Change Management in Ibm

Embed Size (px)

Citation preview

  • 7/28/2019 Change Management in Ibm

    1/13

    SUBMITTED BY:SAGARIKA DUTTA (BAM 11006)AKASHDEEP DAS (BAM 11015)KARABI MALAKAR (BAM 11033)

  • 7/28/2019 Change Management in Ibm

    2/13

    SLIDES 3-6 AKASH SLIDES 7-9 KARABI

    SLIDES 10-12 SAGARIKA

  • 7/28/2019 Change Management in Ibm

    3/13

    An American multinational technology and consultingcorporation.

    Founded in 16 June 1911 by Charles Ranlett Flint as theComputing Tabulating Recording Company (CTR)through a merger of three companies :

    The Tabulating Machine Company The International Time Recording Company The Computing Scale Company.

  • 7/28/2019 Change Management in Ibm

    4/13

    Extremely cohesive group of dedicated,dynamic and result oriented people with a

    clear focus of serving the customers globally.Always soaring high in search of latest trendsand challenges the in the world of IT

  • 7/28/2019 Change Management in Ibm

    5/13

    Educate the marketplace

    Develop common definitions for the industry

    Serve as a forum for discussion about the industry

    Sponsor research in the industry

    Foster open standards and guidelines

    Promote best practices

  • 7/28/2019 Change Management in Ibm

    6/13

    NEED FOR CHANGES :

    Latest level of system software to increase thesystems performance

    System operating at peak availability

    Providing its customers with the most reliable

    server platforms

    System software update provide a way for themanufacturer to improve compatibility, features,

    performance, availability for their customers.

  • 7/28/2019 Change Management in Ibm

    7/13

    CHANGE IN THE SUPPLY CHAINObjective:

    Developing flexible E2E processes

    Changes:

    Identifying the problem with performance

    Developing an ISC optimization team Identifying issues affecting process performanceE2E performance improvement

  • 7/28/2019 Change Management in Ibm

    8/13

    Objective: Improve the quality of their work flexibility needed to implement any process for

    managing, tracking, and reporting on allproposed changes against critical requirements

    Changes:Activity reports run from the Rational DOORS Implementation of repeatable compliance

    processes such as CMMI or ITIL

  • 7/28/2019 Change Management in Ibm

    9/13

    Objective:Can improve traceability, promote compliance,

    and reduce the cost of ownership

    Changes: Rational Change and Rational ClearCase integration

    Rational Change and Mylyn Subversion Rational Change and Rational Team Concert Coexistence

    Complementary

  • 7/28/2019 Change Management in Ibm

    10/13

    Objective: Easy-to-use, best practice templates, processes, and

    configurable workflow that can help increas

    productivity and improve quality.

    Changes:ECP which provides CMMI and SPICE compliance Strategic QA support CMMI matrix report package Generate help with lifecycle visualization tool

  • 7/28/2019 Change Management in Ibm

    11/13

    Objective:Decrease the software changes time to reduce cost

    and improve quality

    Changes: Reduce turn-around time in design and defect

    resolution for advanced systems development Provide full integration and traceability between

    requirements, activities Can help drive that integration and co-ordination.

  • 7/28/2019 Change Management in Ibm

    12/13

    Building enterprise change management

    Enabling strategic change management

    Managing change for long-term business value

    Moving from change chaos to changecompetence

    Improving global collaboration

  • 7/28/2019 Change Management in Ibm

    13/13