CEDCP009 CIVIL ENGINEERING DIVISION Revision 00 January 2013 Page 1 of 13 Client’s procedure for Building Permit 1.0 Purpose: The purpose of this document is to outline the procedure for the Client to obtain a Building Permit for their specific project. The Building Permit obtained will enable them to initiate the construction on site. 2.0 Scope: All Clients/Business Units operating within the Trakhees jurisdiction area. 3.0 Responsibility: Trakhees/CED Engineers will handle reviewing submitted drawings in compliance to Trakhees Codes, Regulations and relevant codes, even if ,the Client consultants’ and his contractors’ shall remain entirely responsible for the design, accuracy of design and drawings for the stability and safety. 4.0 References: Client consultants’ and his contractor shall refer to Trakhees Codes, Regulations and relevant codes where it’s required. TrakheesBuilding Permit procedure may be used for additional information. 5.0 Definitions: AuthorityTrakhees BPBuilding Permit CEDCivil Engineering Division EHSEnvironment Health & Safety Division NOCNo objection Certificate 6.0 Procedure: After obtaining Concept design NOC (the primary stage) Client’s Consultant shall registered project online by epermit to obtain B.P application ID. & apply for B.P payment. Permit admin shall send B.P fees notification to the Client’s Consultant for payment prior submitting to Trakhees/CED recipient. And no B.P will be accepted without Trakhees/CED B.P payment. Payment shall be to Trakhees Cashier at Dragon Mart (1st floor). There are four types of for Building Permit submissions that applied for through the Helpdesk by the appointed Client’s Consultant: New Building Permit (as documented in the B.P procedure) Revised Building Permit (Revision): This any type of modification, minor or major that occurs during the construction period within the validity of the Building Permit shall be classified as a Revision.

CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  • Upload
    dodang

  • View
    225

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 1 of 13 

 

 

Client’s procedure for Building Permit 

1.0 Purpose: The  purpose  of  this  document  is  to  outline  the  procedure  for  the  Client  to  obtain  a  Building Permit  for  their  specific project.  The Building Permit obtained will enable  them  to  initiate  the construction on site.   

2.0 Scope: All Clients/Business Units operating within the Trakhees jurisdiction area.  

3.0 Responsibility: Trakhees/CED  Engineers will  handle  reviewing  submitted  drawings  in  compliance  to  Trakhees Codes, Regulations and relevant codes, even  if  ,the Client consultants’ and his contractors’ shall remain entirely responsible for the design, accuracy of design and drawings for the stability and safety.   

4.0 References: Client  consultants’  and  his  contractor  shall  refer  to  Trakhees  Codes,  Regulations  and  relevant codes  where  it’s  required.  Trakhees‐Building  Permit  procedure  may  be  used  for  additional information.    

5.0 Definitions: Authority‐Trakhees BP‐ Building Permit CED‐Civil Engineering Division EHS‐Environment Health & Safety Division NOC‐ No objection Certificate  

6.0 Procedure: After  obtaining  Concept  design  NOC  (the  primary  stage)  Client’s  Consultant  shall  registered project online by e‐permit  to obtain B.P application  ID. & apply  for B.P payment. Permit admin shall  send  B.P  fees  notification  to  the  Client’s  Consultant  for  payment  prior  submitting  to Trakhees/CED  recipient.  And  no  B.P  will  be  accepted  without  Trakhees/CED  B.P  payment. Payment shall be to Trakhees Cashier at Dragon Mart (1st floor).  There are four types of for Building Permit submissions that applied for through the Helpdesk by the appointed Client’s Consultant:  

• New Building Permit (as documented in the B.P procedure) • Revised Building Permit  (Revision):   This any  type of modification, minor or major that 

occurs during the construction period within  the validity of the Building Permit shall be classified as a Revision. 

Page 2: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 2 of 13 

 

   

• Revalidation of Building Permit:  This  is  ‐  almost  an  administrative procedure which  is required If the Construction on site doesn’t commence within Six months for date of B.P issuance. 

• Amendment of Building Permit: The request for an amendment could be for change of Consultant/Contractor, project description, change in the area (BUA)….etc.    

