DEPARTMENT OF ENGINEERING
AND PUBLIC WORKSCEBU CITY
THREE YEAR PROGRAM2 0 1 3 - 2 0 1 6
P R E S E N T E D B Y :
K E N N E T H C A R M E L I T A M . E N R I Q U E Z
C I T Y E N G I N E E R
1
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
2/77
CEBU CITY MAP
MOUNTAIN BARANGAYS = 31
URBAN BARANGAYS = 49(COASTAL BARANGAYS = 17)
TOTAL NUMBER OF
BARANGAYS = 80
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
3/77
CHALLENGES TO URBAN DEVELOPMENT
A. ROAD INFRASTRUCTURE
1. ROAD PAVEMENTS
INCREASING NUMBER OF DILAPIDATED ROADS
2. SIDEWALKSFOR THE PEDESTRIAN
ABSENCE OR FILLED WITH VENDORS
3. DRAINAGE SYSTEMS
FULLY SILTED, NARROWED, ABSENCE, DISCONNECTED
4. SEWERAGE SYSTEMS
NO SEPARATE SEWER SYSTEM; COMBINED WITH DRAINAGE
SYSTEM5. GARBAGE FACTOR
FILLING UP OUR DRAINAGE SYSTEMS, ROADS AND
SIDEWALKS
6. UTILITIES
INTERMITTENT EXCAVATION/DIGGINGS ACROSS THE ROADS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
4/77
DESCRIPTION
LENGTH (meters)
GOOD FAIR BAD UPAVED/ DIRT TOTAL LENGTH OFROAD
CITY ROAD
ASPHALTED 43,986.47 103,437.24 1,525.16 148,948.87
CONCRETED 2,765.55 4,805.14 - 7,570.69
GRAVEL 82.88 4,514.23 553.50 5,150.61
275.20 1,662.66 3,418.08 5,355.94
NATIONAL ROAD - - -
ASPHALTED 48,220.62 30,581.89 354.53 79,157.03
CONCRETED - 807.74 - 807.74
GRAVEL - 736.85 - 736.85
294.17 48.65 342.82
UNCATEGORIZED ROAD - - -
ANAPOG - 10,970.96 - 2,005.15 12,976.11
ASPHALTED 184,148.72 106,855.71 - 291,004.42
CONCRETED 4,885.37 58,137.73 - 63,023.10
GRAVEL 2,503.18 60,999.94 306,656.71 1,754.01 371,913.83
- - -
NO NAME 5,399.10 5,399.10
TOTAL 287,162.15 383,510.08 317,955.73 3,759.16 992,387.11
% 28.94% 38.65% 32.04% 0.38% 100%
Urban Challenge 1: ROAD PAVEMENTS
SUMMARY OF ROADS CONDITIONSAS PER GIS DATA (2006)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
5/77
GOOD
GOOD GOOD
BAD
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
6/77
GOOD
GOOD
FAIR
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
7/77
FAIR
BAD
BAD
BAD
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
8/77
URBAN DEVELOPMENT CHALLENGE 2
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
9/77
URBAN DEVELOPMENT CHALLENGE 2
CONCRETE LINED
CANALS
CLOSED CONDUITS -
ULVERTS
OPEN CANALS
ABSENCE OF
SIDEWALKS
URBAN DEVELOPMENT CHALLENGE 2
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
10/77
URBAN DEVELOPMENT CHALLENGE 2
CONCRETE LINED
CANALS
OBSTRUCTIONS IN THE
SIDEWALKS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
11/77
STRATEGIES TO ADDRESS THE
CHALLENGES OF OUR
NO. CHALLENGE CEBU CITY INITIATIVES
1 Increasing
dilapidated roads
ROAD SAFETY AND COMFORT:
Continued maintenance works to do patching works eitherby administration or by contract
2 Unpaved roads of
the mountain
barangays
IMPROVE CONNECTIVITY/MOBILITY:
On-going road concreting with drainage system of mountain
barangays to increase our connectivity from farm-to-market
Opening of new roads
ROAD SAFETY AND COMFORT:Addressed slope protection measures
3 Utility diggings
across the roads
Enforcement of the Ordinance 2135 on Street Diggings
4 No more walkways
for the pedestrians
ROAD SAFETY AND COMFORT:
Implemented one-side vending in all sidewalks
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
12/77
URBAN DEVELOPMENT CHALLENGE 3 & 4
CONCRETE LINED
CANALS
CLOSED CONDUITS -
CULVERTS
OPEN CANALS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
13/77
SUMMARY OF DRAINAGE CONDITIONS OF CITY ROADSAS PER DRAINAGE MASTERPLAN STUDY - YEAR 2005
SUMMARY OF DRAINAGE INVENTORY ON MAJOR ROADS (NORTH DISTRICT)
LENGTH (m) %
TOTAL LENGTH OF MAJOR STREETS 118,221.00 100.00
GOOD CONDITION 6,545.00 5.54 20.51
SLIGHTLY SILTED 17,708.00 14.98
MODERATELY SILTED 44,229.00 37.41 79.49
HEAVILY SILTED 29,933.00 25.32
UNDETERMINED 19,806.00 16.75
SUMMARY OF DRAINAGE INVENTORY ON MAJOR ROADS (SOUTH DISTRICT)
LENGTH %
TOTAL LENGTH OF MAJOR STREETS 72,227.30 100.00
GOOD CONDITION 2,249.00 3.11 15.58
SLIGHTLY SILTED 9,005.70 12.47
MODERATELY SILTED 32,942.40 45.61 84.42
HEAVILY SILTED 23,515.50 32.56
UNDETERMINED 4,514.70 6.25
TOTAL LENGTH = 190,448.30 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
14/77
URBAN DEVELOPMENT CHALLENGE 5
CLOSED CONDUITS -
CULVERTS
OPEN CANALS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
15/77
STRATEGIES TO ADDRESS THE
CHALLENGES OF OUR
NO. CHALLENGE CEBU CITY INITIATIVES
1 Inadequate drainage system PROPOSED IMPROVEMENT OF
DRAINAGE SYSTEMS
= Php. 220,520,000.00
IMPLEMENTED REHABILITATIONS
2 Absence of drainage system PROPOSED NEW DRAINAGE
LINES = Php.
