CCSDS Security WG

Management Remarks

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 1

Page 2: CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013 Slide 1

CCSDS strategy

For Security the following statement is given in the CCSDS Strategic Plan:

By 2015: to complete a security architecture, and to complete framework, infrastructure mechanisms and techniques to protect system elements and information as it flows through the end-to-end space mission system.

- Currently only blue books on “CCSDS Symmetric Key Management Recommendations” and “Network Layer Security Adaptation Profile” are planned. Are these documents sufficient to fulfil the goal; are there other deliverables foreseen? Do we need to define sub-goals to better explain the role of these documents? Should the goal be reduced to fit the work plan?

- Are there dependencies and inter-relations with other areas

- A mapping to IOAG requirements or other Roadmaps is missing

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 2

Page 3: CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013 Slide 1

CCSDS Strategic Plan

- The Strategic Plan will be approved by the CCSDS Member Agencies. It is intended that the Strategic Plan should be updated whenever necessitated by changing events (or at least every 3-years) to redefine the organization’s current objectives, domains for standardization and strategic goals. The Strategic Plan also serves to reaffirm the cooperative agreements entered into by the founding and continuing members of the CCSDS.

 - A separate CCSDS Operating Plan, that provides the current CCSDS

tactical program of work and organizational details, supplements this CCSDS Strategic Plan. The Operating Plan is established and maintained by the CCSDS Engineering Steering Group, and is nominally updated twice per year.

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 3

Page 4: CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013 Slide 1

Framework – 1.02 Security Working Group

Projects:

CCSDS Symmetric Key Management Recommendations Blue Book Security Threats against Space Missions Revision Green Book Network Layer Security Adaptation Profile Blue Book CCSDS Cryptographic Algorithms Green Book

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 4

Page 5: CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013 Slide 1

Framework – 1.02 Security Working GroupCCSDS Symmetric Key Management Recommendations Blue Book

Problems:- No Prototyping defined- Second draft circulated

to WG already outdated

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 5

Page 6: CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013 Slide 1

Framework – 1.02 Security Working GroupSecurity Threats against Space Missions Revision Green Book

Problems:- Project approval date

already outdated

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 6

Page 7: CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013 Slide 1

Framework – 1.02 Security Working GroupNetwork Layer Security Adaptation Profile Blue Book

Problems:- No Prototyping defined- Project approval date

already outdated

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 7

Page 8: CCSDS Security WG Management Remarks Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013 Slide 1

Framework – 1.02 Security Working GroupCCSDS Cryptographic Algorithms Green Book

Problems:- Project approval date

already outdated

Martin Pilgram - DLR RB-KOB > Management Remarks on Sec WG > 15-04-2013www.DLR.de/rb • Slide 8