 750 2 1 757 2 1 764 2 1 771 2 2 900
Total Summer Pulses 1 1 600 2 1 750 2 1 757 2 1 764 2 1 771 2 2 900
Total Summer
Foodgrains 1 1 600 2 1 750 2 1 757 2 1 764 2 1 771 2 2 900
Oilseeds 0 0 0 0 0 0
1 Groundnut 12 20 1728 12 21 1780 14 26 1833 16 30 1888 18 35 1945 20 44 2200
Total Summer Oilseeds 12 20 1728 12 21 1780 14 26 1833 16 30 1888 18 35 1945 20 44 2200
Total Summer season 13 21 2328 13 22 2530 16 27 2590 18 31 2652 20 36 2716 22 46 3100
Cereals 8982 5141 6301 9292 5807 6721 9293 6101 7196 9278 6423 7652 9338 7027 8058 9411 7778 8516
Pulses 1003 496 2355 1214 599 2561 1231 631 2682 1250 680 2839 1270 747 3021 1309 848 3400
Foodgrains 9985 5637 8656 10506 6406 9282 10524 6732 9878 10528 7103 10491 10608 7775 11079 10720 8626 11916
Oilseeds 643 416 5212 1267 1156 5353 1270 1224 5593 1309 1313 5866 1330 1395 6141 1353 1499 6700
cash crops 1164 61829 60218 1130 44984 61723 1150 45603 65229 1125 46665 70250 1135 50004 75275 1145 59994 90300
Note: A-Area, P- Production, Y- Productivity, K/R/S-Kharif/Rabi/Summer
Source: DASO, Ahmednagar
246
Table 6.3: Area Expansion Plan of Horticultural Crops ( Area in 00 ha)
Existing Cropping
Pattern (2011-12) 2012-13 2013-14 2014-15 2015-16 2016-17
Crops Area Area Area Area Area Area
Fruit Crops
Mango 32.51 34.5 36 38 40 42.71
Pomogranet 60.93 64 68 72 76 80
Banana 3 3.4 3.8 4.2 4.6 5
Casterd apple 12 12.2 12.4 12.6 12.8 13
Amala 5 5.2 5.4 5.6 5.8 6
Tamrin (Chinch) 10 10.2 10.4 10.6 10.8 11
Gava 20.09 20.4 20.8 21.2 21.6 22
Grapes 8 8.2 8.4 8.6 8.8 9
Lemon 32 34.5 37 39 40 42
Fig 1.5 1.6 1.7 1.8 1.9 2
Sapota 30.92 31.5 32 32.75 33.5 34
Sweet Orange 6 6.2 6.4 6.6 6.8 7
Papaya 2 2.2 2.4 2.6 2.8 3
Ber 4 4 4 4 4 4
Total Fruit Crops 227.95 238.1 248.7 259.55 269.4 280.71
Vegetable Crops 10.15 10.6 10.85 9.85 11.31
Brinjal 14 14.2 14.2 14.4 14.8 15
Tomato 22 22.2 22.4 22.7 22.8 23
Bhendi 10 10.2 10.4 10.7 10.8 11
Onion 650 660 670 680 690 700
247
Chillii 18 18.2 18.4 18.6 18.8 19
Leafy vegitable 11 11.2 11.4 11.6 11.8 12
Cabbage 3.16 3.2 3.25 3.3 3.35 3.4
Cauliflower 4.81 4.83 4.85 4.9 4.95 5
Green peas 2.22 2.25 2.4 2.6 2.8 3
Potato 11.15 11.2 11.4 11.6 11.8 12
Cucerbits 2 2.1 2.205 2.31525 2.431013 2.552563
watermelon 20 20.1 20.2 20.4 20.7 21
muskmelon 5 5.1 5.2 5.3 5.4 5.5
ginger 1 1.02 1.071 1.12455 1.5 2
garlic 2 2.02 2.121 2.22705 2.338403 3
Total Vegetable Crops 776.34 787.82 799.497 811.7669 824.2694 837.4526
Flower Crops
Marigold 3.99 4 4.01 4.05 4.06 4.1
Galardia 1.1 1.15 1.16 1.17 1.18 1.2
Chrysanthemum 2.72 2.78 2.8 2.84 2.88 3
Aster 0.09 0.117 0.1521 0.19773 0.257049 0.334164
Rose 0.35 0.455 0.5915 0.76895 0.999635 1.299526
Tube Rose 0.6 0.62 0.64 0.66 0.68 0.7
Total Flower Crops 8.85 9.122 9.3536 9.68668 10.05668 10.63369
Spices
Tarmaric
Ginger
Total Spices 0 0 0 0 0 0
1013.14 1035.042 1057.551 1081.004 1103.726 1128.796
248
Table 6.4: IPM Demonstrations in Next Five Years (Phy – Area covered in ha) (Fin – Rs. In lakh)
Name of crop TOF Trained
Available Man
power (Nos.)
FFS Conducted in five year (Aided)
Yield obtained
under FFS
In 11-12 Quntl/ha
Normal average yield
obtained in
2011-12 Quntl/ha
2012-13 2013-14 2014-15 2015-16 2016-17
No
,of
FF
s co
ndu
cted
in
last
fiv
e y
ears
No
. o
f v
illa
ges
Cov
ered
in l
ast
five
yea
rs
Are
a C
ov
ered
in l
ast
five
yea
rs (
Ha.
