DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1
CE/C/I-JP Dy. CE/C/GC-JP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 DY.CE /C/
GC/
NWR/
2011/T-
14
Construction of
New Major Bridge
of span 12 X 6.10
m (Km. 319/6-7)
and strengthening
of Bridge no. 165
(3x6.10 M at Km.
268/5-6) and PSC
Slabs as super-
structure including
earth work in
approaches and
other ancillary
works in Sikar-
Loharu section in
connection with
Jaipur-Sikar-
Loharu & Sikar-
Churu Gauge
conversion Project.
Open
tender
16.12.11 Single
Packet
system
25.01.12 06 - - Yes 11/NWR/Dy.
CE/C-GC/JP
/2012-
13/JP-SIKR-
CUR &
SIKR-LHU
dt. 04.07.12
M/s Surabhi
Maheshwar rao,
C-58, Road No. 1,
Film Nagar, Jublee
Hills,
Hyderabad
276.47 15.08.12
Ext.
31.01.14
30.3.2012. 31.01.14. Final bill under
process.
2 DY.CE /C/
GC/
NWR/
2011/T-
18
Dismantling of
existing MG track,
Laying and linking
of Broad gauge
main line, loop
lines including
points and
crossings in yards,
spreading of
ballast, tamping of
track,
transportation of P.
Way materials and
other ancillary
works in Sikar -
Loharu section
Zone-II (Km.
267.50 to Km.
314.00) including
Dundlod
Mukundgarh, Nua
& Jhunjhunu yards
in connection with
Jaipur-Sikar-
Loharu & Sikar -
Churu Gauge
conversion project
Open
tender
16.12.11 Single
Packet
system
20.01.12 02 - - YES 16/NWR/Dy.
CE/C-GC/JP
/2012-13/JP-
SIKR-CUR &
SIKR-LHU dt.
27.09.12
M/s Bharwal Lal
Bijarnia,
Villgae- Raipur, Post-
Prewari, Distt. Nagour.
511.17 06.03.13
Ext.
31.12.14
20.7.2012
3 DY.CE /C/
GC/
NWR/
2011/T-
19
Dismantling of
existing MG track,
Laying and linking
of Broad gauge
main line, loop
lines including
points and
Open
tender
16.12.11 Single
Packet
system
18.01.12 05 - - YES 13/NWR/Dy.
CE/C-GC/JP
/2012-
13/JP-SIKR-
CUR &
SIKR-LHU
M/s Laxyo Energy Pvt.
Ltd.,
113, Bakhatgarh
Tower, 10/A, New
Plasia, Indore (MP)
473.94 06.03.13
Ext
31.12.14
20.7.2012
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
2
crossings in yards,
spreading of
ballast, tamping of
track,
transportation of P.
Way materials and
other ancillary
works in Sikar -
Loharu section
Zone-III (Km.
314.00 to Km.
360.70) including
Ratan Shahar,
Chirawa, Surajgarh
& Loharu yards in
connection with
Jaipur-Sikar-
Loharu & Sikar -
Churu Gauge
conversion project.
dt.
03.08.12.
4 DY.CE /C/
GC/
NWR/
2011/T-
17
Dismantling of
existing MG track,
Laying and linking
of Broad gauge
main line, loop
lines including
points and
crossings in yards,
spreading of
ballast, tamping of
track,
transportation of P.
Way materials and
other ancillary
works in Sikar -
Loharu section
Zone-I (Km.
237.50 to Km.
267.50) including
Sikar & Nawalgarh
yards in connection
with Jaipur-Sikar-
Loharu & Sikar -
Churu Gauge
conversion project.
Open
tender
16.12.11 Single
Packet
system
23.01.12 04 03 1. M/s Bhika ram Dev rath, VPO-
Dhiarla, Distt. Churu.
2. M/s Goel Brothers Rail Infra PVT. Ltd., Bareilly.
3. Shri Nahar Const. Co., Jodhpur.
L-4 12/NWR/Dy.
CE/ C-
GC/JP
/2012-
13/JP-SIKR-
CUR &
SIKR-LHU
dt. 03.08.12
M/s Shupal Kumawat,
Rly. Contractor, Village
& Post.- Badhal,
Distt.- Jaipur.
330.97 04.04.13
31.12.2014
06.9.2012
5 Dy.CE/C/
GC/2012/
T-26
Residual work of construction including addition and alteration of station buildings, Staff quarters, passenger platforms, platform surfacing, and all other ancillary works between Jhunjhunu (excl.)-Loharu (incl.)
Open
tender
12.6.12 Single
Packet
system
16.7.12 02 - - yes 18/NWR/Dy.
CE/C-GC/JP
/2012-13/JP-
SIKR-CUR &
SIKR-LHU dt.
22.11.12
M/s RSB Project
Limited, RSB Plaza,
SCO,30,31, Sector -16
Faridabad (Haryana)
783.97 10.3.13
Ext.
30.04.15.
18.09.12
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
3
stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project
6 Dy.CE/C/
GC/2012/
T-9
Residual work of construction including addition and alteration of station buildings, Staff quarters, passenger
platforms, platform surfacing, and all other ancillary works between Sikar(Incl.)-Jhunjhunu (incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project
Open
tender
14.6.12 Single
Packet
system
17.7.12 01 - yes NWR
/S&C/CA/11
9
dtd.20.11.1
2
M/s RSB Project
Limited, RSB Plaza,
SCO,,30.31, Sector -
16 Faridabad
(Haryana)
1213.13 20.3.13
Ext.
30.04.15
25.09.12
7 Dy.CE/C/
GC/2012/
T-28
Residual earth work
in bank, Cutting and
lead bank utilising
cut spoils for
widening/constructio
n of BG formation
including side
drains, trolley
refuses, cess wall
etc. and other
ancillary works
between
Sikar(Incl.)-Loharu
(Incl.) stations of
Sikar- Loharu
section in
connection with
Jaipur-Sikar-Loharu
& Sikar-Churu GC
project.
Open
tender
11.7.12 Single
Packet
system
14.08.12 02 - - yes 19/NWR/Dy.
CE/C-GC/JP
/2012-13/JP-
SIKR-CUR &
SIKR-LHU dt.
21.12.12
M/s Bharwal Lal
Bijarnia,
Jaulsa Kua Road, Near
Tagore B. Ed. College,
Tegore Nagar,
Kuchaman City, Distt.
Nagour.
119.22 03.01.13
Ext.
30.11.14.
21.09.2012
8 Dy.CE/C/
GC/2012/
T-29
Residual work for construction of minor bridges including dismantling of existing bridges, construction of return/wing walls, launching of already casted &
Open
tender
11.7.12 Single
Packet
system
14.8.12 01 - - yes 21/NWR/Dy.
CE/C-GC/JP
/2012-13/JP-
SIKR-CUR &
SIKR-LHU dt.
19.01.13
M/s Surabhi
Maheshwar rao,
C-58, Road No. 1,
Film Nagar, Jublee
Hills,
Hyderabad
301.79 26.02.13
Ext.
31.12.2014
.
03.10.12
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4
transported RCC box and other ancillary works between Sikar(Incl.)-Loharu (Incl.) and Sikar(Incl.)-Churu (Incl.) stations of Sikar- Loharu & Sikar – Churu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project.
9 Dy.CE/C/
GC/2012/
T-27
Providing in situ Glued joints of G-3 ( L) type as per RDSO drawings for 60 kg & 52 kg rails with all fittings etc. complete in Jaipur - Sikar -Loharu & Sikar - Churu section in connection with Jaipur - Sikar - Loharu & Sikar - Churu
Open
tender
06.07.12 Single
Packet
system
07.08.12 03 - - yes 22/NWR/Dy.
CE/C-GC/JP
/2012-13/JP-
SIKR-CUR &
SIKR-LHU dt.
22.02.13
M/s Creative
Engineers,
F-189, Road NO. 5, I.
P. Industrial Area,
Kota.
141.22 19.02.15 20.12.12
10 Dy. CE
/C/
GC/NWR/
2012/T-
24R-1
Construction including Fabrication of FOBs and platform shelters in SIKAR-LOHARU section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project.
Open
tender
10.12.12 Single
Packet
system
11.01.13 06 - - Yes 28/ NWR/Dy.
CE/C-GC/JP
/2012-13/JP-
SIKR-CUR &
SIKR-LHU dt.
27.07.13
M/s Rishab
Construction (Pvt.)
Ltd.
53-54, Shopping
Centre,
Janata Colony,
Jaipur
695.22 07.10.13
Ext.31.12.1
4.
05.04.13
11 Dy. CE
/C/
GC/NWR/
2013/T-
37
Supplying and stacking 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Nawalgarh, Jerthi Dadhiya station on Sikar - Loharu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion project.
Open
tender
01.08.13 Single
Packet
system
05.09.13 02 - - Yes 30/ NWR/Dy.
CE/C-GC/JP
/2013-14/JP-
SIKR-CUR &
SIKR-LHU dt.
20.12.13
Rajesh Kumar Gupta,
Railway Contractor,
54, Nehru Nagar, Kush
Marg,
P. O. - Alwar (Raj.)
301001
353.05 20.05.2014
Ext.30.09.1
4.
27.11.2013
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
5
12 NWR/S&C
/LHS/
SIKR-LHU
/T/4
Construction of Road Under Bridge/Limited Height Sub-way in lieu of level crossing (36 no) between Km. 274 to 311 in Sikar – Loharu section.
Open
tender
02.09.13 Two Packet
system
14.10.13 01 - - Yes NWR/S&C/CA
/131, dt.
05.03.2014
M/s Park
Infrastructure Limited,
101-B, Pocket –A,
Ashok Vihar, Phase-II,
Delhi – 110052
4316.25 11.12.2015 27.01.2014
13 NWR/S&C
/LHS/
SIKR-LHU
/T/5
Construction of Road Under Bridge/Limited Height Sub-way in lieu of level crossing (27 no) between Km. 311 to 360 in Sikar – Loharu section.
Open
tender
02.09.13 Two Packet
system
09.10.13 01 - - Yes NWR/S&C/CA
/132, dt.
05.03.2014
M/s Park
Infrastructure Limited,
101-B, Pocket –A,
Ashok Vihar, Phase-II,
Delhi – 110052
3309.22 11.12.2015 20.12.2013
14 Dy. CE /C/ GC/ NWR/ 2014/T-47
Construction of toe wall, Pitching on high bank, Road works at Level Crossings and other misc. works required between Sikar
(including) to Jhunjhunu (excluding) stations for successful commissioning of the Sikar-Loharu section in connection with Jaipur-Sikar-Loharu and Sikar-Churu Gauge Conversion Project.
Open
tender
09.10.14 Single
Packet
system
12.11.14 08 - - Yes P. G. Not yet
submitted.
M/s Ramswaroop Jat,
295-B, Taru Chhaya
Nagar,
Tonk Road,
Jaipur
411.13 17.06.2015 11.01.2015
15 Dy. CE /C/ GC/ NWR/ 2014/T-48R
Construction of toe wall, Pitching on high bank, Road works, construction of Over Head water Tank at Jhunjhunu & Chirawa and other misc. works from Jhunjhunu (incl.) to Loharu (incl.) required for successful commissioning of the Jhunjhunu-Loharu section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion
Open
tender
17.01.15 Single
Packet
system
17.02.15 05 - - Yes P. G. Not yet
submitted.
M/s Jai Mata Di Energy
Systams,
V. P. O. - Narodara,
Teh. - Laxmangarh,
Distt.- Sikar (Raj)
323.78 10.09.15
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
6
DY. CE/C/III-JP
Project.
1
AF/B
KI/
GC/J
P/4
R
Construction
strengthening and
rebuilding minor
bridges between
Nadbai- Bharatpur
Open
tender
Two bid
system
29.0
4.9
9
15 07 08 Yes
CPM/JP/KTT/
CA/16 dated
15.02.2000
M/s Jugendra Singh
& Co., Etah.
2.98 crore 04.01.2000 01.06.01 31/3/04 Final bill passed
in June-2015.
.
2
AF/B
KI/
GC/
JP/6
8
Laying and linking
BG track between
BTE- AH section
Open
tender
24..
