8 7 6 5 4

C

A

B

33 22

420mm x 297mm420mm x 297mm

11

AA

B

C

D

E

F

8 7 6 5 4

D

E

3 2 1

∅500mm

d1=280mm

d2=350mm

PILE DIAMETER=∅500mm

INTERNAL STIFFENING RING

pos 2

5500 0.325 12

SECTION A-A

nos.

QTY.

PILE

DIA

(mm)

s

(m)

pos.1

∅ L

(mm) (m)

Pitch

(mm)

250165 10280 350

pos.2

(mm)nos.

QTY. ∅

(mm)

∅d1

(mm)

pos.3

d2

(mm)

1 20012

nos.

QTY.

pos.4

d3

(mm)

(mm)

CAGE ELEMENT - REINFORCEMENT DETAILS

d1=280mm

INTERNAL STIFFENING RING

@ 2800 c/c pos 2

pos 4 (1 no.)

BOTTOM STIFFENING RING

d3=200mm

C H E C K E DD R A W NNo D A T E

CFA PILE REINFORCEMENT DETAILS

ROCKSON ENGINEERING LIMITED

NEPA SINGLE/COMBINED FACILITIES

AT ALAOJI POWER STATION, ABA.

TITLE

CLIENT / MAIN CONTRACTOR

PROJECT

DRAWING No.

1:50/A3

SCALE

03

PLATE

PH/05/029

APPROVED

CHECKED

DATE

DRAWN

32 9

PHILIP

026 00

HILARY EKWERE

K. T. JOHN

LENGTH OF PILE = 15000

TRELICON PILE REINFORCEMENT

1:50

LENGTH OF REINFORCEMENT CAGE L= 12

.0mm

∅500

∅16mm pos 2

∅12mm pos 4

500

5 ∅25mm MAIN BARS

∅16mm pos 2

pos 1

∅16mm pos 2

A A

∅16mm pos 2

∅10mm pos 3

@ 250mm c/c

∅16mm pos 2

5 ∅25mm MAIN BARS

s

pos 1