Upload
madelynn-armiger
View
220
Download
1
Embed Size (px)
Citation preview
Central Texas TurnpikeCentral Texas TurnpikeProject Tour 2005Project Tour 2005
Texas Turnpike Authority Division
Texas
of TransportationDepartment
Texas Turnpike Authority Division
Texas
of TransportationDepartment
Texas Turnpike Authority Division
Texas
of TransportationDepartment
Texas Turnpike Authority Division
Texas
of TransportationDepartment
Donald C. Toner Jr., SR/WADonald C. Toner Jr., SR/WA
Right of Way AdministratorRight of Way Administrator
Texas Department of Texas Department of TransportationTransportation
Central Texas Turnpike Central Texas Turnpike Project Project
Austin DistrictAustin District
Phone: (512) 225-1361Phone: (512) 225-1361FAX : (512) 225-1400FAX : (512) 225-1400
email: [email protected]: [email protected]
Teri J. MorganTeri J. Morgan SR/WA, R/W-RACSR/WA, R/W-RAC
EDA ROW / Utility ManagerEDA ROW / Utility Manager
HDR EngineeringHDR Engineering
Phone: (512) 225-1366Phone: (512) 225-1366FAX : (512) 225-1400FAX : (512) 225-1400
email: [email protected]: [email protected]
Central Texas Turnpike ProjectCentral Texas Turnpike Project
ConstructionConstruction ROWROW
SH 130 SH 130 $1.4 bill$1.4 bill $389 $389 mill mill
Loop 1/SH 45NLoop 1/SH 45N $1.2 bill$1.2 bill $145 mill $145 mill
SH 45 SE SH 45 SE $154 mill $154 mill $40 mill$40 mill
CTTP Office ImpactCTTP Office Impact
Over 2,000 FTEs at peakOver 2,000 FTEs at peak
Over $2 Billion Bond Package Over $2 Billion Bond Package
$916 Million TIFIA Loan from US DOT$916 Million TIFIA Loan from US DOT
Over $220 Million from Local Public Over $220 Million from Local Public AgenciesAgencies
$500 Million Budget for ROW and Utilities$500 Million Budget for ROW and Utilities
SH 130 ImpactSH 130 Impact
Move 30 million CY of dirtMove 30 million CY of dirt
Build 433 lane milesBuild 433 lane miles
Place 2.7 million SY of ConcretePlace 2.7 million SY of Concrete
Lay 1.7 million tons of Asphalt Lay 1.7 million tons of Asphalt
Erect 590,000 sf of retaining wallErect 590,000 sf of retaining wall
Install 150 new signalsInstall 150 new signals
SH 130 Impact continuedSH 130 Impact continued
Build 119 bridgesBuild 119 bridges
Construct 14,000 sf of new BuildingsConstruct 14,000 sf of new Buildings
Construct 4 Mainlane Toll PlazasConstruct 4 Mainlane Toll Plazas
Construct 30 Ramp PlazasConstruct 30 Ramp Plazas
SH 130 SH 130 SegmentsSegments
11
33
22
44
55
66
6 Segments6 Segments 91 Miles91 Miles 4-Lane divided, Controlled-4-Lane divided, Controlled- Access TurnpikeAccess Turnpike 103’ Median103’ Median Discontinuous 2-LaneDiscontinuous 2-Lane Frontage Roads Frontage Roads 8 Major Interchanges8 Major Interchanges
SH 130SH 130NTP1 Issued July 8, 2002NTP1 Issued July 8, 2002
NTP2 Issued January 4, 2003NTP2 Issued January 4, 2003
NTP3 Issues December 30, 2004NTP3 Issues December 30, 2004
Construction began on October 3, 2003Construction began on October 3, 2003
NTPs Issued for $999 MillionNTPs Issued for $999 Million
Change orders for 52.5 Million (5%)Change orders for 52.5 Million (5%)
LSI has earned 34% of contract amount and LSI has earned 34% of contract amount and used 46% of contract timeused 46% of contract time
Contractor: Lone Star Infrastructure, JVContractor: Lone Star Infrastructure, JV
SH 130 – ROW SH 130 – ROW SummarySummary
ParcelsParcels 410410 408408 407407 408408
Surveys CompletedSurveys Completed 276276 359359 364364 364364
Appraisals ApprovedAppraisals Approved 197197 321321 334334 346346
Offers MadeOffers Made 153153 310310 329329 343343
Offers AcceptedOffers Accepted 6868 126126 150150 162162
Condemnation Packages ApprovedCondemnation Packages Approved 5050 215215 235235 251251
Parcels AcquiredParcels Acquired 3939 163163 199199 230230
Possession & Use AgreementsPossession & Use Agreements 1212 2323 4646 4444
Parcels available for ConstructionParcels available for Construction 5151 186186 245245 274274
Mar
. 200
4
No
v. 2
004
Feb
. 200
5
Ap
r. 2
005
Instructions Instructions
1.)1.) Load Buses – Front Door MarriottLoad Buses – Front Door Marriott2.)2.) Proceed to Loop 1 Toll FacilityProceed to Loop 1 Toll Facility3.)3.) Meet TxDOT escort vehicles Meet TxDOT escort vehicles 4.) 4.) Drive Construction Area for Loop 1, SH 45, SH 130Drive Construction Area for Loop 1, SH 45, SH 1305.) 5.) Snacks provided during tour Snacks provided during tour 6.) 6.) Buses will return to the Marriott – 5pm Buses will return to the Marriott – 5pm