Challenges taking offshore wind to the next levelMAPPING SCIENTIFIC NEEDS IN THE ARCTIC AND NORTHERN AREASNorway House – Brussels 11.10.2012
Classification: External l 2012-10-03
What is needed to develop a competitive technology?
Cost reduction is possible but takes time
The potential is there….
• Huge markets with load centers close to sea
• Political will important
• Vast wind resources in place
• Electrical infrastructure is essential
• Local supply chain important
A structured approach is needed !
• Innovation
• Implementation
• Industrialization
You need a innovative concept
6
From idea to commercial concept
Model test2005
Concept2001
Full-scale prototype
2009
Pilot Park, 3-6 turbines<5 years
Large Parks, 500
MW<10 years
Hywind Demo – in operation since 2009
Main dataWTG: 2.3 MWTurbine weight: 138 tonsDraft: 100 mDisplacement: 5300 m3
Diameter at water line: 6 mWater depth: 200 m
• Concept is proven
• Survived winter storms
• Very good characteristics
Industrialization is needed to improve cost
Concept development•Upscaling
•Design optimization
•Mooring systems
Cost-efficient fabrication•Fabrication friendly design
•Efficient mass production
Assembly and installation•Efficient installation vessels
•Onshore assembly
It is possible!
• A future market is essential to trigger development
• Implementation by Public – Private -Partnership is needed to launch projects
• Innovation is necessary in all development phases
• Industrialization and supply chain involvement is key to success
Jan Fredrik StadaasTechnology Manager Offshore [email protected]: +47 41 44 00 46