Central Texas TurnpikeCentral Texas TurnpikeProject Tour 2005Project Tour 2005

Texas Turnpike Authority Division

Texas

of TransportationDepartment

Texas Turnpike Authority Division

Texas

of TransportationDepartment

Texas Turnpike Authority Division

Texas

of TransportationDepartment

Texas Turnpike Authority Division

Texas

of TransportationDepartment

Page 2: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

Donald C. Toner Jr., SR/WADonald C. Toner Jr., SR/WA

Right of Way AdministratorRight of Way Administrator

Texas Department of Texas Department of TransportationTransportation

Central Texas Turnpike Central Texas Turnpike Project Project

Austin DistrictAustin District

Phone: (512) 225-1361Phone: (512) 225-1361FAX : (512) 225-1400FAX : (512) 225-1400

email: [email protected]: [email protected]

Page 3: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

Teri J. MorganTeri J. Morgan SR/WA, R/W-RACSR/WA, R/W-RAC

EDA ROW / Utility ManagerEDA ROW / Utility Manager

HDR EngineeringHDR Engineering

Phone: (512) 225-1366Phone: (512) 225-1366FAX : (512) 225-1400FAX : (512) 225-1400

email: [email protected]: [email protected]

Page 4: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike
Page 5: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

Central Texas Turnpike ProjectCentral Texas Turnpike Project

ConstructionConstruction ROWROW

SH 130 SH 130 $1.4 bill$1.4 bill $389 $389 mill mill

Loop 1/SH 45NLoop 1/SH 45N $1.2 bill$1.2 bill $145 mill $145 mill

SH 45 SE SH 45 SE $154 mill $154 mill $40 mill$40 mill

Page 6: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

CTTP Office ImpactCTTP Office Impact

Over 2,000 FTEs at peakOver 2,000 FTEs at peak

Over $2 Billion Bond Package Over $2 Billion Bond Package

$916 Million TIFIA Loan from US DOT$916 Million TIFIA Loan from US DOT

Over $220 Million from Local Public Over $220 Million from Local Public AgenciesAgencies

$500 Million Budget for ROW and Utilities$500 Million Budget for ROW and Utilities

Page 7: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

SH 130 ImpactSH 130 Impact

Move 30 million CY of dirtMove 30 million CY of dirt

Build 433 lane milesBuild 433 lane miles

Place 2.7 million SY of ConcretePlace 2.7 million SY of Concrete

Lay 1.7 million tons of Asphalt Lay 1.7 million tons of Asphalt

Erect 590,000 sf of retaining wallErect 590,000 sf of retaining wall

Install 150 new signalsInstall 150 new signals

Page 8: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

SH 130 Impact continuedSH 130 Impact continued

Build 119 bridgesBuild 119 bridges

Construct 14,000 sf of new BuildingsConstruct 14,000 sf of new Buildings

Construct 4 Mainlane Toll PlazasConstruct 4 Mainlane Toll Plazas

Construct 30 Ramp PlazasConstruct 30 Ramp Plazas

Page 9: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

SH 130 SH 130 SegmentsSegments

11

33

22

44

55

66

6 Segments6 Segments 91 Miles91 Miles 4-Lane divided, Controlled-4-Lane divided, Controlled- Access TurnpikeAccess Turnpike 103’ Median103’ Median Discontinuous 2-LaneDiscontinuous 2-Lane Frontage Roads Frontage Roads 8 Major Interchanges8 Major Interchanges

Page 10: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

SH 130SH 130NTP1 Issued July 8, 2002NTP1 Issued July 8, 2002

NTP2 Issued January 4, 2003NTP2 Issued January 4, 2003

NTP3 Issues December 30, 2004NTP3 Issues December 30, 2004

Construction began on October 3, 2003Construction began on October 3, 2003

NTPs Issued for $999 MillionNTPs Issued for $999 Million

Change orders for 52.5 Million (5%)Change orders for 52.5 Million (5%)

LSI has earned 34% of contract amount and LSI has earned 34% of contract amount and used 46% of contract timeused 46% of contract time

Contractor: Lone Star Infrastructure, JVContractor: Lone Star Infrastructure, JV

Page 11: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

SH 130 – ROW SH 130 – ROW SummarySummary

ParcelsParcels 410410 408408 407407 408408

Surveys CompletedSurveys Completed 276276 359359 364364 364364

Appraisals ApprovedAppraisals Approved 197197 321321 334334 346346

Offers MadeOffers Made 153153 310310 329329 343343

Offers AcceptedOffers Accepted 6868 126126 150150 162162

Condemnation Packages ApprovedCondemnation Packages Approved 5050 215215 235235 251251

Parcels AcquiredParcels Acquired 3939 163163 199199 230230

Possession & Use AgreementsPossession & Use Agreements 1212 2323 4646 4444

Parcels available for ConstructionParcels available for Construction 5151 186186 245245 274274

Mar

. 200

4

No

v. 2

004

Feb

. 200

5

Ap

r. 2

005

Page 12: Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike

Instructions Instructions

1.)1.) Load Buses – Front Door MarriottLoad Buses – Front Door Marriott2.)2.) Proceed to Loop 1 Toll FacilityProceed to Loop 1 Toll Facility3.)3.) Meet TxDOT escort vehicles Meet TxDOT escort vehicles 4.) 4.) Drive Construction Area for Loop 1, SH 45, SH 130Drive Construction Area for Loop 1, SH 45, SH 1305.) 5.) Snacks provided during tour Snacks provided during tour 6.) 6.) Buses will return to the Marriott – 5pm Buses will return to the Marriott – 5pm