Cebu City Engineering 3-YEAR PROGRAM

Embed Size (px)

Citation preview

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    1/77

    DEPARTMENT OF ENGINEERING

    AND PUBLIC WORKSCEBU CITY

    THREE YEAR PROGRAM2 0 1 3 - 2 0 1 6

    P R E S E N T E D B Y :

    K E N N E T H C A R M E L I T A M . E N R I Q U E Z

    C I T Y E N G I N E E R

    1

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    2/77

    CEBU CITY MAP

    MOUNTAIN BARANGAYS = 31

    URBAN BARANGAYS = 49(COASTAL BARANGAYS = 17)

    TOTAL NUMBER OF

    BARANGAYS = 80

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    3/77

    CHALLENGES TO URBAN DEVELOPMENT

    A. ROAD INFRASTRUCTURE

    1. ROAD PAVEMENTS

    INCREASING NUMBER OF DILAPIDATED ROADS

    2. SIDEWALKSFOR THE PEDESTRIAN

    ABSENCE OR FILLED WITH VENDORS

    3. DRAINAGE SYSTEMS

    FULLY SILTED, NARROWED, ABSENCE, DISCONNECTED

    4. SEWERAGE SYSTEMS

    NO SEPARATE SEWER SYSTEM; COMBINED WITH DRAINAGE

    SYSTEM5. GARBAGE FACTOR

    FILLING UP OUR DRAINAGE SYSTEMS, ROADS AND

    SIDEWALKS

    6. UTILITIES

    INTERMITTENT EXCAVATION/DIGGINGS ACROSS THE ROADS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    4/77

    DESCRIPTION

    LENGTH (meters)

    GOOD FAIR BAD UPAVED/ DIRT TOTAL LENGTH OFROAD

    CITY ROAD

    ASPHALTED 43,986.47 103,437.24 1,525.16 148,948.87

    CONCRETED 2,765.55 4,805.14 - 7,570.69

    GRAVEL 82.88 4,514.23 553.50 5,150.61

    275.20 1,662.66 3,418.08 5,355.94

    NATIONAL ROAD - - -

    ASPHALTED 48,220.62 30,581.89 354.53 79,157.03

    CONCRETED - 807.74 - 807.74

    GRAVEL - 736.85 - 736.85

    294.17 48.65 342.82

    UNCATEGORIZED ROAD - - -

    ANAPOG - 10,970.96 - 2,005.15 12,976.11

    ASPHALTED 184,148.72 106,855.71 - 291,004.42

    CONCRETED 4,885.37 58,137.73 - 63,023.10

    GRAVEL 2,503.18 60,999.94 306,656.71 1,754.01 371,913.83

    - - -

    NO NAME 5,399.10 5,399.10

    TOTAL 287,162.15 383,510.08 317,955.73 3,759.16 992,387.11

    % 28.94% 38.65% 32.04% 0.38% 100%

    Urban Challenge 1: ROAD PAVEMENTS

    SUMMARY OF ROADS CONDITIONSAS PER GIS DATA (2006)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    5/77

    GOOD

    GOOD GOOD

    BAD

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    6/77

    GOOD

    GOOD

    FAIR

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    7/77

    FAIR

    BAD

    BAD

    BAD

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    8/77

    URBAN DEVELOPMENT CHALLENGE 2

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    9/77

    URBAN DEVELOPMENT CHALLENGE 2

    CONCRETE LINED

    CANALS

    CLOSED CONDUITS -

    ULVERTS

    OPEN CANALS

    ABSENCE OF

    SIDEWALKS

    URBAN DEVELOPMENT CHALLENGE 2

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    10/77

    URBAN DEVELOPMENT CHALLENGE 2

    CONCRETE LINED

    CANALS

    OBSTRUCTIONS IN THE

    SIDEWALKS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    11/77

    STRATEGIES TO ADDRESS THE

    CHALLENGES OF OUR

    NO. CHALLENGE CEBU CITY INITIATIVES

    1 Increasing

    dilapidated roads

    ROAD SAFETY AND COMFORT:

    Continued maintenance works to do patching works eitherby administration or by contract

    2 Unpaved roads of

    the mountain

    barangays

    IMPROVE CONNECTIVITY/MOBILITY:

    On-going road concreting with drainage system of mountain

    barangays to increase our connectivity from farm-to-market

    Opening of new roads

    ROAD SAFETY AND COMFORT:Addressed slope protection measures

    3 Utility diggings

    across the roads

    Enforcement of the Ordinance 2135 on Street Diggings

    4 No more walkways

    for the pedestrians

    ROAD SAFETY AND COMFORT:

    Implemented one-side vending in all sidewalks

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    12/77

    URBAN DEVELOPMENT CHALLENGE 3 & 4

    CONCRETE LINED

    CANALS

    CLOSED CONDUITS -

    CULVERTS

    OPEN CANALS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    13/77

    SUMMARY OF DRAINAGE CONDITIONS OF CITY ROADSAS PER DRAINAGE MASTERPLAN STUDY - YEAR 2005

    SUMMARY OF DRAINAGE INVENTORY ON MAJOR ROADS (NORTH DISTRICT)

    LENGTH (m) %

    TOTAL LENGTH OF MAJOR STREETS 118,221.00 100.00

    GOOD CONDITION 6,545.00 5.54 20.51

    SLIGHTLY SILTED 17,708.00 14.98

    MODERATELY SILTED 44,229.00 37.41 79.49

    HEAVILY SILTED 29,933.00 25.32

    UNDETERMINED 19,806.00 16.75

    SUMMARY OF DRAINAGE INVENTORY ON MAJOR ROADS (SOUTH DISTRICT)

