Changes in Urban Infrastructure
responsible for Social Dislocation
An insight into the positive and negative
dimensions of dislocation and resettlement
Maitreyi | Dini | Shaik | Swati | Vyomkesh | Gobinda
1
2
Abstract
The issues pertaining to social dislocation and resettlement have been existing since a long time world wide. Many
innovative approaches have been applied in the past and in current projects to enhance the quality of life of the
resettlers.
The mental trauma that one undergoes on relocation is definitely challenging. But, the government and authorities
have an added responsibility of providing a better scope and opportunities for the persons affected. The discussion
on which the seminar was based on was to understand the issues of persons having to resettle or are forcefully
evicted by authorities for the benefit of a larger section of the population. The main question was to address if the
benefit of a more is prime concern than the collective benefit of all.
Urban Infrastructure forms an essential component of the city. It can also be regarded as a measure for the
economic and social status of a city and thus governs the overall quality of life people of a city enjoy.
The developments in the field of urban infrastructure touch all sections of the society. They affect certain sections
positively and the others negatively. Any project is usually a compromise between the positive impacts and the
negative impacts.
The discussion was aimed at throwing light on the issues in relocation projects through various case studies, which
could be explained on a positive note by the role of authorities and the current strategies being undertaken to
enhance the situation of the settlers.
Also positive impacts of the relocation projects have also been highlighted.
It was observed that the success rate of relocation projects depended solely on the interests taken by the authorities
and in managing the long time-bound process with complete care and supervision.
Keywords: Relocation, urban environment, infrastructure, urban sprawl, resettlement, displacement, displacement
induced development, migration.
3
Contents
1. Introduction 4
2. Casestudies for the topic
2.1 Relocation of slum areas: Yamuna Pushta 5
2.2 The resettlement colonies: bawana 6
2.3 High Spees Roads and Road Widening 8
2.4 New Roads 10
3. Casestudies against the topic
3.1 Resettlement at Shuikou Dam 16
3.2 Urban Infrastructure and transportation 19
3.3 Mumbai Urban Transport Resettlement 20
3.4 Hibei Shiman Highway Project 21
3.5 Urban Squatters and resettlement 22
3.6 resettlement through CSR 23
3.7 Road Construction at Mbinga 24
4. Migration: an after affect of changes in Infrastructure 25
5. Urban Sprawl 27
6. Management of Resettlement 30
7. Lessons Learnt 30
8. Development benefits whom – Debate 36
4
Introduction
Each year, millions of persons are forcibly displaced by development projects, whether
dams, roads, reservoirs or oil, gas and mining projects.
While such projects can bring enormous benefits to society, they also impose costs, which are often
borne by its poorest and most marginalized members..
In India, 2 percent of the total population had been displaced by development projects in the first forty years of the country’s independence. Of those displaced, however, 40 percent were tribal people though they comprise only 8 percent of the population. REASONS FOR DISPLACEMENT water supply (dams, reservoirs, irrigation) urban infrastructure transportation (roads, highways, canals) energy (mining, power plants, oil extraction, pipelines)
CHARACTERISTICS It is a profound socioeconomic and cultural disruption. It breaks up living patterns and social continuity. It dismantles existing modes of production, It causes the impoverishment of many of those uprooted. It threatens their cultural identity. It increases the risks of epidemics and health problems.
Infrastructure development is of vital importance for the prosperity of a nation. All infrastructure projects require land and that
land has to come from somewhere. However, it has to be acknowledged that the loss of a single human life or livelihood cannot be a justified cost for infrastructure development at
the grandest scale imaginable.
5
Yamuna Pushta is the Pushta
(embankment) on both sides of the Yamuna River
in Delhi, starting from the ITO bridge and up to
the Salimgarh Fort. It has been a home to more
than 100000 residents of slum population
mostly domestic workers, rag pickers, rubbish
scavengers, rickshaw drivers, vegetable sellers
and street sweepers. Delhi slums were
developed by the migrant populations who
could not afford land in the city, encroached
upon the riverbed. Important reason for their
development right up to the Nizamuddin bridge
in recent years was the availability of work
opportunities in the vicinity
Relocation of slum areas : Yamuna Pushta
Many of these slums were being demolished in 2004, after court orders which were
part of the beautification drive of the Government ahead of the 2010 Commonwealth Games and
for creating a "green belt“. In this drive 1,000 slum clusters from Gautampurui-I and Koyla Basti of
Yamuna Pushta were demolished, in all more than 18,000 slum clusters from both sides of the Yamuna
river. As later studied revealed, the income of most of resettled residents decreased by 50 percent.
