CDM-Morocco CDM-Morocco trategy, Organization, Procedures trategy, Organization, Procedures & & Preliminary Preliminary Project Project Portfolio Portfolio ALI AGOUMI CD CDM Project Coordinator CD4CDM Project Side event 11 December 2004 COP10-Buenos Aires KINGDOM OF MOROCCO KINGDOM OF MOROCCO MINISTRY OF LAND-USE MANAGEMENT, MINISTRY OF LAND-USE MANAGEMENT, WATER AND THE ENVIRONMENT WATER AND THE ENVIRONMENT

CDM-Morocco Strategy, Organization, Procedures & Preliminary Project Portfolio

  • Upload
    aliza

  • View
    53

  • Download
    0

Embed Size (px)

DESCRIPTION

KINGDOM OF MOROCCO MINISTRY OF LAND-USE MANAGEMENT, WATER AND THE ENVIRONMENT. CD4CDM Project Side event 11 December 2004 COP10-Buenos Aires. CDM-Morocco Strategy, Organization, Procedures & Preliminary Project Portfolio. ALI AGOUMI CD CDM Project Coordinator. Contents. - PowerPoint PPT Presentation

Citation preview

Page 1: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

CDM-MoroccoCDM-Morocco Strategy, Organization, ProceduresStrategy, Organization, Procedures

& & PreliminaryPreliminary Project Project PortfolioPortfolio

ALI AGOUMI

CD CDM Project Coordinator

CD

4C

DM

Pro

ject

Sid

e even

t 1

1 D

ecem

ber

20

04

CO

P1

0-B

uen

os A

ires

KINGDOM OF MOROCCOKINGDOM OF MOROCCO

MINISTRY OF LAND-USE MANAGEMENT, MINISTRY OF LAND-USE MANAGEMENT, WATER AND THE ENVIRONMENTWATER AND THE ENVIRONMENT

Page 2: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

•SETTING UP CDM IN MOROCCO

•CDM NATIONAL STRUCTURES AND PROCEDURES

•ENHANCE NATIONAL CAPACITIES

•PROMOTING CDM MOROCCO •PRELIMINARY CDM PROJECT PORTFOLIO

•NEXT STEPS

ContentsContents

Page 3: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

I-I-Setting up CDM in MoroccoSetting up CDM in Morocco

KP Ratification : 2002

Designation of CDM DNA by ministerial order : 2002

CDM National Strategy with UNDP-UNEP support : 2003-2005

“Learning by doing” Approach at different levels through concrete pilot projects

1. IMPLEMENT AND OPERATIONALIZE NATIONAL CDM STRUCTURES AND PROCEDURES

2. DEVELOP CDM NATIONAL CAPACITY BUILDING

3. PROMOTE CDM MOROCCO

CD4CDM project

Page 4: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

II –CDM II –CDM National structures and proceduresNational structures and procedures

CDM DNA activities

a regulation activity to set the CDM project evaluation and approval rules and procedures (prerequisites for subsequent validation and certification);  

a promotion activity centered on capacity building and marketing

Implementation of the institutional setting for monitoring CDM activities in the country: CDM DNA

CDM DNA structure

a CDM National Council (CDM NC)

a Permanent Secretariat of the National Council (CDM PS) Ministry of Land-Use Management, Water and the Environment (CCU).

Page 5: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

Approval and Evaluation Procedure of CDM Projects

PIN received by the DNA

Preliminary Evaluation

Based on the PIN

(response announced by the DNA:

maximum within 2 weeks)

In-depth Evaluation Based on the PDD

(response transmitted by the DNA:

maximum within 4 weeks)

Approval letter delivered to the project promoter by the

Moroccan DNA

not accepted

Page 6: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

1st meeting of the CDM NC in September 2003 - CDM Strategy, Organization and Procedures adopted

2nd meeting of the CDM NC in November 2003 - First CDM projects approved

- Morocco SD criteria adopted

3rd meeting of CDM NC in June 2004 - Adoption of CDM NC Internal procedures - Evaluation and approval of 10 PINs

CDM NC Activities : 2003-2004

2003 Morocco CDM Annual Report CDM EB

Page 7: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

Sustainable Development Criteria

Possible Indicator

Contribution to mitigation of global Climate Change

The net reduction of GHG emissions measured in CO2 equivalent

Contribution to the sustainability of the local environment

The most significant local pollutant (oxides of sulphur, nitrogen, carbon and other wastes, any sold and liquid waste )

Contribution to the creation of employment

The number of additional jobs created by the CDM project

Contribution to the durability of balance of payments

Foreign currency expenditure compared with the baseline

Positive contribution to the macro-economic plan

The possible reduction of direct government investments dues to the CDM project investment

