TABLE-IA&IIA
MID-POINT Mid Point Updated Base Rate Escalation in Revised Rate
DISTANCE Distance Rs/Te as on Rs/Te as in Rs/Te. as
LEAD LEAD/2 KM 01.04.2013 on 01.12.2014 on 01.12.2014
(KM) (KM) (HSD=Rs52.85/L) (HSD=Rs.57.07/L) (HSD=Rs.57.07/L)
0-0.5 0.25 0.25 17.10 0.07 17.17
0.5-1 0.75 0.75 19.43 0.21 19.64
1-2 1.50 1.50 23.83 0.42 24.25
2-3 2.50 2.50 29.18 0.70 29.88
3-4 3.50 3.50 37.21 0.97 38.18
4-5 4.50 4.50 45.06 1.25 46.31
5-6 5.50 5.50 52.73 1.53 54.26
6-7 6.50 6.50 60.26 1.81 62.07
7-8 7.50 7.50 67.64 2.09 69.73
8-9 8.50 8.50 74.88 2.37 77.25
9-10 9.50 9.50 82.01 2.65 84.66
10-11 10.50 10.50 89.02 2.92 91.94
11-12 11.50 11.50 95.91 3.20 99.11
12-13 12.50 12.50 102.72 3.48 106.20
13-14 13.50 13.50 109.43 3.76 113.19
14-15 14.50 14.50 116.05 4.04 120.09
15-16 15.50 15.50 122.59 4.32 126.91
16-17 16.50 16.50 129.04 4.60 133.64
17-18 17.50 17.50 135.44 4.87 140.31
18-19 18.50 18.50 141.75 5.15 146.90
19-20 19.50 19.50 148.01 5.43 153.44
20-21 20.50 20.50 154.21 5.71 159.92
21-22 21.50 21.50 160.34 5.99 166.33
22-23 22.50 22.50 166.42 6.27 172.69
23-24 23.50 23.50 172.46 6.55 179.01
24-25 24.50 24.50 179.45 6.82 186.27
25-26 25.50 25.50 186.43 7.10 193.53
26-27 26.50 26.50 193.43 7.38 200.81
27-28 27.50 27.50 200.42 7.66 208.08
28-29 28.50 28.50 207.40 7.94 215.34
29-30 29.50 29.50 214.40 8.22 222.62
30-31 30.50 30.50 221.39 8.49 229.88
31-32 31.50 31.50 228.37 8.77 237.14
32-33 32.50 32.50 235.37 9.05 244.42
33-34 33.50 33.50 242.36 9.33 251.69
34-35 34.50 34.50 249.34 9.61 258.95
35-36 35.50 35.50 256.34 9.89 266.23
36-37 36.50 36.50 263.33 10.17 273.50
37-38 37.50 37.50 270.31 10.44 280.75
38-39 38.50 38.50 277.31 10.72 288.03
39-40 39.50 39.50 284.30 11.00 295.30
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 (WEST-BENGAL)
MID-POINT
DISTANCE
LEAD LEAD/2 DRY MONSOON DRY MONSOON DRY MONSOON
(Km) (KM) SEASON SEASON SEASON SEASON SEASON SEASON
0 - 1 0.50 48.29 61.52 0.22 0.22 48.51 61.74
+ 1 - 2 1.50 60.41 73.64 0.65 0.65 61.06 74.29
+ 2 - 3 2.50 73.78 87.01 1.08 1.08 74.86 88.09
+ 3 - 4 3.50 85.07 98.30 1.52 1.52 86.59 99.82
+ 4 - 5 4.50 99.49 112.72 1.95 1.95 101.44 114.67
+ 5 - 6 5.50 113.54 126.77 2.38 2.38 115.92 129.15
+ 6 - 7 6.50 127.23 140.46 2.81 2.81 130.04 143.27
+ 7 - 8 7.50 130.67 144.98 3.25 3.25 133.92 148.23
+ 8 - 9 8.50 143.06 157.38 3.68 3.68 146.74 161.06
+ 9 - 10 9.50 155.20 169.51 4.11 4.11 159.31 173.62
+ 10 - 11 10.50 155.25 169.56 4.55 4.55 159.80 174.11
+ 11 - 12 11.50 166.36 180.67 4.98 4.98 171.34 185.65
+ 12 - 13 12.50 177.28 191.60 5.41 5.41 182.69 197.01
+ 13 - 14 13.50 188.05 202.36 5.85 5.85 193.90 208.21
+ 14 - 15 14.50 198.67 212.98 6.28 6.28 204.95 219.26
+ 15 - 16 15.50 209.13 223.44 6.71 6.71 215.84 230.15
+ 16 - 17 16.50 219.46 233.77 7.14 7.14 226.60 240.91
+ 17 - 18 17.50 229.66 243.97 7.58 7.58 237.24 251.55
+ 18 - 19 18.50 239.75 254.07 8.01 8.01 247.76 262.08
+ 19 - 20 19.50 249.72 264.04 8.44 8.44 258.16 272.48
+ 20 - 21 20.50 259.59 273.90 8.88 8.88 268.47 282.78
+ 21 - 22 21.50 269.36 283.67 9.31 9.31 278.67 292.98
+ 22 - 23 22.50 279.03 294.15 9.74 9.74 288.77 303.89
+ 23 - 24 23.50 288.60 303.73 10.17 10.17 298.77 313.90
+ 24 - 25 24.50 299.87 315.00 10.61 10.61 310.48 325.61
+ 25 - 26 25.50 311.13 326.26 11.04 11.04 322.17 337.30
+ 26 - 27 26.50 322.39 337.51 11.47 11.47 333.86 348.98
+ 27 - 28 27.50 333.66 348.78 11.91 11.91 345.57 360.69
+ 28 - 29 28.50 344.92 360.04 12.34 12.34 357.26 372.38
+29 - 30 29.50 356.18 371.3 12.77 12.77 368.95 384.07
+30 - 31 30.50 367.43 382.56 13.21 13.21 380.64 395.77
+31 - 32 31.50 378.70 393.83 13.64 13.64 392.34 407.47
+32 - 33 32.50 389.96 405.09 14.07 14.07 404.03 419.16
+33 - 34 33.50 401.22 416.34 14.50 14.50 415.72 430.84
+34 - 35 34.50 412.49 427.61 14.94 14.94 427.43 442.55
+35 - 36 35.50 423.75 438.87 15.37 15.37 439.12 454.24
+36 - 37 36.50 435.00 450.13 15.80 15.80 450.80 465.93
+37 - 38 37.50 446.27 461.4 16.24 16.24 462.51 477.64
+38 - 39 38.50 457.53 472.66 16.67 16.67 474.20 489.33
+39 - 40 39.50 468.79 483.91 17.10 17.10 485.89 501.01
TABLE - IIIA
ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 (WEST-BENGAL)
01.12.2014 (HSD=Rs.57.07/L)01.04.2013 (HSD=Rs.52.85/L)
REVISED RATE OF TRANSPORTATION OF SAND INCORPORATING ESCALATION
ESCALATION AS ON
01.12.2014 (HSD=Rs.57.07/L)
REVISED RATE AS ON
RATE IN Rs. / CuM
UPDATED BASE RATE AS ON
TABLE - IVA
MID-POINT
DISTANCE
LEAD LEAD/2 DRY MONSOON DRY MONSOON DRY MONSOON
(Km) (KM) SEASON SEASON SEASON SEASON SEASON SEASON
0 - 1 0.50 63.15 76.38 0.22 0.22 63.37 76.60
+ 1 - 2 1.50 75.27 88.50 0.65 0.65 75.92 89.15
+ 2 - 3 2.50 88.64 101.87 1.08 1.08 89.72 102.95
+ 3 - 4 3.50 99.93 113.16 1.52 1.52 101.45 114.68
+ 4 - 5 4.50 114.35 127.58 1.95 1.95 116.30 129.53
+ 5 - 6 5.50 128.40 141.63 2.38 2.38 130.78 144.01
+ 6 - 7 6.50 142.09 155.32 2.81 2.81 144.90 158.13