04.0
4
One bid
system
27.0
9.0
4
5 1 4 Yes NWR/S&C/CA
/51 dated
04.01.05
M/s RSV Construction
Hyderabad
1.83 crore 01.03.05 5.11.04 31.5.05 Reply of
technically check
received on
24.7.15 from Sh.
J.K. Jain. Final
bill/ Final
variation is
under technically
check.
3
AF/B
KI/
GC/J
P/6
9
Laying and linking
BG track between
BTE-AH section
Open
tender
24.0
4.0
4
One bid
system
27.9
.2004
5 1 4 Yes NWR/S&C/CA
/49
dated24.12.0
4
M/s Engipress Rail
Link, Gwalior
1.58 crore 25.02.05 28.10.04 30.11.05 Final bill awaited
from AEN/C/AWR
& (Sh. S.K.
Mittal ) .
4
AF/B
KI/
GC
/36
Welding of rail
joints bet. BKI- KL
section
Open
tender
-
One packet
system
09.0
6.0
3
3 1 2 Yes, Dy.
CE(C)JP/CA/7
7 dated
07.10.03
M/s India Thermit
Corp Ltd., Kanpur
1.02
Crore
08/3/04 12/10/03 30/06/04 Final variation
under finance
vetting.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
7
5
HIS
-
RE/D
oubling/2
Const/ Extension
of FOB&PF shelter
shed bet. RE-HIS.
Open
tender
24.0
7.2
008
One packet
system
25.0
8.2
008
03 - 01 Yes Dy CE/C-
JP/CA/224 dt.
19.03.09
M/S Sanjeev Brothers,
Jaipur.
4.16
Crore
22/4/09 22/02/09 31/12/11 Work Stopped by
contractor, Case
is under
Arbitration.
6
HSI-
RE/D
oubling/1
Construction of
Major Bridge minor
bridge R/wall earth
work station
building ballast
supply , track
linking etc.
Open
tender
21 &
22.0
7.2
008
One packet
system
23.0
4.2
008
05 - 01 Yes NWR/S&C/CA
/101 dated
23.10.08-
M/s ARSS- Triveni(JV)
Bhubaneshwar
50.81
Crore
24/2/10 03/11/08 31/10/12 Work completed.
Final bill/Final
variation under
technical check
since 24.8.2014
7
AW
R-H
SI/
Doubling/6
Construction
station building
Misc. structure
ballast supply track
linking etc.
Open
tender
21.0
2.2
008
One packet
system
23.0
4.2
008
06 - 01 Yes NWR/S&C/CA
/102 dated
23.10.08
M/s ARSS Infra
structure project Ltd.
Bhubaneshwar
(Orissa)
21.24
Crore
02/07/09 27/10/08 31/05/12 Work completed
Final bill under
process. Material
statement under
cheking.
8
NW
R/S
&C/T
/1/R
OB-5
3
Construction of
ROB- 53-B on
Biwani- Rohtak
line.
Open
tender
One packet
system
- Yes Dy
CE/C/IIII/JP
/CA/242 dt.
11.9.2013
M/s Shree Goutam
Construction Co. Ltd.
4.75
Crore
28.02.2015
28.5.13
28.2.15 Work physical
completed.
9
NW
R/S
&C/T
/1/R
RI
Buildin
g.
Construction of
RRI building at
satroad & Bhiwani
sattion yard.
Open
tender
One packet
system
-
Yes
Dy
CE/C/IIII/JP
/CA/241 dt.
13.8.2013
M/s Shree Shayam
Engg.
1.93
Crore
31.3.20154
1.6.13 Work physical
completed
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
8
10
NW
R/S
&C/T
/1/R
R Construction 118
Qtrs DFCCIL
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/127 dated
25.6.13
M/s V.K. Sood
Engineers &
contractors
19.27 Crore
3.2.15 1.1.14
- Work terminated
on 07.8.2015
11
NW
R/S
&C/T
/39
Construction of
officers Qtrs at
jagatpura
Open
tender
Two packet
system
- Yes NWR/S&C/C
A/140 dated
28.12.14
M/s Harinarayan
Khandelwal
34.28 crore 26.4.16 27.10.14 - Work in
progress.
12
NW
R/S
&C/L
HS/R
E-F
L-
Madar/
T/1
Construction of
road under
bridges / limited
height subways
(35 Nos) in
Rewari–Phulera(
RPC) section
Open
tender
Two packet
system
- Yes Work in
progress.
13
NW
R/S
&C/L
HS/R
E-F
L-
Madar/
T/2
Construction of
road under
bridges / limited
height subways
(32 Nos) in Rewari
– Phulera( RPC)
section
Open
tender
Two packet
system
- Yes Work in
progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
9
Dy. CE/C/II-JP
Dausa-Jaipur Doubling Project.
1 JP-DO/ Doubling/8
Construction of FOB bet. DO-JP section
Open tender
- Single Packet System
29.11.06 2 M/s. Sanjeev Brothers Jaipur
1 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. Sanjeev Brothers Jaipur
130.02 15.4.08 14.2.07 15/04/08 Extended upto 15/10/2010
Under preparation.
2 DO-JP-FL/ Doubling/16
Welding of 52Kg. /60Kg. Rails
Open tender
- Single Packet System
31/07/07 1 M/s. ITC, Kanpur.
0 YES Dy.CE(C)-II/JP/CA /4 dt.18/4/07
M/s. ITC, Kanpur. 341.22 18/02/09 20/06/09 18/02/09 Extended upto 30/04/2011
Physically completed.
3 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/5 RR
Construction of Minor Bridges , Wing /Return walls.E/work in formation construction including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR
Open tender
_ Single Packet System
16/09/2011
Modi Construction(JV) Jaipur
YES NWR/S&C/CA/116 Dated 27/03/2012
Modi Construction(JV) Jaipur
1724 26/04/2013
02.01.2012 Extended upto 31/10/13
Final bill under process with SE/C/W/JP
4 NWR/S&C/JP-SIKR -LHU &SIKR-CUR/GC/T/ 01(geot
ech)
Staking out alignment , conducting geotechnical investigation design of the sun/super structure of minor
& major bridges , prepration of GAD got minor &Major bridges etc
Open tender
_ Single Packet System
20.12.2011
M/S Surbhi Enterprises Jagatpura Jaipur.
YES NWR/S&C/CA/118 Dated 25/07/12
M/S Surbhi Enterprises Jagatpura Jaipur.
946 Lakhs 01.09.2012 08-01-2012 Extended upto 31/12/13
work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
10
6 NWR/S&C/JP/RUB-
82&83/T-1]:
Construction of Road Under Bridge including providing
road approaches, covering shed, retaing wall, pedestrian path way, height gauge, drainage arrangement, sump etc complete in lieu of level crossing No.- 82 & 83 in Jaipur - Sawai Madhopur Railway section.
Open tender
double Packet System
20/12/2012
V.K.Sood Engineers& Contractor
Panchkula
YES NWR/S&C/CA/127 Dated
25/06/13
V.K.Sood Engineers& Contractor Panchkula
15.36 Crores
04-10-2014 22/04/2013 Extended upto 31/12/2015
Work in progress
7 Tender No. NWR/S&C/RPC/ROB-149 C/T-01
Construction of 2 lane Road over bridge (3span) with RCC deck slab on composite &PSC girder super structure including pile foundation & RCC sub structure & related allied works, in lieu of Level crossing No.C-149 at Km 212/0 - 1 near Phulera in Rewari - Ringus - Phulera (RPC) section.
Open tender
Single Packet System
27/02/13 M/s Biharilal Meghani New Delhi
YES M/s Biharilal Meghani New Delhi
6.50 crores 29/04/2014 16/05/2013 Extended upto 30/05/2015
Final bill under process with SE/C/W/JP
8 Tender No. NWR/S&C/FL Shed/T/1
“Fabrication & erection of structural steel covering shed including gantry for EOT cranes alongwith Pway track for freight examination & stabling line with and without inspection pit and construction of misc. offices, minor bridge and other ancillary structures etc complete in connection with re orgnisation of freight train examination facility at Phulera
Open tender
Single Packet System
10.10.2014
2 M/s. M.H. Khanusiya, Himmatnagar-383001, Dist. S.K. (Gujrat)
YES M/s. M.H. Khanusiya, Himmatnagar-383001, Dist. S.K. (Gujrat)
7.17 cores 16.09.2015 Work in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
11
CE/C/II-JP
Dy. CE/C/UDZ 1 T.NO.UDZ
-
HMT/MB/
T/1
Construction of
Major bridges from
DNRP-HMT in
connection with
UDZ-HMT section
GC Project .
Open 19.11.10 Single 21.12.10 2
Yes NWR/S&C/
CA/111 dtd.
9.9.11
M/S Om Prakash
Goyal & Co.,
Neemach
1568
29.11.12
31.12.14
30.06.15
31.12.15
10.08.11 Work in
Progress
2 T.NO.UD
Z-
HMT/GC
/MB/T-2
Const., minor
bridges &
earthwork from
Km. 160/0 to
187/0 in
connection with
UDZ-HMT Section
GC Project
Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/
CA/109 dtd.
16.8.11
M/s Braham Prakash
ModiRavi Constn.Co.
(JV) , Jaipur
1212.6
804.33
21.09.12
27.6.13
31.03.14
30.09.14
31.03.15
31.08.15
30.04.11
Work in
Progress
3 T.NO.UD
Z-
HMT/GC
/EW/T/3
Construction of
Minor bridges &
earthwork from
Km. 270/0 to
320/0 in
connection with
UDZ-HMT section
GC Project.
Open 08.12.10 Single 20.01.11 5 Yes NWR/S&C/
CA/112 dtd.
21.10.11
Amit-Mass (JV) ,
Alkapuri, VADODARA
1665.1
20.01.13 03.08.11 Contract
terminated
on
07.11.2012
4 T.NO.UD
Z-
HMT/GC
/EW/T/4
Construction of
Minor bridges &
earthwork form
Km. 207/0 to
250/0 in
connection with
UDZ-HMT section
GC Project .
Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/
CA/113 dtd.
21.10.11
M/s Rahee-Triveni
(J/V), Kolkatta
3045.2
2343.48
07.02.13
30.11.13
31.07.14
31.03.15
31.12.15
23.08.11 Work in
Progress
5 T.NO.UDZ
-HMT/GC/
EW/T/11
Construction of
Minor bridges &
earthwork from
Km.187/0 to 207
in connection with
UDZ-HMT section
GC Project
Open 17.07.12 Single 23.8.12 03 - - Yes NWR/S&C/
CA/1223
dtd.
23.01.2013
M/S M.G.
Contractors, Pvt.,
Ltd., Panchkula
1919.40
2120.31
6.02.14
31.12.14
30.06.15
31.12.15
27.11.12 Work in
Progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
12
6 T.NO.UDZ
-HMT/GC/
EW/T/12
Construction of
Minor bridges &
earthwork from
Km. 250/0 to
270/0 in
connection with
UDZ-HMT section
GC Project
Open 17.07.12 Single 23.8.12 03 - - Yes NWR/S&C/
CA/ 123 dtd.
13.02.1013
M/S Ravi Infrabuild
Projects Pvt, Ltd.,
sector-11, Udaipur
3517.86
4383.64
30.11.14
31.03.15
31.08.15
30.09.15
03.11.12 Work in
Progress
7 Tender
No. UDZ-
HMT/LHS/
T-14
Construction of
Limited Height
Sub-way in lieu of
Level crossings
(63Nos) in
Udaipur-
Himmatnagar
section
Open 27.10.12 Two bid
system
5.12.12 05 04 01 Yes NWR/S&C/
CA/ 126 dtd.
19.06.2013
M/S M.G.
Contractors, Pvt.,
Ltd., Panchkula
5652.54
6242.99
30.04.15
31.01.16
21.05.13 In progress
8 UDZ-
HMT/GC/
PIT-
LINE/T-16
Provision of
additional pit line
at Udaipur s
Open 14.08.14 Single 17.09.14 05 NA NA Yes Dy.CE/CUDZ
/CA/23 dt.
