24
CESI EXPERIENCE IN " CESI EXPERIENCE IN " CESI EXPERIENCE IN " CESI EXPERIENCE IN "NON CONVENTIONAL" NON CONVENTIONAL" NON CONVENTIONAL" NON CONVENTIONAL" HVDC PROJECTS HVDC PROJECTS HVDC PROJECTS HVDC PROJECTS CESI -Francesco Rizzo [email protected] Tel. +393299562208

CESI EXPERIENCE IN CESI EXPERIENCE IN NON …xxivsnptee.com.br/wp-content/uploads/2016/08/2palestrasexpositores... · CESI EXPERIENCE IN "CESI EXPERIENCE IN "NON CONVENTIONAL" NON

  • Upload
    ngolien

  • View
    223

  • Download
    1

Embed Size (px)

Citation preview

CESI EXPERIENCE IN "CESI EXPERIENCE IN "CESI EXPERIENCE IN "CESI EXPERIENCE IN "NON CONVENTIONAL" NON CONVENTIONAL" NON CONVENTIONAL" NON CONVENTIONAL" HVDC PROJECTS HVDC PROJECTS HVDC PROJECTS HVDC PROJECTS

CESI - Francesco Rizzo

[email protected] Tel. +393299562208

CESI at a Glance

SummarySummarySummarySummary1. Company Overview

2. CESI Experience in HVDC

3. Case Study 1 – Colombia-Panama Interconnection

4. Case Study 2 – Jeddah-Riyadh link

5. Case Study 3 – Italy/France and Italy Swiss HVDC link

6. Case Study 4 – EurAsian Interconnector

CESI at a Glance

SummarySummarySummarySummary1. Company Overview

2. CESI Experience in HVDC

3. Case Study 1 – Colombia-Panama Interconnection

4. Case Study 2 – Jeddah-Riyadh link

5. Italy/France and Italy Swiss HVDC link

6. EurAsian Interconnector

XXXIII SNPTE

Foz de Iguassù

CESI is a leading player in engineering, CESI is a leading player in engineering, CESI is a leading player in engineering, CESI is a leading player in engineering, testing and testing and testing and testing and power systems power systems power systems power systems consulting for the electricity sector worldwideconsulting for the electricity sector worldwideconsulting for the electricity sector worldwideconsulting for the electricity sector worldwide

4444

Mannheim

Berlin

Milan

Dubai

Rio de Janeiro

1.0

---- 05/11/2015

Over 800 experienced professionals to offer our clients high-end, tailored solutions

1.0

555505/11/2015

XXXIII SNPTEE

� Testing Laboratories for HV, MV,

LV Components and Cables

� Design and Specification Review

& Quality Assurance

� Certification (ISO 9000, 14000,

18000 and ATEX)

Testing Laboratories

� Transmission Systems Operators

Support

� T&D Automation and Control,

Smart Grid

� Interconnections, Markets, HVDC,

Master Plans, Feasibility Studies,

Power Markets Simulations,

Policies

� Diagnostic and Monitoring Tools

for Generation Plants

Consulting & Solutions

� Civil Structural Engineering for

Hydro and RES Plants

� Natural Risk Monitoring for

Hydro Plants

� Environmental Diagnostic and

Monitoring Systems for

Generation

� Environmental Analysis and

Assessments Studies

Engineering & Environment

CESI CESI CESI CESI atatatat a a a a glanceglanceglanceglance

CESI at a Glance

SummarySummarySummarySummary1. Company Overview

2. CESI Experience in HVDC

3. Case Study 1 – Colombia-Panama Interconnection

4. Case Study 2 – Jeddah-Riyadh link

5. Case Study 3 – Italy/France and Italy Swiss HVDC link

6. Case Study 4 – EurAsian Interconnector

XXXIII SNPTE

� Third-party validation of power system studies;

� Third-party validation of Converter Stations / OHL / Cables design; Main Component design

