KINGDOM OF MOROCCO MINISTRY OF LAND-USE MANAGEMENT, WATER AND THE ENVIRONMENT. CD4CDM Project Side event 11 December 2004 COP10-Buenos Aires. CDM-Morocco Strategy, Organization, Procedures & Preliminary Project Portfolio. ALI AGOUMI CD CDM Project Coordinator. Contents. - PowerPoint PPT Presentation
Citation preview
CDM-MoroccoCDM-Morocco Strategy, Organization, ProceduresStrategy, Organization, Procedures
& & PreliminaryPreliminary Project Project PortfolioPortfolio
ALI AGOUMI
CD CDM Project Coordinator
CD
4C
DM
Pro
ject
Sid
e even
t 1
1 D
ecem
ber
20
04
CO
P1
0-B
uen
os A
ires
KINGDOM OF MOROCCOKINGDOM OF MOROCCO
MINISTRY OF LAND-USE MANAGEMENT, MINISTRY OF LAND-USE MANAGEMENT, WATER AND THE ENVIRONMENTWATER AND THE ENVIRONMENT
•SETTING UP CDM IN MOROCCO
•CDM NATIONAL STRUCTURES AND PROCEDURES
•ENHANCE NATIONAL CAPACITIES
•PROMOTING CDM MOROCCO •PRELIMINARY CDM PROJECT PORTFOLIO
•NEXT STEPS
ContentsContents
I-I-Setting up CDM in MoroccoSetting up CDM in Morocco
KP Ratification : 2002
Designation of CDM DNA by ministerial order : 2002
CDM National Strategy with UNDP-UNEP support : 2003-2005
“Learning by doing” Approach at different levels through concrete pilot projects
1. IMPLEMENT AND OPERATIONALIZE NATIONAL CDM STRUCTURES AND PROCEDURES
2. DEVELOP CDM NATIONAL CAPACITY BUILDING
3. PROMOTE CDM MOROCCO
CD4CDM project
II –CDM II –CDM National structures and proceduresNational structures and procedures
CDM DNA activities
a regulation activity to set the CDM project evaluation and approval rules and procedures (prerequisites for subsequent validation and certification);
a promotion activity centered on capacity building and marketing
Implementation of the institutional setting for monitoring CDM activities in the country: CDM DNA
CDM DNA structure
a CDM National Council (CDM NC)
a Permanent Secretariat of the National Council (CDM PS) Ministry of Land-Use Management, Water and the Environment (CCU).
Approval and Evaluation Procedure of CDM Projects
PIN received by the DNA
Preliminary Evaluation
Based on the PIN
(response announced by the DNA:
maximum within 2 weeks)
In-depth Evaluation Based on the PDD
(response transmitted by the DNA:
maximum within 4 weeks)
Approval letter delivered to the project promoter by the
Moroccan DNA
not accepted
1st meeting of the CDM NC in September 2003 - CDM Strategy, Organization and Procedures adopted
2nd meeting of the CDM NC in November 2003 - First CDM projects approved
- Morocco SD criteria adopted
3rd meeting of CDM NC in June 2004 - Adoption of CDM NC Internal procedures - Evaluation and approval of 10 PINs
CDM NC Activities : 2003-2004
2003 Morocco CDM Annual Report CDM EB
Sustainable Development Criteria
Possible Indicator
Contribution to mitigation of global Climate Change
The net reduction of GHG emissions measured in CO2 equivalent
Contribution to the sustainability of the local environment
The most significant local pollutant (oxides of sulphur, nitrogen, carbon and other wastes, any sold and liquid waste )
Contribution to the creation of employment
The number of additional jobs created by the CDM project
Contribution to the durability of balance of payments
Foreign currency expenditure compared with the baseline
Positive contribution to the macro-economic plan
The possible reduction of direct government investments dues to the CDM project investment
Effect on costs
Cost reductions implied by the CDM project in comparison with the baseline
Contribution to technology autonomy
-The contribution of domestically produced equipment -Imported technical assistance
Contribution to the sustainable use of natural resources
Change use of water , fuel or other non renewable natural resources
National Sustainable Development Criteria
III-ENHANCE III-ENHANCE NATIONAL NATIONAL CDM CDM CAPACITCAPACITIESIES
-Organization of 6 WS in 2003-2004 to enhance the capacities of :
• the national experts (private consultancy ,individuals and economic operators )on CDM project preparation: development of PDD;
• the project proponent on the CDM possibilities and on theirs project portfolio
• the financial sector operators on the CDM opportunities and on their role in this mechanism development
Intiatiation a CDM Morocco’s Experts network
5 regional WS , NA-ME
CD4CDM Project
IV-IV-PROMOTING CDM MOROCCOPROMOTING CDM MOROCCO
• - CDM Morocco Forum in April 2004
• -Participation in different meetings and workshops organized in this field; Carbon expo Cologne , Jerba Cd4CDM Forum , the differents COPs (Side events )
• -Contacts with potential CDM investors: carbon buying organizations and Annex I Parties investors;
• -Website: www.mdpmaroc.com and ECHOS MDP Maroc, BULLETIN MDP Maroc www.mdpmaroc.com
• -2 MOU: France and Austria
Italie,Canada,
JBIC (Japon)
Morocco 6th attractif host country ;
Point Carbon novembre 2004
•More than 4 millions T co2 Eq/year for the next 10 years!