06.01.15
M/S Ravi Infrabuild
Projects Pvt, Ltd.,
sector-11, Udaipur
499.75 13.06.15
13.08.15
13.08.15
13.10.15
10.11.14 Work in
Progress
9 UDZ-
HMT/GC/
ORH/T-
17-R
Construction of
officer Rest house
in ORH campus at
Udaipur
Open 14.8.14 Single 17.09.14 05 NA NA Yes Dy.CE/CUDZ
/CA/22 dt.
09.12.14
M/S A.R.
Construction
New Delhi-
108.26 16.06.15
16.08.15
15.10.15
20.10.14 Work in
Progress
10 UDZ-
HMT/GC/
MB/T-13-
R-1
Substructures of
major bridges from
Udaipur to
Dungarpur.
Open 13.11.14 Two bid
system
17.12.14 05 Yes NWR/S&C/
CA/ 142 dtd.
30.06.15
M/s Murali Krishna
Const. Co,
Hyderabad
4930.68 23.04.17 09.05.15 Work in
progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
13
Dy. CE/C/Dungarpur
Dy. CE/C/RTM
1
Dy.C
E/C
/BN
SW
/DN
RP-
RTM
/NL/T
-9
Construction of
Office
Accommodation for
Dy.CE/C/RTM &
Officers Rest House
at Ratlam in c/w
Construction of
New BG Line
between DNRP-
RTM via Banswara.
Open 23.10.13 Single 12.12.13 3 Nos. - - Yes Dy.CE/C/
RTM/CA/02
dt.21.04.14
M/S Kirti Contractors
& Engineers, 168,
Samta Parisar,
Ratlam (MP)
Rs. 124.14
Lacs
09.09.2014 11.03.14 09.09.14
Extension
given up to
31.10.15
Work is in
progress.
1. Dy.CE/C
/UDZ/D
NRP-
RTM/FL
S/2011/
T/1
Carrying out final
location of survey &
….other preliminary
activities in
connection with
new BG line
between DNRP-
RTM via Banswara
Open 1/6/11 &
30/6/11
(NIT & First
corrigendum
)
Single 15-07-
2011
10 NA NA Yes NWR/S&C/
CA/114 Dt.
27-02-12
M/s S.M.Consultants,
Bhubneswar
4.99 Cr 13/11/12
Extended
up to
31.12.2015.
14/11/2011 -
Work in progress
2. Dy.
CE/C/D
NRP/
RTM-
DNRP/E
W/
NL/T-8
E/W in cutting and
filling for formation
& all other ancillary
works etc. from
Km. 0.00 to Km.
17.00 between
Dungarpur-Nawa
Gaon station in
c/with DNRP-RTM
New BG Rail Line
Project.
Open 23-01-2013 Two
Packet
06-03-
2013
15 5 10 Yes NWR/S&C/
CA/129
Dt. 31-10-
13
M/s Nayak
Infrastructure Pvt.
Ltd., Guwahati
56.74 Cr. 09-07-15.
Further
extended
upto
09.07.2016
06-11-2013 - Work in
progress.
3. T. No.
Dy.
CE/C/
DNRP/
RTM-
DNRP/M
B/NL/T/
10
– Const. of minor
bridges, RUB &
other ancillary
works etc. from
Km. 0.00 to 17.00
bet. Dungarpur to
Nawa Gaon
stations in c/with
DNRP-RTM New BG
Rail Line Project.
Open 10-09-2013 Two
Packet
23-10-
2013
8 6 2 Yes NWR/S&C/
CA/137 Dt.
30-06-
2014
accepted
on
04.04.2014
M/s Gannon Dunkerley & Co. Ltd., Ahmedabad
38.06 Crore 03-04-2016
(24 months)
14.11.2014 - Work in
progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
14
2
Dy.C
E/C
/RTM
/DN
RP-R
TM
/NL/T
-2
Construction of
minor bridges,Road
under bridges
(RUB) & other
ancillary works
from 142.85 to
163.00 km
between Chotti
Sarvan -Shivgarh
stations in c/w
Construction of
DNRP-RTM via
Banswara.New BG
Rail line project
Open
16.0
6.2
014
Tw
o b
id
23.0
7.1
4
5 N
os.
01N
o
-
Yes
NWR/S&C/C
A/141 dated
16.03.2015
M/S
Gannon D
unkerley &
Co.L
td.
301-
303,P
rem
a A
crc
ade,3
rd F
loor,
Opp
Docto
r H
ouse,
Near
Parim
al
Cro
ssin
g,C
.G.R
oad,A
hem
dabad-3
80006
Rs.4
2.8
9 C
r
17.1
2.1
6
Yet
to S
tart
17.1
2.2
016
Yet
to s
tart
Dy. CE/C/BNSW
- NIL -
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
15
CE/C/III-JP
DY. CE/C/I-Aii
1
AII
/Const/
Loco/M
od/T
/1
Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of Loco Workshop at Ajmer.
Open 25.08.09 Single 28-10-09 08 Nos. M/s Era
Infra Engg. Ltd. Noida.
-
No, Tender
awarded to 2nd lowest
tenderer, after
Tech. evaluation
of L-1.
NWR/S&C/ CA/31
Dt. 17-06-10
M/s Bharat Span- GPT (JV) 43 Industrial
Area, Jhotwara, Jaipur
3829.48 Lakhs
22/04/2012, 06/11/2012, 30/06/2013, 31/12/2013, 31/12/2014, 31/03/2015
& 30/06/2015
27/03/2010 - Work completed.
2
AII
/Const/
C&
W/M
od.
/T/3
/R1
Const. & fabrication of various sheds with or without tracks for EOT cranes of different capacity and construction of offices, Toilets including laying of BG tracks and dismantling of existing structures/sheds, BG/MG tracks in c/with Modernisation of C&W Workshop at Ajmer.
Open 14.06.10 Single 07-07-2010 - - - Yes
NWR/S&C/ CA/34 dated
07/09/2011
M/s Prem Fabricators 301 Meera Manon
Arcude, Near Krupa Petrol Pump, Parimal Garden, Ellis Bridge,
Ahmedabad.
1524.97 Lakhs
05/12/2012, 31/12/2013, 30/07/2014, 31/10/2014
& 31/12/2014
05/09/2011 - Work Completed.
3
AII
/BN
GM
-RAS/
NL/T
/2
Construction of major bridge including earth work on the approaches between BNGM (Excl.)-RAS (incl.) section in c/with BNGM-RAS New B.G. Rail Line Project.
Open 03.11.10 Single 10.12.10 07 Nos. - - Yes
NWR/S&C/CA/38 dated
09/12/2011
M/s SB-SHC-MCDPL (JV) C-10, Vaishali
Nagar, Jaipur.
Rs. 1592.08
Lakhs
18/07/2012, 31/12/2012, 31/08/2013, 31/01/2014, 31/03/2014
& 31/05/2014
23/07/2011 - Work Completed, final bill passed.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
16
4
AII
/BN
GM
-RAS/
NL/T
/3(R
)
Earthwork in bank/cutting and construction of minor bridges between Km. 0.00 to 10.50
Open 12.07.11 Single 03.08.11 07 Nos. - - Yes
NWR/S&C/CA/39 dated
16/01/2012
M/s Jandu Construction Co. 305,
Model Town Mandi, Adampur Hisar
Rs. 1060.43
Lakhs
30/10/2012,
31/03/2013, 31/07/2013, 31/10/2013, 31/01/2014, 30/04/2014
& 31/10/2014
1011/2011 - Work Completed,
final bill under preparation.
5
AII
/BN
GM
-RAS/
NL/T
/4 Earthwork in
bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS (Km. 10.50 to 20.50) section in c/with Bangurgram-RAS new BG Rail Link Project.
Open 16.12.10 Single 24.01.11 10 Nos. - - Yes
NWR/S&C/CA/37 dated
08/12/2011
M/s Jai Mata Di Energy System (JV) VPO-Narodara, Tehsil - Laxmangarh Sikar
(Raj.)
Rs. 1103.49
Lakhs
16/06/2012, 31/12/2012, 31/05/2013, 30/09/2013, 31/12/2013, 28/02/2014, 30/04/2014
& 15/05/2014
29/06/2011
15/0
5/2
014
Work Completed. Final bill passed.
6
AII
/BN
GM
-RAS/
NL/T
/5 Earthwork in
bank/cutting and construction of minor bridges including ancillary works beween Bangurgram-RAS (Km. 20.50 to 28.50) section in c/with Bangurgram-RAS new BG Rail Link Project.
Open 16.12.10 Single 24.01.11 08 Nos. - - Yes
NWR/S&C/CA/36 dated
08/12/2011
M/s Jandu Construction Co. 305,
Model Town Mandi, Adampur Hisar
Rs. 825.62 Lacs
19/06/2012, 31/12/2012, 30/06/2013, 31/10/2013, 28/02/2014, 30/06/2014, 30/09/2014, 31/12/2014
& 31/03/2015
04/07/2011 - Work Completed,
final bill under preparation.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
17
7
AII
/BN
GM
-RAS/
NL/T
/8
Supplying and Stacking machine crushed stone track Ballast in stacks as per Railways’ specifications between Km. 0.00 to 28.50 [Bangurgram to Ras] in connection with Bangurgram - Ras new rail line project.
Open 19.08.11 Single 27.09.11 4 Nos. - - Yes
Dy. CE/C/AII/B
NGM-RAS/NL/CA
/73 dated 12/03/201
2
M/s Rajesh Kumar Gupta, 54, Nehru
Nagar, Kush Marg, Alwar(Raj.)
Rs. 406.50 Lacs
25/12/2012, 31/03/2013, 30/06/2013
& 30/09/2013
08/02/2012 - Final bill passed.
8
AII
/BN
GM
-RAS/N
L/T
/12
Construction of Road under Bridges & Road Over Bridges including earth work & Road work on the approaches & miscellaneous works in connection with Bangurgram-Ras New BG line project
Open 13.08.12 Single 21.09.12 6 Nos. - - Yes
NWR/S&C/CA/46 dated
24/12/2012
M/s. Varaha Infra Ltd., Umesh Smriti, 6-
Jalam Vilas Sceheme, Paota, B-Road, Jodhpur (Raj.)
335944842.4
5
21/10/2013, 28/02/2014, 30/06/2014, 30/11/2014
& 31/05/2015
23/11/2012 - Work completed.
9
AII
/BN
GM
-RAS/N
L/T
/11 R
2
Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P-way materials, construction of station building & platform and other ancillary works between
Bangurgram and Ras stations in connection with Bangurgram-Ras New Broad Gauge Line Project.
Open 05.10.12 Single 09.11.12 1 Nos. - - Yes
Dy. CE(C)/AII/
BNGM-RAS/CA/85
dated 20/11/201
3
M/s. Bhanwar Lal Bijarnia, Village-
Rajpura, Tehsil-Nawa, District-Nagaur (Raj.)
66749882.0
9 17/09/2013,
28/02/2014, 31/05/2014, 30/09/2014, 31/01/2015
& 31/05/2015
02/09/13 - Work in
progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
18
10
AII
/Const.
/DFCCIL
/T/1
-R
Construction of staff Quarters including electric work, Under Ground Water Tank, Road work, Boundary Wall etc. between Madar-Guriya Section in connection with shifting of utilities for DFCCIL.
Open 11.10.12 Two Bid 19.11.12 2 Nos. - - Yes
NWR/S&C/CA/53 dated
05/07/2013
M/s. RSB project Limited, RSB Plaza,
SCO 30-31, sector-16, Faridabad-121002
248670141.3
6
17/08/2014,31/05/2015
& 30/11/2015
13/03/13 - Work under
progress.
11
AII
/Const.
/DFCCIL
/T/3
-R2
Shifting of track between Madar & Durai stations & shifting MG yard at
Marwar Jn. i.c.w. DFC.
Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes
NWR/S&C/CA/60 dated
26/12/201
3
M/s. Ravi Infra build Pvt. Ltd., 95, Hiran
Magri, Sector-11, Udaipur
321699681.7
9
04/02/2015 &
30/04/2016 14/12/13 -
Work under progress.
12
AII
/Const.
/DFCCIL
/T/6
Construction of station building & staff quarters in c/w shifting of utilities for DFCCIL.
Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes
NWR/S&C/CA/61 dated
27/12/2013
M/s. Rama Construction
company, H-240, Ashok Vihar Phase-I
New Delhi
411703686.3
4
05/03/2015 &
31/12/2015 15/09/13 -
Work under progress.
13
AII
/Const.
/LH
S/T
/3 Providing Limited
Height Subways in lieu of existing Level Crossings between Madar & Haripur stations of Madar - Marwar Section in connection with
elimination of existing level crossing gates.
Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes
NWR/S&C/CA/64 dated
20/02/2014
M/s. Lall Construction Co. AA-105, Shalimar
Bagh, Delhi-110088
457717339.3
5
15/12/2015 18/02/14 - Work under
progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
19
14
AII
/Const.
/Loco/M
od/T
/7
Improvement to drainage system in Loco Workshop by the construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of Loco Workshop, Ajmer
Open 21/10/14 Two Bid 26/11/14 07
(Seven) 03
(Three)
1.0 JCC Infra
Projects Pvt.
Ltd., 761/30, Aklank House,
Tikam Ganj, Ajmer
(Raj.)2.0 Bharat Spun
Pipe & Construction
Company, 43,
Industrial Area,
Jhotwara, Jaipur-
3020123.0 M/s. B. L.
Infra Projects Pvt. Ltd., B-8/6,
Sector-3, Rohini, New
Delhi -110085.
M/s. Satish & Amit Infra
Structure 2/108, Royal Green, Near
Sirsi Mod, Post office
Sirsi, Jaipur.JCC
Infra Projects Pvt.
Ltd., 761/30, Aklank House,
Tikam Ganj, Ajmer (Raj.) Bharat Spun
Pipe & Construction
Company, 43,
Industrial Area,
Jhotwara, Jaipur-
302012. M/s. B. L.
Infra Projects Pvt. Ltd., B-8/6,
Sector-3, Rohini, New
Yes
NWR/S&C/ CA/70 dated
29/07/2015
Prem Fabricator's, 426, Near Jyoti Power,
Behind Steel Town, Moriya, Chandgodar, Ahmedabad-382110
1326.88 Lakhs
04/02/2016 17/02/2015 - Work in
progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
20
1Delhi -110085.
M/s. Satish
& Amit Infra Structure
2/108, Royal Green, Near
Sirsi Mod, Post office
Sirsi, Jaipur.
15
AII
/Const.
/C&
W/M
od./
T/6
Improvement to drainage system in C&W Workshop by the construction of drain using mostly pre-cast RCC units including launching. Work also includes construction of traverser path and other ancillary works in connection with Modernisation of C&W Workshop, Ajmer
Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four)
1.0 Varaha Infra
Limited, Umesh
Smriti-6, Jalam Vilas
Scheme, Poata B.
Road, Jodhpur (Raj.)-
342006. 2.0 Bharat Spun
Pipe & Construction
Company, 43,
Industrial Area,
Jhotwara, Jaipur-
302012. 3.0 JCC Infra
Projects Pvt. Ltd.,
761/30, Aklank House,
Tikam Ganj, Ajmer (Raj.) 4.0 M/s. Raj
Kumar Gupta
Contractors, III-J/59,
Nehru Nagar,
Ghaziabad-201001.
Yes
Dy. CE(C)/AII/
CA/91 dated
30/07/2015
Prem Fabricator's, 426, Near Jyoti Power,
Behind Steel Town, Moriya, Chandgodar, Ahmedabad-382110
948.74 Lakhs
21/01/2016 - - Work in
progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
21
Dy. CE/C/II-Ajmer
1
AII
/KV
J-K
RJ
D/I
/BG
D
ou
bli
ng
/T/3
Earthwork in bank/cutting for formation between Keshavganj (incl.) – Swarupganj (Excl.) section in connection with Keshavganj– Swarupganj Patch Doubling Project.
Open
24
.09
.10
Single
01
.11
.10 14
No
s.
Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6
Jalam Vilas Scheme, Poata B.
Road, Jodhpur
NIL Yes
NW
R/S
&C
/CA
/32
D
t.
21.0
7.1
1
M/S Varaha Infra Ltd., Umesh Smriti-6 Jalam Vilas Scheme, Poata
B. Road, Jodhpur
`89
6.9
0 L
acs.
17/11/2011, 31/03/2012, 30/06/2012,30/11/2012, 31/12/2012,31/03/2013
& 30/05/2013
01
/02
/20
11
- Work Completed, final bill under preparation.
2
AII
/KV
J-K
RJ
D/I
/BG
Do
ub
lin
g/T
/8-R
Dismantling of existing BG track, laying and linking of Broad gauge main line, loop lines including points and crossings at various yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project.
Open
27
.07
.11
Single 0
2.0
9.1
1
6 N
os.
Ist Lowest M/s Laxyo Energy
Pvt. Ltd., 46/1, TIT
Road, Ratlam (M.P.)
NIL Yes
Dy.C
E(C
)AII/K
VJ-S
RP
J/B
GD
/CA
/71 D
td.
05.1
2.2
01
1
Ist Lowest M/s Laxyo Energy Pvt. Ltd., 46/1,
TIT Road, Ratlam (M.P.)
`37
1.1
2 L
acs.
14/04/2012, 30/09/2012, 30/04/2013,31/10/2013, 30/05/2014, 31/01/2015,30/05/2015
& 20/06/2015
22
/10
/20
11
- Work under progress
3
AII
/KV
J-K
RJ
D/I
/BG
Do
ub
lin
g/T
/14
-R
Addition, alteration and construction of S&T structures, Pass. Platform, Platform Shelters, station Building, staff Quarters, water Huts, toilets, Hand Pumps, FOBs, Level Crossing works, Km Post, Gradient Posts & Hectometer Posts etc. between Keshavganj – Swarupganj (both incl.) section and Officer Rest House at Aburoad Station in connection with Keshavganj– Swarupganj BG Patch Doubling Project.
Open
30
.07
.12
Single
03
.09
.12
02
No
s.
Ist Lowest M/S Varaha Infra Ltd., Umesh Smriti-6
Jalam Vilas Scheme, Poata B.
Road, Jodhpur
NIL Yes
NW
R/S
&C
/CA
/47
date
d 2
4/1
2/2
012
M/S Varaha Infra Ltd., Umesh Smriti-6 Jalam Vilas Scheme, Poata
B. Road, Jodhpur
`89
8.8
6 L
acs.
14/06/2013, 30/09/2013, 31/12/2013, 30/04/2014,30/09/2014, 31/01/2015, 30/04/2015& 31/07/2015
23
.10
.20
12
- Work under progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
22
4
AII
/Co
ns
t/L
HS
/T/1
Construction of Limited Height Subway in lieu of existing LC No. 101 (Km 548/5-6), LC No. 102 (Km 550/7-8), LC No. 107 (Km 562/6-7), LC No. 109 (Km 568/9-10), LC No. 110 (Km 571/2-3) & LC No. 111 (Km 572/5-6) between stations Keshavganj-Swarupganj of Marwar-PalanPur Section in connection with elimination of level crossing gates.
Open
08
.08
.12
Single
19
.09
.12
2 N
os.
2nd Lowest M/s. Ravi Infrabuild
Projects Pvt. Ltd. Office 95, Hiran
Magri Sector-11, Udaipur-
313002 (Raj.).
NIL Yes
NW
R/S
&C
/CA
/50
date
d 2
1.0
2.2
013
M/s. Ravi Infrabuild Projects Pvt. Ltd.
Office 95, Hiran Magri Sector-11, Udaipur-
313002 (Raj.).
`11
22
.63 L
acs.
11/05/2013,10/12/2013, 31/05/2014
& 31/07/2014 1
9.1
2.2
012
- Work completed.
5
AII
/Co
ns
t./L
HS
/T/2
Construction of Limited Height Subway in lieu of existing LC No. 58, 60, 61, 62, 64, 65, 66, 67, 68, 69, 71, 72 & 73(13 Nos) between stations Marwar to Rani of Marwar-Palanpur Section in connection with elimination of level crossing gates.
Open
21
.02
.20
13
Single
28
.03
.20
13 01
No
s.
1st Lowest M/s. Ravi Infrabuild
Projects Pvt. Ltd. Office 95, Hiran
Magri Sector-11, Udaipur-
313002 (Raj.).
NIL Yes
NW
R/S
&C
/CA
/58
d
ate
d
18/1
1/2
01
3
M/s. Ravi Infrabuild Projects Pvt. Ltd.
Office 95, Hiran Magri Sector-11, Udaipur-
313002 (Raj.).
`17
90
497
92
.55
31/12/2014 &
30/09/2015
14
/09
/20
13
- Work under progress
6
AII
/GR
I-M
J/B
GD
/T/1
Earthwork in embankment for cutting & filling, Blanketing for bank, Addition, alteration and construction of S&T structures, Pass. Platform, Platform Shelters, station Building, staff Quarters, water Huts, toilets, Hand Pumps, FOBs, TMC Rest house etc. between Guriya–Marwar Jn. stations (both excl.) and Officer Rest House at Mawar Jn. Station in connection with Guriya-Marwar Jn. BG Patch Doubling Project.
Open
30
.08
.12
Single
16
.10
.12
07
No
s.
1st Lowest M/s. Braham
Prakash Modi, 74
Sudarshanpura, Industrial
Area, Baisgodam, Jaipur-06
NIL Yes
NW
R/S
&C
/CA
/51
date
d 1
4/0
3/2
013
M/s. Braham Prakash Modi, 74
Sudarshanpura, Industrial Area,
Baisgodam, Jaipur-06
`35
41
.71 L
acs.
30/09/2014, 30/04/2015, 31/07/2015
& 30/10/2015 3
1/1
2/2
012
- Work under progress
7
AII
/GR
I-M
J/B
GD
/T/2
Construction of Important/Major Bridges including earthwork, blanketing on the approaches between stations Guriya to Marwar Junction with Railway’s/Contractor’s design & drawing in connection with Guriya-Marwar Junction BG Patch Doubling Project.
Open
21
.01
.20
13
Single
26
.02
.20
13
06
No
s.
1st Lowest M/s.PNC Infratech Ltd.-Jain
Construction Company
(JV) 761/30, Aklank
House, Near Mal Godown, Tikam Ganj,
Ajmer
NIL Yes N
WR
/S&
C/C
A/6
2 d
ate
d 0
6/0
1/2
014
M/s. PNC Infratech Ltd.-Jain Construction Company (JV) 761/30,
Aklank House, Near Mal Godown, Tikam
Ganj, Ajmer `32
40
432
84
.89
28/01/2015 &
31/12/2015
06
/12
/20
13
- Work under progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
23
8
AII
/Co
ns
t./F
LS
/T/1
Marking out of center line, taking levels including all details, Carrying out Geotech investigation, designing of foundation and sub – structures / super structure of Minor / Major bridges/LHS, preparation of land plans & proposal, Preparation of L-section & yard plans etc. & submitting detailed working drawings in connection with Bangurgram to Guriya & Marwar to Rani Doubling projects and Various shifting of utility works of DFCCIL & LHS works between Kishangarh & Palanpur stations.
Open
17
.09
.20
12
Single
09
.11
.20
12
03
No
s.
2nd Lowest M/s. S. M.
Consultants, Plot No.-130, S.M. Tower, Mancheswar
Industrial Estate,
Rasulgarh, Bhubneshwar
(Odisha)
M/s. BPC India,
Nataraj Bhawan,
P.O.Khamarchandi, P.S.
Haripal, Dist.-
Hooghly, West
Bengal
Yes
NW
R/S
&C
/CA
/57
date
d 0
7/1
1/2
013
M/s. S. M. Consultants, Plot No.-
130, S.M. Tower, Mancheswar Industrial
Estate, Rasulgarh, Bhubneshwar (Odisha) `1
833
829
3.9
7 06/07/2013,
30/11/2013, 31/03/2014, 31/10/2014,30/04/2015
& 31/08/2015
02
/02
/20
13
- Work under progress
9
AII
/Co
ns
t/F
BW
/T/1
Flash butt Welding of 60/52 Kg. New/SH,(72/90 UTS ) Rail joints by using mobile flash butt welding plant in connection with various sanctioned works of Ajmer unit of construction organization.