Subsequently, an eight-lane express highway has been opened there in 2007, paving way for
construction of the 2010 Commonwealth Games Village and beautification drive of the Yamuna
banks prior to it. By October 2009, nearly 400,000 people from three large slum clusters, of Yamuna
Pushta, Nanglamachi and Bhatti mines have been relocated
Picture (anticlockwise) : 1. Unhealthy environment of the Yamuna pushta 2. A barbar shop in the
demolished Yamuna pushta area 3. Demolition of building for 2010 commonwealth
beautification drive 4. Homeless people after demolition
source: http://www.thenational.ae/news/world/south-asia/we-made-them-criminals-the-failure-
of-a-delhi-slum-relocation#ixzz2K9CikbFL
http://www.Wikipedia.org
6
The resettlement colonies: Bawana
It is located 40km away from Yamuna Pushta. It is one of the resettlement colonies
where people were shifted. Most of them were the daily wage labourers and now they were shifted
to a place from which is far away from the work place. A single route bus ferries people a couple of
times a day. Going to work, going to Delhi where they used to live and work, takes hours just to go
on three different buses and on top of that costs 50 rupees. They might make 200-300 rupees a
day, but half would be used in transport, and then there are the hours spent coming and going. The
relocation sites also lack schools. An estimated 15,000 in Bawana are younger than 8. The single
public school has room for 3000 students. Sewage from the toilet blocks is released into the parks
and the toilet blocks are not clean.
Broken sewage pipes and leaking water supply lines are creating havoc in the area.
Nobody comes to clear the garbage and there are multiple families suffering from chronic diseases
due to the prevailing conditions over there. Public distribution system for subsidized food and oil is
absent for economically weaker section. Doctors are not available in the dispensary. There is one
police station with 6 policemen for based 8 km away for support to the more than 100,000
residents. On the name of beautification of a city, people not only looses there houses but jobs. Time
spent on travelling is more than the time spent on work, resulting in spending of more money on
transportation rather than earning money.
The people in the resettlement
colonies not only loose there livelihood but also
residing in poorer living conditions. Their income is
less than 50% what they were getting earlier. A
new Bawana industrial estate is proposed but at
the time of resettlement there was no employment
opportunity for people over there. These are the
hazardous industries which were earlier inside
Delhi and they are planning to make hazardous
landfill site for the industrial over there.
Picture (clockwise): 1. Playground present in Bawana, used as a place for deposition of
sewage water 2. deficient watersupplt system in Bawana #. Presence of dumping yard just
outside Bawana.
Source: http://www.indiatogether.org/2008/jun/ksh-sweptoff.html
http://www.thehindu.com/news/cities/Delhi/article3906451.ece?homepage=true
http://www.thehindu.com/news/cities/Delhi/article3906452.ece
7
“When I was in Saraswati Vihar I could at least earn livelihood. Now more than 30 km away from
where I used to work, it is impossible for me to travel there. I barely make any money, and the
government refuses to issue an income certificate that would allow me to apply for a ration card,
because the official there does not believe that I earn as little as Rs. 3,000 a month,” said Sati Ram,
a resident.
“The children should be playing in the park, but it is always flooded with filth. There are no garbage
dumps and no one comes to clean, consequently we have people coming down with dengue, malaria
and other diseases all the time. The broken sewage pipe is next to the drinking water pipeline,
contaminating the water. Sometimes the water is so dirty; we cannot even use it for cleaning. We can
see worms floating in it,” said Meena another resident.
“When we landed here we were assured of a plot of land for construction of a house and basic
amenities. And what we have is worse than what our slum cluster used to be,” Umesh, another
resident.
Voice of people
8
World Bank has acknowledged that though large
dams constitute only 26.6 per cent of the total
WB funded projects, the resulting displacement
makes up 62.8 per cent of the total number of
people displaced.