6.1 Front desk registration & acknowledgement process 6.1.1. Registered Client’s Consultant shall submit after  register  their specific project  for B.P by e‐permit to obtain B.P Application ID & apply for B.P payment. This payment shall be paid to Trakhees Cashier at Dragon Mart (1st floor) prior submitting to Trakhees/CED recipient. And no B.P will be accepted without Trakhees/CED B.P payment.  6.1.2. Trakhees/CED Helpdesk receives from the Client’s Consultant the application for the Building Permit accompanied with copy of the appraisal fees payment receipt (for new Building Permit only). This application is presented in pdf format in a CD containing the document/drawing package together with other submission requirements depending on submission type   6.1.3. The Trakhees/CED Helpdesk has the right to accept or reject the submission if the CD is not complete as per the checklist requirements. If the submission is complete, then the CD is accepted and a mail notification is forwarded with the submission serial number to the Consultant within one working day, for easy tracking purposes.  6.1.4. Incomplete submissions are rejected by the Trakhees/CED Helpdesk to be resubmitted.  

6.2 Distribution of Documentation to Respective Sections 6.2.1 One submission accepted it assigned to individual Structural Engineers by the 

Permit Administration. The Structural Engineer  circulates  the  submission  to relevant sections (namely Architectural, , Quality & HVAC) 

6.2.2 All sections undertake to review of received drawings and calculations as per Trakhees Codes & Regulation & other relevant Codes and standards.  

6.2.3 Structural Engineer undertakes review of structural drawings and calculations while , Architectural section  

6.2.4 Architect Engineer checks the submission for compliance with BRDG & other applicable standards.  

6.2.5 Quality  Control  Engineer  undertakes  review  submission  according  to Construction Materials Quality Control Guidelines when required. 

6.2.6 Submissions  are directed  to  the HVAC  Specialist  to  check  the  thermal  load calculations and HVAC design drawings.    

6.3 Feedback & Compile Summary 

Page 3: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 3 of 13 

 

6.3.1 Structural  Engineer  receives  feedback  by  email  from  each  section  and prepare feedback summary Report and sends  it to permit admin to prepare commented/approved letter to be sent to the related consultant.  

6.3.2 In the event where any major problems have been  identified, permit admin to prepare commented letter and request them to resubmit.  

6.3.3 Additional  payment  (if  any)  shall  be  calculated  by  Architect  Engineer  and send  to  permit  admin  to  prepare  payment  notification  to  be  sent  to  the Client’s Consultant to settle payment prior receiving B.P 

6.4 Sign Drawings, Prepare Building Permit and save drawing in the server 6.4.1 If  the  submission  is  complete  and  complies  with  all  the  Regulations  and 

Guidelines set by Trakhees/CED,  the Structural Engineer stamped Structural drawings  and  Architect  Engineer  stamped  Architectural  drawings  and  save them in the server. 

6.4.2 Any  conditions  from  the  reviewing  sections  (if  any)  &  Quality  Control Section’s recommendations   as well as the HVAC review report are collected from the concerned sections and attached to the B.P . 

6.4.3  Permit  Admin  to  prepare  Building  Permit  NOC.  General  Conditions, Recommendations  of  the  Concrete Mix Design  and HVAC Review Report(if any)   are to be attached to the issued BP. 

6.4.4 B.P  to be  signed Architect  Engineer,  structure  Engineer  and  Sr. Manager  –Permits & Compliance prior CED. 

6.5 Notify Consultant  6.5.1 Once  B.P  NOC  signed  by  CED  director.  Permit  admin  shall  send  notify 

Consultant  about  the  missing  fees  (if  any)  amount  to  settle  payment  to Trakhees  Cashier  at  Dragon  Mart  (1st  floor)  and  request  to  collect  CD containing Building Permit, stamped Drawings and other related documents such as the Recommendations of the Concrete Mix Design and HVAC Review Report  which  will  be  handed  over  to  the  Client/Consultant/Contactor Representative only.   

6.6 Issuance of Building Permit 6.6.1 Building  Permit  is only  issued by  Trakhees/CED helpdesk upon  payment of 

any additional calculated fees to Trakhees Cashier at Dragon Mart (1st floor). The  collected  CD  containing  Cover  Letter,  Building  Permit,  and Recommendations  of  the  Concrete  Mix  Design  and  HVAC  Review  Report along  with  the  approved  drawings  are  handed  over  to  the Client/Consultant/Contactor Representative only.  