Open
11
.10
.20
12
Single
19
.11
.20
12
01
No
.
1st Lowest M/s. The
India Thermit Corpn. Ltd., 84/22, Fazal
Ganj, Kanpur-208012.
NIL Yes
Dy.
CE
(C)/
AII/F
BW
/CA
/85
date
d 2
1/1
0/2
013
M/s. The India Thermit Corpn. Ltd., 84/22,
Fazal Ganj, Kanpur-208012
`69
90
480
0.0
0
18/03/2015 &
18/03/2016
13
/11
/20
13
- Work under progress
10
AII
/Co
ns
t./D
FC
CIL
/T/7
Shifting of different utilities in connection with infringements in DFCCIL alignment by dismantling of service building, over head / underground water tank, diesel shed, cycle stand etc. and reconstruction of the same utilities, construction of Road, boundary wall, drains, septic tanks, pathways & extension of FOB's etc. as per requirement of shifted locations between Madar-Palanpur section.
Open
11
.01
.20
13
Single
19
.02
.20
13
& 2
2/0
4/2
01
2
1 N
o.
1st Lowest M/s. RSB
project Limited, RSB Plaza, SCO
30-31, sector-16, Faridabad-
121002
NIL Yes
NW
R/S
&C
/CA
/54
date
d 2
0/0
9/2
012
M/s. RSB project Limited, RSB Plaza,
SCO 30-31, sector-16, Faridabad-121001
`30
77
083
56
.73
28/11/2014 &
30/09/2015 - - Work under progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
24
11
AII
/Co
ns
t./D
FC
CIL
/T/8
Construction of staff Quarters including electric work, Under Ground Water Tank, Road work, Boundary Wall etc. between Chandawal (incl.) – Nana (incl.) Section in connection with shifting of utilities for DFCCIL.
Open
11
.01
.20
13
Single
19
.02
.20
13
& 2
2/0
4/2
01
3
01
No
.
1st Lowest M/s. RSB
project Limited, RSB Plaza, SCO
30-31, sector-16, Faridabad-
121002
NIL Yes
NW
R/S
&C
/CA
/55
d
ate
d
20/0
9/2
01
3
M/s. RSB project Limited, RSB Plaza,
SCO 30-31, sector-16, Faridabad-121002
`29
47
352
33
.22
19/11/2014,31/05/2015
& 31/10/2015
- - Work under progress
12
AII
/Co
ns
t./D
FC
CIL
/T/9
Construction of staff Quarters including electric work, Under Ground Water Tank, Road work, Boundary Wall etc. between Nana (excl.) – Palanpur (excl.) Section in connection with shifting of utilities for DFCCIL.
Open
11
.01
.20
13
Single
19
.02
.20
13
& 2
2/0
4/2
01
3
01
No
.
1st Lowest M/s. RSB
project Limited, RSB Plaza, SCO
30-31, sector-16, Faridabad-
121002
NIL Yes
NW
R/S
&C
/CA
/56
da
ted
20/0
9/2
01
3
M/s. RSB project Limited, RSB Plaza,
SCO 30-31, sector-16, Faridabad-121002
`18
71
122
04
.24
19/08/2014, 30/04/2015
& 30/11/2015 2
2/0
7/2
013
- Work under progress
13
AII
/Co
ns
t./L
HS
/T/5
Providing Limited Height Subways (19 Nos.) in lieu of existing level crossings between Rani & Keshavganj stations of Marwar Jn. – Palanpur section in connection with elimination of existing level crossing gates.
Open
21
.02
.20
13
Two packet system
13
.08
.20
14
04
Nos.
1st Lowest M/s. Ravi Infrabuild
Projects Pvt. Ltd. Office 95, Hiran
Magri Sector-11, Udaipur-
313002 (Raj.).
03 (Three) Yes
NW
R/S
&C
/CA
/66 D
t. 27
-0
2-2
015
M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-
11, Udaipur-313002 (Raj.).
Rs.
39
08
.17
Lac
s
18/05/2016
03
/12
/20
14
- Work under progress
14
AII
/Co
ns
t./L
HS
/T/6
Providing Limited Height Subways in lieu of existing level crossings between Swaroopganj & Palanpur stations of Marwar Jn. - Palanpur section in connection with elimination of existing level crossing gates.
Open
21
.02
.20
13
Two packet system
13
.08
.20
14
04
No
s.
1st Lowest M/s. Ravi Infrabuild
Projects Pvt. Ltd. Office 95, Hiran
Magri Sector-11, Udaipur-
313002 (Raj.).
03 (Three) Yes
NW
R/S
&C
/CA
/67
da
ted
27/0
2/2
01
5
M/s. Ravi Infrabuild Projects Pvt. Ltd. Office 95, Hiran Magri Sector-
11, Udaipur-313002 (Raj.).
Rs.
38
73
.36
Lac
s.
18/05/2016
18
/12
/20
14
- Work under progress
15
AII
/GR
I-M
J/B
GD
/T/6
Construction of Minor Bridges including other ancillary work between station Guriya (excluding) - Marwar Jn. (excluding) in connection with Guriya - Marwar Junction BG patch doubling project.
Open
07
/07
/20
14
Two packet system
13
/08
/20
14
04
No
s.
1.0 (One)
1.0 M/s. Ashish
Construction Co.- SP Infracon (JV) 211, Shivam
Complex, Opp.
Hetarth Party Plot,
Science City Road, Sola, Ahmedabad
- 380061.
Yes
NW
R/S
&C
/CA
/69
da
ted 0
9/0
3/2
01
5.
M/s. JCC InfraProjects Pvt. Ltd., 761/30,
"Aklank House", Tikam Ganj, Ajmer (Raj.).
`21
69
630
87
.73
29/02/2016
01
/03
/20
15
- Work under progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
25
Dy. CE/C/Jodhpur
1. JUConst-/
09.R/2010-
11
MKN-BIDD E/Work in
cutting & filling Const.of
ROB instead of LC etc.
Open temder 21.02.11 Single 07.06.11 01 M/s Bhanwar Lal
Bijarnia Vill.
Rajpura Distt.
NGO
- L-1 Dy.CE/C/
JU/37/ 2011-12
dtd. 23.01.12
M/s Bhanwar Lal Bijarnia 335.54 29.09.12
31.01.13
30.04.13
31.07.13
31.12.13
31.03.14
10.10.11 Work Physically
completed
-
2. T.No. JU/
CONST/
15/2011-12
Accepted
on–
17.09.12
Work of remodeling of JU
yard including all work
related to P. way, AT
welding
Open 25.03.12 Single 26.04.12 04 Sh.Girdhari Ram
S/o Sh. Sajjan
Ram,
JODHPUR
M/s P.C.
Sharma, Noida
(U.P.)
L-1 Dy.CE/C/
JU/03/2012-13,
dtd. 13.12.12
Sh.Girdhari Ram S/o Sh.
Sajjan Ram,
JODHPUR
132.02 16.06.13
31.10.13
30.04.14
31.12.14
28.02.15
20.03.15
31.12.15
11.11.12 Work in
progress,
Work delayed due to non
availability of DISCOM
land.
3. T.No. JU/
Const/T-02/
2012-13 (JU
Yard)
Accepted
on–
16.10.12
Work of remodeling of JU
yard incl all work related to
Civil works
Open 19.07.12 Single 22.08.12 03 M/s Kalu Ram
Contractor,
Jodhpur.
M/s Prathem
Builders,
Jodhpur Kera
Ram S/o Pusha
Ram, Jodhpur.
L-1 Dy.CE/C/
JU/05/2012-13,
dtd. 08.01.13
M/s Kalu Ram Contractor, E-
15,Shastri Nagar, JU.
414.97 15.08.13
15.12.13
31.03.14
31.08.14
31.01.15
30.12.15
07.12.12 Work in
progress,
-do-
4. JU/Const./
T-18/13-14/
ROB/C-
21/NAC
Construction of complete
ROB (2 lane)
incl.approaches in lieu of
existing LC No.C-21 on
MTD-FL sec at NAC station
Open tender 08.11.13 Two packet
system
13.12.13 09 Nos. 06 Nos.
1. Vishnu
Prakash R
Pungalia
2. Rachana
Const. Co.
3. Praveen
Gulati Infra-
structures Pvt.
Ltd.
4. Sona
Builders,
5. Rakesh
Const. Co.
6. M/s Jain
Const. Co.
03 Nos.
1. Shree
Gautam
Construction
Co. Ltd.,
2. M/s Maan
Rana (JV),
3. M/s DRA-
BSP
Construction
(JV),
L-1 NWR/S&C/CA-
65, dtd.
20.10.2014
M/s Vishnu Prakash R
Punglia Limited, H-1 First
Floor Shivalik Complex,
Near Gol Building,
Sardarpura, Jodhpur
18.88 Cr. 03.07.16 08.07.14 Work in
progress
5. T.No. JU/
Const./
T-06R/
2014-
RUBs in lieu of LCs, in
section of MTD-BKN (04
Nos.), MTD Bye Pass (01
No.) & MTD-FL (01 No.) on
Open Tender 05.11.14 Single Tender 09.12.14 04 Nos. M/s Shree Karni
Traders,
C-171 Kanta
Khaturia
- L-1 Dy.CE/C/
JU/13/2014-
15/LHS, dtd.
18.04.2015.
M/s Shree Karni Traders,
C-171 Kanta Khaturia
Colony,
Bikaner
624.15 lacs. 27.04.16 17.04.15 Work in
progress
-
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
26
15/LHS JU division
Colony,
Bikaner
6. JU/Const./T-
22/14-
15/Std.IIR/M
TD-BKN
All Civil & P.Way work
c/with Std-II work in MTD-
BKN & RKB-PLC sec
Open Tender 21.11.14 Single Tender 23.12.14 02 Nos. M/s Bhanwar Lal
Bijarnia,
Village-Rajpura,
Post- Prewari,
Tehsil- Nawa,
Distt. Nagour
(Rajasthan)
M/s Jai Mata
De Energy
System,
Laxmangarh
sikar
L-1 Dy.CE/C/
JU/14/2015-
16/Std-IIR, dtd.
11.06.15.
M/s Bhanwar Lal Bijarnia,
Village-Rajpura, Post-
Prewari,
Tehsil- Nawa, Distt. Nagour
(Rajasthan)
715.80 lacs. 03.10.16 10.04.15 Work in
progress
-
7. JU/Const./T-
23R/2014-
15/Std.IIR/M
TD-BKN
Supplying and stacking
28400 cum 65mm gauge
hard stone ballast (Machine
crushed) in c/ with RKB-PLC
Std-IIR work
Open Tender 03.02.15 Single Tender 05.03.15 05 Nos. M/s Jai Balaji
Construction Co.,
Shanti Marble,
Station Road,
Chirawa, Distt.
Jhunjhunu
M/s Shree
Shyam
Engineering
Co., 29,
Poonia Colony,
Churu
(Rajasthan)
L-2 Dy.CE/C/
JU/15/2015-
16/Std-IIR, dtd.
04.08.15.
M/s Jai Balaji Construction
Co., Shanti Marble, Station
Road, Chirawa, Distt.
Jhunjhunu
194.77 lacs. 22.01.16 01.06.15 Work in
progress
-
8. JU/Const./74
-W-26/2015-
16/Std.IIR/
RKB-PLC
Supplying and stacking of
20800 cum Stone ballast for
Std.IIR work in RKB-PLC
section
Open Tender 05.06.15 Single Tender 10.07.15 04 Nos. M/s J.K.
Const.Co.
Nokha,
A.K. Gupta &
Co., , DELHI
M/s
Hanuman
Construction
Co., Nokha
M/s Shree
Shyam
Engineering
Co, Churu
L-1 Dy.CE/C/
JU/___/ 2015-
16/Std.IIR/
RKB-PLC, dtd.
.......15
M/s J.K. Construction Co.,
New Market, Nokha,
District – Bikaner 334803
(Rajasthan)
142.84 lacs. 10.05.16 ...... Work yet to be
started.