+ 7 - 8 7.50 145.53 159.84 3.25 3.25 148.78 163.09
+ 8 - 9 8.50 157.92 172.24 3.68 3.68 161.60 175.92
+ 9 - 10 9.50 170.06 184.37 4.11 4.11 174.17 188.48
+ 10 - 11 10.50 170.11 184.42 4.55 4.55 174.66 188.97
+ 11 - 12 11.50 181.22 195.53 4.98 4.98 186.20 200.51
+ 12 - 13 12.50 192.14 206.46 5.41 5.41 197.55 211.87
+ 13 - 14 13.50 202.91 217.22 5.85 5.85 208.76 223.07
+ 14 - 15 14.50 213.53 227.84 6.28 6.28 219.81 234.12
+ 15 - 16 15.50 223.99 238.30 6.71 6.71 230.70 245.01
+ 16 - 17 16.50 234.32 248.63 7.14 7.14 241.46 255.77
+ 17 - 18 17.50 244.52 258.83 7.58 7.58 252.10 266.41
+ 18 - 19 18.50 254.61 268.93 8.01 8.01 262.62 276.94
+ 19 - 20 19.50 264.58 278.90 8.44 8.44 273.02 287.34
+ 20 - 21 20.50 274.45 288.76 8.88 8.88 283.33 297.64
+ 21 - 22 21.50 284.22 298.53 9.31 9.31 293.53 307.84
+ 22 - 23 22.50 293.89 309.01 9.74 9.74 303.63 318.75
+ 23 - 24 23.50 303.46 318.59 10.17 10.17 313.63 328.76
+ 24 - 25 24.50 314.73 329.86 10.61 10.61 325.34 340.47
+ 25 - 26 25.50 325.99 341.12 11.04 11.04 337.03 352.16
+ 26 - 27 26.50 337.25 352.37 11.47 11.47 348.72 363.84
+ 27 - 28 27.50 348.52 363.64 11.91 11.91 360.43 375.55
+ 28 - 29 28.50 359.78 374.90 12.34 12.34 372.12 387.24
+29 - 30 29.50 371.04 386.16 12.77 12.77 383.81 398.93
01.04.2013 (HSD=Rs.52.85/L)
ESCALATION AS ON
01.12.2014 (HSD=Rs.57.07/L)
RATE IN Rs. / CuM
REVISED RATE AS ON
01.12.2014 (HSD=Rs.57.07/L)
UPDATED BASE RATE AS ON
REVISED RATE OF TRANSPORTATION OF SAND (WITH BRIDGE) INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D. PRICE ON 01.12.2014 (WEST-BENGAL)
TABLE - VA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 01.12.2014 AS ON 01.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.57.07/L) (HSD=Rs.57.07/L)
0 - 1 0.50 44.09 0.22 44.31
+ 1 - 2 1.50 56.21 0.65 56.86
+ 2 - 3 2.50 69.58 1.08 70.66
+ 3 - 4 3.50 80.87 1.52 82.39
+ 4 - 5 4.50 95.29 1.95 97.24
+ 5 - 6 5.50 108.33 2.38 110.71
+ 6 - 7 6.50 122.02 2.81 124.83
+ 7 - 8 7.50 125.46 3.25 128.71
+ 8 - 9 8.50 137.85 3.68 141.53
+ 9 - 10 9.50 149.99 4.11 154.10
+ 10 - 11 10.50 148.84 4.55 153.39
+ 11 - 12 11.50 159.95 4.98 164.93
+ 12 - 13 12.50 170.87 5.41 176.28
+ 13 - 14 13.50 181.64 5.85 187.49
+ 14 - 15 14.50 192.26 6.28 198.54
+ 15 - 16 15.50 202.72 6.71 209.43
+ 16 - 17 16.50 213.05 7.14 220.19
+ 17 - 18 17.50 223.25 7.58 230.83
+ 18 - 19 18.50 233.34 8.01 241.35
+ 19 - 20 19.50 243.31 8.44 251.75
+ 20 - 21 20.50 251.76 8.88 260.64
+ 21 - 22 21.50 261.53 9.31 270.84
+ 22 - 23 22.50 271.20 9.74 280.94
REVISED RATE OF TRANSPORTATION OF SAND INCORPORATING
ESCALATION ON ACCOUNT OF H.S.D. PRICE ON
01.12.2014 (WEST-BENGAL) FOR J.K. ROPEWAYS MECHANICAL DUMP
RATE IN Rs. / CuM
TABLE - VIA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 01.12.2014 AS ON 01.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.57.07/L) (HSD=Rs.57.07/L)
0 - 1 0.50 51.76 0.22 51.98
+ 1 - 2 1.50 63.88 0.65 64.53
+ 2 - 3 2.50 77.25 1.08 78.33
+ 3 - 4 3.50 88.54 1.52 90.06
+ 4 - 5 4.50 102.96 1.95 104.91
+ 5 - 6 5.50 117.01 2.38 119.39
+ 6 - 7 6.50 130.70 2.81 133.51
+ 7 - 8 7.50 134.14 3.25 137.39
+ 8 - 9 8.50 146.53 3.68 150.21
+ 9 - 10 9.50 158.67 4.11 162.78
+ 10 - 11 10.50 158.72 4.55 163.27
+ 11 - 12 11.50 169.83 4.98 174.81
+ 12 - 13 12.50 180.75 5.41 186.16
+ 13 - 14 13.50 191.52 5.85 197.37
+ 14 - 15 14.50 202.14 6.28 208.42
+ 15 - 16 15.50 212.60 6.71 219.31
+ 16 - 17 16.50 222.93 7.14 230.07
+ 17 - 18 17.50 233.13 7.58 240.71
+ 18 - 19 18.50 243.22 8.01 251.23
+ 19 - 20 19.50 253.19 8.44 261.63
+ 20 - 21 20.50 263.06 8.88 271.94
+ 21 - 22 21.50 272.83 9.31 282.14
+ 22 - 23 22.50 282.50 9.74 292.24
+ 23 - 24 23.50 292.07 10.17 302.24
+ 24 - 25 24.50 303.34 10.61 313.95
+ 25 - 26 25.50 314.60 11.04 325.64
+ 26 - 27 26.50 325.86 11.47 337.33
+ 27 - 28 27.50 337.13 11.91 349.04
+ 28 - 29 28.50 348.39 12.34 360.73
+29 - 30 29.50 359.65 12.77 372.42
ESCALATION ON ACCOUNT OF H.S.D. PRICE ON
RATE IN Rs. / CuM
01.12.2014 (WEST-BENGAL) FOR J.K. ROPEWAYS MANUAL DUMP
REVISED RATE OF TRANSPORTATION OF SAND INCORPORATING
10.04 0.28 10.32
Applicable for West Bengal
TABLE - VIIA
W.E.F. 01.12.2014
UPDATED SOR RATE IN Rs./Tonne AS
ON 01/04/2013(HSD=Rs52.85/L)
ESCALATION IN Rs./Tonne AS
ON 01.12.2014 (HSD=Rs.57.07/L)
REVISED RATE IN Rs./Tonne AS
ON 01.12.2014 (HSD=Rs.57.07/L)
REVISED RATE OF LOADING OF COAL
BY PAY LOADER
( INTO WAGONS / TIPPERS )
TABLE-VIIIA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 01.12.2014 AS ON 01.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.57.07/L) (HSD=Rs.57.07/L)
0 - 0.5 0.25 20.12 0.07 20.19
+0.5 -1 0.75 22.85 0.21 23.06
+ 1 - 2 1.50 28.02 0.42 28.44
+ 2 - 3 2.50 34.30 0.70 35.00
+ 3 - 4 3.50 43.75 0.97 44.72
+ 4 - 5 4.50 52.96 1.25 54.21
+ 5 - 6 5.50 61.99 1.53 63.52
+ 6 - 7 6.50 70.84 1.81 72.65
+ 7 - 8 7.50 79.50 2.09 81.59
+ 8 - 9 8.50 88.02 2.37 90.39
+ 9 - 10 9.50 96.39 2.65 99.04
RATE IN Rs. / Te.