6.6.2 Client’s Consultant and his Contractor shall comply with all conditions  list  in the  issued  B.P  and  to  fulfil  with  Recommendations  of  the  Concrete  Mix Design and HVAC Review Report (in any). 

6.6.3 Site  Construction  shall  be  as  per  the  approved  Architectural  &  Structural drawings by Trakhees/CED Engineers. 

6.6.4 For  inspection  issues    Client’s  Consultant  shall  refer  to  Trakhees/CED inspection procedure 

6.6.5 Revised Building Permit (Revision):  In case of any modification from previous approved  drawings  during  construction  stage  before  issuing  Building Completion Certificate  (BCC)  comprises Architectural and  Structural  revised drawings along with approved drawings by  the Authority. For  this stage, no 

Page 4: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 4 of 13 

 

need  for  registration  on  e‐permit.  Only  submittal  of  soft  copy  of  revised drawings along with documents is required.   

6.6.6 To  apply  for  Building  Completion  Certificate  (BCC),  Client’s  Consultant  to refer to BCC procedure. 

 

 7.0 Records 

 

No  Record description  Retention Time 

7.1  Consultants application form   2 years 

  DEWA (E) and (W) NOC  2 years 

  Telecommunication NOC  2 years 

  EHS NOC  10 years 

  Building Permit  Permanent 

  Stamped Drawings  Permanent 

  Design calculations  1 years 

  Soil Report  1 years 

  Consultant / Contactor’s License  2 years 

  Documentation Package  2 years 

  Correspondence  2 years 

  Affection Plan   Permanent 

  Consultant / Contactor Appointment Letter  10 years 

  Demarcation Certificate   10 years 

Upon  completion  of  each  review,  records  are  kept  centrally  on  Trakhees  server.  The records  include  all  documents,  drawings  and  end  with  the  covering  letter  sent  to  the applicant by Trakhees. 

 8.0 Attachments  

8.1 Client Work Flow for BP 8.2 Application Form 8.3 Template for Building Permit 

  

Page 5: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 5 of 13 

 

8.1 Client Work Flow for BP  

 

Page 6: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

 

 

 

R

 

 

CED‐CP

Revision 00     

 8

  

   

P‐009 

8.2 A

C

Application

/ Amendment 

  

CIVIL ENGINE

Janu

n Form 

 

EERING DIVIS

uary 2013

SION 

Page 6 of 13 

 

Page 7: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

 

 

 

R

 

CED‐CP

Revision 00     

   

              

P‐009 

C

  

CIVIL ENGINE

Janu

 

EERING DIVIS

uary 2013

SION 

Page 7 of 13 

 

 

Page 8: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 8 of 13 

 

    

 

9.4 Building Permit Template  Our Ref: ……………………………………………………………………………………            Date: ………  M/s. xxxxxxxxxxxxxx P.O. Box: xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Dubai.  Attn.: Manager        E‐Mail: xxxxxxxxxxxxxxxxxxxxxxxxxxxxx 

  

Community / Area:    xxxxxxxxxxxxxxxxxxxxxx Building Type:      xxxxxxxxxxxxxxxxxxxxxxxxxxxx Building Description & Height:  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Total Built‐Up Area:    xxxxxxxxxxxxxxxxx SQ.M BP Ref No:      xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Date of Issuance:    Date of Building Permit                Expiry Date:      6 Months from the date of BP (*Refer to General Conditions) Plot No:      xxxxxxxxxxxxxxxxxxxxxxxx Owner:                             xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx. Lessee / Purchaser:               xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Consultant  (Lead & Supervision):    xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx               Contractor:      xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Subject:      Building Permit  

We refer to your submission letter ref: xxxxxxxxxxxxxxx received on xxxxxxx with submission number xxxxx. 

We request you to collect the following documents from Civil Engineering department.  

1. The Original Building Permit ( Soft copy) 2. The CED stamped drawings  3. General Conditions of Civil Engineering Department 4. Quality Control Section Recommendations regarding Concrete Mix Design. 

  

Yours faithfully,     Eng. xxxxxxxxxxxxx Sr. Manager – Permit & Compliance     

Page 9: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 9 of 13 

 

 (xxxxx)  CC:  EHS & M‐File  

 

GENERAL CONDITIONS OF CIVIL ENGINEERING DIVISION 

 

1. *Expiry & Revalidation procedure:  

• Building permit is valid for 6 months from the issuance date. • Revalidation is required if construction activities does not commence within six (6) 

months from the date of issuance of this permit. Revalidation of the building permit can be carried out up to three times for a period of 6 months. 