    LENGTH %

    TOTAL LENGTH OF MAJOR STREETS 72,227.30 100.00

    GOOD CONDITION 2,249.00 3.11 15.58

    SLIGHTLY SILTED 9,005.70 12.47

    MODERATELY SILTED 32,942.40 45.61 84.42

    HEAVILY SILTED 23,515.50 32.56

    UNDETERMINED 4,514.70 6.25

    TOTAL LENGTH = 190,448.30 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    14/77

    URBAN DEVELOPMENT CHALLENGE 5

    CLOSED CONDUITS -

    CULVERTS

    OPEN CANALS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    15/77

    STRATEGIES TO ADDRESS THE

    CHALLENGES OF OUR

    NO. CHALLENGE CEBU CITY INITIATIVES

    1 Inadequate drainage system PROPOSED IMPROVEMENT OF

    DRAINAGE SYSTEMS

    = Php. 220,520,000.00

    IMPLEMENTED REHABILITATIONS

    2 Absence of drainage system PROPOSED NEW DRAINAGE

    LINES = Php.

    222,400,000.00

    IMPLEMENTED NEW LINES

    3 Fully silted drainage system &

    filled with garbage

    PROPOSED DESILTING

    = Php. 62,900,000.00

    CONTINUING DESILTING

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    16/77

    CHALLENGES TO URBAN DEVELOPMENT

    B. RIVERS AND CREEKS

    1. RIVERS AND CREEKS

    NARROWED WITH HOUSES, FILLEDWITH GARBAGE, HEAVY

    SEDIMENTATION

    2. GARBAGE FACTOR

    FILLING UP OUR RIVERS AND CREEKS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    17/77

    CEBU CITY MAP

    SHOWING THE

    COASTALBARANGAYS

    (COLORED PINK)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    18/77

    URBAN DEVELOPMENT CHALLENGE: 6

    CLOSED CONDUITS -

    CULVERTS

    OPEN CANALS

    CEBU CITY MAP

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    19/77

    1 BULACAO RIVER

    CATCHMENT AREA = 162.084 Ha.

    TOP ELEVATION = 600 meters

    BOTTOM ELEVATION = 0 meters

    DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006

    IDENTIFIED FREQUENTLY FLOODED AREA = 1.4 Ha.

    AFFECTED HOUSEHOLD = 2,306 households

    CURRENT SITUATION:

    NO DEFINED OUTLET BEFORE BUT WE HAVE

    IMPLEMENTED DREDGING & CHANNELING

    Estimated Drainage Improvement

    Php 23,600,000.00 (DREDGING, DRAINAGE

    IMPOVEMENT, & MINI DAMS)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    20/77

    2 TAGUNOL WATERWAY

    CATCHMENT AREA = 492.123 Ha.

    TOP ELEVATION = 200 meters

    BOTTOM ELEVATION = 0 meters

    DATA FROM THE DRAINAGE MASTERSTUDY PLAN

    STUDY 2006

    IDENTIFIED FREQUENTLY FLOODED AREA = 16.68 Ha. AFFECTED HOUSEHOLD = 1,620 households

    CURRENT SITUATION:

    NO DEFINED OUTLET

    ON-GOING DREDGING 4-7 WIDE

    HUNDREDS OF RESIDENTS ARE LIVING ON

    AND ALONG THE WATERWAY

    Estimated Drainage Improvement

    Php. 95,070,000.00

    (NEW DRAINAGE LINES, DRAINAGE

    IMPROVEMENTS, & CHANNEL

    IMPROVEMENTS)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    21/77

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    22/77

    3 KINALUMSAN RIVER

    CATCHMENT AREA = 703.199 Ha.

    TOP ELEVATION = 500 meters

    BOTTOM ELEVATION = 0 meters

    DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006

    IDENTIFIED FREQUENTLY FLOODED AREA = 3.73 Ha.

    AFFECTED HOUSEHOLD = 700 households

    CURRENT SITUATION:

    MASSIVE FLOODING @ SHADED

    HUNDREDS OF RESIDENTS AREA ALONG THE RIVER.

    ESTIMATED DRAINAGE IMPROVEMENT

    P 617,153,000.00 (CHANNEL IMPROVEMENT & DRAINAGE SYSTEM IMPROVEMENT)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    23/77

    4 GUADALUPE RIVER

    CATCHMENT AREA = 599.6148 Ha.

    TOP ELEVATION = 600 meters

    BOTTOM ELEVATION = 0 meter

    DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006

    IDENTIFIED FREQUENTLY FLOODED AREA = 0.43 Ha. AFFECTED HOUSEHOLD = 650 households

    CURRENT SITUATION:

    HEAVILY SILTED & FILL IN WITH GARBAGE

    PASSES THROUGH ESTABLISHMENTS

    ESTIMATED DRAINAGE IMPROVEMENT

    P 94,620,000.00 (MINI DAMS, CHANNEL

    IMPROVEMENT, & DRAINAGE SYSTEM

    IMPROVEMENT)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    24/77

    5 ESTERO PARI-AN

    CATCHMENT AREA = 149.222 Ha.

    TOP ELEVATION = 27 meters

    BOTTOM ELEVATION = 0 meters

    DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006

    IDENTIFIED FREQUENTLY FLOODED AREA = 2.55 Ha.