India is the third largest dam building country and
there are over 3600 large dams and more than
700 under construction. Project authorities do not
consider the problems of displacement and
rehabilitation as important parts of the project.
The primary concerns are engineering
specifications and electricity and irrigation
benefits. In this event, concerned authorities
seldom undertake detailed and systematic surveys
of the population to be displaced. Despite the
fact that the number of displaced persons since
independence is more than thrice the number of
population displaced by India’s partition, they are
yet to enter into our national consciousness.
(Source : Development Induced Displacement in
India by Parshuram Ray)
Narmada Bachao Andolan
Narmada Bacha Andolan is a social movement
consisting of tribal people, adivasis, farmers,
environmentalists and human rights activists
against the Sardar Sarovar Dam being built
across the Narmada river, Gujrat, India
It is the most powerful mass movement, started in
1985, against the construction of huge dam on
the Narmada river.
Movement started when the World Bank lent India
$450 million for the Sardar Sarovar Project. Due
to inter-state differences in implementing schemes
and sharing of water, the Narmada Water
Disputes Tribunal was constituted by
the Government of India on October 6, 1969 to
adjudicate over the water disputes. As per the
Tribunal's decision, 30 major, 135 medium, and
3000 small dams, were granted approval for
construction including raising the height of
the Sardar Sarovar dam.
The Narmada Valley Project has been in
controversy right since its inception.
DAMS AS A CAUSE OF SOCIAL DISLOCATION
9
The dispute has been with regard to sharing of
benefits and costs between Gujarat, Maharashtra
and Madhya Pradesh.
The project will entail large-scale exploitation of
resources, submerging of an enormous area of
37,000 hectares of land including forests and
agricultural.
Another biggest problem apart from the
environmental aspect is of displacement of as
many as one million people, which has a large
number of culturally diverse people and peasant
communities.
By 1987-88 Medha Patkar and other activists led
campaigns in Maharashtra and Madhya Pradesh
and laid the foundations of what we know today
as Narmada Bachao Andolan.
Reasons for Public Discontent
According to the Government, the Sardar Sarovar
Project when completed will flood more than
37,000 hectares of forest and agricultural land,
displacing more than a million people and
destroying some of Indias most fertile land.
According to Narmada Bachao Andolan
approximately 85,000 families in all will be
displaced by the completion of the project.
Doubtful equivalent Shelter and compensation
provision for all the displaced families.
Problem is further aggravated by the fact that
most of the displaced are from tribal group.
Direct and indirect violence including harm and
loss to life and property during the protest.
DAMS AS A CAUSE OF SOCIAL DISLOCATION
10
An inadequate master plan, poor housing
facilities, environmental problems, and shanty
corners, among others, characterize urban centres
of developing countries.
In order to solve these problems and create a
conducive environment for investment, government
authorities tend to re-order urban space, which
would require changes in urban land use. This
process often causes the displacement (relocation
and resettlement) of certain households, in most
cases the powerless low income people.
Addis Ababa has been witnessing major
transformations as evidenced by phenomenal
public and private investments since the 1990s.
The strategic development framework of the City
provides a ten-year (2001- 2010) policy and
development direction. According to the Master
Plan Revision Office of Addis Ababa, housing,
upgrading, the development of inner city,
construction of roads, establishment of industries
and warehouses, and protection and development
of the environment are the six priority strategic
development goals to be achieved during the ten-
year plan.
The Impact of Resettlement Projects on Low-
income Households
Weak inspection and reporting mechanism.
Poor maintenance and lack of new facilities
combined with rapid population growth has been
causing water shortages.
26 % of the houses - and the majority of slum-
dwellers, have no toilet facility, and thus use rivers,
ditches and open spaces.
A shortage of water-supply, ensured that the
same areas are used for public baths and
washing.
ADDIS ABABA, ETHIOPIA RELOCATION MASTER PLAN
11
Political power in Ethiopia power has
traditionally been highly centralized.
Local governments have tended to be
Representatives of the centre, rather than
the local community.
Community participation,
decentralization, private public
partnership, transparency, and
accountability were thus not prevalent
indicators of success.
Monetary compensation for rehabilitation
of the displaced people was insufficient
because the replacement of housing and
Income generating possibilities were not
considered.
