Pump Overhaul Report (Centrifugal)
Vessel: Condition Report No.:
Vessel IMO No.: Pump examined:
Serial No.:
Inspection Date: Total Running Hours:
Previous Inspection Date: Total Running Hours:
Main Reason for inspection:
Surveyed/Verified by Surveyor: Place: Date:Machinery part Good Tick/X Renewed
Tick
Pump casing
Wear rings casing
Wear rings impellers
Impellers
Shaft
Liners
Bearings
Slide bearing
Stuffing Box
Mechanical seal compl.
Stationary seal ring
Seal plate
Rotary seal ring
Spring
Pump base
Motor spool
CouplingIntermediate shaft with bulk head gas tight stuffing box
Bulkhead bearing
Self priming devices
Pressure relief devices
Pressure relief devices
Pressure relief devices
Pressure relief devices
Remarks
Electric Motor Cleaned: Megger tested:
Electric Motor Bearings
Clearances (Diameter) For/aft mm Ps/sb mm Comments
Spare parts ordered on Requisition Number
Chief Engineer Signature (Chief Engineer)