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 (WEST-BENGAL) FROM Q-BED TO SURFACE.
TABLE-IXA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 01.12.2014 AS ON 01.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.57.07/L) (HSD=Rs.57.07/L)
0 - 0.5 0.25 22.42 0.07 22.49
+0.5 -1 0.75 24.74 0.21 24.95
+ 1 - 2 1.50 29.44 0.42 29.86
+ 2 - 3 2.50 35.03 0.70 35.73
+ 3 - 4 3.50 44.19 0.97 45.16
+ 4 - 5 4.50 53.10 1.25 54.35
+ 5 - 6 5.50 61.79 1.53 63.32
+ 6 - 7 6.50 70.28 1.81 72.09
+ 7 - 8 7.50 78.56 2.09 80.65
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 (WEST-BENGAL) FROM TIPPLER WITHOUT BUNKER
RATE IN Rs. / Te.
11.20 0.51 11.71
Applicable for West Bengal
BY EXCAVATOR
( INTO TIPPERS )
W.E.F. 01.12.2014
UPDATED SOR RATE IN Rs./Tonne
AS ON 01/04/2013(HSD=Rs52.85/L)
TABLE - XA
REVISED RATE OF LOADING OF COAL
ESCALATION IN Rs./Tonne AS
ON 01.12.2014 (HSD=Rs.57.07/L)
REVISED RATE IN Rs./Tonne AS
ON 01.12.2014 (HSD=Rs.57.07/L)
TABLE-XIA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 01.12.2014 AS ON 01.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.57.07/L) (HSD=Rs.57.07/L)
+40 - 41 40.50 291.29 11.28 302.57
+41 - 42 41.50 298.28 11.56 309.84
+42 - 43 42.50 305.27 11.84 317.11
+43 - 44 43.50 312.26 12.12 324.38
+44 - 45 44.50 319.25 12.39 331.64
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 (WEST-BENGAL) FOR DISTANCE BEYOND 40 Km. IN WB
RATE IN Rs. / Te.
TABLE - IB
MID-POINT Updated Base Rate in Escalation in Revised Rate
LEAD DISTANCE Rs/Te as on Rs/Te as in Rs/Te
(KM) LEAD/2 01.04.2013 on 01.12.2014 as on 01.12.2014
(KM) (HSD=Rs50.88/L) (HSD=Rs.54.98/L) (HSD=Rs.54.98/L)
0-0.5 0.25 17.11 0.07 17.18
+0.5-1 0.75 19.37 0.20 19.57
+1-2 1.50 23.66 0.41 24.07
+2-3 2.50 28.89 0.68 29.57
+3-4 3.50 36.80 0.95 37.75
+4-5 4.50 44.52 1.22 45.74
+5-6 5.50 52.08 1.49 53.57
+6-7 6.50 59.47 1.76 61.23
+7-8 7.50 66.72 2.03 68.75
+8-9 8.50 73.84 2.30 76.14
+9-10 9.50 80.84 2.57 83.41
+10-11 10.50 87.73 2.84 90.57
+11-12 11.50 94.50 3.11 97.61
+12-13 12.50 101.17 3.38 104.55
+13-14 13.50 107.75 3.65 111.40
+14-15 14.50 114.24 3.92 118.16
+15-16 15.50 120.65 4.19 124.84
+16-17 16.50 126.99 4.46 131.45
+17-18 17.50 133.25 4.74 137.99
+18-19 18.50 139.44 5.01 144.45
+19-20 19.50 145.56 5.28 150.84
+20-21 20.50 151.63 5.55 157.18
+21-22 21.50 157.64 5.82 163.46
+22-23 22.50 163.60 6.09 169.69
+23-24 23.50 169.50 6.36 175.86
+24-25 24.50 176.37 6.63 183.00
+25-26 25.50 183.22 6.90 190.12
+26-27 26.50 190.09 7.17 197.26
+27-28 27.50 196.95 7.44 204.39
+28-29 28.50 203.82 7.71 211.53
+29-30 29.50 210.68 7.98 218.66
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 FOR MUGMA AREA (JHARKHAND STATE)
TABLE - IIB
MID-POINT Updated Base Rate in Escalation in Revised Rate
LEAD DISTANCE Rs/Te as on Rs/Te as in Rs/Te
(KM) LEAD/2 01.04.2013 on 01.12.2014 as on 01.12.2014
(KM) (HSD=Rs50.88/L) (HSD=Rs.54.98/L) (HSD=Rs.54.98/L)
+30-31 30.50 217.55 8.25 225.80
+31-32 31.50 224.40 8.52 232.92
+32-33 32.50 231.27 8.79 240.06
+33-34 33.50 238.13 9.07 247.20
+34-35 34.50 245.00 9.34 254.34
+35-36 35.50 251.86 9.61 261.47
+36-37 36.50 258.73 9.88 268.61
+37-38 37.50 265.58 10.15 275.73
+38-39 38.50 272.45 10.42 282.87
+39-40 39.50 279.31 10.69 290.00
ESCALATION ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 FOR MUGMA AREA (JHARKHAND)
REVISED RATE OF TRANSPORTATION OF COAL BEYOND "30 Km." DISTANCE INCORPORATING
TABLE - IIIB
MID-POINT
LEAD DISTANCE
(KM) LEAD/2 DRY MONSOON DRY MONSOON DRY MONSOON
(KM) SEASON SEASON SEASON SEASON SEASON SEASON
0-1 0.50 48.29 60.70 0.21 0.21 48.50 60.91
+1-2 1.50 60.23 71.30 0.63 0.63 60.86 71.93
+2-3 2.50 73.40 84.47 1.05 1.05 74.45 85.52
+3-4 3.50 84.49 95.57 1.47 1.47 85.96 97.04