The relocated population faced shortage
of schools, uneven distribution,
inconvenient location, inefficient
management, lack of expansion area,
and dilapidated school buildings due to
lack of proper infrastructure and
maintenance.
Also, the land given in exchange and
compensation to the relocated population
has a low land value.
Compensation was provided only to the
male head members of the family.
(Sources :
http://en.wikipedia.org/wiki/Narmada_B
achao_Andolan
Development Induced Displacement in
India by Parshuram Ray
http://muse.jhu.edu/journals/eas/summar
y/v024/24.2.yntiso.html)
ADDIS ABABA, ETHIOPIA RELOCATION MASTER PLAN
High Speed Roads and Road Widening A general growth pattern-
1. A connectivity to different distant settlements – single or double lane Highways.
2. All the villages/settlements/hamlets nearby gets benefitted with other infrastructures coming up near the
highway.
3. City starts growing towards these settlements.
4. Population increases, no. of vehicles increases.
5. As a consequence, highways need to be widened and new High Speed Roads come into picture.
Damages it does to society when placed badly, which normally happens due to the pattern discussed earlier-
1. Slice communities in half
2. Peoples and properties that come in direct path of road projects are affected.
3. Disruption of livelihood, loss of accustomed travel paths and community linkages, air pollution due to plying
vehicle and maintenance activities.
4. Any new roadways alignment cuts across hills and field inevitably a number of trees and the communities
depended upon them get destroyed.
5. Cutoff waterfronts
6. Cutoff access to countryside
7. Create enormous noise
Source : www.irc.org.in/ENU/knowledge/.../November%202011.pdf
High Speed Roads and Road Widening Example of Bangalore-
The author of the article Dasarathi GV talks about Sankey Road where line of trees were cut-down, destroyed High
Point Police station and the Golf Course. He also talks about Hosur Road, Race Course Road and Bellary road. In
each of the above examples road were widened from single to 2 or 3-lane, without getting the congestion during
peak hours problem solved. Problem at Sankey Road was again considered and after building an under pass at the
intersection, this was resolved.
Source : http://www.slideshare.net/das_gv/bangalore-road-widening-road-to-nowhere
Bangalore Transportation Projects Impacted Communities Network (BATPIC Network) launched with an objective
of pursuing urban transport projects that are socially just, economically viable, environmentally friendly and long
lasting solutions.
Their issues are:
1. The proposal to widen roads that was initially promoted by identifying 91 inner-city roads in 2004, is now
enlisting a total of 216 roads and a bunch of signal free corridors.
2. Together, these projects involve a massive displacement of communities and the careless refashioning of
core city areas.
High Speed Roads and Road Widening 3. These are affecting thousands of businesses, homes, street vending spaces, trees and critical pedestrian
and cycling zones in an adverse and illegal manner.
4. 40 lakhs commuters in 5000 buses and 1 lakh autos occupy merely 2% of Bangalore city's road space. In
contrast, 35 lakhs using private motor vehicles monopolise 90% of the city's road space.
Source: http://www.esgindia.org/education/community-outreach/press/bangalore-road-widening-and-other-urban-
.html
New Roads
NEW ROADS AND HUMAN HEALTH: A SYSTEMATIC REVIEW
(American Public Health Association)
A research by: Matt Egan, MPhil, PhD, Mark Petticrew, PhD, David Ogilvie, MPH, MFPHM, and Val Hamilton,
DipLib, Mlitt
WHO: A range of public health and environmental concerns have been associated with these trends of increasing
automobile ownership and decline in public transport use & walking, including smog, urban sprawl, a rising
prevalence of obesity, and their associated health problems. Furthermore, between 1970 and 1995, 1.2 million
people died on America’s roads.
Red Cross: By 2020 injuries related to traffic will be the world’s third largest cause of death and disability.
Road construction and automobile dependency have also been associated with community severance (i.e.,
reduced access to local amenities and disruption of social networks caused by a physical barrier running through
the community), increased “disturbance” among residents (e.g., noise, vibration, fumes), and social inequalities.
Source : http://www.ncbi.nlm.nih.gov/pmc/articles/PMC1447994/
Road Injuries:
Table 1 summarizes the results of studies assessing effects of new roads on injury prevalence rates.