    AFFECTED HOUSEHOLD = 1,011 households

    CURRENT SITUATION:

    HEAVILY SILTED & FILL IN WITH GARBAGE

    PASSES THROUGH BY ESTABLISHMENTS

    ESTIMATED DRAINAGE IMPROVEMENT

    P 69,530,000.00

    (CHANNEL IMPROVEMENT & DRAINAGE SYSTEM

    IMPROVEMENT STRUCTURE ONLY)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    25/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    BINACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME

    2.0 meters

    2.0 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    26/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    BINACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME

    3.0 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    27/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    B

    INACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME

    3.0 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    28/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    B

    INACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME

    2.87 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    29/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    B

    INACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME

    2.95 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    30/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    B

    INACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME

    2.50 meters

    2.50 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    31/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    B

    INACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME

    7.0 meters

    7.0 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    32/77

    SAN ROQUE

    TINAGO

    STO. NINO

    AN

    PARIAN

    KAMAGAYAN

    COLONST.

    LEGASPIST.

    LANESST.

    LAPU

    -LAPU

    ST

    .

    V.GULLAS

    ST.

    M A B I N I S

    T .

    GEN.JU

    NQUERAST.

    V.SOTTOST.

    P.DEL

    ROS

    ARIO

    ST.

    R. PALMAST.

    A. BONIFACIO ST.

    MANALILIST

    .

    PLARIDEL

    ST

    .

    .

    ST

    .

    S.GOST.

    LEGAZPIEXT.

    M. LOGARTA

    ST.

    E. ABOIT

    IZST.

    .

    ZULUETA ST.

    PIER2ST.

    PIER3ST.

    C.CUIZON ST.

    A.JEREZAST.

    I BAR

    RAS

    T.

    V. GULLASEXT.

    P.GOMEZST.

    .

    .

    J. ZAMORA ST.

    F.URDANETAST.

    G.LA

    VIL

    LES

    ST.

    P.

    GULLASST

    .

    ISAGANI ST.

    A.VA

    LLE

    .

    SUDL

    ON

    ST

    .

    SIMOUN

    ST.

    CALERONGST.

    B

    INACAYAN

    ST

    .

    ZAMORAST

    .PLARIDEL

    EXT.

    F.ZA

    PAN

    TAS

    T.

    B A L L

    E S T E

    R O S

    S T .

    AST.

    D.

    JAKOSALEMST

    .

    P.

    BURGOS

    ST

    .

    D . J A K O S A L E M S T .

    NONAME

    NONAME

    NONAME

    ..

    OA

    VE

    .

    NONAME

    NONAM

    E

    NONAME

    NONAME8.8 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    33/77

    LAHUG RIVER / T. PADILLA CREEKRECOMMENDED WIDTH = 7M 13M

    6 LAHUG RIVER

    CATCHMENT AREA = 879.358 Ha.

    TOP ELEVATION = 600 meters

    BOTTOM ELEVATION = 0 meters

    DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006

    IDENTIFIED FREQUENTLY FLOODED AREA = 18.32 Ha. AFFECTED HOUSEHOLD = 3,383 households

    CURRENT SITUATION:

    MASSIVE FLOODING @ SHADED

    HUNDREDS OF RESIDENTS ARE LIVING ALONG THE

    RIVER.

    ESTIMATED DRAINAGE IMPROVEMENT

    P 684,409,300.00

    (CHANNEL IMPROVEMENT, BRIDGE, MINI DAMS, &

    DRAINAGE SYSTEM IMPROVEMENT)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    34/77

    6.55 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    35/77

    5.0 meters

    5.0 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    36/77

    3.2 meters

    5.79 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    37/77

    4.21 meters

    3.48 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    38/77

    2.54 meters

    5.1 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    39/77

    4.0 meters

    5.26 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    40/77

    6.24 meters

    6.37 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    41/77

    6.51 meters

    5.91 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    42/77

    4.98 meters

    5.15 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    43/77

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    44/77

    7 MAHIGA RIVER

    CATCHMENT AREA = 1239.154 Ha.

    TOP ELEVATION = 200 meters

    BOTTOM ELEVATION = 0 meters

    DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006

    IDENTIFIED FREQUENTLY FLOODED AREA = 6.21 Ha.

    AFFECTED HOUSEHOLD = 1,160 households

    CURRENT SITUATION:

    OUTLET IS NARROW @ 4meters

    HUNDREDS OF RESIDENTS LIVING AT THE RIVERS

    ESTIMATED DRAINAGE IMPROVEMENT

    P 762,336,000.00 (CHANNEL IMPROVEMENT, MINI DAMS, &

    DRAINAGE SYSTEM IMPROVEMENT)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    45/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1STAV

    E.

    VD

    .

    GEN. MAXILOMAVE.

    M.J.

    CUENCO

    AVE

    .

    SAV

    E.

    1STST

    .

    SMRD.

    F.UROT

    ST.

    J .C.DEVE

    YRAA

    VE.

    F .BATILLER

    ST.

    A.SOR

    IANO

    JR.AVE

    .

    CEBUNORTH

    RD.

    C.MIN

    AST.

    G.T

    UDTUDST.

    L

    .TUDTUDST.

    WEST ST

    .

    KAOSH

    IUNGDRIVE

    CAM

    OT E

    SR

    D.

    J.SENO ST

    .

    H.JUAQU

    INOST.

    ARCA

    ST.

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.AR

    CILLA

    ST.

    L E Y T E

    L O O P

    NOR

    TH6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAU

    LST.

    H.BO

    RGON

    IAST.

    B. BENE

    DICT

    OST

    .

    PANAY

    RD.

    ST.

    S. BORCESST.

    SANR

    OQUE

    ST.

    QUE

    ENCEM

    ETERYRD

    .