Project category Nb of projects
Nb of SSP
Renewable energy 8 5
Energy efficiency 7 1
Waste 5 3
Afforestation/reforestation
4 0
Industrial process changes
1 0
Total 25 9
V- CDM PROJECT PORTFOLIOV- CDM PROJECT PORTFOLIO Preliminary Preliminary
Sectoriel Projects Repartition
13
23
38
23
3
. Afforestation & forestation projects
Waste projects
Renewable energy projects
Energy effeciency
Industrial process change projects
Sectoriel CERs Repartition
3
20
52
16
9 Afforestation & forestation projects
Waste projects
Renewable energy projects
Energy effeciency
Industrial process change projects
Preliminary CDM projects portfolio
Projects approved by the Morocco CDM DNA
Project title Approval of the project by the Morocco CDM
DNA
Global Emission ReductionsTon Eq CO2
60 MW wind farm (Essaouira) Project approved (PDD)
1 500 000(10 years)
Introduction of Heat Recovery System (HRS) at Jorf Lasfar’s chemical plant
Project approved (PDD)
848 895(10 years)
Biogas recovery and flaring (Rabat Akreuch landfill)
Project approved (PDD)
1 594 904 (21 years)
10 MW Wind farm for the Tan Tan desalination plant
PIN approved PDD
167 000(10 years)
105,000 Photovoltaic kits for rural electrification PIN approved PDD
288 000(10 years)
1.3 MW wastewater-derived power generation unit (Marrakesh)
PIN approvedPDD
650 000(10 years)
140 MW wind farm (Tangiers) PIN approved 4 000 000(10 years)
54 MW Abdelkhalek TORRES wind farm PIN approved 1 830 000(10 years)
10 MW wind farm (Tétouan) PIN approved 345 000(10 years)
41 MW hydro-electric dam project (Tanafnit - El Borj)
PIN approved 1 590 000(10 years)
Biogas recovery and flaring (Marrakesh landfill) PIN approved 3 557 790(21 years)
2.6 MW wastewater-derived power generation unit (Fez)
PIN approved 1250 000(10 years)
Public lighting with low consumption bulbs(LCB) and power modulators (15,000 bulbs program)
PIN approved 26 000(10 years)
Total Emission Reductions Ton Eq CO2 17 647 000
VI- Next stepsVI- Next steps
Enhance local capacities in particular in the areas of
validation and verification procedures , contract negotiations
Develop more CDM projects in promising sectors :
Renewable energy, wastewater units, landfills, Hydropower,
transport, energy efficiency , forestry..
Develop the involvement of civil society in CDM, in particular
active NGOs on the ground, so that we can benefit from this
mechanism of small scale projects with positive social and
environmental impact.
www.mdpmaroc.comwww.mdpmaroc.com
Climate Change Unit
Directorate of Partnership, Communication and Cooperation
Ministry of Land-Use Management, Water and the Environment
CDM Permanent Secretariat