222,400,000.00
IMPLEMENTED NEW LINES
3 Fully silted drainage system &
filled with garbage
PROPOSED DESILTING
= Php. 62,900,000.00
CONTINUING DESILTING
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
16/77
CHALLENGES TO URBAN DEVELOPMENT
B. RIVERS AND CREEKS
1. RIVERS AND CREEKS
NARROWED WITH HOUSES, FILLEDWITH GARBAGE, HEAVY
SEDIMENTATION
2. GARBAGE FACTOR
FILLING UP OUR RIVERS AND CREEKS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
17/77
CEBU CITY MAP
SHOWING THE
COASTALBARANGAYS
(COLORED PINK)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
18/77
URBAN DEVELOPMENT CHALLENGE: 6
CLOSED CONDUITS -
CULVERTS
OPEN CANALS
CEBU CITY MAP
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
19/77
1 BULACAO RIVER
CATCHMENT AREA = 162.084 Ha.
TOP ELEVATION = 600 meters
BOTTOM ELEVATION = 0 meters
DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006
IDENTIFIED FREQUENTLY FLOODED AREA = 1.4 Ha.
AFFECTED HOUSEHOLD = 2,306 households
CURRENT SITUATION:
NO DEFINED OUTLET BEFORE BUT WE HAVE
IMPLEMENTED DREDGING & CHANNELING
Estimated Drainage Improvement
Php 23,600,000.00 (DREDGING, DRAINAGE
IMPOVEMENT, & MINI DAMS)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
20/77
2 TAGUNOL WATERWAY
CATCHMENT AREA = 492.123 Ha.
TOP ELEVATION = 200 meters
BOTTOM ELEVATION = 0 meters
DATA FROM THE DRAINAGE MASTERSTUDY PLAN
STUDY 2006
IDENTIFIED FREQUENTLY FLOODED AREA = 16.68 Ha. AFFECTED HOUSEHOLD = 1,620 households
CURRENT SITUATION:
NO DEFINED OUTLET
ON-GOING DREDGING 4-7 WIDE
HUNDREDS OF RESIDENTS ARE LIVING ON
AND ALONG THE WATERWAY
Estimated Drainage Improvement
Php. 95,070,000.00
(NEW DRAINAGE LINES, DRAINAGE
IMPROVEMENTS, & CHANNEL
IMPROVEMENTS)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
21/77
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
22/77
3 KINALUMSAN RIVER
CATCHMENT AREA = 703.199 Ha.
TOP ELEVATION = 500 meters
BOTTOM ELEVATION = 0 meters
DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006
IDENTIFIED FREQUENTLY FLOODED AREA = 3.73 Ha.
AFFECTED HOUSEHOLD = 700 households
CURRENT SITUATION:
MASSIVE FLOODING @ SHADED
HUNDREDS OF RESIDENTS AREA ALONG THE RIVER.
ESTIMATED DRAINAGE IMPROVEMENT
P 617,153,000.00 (CHANNEL IMPROVEMENT & DRAINAGE SYSTEM IMPROVEMENT)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
23/77
4 GUADALUPE RIVER
CATCHMENT AREA = 599.6148 Ha.
TOP ELEVATION = 600 meters
BOTTOM ELEVATION = 0 meter
DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006
IDENTIFIED FREQUENTLY FLOODED AREA = 0.43 Ha. AFFECTED HOUSEHOLD = 650 households
CURRENT SITUATION:
HEAVILY SILTED & FILL IN WITH GARBAGE
PASSES THROUGH ESTABLISHMENTS
ESTIMATED DRAINAGE IMPROVEMENT
P 94,620,000.00 (MINI DAMS, CHANNEL
IMPROVEMENT, & DRAINAGE SYSTEM
IMPROVEMENT)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
24/77
5 ESTERO PARI-AN
CATCHMENT AREA = 149.222 Ha.
TOP ELEVATION = 27 meters
BOTTOM ELEVATION = 0 meters
DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006
IDENTIFIED FREQUENTLY FLOODED AREA = 2.55 Ha.