)
No
.of
FF
S
No
.of
vil
lag
es t
o b
e
cov
ered
No
.of
FF
S
No
.of
vil
lag
es t
o b
e
cov
ered
No
.of
FF
S
No
.of
vil
lag
es t
o b
e
cov
ered
No
.of
FF
S
No
.of
vil
lag
es t
o b
e
cov
ered
No
.of
FF
S
No
.of
vil
lag
es t
o b
e
cov
ered
Paddy 1 4 4 40 7.30 6.20 1 1 3 3 4 4 5
5 5 5
Wheat 0 49 49 1275 105 79 36 36 42 45 38 43 54 44 43 43
Soyabean 5 77 77 2070 135.20 109.20 52 52 57 69 67 68 67 67 71 71
Rabi. Jawar 13 58 63 1535 4140.75 2828.55 37 37 48 40 59 59 65 65 76 76
Gram 4 69 71 1910 89 55.20 51 55 65 60 76 77 82 83 97 98
S.cane 12 45 45 1345 16965 72.85 42 42 70 70 80 80 82 82 90 90
Cotton 21 50 47 1625 72 56.50 50 50 67 67 76 76 98 98 140 120
Gr.Nut 1 4 4 60 85 68 1 1 1 1 4 4 3 3 4 4
Sunfiower 9 12 15 400 3024 81.50 8 8 19 19 24 24 35 35 41 41
Tur 1 15 15 440 54 42 6 6 11 11 12 12 12 12 12 12
Maize 0 2 2 60 40 30 3 3 3 3 3 3 3 3 3 3
Bajra 6 36 36 1110 55 36.25 32 32 33 35 36 39 36 38 40 40
Fruit 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 73 421 428 11870 - - 319 323 419 423 479 489 542 535 622 603
249
Table 6.5: INM Demonstrations in Next Five Years (Phy Area covered in ha) (Fin – Rs. In lakh)
Name
of crop
Average
Area per
demon-
stration
(ha.)
Present
Area
under
Varietal
demon.
(ha)
Varietal Demonstrations
In 2011-12 Varietal Demonstration Projection (Phy in No)
2012-13 2013-14 2014-15 2015-16 2016-17
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin No. of
Demos
conducted
Area
covered
(ha)
Paddy 0.40 932 4 1.60 3 0.06 480 9.60 545 1.09 550 11.00 600 12.00
Red gram 1.0 200 30 30.00 8 0.24 30 0.40 55 1.65 60 1.80 70 2.10
Bajara 0.40 1282 73 29.20 26 0.52 80 1.60 455 9.10 480 9.60 500 10.00
R. Jawar 0.40 5163 106 42.40 24 0.48 1369 27.38 1017 20.34 1100 22.00 1150 23.00
Wheat 0.40 1346 91 36.40 16 0.32 570 9.43 600 12.00 650 13.00 700 14.00
K & S
Gr.Nut 1.00 200 4 6.00 2 0.02 235 3.09 300 9.00 350 1050 400 12.00
Sunflower 1.00 400 5 5.00 18 0.54 0 0 33 0.99 40 1.20 50 1.50
Soyabean 1.00 555 55 55.00 26 0.78 381 6.22 400 12.00 450 13.50 500 15.00
Gram 1.00 890 166 166.00 9 0.27 484 6.45 500 15.00 550 16.50 600 18.00
Mung 1.00 60 0 0 31 0.93 0 0 0 0 0 0 0 0
Sugarcane 0.50 768 112 421.80 873 43.05 98 6.68 6.30 47.25 600 48.75 700 52.50
Cotton 0.40 593 9 9.00 8 0.32 491 7.25 290 6.60 250 7.50 500 9.00
Maize 1.00 202 6 6.00 7 0.12 90 3.60 75 3.00 80 3.20 90 3.60
Total - 12591 661 808.4 1051 47.65 4308 81.7 4276.3 138.02 5160 1198.05 5860 172.7
250
Table 6.6 : Proposed production of organic input and formation of organic groups in the next five years ( Year 2012 –13 to 2016-17)
Taluka Production of organic inputs (q) Other activities District Level Activities
Required
Amount
(in lakh Rs.)
Biofertilizers
in ( Ton ) Vermi
Compost
Produc-tion
in ( Ton )
Biodyna-mic
Compost
Producti-on
in (ton )
Biopest
-icides
Group
Botani-cal
pesti-
cides
Organic
farming
seeds
O.F.
Group
Organic
Certifi-
cation
Group
Vermic
ulture
Center
Vermico
mpost
Center
Bio-
Dynamic
compost
center
Pub
li-
city
Train
ing
&
work
shop
Exhi-
bition
A,nagar 104144 12935 41243 38370 76613 23158 22848 74674 200723
Parner 123083 29739 51860 64918 116778 14020 91271 96178 309863
Pathardi 84769 11184 32444 67302 99746 25331 20200 90461 125659
Karjat 31914 33047 32127 33373 65500 6840 39088 52409 119201
Jamkhed 61470 13161 22820 33388 56208 10234 4134 36322 75736
Shrigonda 83489 8340 51750 67809 119559 21459 31123 95639 178420
Shrirampur 22344 2569 35351 14158 49509 7196 5665 35627 94668
Shevgaon 61903 10843 20364 52886 73250 15263 11836 67017 130911
Newasa 45302 15058 57770 59104 116874 24259 29259 93396 151186
Rahuri 32898 13041 88944 23858 112802 8243 27073 86232 128516
Sangamner 69332 20770 102464 39957 142421 5507 66014 83264 184951
Akole 39496 12450 33841 61430 95271 14529 1609 50199 86431
Kopargaon 39141 2940 47965 17978 65943 11148 6701 49597 131843
Rahata 28803 1581 56005 8144 64149 5009 14480 49690 136478
Total 828088 187658 674948 582675 1254623 192196 371301 960705 2054586
251
Table 6.7: Facilities Available in Agri Polyclinics
SrNo
Taluka Name of
Agri
polyclinic
Facility available (Yes or No) Average
No. of
farmers
benefited
/ year
Average
Receipts/
year (Rs
in Lakhs)
Farmers
Training
Demons
tration
Diagnosis
of Soil &
Water
Samples
Diagnosis
of Pest &
Diseases
Producti
on of
Vermi
compost
Green
House
Dormito
ry
facility
Librar
y
Museum
(crop /
impleme
nt)
Comput
er with
modem
1 Nagar Savedi Yes Yes Yes Yes Yes Yes Yes Yes Yes No 4483 1.50
2 Parner Bhalawni Yes Yes No No No No No No No Yes 1000 2.00
3 Pathardi Pathardi yes yes yes yes yes no no no yes yes 6372 2.10
4 Karjat Karjat Yes Yes Yes Yes Yes No No Yes(1) Yes(1) Yes(1) 5067 3.00
5 Jamkhed Arangaon Yes Yes Yes No Yes No No Yes Yes Yes 1850 2.00
6 Shrigonda Kashti Yes Yes Yes Yes Yes Yes No Yes No No 6388 6.00
7 Shrirampur Shrirampur Yes Yes No No Yes No No Yes Yes Yes 4148 2.00
8 Shevgaon T.Pimpalgaon Yes Yes No No Yes No No Yes Yes Yes 542 1.50
9 Newasa Kukana Yes Yes Yes No Yes Yes No No No Yes 2749 1.20
10 Rahuri Rahuri Yes Yes Yes Yes Yes No No No Yes No 1343 3.00
11 Sangamner Kokangoan Yes Yes Yes Yes Yes Yes No No No No 2012 15.00
12 Akole Akole 100 50 -- -- -- -- -- -- -- Yes 1616 0.50
13 Kopargaon Kopargaon Yes Yes No No Yes No No No Yes Yes 2268 3.70
14 Rahata Puntamba Yes Yes Yes Yes Yes Yes No Yes Yes Yes 8119 3.00
Total -- -- -- -- -- -- -- -- -- -- 47957 46.5
252
Table 6.8: COMPOUND GROWTH RATE DURING XITH PLAN AND PROPOSED FOR XII TH PLAN.