Effect on costs

Cost reductions implied by the CDM project in comparison with the baseline

Contribution to technology autonomy

-The contribution of domestically produced equipment -Imported technical assistance

Contribution to the sustainable use of natural resources

Change use of water , fuel or other non renewable natural resources

National Sustainable Development Criteria

Page 8: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

 III-ENHANCE III-ENHANCE NATIONAL NATIONAL CDM CDM CAPACITCAPACITIESIES

-Organization of 6 WS in 2003-2004 to enhance the capacities of : 

• the national experts (private consultancy ,individuals and economic operators )on CDM project preparation: development of PDD;

• the project proponent on the CDM possibilities and on theirs project portfolio

• the financial sector operators on the CDM opportunities and on their role in this mechanism development  

 

Intiatiation a CDM Morocco’s Experts network

5 regional WS , NA-ME

CD4CDM Project

Page 9: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

  IV-IV-PROMOTING CDM MOROCCOPROMOTING CDM MOROCCO

• - CDM Morocco Forum in April 2004

• -Participation in different meetings and workshops organized in this field; Carbon expo Cologne , Jerba Cd4CDM Forum , the differents COPs (Side events )

• -Contacts with potential CDM investors: carbon buying organizations and Annex I Parties investors; 

• -Website: www.mdpmaroc.com and ECHOS MDP Maroc, BULLETIN MDP Maroc www.mdpmaroc.com

• -2 MOU: France and Austria

  Italie,Canada,

JBIC (Japon)

Morocco 6th attractif host country ;

Point Carbon novembre 2004

Page 10: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

•More than 4 millions T co2 Eq/year for the next 10 years!

Project category Nb of projects

Nb of SSP

Renewable energy 8 5

Energy efficiency 7 1

Waste 5 3

Afforestation/reforestation

4 0

Industrial process changes

1 0

Total 25 9

V- CDM PROJECT PORTFOLIOV- CDM PROJECT PORTFOLIO Preliminary Preliminary

Page 11: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

Sectoriel Projects Repartition

13

23

38

23

3

. Afforestation & forestation projects

Waste projects

Renewable energy projects

Energy effeciency

Industrial process change projects

Sectoriel CERs Repartition

3

20

52

16

9 Afforestation & forestation projects

Waste projects

Renewable energy projects

Energy effeciency

Industrial process change projects

Preliminary CDM projects portfolio

Page 12: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

Projects approved by the Morocco CDM DNA

Project title Approval of the project by the Morocco CDM

DNA

Global Emission ReductionsTon Eq CO2

60 MW wind farm (Essaouira) Project approved (PDD)

1 500 000(10 years)

Introduction of Heat Recovery System (HRS) at Jorf Lasfar’s chemical plant

Project approved (PDD)

848 895(10 years)

Biogas recovery and flaring (Rabat Akreuch landfill)

Project approved (PDD)

1 594 904 (21 years)

10 MW Wind farm for the Tan Tan desalination plant

PIN approved PDD

167 000(10 years)

105,000 Photovoltaic kits for rural electrification PIN approved PDD

288 000(10 years)

1.3 MW wastewater-derived power generation unit (Marrakesh)

PIN approvedPDD

650 000(10 years)

140 MW wind farm (Tangiers) PIN approved 4 000 000(10 years)

54 MW Abdelkhalek TORRES wind farm PIN approved 1 830 000(10 years)

10 MW wind farm (Tétouan) PIN approved 345 000(10 years)

41 MW hydro-electric dam project (Tanafnit - El Borj)

PIN approved 1 590 000(10 years)

Biogas recovery and flaring (Marrakesh landfill) PIN approved 3 557 790(21 years)

2.6 MW wastewater-derived power generation unit (Fez)

PIN approved 1250 000(10 years)

Public lighting with low consumption bulbs(LCB) and power modulators (15,000 bulbs program)

PIN approved 26 000(10 years)

Total Emission Reductions Ton Eq CO2 17 647 000

Page 13: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

VI- Next stepsVI- Next steps

Enhance local capacities in particular in the areas of

validation and verification procedures , contract negotiations

Develop more CDM projects in promising sectors :

Renewable energy, wastewater units, landfills, Hydropower,

transport, energy efficiency , forestry..

Develop the involvement of civil society in CDM, in particular

active NGOs on the ground, so that we can benefit from this

mechanism of small scale projects with positive social and

environmental impact.

Page 14: CDM-Morocco Strategy, Organization, Procedures &  Preliminary Project  Portfolio

www.mdpmaroc.comwww.mdpmaroc.com

Climate Change Unit

Directorate of Partnership, Communication and Cooperation

Ministry of Land-Use Management, Water and the Environment

[email protected]

CDM Permanent Secretariat

French and

English