AFFECTED HOUSEHOLD = 1,011 households
CURRENT SITUATION:
HEAVILY SILTED & FILL IN WITH GARBAGE
PASSES THROUGH BY ESTABLISHMENTS
ESTIMATED DRAINAGE IMPROVEMENT
P 69,530,000.00
(CHANNEL IMPROVEMENT & DRAINAGE SYSTEM
IMPROVEMENT STRUCTURE ONLY)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
25/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
BINACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME
2.0 meters
2.0 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
26/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
BINACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME
3.0 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
27/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
B
INACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME
3.0 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
28/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
B
INACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME
2.87 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
29/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
B
INACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME
2.95 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
30/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
B
INACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME
2.50 meters
2.50 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
31/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
B
INACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME
7.0 meters
7.0 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
32/77
SAN ROQUE
TINAGO
STO. NINO
AN
PARIAN
KAMAGAYAN
COLONST.
LEGASPIST.
LANESST.
LAPU
-LAPU
ST
.
V.GULLAS
ST.
M A B I N I S
T .
GEN.JU
NQUERAST.
V.SOTTOST.
P.DEL
ROS
ARIO
ST.
R. PALMAST.
A. BONIFACIO ST.
MANALILIST
.
PLARIDEL
ST
.
.
ST
.
S.GOST.
LEGAZPIEXT.
M. LOGARTA
ST.
E. ABOIT
IZST.
.
ZULUETA ST.
PIER2ST.
PIER3ST.
C.CUIZON ST.
A.JEREZAST.
I BAR
RAS
T.
V. GULLASEXT.
P.GOMEZST.
.
.
J. ZAMORA ST.
F.URDANETAST.
G.LA
VIL
LES
ST.
P.
GULLASST
.
ISAGANI ST.
A.VA
LLE
.
SUDL
ON
ST
.
SIMOUN
ST.
CALERONGST.
B
INACAYAN
ST
.
ZAMORAST
.PLARIDEL
EXT.
F.ZA
PAN
TAS
T.
B A L L
E S T E
R O S
S T .
AST.
D.
JAKOSALEMST
.
P.
BURGOS
ST
.
D . J A K O S A L E M S T .
NONAME
NONAME
NONAME
..
OA
VE
.
NONAME
NONAM
E
NONAME
NONAME8.8 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
33/77
LAHUG RIVER / T. PADILLA CREEKRECOMMENDED WIDTH = 7M 13M
6 LAHUG RIVER
CATCHMENT AREA = 879.358 Ha.
TOP ELEVATION = 600 meters
BOTTOM ELEVATION = 0 meters
DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006
IDENTIFIED FREQUENTLY FLOODED AREA = 18.32 Ha. AFFECTED HOUSEHOLD = 3,383 households
CURRENT SITUATION:
MASSIVE FLOODING @ SHADED
HUNDREDS OF RESIDENTS ARE LIVING ALONG THE
RIVER.
ESTIMATED DRAINAGE IMPROVEMENT
P 684,409,300.00
(CHANNEL IMPROVEMENT, BRIDGE, MINI DAMS, &
DRAINAGE SYSTEM IMPROVEMENT)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
34/77
6.55 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
35/77
5.0 meters
5.0 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
36/77
3.2 meters
5.79 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
37/77
4.21 meters
3.48 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
38/77
2.54 meters
5.1 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
39/77
4.0 meters
5.26 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
40/77
6.24 meters
6.37 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
41/77
6.51 meters
5.91 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
42/77
4.98 meters
5.15 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
43/77
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
44/77
7 MAHIGA RIVER
CATCHMENT AREA = 1239.154 Ha.
TOP ELEVATION = 200 meters
BOTTOM ELEVATION = 0 meters
DATA FROM THE DRAINAGE MASTERSTUDY PLAN STUDY 2006
IDENTIFIED FREQUENTLY FLOODED AREA = 6.21 Ha.
AFFECTED HOUSEHOLD = 1,160 households
CURRENT SITUATION:
OUTLET IS NARROW @ 4meters
HUNDREDS OF RESIDENTS LIVING AT THE RIVERS
ESTIMATED DRAINAGE IMPROVEMENT
P 762,336,000.00 (CHANNEL IMPROVEMENT, MINI DAMS, &
DRAINAGE SYSTEM IMPROVEMENT)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
45/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1STAV
E.
VD
.
GEN. MAXILOMAVE.
M.J.
CUENCO
AVE
.
SAV
E.
1STST
.
SMRD.
F.UROT
ST.
J .C.DEVE
YRAA
VE.
F .BATILLER
ST.
A.SOR
IANO
JR.AVE
.
CEBUNORTH
RD.
C.MIN
AST.
G.T
UDTUDST.
L
.TUDTUDST.
WEST ST
.
KAOSH
IUNGDRIVE
CAM
OT E
SR
D.
J.SENO ST
.
H.JUAQU
INOST.
ARCA
ST.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.AR
CILLA
ST.
L E Y T E
L O O P
NOR
TH6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAU
LST.
H.BO
RGON
IAST.
B. BENE
DICT
OST
.
PANAY
RD.
ST.
S. BORCESST.
SANR
OQUE
ST.
QUE
ENCEM
ETERYRD
.
. COLINAST.
REALST.
PH
ST.