- -
9. JU/Const./
T-27/2015-
16/Std.IIR/
RKB-PLC
All Civil & P.Way work
c/with Std-II work in RKB-
PLC sec
Open Tender 11.06.15 Single 15.07.15 01 No. M/s Bhanwar Lal
Bijarnia,
Village-Rajpura,
Post- Prewari,
Tehsil- Nawa,
Distt. Nagour
(Rajasthan)
- L-1 Dy.CE/C/
JU/___/ 2015-
16/Std.IIR/
RKB-PLC, dtd.
.......15
M/s Bhanwar Lal Bijarnia,
Village-Rajpura, Post-
Prewari,
Tehsil- Nawa, Distt. Nagour
(Rajasthan)
679.84 lacs. 15.03.17
10. JU/Const./T-
25/2015-
16/Std IIR
Providing “IN SITU” Glued
Insulated Joints of G-3 (L)
type for 52 kg/60 kg rails in
c/w StdIIR work in MTD-
BKN & RKB-PLC section.
Open Tender Single 10.07.15 M/s Tirupati Metal
Fabricators,
1433 Sector 16,
Faridabad-
121002
(Haryana)
Dynamic
EngineersKot
a.
Creative
Engineers
Kota -
L-1 Dy.CE/C/
JU/___/ 2015-
16/Std.IIR/
RKB-PLC, dtd.
.......15
M/s Tirupati Metal
Fabricators,
1433 Sector 16,
Faridabad-121002
(Haryana)
320.01 lacs. 31.03.18 - - -
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
27
CE/C/IV-JP
Dy. CE/C/BKN
1 Const/BKN/04/2011-12/BKN-SDLP-RTGH-SRDR
Supplying and stacking 55000 cum 65mm gauge stone ballast machine crushed (hard stone) confirming to RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh-Sardarshahar section in
connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
14.09.11 single 14.10.11 08 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
Yes 172-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S Jai Mata Const.Co. H.No.14169 Street no.8A Ganesh Nagar Bhatinda( Pb)
Rs 305.25 lakhs
25.05.12 10.01.12 30.06.15 Final bill is under preparation.
2 Const/BKN/08/2011-12/BKN-SDLP-RTGH-SRDR
Earthwork in banks and cutting for formation including side drains , trolley refuges, toe walls/ retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshahar (including) section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project.
Open tender
17.09.311 single 17.10.11 2 nos Tender awarded to evaluated L-1 .
Yes, tender awarded to lowest valid and eligible tenderer
Yes 173-NWR/Dy CE/C-I/BKN Dt 09.03.2012
M/S LVJ Projects Private Limited, 1 & 2, 1st Floor, Shri Krishna Centre , Near Mithakhari Six Roads , Navrangpura, Ahemadabad-380009 , Gujrat
Rs 534.82 lakhs
01.06.12 05.01.12 31.12.15 Work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
28
3 Const/BKN/06 (R)/201
1-12/BKN-SDLP-RTGH-SRDR
Dismantling of existing MG track, Laying and linking
of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project
Open tender
20.01.12 single 22.02.12 2 nos Tender awarded to evaluated L-
1 .
Yes, tender awarded to lowest valid
and eligible tenderer
Yes 178-NWR/Dy CE/C-I/BKN
Dt 18.08.2012
M/S Shree Nahar Construction Co., A-328, Shastri Nagar ,
Jodhpur -342003
Rs 531.61 lakhs
25.12.12 24.05.12 30.06.15 Work is in progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
29
4 Const/BKN/09(R)/2011
-12/BKN-SDLP-RTGH-SRDR Dt 13.01.2012.
Construction and modification of station buildings,
platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh-Sardarshahar section in connection with Bikaner-Sadulpur-Ratangarh-Sardarshahar gauge conversion project
Open tender
20.01.12 single 28.03.12 04 nos Tender awarded to evaluated L-
1 .
Tender awarded to evaluated
L-1.
Yes 177-NWR/Dy CE/C-
II/BKN Dt 07.08.12.
M/S Maheshwari Construction Co Bikaner Road,
Nokha(Bikaner)
Rs 647.31 lakhs
03.03.13 06.07.12 31.10.15 Work is in progress
5 Const/BKN/01/2012-13/SRPR-SGNR Dated 29.08.2012
Supplying and stacking 14000 cum 65mm gauge stone ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project
Open tender
26.05.12 single 27.06.12 05 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 20/NWR/Dy CE/C/BKN/2012-13/SRPR-SGNR Dated 19.10.2012
M/S R.K.Infrastructure, 407, Pink Tower, Tonk Road, Jaipur
Rs137.94 lakhs
28.12.12 07.09.12 31.03.14 Contract terminated. Final variation in process.
6 Const/BKN/05/2012-13/SRPR-SGNR
Dismantling & reconstruction of parcel office, extension of waiting hall, construction of platform shelters, improvement of platform surfacing of Island platform and other ancillary works at Sri Gangsanagar in connection with Sarupsar -Sriganganagar Gauge Conversion Project.
Open tender
08.08.12 single 08.08.12 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 21-NWR/Dy CE/C/BKN/SRPR-SGNR Dt 06.12.12
M/S V.K.Const Co, 2-D-37,Jawaharnagar Sri Ganganagar
Rs131.75 lakhs
06.05.13 26.10.12 10.02.15 Final variation under finance vetting.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
30
7 Const/HMH/09/2012-
13/SURP-HMH-SGNR Dated 16.07.12
Construction/modification of station buildings &
structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Diplana (excluding) to Tehsil Bhadra (including) section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
16.07.12 single 22.08.12 05 nos Tender awarded to evaluated L-
1 .
Tender awarded to evaluated
L-1.
Yes NWR/S&C/CA/48 dated
22.01.2013
M/S Ramesh Kumar Bansal, 182, Vinoba Basti, Near Dhan
Mandi Gate, Sri Ganganagar ( Raj)
Rs 1051.42 lakhs
03.08.13 27.10.12 30.09.15 Work since completed.
8 Const/BKN/03/2012-13/SRPR-SGNR
Dismantling & Construction of BG Washing line coach care complex,BG goods platform with approach road, electrical sub-station building,building extension of high level passenger platform, water hydrants on washable apron,drainage pipe line and other ancillary works at Sri Gangsanagar station yard in connection with Sarupsar -Sriganganagar Gauge Conversion
Project.
Open tender
27.06.12 single 06.08.12 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/45 dated 07.12.12.
M/S Pragati Construction Consultants, 28/12, East Punjabi Bagh, Main Ring Road, New Delhi -110026.
Rs 1009.05 lakhs
02.07.13 26.10.12 31.10.14 Final variation under finance vetting.
9 Const/BKN/04/2012-13/SRPR-SGNR
Construction of BG Sick line shed , Dismantling of MG sheds & MG goods PF at Sri Ganganagar, Foot Over bridge at Sri Ganganagar & Suratgarh station, and other ancillary works at Sriganganagr station yard in connection with Sarupsar-Sriganganagar Gauge Conversion Project
Open tender
27.06.12 single 06.08.12 01 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes NWR/S&C/CA/44 dated 07.12.12.
M/S Pragati Construction Consultants, 28/12, East Punjabi Bagh, Main Ring Road, New Delhi -110026.
Rs 1266.63 lakhs
02.07.13 26.10.12 31.01.15 Final variation under finance vetting.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
31
10 Const/BKN/01/2012-
13/SURP-DPLN-HMH-SGNR dated 08.08.12
Dismantling of existing MG track, laying and linking
of broad gauge main line, loop lines, including points and crossings in yards, spreading of ballast tamping of track, transportation of P.Way materials and other ancillary works in Zone-3 (Ch.88000 to 132000 including Gogameri, Tehsil Bhadra & Anupsahar station yard) on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
11.08.12 single 14.09.12 2 nos Tender awarded to evaluated L-
1 .
Tender awarded to evaluated
L-1.
Yes 06/NWR/Dy CE/C/BKN/
2012-13/SURP-DPLN dated 20.02.2013
M/S Laxyo Energy Pvt. Ltd 46/1 TIT Road Ratlam (MP)
553.10 lakhs 08.11.13 15.12.12 31.03.16 Work is in progress
11 Const/BKN/02/2012-13/SURP-DPLN-HMH-SGNR dated 08.08.12
Dismantling of existing MG track, laying and linking of broad gauge main line, loop lines, including points and crossings in yards, spreading of ballast tamping of track, transportation of P.Way materials and other ancillary
works in Zone-4 (Ch.132000 to 175000 including Sidhmukh, Narwasi, Suratpura & Sadulpur By-pass station yard) on Hanumangarh-Suratpura section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project
Open tender
11.08.12 single 14.09.12 2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 05/NWR/Dy CE/C/BKN/2012-13/SURP-DPLN dated 08.02.2013
M/S Bhairav Construction Co, Sukh sagar , Arya Samaj Road, Gulab Bari < Kota ( Raj)
Rs 521.79 lakhs
08.11.13 17.11.12 31.03.16 Work is in progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
32
12 Const/BKN/04(R)/2012-13/SRPR-SGNR dt. 07.12.2012
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, Addition and alteration to station yards, insertion of fan shaped turnouts, shifting of existing turnouts, leading of P.way material and other miscellaneous works in Suratgarh Yard on Suratgarh -Sriganganagar section in connection with Sarupsar -Sriganganagar Gauge conversion project
Open tender
10.12.12 single 11.01.13 2 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 22-NWR/Dy CE/C/BKN/SRPR-SGNR Dt15.05.13
M/S P.C. Sharma, A-87, Sector-49, Noida, Gautam Budh Nagar,UP
Rs 294.64 25.11.13 07.04.13 31.12.14 Final bill under technical check.
13 Const/BKN/03/2013-14/SUR
P-HMH-SGNR dated 12.11.2013.
Balance work of earthwork in banks and cutting for formation including
side drains, trolley refuges, toe walls/ retaining wall etc. between Diplana (excluding) to Suratpura ( including) section i.e. from km 88.00 to km 175.00 in connection with Suratpura-Hanumangarh-Sri Ganganagar gauge conversion project
Open tender
14.11.13 single 17.12.13 4 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 11-NWR/Dy CE/C/BKN/2013-
14/SURP-HMH-SGNR Dt 15.03.2014
M/S V.K. Construction Co. 2-D-37 A, Jawahar Nagar, Sri
Ganganagar-335001 ( Raj)
Rs 272.70 lakhs
12.07.14 05.02.14 31.08.15 Work is in progress
14 Tender No. Const/BKN/05/2013-14/ROK-BNW STD IIR 20.02.2014
Construction / modification of station buildings & structures i.e. S&T buildings and other ancillary works between Rohtak ( excluding) to Bhiwani ( excluding) section in connection with Rohtak- Bhiwani standard II-R works
Open tender
23.02.14 single 26.03.14 04 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 14-NWR/Dy CE/C/BKN/2014-15 dated 29.10.2014
M/S Navdeep Constructions, VPO- Badhawar Distt Hisar.
Rs 149.14 lakhs
16.02.15 20.06.14 30.10.15 Work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
33
15 Tender No. Const/BKN/07/2013-14/ROK-BNW STD IIR 20.02.2014
Addition and Alteration to station yards, insertion of fan shaped turnouts, linking of track, sand humps and over runs, shifting of existing turnouts, leading of p.way material and other miscellaneous works at all station in connection with Standard –IIR and Signalling work at Lahil, Kalanaur Kalan & Bamla stations on Rohtak – Bhiwani section..)
Open tender
23.02.14 single 26.03.14 03 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 15/NWR/Dy.CE/C/BKN/2014-15 dated 07.11.2014
M/S Bhikha Ram DevrathVillage- Digarla, Tehsil- Rajgarh,District – Churu ( Rajasthan
Rs 101.62 lakhs
12.03.15 01.09.14 31.12.15 Work is in progress
16 Tender No. Const/BKN/04/2014-15/LGH Work Shop Dated 11.07.2014
Construction of Roller bearing shop and supervisor rooms at Lalgarh Work Shop of Bikaner Division.
Open tender
18.07.14 single 20.08.14 02 nos Tender awarded to evaluated L-1 .
Tender awarded to evaluated L-1.
Yes 18/NWR/Dy.CE/C/BKN/2014-15 dated 15.01.2015
Dilbag Singh Contractor, 9-C, Friends Colony, Rajgarh Road, Hissar (Haryana)
Rs 275.57 lakhs
14.05.15 09.10.14 30.06.15 Final bill passed.
