CEA /DSM Dapnia
Linear Collider and other HEP Accelerator R&D
O. Napoly
CEA-Saclay, DAPNIA
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 2
Contribution of French Labsto Major Accelerator Complex
LHC Quads
ATLAS CMS
CHECHIA
LHC Dipoles« The quest will wither away if we only pick the fruits off the tree planted in the last generation and don't nourish the tree that will feed the next generation » H.T.Shapiro, as quoted by F. Richard.
TTF Injector 1
CEA /DSM Dapnia
Linear Collider R&D:ILC, CLIC
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 4
FP6 : CARE-SRF Goals
WP5 : Electro Polishing (DAPNIA)
WP7 : RF Coupler (LAL*)
WP8 : Tuners (DAPNIA, IPNO)
WP10: Horizontal Integrated Test (DAPNIA*, IPNO, LAL)
WP11: Beam Diagnostics (DAPNIA)
WP8: TTFV coupler
WP9:ColdPiezo-Tuner
WP11: TTFCold BPM
WP5:EP Setup
WP10: RF test in CryHoLab
WP11: TTFHOM studies
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 5
4 year plan : 2004-2007
Manpower (2004 + 2005) 20.2 FTE
FP6 : CARE-SRF Resources
ParticipantDurable
Equipment (k€)
Consumable (k€)
Travel (k€)
Expected costs (k€)
Requested EU funding (k€)
CEA 0 845 40 2 623 565
CNRS Orsay 30 445 40 2 315 730
Staff + temporary DAPNIA IPN0 LAL Total
person·months
59.4+143.2
20+24 99+140
485
Evolution :
LoIs for a SCRF JRA and New Infrastructure in FP7
SCRF Test Area at Saclay will be moved and renovated
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 6
CryHoLab @ SUPRATECH
IPHI
SPIRAL2Injector
Vert. & Hor. SC Test Area
CryHoLab present location
moving to
Piezo Compensation
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 7
XFEL RF-Coupler Industrialisation
Goals :
Prototyping
Conditioning Studies
Technology Development
Industrialization Study
LAL 2006 2007
Manpower(person·years)
12 12
Equipment(k€)
900 220
Manpower 12 FTE (including CARE/SRF)
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 8
FP6 : EUROTeV Goals
WP2: Beam Delivery System (DAPNIA)
WP5: Diagnostics (LAL)
WP6: Beam Simulation (LAL)
WP7: Metrology and Stabilisation (LAPP*)
WP2+6:ILC 2 mrad IR
WP7: ILC final quad mock-up measurement
WP5: PLIC Laser Cavity for Compton Polarimetry
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 9
3 year plan : 2005-2007
Manpower (2005) 13.8 FTE
FP6 : EUROTeV Resources
Participant
Personnel(person·month
s)
Consumable (k€)
Travel (k€)
Expected costs (k€)
Requested EU funding (k€)
CEA 69 140 33 517 252
CNRS 607 664 164 3 582 864
Staff + temporary DAPNIA LAL LAPP Total
person·months 17.1 108.2 40.5 166
Evolution :
ATF2@KEK : participation in optics, simulation and stabilization
Compton scheme for the polarized positron source (KEK, INFN,..)
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 10
French Contribution to the
Additional Contributions :
Electronics for TTF machine protection
Cavity baking studies
Tuner Industrialization Study
ILC Communication
Total Resources in 2006 CEA CNRS Total
Equipment (k€) 217 1 194 1411
Personnel (FTE) 25.5 31.0 56.5
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 11
FP6 : CARE-PHIN Goals
WP4: RF-Gun (LAL*)
WP4: NEPAL experimental area will be renovated at LAL
WP4: CTF3 Drive Beam
Photo-Injector(prototype)
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 12
Staff + temporary LAL Total
person·months51.5 + 50.0
101.5
4 year plan : 2004-2007
Manpower (2004 + 2005) 4.2 FTE
ParticipantDurable
Equipment (k€)
Consumable (k€)
Travel (k€)
Expected costs (k€)
Requested EU funding (k€)
CNRS-LAL 250 410 25 2 115 755
FP6 : CARE-PHIN Resources
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 13
CTF3 Goals
Combiner Ring• LAPP : BPM electronics
Probe beam linac• LAL : RF-Gun• DAPNIA : 160 MeV linac and diagnostics
WP4: CTF3 complex
BPM analog
electronics
Probe beam linac design
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 14
Manpower (2005-2008) 5.3 FTE
Evolution :
Participation in CTF3 operation
LoI for CLIC developments JRA in FP7
CTF3 Resources
Resources2005 – 2008
CEA CNRS Total
Manpower(person·year)
18 3 21
Equipment
(k€)~1 300 210 1 510
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 15
PhD Thesis, on Linear Colliders
ILC-SC Cavity Sébastien Bousson 1997-2000
ILC-SCRF Hui Min Gassot 1998-2001
ILC-SC Cavity Melissa Delheusy 2003-2006
ILC-RF Coupler Hassen Jenhani 2003-2006
ILC-RF HOM Rita Paparella , with DESY 2003-2006
CEA /DSM Dapnia
Proton Linac R&D:LHC, -Facility
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 17
The IPHI Project (High Intensity Proton Injector)
The project involves 3 french laboratories (+ CERN as of 2002):
CEA/DAPNIA for the proton source, LEBT and RFQ
IN2P3/INPO-Orsay for the beam diagnostics (as of 1997)
IN2P3/LPSC-Grenoble for the 3 MeV beam dump (as of 2003)
RFQ Diagnostics Dump300 kWH+ ECR Source SILHI
95 keV, 120 mA
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 18
The IPHI Project over 12 years (1996-2008)
Resources1996 – 2008
CEA CNRSResearch
Ministry Total
Manpower(person·year)
~170 ~70 - 240
Equipment 6.0 M€ 4.2 M€ 2.0 M€ 12.2 M€
Goal: demonstrator for high intensity CW source and injector for future proton driver. As of 2002, 3 MeV injector for LINAC4.