S.No
Compound Growth rate 2007-08 to 2011-12
Proposed Growth Rate XII TH PLAN
Crops
2007-08 2008-09 2009-10 2010-11 2011-12 Growth
rate 2012-13
Average10
-11&12-13 2013-14 2014-15 2015-16 2016-17
Total
Production
00 ton
production
00 ton
production
00 ton
production
00 ton
production
00 ton
production productio
n
00 ton
production
00 ton
production
00 ton
production
00 ton
production
00 ton
1 Cereals 4628 3953 1875 6112 6735 10.85 5806 6270.5 6100 6422 7027 7777 5.09
2 Pulses 456 471 294 573 517 3.96 599 558 630 679 747 848 9.14
3 Food
grain 5084 4424 2169 6685 7253 10.16 6405 6829 6731 7102 7774 8626 5.45
4 Oil seed 535 469 309 888 587 7.41 1155 871 1223 1312 1395 1499 11.15
5 Cash
crop 36130 53113 14972 10285 37128 -12.87 44984 41056 45603 46665 50004 59994 7.66
6 Total 46833 62430 19619 24543 52220 -6.02 58949 55584.5 60287 62180 66947 78744 7.21
7 Fruit
crops 2166 3070 2660 6800 7900 34.15 2866 5383 4272 5689 8962 10965 20.67
8 Vegetab
les 10120 8328 12400 14800 18200 16.38 13009 15604.5 14429 16839 19930 24398 11.14
9 Flower
crops 52 70 125 190 250 43.26 78 164 129 251 392 574 36.91
10 Medice
ne crops 46 75 111 125 135 26.03 88 111.5 144 200 243 280 22.89
59217 73973 34915 46458 78705 0.9 74990 76847.5 79262 85159 96474 114961 9.09
253
Table 6.9: Growth Value Addition
S.No Particular 2007-08 2008-09 2009-10 2010-11 2011-12 GVA % S.No particular 2012-
13
Average1
0-11&12-
13 2013-14 2014-15 2015-16 2016-17 GVA %
A Agriculture
1 Cereals 19262 16621 8247 27954 24177 8.83 1 Cereals 34086 29132 35716 37529 41105 45635 9.43
2 Pulses 3712 4299 3530 5293 4987 7.18 2 Pulses 8581 6784 9051 9766 10732 12209 12.39
3 Oilseed 3794 4004 2397 6016 4662 7.36 3 Oilseed 9781 7222 10359 11161 11890 12838 11.84
4 cash crops 17312 16260 13578 5620 22412 -4.7 4 cash crops 26527 24469 27071 27840 29919 35736 7.73
5
Drugs &
narcotics 53 34 34 34 52 -0.3 5
Drugs &
narcotics 60 56 62 63 65 70 4.38
6 Fruts & vegi 41270 43981 86633 77461 82384 18.44 6 Fruts & vegi 89032 85708 108921 127188 173193 203233 20.95
7 Fodder 24725 26075 27629 27383 27421 2.24 7 fodder 25800 26611 27000 29000 31000 32000 4.5
8 By products 17801 17621 17703 19863 21380 4.31 8 By products 26937 24159 27300 27930 29835 31488 5.52
9 Floriculture 1892 2901 3353 3540 3545 13.47 9 flowers 390 1968 667 1329 2093 3117 19.62
10
Kitchen
Garden 77 80 84 83 83 1.63 10
Kitchen
Garden 80 82 82 84 87 88 1.75
total GVA 131705 133619 164858 174222 192399 9.29 total GVA 221274 206836 246229 271890 329919 376414 13.81
B Animal
husbandry 0
1 Milk 22095 20877 19178 21439 22208 0.31 1 milk 54000 38104 58000 62000 66000 68845 11.71
2 Meat 3207 3457 3051 2339 3267 -3.02 2 meat 3100 3184 3300 3500 3700 3827 4.27
3 Poultry 3640 3440 3155 3248 2146 -9.22 3 poultry 434 434 454 474 495 518 3.89
4 Others 2477 2379 2195 2288 2338 -1.33 4 sericulture 62.35 62 162.4 246.5 332 406 47.34
5 value of input 31419 30153 27579 29314 29960 -1.06 5 fisheries 132 132 140 148 157 165 4.99
Total district 163124 163772 192437 203536 222359 7.54 total district 279002 248752 308286 338258 400603 450175 12.26
254
Table 6.10: Proposed Research Strategies
Sr.