+4-5 4.50 98.74 109.81 1.89 1.89 100.63 111.70
+5-6 5.50 112.59 123.67 2.31 2.31 114.90 125.98
+6-7 6.50 126.10 137.18 2.73 2.73 128.83 139.91
+7-8 7.50 129.35 142.76 3.15 3.15 132.50 145.91
+8-9 8.50 141.55 154.97 3.58 3.58 145.13 158.55
+9-10 9.50 153.49 166.91 4.00 4.00 157.49 170.91
+10-11 10.50 153.35 166.77 4.42 4.42 157.77 171.19
+11-12 11.50 164.27 177.69 4.84 4.84 169.11 182.53
+12-13 12.50 175.00 188.42 5.26 5.26 180.26 193.68
+13-14 13.50 185.58 199.00 5.68 5.68 191.26 204.68
+14-15 14.50 195.99 209.41 6.10 6.10 202.09 215.51
+15-16 15.50 206.26 219.68 6.52 6.52 212.78 226.20
+16-17 16.50 216.41 229.83 6.94 6.94 223.35 236.77
+17-18 17.50 226.41 239.83 7.36 7.36 233.77 247.19
+18-19 18.50 236.31 249.73 7.78 7.78 244.09 257.51
+19-20 19.50 246.08 259.50 8.20 8.20 254.28 267.70
+20-21 20.50 255.75 269.17 8.62 8.62 264.37 277.79
+21-22 21.50 265.33 278.75 9.04 9.04 274.37 287.79
+22-23 22.50 274.80 288.97 9.46 9.46 284.26 298.43
+23-24 23.50 284.19 298.36 9.89 9.89 294.08 308.25
+24-25 24.50 295.26 309.43 10.31 10.31 305.57 319.74
+25-26 25.50 306.33 320.50 10.73 10.73 317.06 331.23
+26-27 26.50 317.40 331.57 11.15 11.15 328.55 342.72
+27-28 27.50 328.46 342.63 11.57 11.57 340.03 354.20
+28-29 28.50 339.54 353.71 11.99 11.99 351.53 365.70
+29-30 29.50 350.61 364.78 12.41 12.41 363.02 377.19
+30-31 30.50 361.68 375.85 12.83 12.83 374.51 388.68
+31-32 31.50 372.75 386.92 13.25 13.25 386.00 400.17
+32-33 32.50 383.81 397.99 13.67 13.67 397.48 411.66
+33-34 33.50 394.89 409.06 14.09 14.09 408.98 423.15
+34-35 34.50 405.96 420.13 14.51 14.51 420.47 434.64
+35-36 35.50 417.03 431.20 14.93 14.93 431.96 446.13
+36-37 36.50 428.10 442.27 15.35 15.35 443.45 457.62
+37-38 37.50 439.17 453.34 15.77 15.77 454.94 469.11
+38-39 38.50 450.24 464.41 16.20 16.20 466.44 480.61
+39-40 39.50 461.31 475.48 16.62 16.62 477.93 492.10
REVISED RATE AS ON
01.12.2014 (HSD=Rs.54.98/L)
ESCALATION ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 FOR MUGMA AREA (JHARKHAND)
01.12.2014 (HSD=Rs.54.98/L)
UPDATED BASE RATE AS ON
01.04.2013 (HSD=Rs.50.88/L)
ESCALATION AS ON
RATE IN Rs. / Cu M.
REVISED RATE OF TRANSPORTATION OF SAND FROM BARAKAR RIVER INCORPORATING
TABLE - IVB
9.83 0.27 10.10
REVISED RATE OF LOADING OF COAL
BY PAY LOADER( INTO WAGONS / TIPPERS )
AS ON 01.12.2014
Applicable for Mugma Area (Jharkhand State)UPDATED BASE RATE IN Rs./Te. AS
ON 01/04/2013 (HSD=Rs.50.88/L)
ESCALATION IN Rs./Te. AS ON
01.12.2014 (HSD=Rs.54.98/L)
REVISED RATE IN Rs./Te. AS ON
01.12.2014 (HSD=Rs.54.98/L)
TABLE - VB
MID-POINT Updated Base Rate in Escalation in Revised Rate
LEAD DISTANCE Rs/Te as on Rs/Te as in Rs/Te
(KM) LEAD/2 01.04.2013 on 01.12.2014 as on 01.12.2014
(KM) (HSD=Rs50.88/L) (HSD=Rs.54.98/L) (HSD=Rs.54.98/L)
0-0.5 0.25 20.13 0.07 20.20
+0.5-1 0.75 22.78 0.20 22.98
+1-2 1.50 27.83 0.41 28.24
+2-3 2.50 33.97 0.68 34.65
+3-4 3.50 43.27 0.95 44.22
+4-5 4.50 52.35 1.22 53.57
+5-6 5.50 61.24 1.49 62.73
+6-7 6.50 69.93 1.76 71.69
+7-8 7.50 78.46 2.03 80.49
+8-9 8.50 86.83 2.30 89.13
+9-10 9.50 95.06 2.57 97.63
REVISED RATE OF TRANSPORTATION OF COAL (QUARRY-BED TO SURFACE) INCORPORATING
ESCALATION ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 FOR MUGMA AREA (JHARKHAND)
TABLE-VIB
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 01.12.2014 AS ON 01.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.50.88/L) (HSD=Rs.54.98/L) (HSD=Rs.54.98/L)
0 - 0.5 0.25 22.44 0.07 22.51
+0.5 -1 0.75 24.69 0.20 24.89
+ 1 - 2 1.50 29.30 0.41 29.71
+ 2 - 3 2.50 34.75 0.68 35.43
+ 3 - 4 3.50 43.79 0.95 44.74
+ 4 - 5 4.50 52.58 1.22 53.80
+ 5 - 6 5.50 61.15 1.49 62.64
+ 6 - 7 6.50 69.50 1.76 71.26
+ 7 - 8 7.50 77.67 2.03 79.70
RATE IN Rs. / Te.