1. Seven of the injury studies involved meta-analyses of data from more than one new road site.
2. 4 studies in this category examined the impact of a single new road on injuries.
3. The studies covered 3 broad categories of roads: major urban roads (4 studies), out-of-town bypasses (5
studies), and major connecting roads between towns (3 studies).
4. One study included both bypasses and major connecting roads.
5. All involved the use of before-and-after comparisons of police injury statistics adjusted for general trends.
Major Urban Roads-
1. One study examined 4 new major urban roads in Oslo and estimated a mean decrease in injury accidents of
4% when only major roads were considered and a decrease of 19% when secondary roads were included.
2. The authors noted that there were systematic variations in the results of the 4 projects. Three of the roads
were new tunnels that together were associated with an estimated increase in injury accidents of 10% on
major roads.
Bypasses-
1. The 5 bypass studies showed a general decline in the incidence of injury accidents after the opening of new
bypasses.
2. In a recent meta-analysis of 20 bypasses in Norway, the observed decrease in injury accidents of 19% was
statistically significant when a fixed effects model was used in the analysis, but was narrowly rejected by
significance testing when a random effects model was used. All of the studies in this category compared the
incidence of injury accidents on main through roads in the “before” period with the incidence of injury
accidents on both old through roads and new bypasses in the “after” period.
3. Andersson et al. found a mean increase in the incidence of injury accidents of 41% along secondary roads
that linked new out-of-town bypasses to old main roads that ran through towns.
Disturbances-
1. Twenty-one studies involved the use of structured and semi structured surveys to consider the impact of
new roads on disturbance (M. L. Burr, G. Karani, B. Davies, B. A. Holmes, and K. L. Williams, unpublished
data, 2002). They focused on major urban roads and bypasses. Types of disturbance included noise,
vibration, fumes, and dirt. Some of the studies also considered community severance.
TABLE 3—
Summary of Studies Showing Effects of New Bypasses on Disturbance Among Residents of the Area Being
Bypassed
TABLE 4—
Summary of Studies on Disturbance After the Opening of New Roads: Postconstruction Only
Inferences-
1. Overall, there was little evidence that new major urban roads significantly reduce the incidence of injury
accidents, except for a study of widening and intersection improvements made to a single urban road in
Norway (A. H. Amundsen and R. Elvik, unpublished data, 2001).
2. New major urban roads appear to increase noise disturbance and severance effects in local communities.
There is qualitative, but not quantitative, evidence that residents may respond to these effects via behavioral,
attitudinal, and environmental adaptation.
3. The evidence on out-of-town bypasses indicates that they reduce the incidence of injury accidents on main
routes through or around towns.
4. Secondary roads within towns may be affected differently (e.g., the Andersson et al. study suggests that
bypasses lead to increases in injuries on secondary roads and intersections).
5. Unfortunately, detailed accident statistics are not always available for secondary roads (A. H. Amundsen and
R. Elvik, unpublished data, 2001), which perhaps explains the relative lack of robust evidence on how new
bypasses affect the distribution of injury accidents across broader road networks.
6. Although new bypasses reduce the amount of disturbance in some communities, people living near the
bypasses themselves typically experience adverse effects (which were addressed in only a few studies).
7. Similarly, there is evidence that major new roads connecting urban centers are associated with significant
decreases in accident injuries, but there is no evidence regarding the effects on rural residents.
New Roads
New Roads
Source: PubMed Central, Table 1-: Am J Public Health, 2003 September; 93(9): 1463-1471.
New Roads
Source: PubMed Central, Table 2-: Am J Public Health, 2003 September; 93(9): 1463-1471.
New Roads
Source: PubMed Central, Table 3-: Am J Public Health, 2003 September; 93(9): 1463-1471.
New Roads
Source: PubMed Central, Table 4-: Am J Public Health, 2003 September; 93(9): 1463-1471.
20
Resettlement at Shuikou Dam
Large-scale resettlement for dam and reservoir construction is a difficult business. Thus examples where resettlement has been successfully carried out, and where this claim can be backed up quantitatively, are relatively rare. The Shuikou Dam and Reservoir Project in the Fujian Province of China is one such example. Reservoir area of 94 square kilometers. Relocation of 67,239 persons in rural areas and 17,215 persons in Nanping City. The physical relocation was carried out between 1988 and 1993. The economic rehabilitation of the affected households took another five years. By the end of 1997, 38,439 jobs had been created for the rural population, while for Nanping, no job creation was required, as people were able to continue their old jobs after relocation.