No. Identified Problems/Issues Proposed Research Strategies Proposed Activities
A Re-synthesis of Existing Technological Package for Making It Situation Specific
1 Refinement of Integrated Pest Management
package for udid
Promoting for carrying out Re-synthesis of
IPM package by KVK
Organizing frontline demonstrations on
farmers fields
2 Refinement of Integrated Pest Management
package for udid
Promoting for carrying out Resynthesis of
IPM package by KVK
Organizing frontline demonstrations on
farmers fields
3 Refinement of dry land production technology
for Rabi jowar ,safflower
Promoting for carrying out Resynthesis of
IPM package by ZRS
Organizing frontline demonstrations on
farmers fields
4 Refinement of Pest Management package for
Soybean
Promoting for carrying out Resynthesis of
IPM package by KVK
Organizing frontline demonstrations on
farmers fields
5 Refinement of Integrated nutrient management
package for groundnut
Promoting for carrying out Resynthesis of
INM package by KVK
Organizing frontline demonstrations on
farmers fields
6 Refinement of Integrated nutrient management
package for wheat
Promoting for carrying out Resynthesis of
INM package by KVK
Organizing frontline demonstrations on
farmers fields
8 Refinement of integrated nutrient management
for maize for grain
Promoting for carrying out resynthesis of
INM package by KVK
Organizing frontline demonstrations on
farmers fields
9 Refinement of Integrated nutrient management
for onion
Promoting for carrying out resynthesis of INM
package by KVK
Organizing frontline demonstrations on
farmers fields
10 Refinement of Integrated Pest management
package for onion
Promoting for carrying out resynthesis of
IPM package by KVK
Organizing frontline demonstrations on
farmers field
B On-Farm Research Activities for Validation Technologies
13 Refinement of rainwater harvesting
techniques
Promoting for carrying out refinement and validation
of rain water harvesting techniques.
by ZRS/SAU
Arranging On farm trials
14 Developing agro–forestry –dry land
horticulture- dairy and animal husbandry
Promoting for carrying out refinement and validation
of production technology
Arranging On farm trials
255
farming system model by ZRS/SAU
15 Promotion of nutrient enrichment of
agro –wastes for fodder
Promoting for carrying out refinement and validation
of production technology by ZRS/SAU
Arranging On farm trials
16 Standardization of organic production
technology for vegetables and fruit crops
Promoting for carrying out refinement and validation
of production technology by ZRS/SAU
Arranging On farm trials
C On-Station Research for Evolving New Technological Package.
17 Processing and value addition for jowar
Promoting for new production technology
by ZRS/SAU
Undertaking research programme by ZRS
/SAU
18 Promoting for Goat breed up gradation
Promoting for new production technology
by ZRS/SAU
Undertaking research programme by ZRS
/SAU
19
Suitable variety for late sowing
conditions for safflower
Promoting for new production technology
by ZRS/SAU
Undertaking research programme by ZRS
/SAU
20
Suitable variety for late sowing
conditions for wheat
Promoting for new production technology
by ZRS/SAU
Undertaking research programme by ZRS
/SAU
256
6.5 : DISTRICT PLAN OF AHMEDNAGAR DISTRICT
Table 6.11: Budget Required in Existing Schemes and New Schemes- Ahmednagar district
AGRICULTURE AND ALLIED SECTORS: STREAM I
2013-14 2014-15 2015-16 2016-17
1
1 Soil Health Improvement-Establishment &
Strengthning Of Soil Test Lab. 45.00 95.00 85.00 25.00 250.00
2 Agri Mechanization-Community implement service
center 100.00 300.00 300.00 300.00 1000
3 Agri clinics- Establishment 25.00 25.00 25.00 25 100
4 Integrated Pest Management 25.00 25.00 25.00 25 100
5 Women Farmer Field School 25.00 25.00 25.00 25 100
6 Infrastructure for Strenthening of District Training
Center 150.00 150.00 165.00 150.00 615
7 Surveillance & monitering of pest on cotton, Soyabean
and various crop 50.00 50.00 50.00 50 200
8 Human Resource Devlopment 1000.00 1000.00 1380.00 1000 4380
9 Agriculture Tourism 70.00 70 140
10 Precision farming 25.00 25 50
11 Group/ Integrated Farming 25.00 25 50
12 Organic farming-end to end Project 25.00 25 50
9 Mahatma Phule Agriculture University 1882.00 1000.00 1000.00 1000 4882
10 Increasing Water use efficiency 500.00 500.00 500.00 205 1705
Total 3802.00 3170.00 3700.00 2950.00 13622.00
2
1
Introducing Farm Pond and drip irrigation for
cotton crop 200.00 500.00 500.00 300.00 1500
2 Development Of Rainfed Farming System 4000.00 4000.00 4000.00 3500.00 15500.00
3 Insitu Conservation 50.00 50.00 100.00
Total 4200.00 4500.00 4550.00 3850.00 17100.00
3
1
Rejuvenation Of Lemon garden for Productivity
20 10 10 10 50
2 Medow Orchad in Guava 10 5 5 5 25
3 pre cooling chambers 40*15 lakh 150 150 150 150 600
4 Ripening chambers 20*10lakh 50 50 50 50 200
Total 230 215 215 215 8754
1
Improving Artificial insemensation DeliverySystem
154.75 154.75 154.75 154.75 619
2 Breed Village System for Sheep &Gaot 17.5 17.5 17.5 17.5 70
3
Strenthening/mordenisation of existing Veternery
Dispenseries(g1) 107.97 107.97 107.97 107.97 431.87
4
Strenthening of Intensive poultry devlopment
blocks 18.75 18.75 18.75 18.75 75
5 Supply of mini hatheries to SHGs 5.63 5.63 5.63 5.63 22.53
Total 304.6 304.6 304.6 304.6 1218.4
Agriculture
Water Conservation
Outlay of Stream - I under RKVY scheme for Ahmednagar district.
(Rs. In lack)
Sr.N
o.
Name of
department
Scheme Proposed Year wise programme (Financial) Totoal
Horticulture
Animal Husbandary
2013-14 2014-15 2015-16 2016-17
Sr.N
o.
