31
Central Appalachian Basin Unconventional (Coal/Organic Shale) Reservoir Small Scale CO 2 Injection Nino Ripepi Michael Karmis Ellen Gilliland Virginia Center for Coal and Energy Research at Virginia Tech US DOE/NETL Annual Carbon Storage and Oil and Natural Gas Technologies Review Meeting Pittsburgh, PA August 3, 2017

Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Central Appalachian Basin Unconventional (Coal/Organic Shale) Reservoir Small Scale

CO2 Injection

Nino RipepiMichael KarmisEllen Gilliland

Virginia Center for Coal and Energy Research at Virginia Tech

US DOE/NETL Annual Carbon Storage and Oil and Natural Gas Technologies Review Meeting

Pittsburgh, PAAugust 3, 2017

Page 2: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

+3

• Acknowledgments– Financial assistance for this work was provided by the U.S.

Department of Energy through the National Energy Technology Laboratory’s Program under Contract No. DE-FE0006827.

2

Acknowledgments

Page 3: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Project Overview: Goals and Objectives

Objectives: Inject up to 20,000 metric tons of CO2 into 3 vertical CBM wells

over a one-year period in Central Appalachia Perform a small (approximately 400-500 metric tons) Huff and

Puff test in a horizontal shale gas well Goals

Test the storage potential of unmineable coal seams and shale reservoirs Learn about adsorption and swelling behaviors (methane vs. CO2) Test the potential for enhanced coalbed methane (ECBM) and enhanced gas

(EGR) production and recovery Major tasks:

Phase I: site characterization, well coring, injection design Phase II: site preparation, injection operations Phase III: post-injection monitoring, data analysis, reservoir modeling

Page 4: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

4

Research Partners

• Virginia Center for Coal and Energy Research (Virginia Tech)1,2,3,4,5

• Cardno2,3

• Gerald Hill, Ph.D.1,4

• Southern States Energy Board1,5

• Virginia Dept. of Mines, Minerals and Energy3

• Geological Survey of Alabama3

• Sandia Technologies3

• Det Norske Veritas (DNV)4

• Consol Energy (Research Group)2,3

Industrial Partners• Consol Energy (CNX Gas)• Harrison-Wyatt, LLC• Emory River, LLC• Dominion Energy• Alpha Natural Resources• Flo-CO2• Praxair

Collaborators• Schlumberger• Global Geophysical Services• Oak Ridge National Laboratory• University of Nottingham / British

Geological Survey• University of Tennessee• University of Virginia• Southern Illinois University• Oklahoma State University

1 Project management2 Operations3 Research4 Risk management5 Outreach

Page 5: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

5

• 1000-ton CO2 injection

• Stacked coal reservoir

• Evidence of preferential adsorption: elevated N2and CH4

• Enhanced CH4 recovery at two offset wells, no CO2 breakthrough

• 30% CO2 in flowbackover 7 years

• EUR of test well has increased by 48 percent

Shut-in Period with CO2 Injectionmid November ‘08 – mid May ‘09

Pre CO2 Injection EUR = 319 MMcf

Post CO2 Injection EUR = 471 MMcf

Gas

Pro

duct

ion,

M

cf/m

onth

Production curve for huff-and-puff test well, Russell County, Virginia, 2009

Previous Experience in Huff and Puff Test in Russell County, Virginia (2009)

Page 6: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

6

Shale CO2 Injection Test (510 tons)Morgan County, Tennessee

• Horizontal well in Chattanooga Shale formation, drilled in 2009

• Legacy producing gas well permitted under TDEC

• 510 tons for “huff and puff” injection test

• Injection period: March 18-31, 2014 (14 days)

• Shut-in period: March 31- July 29, 2014 (~4 months)

• Flowback period: July 29, 2014- present (~24 months)

• Current status: post-injection monitoring

Page 7: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

7

Shale CO2 Injection Test in Morgan County, TennesseeOperations Overview

Storage Vessel Injection

Skid

Propane Heater

HW-1003

Page 8: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

8

Shale CO2 Injection Test in Morgan County, TennesseeOperations Overview

Storage Vessel Injection

Skid

Propane Heater

HW-1003

Check valve

Tracer Injection Tee

Ball valve

Check valve

Gate valve

CO2Inlet

Page 9: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Shale CO2 Injection Test in Morgan County, Tennessee

Flowback Results

• EGR: An increase versus baseline production• Correlated production of hydrocarbons and CO2

• 34 percent of injected CO2 produced to date (173 tons)

Page 10: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

10

Shale CO2 Injection Test in Morgan County, TennesseeResults to Date

Production of heavy hydrocarbons elevated from baseline values:• Role of pressure, viscosity and adsorption/desorption processes

