15
CE 515 Railroad Engineering Operations of Railways “Transportation exists to conquer space and tim

CE 515 Railroad Engineering

Embed Size (px)

DESCRIPTION

CE 515 Railroad Engineering. Operations of Railways. “Transportation exists to conquer space and time -”. Safety. FRA responsible for safety Safety never deregulated All accidents reported Safety and Loss Control Department. Tracks. - PowerPoint PPT Presentation

Citation preview

Page 1: CE 515 Railroad Engineering

CE 515 Railroad Engineering

Operations of Railways

“Transportation exists to conquer space and time -”

Page 2: CE 515 Railroad Engineering

Safety

• FRA responsible for safety

• Safety never deregulated

• All accidents reported

• Safety and Loss Control Department

Page 3: CE 515 Railroad Engineering

Tracks

• Main tracks: governed by one or more methods of control.

Should not be occupied without permission or authority

• Other than main tracks: occupancy without authority, the

locomotive engineer should look for other movements,

usually max 20mph

Page 4: CE 515 Railroad Engineering

Speed

• Higher speed: improve capacity and productivity but

also risk and maintenance cost

• Separate speed according to the type of train

• Temporary Speed Restrictions (TSR) and Permanent

Speed Restrictions (PSR)

Page 5: CE 515 Railroad Engineering

Rail Traffic Control Systems

• Track Warrant Control (TWC)

• Direct Traffic Control (DTC)

• Automatic Block Signal (ABS)

• Centralized Traffic Control (CTC)

Page 6: CE 515 Railroad Engineering

Rail Traffic Control Systems

• TWC, DTC: Non-signalized systems

• Use radio communication and computers

• Rail Traffic Controller (RTC): order transferred

by radio and written by crew

Page 7: CE 515 Railroad Engineering

Automatic Block Signal (ABS)

• Series of consecutive blocks governed by block signals, cab signals, or both. Signals activated by a train moving through the block, or by certain conditions that affect the block use.

• Developed in 1872, Dr. William Robinson

• Divide “tracks” into blocks, only one train per block

• Directional operations, two or more tracks

• Designated current of traffic, low-density single tracks

Page 8: CE 515 Railroad Engineering

Automatic Block Signal (ABS)

• Track circuit• Fail-safe design• Length of block: equal to longest normal

stopping distance • “Two-block, three-indication”, “Three-block,

four-indication”• Remained ABS systems: operated by TWC

rules

Page 9: CE 515 Railroad Engineering

Automatic Block Signal (ABS)

http://www.youtube.com/watch?v=U8yGNKH2t3g

Page 10: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

• Track territories, double track sections: crossing

over is allowed.

• Rail Traffic Control Center: all track circuits

connected, controlled together

• Panel: showing position of each train

Page 11: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

http://mysite.du.edu/~jcalvert/railway/ctc.htm

Page 12: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

Page 13: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

• Authority to enter a CTC main track: by signal.

• Crew requests for permission by radio

• Opposing movements: not allowed, only following

train movements

• “Intermediate signals”: facilitate fleeting of trains

Page 14: CE 515 Railroad Engineering

Centralized Traffic Control (CTC)

• Single track: 70% of capacity of double track

with ABS

• Railways: shift to CTC: excess capacity

Page 15: CE 515 Railroad Engineering

Questions?