    . COLINAST.

    REALST.

    PH

    ST.

    LAHIN

    G-LAHIN

    GST

    .

    J .LIM

    BONG

    ST.

    MA-O

    VAL

    SANA

    NTON

    IOST

    .

    E. LABU

    CAY

    S.

    FROIL

    ANST

    .

    SR.SAN

    ROQU

    E ST.

    ST.

    M.BORGONIA

    ST.

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULEST.

    MAN

    DAUE

    REC

    LAMATIO

    NRD.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAS

    T3R

    DRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    UALH

    ELPST

    .

    ST.LUK

    EST.

    ST. GABRIEL

    ST.

    SANGU

    ILLER

    MOST.

    E

    LEYT

    ELOOP

    N O N A M E

    NONAM

    E

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    ONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAM

    E

    NO NAME

    MACTANST

    .

    QUE

    ZON

    BLV

    D.

    NONA

    ME

    NO

    NAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NO NAM

    E

    S.CAB

    AHUG

    ST.

    NO NA

    ME

    NONAME

    NONAME

    NO NAME

    NONAME

    NONA

    ME

    NONAME

    NO NAME

    BEFORE

    AFTER

    9.5 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    46/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1STA

    VE.

    VD

    .

    GEN. MAXILOMAVE.

    M.J.

    CUENCO

    AVE

    .

    ESAVE.

    1ST

    ST.

    SM RD.

    F.UROT

    ST.

    J.C.

    DEVEYRA

    AVE.

    F.BATIL

    LERS

    T.

    A.SORIA

    NOJR

    .AVE

    .

    CEBUNORTH

    RD.

    C.M

    INAST.

    G.T

    UDTUDST.

    L.TU

    DTUDST.

    WESTS

    T.

    KAOSH

    IUNGDRIVE

    CAM

    OTE

    SR

    D.

    J.SENO ST

    .

    H.JU

    AQUINOST.

    ARCA

    ST.

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.AR

    CILLA

    ST.

    L E Y T E

    L O O P

    NORTH6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAUL

    ST.

    H.BO

    RGON

    IAST.

    B.BENE

    DICT

    OST

    .

    PANAY

    RD.

    ST.

    S.BORCESST.

    SANR

    OQUE

    ST.

    QUEENCE

    METE

    RYRD.

    . COLINAST.

    REALST.

    EP

    HST.

    LAHIN

    G-LAH

    INGST

    .

    J .LIM

    BONG

    ST.

    MA-O

    VAL

    SANA

    NTON

    IOST

    .

    E. LABU

    CAY

    S.

    FROIL

    ANST

    .

    SR.SAN

    ROQU

    EST.

    ST.

    M.BORGONIA

    ST.

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULES

    T.

    MAN

    DAUE

    REC

    LAMATIO

    NRD.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAS

    T3R

    DRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    TUAL

    HELP

    ST.

    ST.LUK

    EST.

    ST. GABRIEL

    ST.

    SANGUIL

    LERMO

    ST.

    E

    LEYTE

    LOOP

    NONAME

    NONAM

    E

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    NONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAM

    E

    NO NAME

    MACTANST

    .

    QUEZON

    BLVD

    .

    NONA

    ME

    NONAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NO NAM

    E

    S.CAB

    AHUG

    ST.

    NONAM

    E

    NONAME

    NONAME

    NO NAME

    NONAME

    NONAME

    NONAME

    NO NAME

    BEFORE

    AFTER

    5.0 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    47/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1STA

    VE.

    VD

    .

    GEN. MAXILOMAVE.

    M.J.CUENCO

    AVE

    .

    .

    SAVE

    .

    1ST

    ST.

    SMRD.

    F.UROT

    ST.

    J.C.

    DEVEY

    RAAVE.

    F .BATIL

    LERS

    T.

    A.SORIA

    NOJR

    .AVE

    .

    CEBUNORTH

    RD.

    C.M

    INAST.

    G.T

    UDTUDST.

    L.T

    UDTUDST.

    WESTS

    T.

    KAOSH

    IUNGDRIVE

    CA M

    OT E

    S R

    D.

    J.SENO ST

    .

    H.JUAQUINOST.

    ARCA

    ST.

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.ARCILLA

    ST.

    L E Y T E

    L O O P

    NORTH

    6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAU

    LST.

    H.BO

    RGONIA

    ST.

    B .BENE

    DICT

    OST

    .

    PANAY

    RD.

    ST.

    S.BORCESST.

    SANR

    OQUE

    ST.

    QUEE

    NCE

    METE

    RYRD.

    . COLINAST.

    REALST.

    PH

    ST.

    LAHIN

    G-LAHIN

    GST

    .

    J .LIM

    BONG

    ST.

    A-O

    VAL

    SANA

    NTON

    IOST

    .

    E. LABUCAYS

    .

    FRO

    ILANST

    .

    SR.SAN

    ROQU

    EST.

    ST.

    M.BORGONIAST

    .

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULEST.

    MAN

    DAUE

    REC

    LAMATIO

    NRD.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAS

    T3R

    DRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    UALH

    ELPST

    .

    ST.L

    UKEST.

    ST. GABRI

    ELST

    .

    SANG

    UILLER

    MO ST.

    E

    LEYTE

    LOOP

    N O N A M E

    NONAM

    E

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    ONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAM

    E

    NO NAME

    MACTANST

    .

    QUE

    ZONBLVD

    .

    NONA

    ME

    NO

    NAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NO N

    AME

    S.CAB

    AHUG

    ST.