Evolution :
End 2007, CW reliability tests will be done for EUROTRANS
In 2008, beam chopping tests (HIPPI) will be done at Saclay.
The RFQ and Diagnostics will then be transferred to CERN.
Manpower (1996-2008) 20 FTE
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 19
Negative H- Ions Source
FP5 Project : HP-NIS
DAPNIA 2002 2003 2004 2005 Total
Manpower(person·month)
9 12 21 24 67
Equipment(k€)
10 55 72 60 197
Goal : Increase the H- current produced by ECR sources
Evolution : LoI for a Light Ion Source JRA in FP7
Manpower (2002-2005) 1.4 FTE
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 20
FP6 : CARE-HIPPI Goals
WP2: Warm Linac Structures (LPSC*, DAPNIA)
WP3: Superconducting Linac Structures (DAPNIA*, IPNO)
WP5: Beam Dynamics (DAPNIA, LPSC)
Evolution :
WP4: Chopper beam tests on IPHI site in 2008
Exploitation of the RF test stand at Saclay (within SPL, FP7 ??)
WP2 : High power 700 MHz cavity
test stand
WP5: Beam code benchmarking in UNILAC
WP2: SCL studies
WP2:Spoke cavity
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 21
ParticipantDurable
Equipment (k€)
Consumable (k€)
Travel (k€)
Expected costs (k€)
Requested EU funding
(k€)
CEA 1 065 924 11 3 835 980
CNRS-IPNO 0 130 7 272 70
CNRS-LPSC 0 55 11 806 60
CNRS 0 185 18 1 078 130
Staff + temporary DAPNIA IPN0 LPSC Total
person·months
26.6+45.9
10.5+8.3
5.5+19.7
116.5
5 year plan : 2004-2008
Manpower (2004 + 2005) 4.9 FTE
FP6 : CARE-HIPPI Resources
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 22
PhD Thesis, on Proton Linacs
IPHI-RFQ Romuald Duperrier 1997-2000
P-Driver SCRF Jean-Luc Biarotte 1997-2000
IPHI-DTL Pierre-Emmanuel Bernaudin 1998-2002
IPHI-RFQ François Simoëns 1999-2002
IPHI-Instr Bruno Pottin 1999-2002
P-Driver SCRF Christophe Miélot 1999-2002
P-Driver SCRF Guillaume Olry 2000-2003
H- Source Karim Benmeziane 2001-2004
IPHI-BDcs Amhed Ben Ismail 2002-2005
HIPPI-SCRF Mehdi Souli 2003-2006
CEA /DSM Dapnia
Proton RingsLHC complex, -Facility
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 24
FP6 : CARE-NED Goals
Evolution :
Nb3Sn 15 T Dipole and Quadrupole prototypes, JRA in FP7
WP2: Crysotat for heat transfer
measurements(designed at
Saclay,built at Wroclaw
University)
Overall Coordination (DAPNIA*)
WP2: Thermal Studies and Quench Protection (DAPNIA)
WP3: Conductor Development (DAPNIA)
WP4: Insulation Development and Implementation (DAPNIA)
WP5: Magnet Design and Optimisation (DAPNIA)
WP5: 88 mm aperture dipole coil
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 25
Staff + temporary DAPNIA Total
person·months14.0 + 27.1
41.1
3 year plan : 2004-2006
Manpower (2004 + 2005) 1.7 FTE
ParticipantDurable
Equipment (k€)
Consumable (k€)
Travel (k€)
Expected costs (k€)
Requested EU funding (k€)
CEA-DAPNIA 0 95 8 645 100
FP6 : CARE-NED Resources
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 26
CEA : Nb3Sn Quadrupole program
Evolution :
2007: Nb3Sn 213 T/m Quadrupole test in 4 T solenoid
Winding process of one
pole
Goal : build a 1m long Nb3Sn quadrupole prototype with lattice LHC gradient and cold mass.