LAHIN
G-LAHIN
GST
.
J .LIM
BONG
ST.
MA-O
VAL
SANA
NTON
IOST
.
E. LABU
CAY
S.
FROIL
ANST
.
SR.SAN
ROQU
E ST.
ST.
M.BORGONIA
ST.
ST. JUDETHADDEUSST.
VIRG
INOF
RULEST.
MAN
DAUE
REC
LAMATIO
NRD.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAS
T3R
DRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
UALH
ELPST
.
ST.LUK
EST.
ST. GABRIEL
ST.
SANGU
ILLER
MOST.
E
LEYT
ELOOP
N O N A M E
NONAM
E
NO
NONAM
E
NONAM
E
NONAME
ONAME
NO NAME
NONAME
NO
NAME
NONAM
E
NO NAME
MACTANST
.
QUE
ZON
BLV
D.
NONA
ME
NO
NAME
LEYTELO
OP
AYALARD.
NONAM
E
NO NAM
E
S.CAB
AHUG
ST.
NO NA
ME
NONAME
NONAME
NO NAME
NONAME
NONA
ME
NONAME
NO NAME
BEFORE
AFTER
9.5 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
46/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1STA
VE.
VD
.
GEN. MAXILOMAVE.
M.J.
CUENCO
AVE
.
ESAVE.
1ST
ST.
SM RD.
F.UROT
ST.
J.C.
DEVEYRA
AVE.
F.BATIL
LERS
T.
A.SORIA
NOJR
.AVE
.
CEBUNORTH
RD.
C.M
INAST.
G.T
UDTUDST.
L.TU
DTUDST.
WESTS
T.
KAOSH
IUNGDRIVE
CAM
OTE
SR
D.
J.SENO ST
.
H.JU
AQUINOST.
ARCA
ST.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.AR
CILLA
ST.
L E Y T E
L O O P
NORTH6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAUL
ST.
H.BO
RGON
IAST.
B.BENE
DICT
OST
.
PANAY
RD.
ST.
S.BORCESST.
SANR
OQUE
ST.
QUEENCE
METE
RYRD.
. COLINAST.
REALST.
EP
HST.
LAHIN
G-LAH
INGST
.
J .LIM
BONG
ST.
MA-O
VAL
SANA
NTON
IOST
.
E. LABU
CAY
S.
FROIL
ANST
.
SR.SAN
ROQU
EST.
ST.
M.BORGONIA
ST.
ST. JUDETHADDEUSST.
VIRG
INOF
RULES
T.
MAN
DAUE
REC
LAMATIO
NRD.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAS
T3R
DRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
TUAL
HELP
ST.
ST.LUK
EST.
ST. GABRIEL
ST.
SANGUIL
LERMO
ST.
E
LEYTE
LOOP
NONAME
NONAM
E
NO
NONAM
E
NONAM
E
NONAME
NONAME
NO NAME
NONAME
NO
NAME
NONAM
E
NO NAME
MACTANST
.
QUEZON
BLVD
.
NONA
ME
NONAME
LEYTELO
OP
AYALARD.
NONAM
E
NO NAM
E
S.CAB
AHUG
ST.
NONAM
E
NONAME
NONAME
NO NAME
NONAME
NONAME
NONAME
NO NAME
BEFORE
AFTER
5.0 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
47/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1STA
VE.
VD
.
GEN. MAXILOMAVE.
M.J.CUENCO
AVE
.
.
SAVE
.
1ST
ST.
SMRD.
F.UROT
ST.
J.C.
DEVEY
RAAVE.
F .BATIL
LERS
T.
A.SORIA
NOJR
.AVE
.
CEBUNORTH
RD.
C.M
INAST.
G.T
UDTUDST.
L.T
UDTUDST.
WESTS
T.
KAOSH
IUNGDRIVE
CA M
OT E
S R
D.
J.SENO ST
.
H.JUAQUINOST.
ARCA
ST.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.ARCILLA
ST.
L E Y T E
L O O P
NORTH
6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAU
LST.
H.BO
RGONIA
ST.
B .BENE
DICT
OST
.
PANAY
RD.
ST.
S.BORCESST.
SANR
OQUE
ST.
QUEE
NCE
METE
RYRD.
. COLINAST.
REALST.
PH
ST.
LAHIN
G-LAHIN
GST
.
J .LIM
BONG
ST.
A-O
VAL
SANA
NTON
IOST
.
E. LABUCAYS
.
FRO
ILANST
.
SR.SAN
ROQU
EST.
ST.
M.BORGONIAST
.
ST. JUDETHADDEUSST.
VIRG
INOF
RULEST.
MAN
DAUE
REC
LAMATIO
NRD.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAS
T3R
DRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
UALH
ELPST
.
ST.L
UKEST.
ST. GABRI
ELST
.
SANG
UILLER
MO ST.
E
LEYTE
LOOP
N O N A M E
NONAM
E
NO
NONAM
E
NONAM
E
NONAME
ONAME
NO NAME
NONAME
NO
NAME
NONAM
E
NO NAME
MACTANST
.
QUE
ZONBLVD
.
NONA
ME
NO
NAME
LEYTELO
OP
AYALARD.
NONAM
E
NO N
AME
S.CAB
AHUG
ST.