1111°°°° YearYearYearYear 2222°°°° YearYearYearYear 3333°°°° YearYearYearYear 4444°°°° YearYearYearYear 5555°°°° YearYearYearYear

System Studies

Technical Specifications & Tendering Assistance

Design Review

Quality Assurance

Transmission Transmission Transmission Transmission ---- Engineering Engineering Engineering Engineering CESI Experience in HVDC Infrastructure

Factory Tests

Commissioning & Performance Tests

DistanceDistanceDistanceDistance

CA

PE

X

CA

PE

X

CA

PE

X

CA

PE

X HVAC

HVDC

1111

2222

3333

4444

5555

6666

� Potentialities & Limits of the HVDC system integration in the AC networks

� Performances and Requirements Definition

� Reliability requirements

� Preparation of Technical Specifications

� Preparation of Tender Documents

� Bid Evaluation & Comparison

� In-production inspection assessing & validating quality procedures during manufacturing

� Validation of acceptance criteria for factory test specifications and procedures

� converter transformers

� smoothing reactors

� thyristor valves

� converter control & protection system

� cables and OHLs

Supervision of the in-field tests during commissioning phase and validation of correct performances

� Analysis of the specifications & planning for commissioning site tests

� Engineering support during site tests

2.0

777705/11/2015

XXXIII SNPTE

Feasibility Feasibility Feasibility Feasibility StageStageStageStage

Implementation Implementation Implementation Implementation StageStageStageStage

Transmission Transmission Transmission Transmission ---- Engineering Engineering Engineering Engineering CESI Experience in HVDC Infrastructure

CESI performed more than more than more than more than 40 HVDC 40 HVDC 40 HVDC 40 HVDC Consultancy Projects Consultancy Projects Consultancy Projects Consultancy Projects at International level, including more than 30.000 km of overhead lines, 7000 km of submarine cable30.000 km of overhead lines, 7000 km of submarine cable30.000 km of overhead lines, 7000 km of submarine cable30.000 km of overhead lines, 7000 km of submarine cable and 50 GW of installed capacity50 GW of installed capacity50 GW of installed capacity50 GW of installed capacity

888805/11/2015

2.0

CESI at a Glance

SummarySummarySummarySummary1. Company Overview

2. CESI Experience in HVDC

3. Case Study 1 – Colombia-Panama Interconnection

4. Case Study 2 – Jeddah-Riyadh link

5. Case Study 3 – Italy/France and Italy Swiss HVDC link

6. Case Study 4 – EurAsian Interconnector

XXXIII SNPTE

2-terminal±300kV - 400MW – 600km • Feasibility study• Networks studies• Systems specifications

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSColombia Colombia Colombia Colombia ---- PanamPanamPanamPanamá ProjectProjectProjectProject

3.0

1010101005/11/2015

XXXIII SNPTE

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSColombia Colombia Colombia Colombia ---- PanamPanamPanamPanamá ProjectProjectProjectProject

3.0

MainMainMainMain ProblemProblemProblemProblem::::

Environmental licenses

Original design considered ground electrodes andProtected Area crossing not accepted by localpopulation and environmental authorities.

SolutionSolutionSolutionSolution::::

Review of the design and of TS considering:

• Metallic Return with MRTB

• Submarine cable crossing the Urabà gulf

ConConConCon’ssss ProProProPro’ssssCS higher cost for MRTB Improved link reliability

Higher cost for submarine cable Bypass of the swampy area, requiring very high cost for OHTL construction and maintenance

Tough Seabed condition• Detailed geologic/geophysics

investigation• Improved cable protection

required

Easier approval from environmental entities

1111111105/11/2015

CESI at a Glance

SummarySummarySummarySummary1. Company Overview

2. CESI Experience in HVDC

3. Case Study 1 – Colombia-Panama Interconnection

4. Case Study 2 – Jeddah-Riyadh link

5. Case Study 3 – Italy/France and Italy Swiss HVDC link

6. Case Study 4 – EurAsian Interconnector

XXXIII SNPTE

Jeddah - Riyadh2-terminal±600kV - 3500MW – 830km• System Specification• Tender Evaluation• Quality Assurance• Construction and commissioning Follow-up