Nb3Sn cable
DAPNIA 2005 2006 2007 TotalManpower(person·years)
6.4 5.2 2.7 14.3
Equipment (k€) 143 88 - 231
This program started in 1995 on Nb3Sn conductor studies (two PhD thesis).The integrated effort is ~twice
Manpower (2005-2007) 5 FTE
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 27
PhD Thesis, on Proton Rings,High Field Magnets and Cryogenics
NED-IDI Alexandre Puiségur 2002-2005
Nb3Sn Frédéric Trillaud 2002-2005
NED-MDO Hélène Felice 2003-2006
Cryogenics Lahcène Benkheira 2003-2006
CollimatorsGuillaume Robert-Demolaize, with CERN
2004-2007
Cryogenics Hervé Allain 2005-2008
CEA /DSM Dapnia
Accelerator Physics and Design:
ILC , LHC, -Facility
Linear Collider (EUROTeV) and Proton Driver (CARE/HIPPI) studies already covered above
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 29
FP6 : EURISOL / Beta Beams
Goal : Beta Beam Facility Conceptual Design Report
WP12: Beta Beam Aspects
• IPNO : Low energy ion rings and fast acceleration
• DAPNIA: High energy ion decay ring
Evolution :
LoI for a Neutrino Facility Design Study or CNI in FP7
4 year plan : 2005-2008 2 FTE
Participant
Personnel(person·month
s)
Consumable (k€)
Travel (k€)
Expected costs (k€)
Requested EU funding (k€)
CEA-DAPNIA 84 20 40 860 192
CNRS-IPNO 12 ? ? 145 66.5
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 30
Linac4 / SPL and -Fact
Evolution : LINAC4: cf. decision about construction SPL : cf. PAF recommandations
Goals : SPL : Conceptual Design Report 2
LINAC4 : Technical Design Report
LPSC : Beam dynamics studies CARE/HIPPI
DAPNIA: linac design and optimization
Manpower(person·months)
2004 2005 Total
LPSC 12 18 30
DAPNIA 12.3 17.3 29.5
Manpower (2004 + 2005) 2.5 FTE
LPSC-DAPNIA : FFAG Studies for µ± acceleration 1 FTE + 1 PhD
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 31
PhD Thesis, on Accelerator Physics and Design
LHC Christophe Peaucelle 1998-2001
Nu-Fact Franck Lemuet , with CERN 2004-2007
Beta-Beams
Antoine Chancé 2004-2007
CEA /DSM Dapnia
LASER Plasma acceleration
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 33
Laser Plasma Acceleration
Courtesy of L. O. Silva/IST, © IEEE
CNRS Laboratories
17 years of research
Number of Researchers
involved today
Lab. Optique Appliquée
(LOA), Palaiseau4
Lab. Utilisation Lasers Intenses (LULI), Palaiseau
2
Lab. Leprince Ringuet
(IN2P3-LLR), Palaiseau
4
Lab. Physique des Gaz et Plasmas (LPGP), Orsay
5
Centre de Physique Théorique
(CPhT), Palaiseau2
170 MeV non-linear wake field acceleration (LOA,CARE/PHIN)
LOA - Palaiseau
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 34
Laser Plasma Acceleration
Courtesy of L. O. Silva/IST, © IEEE
Manpower
(pers·months)Expected Cost (k€)
LPGP 103 550.6
LOA 74.8 400
LLR 42.9 260
LAL 5.4 82.4
Total 226 1200
ELI : Extreme Light Infrastructure (FP7-CNI)coordinated by LOA, ~200 M€.Goal : new infrastructure dedicated to extreme laser intensities (PW), extremely short pulses and acceleration (> 10 GeV) studies.
Future Projects → GeV e-beam
EUROLEAP (FP6-NEST)coordinated by B. Cros (LPGP), 3 years, 2 M€, 11 EU labs.Goal : to build a laser-plasma accelerator to accelerate electrons to the GeV energy range in a plasma wave.
O. Napoly, R-ECFA Visit to FranceCEA /DSM Dapnia12 May 2006 35
Conclusions
Courtesy of L. O. Silva/IST, © IEEE
Accelerator R&D profits from the synergy with other applications: nuclear physics, neural imagery, hadrontherapy, nuclear energy, …
ex. ISEULT / EUROTeV
Re-enforcement from HEP physicists in the field of electron acceleration: LAL + LAPP ILC + CLIC, LLR LASER Plasma
European funding brought oxygen to the accelerator R&D, thanks to M. Spiro and R. Aleksan actions in 2003
My personal (politically incorrect) touch: Dream vs. Reality
Real World: lots of projects, many priorities, limited
resources
Dream World: unlimited resources, many projects, my priorities !