NONAM
E
NONAME
NONAME
NO NAME
NONAME
NONAME
NONAME
NO NAME
BEFORE AFTER
10.57 meters
3.56 meters
1.85 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
48/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1S
TAV
E.
VD.
GEN. MAXILOMAVE.
M.J.
CUENCO
AVE
.
SAV
E.
1STST
.
SM RD.
F.UROT
ST.
J.C.DEVEY
RAAVE
.
F .BATILLER
ST.
A.SORIA
NOJR
.AVE
.
CEBUNORTH
RD.
C.MIN
AST.
G.T
UDTUDST.
L.T
UDTUDST.
WEST ST
.
KAOSH
IUNGDRIVE
CAM
OT E
SR
D.
J.SENO ST
.
H.JUAQUINOST.
A
RCA
ST
.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.AR
CILLA
ST.
L E Y T E
L O O P
NOR
TH6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAU
LST.
H.BO
RGON
IAST.
B.BEN
EDICTO
ST.
PANAY
RD.
ST.
S. BORCESST.
SANR
OQUE
ST.
QUE
ENCEM
ETERYRD
.
. COLINAST.
REALST.
PH
ST.
LAHIN
G-LAHIN
GST
.
J .LIM
BONG
ST.
MA-O
VAL
SANA
NTON
IOST
.
E. LABU
CAY
S.
FROIL
ANST
.
SR.SA
NROQ
UEST
.
ST.
M.BORGONIA
ST.
ST. JUDETHADDEUSST.
VIRG
INOF
RULEST.
MAN
DAUE
REC
LAMATIONR
D.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAS
T3R
DRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
UALH
ELPST
.
ST.LUK
EST.
ST. GABRIEL
ST.
SANG
UILLER
MOST.
E
LEYTE
LOOP
N O N A M E
NONAM
E
NO
NONAM
E
NONAM
E
NONAME
ONAME
NO NAME
NONAME
NO
NAME
NONAM
E
NO NAME
MACTANST
.
QUE
ZON
BLV
D.
NONA
ME
NO
NAME
LEYTELO
OP
AYALARD.
NONAM
E
NONAM
E
S.CAB
AHUG
ST.
NONAM
E
NONAME
NO
NAME
NO NAME
NONAME
NONA
ME
NONAME
NO NAME
BEFORE AFTER
5.0 meters
3.7 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
49/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1STA
VE.
VD
.
GEN. MAXILOMAVE.
M.J.
CUENCO
AVE
.
SAVE
.
1STST.
SM RD.
F.UROT
ST.
J.C.
DEVEY
RAAVE.
F.BATIL
LERS
T.
A.SORIA
NOJR
.AVE
.
CEBUNORTH
RD.
C.M
INAST.
G.T
UDTUDST.
L.T
UDTUDST.
WESTS
T.
KAOSHIUNGDRIVE
CAM
OTE
SR
D.
J.SENO ST
.
H.JUAQUINOST.
ARCA
ST
.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.AR
CILLA
ST.
L E Y T E
L O O P
NORT
H6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAU
LST.
H.BORG
ONIAST.
B.BENE
DICTO
ST.
PANAY
RD.
ST.
S.BORCESST.
SANR
OQUE
ST.
QUEE
NCE
METE
RYRD.
. COLINAST.
REALST.
PH
ST.
LAHIN
G-LAH
INGST
.
J .LIM
BONG
ST.
A-O
VAL
SANA
NTON
IOST
.
E. LABU
CAY
S.
FROIL
ANST
.
SR.SAN
ROQU
EST.
ST.
M.BORGONIA
ST.
ST. JUDETHADDEUSST.
VIRG
INOF
RULEST.
MAN
DAUE REC
LAMATIO
NRD.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAST3R
DRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
UALH
ELPST
.
ST.LUK
EST.
ST. GABRIEL
ST.
SANG
UILLERM
O ST.
E
LEYTE
LOO
P
NONAME
NONAME
NO
NONAM
E
NONAM
E
NONAME
ONAME
NO NAME
NONAME
NO
NAME
NONAME
NO NAME
MACTANST
.
QUEZON
BLVD
.
NONA
ME
NONAME
LEYTELO
OP
AYALARD.
NONAM
E
NONAM
E
S.CAB
AHUG
ST.
NONAM
E
NONAME
NONAME
NO NAME
NONAME
NONAME
NONAME
NO NAME
BEFORE
AFTER
3.57 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
50/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1STA
VE.
VD.
GEN. MAXILOMAVE.
M.J.
CUENCO
AVE
.
SAVE
.
1STS
T.
SM RD.
F.UROT
ST.
J. C.DEVE
YRAAV
E.
F .BATIL
LERS
T.
A.SOR
IANO
JR.AVE
.
CEBUNORTH
RD.
C.M
INAST.
G.T
UDTUDST.
L.T
UDTUDST.
WEST S
T.
KAOSH
IUNGDRIVE
C A M
O T E
S R
D .
J.SENO ST
.
H
.JUAQUINOST.
ARC
AST
.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.AR
CILLA
ST.
L EYT E
L OOP
NOR
TH6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAU
LST.
H.BOR
GONIA
ST.