Name of
department
Scheme Proposed Year wise programme (Financial) Totoal
5
1 Capital subsidy to primary dairy co op society 25 25 25 23 98
2 Providing milk tester 15 15 15 24 69
3 Providing coputerised milk acceptance system 100 100 100 117 417
4 Providing N D D B adulteration kits 5 5
5 Market insulation vehicle 25 25 25 30 105
6 Installing milk product manufacturing units 3030 3030 3030 9090
7 Installing bulk coolers 1000 1355 0 0 2355
8 IDFP- Dairy Farm Project 0 1365.75 1365.75 1092.6 3824.1
Total 4200 5915.75 4560.75 1286.6 15963.1
6 Fisheries
1
Enhance of fish poduction in agriculture farm
pond.Establishment of fish seed production centre ,
stocking of fish seed, Fish farmer devlopment
agency, Strenthning of fishery cooperative
50 50 50 50 2007
1 Mulberry Plantation 3 3 3 4.75 13.75
2 Assistance for irrigation 4 3 3 3 13
3 Rearing house 25 25 25 0 75
4 Chawki rearing center 10 10 10 4.4 34.4
5 Const of vermicompost shed 3 3 3.1 9.1
6 Reeling unit(post cacoon ) 8 8 8 8 32
7 Contractual staff 2 2 2 1.92 7.92
Total 55 54 54.1 22.07 185.177
1 seedling prepration 40 40 40 38 158
2 mordenisation of nerseries 75 75 75 75 300
3 Roadside Plantation(3yrs) 400 400 400 450 1650
4 Roadside Plantation (15mon) 237 200 200 200 837
Total 752 715 715 763 29458
1 Drip &sprikler 2000 2000 2000 668 6668
9 Cooperative &marketing Dept
1 market mordenisation system for fruits & veg 0 0 0 159.5 159.5
2 cooprative society Godown Repairs 495.43 0 0 0 495.43
3 Hindustan multi state co.op- Onion radiation Center 1500 1500 1500 1500 6000
4 Export facility center 378.71 126.23 504.94
5 Onion Storage Structures 358.65 333.73 600 1292.38
Total 2354.08 1833.73 2478.71 1785.73 8452.25
10 KVIC Bee Keeping 18.76 37.52 56.28
Grand Total 19607.00 18596.00 17964.81 11924.30 68092.11
Update:16 march 2015
Ahmednagar
District Superintending Agriculture Officer
Ahmednagar
Minor irrigation
Dairy Development
Sericulture
Social Forestry
2013-14 2014-15 2015-16 2016-17
1
1 Cereals Development Programme 60 60 60 70 250
2 National Food Security Mission 700 700 700 800 2900
3 Sugarcane Devlopment Project 125 125 125 135 510
4 Cotton development project 30 30 30 35 125
5 Organic farming 60 60 60 70 250
6 Pulses Devlopment 40 40 40 30 150
7 Oil seed Devlopment Programme 50 50 50 50 200
8 Maize Devlopment Programme 7 7 7 9 30
9 Cereals seed production in selected area 125 125 125 125 500
10
Womens Participation in agriculture Training,Exibition,
Marketing survey Training material
25 25 25 25 100
11 NATP -ATMA 125 125 125 125 500
12 Strenthning of extension institutes 125 125 125 125 500
13 Imformation support in agriculture extension 50 50 50 50 200
14 Seed treatment Campaign 5 5 5 5 20
15 Agriculture Mechanisation 10 10 10 10 40
16 Strenthening of agropolyclinic 10 10 10 10 40
17 Strenthening of bio control lab 10 10 20
18 Accelarated pulse production 20 20
19 Maintaining Agriculture Statistics 5 5 5 5 20
20 strenthening of TSF 5 5 5 5 20
Total 1557 1567 1557 1714 63952
1 Farm Pond 1250 1250 1250 1250 5000
2 Integrated watershed devlopment programme 2500 2500 2500 2500 10000
3 Western ghat watershed Devlopment 250 250 250 250 1000
4 soil reclamation 250 250 250 250 1000
5 Nala bund 250 250 250 250 1000
6 National Watershed Devlopment Programme 250 250 250 250 1000
6 CNB 1000 2000 2000 2000 7000
Total 5750 6750 6750 6750 260003
1 E G S Horticulture Area Expansion 600 600 600 700 2500
2 NHM –Estb of new Nursery 25 25 25 25 100
3 Vegetable seedling production 20 10 10 10 50
4 Estb of new gardens 25 25 25 25 100
5 Farm ponds 1000 1000 1000 3000
6 NHM 500 500 500 500 2000
Agriculture
Outlay of Stream - II under RKVY scheme for Ahmednagar district.
(Rs. In lack)
Sr.N
o.
Name of
department
Scheme Proposed Year wise programme (Financial) Totoal
Water Conservation
Horticulture
2013-14 2014-15 2015-16 2016-17
Sr.N
o.
Name of
department
Scheme Proposed Year wise programme (Financial) Totoal
7 Strenthening of horticulture Nursery 10 10 10 10 40
10 Plant Protection 20 20 20 20 80
14 Value addition Units 25 25 50
15 Post Harvest Management 25 25 25 25 100
16 Marketing Infrastructure 20 20 10 50
17 BBD 250 250 250 250 1000
Total 2520 2510 2475 1565 9070
4 Micro Irrigation 1000 1000 1000 1000 40005 100 100 100 100 400
6
Training for secretaries 12 12 12 16 52
Training of milk producers 11 11 11 12 45
Training for milk testers 1 1 1 3
Training for director of societies 6 6 6 6 24
Training for clean milk production 5 4 4 4 17
Total 35 34 34 38 141
7 Fisheries
Training ongoing schemes 6 6 7 6 25
Training 9 7 7 7 30
Total 15 13 14 13 558 Sericulture 0
9
CCT 100 100 100 70 370
Plantation 100 100 100 6 306
Roadside Plantation 100 100 100 24 324
other 25 25 25 18 93
Total 325 325 325 118 109310 KVIC 9.38 18.76 28.89
Grand Total 11062 12049 11965 10978 46054
Date:16 march 2015
Ahmednagar
District Superintending Agriculture Officer
Ahmednagar
Social Forestry
Dairy Development
Animal Husbandary (General ,TSP,OTSP)
RKVY Comprehensive District Agriculture Plan -Ahmednagar
2013-14 2014-15 2015-16 2016-17 Total 2013-14 2014-15 2015-16 2016-17 Total
1 2 4 5 6 7 8 4 5 6 7 8 8
1 Agriculture 3802 3170 3700 2950 13622 1557 1567 1557 1714 6395 20017
2 Water conservation 4200 4500 4550 3850 17100 5750 6750 6750 6750 26000 43100
3 Horticulture 230 215 215 215 875 2520 2510 2475 1565 9070 9945
4 Micro Irrigation 0 0 0 0 0 1000 1000 1000 1000 4000 4000
5 Animal Husbandry 304.6 304.6 304.6 304.6 1218.4 100 100 100 100 400 1618.4
6 Dairy Development 4200 5915.75 4560.75 1286.6 15963.1 35 34 34 38 141 16104.1
7 Fisheries 50 50 50 50 200 15 13 14 13 55 255
8 Minor irrigation 2000 2000 2000 668 6668 0 0 0 0 0 6668
9 Sericulture 55 54 54.1 22.07 185.17 0 0 0 0 0 185.17
10 Social Forestry 752 715 715 763 2945 325 325 325 118 1093 4038
11 Co-operation Department 2354.08 1833.73 2478.71 1785.73 8452.25 0 0 0 0 0 8452.25
12 KVIC 18.76 37.52 56.28 9.38 18.76 28.14 84.42
Total 17947.68 18758.08 18646.92 11932.52 67285.2 11302 12299 12264.38 11316.76 47182.14 114467.34
Ahmednagar- 16 march-
2015
District Superitending Agri officer,
Ahmednagar
Total Outlay of all Department Stream I and Stream II , Ahmednagar
( Rs. In lack )
Sr.