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSSaudiSaudiSaudiSaudi Arabia: Arabia: Arabia: Arabia: JeddahJeddahJeddahJeddah----Riyadh Riyadh Riyadh Riyadh HVDC linkHVDC linkHVDC linkHVDC link

4.0

1313131305/11/2015

XXXIII SNPTE

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSJeddahJeddahJeddahJeddah----Riyadh HVDC linkRiyadh HVDC linkRiyadh HVDC linkRiyadh HVDC link

4.0

MainMainMainMain ProblemProblemProblemProblem::::

Power Quality due to harmonic pollution

Saudi electrical system is characterized by an unbelievablenumber of FACTS (more than 150 SVCs in operation) andwith one HVDC links in operation and others inconstruction or planned for the next future.

SolutionSolutionSolutionSolution::::

Development of new models and methodology to:

• Models that allow a detailed evaluation of theinteraction between SVC and HVDC

• Precise definition the Harmonic Impedanceenvelope that allow the Technical/Economicoptimization of the filter along the link life

ConConConCon’ssss ProProProPro’ssssVery high number of simulation required

Improved link reliability

Right filter design with noextra cost for over-sizing

1,E-03

1,E-02

1,E-01

1,E+00

1,E+01

1,E+02

1,E+01 1,E+02 1,E+03 1,E+04

mo

du

le Z

+ (

oh

m)

Freq (Hz)

Z positive sequence: 2TSC

No TCR with TCR

-100

-50

0

50

100

1,E+01 1,E+02 1,E+03 1,E+04

an

gle

Z+

(°)

Freq (Hz)

Z positive sequence: 2TSC

No TCR with TCR

1,E-03

1,E-02

1,E-01

1,E+00

1,E+01

1,E+02

1,E+01 1,E+02 1,E+03 1,E+04

mo

du

le Z

+ (

oh

m)

Freq (Hz)

Z positive sequence: 1TSC

No TCR with TCR

-100

-50

0

50

100

1,E+01 1,E+02 1,E+03 1,E+04

an

gle

Z+

(°)

Freq (Hz)

Z positive sequence: 1TSC

No TCR with TCR

1,E-03

1,E-02

1,E-01

1,E+00

1,E+01

1,E+02

1,E+01 1,E+02 1,E+03 1,E+04m

od

ule

Z+

(o

hm

)Freq (Hz)

Z positive sequence: no TSC

No TCR with TCR

-100

-50

0

50

100

1,E+01 1,E+02 1,E+03 1,E+04

an

gle

Z+

(°)

Freq (Hz)

Z positive sequence: no TSC

No TCR with TCR

1414141405/11/2015

XXXIII SNPTE

CESI at a Glance

SummarySummarySummarySummary1. Company Overview

2. CESI Experience in HVDC

3. Case Study 1 – Colombia-Panama Interconnection

5. Case Study 3 – Italy/France and Italy Swiss HVDC link

4. Case Study 2 – Jeddah-Riyadh link

6. Case Study 4 – EurAsian Interconnector

XXXIII SNPTE

Piossasco – Grand Ile2-terminal - VSC±320kV - 1200MW – 200km• Basic Design • Technical Specification

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSItaly Italy Italy Italy ---- France France France France ProjectProjectProjectProject

5.0

1616161605/11/2015

XXXIII SNPTE

Sils – Verderio2-terminal - cable±400kV - 1000MW – 150km• Basic Design • Technical Specification

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSItaly Italy Italy Italy ---- Swiss Swiss Swiss Swiss ProjectProjectProjectProject

5.0

1717171705/11/2015

XXXIII SNPTE

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSItalyItalyItalyItaly----France France France France and and and and ItalyItalyItalyItaly----Swiss Swiss Swiss Swiss HVDC HVDC HVDC HVDC linkslinkslinkslinks

5.0

MainMainMainMain ProblemProblemProblemProblem::::

Right of way obtaining

The two projects suffers big difficulties todetermine a feasible routing due to the highcrowding of the possible route and the consequentproblems with environmental permits.