B.BEN
EDICT
OST
.
PA
NAY
RD.
ST.
S. BORCESST.
SANR
OQUE
ST.
QUE
ENCEM
ETERY
RD.
. COLINAST.
REALST.
PHST
.
LAHIN
G-LAH
INGST
.
J .LIM
BONG
ST.
-OVAL
SANA
NTON
IOST
.
E. LABU
CAY
S.
FROIL
ANST
.
SR.SAN
ROQU
EST.
ST.
M.BORGONIA
ST.
ST. JUDETHADDEUSST.
VIRG
INOF
RULES
T.
MAN
DAUE
REC
LAMATIO
NRD.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAS
T3RDRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
UALH
ELPST
.
ST.LUK
EST.
ST. GABRIEL
ST.
SANG
UILLERMO
ST.
E
LEYTE
LO
OP
NONAME
NONAM
E
NO
NONAM
E
NONAM
E
NONAME
ONAME
NO NAME
NONAME
NO
NAME
NONAM
E
NO NAME
MACTANST
.
QUEZ
ONBLVD
.
NONA
ME
NO
NAME
LEYTELO
OP
AYALARD.
NONAM
E
NONAM
E
S.CAB
AHUG
ST.
NONA
ME
NONAME
NONAME
NO NAME
NONAME
NONA
ME
NONAME
NO NAME23.76 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
51/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1STA
VE.
VD.
GEN. MAXILOMAVE.
M.J.
CUENCO
AVE
.
SAVE
.
1STS
T.
SM RD.
F.UROT
ST.
J. C.DEVE
YRAAV
E.
F .BATIL
LERS
T.
A.SOR
IANO
JR.AVE
.
CEBUNORTH
RD.
C.M
INAST.
G.T
UDTUDST.
L.T
UDTUDST.
WEST S
T.
KAOSH
IUNGDRIVE
C A M
O T E
S R
D .
J.SENO ST
.
H
.JUAQUINOST.
ARC
AST
.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.AR
CILLA
ST.
L EYT E
L OOP
NOR
TH6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAU
LST.
H.BOR
GONIA
ST.
B.BEN
EDICT
OST
.
PANAY
RD.
ST.
S. BORCESST.
SANR
OQUE
ST.
QUE
ENCEM
ETERY
RD.
. COLINAST.
REALST.
PHST
.
LAHIN
G-LAH
INGST
.
J .LIM
BONG
ST.
-OVAL
SANA
NTON
IOST
.
E. LABU
CAY
S.
FROIL
ANST
.
SR.SAN
ROQU
EST.
ST.
M.BORGONIA
ST.
ST. JUDETHADDEUSST.
VIRG
INOF
RULES
T.
MAN
DAUE
REC
LAMATIO
NRD.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAS
T3RDRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
UALH
ELPST
.
ST.LUK
EST.
ST. GABRIEL
ST.
SANG
UILLERMO
ST.
E
LEYTE
LO
OP
NONAME
NONAM
E
NO
NONAM
E
NONAM
E
NONAME
ONAME
NO NAME
NONAME
NO
NAME
NONAM
E
NO NAME
MACTANST
.
QUEZ
ONBLVD
.
NONA
ME
NO
NAME
LEYTELO
OP
AYALARD.
NONAM
E
NONAM
E
S.CAB
AHUG
ST.
NONA
ME
NONAME
NONAME
NO NAME
NONAME
NONA
ME
NONAME
NO NAME
44.75 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
52/77
MABOLO PROPER
CEBU PORT CENTER
CARRETA
1STA
VE.
VD.
GEN. MAXILOMAVE.
M.J.
CUENCO
AVE
.
SAVE
.
1STS
T.
SM RD.
F.UROT
ST.
J. C
.DEVE
YRAAV
E.
F .BATIL
LERS
T.
A.SOR
IANO
JR.AVE
.
CEBUNORTH
RD.
C.M
INAST.
G.T
UDTUDST.
L.T
UDTUDST.
WEST S
T.
KAOSH
IUNGDRIVE
C A M
O T E
S R
D .
J.SENO ST
.
H
.JUAQUINOST.
ARC
AST
.
EAST
RD.
C.BOR
CESS
T.
DUTYFREERD.
F.AR
CILLA
ST.
L EYT E
L OOP
NOR
TH6THRD
.
C.TU
DTUD
M.BO
RCES
ST.
WEST1
RD.
ST.JUD
EST.
ST.PAU
LST.
H.BORG
ONIAST.
B.BEN
EDICT
OST
.
PANAY
RD.
ST.
S. BORCESST.
SANR
OQUE
ST.
QUE
ENCEM
ETE
RYRD.
. COLINAST.
REALST.
PHST
.
LAHIN
G-LAH
INGST
.
J .LIM
BONG
ST.
-OVAL
SANA
NTON
IOST
.
E. LABU
CAY
S.
FROIL
ANST
.
SR.SAN
ROQU
EST.
ST.
M
.BORGONIA
ST.
ST. JUDETHADDEUSST.
VIRG
INOF
RULES
T.
MAN
DAUE
REC
LAMATIO
NRD.
F.MINAST.
ELGUSTO
DRIVE
FAITH
FULST.
OURL
ADYO
FREM
EDYS
T.