• Enhanced recovery implications for other shale plays

Page 11: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Boissevain

7 RIGHT

10/3

1/99

11/1

6/99

2/29

/00

3/13

/007/

8/00

6/30

/00

11/1

7/00

10/3

1/00

4224

'42

37'

4475

'44

75'

3491

'34

95'

2904

'28

97'

SECARB PilotInjection Well

RU-84

Honaker

Raven

Vansant

CBM Injection CandidatesCNX GAS CBM WELLEQT CBM WELLRANGE RESOURCES CBM WELLPOCAHONTAS NO. 3 DEEP MINESURFACE FAULTSQUADRANGLE BOUNDARIESTOWNS

0 5,000 10,000

SCALE IN FEET

DICKENSON CO.

RUSSELL CO.

BUCHANANCO.

Buffalo Mountain Fault

Keen Mtn Fault

UD

Russell Fork Fault

Little Paw Paw Fault

Fault

TestSite

CBM Injection Test SitesRussell and Buchanan Counties, VA

Page 12: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

12

CBM CO2 Injection Test in Buchanan County, Virginia

• Oakwood coalbed methane field

• Stacked coal reservoir, 15-20 seams

• Tight shale and sandstone confining units

• 14,000 tons CO2 injected in two distinct Phases injection over 17 months in three legacy wells

• CO2 storage + Enhanced gas recovery • US EPA Class II UIC Permit

• Current status: Post-injection monitoring.

Page 13: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

13

CBM CO2 Injection Test in Buchanan County, VirginiaReservoir Modeling

Stratigraphic cross section through injection wells

Lee Sandstone

Hensley Shale(seal)

• 15-20 coal seams in injection zone

• Average seam thickness of 1.0 feet

• Depth range: 900-2200 feet

• Variable lateral continuity

• Intermediate and overlying seals

• Dynamic reservoir properties (active production operations)

• Multi-phase flow

Modeling Considerations:

Page 14: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

0

1000

2000

3000

4000

5000

6000

01/2000 10/2002 06/2005 03/2008 12/2010 09/2013 06/2016

Gas P

rodu

ctio

n Ra

te (M

CF/m

onth

)

Date (month/year)

Production history for Buchanan County CO2-ECBM test injection wells

DD7 DD7A DD814

Wells shut in for test

Historical Monitoring: CBM Production Data

Higher production for DD7 enhanced permeability on anticline

Page 15: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

15

DD7

DD7A

DD8

18-layer reservoir model

CO2 Injection simulations usedto define Area of Review (AOR)for monitoring program

CBM CO2 Injection Test in Buchanan County, VirginiaReservoir Modeling

Page 16: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

16

CBM CO2 Injection Test in Buchanan County, VirginiaMonitoring, Verification, and Accounting (MVA)

Oakwood Field Demonstration SiteMVA Focus Area

• Injection wells

• CBM production wells

• MVA boundaries

• Roads

• Monitoring and

characterization wells

• Microseismic array (28 stns)

• GPS array (20 monuments)

DD-7 DD-8

DD-7A

½-mile boundary¼-mile

boundary

Page 17: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

17

CBM CO2 Injection Test in Buchanan County, VirginiaMonitoring, Verification, and Accounting (MVA)

Oakwood Field Demonstration SiteMVA Focus Area

• Injection wells

• CBM production wells

• MVA boundaries

• Roads

• Monitoring and

characterization wells

• Microseismic array (28 stns)

• GPS array (20 monuments)

DD-7 DD-8

DD-7AM1

M2

C1

Page 18: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

18

CBM CO2 Injection Test in Buchanan County, VirginiaMonitoring, Verification, and Accounting (MVA)

Oakwood Field Demonstration SiteMVA Focus Area

• Injection wells

• CBM production wells

• MVA boundaries

• Roads

• Monitoring and

characterization wells

• Microseismic array (28 stns)

• GPS array (20 monuments)

DD-7 DD-8

DD-7A

Page 19: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

19

CBM CO2 Injection Test in Buchanan County, VirginiaMonitoring, Verification, and Accounting (MVA)

Oakwood Field Demonstration SiteMVA Focus Area

• Injection wells

• CBM production wells

• MVA boundaries

• Roads

• Monitoring and

characterization wells

• Microseismic array (28 stns)

• GPS array (20 monuments)

DD-7 DD-8

DD-7A

Page 20: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

20

Technologies deployed over large areal extents:

– Microseismic/TFI– Surface deformation

measurement (GPS + InSAR)

Borehole-scale technologies:

– Pressure/Temperature– Gas/H2O composition– Tracers/Isotopes– Formation logging

MVA Approach

• Combination of technologies will provide data sets with overlappingspatial and temporal scales.• Data will help distinguish signals from CO2 operations vs. active CBM

operations• Data sets will cross validate each other

• Selected technologies to address/overcome challenges of reservoirgeometry and terrain

CBM CO2 Injection Test in Buchanan County, VirginiaMonitoring, Verification, and Accounting (MVA)

Page 21: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

CO2 Storage and Delivery and Injection Skid

21

Page 22: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Injection Skid for 3 wells w/ Coriolis Flowmeters, Valves and Radio/Cell Communication

22

Page 23: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

23

SCADA system:• ~Continuous recording• Remote access for

monitoring and adjustments

Expected correlation

CO2 Injectivity= injection rate/pressure

• Decreases w/ incr. pressure• Levels out before zero• Restored

CO2 Injection Parameters

Page 24: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

24

Transition from Gas Liquid CO2

Page 25: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

25

• Three rounds of tracers: Start of injection, 15% of CO2 target volume, 40% of CO2 target volume

• Only tracers from start of injection detected

• For DD7, all detecting wells located west (up-dip); could encounter pressure interference from other injection wells

Gas composition: Tracer Detection at Offset Wells

PMCP in DD7 water SF6 in DD8 CO2 stream

Page 26: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

26

0

5

10

15

20

25

65

70

75

80

85

90

95

100

Perc

ent C

O2,

N2

Perc

ent C

H4

CO2 Breakthrough at DD8A

CH4 CO2 N2

CO2 Injection Phase I

Gas composition: CO2 Breakthrough at DD8A

• Increase in CO2 from < 1% to 12.9%

• Outcome: no change to operations; did not compromise test objectives or CBM operations

Page 27: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

27

CO2 Injection Phase I

CO2 InjectionPhase II

7/1/2013 1/17/2014 8/5/2014 2/21/2015 9/9/2015 3/27/2016 10/13/2016 5/1/2017 11/17/2017 6/5/2018

Gas composition Microseismic survey SAR acquisitions GPSEchometer Well logging Injection parameters Reservoir pressureTracers Water composition

Pre-injection Soak Post-injection

End of Test

Project TimelineTwo Injection Phases

Currently in Post-injection Monitoring

Page 28: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Reservoir Modeling –History Match Monitoring Results

28

• Coal swelling effects?– Geomechanical effects from laboratory testing

• What seams take the CO2?– Spinner Surveys on Injection Wells as inputs– Water Kill Test on Production Wells as inputs

• Why does SF6 breakthrough prior to CO2?– Adsorption Isotherms run on SF6/CO2/CH4 as

inputs

• How far do the hydraulic fractures go?– Fracture length in coalmines– TFI’s from Microseismic Monitoring

Page 29: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Summary

29

• Shale Test Injection successful– Flowback showed EGR and specifically NGLs

• CBM Test Injection– 14,000 tons injected in two Phases– Multiple wells allow for varied injection rates

and pressures as well as fall-off testing– Breakthrough of CO2 at 1 offset well– Pressure has nearly stabilized– Expect to flowback injection wells during final

quarter as an extended huff and puff.

Page 30: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

+3

• Acknowledgments– Financial assistance for this work was provided by the U.S.

Department of Energy through the National Energy Technology Laboratory’s Program under Contract No. DE-FE0006827.

30

Acknowledgments

Page 31: Central Appalachian Basin Unconventional (Coal/Organic ... · 8/3/2017  · Project Overview: Goals and Objectives ... • Consol Energy (Research Group) 2,3. Industrial Partners

Phase III(2/1/17 – 12/31/17)

•Site closure – Conversion of injection

and monitor wells– Site restoration

•Post-injection characterization

– Data analysis and interpretation

– Post-injection monitoring

– Reservoir modeling– Assessing enhanced

recovery for commercialization

Project Schedule

Phase I(10/1/11 – 3/31/13)

•Characterization – Drill char. Well– Core sample analysis– Modeling– Baselines for monitoring

•Injection design•Monitoring design

– Well locations– Geophysical surveys

• Go/no go 1: permits, access(12 months)

• Go/no go 2: characterization(18 months)

Ongoing: Post-Injection Monitoring, Reservoir Modeling, Education/Outreach

Phase II(4/1/13 – 1/31/17)

•Site preparation – Conversion of

production wells– Drill monitor wells– Install additional

monitor stations

•CO2 injection period(3/18/14 - 3/31/14) - Shale(7/02/15 – 1/31/17) - CBM

•Monitoring – Atmosphere– Surface– Reservoir

31