• If the Building Permit is not revalidated prior to its expiry date, then the building permit is considered as cancelled and new Building Permit is to be obtained. 

• For projects under construction and obtained work suspension NOC, Building Permit revalidation is mandatory upon re‐commencing the works. 

 

2. A copy of Consultancy Agreement shall be submitted to confirm that you will be supervising the works. 

 

3. The “Certificate of conformity for construction safety” issued by our EHS department shall be submitted to CED  ‐ Trakhees prior to commencement of work on site. No  inspection will be done by CED until getting the “COC (I)”.  

4. Please  furnish an undertaking  letter  that  the structural drawings are  in  full conformity with architectural drawings approved by CED‐Trakhees.  

5. Drawings are in full conformity with architectural drawings approved by CED ‐ Trakhees.  

6. The Consultant shall confirm that all necessary construction N.O.C's from services authorities (DEWA, Etisalat, etc,) have been obtained by the contractor prior to commencement of work. 

 

7. The consultant shall review and approve the method statement for safe construction of the super‐structural elements. 

 

8. Please  ensure  that  all  Lead‐in  ducts,  chambers  and  other  related  works  are  provided  in compliance with service authority's standards for telephone, water and electrical services to avoid delay in obtaining permanent connection after completion of project. 

 

Page 10: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 10 of 13 

 

9. All electrical drawings shall be submitted to DEWA (Electricity Division) and approval obtained prior  to  commencement  of  construction.  Copies  of  DEWA  approved  drawings  shall  be submitted to us for reference. 

 

10. Assumed  safe bearing  capacity of  soil,  founding  levels, piles  capacities  and  the  location of soak away and planting area shall be in accordance with the recommendations of soil report. 

 

11. Any existing services within the plot shall be shown on drawing and protected.  Please refer to NOCs of Service Authorities (DEWA & Etisalat or DU) also. 

 

12. All construction works shall be confined within the plot limits.  

13. All design and construction of tanks and pipe work, if any, shall comply with requirements of N.F.P.A., A.S.M.E., A.N.S.I., A.P.I. and E.P.A. and shall be checked and certified  in compliance with the requirements of these standards by CED ‐ Trakhees approved third party Inspection Company.  

14. Please obtain approval from HVAC department prior to commencing construction. Ventilation provided  shall  be  substantiated  with  calculations  for  the  proposed  activity.  Design, installation,  testing  and  commissioning  of  air  conditioning  system  shall  conform  to  latest ASHRAE standards. 

 

15. Drainage  system  shall be designed  to enable easy  future  connection  to  the  system. Please liaise  with  our  EHS  Department  and  finalize  the  details  prior  to  commencement  of construction. 

 

16. Please ensure  that adequate retaining measures are provided at  the  locations of u/g water tanks, holding  tanks, etc. Ensure  that neighbor’s plot  is not affected during  the excavation works.  

 

17. All manhole and  septic  tank  covers  shall be of heavy duty  to allow  fire vehicles  in  case of emergency. 

 

18. Ventilation  design,  installation,  testing  and  commissioning  of  air  conditioning  system  shall conform to latest ASHRAE standards. 

 

19. Prior to resubmitting drawings for approval, you shall discuss and clarify comments raised by EHS department on the drawings or  in drawing review report and resolve  in order to avoid delay in commencing construction. 

 

Page 11: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 11 of 13 

 

20. All  revised drawings  shall be  submitted  to Civil Engineering department clearly highlighting the revisions carried out. Any modifications / remedial measures required for the structural system due  to design changes, site related  incidents shall be reported  to us  immediately & revised drawings & calculations to be submitted for our review / approval, prior to execution of related works. Major modifications may result in application for new Building Permit. 

 

21. Appointment  of  contractor  shall  be  in  compliance  with  circular  no.  (101)  of  Dubai Municipality ref. 812/02/03/24222 dated 29.11.2000. 

 

22. Within a week after the completion of the work, the adjoining area shall be cleared of all the debris, construction materials etc. 