Among 89 affected villages, 73 of them required relocation of households, for which two approaches were used: 1) consolidated resettlement, involving the building of a new village,for large relocations. 2) dispersed resettlement, involving relocation within existing villages. SOCIAL REHABILITATION Maintaining the existing social structure was a key objective driving the resettlement strategy. This was achieved through moving of affected villages as whole communities into the same townships. Displaced persons were re-established in the nearest available sites and this was done in a manner that it enables them to continue with their previous occupations. Social rehabilitation consisted of two components: 1) the reestablishment of social infrastructure, such as schools, clinics and community structures, 2) the social support provided to vulnerable individuals and families.
Source : http://documents.worldbank.org
21
Resettlement at Shuikou Dam
ECONOMIC REHABILITATION ACTIVITIES The reservoir inundated farmland, including 30,000 mu of high-yield paddy fields, 25,401 mu of fruit trees other cash crops, Remaining land above the reservoir level were of lesser quantity and inferior quality. To restore income levels and livelihoods of the affected population, the resettlement plan postulated, development of new cultivated land, growing of fruit trees and timber trees on sloped land, developing cage fishery and other sideline activities, setting up enterprises and promoting service activities. After about eight years of efforts, by the end of 1996, as many as 38,473 resettlers had been provided with jobs ranging from traditional agriculture (48.0 percent) animal husbandry (5.5 percent) enterprises (17.4 percent) services (14.0 percent). RESETTLER SATISFACTION Overall, resettler satisfaction as observed was remarkably high. While some complaints were voiced, the level of dissatisfaction that one could anticipate with a major relocation simply was not evident, although those interviewed were given ample opportunity to state their opinions. This was also observed by the periodic World Bank supervision missions.
REASONS FOR THE SUCCESS Early on in project supervision, the World Bank initiated an Independent Evaluation of Resettlement. This evaluation, took place annually over a five-year period The evaluation was the first of its kind in China, and has since been replicated elsewhere This project underscores the point that successful resettlements require a complex, varied set of actions and responses, and sensitivity to broader socio-economic trends.
Source : http://documents.worldbank.org
22
India’s infrastructure sector continues to be a key driver of the nation’s economic progress.
Population displacement and relocation must be regarded as part and parcel of policies for urban
socioeconomic development.
Projects are cleared on the basis of cost-benefit analysis which was solely based on the economic loss and
gain.
To avoid or minimize population dislocation, enactment of domestic policies that explicitly regulate involuntary
displacement and relocation essential.
Urban investments and growth programs must address relocation with no less attention than is given to
other components of urban growth such that economic losses, social trauma and psychological pain inflicted on
displaced people is reduced.
Resettlement planning process has somewhat improved over time, but problems remain with
implementation.
First Steps: Policies Formulated
•Only three states, Maharashtra, Madhya Pradesh and Punjab, had state-wide resettlement and rehabilitation (R&R)
policies.
Objectives of the NRRP :
(i) To minimize displacement and to promote, as far as possible, non-displacing or least-displacing alternatives
(ii) To ensure adequate rehabilitation package and expeditious implementation of the rehabilitation process with the
active participation of the affected families
(iii) To ensure that special care is taken for protecting the rights of the weaker sections of society, especially
members of the Scheduled Castes and Scheduled Tribes
(iv) To provide a better standard of living, making concerted efforts for providing sustainable income to the affected
families
(v) To integrate rehabilitation concerns into the development planning and implementation process
(vi) To facilitate harmonious relationship between the requiring body and affected families through mutual
cooperation in case of Land Acquisition.
India as a whole does not have a national rehabilitation policy.
The latest version of the combined Land Acquisition and Resettlement and Rehabilitation policy is expected to be
put before the Lok Sabha.
Several states and some public sector companies have adopted their own state policies for displacement
and resettlement.
In the 1980s, Maharashtra, Madhya Pradesh and Karnataka enacted laws on the rehabilitation of irrigation-
displaced persons. In the 1990s, Orissa and Rajasthan formulated policies for persons displaced by irrigation
projects.