SolutionSolutionSolutionSolution::::

Design of undergrounded lines using:

• Available Rail Ballast for IT-FR link

• Dismissed pipeline for IT-CH

ConConConCon’ssss ProProProPro’ssssHigh engineering and laying cost (for IT-CH link)

No Problem for right of way

High cost for underground cable

No problem for environmental license

1818181805/11/2015

XXXIII SNPTE

CESI at a Glance

SummarySummarySummarySummary1. Company Overview

2. CESI Experience in HVDC

3. Case Study 1 – Colombia-Panama Interconnection

4. Case Study 2 – Jeddah-Riyadh link

6. Case Study 4 – EurAsian Interconnector

5. Case Study 3 – Italy/France and Italy Swiss HVDC link

XXXIII SNPTE

4-terminal (VSC)• Feasibility study• Cost Benefit Analysis• Main circuit Design• Preliminary ESIA

CESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSEurAsianEurAsianEurAsianEurAsian Interconnector: GreeceInterconnector: GreeceInterconnector: GreeceInterconnector: Greece----CyprusCyprusCyprusCyprus–––– CreteCreteCreteCrete----IsraelIsraelIsraelIsrael

2000 MW

1000 MW

310 km

1000 MW

880 km

2000 MW

330 km

6.0

2020202005/11/2015

XXXIII SNPTE

CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC CESI EXPERTISE IN HVDC LINKSLINKSLINKSLINKSItalyItalyItalyItaly----France France France France and and and and ItalyItalyItalyItaly----Swiss Swiss Swiss Swiss HVDC HVDC HVDC HVDC linkslinkslinkslinks

6.0

MainMainMainMain ProblemsProblemsProblemsProblems::::

Deep Water, I/O Multiterminal

This ongoing feasibility study, is aimed to develop theNatural Gas reservoir discovered in this area ofMediterranean sea and lower the cost of electric energyin the two islands. Solution for the cable laying and forthe control of a real multiterminal HVDC link have to bestudied together with the cable and Converter stationmanufacturer.

SolutionSolutionSolutionSolution::::

Under detailed study:

•The best solution to manage the multiterminal load control(LCC vs VSC, advanced control techniques, etc.)

•Together with the main cable manufacturer studies are on-going to improve cable technology and laying techniques.

ConConConCon’ssss ProProProPro’ssssUncertainty on the time and on the real cable manufacturer interest in the development of the technology for this kind of application

Alternative solution (asLNG+CC) are noteconomically viable.

2121212105/11/2015

XXXIII SNPTE

CESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSEurAsianEurAsianEurAsianEurAsian Interconnector: GreeceInterconnector: GreeceInterconnector: GreeceInterconnector: Greece----CyprusCyprusCyprusCyprus–––– CreteCreteCreteCrete----IsraelIsraelIsraelIsrael

6.0

Some cable sections (approx. 150 km– are in the range of 2.000 to 2.500m and others (approx. 300 km– exceed 2.500 m with the max. depth reaching approx. 2750m.

2222222205/11/2015

XXXIII SNPTE

CESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSCESI EXPERTISE IN HVDC LINKSEurAsianEurAsianEurAsianEurAsian Interconnector: GreeceInterconnector: GreeceInterconnector: GreeceInterconnector: Greece----CyprusCyprusCyprusCyprus–––– CreteCreteCreteCrete----IsraelIsraelIsraelIsrael

6.0

CESI EXPERTISE in High Depth HVDC CABLES (Italy Sardinia Island Project– will be used:Example of Forces (Tension– applied to the cable during Laying or Recovery:

SAPEI: Length: 435 km - Max sea depth: 1640 mT = W*H W=Cable weight in water (kg/m–

H = sea depth (m– T = 25,9 (kg/m– * 1640 (m– = 42,5 ton