EAS
T3RDRD.
SR.STO
.NINO
ST.
V.COLIN
AST.
UALH
ELPST
.
ST.LUK
EST.
ST. GABRIEL
ST.
SANG
UILLER
MOST.
E
LEYTE
LO
OP
NONAME
NONAM
E
NO
NONAM
E
NONAM
E
NONAME
ONAME
NO NAME
NONAME
NO
NAME
NONAM
E
NO NAME
MACTANST
.
QUEZ
ONBLVD
.
NONA
ME
NO
NAME
LEYTELO
OP
AYALARD.
NONAM
E
NONAM
E
S.CAB
AHUG
ST.
NONA
ME
NONAME
NONAME
NO NAME
NONAME
NONA
ME
NONAME
NO NAME
50.0 meters
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
53/77
Coastal Barangays affected with relatively longer period of inundation
are Inayawan (Bulacao River), Duljo Fatima (Kinalumsan River), andTinago (Lahug River); Depth of floodwater is about 0.4m 1.2m highand stays as long as 8hours to 72 hours in these areas.
Other coastal barangays are inundated with about 0.3m to 3m for about0.5 hours to 2.5 hours. Higher Barangays (next to the coastal barangays) experience flooding
as high as 0.4m to 1m for about 0.5 hours to 1 hour. Only in Kamagayan(within the Estero Parian catchment area) that the duration of floodingreaches 24 hours.
Further higher barangays like Labangon and Calamba experienceflooding of 0.7m to 1m for about 1 hour (within Kinalumsan andGuadalupe Catchment areas)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
54/77
Flooding in Cebu City is characterized by the topographic
response of a short duration heavy downpour of rain. This is thegeneral characteristic of rainfall in Cebu city wherein the rainfalldepth can reach as high as 50mm in a day. Extreme conditions
such as those resulting from typhoon generated rainfall may go ashigh as 200mm. The condition can happen between 5-10 timesa year, thus, areas that are considered flood prone willexperience that frequency every year.
Several barangays especially those who are closer to the Mactanchannel and falls within the 0-10m above mean sea level gridelevation experience severe flooding.
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
55/77
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
56/77
THREE YEAR PROGRAM
2013 - 2016
A. ROADS
THREE YEAR PROGRAM (2013 2016)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
57/77
THREE - YEAR PROGRAM (2013 2016)
I. URBAN BARANGAY ROADS (MAIN ROADS)
PROPOSED FOR CONCRETING ALREADY
THREE YEAR PROGRAM 2014 2015 2016
TOTAL
LENGTH
(from GIS)
51,615.24
UNPAVED/
DILAPIDATED
ASP. ROAD
PAVEMENTS
25,313.008,718.67
meters
8,359.17
meters
8,235.17
meters
COST FORROAD
CONCRETING
585,804,212.00 197,319,747.17 98,678,731.67 189,805,733.17
THREE - YEAR PROGRAM (2013 2016)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
58/77
THREE YEAR PROGRAM (2013 2016)
II. URBAN BARANGAY ROADS (MAIN ROADS)
PROPOSED FOR ASPHALTING
THREE YEAR PROGRAM 2013 -
20162014 2015 2016
TOTAL
LENGTH104,962.40
UNPAVED/DIL
APIDATED
ROAD
PAVEMENTES
49,164.00 4276 29077 15811
COST FOR
ROAD
CONCRETING
231,995,089.47 86,452,108.00 97,816,766.05 47,726,215.42
THREE - YEAR PROGRAM (2013 2016)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
59/77
OG ( 0 3 0 6)
III. MOUNTAIN BARANGAY ROADS
(TOTALLY CONNECTING MA IN ROADS)
PROPOSED FOR CONCRETINGTHREE YEAR PROGRAM
2013 - 20162014 2015 2016
TOTALLENGTH
333,274.70
UNPAVED
(MAIN MT.
BRGY.ROADS)
76,200.00 23,166.67 25,266.67 27,766.67
COST FOR
ROAD
CONCRETING
742,647,182.00 225,989,250.67 245,674,765.67 270,983,165.67
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
60/77
NO PROJECT LOCATION LENGTH WIDTH AMOUNTFOR THE YEAR 20141 BRGY. MABINI TO SITIO TAGAYTAY
PANAS CONSOLACION
2,500 6.0 3,781,800.00
2 BRGY. PARIL TO SITIO TUBLE
COMPOSTELA CITY
1,000 6.0 1,512,720.00
SUBTOTAL 5,294,520FOR THE YEAR 20151 BRGY. PARIL TO HILLTOP TAG-UBE TO
COMPOSTELA CITY
3,000 6.0 4,538,160
2 BRGY. LUSARAN TO TAG-UBE TO SITIO
MAHAGNAO DANAO CITY
4,000 6.0 6,050,880
SUBTOTAL 10,589,040FOR THE YEAR 20161 BRGY SIN-SIN TO LOTOPAN ROAD 4,000 6.0 6,050,880
SUBTOTAL 6,050,880GRAND TOTAL 21,934,440
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
61/77
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
62/77
THREE - YEAR PROGRAM (2013 2016)
DRAINAGE SYSTEM
THREE YEAR
PROGRAM 2013 - 20162012 2013 2014 2015 2016
PROPOSED
IMPROVEMENT OF
DRAINAGESYSTEMS
220,520,000.00 88,450,000.00 - 30,000,000.00 17,000,000.00 85,070,000.00
PROPOSED NEW
DRAINAGE LINES222,400,000.00 46,000,000.00 66,400,000.00 27,600,000.00 24,000,000.00 58,400,000.00
PROPOSED
DESILTING62,900,000.00 58,700,000.00 - 4,200,000.00 - -
TOTAL 505,820,000.00 193,150,000.00 66,400,000.00 61,800,000.00 41,000,000.00 143,470,000.00
THREE - YEAR PROGRAM (2013 2016)
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
63/77
THREE YEAR PROGRAM (2013 2016)STRATEGIES TO ADDRESS THE
CHALLENGES OF OUR
NO. CHALLENGE CEBU CITY INITIATIVES
1 Narrowed rivers and
heavilysedimentation
On-going dredging and clearing of houses in the
riversPROPOSED :
CHANNEL IMPROVEMENTS = Php.