    NONAM

    E

    NONAME

    NONAME

    NO NAME

    NONAME

    NONAME

    NONAME

    NO NAME

    BEFORE AFTER

    10.57 meters

    3.56 meters

    1.85 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    48/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1S

    TAV

    E.

    VD.

    GEN. MAXILOMAVE.

    M.J.

    CUENCO

    AVE

    .

    SAV

    E.

    1STST

    .

    SM RD.

    F.UROT

    ST.

    J.C.DEVEY

    RAAVE

    .

    F .BATILLER

    ST.

    A.SORIA

    NOJR

    .AVE

    .

    CEBUNORTH

    RD.

    C.MIN

    AST.

    G.T

    UDTUDST.

    L.T

    UDTUDST.

    WEST ST

    .

    KAOSH

    IUNGDRIVE

    CAM

    OT E

    SR

    D.

    J.SENO ST

    .

    H.JUAQUINOST.

    A

    RCA

    ST

    .

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.AR

    CILLA

    ST.

    L E Y T E

    L O O P

    NOR

    TH6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAU

    LST.

    H.BO

    RGON

    IAST.

    B.BEN

    EDICTO

    ST.

    PANAY

    RD.

    ST.

    S. BORCESST.

    SANR

    OQUE

    ST.

    QUE

    ENCEM

    ETERYRD

    .

    . COLINAST.

    REALST.

    PH

    ST.

    LAHIN

    G-LAHIN

    GST

    .

    J .LIM

    BONG

    ST.

    MA-O

    VAL

    SANA

    NTON

    IOST

    .

    E. LABU

    CAY

    S.

    FROIL

    ANST

    .

    SR.SA

    NROQ

    UEST

    .

    ST.

    M.BORGONIA

    ST.

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULEST.

    MAN

    DAUE

    REC

    LAMATIONR

    D.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAS

    T3R

    DRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    UALH

    ELPST

    .

    ST.LUK

    EST.

    ST. GABRIEL

    ST.

    SANG

    UILLER

    MOST.

    E

    LEYTE

    LOOP

    N O N A M E

    NONAM

    E

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    ONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAM

    E

    NO NAME

    MACTANST

    .

    QUE

    ZON

    BLV

    D.

    NONA

    ME

    NO

    NAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NONAM

    E

    S.CAB

    AHUG

    ST.

    NONAM

    E

    NONAME

    NO

    NAME

    NO NAME

    NONAME

    NONA

    ME

    NONAME

    NO NAME

    BEFORE AFTER

    5.0 meters

    3.7 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    49/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1STA

    VE.

    VD

    .

    GEN. MAXILOMAVE.

    M.J.

    CUENCO

    AVE

    .

    SAVE

    .

    1STST.

    SM RD.

    F.UROT

    ST.

    J.C.

    DEVEY

    RAAVE.

    F.BATIL

    LERS

    T.

    A.SORIA

    NOJR

    .AVE

    .

    CEBUNORTH

    RD.

    C.M

    INAST.

    G.T

    UDTUDST.

    L.T

    UDTUDST.

    WESTS

    T.

    KAOSHIUNGDRIVE

    CAM

    OTE

    SR

    D.

    J.SENO ST

    .

    H.JUAQUINOST.

    ARCA

    ST

    .

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.AR

    CILLA

    ST.

    L E Y T E

    L O O P

    NORT

    H6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAU

    LST.

    H.BORG

    ONIAST.

    B.BENE

    DICTO

    ST.

    PANAY

    RD.

    ST.

    S.BORCESST.

    SANR

    OQUE

    ST.

    QUEE

    NCE

    METE

    RYRD.

    . COLINAST.

    REALST.

    PH

    ST.

    LAHIN

    G-LAH

    INGST

    .

    J .LIM

    BONG

    ST.

    A-O

    VAL

    SANA

    NTON

    IOST

    .

    E. LABU

    CAY

    S.

    FROIL

    ANST

    .

    SR.SAN

    ROQU

    EST.

    ST.

    M.BORGONIA

    ST.

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULEST.

    MAN

    DAUE REC

    LAMATIO

    NRD.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAST3R

    DRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    UALH

    ELPST

    .

    ST.LUK

    EST.

    ST. GABRIEL

    ST.

    SANG

    UILLERM

    O ST.

    E

    LEYTE

    LOO

    P

    NONAME

    NONAME

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    ONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAME

    NO NAME

    MACTANST

    .

    QUEZON

    BLVD

    .

    NONA

    ME

    NONAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NONAM

    E

    S.CAB

    AHUG

    ST.

    NONAM

    E

    NONAME

    NONAME

    NO NAME

    NONAME

    NONAME

    NONAME

    NO NAME

    BEFORE

    AFTER

    3.57 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    50/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1STA

    VE.

    VD.

    GEN. MAXILOMAVE.

    M.J.

    CUENCO

    AVE

    .

    SAVE

    .

    1STS

    T.

    SM RD.

    F.UROT

    ST.

    J. C.DEVE

    YRAAV

    E.

    F .BATIL

    LERS

    T.

    A.SOR

    IANO

    JR.AVE

    .

    CEBUNORTH

    RD.

    C.M

    INAST.

    G.T

    UDTUDST.

    L.T

    UDTUDST.

    WEST S

    T.

    KAOSH

    IUNGDRIVE

    C A M

    O T E

    S R

    D .

    J.SENO ST

    .

    H

    .JUAQUINOST.

    ARC

    AST

    .

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.AR

    CILLA

    ST.

    L EYT E

    L OOP

    NOR

    TH6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAU

    LST.

    H.BOR

    GONIA

    ST.

    B.BEN

    EDICT

    OST

    .