ON ACCOUNT OF H.S.D PRICE ON 01.12.2014 (MUGMA) FROM TIPPLER WITHOUT BUNKER
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
10.97 0.49 11.46
UPDATED BASE RATE IN Rs./Tonne
AS ON 01/04/2013 (HSD=Rs50.88/L)
ESCALATION IN Rs./Tonne AS ON
01.12.2014 (HSD=Rs.54.98/L)
REVISED RATE IN Rs./Tonne AS
ON 01.12.2014 (HSD=Rs.54.98/L)
BY EXCAVATOR
( INTO TIPPERS )
W.E.F. 01.12.2014
Applicable for Mugma Area
REVISED RATE OF LOADING OF COAL
TABLE - VIIB
TABLE-IA&IIA
MID-POINT Mid Point Updated Base Rate Escalation in Revised Rate
DISTANCE Distance Rs/Te as on Rs/Te as in Rs/Te. as
LEAD LEAD/2 KM 01.04.2013 on 16.12.2014 on 16.12.2014
(KM) (KM) (HSD=Rs52.85/L) (HSD=Rs.54.99/L) (HSD=Rs.54.99/L)
0-0.5 0.25 0.25 17.10 0.04 17.14
0.5-1 0.75 0.75 19.43 0.11 19.54
1-2 1.50 1.50 23.83 0.21 24.04
2-3 2.50 2.50 29.18 0.35 29.53
3-4 3.50 3.50 37.21 0.49 37.70
4-5 4.50 4.50 45.06 0.64 45.70
5-6 5.50 5.50 52.73 0.78 53.51
6-7 6.50 6.50 60.26 0.92 61.18
7-8 7.50 7.50 67.64 1.06 68.70
8-9 8.50 8.50 74.88 1.20 76.08
9-10 9.50 9.50 82.01 1.34 83.35
10-11 10.50 10.50 89.02 1.48 90.50
11-12 11.50 11.50 95.91 1.62 97.53
12-13 12.50 12.50 102.72 1.77 104.49
13-14 13.50 13.50 109.43 1.91 111.34
14-15 14.50 14.50 116.05 2.05 118.10
15-16 15.50 15.50 122.59 2.19 124.78
16-17 16.50 16.50 129.04 2.33 131.37
17-18 17.50 17.50 135.44 2.47 137.91
18-19 18.50 18.50 141.75 2.61 144.36
19-20 19.50 19.50 148.01 2.75 150.76
20-21 20.50 20.50 154.21 2.90 157.11
21-22 21.50 21.50 160.34 3.04 163.38
22-23 22.50 22.50 166.42 3.18 169.60
23-24 23.50 23.50 172.46 3.32 175.78
24-25 24.50 24.50 179.45 3.46 182.91
25-26 25.50 25.50 186.43 3.60 190.03
26-27 26.50 26.50 193.43 3.74 197.17
27-28 27.50 27.50 200.42 3.88 204.30
28-29 28.50 28.50 207.40 4.03 211.43
29-30 29.50 29.50 214.40 4.17 218.57
30-31 30.50 30.50 221.39 4.31 225.70
31-32 31.50 31.50 228.37 4.45 232.82
32-33 32.50 32.50 235.37 4.59 239.96
33-34 33.50 33.50 242.36 4.73 247.09
34-35 34.50 34.50 249.34 4.87 254.21
35-36 35.50 35.50 256.34 5.01 261.35
36-37 36.50 36.50 263.33 5.16 268.49
37-38 37.50 37.50 270.31 5.30 275.61
38-39 38.50 38.50 277.31 5.44 282.75
39-40 39.50 39.50 284.30 5.58 289.88
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 (WEST-BENGAL)
MID-POINT
DISTANCE
LEAD LEAD/2 DRY MONSOON DRY MONSOON DRY MONSOON
(Km) (KM) SEASON SEASON SEASON SEASON SEASON SEASON
0 - 1 0.50 48.29 61.52 0.11 0.11 48.40 61.63
+ 1 - 2 1.50 60.41 73.64 0.33 0.33 60.74 73.97
+ 2 - 3 2.50 73.78 87.01 0.55 0.55 74.33 87.56
+ 3 - 4 3.50 85.07 98.30 0.77 0.77 85.84 99.07
+ 4 - 5 4.50 99.49 112.72 0.99 0.99 100.48 113.71
+ 5 - 6 5.50 113.54 126.77 1.21 1.21 114.75 127.98
+ 6 - 7 6.50 127.23 140.46 1.43 1.43 128.66 141.89
+ 7 - 8 7.50 130.67 144.98 1.65 1.65 132.32 146.63
+ 8 - 9 8.50 143.06 157.38 1.87 1.87 144.93 159.25
+ 9 - 10 9.50 155.20 169.51 2.09 2.09 157.29 171.60
+ 10 - 11 10.50 155.25 169.56 2.31 2.31 157.56 171.87
+ 11 - 12 11.50 166.36 180.67 2.52 2.52 168.88 183.19
+ 12 - 13 12.50 177.28 191.60 2.74 2.74 180.02 194.34
+ 13 - 14 13.50 188.05 202.36 2.96 2.96 191.01 205.32
+ 14 - 15 14.50 198.67 212.98 3.18 3.18 201.85 216.16
+ 15 - 16 15.50 209.13 223.44 3.40 3.40 212.53 226.84
+ 16 - 17 16.50 219.46 233.77 3.62 3.62 223.08 237.39
+ 17 - 18 17.50 229.66 243.97 3.84 3.84 233.50 247.81
+ 18 - 19 18.50 239.75 254.07 4.06 4.06 243.81 258.13
+ 19 - 20 19.50 249.72 264.04 4.28 4.28 254.00 268.32
+ 20 - 21 20.50 259.59 273.90 4.50 4.50 264.09 278.40
+ 21 - 22 21.50 269.36 283.67 4.72 4.72 274.08 288.39
+ 22 - 23 22.50 279.03 294.15 4.94 4.94 283.97 299.09
+ 23 - 24 23.50 288.60 303.73 5.16 5.16 293.76 308.89
+ 24 - 25 24.50 299.87 315.00 5.38 5.38 305.25 320.38
+ 25 - 26 25.50 311.13 326.26 5.60 5.60 316.73 331.86
+ 26 - 27 26.50 322.39 337.51 5.82 5.82 328.21 343.33
+ 27 - 28 27.50 333.66 348.78 6.04 6.04 339.70 354.82
+ 28 - 29 28.50 344.92 360.04 6.26 6.26 351.18 366.30
+29 - 30 29.50 356.18 371.3 6.48 6.48 362.66 377.78
+30 - 31 30.50 367.43 382.56 6.70 6.70 374.13 389.26
+31 - 32 31.50 378.70 393.83 6.92 6.92 385.62 400.75
+32 - 33 32.50 389.96 405.09 7.14 7.14 397.10 412.23
+33 - 34 33.50 401.22 416.34 7.36 7.36 408.58 423.70
+34 - 35 34.50 412.49 427.61 7.57 7.57 420.06 435.18
+35 - 36 35.50 423.75 438.87 7.79 7.79 431.54 446.66
+36 - 37 36.50 435.00 450.13 8.01 8.01 443.01 458.14
+37 - 38 37.50 446.27 461.4 8.23 8.23 454.50 469.63
+38 - 39 38.50 457.53 472.66 8.45 8.45 465.98 481.11
+39 - 40 39.50 468.79 483.91 8.67 8.67 477.46 492.58
TABLE - IIIA
ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 (WEST-BENGAL)
16.12.2014 (HSD=Rs.54.99/L)01.04.2013 (HSD=Rs.52.85/L)
REVISED RATE OF TRANSPORTATION OF SAND INCORPORATING ESCALATION
ESCALATION AS ON
16.12.2014 (HSD=Rs.54.99/L)
REVISED RATE AS ON
RATE IN Rs. / CuM
UPDATED BASE RATE AS ON
TABLE - IVA
MID-POINT
DISTANCE
LEAD LEAD/2 DRY MONSOON DRY MONSOON DRY MONSOON
(Km) (KM) SEASON SEASON SEASON SEASON SEASON SEASON
0 - 1 0.50 63.15 76.38 0.11 0.11 63.26 76.49
+ 1 - 2 1.50 75.27 88.50 0.33 0.33 75.60 88.83
+ 2 - 3 2.50 88.64 101.87 0.55 0.55 89.19 102.42