1,884,853,215.00
REPLACEMENT OF CROSS PIPES TO
BRIDGE =Php. 12,800,000.00
2 Absence of Outletsto the sea
On-going dredging of the channels to the sea(funded through the Disaster Risk Reduction
Management Council of Cebu City)
3 Tidal fluctuation
causing backflow
Proposed to construct pumping stations at the
mouth of the river
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
64/77
THREE - YEAR PROGRAM (2013 2016)
RIVERS AND CREEKS
THREE YEARPROGRAM 2013 - 2016
2012 2013 2014 2015 2016
CHANNEL
IMPROVEMEN
T
1,884,853,215.00 16,170,000.00 18,900,000.00 735,772,800.00 1,098,575,415.00 15,435,000.00
BRIDGE 12,800,000.00 - 12,800,000.00 - - -
TOTAL1,897,653,215.00 16,170,000.00 31,700,000.00 735,772,800.00 1,098,575,415.00 15,435,000.00
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
65/77
STATUS OF HEAVY EQUIPMENT
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
66/77
STATUS OF HEAVY EQUIPMENT
NO EQUIPMENT NAME NO OF AVAILABLE
EQUIPMENT AS PER
RECORD 2013
FUNCTIONAL W/
INTERMITTENT
REPAIR (AS PER
RECORD YEARE 2013)
UNDER REPAIR
FOR 2 WEEKS AS
PER RECORDS
1 SELF LOADING NONE
2 H2O TANKER 6 WHEEELS NONE
3 TRUCK CRANE 2 1 1
4 BACK HOE 1 1
5 PAY LOADER 4 3 1
6 ROAD GRADER 4 2 2
7 ROAD ROLLER 7 7
8 MINI DUMP TRUCK 4 3 1
9 MINI LOADER 1 1
10 DUMP TRUCKS 12 10 2
11 TRANSIT MIXER NONE
TOTAL 36 27 8
HEAVY EQUIPMENT REQUEST
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
67/77
HEAVY EQUIPMENT REQUEST
NO EQUIPMENT NAME NO OF AVAILABLE
EQUIPMENT AS PER
RECORD 2013
FUNCTIONAL W/
INTERMITTENT
REPAIR (AS PER
RECORD YEAR2013)
UNDER REPAIR FOR
2 WEEKS AS PER
RECORDS
1 SELF LOADING 3,000,000 1 3,000,000
2 H2O TANKER 6 WHEEELS 2,500,000 1 2,500,000
3 TRUCK CRANE 2,500,000 2 5,000,000
4 BACK HOE 14,000,000 1 14,000,000
5 PAY LOADER 13,500,000 1 13,500,000
6 ROAD GRADER 12,000,000 1 12,000,000
7 ROAD ROLLER 4,800,000 1 4,800,000
8 DUMP TRUCK 6,500,000 8 52,000,000
9 TRANSIT MIXER 5,000,000 2 10,000,000
10 MINI DUMP TRUCKS 3,500,000 3 10,500,000
11 MINI LOADER 1,500,000 2 3,000,000
TOTAL 23 130,000,000
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
68/77
PROPOSED PROJECTS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
69/77
1. BONBON HOSPITAL
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
70/77
PROPOSED PROJECTS
2. CCMC EXPANSION
PROPOSED PROJECTS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
71/77
3. CONVENTION CENTER IN TAPTAP
PROPOSED PROJECTS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
72/77
4. CITY HALL IN THE MOUNTAIN BARANGAY
PROPOSED PROJECTS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
73/77
5. DEPOT IN THE MOUNTAIN BARANGAY IN TAPTAP
DEPOT
PROPOSED PROJECTS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
74/77
6. CITY HALL IN SRP
PROPOSED BUILDING FOR
DEPW, DPS, & GSO
PROPOSED PROJECTS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
75/77
PROPOSED PROJECTS
ON THIS SITE, SHALL
RISE THE DEPW,
DPS, & GSO
BUILDING
PROPOSED PROJECTS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
76/77
7. REHABILITATION OF HEALTH CENTERS
7/28/2019 Cebu City Engineering 3-YEAR PROGRAM
77/77