No.
Department Head Stream I Stream II Total
xv
Executive Summary
Executive Summary
This Chapter should bring out in brief, the contents of the C- DAP. It should cover the features
and peculiarities of the district vis- a- vis the Agriculture and Allied Sectors, the latent potentials
of the various sectors, the activities needed to realise these potentials and a gist of the Plan
which has been prepared. An indicative outline for the Chapter is given below.
1.1: A brief introduction to the District, its location, features, etc.
1.2: Main points of SWOT of the District
1.3: Areas/ Sectors which need to be addressed in the district
1.4: Various on- going programmes in the district- a brief contextual gist
1.5: The District Plan at a Glance
1.6: Public Private Partnerships that can be envisaged in the proposed Plan
1.7: Expected outcomes as a result of implementation of the Plan
1.1. Location and Geographical Units:
Ahmednagar district is the largest district in the state of Maharashtra. The total geographical
area of the district is 17.02 lakh hectares, constituting 5.66 per cent of the state’s geographical
area. Ahmednagar District is surrounded by Ahmednagar district in the west, Nasik district in
the north, Aurangabad district in the north-east, Beed district in the south-east and Solapur
district in the south. Ahmednagar district has a glorious history. Being a drought prone area in
the state of Maharashtra, the district gets an annual rainfall of over 500 mm
Ahmednagar district lies between 18.2 to 19.9 degree North latitude and 73.9 to 75.5
degree eastern longitude. The district comprises of 14 talukas namely Ahmednagar, Parner,
Pathardi,Shewgaon, Karjat, Shreegonda,Jamkhed, Shrirampur, Nevasa,Akole, Sangamner,
Kopergaon,Rahuri, Rahta. The district is divided into four subdivsion, namely Shrirampur,
Sangamner, Karjat, Nagar.
The whole district lies on the elevated table land of the Deccan which has a general slope
from west to east. The western sub-division of Akola, which abuts on the Sahyadris, is the
highest part of the district, and indeed of the Deccan, averaging 2500 feet above the sea-level.
The plain of Shevgaon which lies to the extreme east of the district is not more than 1500 feet
above the sea. The Sahyadri mountains form, for a distance of about twenty- five miles, a
continuous natural boundary between the Ahmadnagar and Thana districts. When viewed from
xvi
the west or low level of the Konkan the appearance of this range is that of a mighty wall of rock,
2000 to 3000 feet high, of dark hue relieved by narrow horizontal belts of grass and evergreen
forest, surmounted by isolated peaks and rocky bluffs rising in many places to a further height of
1000 to 1500 feet.
The different landforms in a region constitute its physical setup. If we consider the
physical setup of Ahmednagar district we see that there are three physical divisions.
1. Western Hilly Region: Akole Taluka and of Sangamner Taluka are included in this region.
The hill ranges of Adula, Baleshwar and Harishchandragad lie in this region and various high
peaks are found in the same region. Kalsubai of height of 5427 feet, the highest peak in the
Sahyadris, lies in this Region.
2. Central Plateau Region: Parner and Ahmednagar Taluka and parts of Sangamner, Shrigonda
and Karjat Taluka are included in this region.
3. The Region of Northern and Southern plains: This region includes northern Kopargaon,
Rahata, Shrirampur, Rahuri, Newasa, Shevgaon and Pathardi Taluka. This is the region of the
Godavari and the Pravara river basins. Parts of the southern Taluka of Shrigonda, Karjat, and
Jamkhed are also included in this physical division.
Agro climatic Zones:
Ahmednagar district is divided into three agro-climatic zones viz., Ghat (Hilly) zone, Plain
(Transition) zone and Scarcity zone
The characteristic features of Agro climatic Zones are as follows:
(A) Scarcity zone: This zone is spread over the whole district except one Taluka i.e.Akole, the
remaining 13 Taluka are under this zone.
(B) Plain (Transition) Zone: This zone is confined only to eastern part of Akole Taluka
consisting only about 4% of geographical area of the district.
(C) Ghat (Hilly) Zone: This zone is situated in northwestern part of the district in western part
of Akole Taluka. Geographically this zone has only 4% of the district area. This zone spread
along with crest of Sahyadri ranges is having mostly tribal population with smallholdings and
are economically backward.
Forests: The western hilly part of Ahmednagar district has forests. Teak, babul, dhavada, haldu
and neem are trees found in these forests. Fruit trees like Mango, Tamrind, Amala, Ber are also
found in the district.The district receives an average annual rainfall of 566 mm. It can broadly be
categorized into three separate zones namely Scarcity zone (receiving 500-700 mm rainfall);
xvii
Transition zone (receiving 700-1250 mm rainfall) and hilly zone (receiving 1250-3250 mm
rainfall).