+ 3 - 4 3.50 99.93 113.16 0.77 0.77 100.70 113.93
+ 4 - 5 4.50 114.35 127.58 0.99 0.99 115.34 128.57
+ 5 - 6 5.50 128.40 141.63 1.21 1.21 129.61 142.84
+ 6 - 7 6.50 142.09 155.32 1.43 1.43 143.52 156.75
+ 7 - 8 7.50 145.53 159.84 1.65 1.65 147.18 161.49
+ 8 - 9 8.50 157.92 172.24 1.87 1.87 159.79 174.11
+ 9 - 10 9.50 170.06 184.37 2.09 2.09 172.15 186.46
+ 10 - 11 10.50 170.11 184.42 2.31 2.31 172.42 186.73
+ 11 - 12 11.50 181.22 195.53 2.52 2.52 183.74 198.05
+ 12 - 13 12.50 192.14 206.46 2.74 2.74 194.88 209.20
+ 13 - 14 13.50 202.91 217.22 2.96 2.96 205.87 220.18
+ 14 - 15 14.50 213.53 227.84 3.18 3.18 216.71 231.02
+ 15 - 16 15.50 223.99 238.30 3.40 3.40 227.39 241.70
+ 16 - 17 16.50 234.32 248.63 3.62 3.62 237.94 252.25
+ 17 - 18 17.50 244.52 258.83 3.84 3.84 248.36 262.67
+ 18 - 19 18.50 254.61 268.93 4.06 4.06 258.67 272.99
+ 19 - 20 19.50 264.58 278.90 4.28 4.28 268.86 283.18
+ 20 - 21 20.50 274.45 288.76 4.50 4.50 278.95 293.26
+ 21 - 22 21.50 284.22 298.53 4.72 4.72 288.94 303.25
+ 22 - 23 22.50 293.89 309.01 4.94 4.94 298.83 313.95
+ 23 - 24 23.50 303.46 318.59 5.16 5.16 308.62 323.75
+ 24 - 25 24.50 314.73 329.86 5.38 5.38 320.11 335.24
+ 25 - 26 25.50 325.99 341.12 5.60 5.60 331.59 346.72
+ 26 - 27 26.50 337.25 352.37 5.82 5.82 343.07 358.19
+ 27 - 28 27.50 348.52 363.64 6.04 6.04 354.56 369.68
+ 28 - 29 28.50 359.78 374.90 6.26 6.26 366.04 381.16
+29 - 30 29.50 371.04 386.16 6.48 6.48 377.52 392.64
01.04.2013 (HSD=Rs.52.85/L)
ESCALATION AS ON
16.12.2014 (HSD=Rs.54.99/L)
RATE IN Rs. / CuM
REVISED RATE AS ON
16.12.2014 (HSD=Rs.54.99/L)
UPDATED BASE RATE AS ON
REVISED RATE OF TRANSPORTATION OF SAND (WITH BRIDGE) INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D. PRICE ON 16.12.2014 (WEST-BENGAL)
TABLE - VA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 16.12.2014 AS ON 16.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.54.99/L) (HSD=Rs.54.99/L)
0 - 1 0.50 44.09 0.11 44.20
+ 1 - 2 1.50 56.21 0.33 56.54
+ 2 - 3 2.50 69.58 0.55 70.13
+ 3 - 4 3.50 80.87 0.77 81.64
+ 4 - 5 4.50 95.29 0.99 96.28
+ 5 - 6 5.50 108.33 1.21 109.54
+ 6 - 7 6.50 122.02 1.43 123.45
+ 7 - 8 7.50 125.46 1.65 127.11
+ 8 - 9 8.50 137.85 1.87 139.72
+ 9 - 10 9.50 149.99 2.09 152.08
+ 10 - 11 10.50 148.84 2.31 151.15
+ 11 - 12 11.50 159.95 2.52 162.47
+ 12 - 13 12.50 170.87 2.74 173.61
+ 13 - 14 13.50 181.64 2.96 184.60
+ 14 - 15 14.50 192.26 3.18 195.44
+ 15 - 16 15.50 202.72 3.40 206.12
+ 16 - 17 16.50 213.05 3.62 216.67
+ 17 - 18 17.50 223.25 3.84 227.09
+ 18 - 19 18.50 233.34 4.06 237.40
+ 19 - 20 19.50 243.31 4.28 247.59
+ 20 - 21 20.50 251.76 4.50 256.26
+ 21 - 22 21.50 261.53 4.72 266.25
+ 22 - 23 22.50 271.20 4.94 276.14
REVISED RATE OF TRANSPORTATION OF SAND INCORPORATING
ESCALATION ON ACCOUNT OF H.S.D. PRICE ON
16.12.2014 (WEST-BENGAL) FOR J.K. ROPEWAYS MECHANICAL DUMP
RATE IN Rs. / CuM
TABLE - VIA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 16.12.2014 AS ON 16.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.54.99/L) (HSD=Rs.54.99/L)
0 - 1 0.50 51.76 0.11 51.87
+ 1 - 2 1.50 63.88 0.33 64.21
+ 2 - 3 2.50 77.25 0.55 77.80
+ 3 - 4 3.50 88.54 0.77 89.31
+ 4 - 5 4.50 102.96 0.99 103.95
+ 5 - 6 5.50 117.01 1.21 118.22
+ 6 - 7 6.50 130.70 1.43 132.13
+ 7 - 8 7.50 134.14 1.65 135.79
+ 8 - 9 8.50 146.53 1.87 148.40
+ 9 - 10 9.50 158.67 2.09 160.76
+ 10 - 11 10.50 158.72 2.31 161.03
+ 11 - 12 11.50 169.83 2.52 172.35
+ 12 - 13 12.50 180.75 2.74 183.49
+ 13 - 14 13.50 191.52 2.96 194.48
+ 14 - 15 14.50 202.14 3.18 205.32
+ 15 - 16 15.50 212.60 3.40 216.00
+ 16 - 17 16.50 222.93 3.62 226.55
+ 17 - 18 17.50 233.13 3.84 236.97
+ 18 - 19 18.50 243.22 4.06 247.28
+ 19 - 20 19.50 253.19 4.28 257.47
+ 20 - 21 20.50 263.06 4.50 267.56
+ 21 - 22 21.50 272.83 4.72 277.55
+ 22 - 23 22.50 282.50 4.94 287.44
+ 23 - 24 23.50 292.07 5.16 297.23
+ 24 - 25 24.50 303.34 5.38 308.72
+ 25 - 26 25.50 314.60 5.60 320.20
+ 26 - 27 26.50 325.86 5.82 331.68
+ 27 - 28 27.50 337.13 6.04 343.17
+ 28 - 29 28.50 348.39 6.26 354.65
+29 - 30 29.50 359.65 6.48 366.13
ESCALATION ON ACCOUNT OF H.S.D. PRICE ON
RATE IN Rs. / CuM
16.12.2014 (WEST-BENGAL) FOR J.K. ROPEWAYS MANUAL DUMP
REVISED RATE OF TRANSPORTATION OF SAND INCORPORATING
10.04 0.14 10.18
Applicable for West Bengal
TABLE - VIIA
W.E.F. 16.12.2014
UPDATED SOR RATE IN Rs./Tonne
AS ON 01/04/2013(HSD=Rs52.85/L)
ESCALATION IN Rs./Tonne AS
ON 16.12.2014 (HSD=Rs.54.99/L)
REVISED RATE IN Rs./Tonne AS
ON 16.12.2014 (HSD=Rs.54.99/L)
REVISED RATE OF LOADING OF COAL
BY PAY LOADER
( INTO WAGONS / TIPPERS )
TABLE-VIIIA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 16.12.2014 AS ON 16.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.54.99/L) (HSD=Rs.54.99/L)
0 - 0.5 0.25 20.12 0.04 20.16
+0.5 -1 0.75 22.85 0.11 22.96
+ 1 - 2 1.50 28.02 0.21 28.23
+ 2 - 3 2.50 34.30 0.35 34.65
+ 3 - 4 3.50 43.75 0.49 44.24
+ 4 - 5 4.50 52.96 0.64 53.60
+ 5 - 6 5.50 61.99 0.78 62.77
+ 6 - 7 6.50 70.84 0.92 71.76
+ 7 - 8 7.50 79.50 1.06 80.56
+ 8 - 9 8.50 88.02 1.20 89.22
+ 9 - 10 9.50 96.39 1.34 97.73
RATE IN Rs. / Te.