    PA

    NAY

    RD.

    ST.

    S. BORCESST.

    SANR

    OQUE

    ST.

    QUE

    ENCEM

    ETERY

    RD.

    . COLINAST.

    REALST.

    PHST

    .

    LAHIN

    G-LAH

    INGST

    .

    J .LIM

    BONG

    ST.

    -OVAL

    SANA

    NTON

    IOST

    .

    E. LABU

    CAY

    S.

    FROIL

    ANST

    .

    SR.SAN

    ROQU

    EST.

    ST.

    M.BORGONIA

    ST.

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULES

    T.

    MAN

    DAUE

    REC

    LAMATIO

    NRD.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAS

    T3RDRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    UALH

    ELPST

    .

    ST.LUK

    EST.

    ST. GABRIEL

    ST.

    SANG

    UILLERMO

    ST.

    E

    LEYTE

    LO

    OP

    NONAME

    NONAM

    E

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    ONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAM

    E

    NO NAME

    MACTANST

    .

    QUEZ

    ONBLVD

    .

    NONA

    ME

    NO

    NAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NONAM

    E

    S.CAB

    AHUG

    ST.

    NONA

    ME

    NONAME

    NONAME

    NO NAME

    NONAME

    NONA

    ME

    NONAME

    NO NAME23.76 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    51/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1STA

    VE.

    VD.

    GEN. MAXILOMAVE.

    M.J.

    CUENCO

    AVE

    .

    SAVE

    .

    1STS

    T.

    SM RD.

    F.UROT

    ST.

    J. C.DEVE

    YRAAV

    E.

    F .BATIL

    LERS

    T.

    A.SOR

    IANO

    JR.AVE

    .

    CEBUNORTH

    RD.

    C.M

    INAST.

    G.T

    UDTUDST.

    L.T

    UDTUDST.

    WEST S

    T.

    KAOSH

    IUNGDRIVE

    C A M

    O T E

    S R

    D .

    J.SENO ST

    .

    H

    .JUAQUINOST.

    ARC

    AST

    .

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.AR

    CILLA

    ST.

    L EYT E

    L OOP

    NOR

    TH6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAU

    LST.

    H.BOR

    GONIA

    ST.

    B.BEN

    EDICT

    OST

    .

    PANAY

    RD.

    ST.

    S. BORCESST.

    SANR

    OQUE

    ST.

    QUE

    ENCEM

    ETERY

    RD.

    . COLINAST.

    REALST.

    PHST

    .

    LAHIN

    G-LAH

    INGST

    .

    J .LIM

    BONG

    ST.

    -OVAL

    SANA

    NTON

    IOST

    .

    E. LABU

    CAY

    S.

    FROIL

    ANST

    .

    SR.SAN

    ROQU

    EST.

    ST.

    M.BORGONIA

    ST.

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULES

    T.

    MAN

    DAUE

    REC

    LAMATIO

    NRD.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAS

    T3RDRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    UALH

    ELPST

    .

    ST.LUK

    EST.

    ST. GABRIEL

    ST.

    SANG

    UILLERMO

    ST.

    E

    LEYTE

    LO

    OP

    NONAME

    NONAM

    E

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    ONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAM

    E

    NO NAME

    MACTANST

    .

    QUEZ

    ONBLVD

    .

    NONA

    ME

    NO

    NAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NONAM

    E

    S.CAB

    AHUG

    ST.

    NONA

    ME

    NONAME

    NONAME

    NO NAME

    NONAME

    NONA

    ME

    NONAME

    NO NAME

    44.75 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    52/77

    MABOLO PROPER

    CEBU PORT CENTER

    CARRETA

    1STA

    VE.

    VD.

    GEN. MAXILOMAVE.

    M.J.

    CUENCO

    AVE

    .

    SAVE

    .

    1STS

    T.

    SM RD.

    F.UROT

    ST.

    J. C

    .DEVE

    YRAAV

    E.

    F .BATIL

    LERS

    T.

    A.SOR

    IANO

    JR.AVE

    .

    CEBUNORTH

    RD.

    C.M

    INAST.

    G.T

    UDTUDST.

    L.T

    UDTUDST.

    WEST S

    T.

    KAOSH

    IUNGDRIVE

    C A M

    O T E

    S R

    D .

    J.SENO ST

    .

    H

    .JUAQUINOST.

    ARC

    AST

    .

    EAST

    RD.

    C.BOR

    CESS

    T.

    DUTYFREERD.

    F.AR

    CILLA

    ST.

    L EYT E

    L OOP

    NOR

    TH6THRD

    .

    C.TU

    DTUD

    M.BO

    RCES

    ST.

    WEST1

    RD.

    ST.JUD

    EST.

    ST.PAU

    LST.

    H.BORG

    ONIAST.

    B.BEN

    EDICT

    OST

    .

    PANAY

    RD.

    ST.

    S. BORCESST.

    SANR

    OQUE

    ST.

    QUE

    ENCEM

    ETE

    RYRD.

    . COLINAST.

    REALST.

    PHST

    .

    LAHIN

    G-LAH

    INGST

    .

    J .LIM

    BONG

    ST.

    -OVAL

    SANA

    NTON

    IOST

    .

    E. LABU

    CAY

    S.

    FROIL

    ANST

    .

    SR.SAN

    ROQU

    EST.

    ST.

    M

    .BORGONIA

    ST.

    ST. JUDETHADDEUSST.

    VIRG

    INOF

    RULES

    T.

    MAN

    DAUE

    REC

    LAMATIO

    NRD.

    F.MINAST.