DY. CE/C/HMH
1 Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt. 04.10.10
Rebuilding, Construction, Strengthening/ extension of existing Minor bridges and upto 6.10m including earthwork in in Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH-SGNR GC project.
Open Tender
09.10.10 One packet system
10.11.10 4 1 3 Yes, L-1
Const/ BKN/ SURP-HMH-SGNR/ 13/ 2010-11 Dt: - 05.02.11
M/s Poonia Const Co. 30, Sector-13, Part-II, Hisar
425.56 04.02.12 24.11.11 04.02.12 31.03.15
Work is in progress.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
34
2 Const/ BKN/ 16/2011-
12/ SURP-HMH-SGNR Dated–16.08.2011
Construction of Foot Over Bridge and Platform
Shelter at Hanumangarh Junction, Hanumangarh Town, Ellenabad and Nohar station in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.””
Open Tender
28.08.11 One packet system
28.09..11 2 1 1 Yes, L-1
Const/BKN/16/2011-12/SURP-
HMH-SGNR Dated: - 16.12.2011
M/s Sajneev Brothers, C-10, Vaishali
Nagar, Jaipur
302.87 Lakh 15.12.12 20.03.12 15.12.12 15.11.14
work is in progress
3 Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,
Transportation, Assembling, Erection, Cambering, Riveting (with contractor’s rivets) painting and launching (as per contractor’s approved scheme) of open web through steel girders on Bridge No. 2-A (2 x 61.00m) at km. 2.347 on Ghaggar River, Bridge No. 14-B (2 x61.00m) at km. 18.345 on Ghaggar River and Bridge No. 21-A (1x 76.20m) at Km. 28.638 on Indira Gandhi Main Canal (Girder components will be
supplied by Railway) with supplying & fixing of bearings and supplying, fabricating & fixing of galvanized steel channel sleepers along with matching fittings at site, on newly constructed top of pier/abutment to perfect level & alignment and other ancillary works in c/with SURP-HMH-SGNR GC project. (M/s Kiran Infra
Open Tender
13.01.12 One packet system
30.7.12 4 1 3 Yes, L-1
Const/HMH/1/ 12-13/SURP-HMH-SGNR Dated 23.6.2012,
M/S Kiran Infra engg.Lted B-141 Road no 9D VKI area JP
495.56 16.9.13 01.10.12 16.9.13 31.05.15
work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
35
Engineers Ltd, Jaipur.
4 Const/HMH/05/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
Construction / modification of station buildings & structures i.e. RRI Building, officers / sub ordinate rest house, S&T buildings, Platforms, duty bunk and other ancillary works between Hanumangarh Jn (including) to Hanumangarh Town (including) section
Open Tender
11.07.12 One packet system
13.08.12 2 1 1 Yes, L-1
Const/HMH/05/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
M/S. V.K. Construction Co, 2-D-37, Jawahar Nagar, Sri Ganganagar
828.64 03.8.13 20.10.12 03.8.13 30.09.15
work is in progress
5 Const/HMH/06/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Hanumangarh Town (excluding) to Talwara Jhil (including) section in connection with Suratpura-Hanumangarh-Sriganganagar gauge conversion project.
Open Tender
11.07.12 One packet system
13.08.12 4 1 3 Yes, L-1
Const/HMH/06/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
M/S. V.K. Construction Co, 2-D-37, Jawahar Nagar, Sri Ganganagar
691.32 23.07.13 20.11.12 23.07.1330.06.15
work is in progress
6 Const/HMH/7/ 12-13/SURP-HMH-SGNR Dated 09.7.2012,
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Talwara Jhil (excluding) to Khinaniyan (including) section in connection
Open Tender
11.7.12 One packet system
13.8.12 4 1 3 Yes, L-1
Const/HMH/25/SURP-HMH-SGNR/2011-12Dated–07.01.12
M/S P.S.Infra Build Pvt.Lited 15 jaat Dharmshala G.T.Road Fatehabad
779.3 12.7.13 4.11.12 12.7.13 31.07.15
work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
36
7 Const/HMH8/ 12-13/SURP-HMH-SGNR Dated 09.7.2012,
Construction / modification of station buildings & structures i.e. S&T buildings, Platforms, duty bunk and other ancillary works between Khinaniyan (excluding) to
Diplana (including) section in connection
Open Tender
11.7.12 One packet system
13.8.12 4 1 3 Yes, L-1
Tender No. Const/HMH/08/SURP-HMH-SGNR/2012-13 Dated – 09.07.2012
M/S Shree Shyam Engineering Co.29 Poonia Colony Churu(Raj)
779.3 12.7.13 29.10.12 12.7.13 31.07.15
work is in progress
8 Const/HMH9/ 12-13/SURP-
HMH-SGNR Dated 05.8.2012,
Dismantling of existing MG track, Laying and linking
of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-1 (Ch. 0.000 to 44.000 including Hanumangarh, Hanumangarh town, Sherekan, Talwara Jhil & Ellenabad station yard)
Open Tender
10.8.12 One packet system
14.9.12 2 1 1 Yes, L-1
Const/HMH/09/SURP-
HMH-SGNR/2012-13 Dated – 05.08.2012
M/S Bhanwar Lal Bijarnia, village- Rajpura, Tehsil
nawa. Distt.Nagaur (Raj)
709.89 30.10.13 22.11.12 30.10.1328.02.16
work is in progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
37
9 Const/HMH10/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-2 (Ch. 44.000 to 88.000 including Khinaniyan, Nohar & Diplana station yard)
Open Tender
10.8.12 One packet system
14.9.12 2 1 1 Yes, L-1
Const/HMH10/ 12-13/SURP-HMH-SGNR Dated 05.8.2012,
M/S. P.C.Sharma A-87-sector 49 NOIDA Distt. Gautum Budh Nagar
444.35 21.10.13 23.10.12 21.10.13 30.09.15
work is in progress
10 Const/HMH13/ 12-13/SURP-HMH-SGNR Dated 22.10.2012,
Construction of Road under Bridges in lieu of existing Level crossing No.33 at km. 47.420, 38 at km. 55.032, 40 at km. 67.620, 48 at km. 75.564, 53-1 at km.93.197, 56 at km. 99.028, 74 at km. 132.745 & 81 at km. 143. 380 on
Hanumangarh-Sadulpur section in connection with elimination of level crossing gates.
Open Tender
25.10.12 One packet system
27.11.12 1 1 1 Yes, L-1
Const/HMH13/ 12-13/SURP-HMH-SGNR Dated 22.10.2012,
M/S Hari Singh & Co.,H.No.101, Model Town, Narwana, Distt- Jind 09416464971.
852.45 10.11.13 27.01.13 10.11.13 31.03.16
work has been complited & final bill under process
11 Const/HMH/02 (R) SURP-HMH-
SGNR/2012-13
dated –19.11.20
12
Flash Butt Welding of 52 Kg / 60 Kg rails at site / depot using Mobile Flash Butt Welding Plant between Sri Ganganagar station (including)- Hanumangarh Junction-Suratpura station (including) in connection Suratpura -Hanumangarh- Sri Ganganagar gauge conversion project
Open Tender
23.11.12 One packet system
26.12.12 2 1 1 Yes, L-1
Const/HMH/02 (R) SURP-HMH-SGNR/2012-13 dated –19.11.2012
M/s Speed Crafts Limited, Layak Bhawan Boring Canal Road Patna-800001
577.81 01.10.14 2.4.13 30.11.14 31.08.15
Work is in Progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
38
12 Const / HMH / 04 / SURP-
HMH-SGNR/2013-14 dt. 04.07.2013
Supplying and stacking 33000 cum 65mm gauge
stone ballast machine crushed (hard stone) conforming to RDSO specifications in the section of Hanumangarh-Diplana in connection with Suratpura- Hanumangarh-SriGanganagar Gauge Conversion Project.
Open Tender
09.07.13 One packet system
12.08.13 3 1 2 Yes, L-1
Const / HMH / 04 / SURP-
HMH-SGNR/2013-14 dt. 04.07.2013
M/s Sura Const. Co., Sector No. 13 H.No.1133/1323,
Hissar
342.94 26.03.14 10.10.13 26.3.14 30.09.15
Work is in Progress
13 Const/HMH/02/SURP-HMH-SGNR/2013-14 dated 04.07.2013
Construction of Road under Bridges in lieu of 07 Nos. of Level Crossing Gates on Hanumangarh - Suratpura section in connection with elimination of level crossing gates
Open Tender
09.07.13 One packet system
12.08.13 2 1 1 Yes, L-1
Const/HMH/02/SURP-HMH-SGNR/2013-14 dated 04.07.2013
M/s Mohla Const. Co., 476,Sector 15-A Hisar
730.558 25.09.14 1.0314 31.3.15 30.08.15
Work is in Progress
14 Const/ HMH
/07/SURP-HMH-
SGNR/2013-14 dated
06.01.2014
Miscellaneous balance work of earthwork in banks and cutting, side
drains, trolley refuges, toe walls /retaining wall, etc. including supply of cement between Km. 0.00 to Km 88.00 in connection with Suratpura – Hanumangarh-Sriganganagar gauge conversion project.
Open Tender
09.01.14 One packet system
12.02.14 4 1 3 Yes, L-1
Const/ HMH
/07/SURP-HMH-
SGNR/2013-14 dated
06.01.2014
M/s J.B. Construction, V.P.O. DaharDistt- Panipat-132103,
248.58 11.11.14 26.04.14 20.4.15 05.10.15
Work is in Progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
39
15 Const/HMH/02/ROB/MBY/2
014-15 dated
17.12.2014
Construction of 04 lane Road Over Bridge (single span
over Railway tracks) with RCC deck slab, composite girder super structure, with RCC substructure & pile foundation and construction of Limited Height Subway in lieu of level crossing No. 32-B at km. 35/2-3 on Bathinda - Suratgarh section at Mandi Dabwali on Delhi - Hisar - Fazilka (NH-10) at RD 315.280 in Sirsa District
Open Tender
22.12.14 One packet system
23.01.15 11 1 10 Yes, L-1
Const/HMH/02/ROB/MBY/2014-
15 dated18.04
.15
M/s Punia Const Co., 30, Sector No.13,
Part-II, Hisar (Haryana) 125005.
912.48 17.12.15 17.12.15
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
40
CE/C/HQ-JP
Dy. CE/C/DO
Sr.
No.
T.No. Item/
Nature
of work
Mode
Of
tender
Date
of
public-
cation
of NIT
Type of bidd
ing
(single/
Two bid
system)
Last date
of receipt
of tender
Nos of
tenders
received
Nos. &
names of
parties
qualified
after
technical
evaluation
Nos &
names of
parties
not
qualified
after
technical
evaluation
Whether
contract
awarded to
lowest
tenderer/
Evaluated L1
Contract No. &
date
Name of
contract-or
Value of
contract
Scheduled
date of
completion
of supplies
Actual date
of start of
work
Actual date
of
completion
Reason for
delay if any
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1
DO
/GG
C/N
L/9
Construction of BG formation
from Chainage 1150 to 15000
between Dausa Kala-
Shekhpura in connection with
DO-GGC new BG line project.
Open
tender
Single Packet
system 0
4/0
1/2
00
6 Yes NWR/S&C/CA/8
1dated
06.09..06
M/s Kewai
Construction
(JV) Jodhpur
6.45 crore 26/09/07
Further
extension
granted up
to
30/11/2011
12/07/06 - Final bill has
been
technically
checked
and under
process.
2
DO
/GG
C/N
L/1
0 Construction of BG formation
from Chainage 15000 to 28000
between Dausa and Lalsot in
connection with DO-GGC new
BG line project.
Open
tender
Single Packet
system
16
/01
/20
06
Yes NWR/S&C/CA/7
9 dated
30.06.06
M/s Parma
Ram Bhakar
Jodhpur.
6.39 crore 17/07/07
extended
upto
30/11/2011
11/05/06 - Final bill has
been
technically
checked
and under
process.
