20
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO

CHAMPION HEIGHTS COMMERCIAL BUILDING

  • Upload
    chakra

  • View
    41

  • Download
    0

Embed Size (px)

DESCRIPTION

ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO. CHAMPION HEIGHTS COMMERCIAL BUILDING. WRIGHT ENGINEERING By:. Champion Heights Commercial Building. Purpose: - PowerPoint PPT Presentation

Citation preview

Page 1: CHAMPION HEIGHTS COMMERCIAL BUILDING

W R I G H T E N G I N E E R I N GBY:

CHAMPION HEIGHTS COMMERCIAL BUILDING

ERIC BEALSRYAN KRAUSE

CAMERON MILLERRANDY RODRIGUEZ

HORACIO MONTEJANO

Page 2: CHAMPION HEIGHTS COMMERCIAL BUILDING

CHAMPION HEIGHTS COMMERCIAL BUILDING

Purpose:The goal of our project is to design a commercial building to meet the needs for the growing community of Boerne, TX.

Scope:• Design of 63,000sf concrete building• Drainage and Detention study• Onsite Parking Area, Drainage, Water, Sewer

Improvements• Offsite Streets, Drainage, Water, and Sanitary Extension

Improvements.• Construction Documents

Eric Beals

Page 3: CHAMPION HEIGHTS COMMERCIAL BUILDING

SITE LOCATION

Eric Beals

Page 4: CHAMPION HEIGHTS COMMERCIAL BUILDING

PROPOSED SITE LAYOUT

Eric Beals

Page 5: CHAMPION HEIGHTS COMMERCIAL BUILDING

DESIGN SCHEDULE

PRIMAVERA P6 DESIGN SCHEDULE • Planning• Monitoring• Reporting Horacio Montejano

Page 6: CHAMPION HEIGHTS COMMERCIAL BUILDING

BUILDING SPECIFICATIONS

• 3 Floors• 63,000 SF office

building

• Glass, Stucco and brick exterior

Ryan Krause

Page 7: CHAMPION HEIGHTS COMMERCIAL BUILDING

LOADS AND ANALYSIS

• Loads Considered:• Dead• Live• Wind

• Code used:• ASCE 7-10

• Drawings done with:• AutoCAD Civil 3D 2011• Google SketchUp

• Analysis done with:• SAP2000 15

• Rain• Snow• Seismic

Ryan Krause

Page 8: CHAMPION HEIGHTS COMMERCIAL BUILDING

ENVIRONMENTAL

• Must Follow Texas Commission on Environmental Quality Guidelines • Minimal Tree Removal • No Indications of

Hazardous Materials or any Area of Contamination

Randy Rodriguez

Page 9: CHAMPION HEIGHTS COMMERCIAL BUILDING

GREEN DESIGN Green Building Materials:

• 10% Fly Ash incorporated into foundation• Use of Local Materials encouraged• Contractors must provide construction

waste management plan Optional Roof Garden:

• Native Drought resistant Plants to absorb CO2

Energy Efficient Appliances:• Low Flow Toilets• Low Flow Faucets• Waterless Urinals• LED Lighting W/ Motion SENSORS• Up to 30% in energy & water

savings expected!

Horacio Montejano

Page 10: CHAMPION HEIGHTS COMMERCIAL BUILDING

BORING LOG

1

2

2. SHALLOW LIMESTONE STRATA1. HIGH PLASTICITY INDEX

Horacio Montejano

Page 11: CHAMPION HEIGHTS COMMERCIAL BUILDING

FOUNDATION ANALYSIS

12345678

• Divide foundation layout into 8 strips • Analyze each strip for the shear & moment developed by the line of column loads

Horacio Montejano

Page 12: CHAMPION HEIGHTS COMMERCIAL BUILDING

FOUNDATION ANALYSISDetermine: Effective depth of Shear Prism for

diagonal tension shear

Maximum Positive & Negative Moments (Interior & Exterior)

Steel reinforcement

@ pu(max)=577.55 Kips; D=20”

(+) Interior = 1269.97 k-ft(-) Interior = 186.05 k-ft(+) Exterior = 958.21 k-ft(-) Exterior = 109.75 k-ft

• Conventional Grade 60 Rebar

Horacio Montejano

Page 13: CHAMPION HEIGHTS COMMERCIAL BUILDING

FOUNDATION DESIGN Foundation Type Selected:

BEAM & SLAB Foundation (Slab is suspended)!

WHY?• Simple Economics:

Less Steel+Less ConcreteSavings!

• Rigid Design• Reduction in Differential

Settlement

• High F.S.

• Eases Construction

• Floor slab is entirely isolated from expansive soils Horacio Montejano

Page 14: CHAMPION HEIGHTS COMMERCIAL BUILDING

STRUCTURAL OVERVIEWOffice Building 3-Stories:• Concrete Structure• Decking (One-Way Joist 2’ Module)• Braced Frame (CMU Walls)

Randy Rodriguez

Page 15: CHAMPION HEIGHTS COMMERCIAL BUILDING

CIVIL DESIGN• Grading• Existing conditions 8’ elevation change• Proposed conditions 3’ Change in elevation (parking

grade .5%)• 3’ deep detention

Eric Beals

Page 16: CHAMPION HEIGHTS COMMERCIAL BUILDING

CIVIL DESIGN• Storm Detention • 98,000 cubic feet• 12” outlet• 1’ freeboard

Eric Beals

Page 17: CHAMPION HEIGHTS COMMERCIAL BUILDING

CIVIL DESIGN• SW3P • 662LF OF Silt Fence• 3 Rock Filter Berms

Eric Beals

Page 18: CHAMPION HEIGHTS COMMERCIAL BUILDING

UTILITY LAYOUT

Water R.O.W. regulation 12-inch main extension

boring under HWY 46. Total Length 438 LF 3-inch water lateral

Service demand 14 edus

Sewer 8-inch 5.8% slope Capacity 251 edus

Cameron Miller

Page 19: CHAMPION HEIGHTS COMMERCIAL BUILDING

PAVEMENT DESIGN

From Geotech Report and Analysis S.N.-2.22 Concrete Asphalt Layer

2-inch Base Layer

8-inches

Cameron Miller

Page 20: CHAMPION HEIGHTS COMMERCIAL BUILDING

COST ESTIMATE

Cameron Miller