Coal India Limited in 1994 and the National Thermal Power Corporation in 1993 formulated their own
sectoral resettlement policies. NTPC revised it in 2005 and the National Hydro-Power Corporation (NHPC)
finalized its policy in 2006.
23
Urban Infrastructure and Transportation The WBED estimated 60 per cent of development-induced displacement every year (about 6 million people) due to
urban infrastructure and transportation projects.
Number of people displaced in individual urban and transportation projects is much lower than the number
displaced in many large infrastructure projects. Higher frequency of such projects resulting in a high overall number
of displacees.
Amount of land appropriated for individual urban projects is often minimal compared to that acquired for individual
large dam or irrigation projects, the ratio of people displaced per unit of expropriated land is usually higher as a
result of high urban population densities.
Rural development projects that have caused displacement have played their own role in this rise, as many
resettlers either relocated to cities or migrate from poor resettlement sites in search of employment.
This situation will only intensify this global trend of urbanization.
Source: Development-induced displacement
and resettlement by Jason Stanley
Roads, Telecommunication networks, Drains, Road widening, Construction of flyovers, Expansion of airports
, Slum clearance and upgrading Establishment of industrial and commercial estates, Sewerage systems,
Schools, Hospitals, Ports
Urban Infrastructure projects which are mostly responsible for displacement and resettlement can be categorised as
24
Mumbai Urban Transport Resettlement THE MUMBAI URBAN Transport Project (MUTP) designed to improve Mumbai’s
traffic and transportation system.
Includes the government of Maharashtra and the Indian Railways who share the
cost between them, the municipal corporation of Greater Mumbai and the Brihan
Mumbai Electric Supply Undertaking.
The project cost is over Rs 7,000 crores (around US$ 175 million) and includes
funding from a World Bank loan of Rs 2,300 crores.
Laying of new railway lines, the extension of station platforms (to allow longer
trains), the removal of road crossings, station improvements and the resettlement
of households living within 10 metres (30 feet) of the tracks
Increase in rail capacity of up to 35 per cent (through higher train frequency during
peak hours), a reduction in journey times and improvements in the flow of
passengers and vehicles in and around selected stations. Measures are also far
cheaper than laying new tracks.
15,000 households living along the tracks and some 4,000 living around the
stations need to be resettled.
Prior to Project, the Railway Slum Dwellers Federation had collected data about the
settlements along the tracks, mapped them, set up women’s savings and credit
groups and supported the formation of housing cooperative societies. This was
not just to collect data but also as a means of community mobilization.
Resettled 900 families in 1999 when the Indian Railways wanted a piece of land
cleared urgently. The families were resettled to Kanjur Marg in temporary one-
room (120 sqft) dwellings with electricity and communal provision for water
and sanitation, while permanent apartments measuring 225 sq ft in multi-storey
buildings were to be constructed.
Unexpected eviction by Indian Railways demolished over 2,000 huts– which
was against state government policy and against the stipulations of the Mumbai
Urban Transport Project attempting to clear illegal structures built after January 1,
1995
Emergency meeting convened to halt demolition.
Land sites identified to accommodate the evicted households and the National
Slum Dwellers Federation was given the responsibility for managing the
resettlement and overseeing the construction of formal housing.
60,000 people resettled in just over a year without any municipal or police force.
Live in secure, better-quality accommodation with provision for piped water,
sanitation and electricity.
More trains are running on the same tracks and at greater speeds. Travelling times
have been reduced and the rail system’s performance improved.
Source:
www.sdinet.org/media/upload/countries/documents/mumbai
_urban_transport_resettlement_mumbai
25
Hubei Shiman Highway Project: China
“… the resettlement under the expressway makes us walk out … from a mountainous area to a roadside, from
earth house to brick house, from single story building to multi-storied house, from inside of the mountain to the
outside, and from village to township, and it also provides our offspring with a hope.” - Villager
BACKGROUND
-The Focus was on sustainable land development, improving housing standards, better access, and centrally-
planned communities.
- 107 km expressway was to be constructed.
- A ‘Resettlement Action Plan’ (in accordance to World Bank Safeguard Policies) was prepared and disclosed prior
to the start of Construction.
- This described the extent of resettlement, identified affected persons and resources.