3
DO
/GG
C/N
L/1
8 Construction of Broad Gauge
Formation & Minor Bridges
from Chainage 41000.00 to
45000.00 between Dausa and
Lalsot in connection with
Dausa- Gangapur City New
Broad Gauge line project.
Open
tender
Single packet
system
14
/11
/20
07
Yes NWR/S&C/CA/9
7 dated
03/03/2008
M/s Atlanta-
ARSS (JV)
Bhubneshwa
r (Orissa)
17.95 Crore 30/07/09
extended
upto
30/06/2014
14/03/08 - Work short
closed vide
HQ’s letter
dated
18/06/2014
. Final
measureme
nts under
process
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
41
4
DO
/GG
C/N
L/2
1 Construction of BG formation
and Minor Bridge from
chanaige 45000 to 60000 bet.
Lalsot and Gangapur City in
connection with DO-GGC New
B G line Project
Open
tender
24
/09
/20
07
Single Packet
system
02
/11
/20
07
3 Yes NWR/S&C/CA/9
5 dated
18/02/2008
M/s. ARSS
Infrastructur
e Projects
Limited,
Bhubaneshw
ar
8.41
Crores
20/03/09
Extended
upto
30/06/15
15/03/08 - Work in
progress.
5
DO
/GG
C/N
L/2
2 Construction of BG formation
and Minor Bridge from
chanaige 60000to 75000 bet.
Lalsot and Gangapur City in
connection with DO-GGC New
B G line Project
Open
tender
2
4/0
9/2
00
7
Single Packet
system
02
/11
/20
07
3 Yes Dy.
CE/C/I/JP/CA/17
dated
29/02/2008
M/s. ARSS
Infrastructur
e Projects
Limited,
Bhubaneshw
ar
6.71 Crores 10/03/09
Extended
upto
30/06/2014
10/03/08 - Work short
closed vide
HQ’s letter
dated
18/06/2014
. Final
measureme
nts under
process.
6
DO
/GG
C/N
L/2
3 Construction of BG formation
and Minor Bridge from
chanaige 75000 to 90000 bet.
Lalsot and Gangapur City in
connection with DO-GGC New
B G line Project
Open
tender
2
4/0
9/2
00
7
Single Packet
system
02
/11
/20
07
3 Yes NWR/S&C/CA
/96 dated
18/02/2008
M/s. ARSS
Infrastructur
e Projects
Limited,
Bhubaneshw
ar
8.56
Crores
20/03/09
Extended
upto
31/03/2014.
Further
extension
under
process
15/03/08 -
Work short
closed vide
HQ’s letter
dated
18/06/2014
. Final
measureme
nts under
process.
7
DO
/GG
C/N
L/8
(R&
C) Construction of Minor Bridges
from Chainage 00.00 to
30000.00 between Dausa and
Lalsot in connection with
Dausa Gangapur city new
Broad gauge line project.
Open
tender
17
/01
/20
08
Single packet
system
20
/02
/20
08
1 Yes
Dy.
CE/C//DO/CA
/20 Dated
23/06/2008
M/s Kewai
Construction
Co. (J/V),
Jodhpur
5.98 Crore 01/01/09
Extended
upto
31/08/2012
28/08/08 - Final
variation is
under
approval
with HQ.
8
DO
/GG
C/N
L/2
9 Construction of platforms,
earthwork in platform in
connection with Dausa-
Gangapurcity new BG line
project.
Open
tender
27
/01
/20
09
Single
packet
system
02
/03
/20
09
9 - - Yes Dy.CE/C/DO/
CA/ 35
dated: 15
/10/2009
M/s Bharat-
Kamal (J/V),
Jaipur
5.47 crore 04/08/10
Extended
upto
31/07/2014
07/08/2009 - Final
variation
has been
sent to HQ
for approval
on
06/02/2015
and under
correspond
ence with
HQ
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
42
9
DO
/GG
C/N
L/3
1 Construction of ROBs across
Railway track at chainage
37034,83925 & 37925 and
drainage over pass at chainage
36960 & 37520 between
salempura to Udaikalan station
inconnection with Dausa-
Gangapurcity new BG line
project
Open
tender
Single packet
system
16
/02
/20
10
11 - - Yes NWR/S&C/CA
/105 dated
22/11/2010
M/s Shree
Ram Kripa
Construction
Jaipur
13.44 Crore 29/02/2012.
Extended up
to
31/07/2015
- - Work in
progress..
10
DO
/GG
C/N
L/3
2
Construction of 150unit type II,
7 units type-III staff quarters &
IOW office and other ancillary
works the water supply,
sewerage, drinakge, roads,
parking, sanitary and provision
of electrical// communication
conduits & metal boxes for
NWR residential colony at
various stations between
Dausa- Gangapurcity new BG
line project.
Open
tender
Single packet
system
05
/07
/20
1
02 - - Yes NWR/S&C/CA
/107 dated
28/03/2011
M/s L.N.
Agrawal-
MCD Pvt.
Ltd., (J/V)
Jaipur
15.65 Crore 31/03/2012.
Extended
upto
31/05/2014.
- - Final
variation
has been
vetted by
finance and
under
sanction
with HQ.
11
DO
/GG
C/N
L/3
0 Construction of single line 13
standard straight alignment
tunnel in soil and rock
including cut and cover portion
between chainage 38/720 to
40/840 including side drain
and other approaches of
tunnel between Didwana-
Lalsot Railway station in
connection with Dausa-
Gangapurcity new BG line
project.
Open
tender
Single packet
system
27
/07
/20
09
12 - - Yes NWR/S&C/CA
/106 dated
29/12/10
M/s Valecha-
Transtonelstr
oey (J/V)
Mumbai
53.02 Crore 27/09/2012.
Extended
upto
31/12/2015
- - Work
terminated
on
07/07/2015
. Final bill is
under
process.
12
DO
/GG
C/N
L/4
0 Laying and linking of BG track
and transportation of P.Way
material, PSC sleepers etc
between Dausa- Deedwana
section in connection with
Dausa- Gangapurcity new BG
line project.
Open
tender
28
/03
/20
11
Single packet
system
18
/05
/20
11
6 - - Yes
Dy.CE/C/DO/CA/
56 dated
18/10/11
M/s Goel
Brothers Rail
Infra Pvt.
Ltd., Bareilly.
5.66 Crore 01/08/2012.
Extended
upto
31/10/2014
13/09/11 Work in
progress
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
43
13
DO
/GG
C/N
L/3
9R
R Construction of station
buildings, signaling
structures and
miscellaneous structures
etc. at various stations
between Dausa (excl.) to
Gangapurcity (excl.) in
connection with Dausa
Gangapurcity new BG line
project.
Open
Tender
28
/06
/20
11
Single packet
system
05
/08
/20
11
3 - - Yes NWR/S&C/CA/1
15 dated
21/03/2012
M/s Bharat-
Kamal (J/V),
Udaipur
8.25 Crore 28/02/13.
Extended
upto
31/05/2014
- - Final bill has
been
passed.
14
DO
/GG
C/N
L/9
(R
&C
) Construction of Broad Gauge
Formation from chainage
1150.00 to 15000.00 between
Dausa Kala and Shekhpura
Villages in connection with
Dausa-Gangapur City New
Broad Gauge line Project(Risk
& Cost tender).
Open
tender
25
/11
/20
11
Single packet
system
28
/12
/20
11
7 - - Yes Dy.CE/C/DO/CA/
58 dated
21/02/20112
M/s Jai
Salasar Balaji
Construction
Co. (J/V)
Jaipur
4.60 Cr. 04/05/12
Extended
upto
04/09/2012
21/01/12 - Final
variation is
under
finance
vetting.
15
DO
/GG
C/N
L/1
0 (
R&
C) Construction of Broad Gauge
Formation from chainage
15000.00 to 28000.00
between Dausa and Lalsot in
connection with Dausa-
Gangapur City New Broad
Gauge line Project(Risk & Cost
tender).
Open
tender
25
/11
/20
11
Single packet
system
28
/12
/20
11
7 - - Yes Dy.CE/C/DO/CA/
59 dated
21/02/20112
M/s Jai
Salasar Balaji
Construction
Co. (J/V)
Jaipur
2.95 Cr. 04/05/12
Extended
upto
04/09/2012
21/01/12 - Final
variation
under
finance
vetting.
16
DO
/GG
C/N
L/9
(R&
C)R
Construction of broad gauge
formation from chainage 1150
to 15000 in connection with
Dausa Gangapurcity new line
project (Risk & Cost tender).
Open
tender
Single packet
system
11
/01
/20
13
2
- - Yes Dy.CE/C/DO/CA/
67 dated
16/04/13
M/s
Meenesh
Contractor &
Developers
Pvt. Ltd.,
Jaipur
5.47 Crore 05/07/2013.
Extended
upto
15/10/2014
08/04/2013 - Work
completed.
Final
measureme
nts under
process
17
DO
/GG
C/N
L/1
0(R
&
C)R
Construction of broad gauge
formation from chainage
15000 to 28000 in connection
with Dausa Gangapurcity new
line project(Risk & cost
tender).
Open
tender
Single packet
system
11
/01
/20
13
2
- - Yes Dy.CE/C/DO/CA/
68 dated
16/04/13
M/s MCD
Pvt. Ltd., &
Aastha
Construction
Co.(JV),
Jaipur
3.30 Crore 05/07/13
Extended
upto
15/10/2014
08/04/2013 - Completed.
Final
measureme
nts under
process.
DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF SEPTEMBER, 2015
Sr. No
Tender No.
Item /nature of work
Mode of tender
Dt. of publication
of NIT
Types of bidding ( single /two bid system )
Last date of receipt of tender
Nos. of tenders received
Nos. and name of parties
qualified after
technical evaluation
Nos. & names of parties not qualified
after technical
evaluation
Whether contract awarded to lowest tenderer
evaluated L1
Contract No. & date.
Name of contractor. Value of contract
Scheduled date of completion of supplies.
Actual date of start of
work
Actual date of
completion
Remarks/ Reason for delay
if any,
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
44
For CAO/C/JP
18
DO
/GG
C/N
L/6
0R
Construction of minor bridges
from chainage 00 to 30000
between Dausa- Lalsot in
connection with Dausa-
Gangapurcity new BG line
project
open
tender
Single packet
system
20
/11
/20
13
3 - - yes Dy.CE/C/DO/CA/
74 dated
14/03/2014
M/s Shree
Ram Kripa
Construction
s, Jaipur
Rs.4.74
Crore
10/06/2014
Extended
upto
30/09/2015
26/12/2014 Safety
works in
progress.
19
DO
/GG
C/N
L/4
8R
Construction of 12 nos LHS
between Dausa- Deedwana
section in connection with
Dausa- Gagnapurcity new BG
line project.
Open
tender
Two packet
system
06
/09
/13
2 - - Yes Dy.CE/C/DO/CA/
75 dated
16/04/2014-
M/s HGIEPL-
COLOSSAL
(JV), Jaipur
Rs.10.72
Crore
29/03/2015
extended
upto
28/02/2016
- - Work in
progress.
20
DO
/GG
C/N
L/5
3 Construction of 3 nos Low Over
Pass at LC No. 4, 26 & 27 on
Dausa- Gangapurcity secton
Open
tender
Two packet
system
06
/09
/13
4 - - Yes NWR/S&C/CA/1
36 dated
03/06/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.10.44
Crore
08/04/15
further
extension
under
process.
- - Agreement
executed.
Work held
up for want
of funds.
21
DO
/GG
C/N
L/5
6 Construction of Road Over
Bridge at LC No. 5B on Dausa-
Gangapurcity section
Open
tender
Two packet
system 0
6/0
9/1
3
6 - - Yes NWR/S&C/CA/1
34 dated
16/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.43
Crore
12/07/15
further
extension
under
process
- - Work in
progress.
22
DO
/GG
C/N
L/5
7 Construction of Road Over
Bridge at LC No. 24B on
Dausa- Gangapurcity section
Open
tender
Two packet
system
06
/09
/13
4 - - Yes NWR/S&C/CA/1
35 dated
19/05/2014
M/s Bharat
Spun Pipe &
Construction
Co., Jaipur
Rs.13.75
Crore
09/07/15
further
extension
under
process
- - Agreement
executed.
Work held
up for want