Soil Type:The soil types of the district are broadly divided into four categories namely coarse
shallow soil; medium black soil; deep black soil and reddish soil occupying about 38, 41, 13 and
8 percent of the cultivated area respectively. In the first two categories, soil moisture is the
predominant limiting factor affecting productivity of crops particularly under rainfed condition.
Though there is good growth rate in agriculture compared to other districts the target of 4 %
growth rate can be achieved by --
Reducing area under sugarcane and diversify in to Soyabean, onion, wheat, fodder,
vegetable, horticulture.
More emphasis is needed to expand the dairy and animal husbandry for sustainability of
agriculture.
The productivity of the field and horticulture crop is to be increase by adoption
integrated crop management practices.
There is a good scope to diversify dry land area with plantation of dry land horticulture.
The growth rate can be enhanced by improving the marketing of horticulture crops by
forming co-operatives for marketing, exports and value addition.
It is needed to increase the productivity of soil and water by improving soil health by
following proper INM, crop rotations, organic practices and using drip and sprinkler
irrigation systems.
Good scope is for increasing area under sericulture as it is labor intensive can generate
rural employment.
Because of good transport infrastructure by road & rails, Ahmednagar is well connected
to metros like Pune, Mumbai, Nagpur, Baroda, Nashik, and Hyderabad. To take
advantages of these urban markets there is scope to increase area under vegetable,
horticulture, floriculture and protected cultivations.
Good marketing infrastructure like cold chain, pack house, market yard & storage god
owns is needed for better price realization to the Agril Commodity.
For better delivery of extension services well equipped Agril Polyclinic, soil testing labs,
bio fertilizer units with quality resource persons and use of innovative farmers for
extension service is recommended.
Considering the small size of farm, to add group dynamics amongst farmer, it is needed
to strengthen FAC, KVM, FIG, and Commodity group.
xviii
To increase availability of irrigation it is needed to expedite incomplete medium, minor
irrigation project & watershed works with emphasis on using drip & sprinkler
technology
Use of information technology to disseminate technology, market information is
necessary.
In order to capitalize on the potential of the agricultural sector in the state so as to
improve the productivity in this sector and thus enhance the incomes of farmers, the following
innovative schemes are being proposed for the 11th
Five Year Plan:
Innovative Schemes:
A) Agriculture Department
Strengthening of Krishi Vigyan Mandal (KVM)
• Organization of Agriculture Exhibition
• Establishing Contract Farming
• Development of Agro-tourism
• Reclamation of ill-drained Soil
• Agriculture Mechanization
• Establishment of Soil Testing Lab at Taluka Level
• Strengthening of Rameti
B) Dairy Department
• Revival of non functional DCSs
• Formation of SHGs & Shetkari Mandal
• Strengthening of existing DCSs
• Clean milk production promotion schemes
• Artificial Insemination Facility
• Improving green fodder supply to DCSs members
• Extension & Training Center
• Plant Machinery
• Civil Construction
C) Animal Husbandry Department
• Improving A.I. Delivering System
• Establishment of Hatcheries at block level
• Strengthening Distribution network of Govt. Hatcheries by involving producer
association
xix
• Establishment of small ruminant market yard
• Breed village of Sheep/Goat
• Strengthening modernization of existing Vet. Hospital
D) Sericulture Department
• Infrastructure for training staff
• Infrastructure for training for farmers
• Consultancy Centers
• Cocoon purchase center
• Starting New reeling Center
• Subsidy for construction of rearing houses
E) Fishery Department
• Reservoirs Development for Fish
• Establishment of Training Centre
• Subsidy for Mechanized Crafts
• Subsidy for Fish Preservation, Transport & Marketing
F) District Industry Centre
• Agro processing Entrepreneurship
• Development of Cooperative industrial Estate
• Agro park incentive Scheme
• Capital for Agro-Processing unit
• Scheme for Quality standards
• Agro information Technology Center
• Food testing Lab
• Export promotion schemes for Agro units
Special Programmes and the Ongoing Projects in the District-
Agricultural department, (state government) which receives funds from both state and
central government executes the major Extension and developmental schemes in the district. In
the present system, the schemes are planned and designed at the state and central level and
implemented at district level. The agricultural department Zilla Parishad also executes some of
the state/central schemes. Part of cess funds available with Zilla Parishad is used for designing
the schemes at district level as per the need of agriculture in the district.
Ongoing Schemes of Agriculture Department
xx
1) National Oilseed Development Programme
2) National Pulses Development Programme
3) Maize Development Programme
4) Sugarcane Development Programme
5) Cotton Development Programme
6) Centrally Sponsored Farmer Study Tour
7) Irrigated And Balanced Use Of Fertilizers And Organic Farming Scheme
8) Centrally Sponsored Efficient Participation Of Women In Agriculture
9) Integrated Cereals Development Programme
10) Strengthening Of District Training centers
11) Strengthening Of Agro Poly Clinics
12) Strengthening Taluka Seed Multiplication Farm
13) Horticulture Development Programme Through EGS
14) National Watershed Development Programme
15) Sampurna Gramin Rojgar Yojana
16) Drought Prone Area Programme
17) Western Ghat Development Programme
18) River Valley Project
19) National Horticulture Mission
Ongoing Scheme of Animal Husbandry
1) Veterinary polyclinics at district level.
2) Taluka Veterinary Dispensaries.
3) District Artificial Insemination centre.
4) Cross breeding, artificial insemination & preservation of indigenous breeds.
5) Upgradation of rural backyard poultry by supply of day old chicks / hatching eggs.
6) Foot and mouth disease control Programme.
7) A S C A D – Assistance to State for control of Animal Diseases (H.S., B. Q., P.P.R.,
R.D.)
Ongoing Schemes of Fishery
1) Fish farming Development Agency.
2) Development of Fisheries Co-op. Society.
3) Fish farming in impounded water
4) Fisheries Requisites.
xxi
5) Fish seed farming.
Ongoing Schemes of Social Forestry
1) Western Ghat Development Scheme
2) Central Nursery Development Scheme.
3) Vanmahotsav
4) Kisan Nursery.