    ELGUSTO

    DRIVE

    FAITH

    FULST.

    OURL

    ADYO

    FREM

    EDYS

    T.

    EAS

    T3RDRD.

    SR.STO

    .NINO

    ST.

    V.COLIN

    AST.

    UALH

    ELPST

    .

    ST.LUK

    EST.

    ST. GABRIEL

    ST.

    SANG

    UILLER

    MOST.

    E

    LEYTE

    LO

    OP

    NONAME

    NONAM

    E

    NO

    NONAM

    E

    NONAM

    E

    NONAME

    ONAME

    NO NAME

    NONAME

    NO

    NAME

    NONAM

    E

    NO NAME

    MACTANST

    .

    QUEZ

    ONBLVD

    .

    NONA

    ME

    NO

    NAME

    LEYTELO

    OP

    AYALARD.

    NONAM

    E

    NONAM

    E

    S.CAB

    AHUG

    ST.

    NONA

    ME

    NONAME

    NONAME

    NO NAME

    NONAME

    NONA

    ME

    NONAME

    NO NAME

    50.0 meters

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    53/77

    Coastal Barangays affected with relatively longer period of inundation

    are Inayawan (Bulacao River), Duljo Fatima (Kinalumsan River), andTinago (Lahug River); Depth of floodwater is about 0.4m 1.2m highand stays as long as 8hours to 72 hours in these areas.

    Other coastal barangays are inundated with about 0.3m to 3m for about0.5 hours to 2.5 hours. Higher Barangays (next to the coastal barangays) experience flooding

    as high as 0.4m to 1m for about 0.5 hours to 1 hour. Only in Kamagayan(within the Estero Parian catchment area) that the duration of floodingreaches 24 hours.

    Further higher barangays like Labangon and Calamba experienceflooding of 0.7m to 1m for about 1 hour (within Kinalumsan andGuadalupe Catchment areas)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    54/77

    Flooding in Cebu City is characterized by the topographic

    response of a short duration heavy downpour of rain. This is thegeneral characteristic of rainfall in Cebu city wherein the rainfalldepth can reach as high as 50mm in a day. Extreme conditions

    such as those resulting from typhoon generated rainfall may go ashigh as 200mm. The condition can happen between 5-10 timesa year, thus, areas that are considered flood prone willexperience that frequency every year.

    Several barangays especially those who are closer to the Mactanchannel and falls within the 0-10m above mean sea level gridelevation experience severe flooding.

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    55/77

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    56/77

    THREE YEAR PROGRAM

    2013 - 2016

    A. ROADS

    THREE YEAR PROGRAM (2013 2016)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    57/77

    THREE - YEAR PROGRAM (2013 2016)

    I. URBAN BARANGAY ROADS (MAIN ROADS)

    PROPOSED FOR CONCRETING ALREADY

    THREE YEAR PROGRAM 2014 2015 2016

    TOTAL

    LENGTH

    (from GIS)

    51,615.24

    UNPAVED/

    DILAPIDATED

    ASP. ROAD

    PAVEMENTS

    25,313.008,718.67

    meters

    8,359.17

    meters

    8,235.17

    meters

    COST FORROAD

    CONCRETING

    585,804,212.00 197,319,747.17 98,678,731.67 189,805,733.17

    THREE - YEAR PROGRAM (2013 2016)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    58/77

    THREE YEAR PROGRAM (2013 2016)

    II. URBAN BARANGAY ROADS (MAIN ROADS)

    PROPOSED FOR ASPHALTING

    THREE YEAR PROGRAM 2013 -

    20162014 2015 2016

    TOTAL

    LENGTH104,962.40

    UNPAVED/DIL

    APIDATED

    ROAD

    PAVEMENTES

    49,164.00 4276 29077 15811

    COST FOR

    ROAD

    CONCRETING

    231,995,089.47 86,452,108.00 97,816,766.05 47,726,215.42

    THREE - YEAR PROGRAM (2013 2016)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    59/77

    OG ( 0 3 0 6)

    III. MOUNTAIN BARANGAY ROADS

    (TOTALLY CONNECTING MA IN ROADS)

    PROPOSED FOR CONCRETINGTHREE YEAR PROGRAM

    2013 - 20162014 2015 2016

    TOTALLENGTH

    333,274.70

    UNPAVED

    (MAIN MT.

    BRGY.ROADS)

    76,200.00 23,166.67 25,266.67 27,766.67

    COST FOR

    ROAD

    CONCRETING

    742,647,182.00 225,989,250.67 245,674,765.67 270,983,165.67

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    60/77

    NO PROJECT LOCATION LENGTH WIDTH AMOUNTFOR THE YEAR 20141 BRGY. MABINI TO SITIO TAGAYTAY

    PANAS CONSOLACION

    2,500 6.0 3,781,800.00

    2 BRGY. PARIL TO SITIO TUBLE

    COMPOSTELA CITY

    1,000 6.0 1,512,720.00

    SUBTOTAL 5,294,520FOR THE YEAR 20151 BRGY. PARIL TO HILLTOP TAG-UBE TO

    COMPOSTELA CITY

    3,000 6.0 4,538,160

    2 BRGY. LUSARAN TO TAG-UBE TO SITIO

    MAHAGNAO DANAO CITY

    4,000 6.0 6,050,880

    SUBTOTAL 10,589,040FOR THE YEAR 20161 BRGY SIN-SIN TO LOTOPAN ROAD 4,000 6.0 6,050,880

    SUBTOTAL 6,050,880GRAND TOTAL 21,934,440

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    61/77

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    62/77

    THREE - YEAR PROGRAM (2013 2016)