 

23. Contractor shall apply and obtain mobilization NOC from CED before start of works on site. The  nominated  contractor  shall  pay  a  refundable  deposit  as  specified  in  the mobilization NOC. The deposit will be refunded upon completion of the project and complete clearance of the site; application for refund shall be submitted to EHS. 

 

24. All  documents  as  per  ‘Procedure  for  Obtaining  Building  Completion  Certificate’  shall  be submitted prior to inviting CED ‐ Trakhees for final inspection. 

 

25. No operation or energization of  the  facility shall be carried out before  the  inspection upon completion and  issuance of Building Completion Certificate. Please contact EHS department on commencement of operations and obtain an Operations Fitness Certificate. 

 

26. The  consultant  shall  instruct  the  contractor  to  maintain  File  for  Compaction  test  result, Municipality  test,  certificate  for  blocks,  concrete  cube  test  results,  Civil  Engineering inspection report for concrete members and Structural Steel prior to false ceiling. The same shall be available for inspection at site at all times. 

 

27. Submit  Curriculum  Vitae  of  the  Resident  Engineer  for  both  the  consultant  and  the Main Contractor, who  shall  be  accredited  by  CED  on  both  BLUE  (Building  Regulations & Design Guidelines) and GREEN (Construction Materials & Quality Control Guidelines) code. 

 

Copies  of  CED  ‐  Trakhees  inspection  reports  shall  be  available  at  site  and  shall  be  presented  on demand. All construction works shall be confined within plot limits. A copy of all approved drawings shall be made available at site at all times. 

 

 

Please ensure that CED ‐ Trakhees approval is obtained for various stages of construction and would draw your attention to Clause 23.6 of our regulations for non‐compliance. 

Page 12: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 12 of 13 

 

 

All documents to be collected from Cil Engineering Office during working hours within a week from receipt of e‐mail intimating approval of Building Permit. 

 

 

Civil Engineering Division‐(Trakhees) ‐ Building Permit 

Community / Area:    xxxxxxxxxxxxxxxxxxxxxx Building Type:      xxxxxxxxxxxxxxxxxxxxxxxxxxxx Building Description & Height:  xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Total Built‐Up Area:    xxxxxxxxxxxxxxxxx SQ.M BP Ref No:      xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Date of Issuance:    Date of Building Permit                Expiry Date:      6 Months from the date of BP (*Refer to General Conditions) Plot No:      xxxxxxxxxxxxxxxxxxxxxxxx Owner:                             xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx. Lessee / Purchaser:               xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Consultant  (Lead & Supervision):    xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx               Contractor:      xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Drawing References:    As per list  

 

Permission is granted for the construction of the development proposal outlined by the above drawings. 

The Building Permit  is  subject  to  resolving  all  comments  regarding our HVAC  and Quality Control Departments which is as per the attached document. 

The provisions of EHS, Electrical and Fire Protection will be subject to approval upon final inspection. 

The construction shall be  in accordance with Civil Engineering Division‐Trakhees and Construction Regulations & guidelines.  Installation  of  utility  services  shall  comply  with  the  Standards/Regulations  of  respective Authority/Departments. 

All HVAC works shall be in full compliance with applicable rules and regulations. 

All thermal insulation material including air ducts where applicable shall be DCL marked. 

 The Consultant and Contractor shall strictly comply with the conditions outlined in NOC’s of DEWA & Etisalat / DU and as per their approved drawings and legal rules. 

Revisions to the proposal and future modifications proposals will require to be submitted to the Civil Engineering Department‐Trakhees for approval. 

Neither the reviewing of the drawings and design calculations nor the  inspection of works during the progress of construction shall be construed in any way to impose any legal responsibility and / or liability on the authority. The consultant and his contractor shall remain entirely responsible for design, accuracy of drawings and the execution 

Page 13: CED CP 009 - trakhees.aetrakhees.ae/en/ced/Client Procedures/Permit Services/CED‐CP‐009...6.2.6 Submissions are directed to the HVAC Specialist to check the thermal load ... Summary

  CED‐CP‐009     

 CIVIL ENGINEERING DIVISION 

 

Revision 00      January 2013 Page 13 of 13 

 

of  the  project  and  for  the  stability  and  safety  of  construction  during  the  progress  of  the  works  and  after completion. 

 

Eng. Abdulla M. Belhoul 

Director – Civil Engineering Division     Date: xx‐xxx‐xxxx