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 (WEST-BENGAL) FROM Q-BED TO SURFACE.
TABLE-IXA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 16.12.2014 AS ON 16.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.54.99/L) (HSD=Rs.54.99/L)
0 - 0.5 0.25 22.42 0.04 22.46
+0.5 -1 0.75 24.74 0.11 24.85
+ 1 - 2 1.50 29.44 0.21 29.65
+ 2 - 3 2.50 35.03 0.35 35.38
+ 3 - 4 3.50 44.19 0.49 44.68
+ 4 - 5 4.50 53.10 0.64 53.74
+ 5 - 6 5.50 61.79 0.78 62.57
+ 6 - 7 6.50 70.28 0.92 71.20
+ 7 - 8 7.50 78.56 1.06 79.62
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 (WEST-BENGAL) FROM TIPPLER WITHOUT BUNKER
RATE IN Rs. / Te.
11.20 0.26 11.46
Applicable for West Bengal
BY EXCAVATOR
( INTO TIPPERS )
W.E.F. 16.12.2014
UPDATED SOR RATE IN Rs./Tonne AS
ON 01/04/2013(HSD=Rs52.85/L)
TABLE - XA
REVISED RATE OF LOADING OF COAL
ESCALATION IN Rs./Tonne AS
ON 16.12.2014 (HSD=Rs.54.99/L)
REVISED RATE IN Rs./Tonne AS ON
16.12.2014 (HSD=Rs.54.99/L)
TABLE-XIA
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 16.12.2014 AS ON 16.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.52.85/L) (HSD=Rs.54.99/L) (HSD=Rs.54.99/L)
+40 - 41 40.50 291.29 5.72 297.01
+41 - 42 41.50 298.28 5.86 304.14
+42 - 43 42.50 305.27 6.00 311.27
+43 - 44 43.50 312.26 6.14 318.40
+44 - 45 44.50 319.25 6.29 325.54
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 (WEST-BENGAL) FOR DISTANCE BEYOND 40 Km. IN WB
RATE IN Rs. / Te.
TABLE - IB
MID-POINT Updated Base Rate in Escalation in Revised Rate
LEAD DISTANCE Rs/Te as on Rs/Te as in Rs/Te
(KM) LEAD/2 01.04.2013 on 16.12.2014 as on 16.12.2014
(KM) (HSD=Rs50.88/L) (HSD=Rs.52.93/L) (HSD=Rs.52.93/L)
0-0.5 0.25 17.11 0.03 17.14
+0.5-1 0.75 19.37 0.10 19.47
+1-2 1.50 23.66 0.20 23.86
+2-3 2.50 28.89 0.34 29.23
+3-4 3.50 36.80 0.47 37.27
+4-5 4.50 44.52 0.61 45.13
+5-6 5.50 52.08 0.74 52.82
+6-7 6.50 59.47 0.88 60.35
+7-8 7.50 66.72 1.01 67.73
+8-9 8.50 73.84 1.15 74.99
+9-10 9.50 80.84 1.29 82.13
+10-11 10.50 87.73 1.42 89.15
+11-12 11.50 94.50 1.56 96.06
+12-13 12.50 101.17 1.69 102.86
+13-14 13.50 107.75 1.83 109.58
+14-15 14.50 114.24 1.96 116.20
+15-16 15.50 120.65 2.10 122.75
+16-17 16.50 126.99 2.23 129.22
+17-18 17.50 133.25 2.37 135.62
+18-19 18.50 139.44 2.50 141.94
+19-20 19.50 145.56 2.64 148.20
+20-21 20.50 151.63 2.77 154.40
+21-22 21.50 157.64 2.91 160.55
+22-23 22.50 163.60 3.04 166.64
+23-24 23.50 169.50 3.18 172.68
+24-25 24.50 176.37 3.31 179.68
+25-26 25.50 183.22 3.45 186.67
+26-27 26.50 190.09 3.59 193.68
+27-28 27.50 196.95 3.72 200.67
+28-29 28.50 203.82 3.86 207.68
+29-30 29.50 210.68 3.99 214.67
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 FOR MUGMA AREA (JHARKHAND STATE)
TABLE - IIB
MID-POINT Updated Base Rate in Escalation in Revised Rate
LEAD DISTANCE Rs/Te as on Rs/Te as in Rs/Te
(KM) LEAD/2 01.04.2013 on 16.12.2014 as on 16.12.2014
(KM) (HSD=Rs50.88/L) (HSD=Rs.52.93/L) (HSD=Rs.52.93/L)
+30-31 30.50 217.55 4.13 221.68
+31-32 31.50 224.40 4.26 228.66
+32-33 32.50 231.27 4.40 235.67
+33-34 33.50 238.13 4.53 242.66
+34-35 34.50 245.00 4.67 249.67
+35-36 35.50 251.86 4.80 256.66
+36-37 36.50 258.73 4.94 263.67
+37-38 37.50 265.58 5.07 270.65
+38-39 38.50 272.45 5.21 277.66
+39-40 39.50 279.31 5.34 284.65
ESCALATION ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 FOR MUGMA AREA (JHARKHAND)
REVISED RATE OF TRANSPORTATION OF COAL BEYOND "30 Km." DISTANCE INCORPORATING
TABLE - IIIB
MID-POINT
LEAD DISTANCE
(KM) LEAD/2 DRY MONSOON DRY MONSOON DRY MONSOON
(KM) SEASON SEASON SEASON SEASON SEASON SEASON
0-1 0.50 48.29 60.70 0.11 0.11 48.40 60.81
+1-2 1.50 60.23 71.30 0.32 0.32 60.55 71.62
+2-3 2.50 73.40 84.47 0.53 0.53 73.93 85.00
+3-4 3.50 84.49 95.57 0.74 0.74 85.23 96.31
+4-5 4.50 98.74 109.81 0.95 0.95 99.69 110.76
+5-6 5.50 112.59 123.67 1.16 1.16 113.75 124.83
+6-7 6.50 126.10 137.18 1.37 1.37 127.47 138.55
+7-8 7.50 129.35 142.76 1.58 1.58 130.93 144.34