5) Selected Water Development Scheme.
6) Publicity.
7) I W D P Scheme.
8) Hariyali Water Shed Development Scheme.
9) Road Side Plantation Scheme.
10) M.S.S.R.D.C., N.H.A.I. Scheme.
11) S.G.R.Y. Scheme
xv
Compound Growth Rate During X th Plan
S.N
Compound Growth rate 2001-02 to 2005-06
Crops
2001-02 2002-03 2003-04 2004-05 2005-06 Growth rate
Production
00 ton
production
00 ton
production
00 ton
production
00 ton
production
00 ton
production
1 Cereals 4628 3953 1875 6112 6735 10.85
2 Pulses 456 471 294 573 517 3.96
3 Food grain 5084 4424 2169 6685 7253 10.16
4 Oil seed 535 469 309 888 587 7.41
5 Cash crop 36130 53113 14972 10285 37128 -12.87
6 Total 46833 62430 19619 24543 52220 -6.02
7 Fruit crops 2166 3070 2660 6800 7900 34.15
8 Vegetables 10120 8328 12400 14800 18200 16.38
9 Flower
crops 52 70 125 190 250 43.26
10 Medicene
crops 46 75 111 125 135 26.03
59217 73973 34915 46458 78705
0.9
xv
Growth Rate Proposed for XI th Plan.
S.No
Proposed Growth Rate
Crops
2007-08 Average 05-06to07-
08
2008-09 2009-10 2010-11 2011-12 Total
production
00 ton
production
00 ton
production
00 ton
productio
n
00 ton
production
00 ton
1 Cereals 5806 6270.5 6100 6422 7027 7777 5.09
2 Pulses 599 558 630 679 747 848 9.14
3 Food grain 6405 6829 6731 7102 7774 8626 5.45
4 Oil seed 1155 871 1223 1312 1395 1499 11.15
5 Cash crop 44984 41056 45603 46665 50004 59994 7.66
6 Total 58949 55584.5 60287 62180 66947 78744 7.21
7 Fruit crops 2866 5383 4272 5689 8962 10965 20.67
8 Vegetables 13009 15604.5 14429 16839 19930 24398 11.14
9 Flower
crops 78 164 129 251 392 574 36.91
10 Medicene
crops 88 111.5 144 200 243 280 22.89
74990 76847.5 79262 85159 96474 114961 9.09
xv
Vision of the Next Plan
The envisaged vision for the 11th
Plan is as follows:
Crop Diversification during 2007-08 to 2011-12
Area under cropping to be increased by - 6.38 %
Area under Wheat & soyabean to be increased- 40000 ha
Area of Sugarcane to be reduced by - 17 %
Area under horticulture crop to be increased by – 11.34 %
Existing cropping intensity - 109.88 %
Proposed cropping intensity – 118.13 %
CROP PRODUCTION during 2007-08 to 2011-12
Food grain production to be increased by -12.09 % - ( 2.42 % per year )
Horticulture & Vegetable production to be increased by – 30.53 % ( 6.11% per year )
Overall agriculture production to be increased by – 27.93%- ( 5.58 % per year )
GROWTH VALUE ADDITION during 2007-08 to 2011-12
Agriculture to be increased by -23.39% ( 4.68 % per year )
Secondary sector to be increased by - 37.07% ( 7.42 % per year )
Overall of the district – 27.37% ( 5.47 % per year )
6.5 District Plan:
The present District Plan is prepared with an objective to achieve an overall growth rate
for agriculture and allied sector of 13.65 percent during the 11th Plan period (2007-08 to 2011 to
2012). More specifically, the 11th
Plan aims at achieving a growth rate of 11.29 per cent per
annum in agricultural sector and a growth rate of 21.91 per cent in the allied sector. This growth
rate was targeted after conducting a SWOT analysis and observing the potential that exists in the
district. Discussions have been held with all departments in the agriculture and allied sector at
district level. There were informal discussions at taluka level, village level and with ATMA
officials to understand the needs of the district which will help to stimulate growth. Based on
the outcome of this exercise, innovative schemes have been devised in this plan. This plan
reflects the completion of the situation assessment phase of the planning process. It covers:
xvi
• An initial review of existing resource-based information, leading to preliminary
conclusions on resource based opportunities and implications for strategy and policy.
• An initial industry analysis of the key agricultural sectors within the district.
• A consultation process with a broad range of interested parties who are involved directly or
indirectly in commercial activity, in agricultural enterprises for small farmers and in support of
rural livelihoods.
Thus the present comprehensive district agriculture plan aims at solving major
constraints faced by the agricultural sector in the district and attempts to capitalize on the
potential of agriculture with the help of new innovative schemes suggested under stream I
As mentioned earlier, the RKVY scheme aims at strengthening the agricultural sector
through innovative and ongoing schemes. In table 6.1, the sector-wise outlay under Stream I
and Stream II is presented.
Table :Sector-Wise Outlay for 11th
Plan
Sr.
No.
Department Financial Budget (Crore)
2007-08 2008-09 2009-10 2010-11 2011-12 Total
1 Agriculture 86.5 118.35 108.45 313.3
2 Horticulture 52.58 59.63 52.88 165.1
3 Drip irrigation 12.5 12.5 15 40
4 Water conservation 83.33 83.33 83.33 250
5 Animal Husbandry 9.22 8.68 6.03 23.79
6 Dairy 43.15 42.27 37.38 122.8
7 Fishery 0.78 0.78 0.98 2.55
8 Minor Irrigation 30 30 6.68 66.68
9 Sericulture 0.22 0.22 0.22 1.85
10 Social Forestry 13.45 11.27 15.65 40.38
11 Co-operative &
Marketing
0 0 0 0
12 MPKV Rahuri 4.82 36.5 5.5 46.82
13 Khadi & Village Industry 0.05 0.1 0.1 0.25
Grand Total 336.61 403.89 333.17 1073.52
Conclusion:
The proposed plan aims at an overall growth rate of 13.65 percent in the agricultural and
allied sector. Besides achieving this growth rate, the plan will also lead to improvement in
infrastructure in all sectors. This will give a major boost for sustained development of the
agricultural and allied sector.