    DRAINAGE SYSTEM

    THREE YEAR

    PROGRAM 2013 - 20162012 2013 2014 2015 2016

    PROPOSED

    IMPROVEMENT OF

    DRAINAGESYSTEMS

    220,520,000.00 88,450,000.00 - 30,000,000.00 17,000,000.00 85,070,000.00

    PROPOSED NEW

    DRAINAGE LINES222,400,000.00 46,000,000.00 66,400,000.00 27,600,000.00 24,000,000.00 58,400,000.00

    PROPOSED

    DESILTING62,900,000.00 58,700,000.00 - 4,200,000.00 - -

    TOTAL 505,820,000.00 193,150,000.00 66,400,000.00 61,800,000.00 41,000,000.00 143,470,000.00

    THREE - YEAR PROGRAM (2013 2016)

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    63/77

    THREE YEAR PROGRAM (2013 2016)STRATEGIES TO ADDRESS THE

    CHALLENGES OF OUR

    NO. CHALLENGE CEBU CITY INITIATIVES

    1 Narrowed rivers and

    heavilysedimentation

    On-going dredging and clearing of houses in the

    riversPROPOSED :

    CHANNEL IMPROVEMENTS = Php.

    1,884,853,215.00

    REPLACEMENT OF CROSS PIPES TO

    BRIDGE =Php. 12,800,000.00

    2 Absence of Outletsto the sea

    On-going dredging of the channels to the sea(funded through the Disaster Risk Reduction

    Management Council of Cebu City)

    3 Tidal fluctuation

    causing backflow

    Proposed to construct pumping stations at the

    mouth of the river

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    64/77

    THREE - YEAR PROGRAM (2013 2016)

    RIVERS AND CREEKS

    THREE YEARPROGRAM 2013 - 2016

    2012 2013 2014 2015 2016

    CHANNEL

    IMPROVEMEN

    T

    1,884,853,215.00 16,170,000.00 18,900,000.00 735,772,800.00 1,098,575,415.00 15,435,000.00

    BRIDGE 12,800,000.00 - 12,800,000.00 - - -

    TOTAL1,897,653,215.00 16,170,000.00 31,700,000.00 735,772,800.00 1,098,575,415.00 15,435,000.00

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    65/77

    STATUS OF HEAVY EQUIPMENT

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    66/77

    STATUS OF HEAVY EQUIPMENT

    NO EQUIPMENT NAME NO OF AVAILABLE

    EQUIPMENT AS PER

    RECORD 2013

    FUNCTIONAL W/

    INTERMITTENT

    REPAIR (AS PER

    RECORD YEARE 2013)

    UNDER REPAIR

    FOR 2 WEEKS AS

    PER RECORDS

    1 SELF LOADING NONE

    2 H2O TANKER 6 WHEEELS NONE

    3 TRUCK CRANE 2 1 1

    4 BACK HOE 1 1

    5 PAY LOADER 4 3 1

    6 ROAD GRADER 4 2 2

    7 ROAD ROLLER 7 7

    8 MINI DUMP TRUCK 4 3 1

    9 MINI LOADER 1 1

    10 DUMP TRUCKS 12 10 2

    11 TRANSIT MIXER NONE

    TOTAL 36 27 8

    HEAVY EQUIPMENT REQUEST

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    67/77

    HEAVY EQUIPMENT REQUEST

    NO EQUIPMENT NAME NO OF AVAILABLE

    EQUIPMENT AS PER

    RECORD 2013

    FUNCTIONAL W/

    INTERMITTENT

    REPAIR (AS PER

    RECORD YEAR2013)

    UNDER REPAIR FOR

    2 WEEKS AS PER

    RECORDS

    1 SELF LOADING 3,000,000 1 3,000,000

    2 H2O TANKER 6 WHEEELS 2,500,000 1 2,500,000

    3 TRUCK CRANE 2,500,000 2 5,000,000

    4 BACK HOE 14,000,000 1 14,000,000

    5 PAY LOADER 13,500,000 1 13,500,000

    6 ROAD GRADER 12,000,000 1 12,000,000

    7 ROAD ROLLER 4,800,000 1 4,800,000

    8 DUMP TRUCK 6,500,000 8 52,000,000

    9 TRANSIT MIXER 5,000,000 2 10,000,000

    10 MINI DUMP TRUCKS 3,500,000 3 10,500,000

    11 MINI LOADER 1,500,000 2 3,000,000

    TOTAL 23 130,000,000

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    68/77

    PROPOSED PROJECTS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    69/77

    1. BONBON HOSPITAL

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    70/77

    PROPOSED PROJECTS

    2. CCMC EXPANSION

    PROPOSED PROJECTS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    71/77

    3. CONVENTION CENTER IN TAPTAP

    PROPOSED PROJECTS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    72/77

    4. CITY HALL IN THE MOUNTAIN BARANGAY

    PROPOSED PROJECTS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    73/77

    5. DEPOT IN THE MOUNTAIN BARANGAY IN TAPTAP

    DEPOT

    PROPOSED PROJECTS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    74/77

    6. CITY HALL IN SRP

    PROPOSED BUILDING FOR

    DEPW, DPS, & GSO

    PROPOSED PROJECTS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    75/77

    PROPOSED PROJECTS

    ON THIS SITE, SHALL

    RISE THE DEPW,

    DPS, & GSO

    BUILDING

    PROPOSED PROJECTS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    76/77

    7. REHABILITATION OF HEALTH CENTERS

  • 7/28/2019 Cebu City Engineering 3-YEAR PROGRAM

    77/77