+8-9 8.50 141.55 154.97 1.79 1.79 143.34 156.76
+9-10 9.50 153.49 166.91 2.00 2.00 155.49 168.91
+10-11 10.50 153.35 166.77 2.21 2.21 155.56 168.98
+11-12 11.50 164.27 177.69 2.42 2.42 166.69 180.11
+12-13 12.50 175.00 188.42 2.63 2.63 177.63 191.05
+13-14 13.50 185.58 199.00 2.84 2.84 188.42 201.84
+14-15 14.50 195.99 209.41 3.05 3.05 199.04 212.46
+15-16 15.50 206.26 219.68 3.26 3.26 209.52 222.94
+16-17 16.50 216.41 229.83 3.47 3.47 219.88 233.30
+17-18 17.50 226.41 239.83 3.68 3.68 230.09 243.51
+18-19 18.50 236.31 249.73 3.89 3.89 240.20 253.62
+19-20 19.50 246.08 259.50 4.10 4.10 250.18 263.60
+20-21 20.50 255.75 269.17 4.31 4.31 260.06 273.48
+21-22 21.50 265.33 278.75 4.52 4.52 269.85 283.27
+22-23 22.50 274.80 288.97 4.73 4.73 279.53 293.70
+23-24 23.50 284.19 298.36 4.94 4.94 289.13 303.30
+24-25 24.50 295.26 309.43 5.15 5.15 300.41 314.58
+25-26 25.50 306.33 320.50 5.36 5.36 311.69 325.86
+26-27 26.50 317.40 331.57 5.57 5.57 322.97 337.14
+27-28 27.50 328.46 342.63 5.78 5.78 334.24 348.41
+28-29 28.50 339.54 353.71 5.99 5.99 345.53 359.70
+29-30 29.50 350.61 364.78 6.20 6.20 356.81 370.98
+30-31 30.50 361.68 375.85 6.42 6.42 368.10 382.27
+31-32 31.50 372.75 386.92 6.63 6.63 379.38 393.55
+32-33 32.50 383.81 397.99 6.84 6.84 390.65 404.83
+33-34 33.50 394.89 409.06 7.05 7.05 401.94 416.11
+34-35 34.50 405.96 420.13 7.26 7.26 413.22 427.39
+35-36 35.50 417.03 431.20 7.47 7.47 424.50 438.67
+36-37 36.50 428.10 442.27 7.68 7.68 435.78 449.95
+37-38 37.50 439.17 453.34 7.89 7.89 447.06 461.23
+38-39 38.50 450.24 464.41 8.10 8.10 458.34 472.51
+39-40 39.50 461.31 475.48 8.31 8.31 469.62 483.79
REVISED RATE AS ON
16.12.2014 (HSD=Rs.52.93/L)
ESCALATION ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 FOR MUGMA AREA (JHARKHAND)
16.12.2014 (HSD=Rs.52.93/L)
UPDATED BASE RATE AS ON
01.04.2013 (HSD=Rs.50.88/L)
ESCALATION AS ON
RATE IN Rs. / Cu M.
REVISED RATE OF TRANSPORTATION OF SAND FROM BARAKAR RIVER INCORPORATING
TABLE - IVB
9.83 0.14 9.97
REVISED RATE OF LOADING OF COAL
BY PAY LOADER( INTO WAGONS / TIPPERS )
AS ON 16.12.2014
Applicable for Mugma Area (Jharkhand State)UPDATED BASE RATE IN Rs./Te. AS
ON 01/04/2013 (HSD=Rs.50.88/L)
ESCALATION IN Rs./Te. AS ON
16.12.2014 (HSD=Rs.52.93/L)
REVISED RATE IN Rs./Te. AS ON
16.12.2014 (HSD=Rs.52.93/L)
TABLE - VB
MID-POINT Updated Base Rate in Escalation in Revised Rate
LEAD DISTANCE Rs/Te as on Rs/Te as in Rs/Te
(KM) LEAD/2 01.04.2013 on 16.12.2014 as on 16.12.2014
(KM) (HSD=Rs50.88/L) (HSD=Rs.52.93/L) (HSD=Rs.52.93/L)
0-0.5 0.25 20.13 0.03 20.16
+0.5-1 0.75 22.78 0.10 22.88
+1-2 1.50 27.83 0.20 28.03
+2-3 2.50 33.97 0.34 34.31
+3-4 3.50 43.27 0.47 43.74
+4-5 4.50 52.35 0.61 52.96
+5-6 5.50 61.24 0.74 61.98
+6-7 6.50 69.93 0.88 70.81
+7-8 7.50 78.46 1.01 79.47
+8-9 8.50 86.83 1.15 87.98
+9-10 9.50 95.06 1.29 96.35
REVISED RATE OF TRANSPORTATION OF COAL (QUARRY-BED TO SURFACE) INCORPORATING
ESCALATION ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 FOR MUGMA AREA (JHARKHAND)
TABLE-VIB
MID-POINT UPDATED BASE RATE AS ON ESCALATION REVISED RATE
LEAD DISTANCE 01.04.2013 AS ON 16.12.2014 AS ON 16.12.2014
(Km) (LEAD/2) IN KM. (HSD=Rs.50.88/L) (HSD=Rs.52.93/L) (HSD=Rs.52.93/L)
0 - 0.5 0.25 22.44 0.03 22.47
+0.5 -1 0.75 24.69 0.10 24.79
+ 1 - 2 1.50 29.30 0.20 29.50
+ 2 - 3 2.50 34.75 0.34 35.09
+ 3 - 4 3.50 43.79 0.47 44.26
+ 4 - 5 4.50 52.58 0.61 53.19
+ 5 - 6 5.50 61.15 0.74 61.89
+ 6 - 7 6.50 69.50 0.88 70.38
+ 7 - 8 7.50 77.67 1.01 78.68
RATE IN Rs. / Te.
ON ACCOUNT OF H.S.D PRICE ON 16.12.2014 (MUGMA) FROM TIPPLER WITHOUT BUNKER
REVISED RATE OF TRANSPORTATION OF COAL INCORPORATING ESCALATION
10.97 0.25 11.22
UPDATED BASE RATE IN Rs./Tonne
AS ON 01/04/2013 (HSD=Rs50.88/L)
ESCALATION IN Rs./Tonne AS
ON 16.12.2014 (HSD=Rs.52.93/L)
REVISED RATE IN Rs./Tonne AS
ON 16.12.2014 (HSD=Rs.52.93/L)
BY EXCAVATOR
( INTO TIPPERS )
W.E.F. 16.12.2014
Applicable for Mugma Area
REVISED RATE OF LOADING OF COAL
TABLE - VIIB