- 780 ha of land was required to be requisitioned, 1,480 households needed to be relocated, and 249,646 m2 area
of buildings had to be removed.
The project has led to an improved quality of infrastructure and livelihoods for most affected residents. Public
participation and continuous dialogue with affected parties throughout the project helped address resident
concerns and contributed to the positive outcome.
Source: Shiman Resettlement Note
siteresources.worldbank.org
RESETTLEMENT STRATEGY – excerpts from the report
Urban Squatters Resettlement Project: Bangladesh The project was a Local level programme on 87-acre site in Mirpur area, at the
outskirts of Dhaka. UNDP responsible organisation for overlooking the project.
Resettlement/rehabilitation of about 3,000 squatter families with support and
services such as providing low cost housing, land and infrastructure development,
community services, socio-economic development and assisting, through NGO
involvement, income-generating activities, addressing issues related to equity,
benefits to women and children.
Issues addressed were:
-Increased quality of life
- Sustainable livelihood through vocational education, skilled development training
- Credit delivery for income generating activities
- Equity, human rights, benefits to women and children.
Objectives
-To assist the Government of Bangladesh in its efforts to provide appropriate
housing and basic community services to the urban poorest without shelter.
- Intended to implement a pilot project to develop a model that will serve as the
guide to formulate a national strategy and methodology in providing low-cost
housing on self-help basis for low-income urban peoples in the capital city and
elsewhere in the country.
Outcomes
- Security of land tenure and house ownership to 2600 families
-Basic infrastructure services, core houses and community facilities such as
opportunity for income generating activities, safe drinking water supply, sanitation
& sewerage, embankment for flood protection and overall environmental
enhancement for the community
- All families became owner of the house through collection of hire-purchase fees
within 10 years is an example of poor's access to resource & ownership.
- Average family income increased 300% over 7 years.
- Created positive impact on living and working condition, on income generating
potential, on social services and women and children.
Lessons learned
- Assetless people can be resourceful if opportunities are created
-Basic needs delivery through participation of the concerned people, government,
development partners and the civil society working together.
-Technical assistance provided by the UNCHS and UNDP and the capital investment
of UN Capital Development Fund along with the NGO assistance resulted in a
systematic approach.
- Keeping the level of the unit cost of resettlement within range of the urban poor.
- The programme should be appropriate with sufficient level of self-help initiative
and involve other partner organizations in the project management and financial
support systems.
Source:
www.un.org/esa/earthsummit/bangl.htm
Resettlement through CSR Indian Hydel Power Company (IHPC)
-Resettlement and Rehabilitation of more than 15000 families since the late 1970s
-R&R linked to community involvement as well as the company’s Corporate Social Responsibility (CSR) programme.
-IHPC Dam and HPP faced major resistance and agitation against the construction of the project. Problems related to
rehabilitation and resettlement and poor geological conditions were also reasons for the huge delay and cost
escalation of the project.
-Benefits of the Hydro Power Complex consisted of installed generating capacity of 2400 MW,annual generation of
5300 MU, irrigation of 2.7 lac ha and stabilization of existing irrigation for 6.04 ha. Drinking water was supplied to the
India state of Delhi.
-Till 2011, more than 15000 families have been rehabilitated by IHPC at a cost of more than Rs.13,0000 million
including building a new town (NT) as the earlier old town (OT) was completely submerged.
-The R&R effort was driven by the company’s R&R policy. The policy mentions that both formal and informal
consultations with project affected families (PAF) will
take place through the Public Information Centre (PIC), Village Development Advisory
Committee (VDAC), community based organizations and non governmental organizations.
-The first project in the Indian state of Uttar Pradesh saw huge protest from social and environmental activists who
alleged that the hydro power project will create irreversible damage to the Himalayan ecology as well as inadequate
rehabilitation package for the displaced people.
-State government takes over maintenance of the sites after the Rehabilitation. Implementation Report is prepared by
IHPC.
-It was handed over to the state government after 7 years, yet many residents still hold IHPC responsible for their
problems.
-Their current demands includes potable drinking water supply ( currently supplied through tube/bore wells), a
technical school imparting engineering and computer skills, repair of the sewage system to avoid flooding and
others.
-Failed due to: LACK OF COMMUNITY PARTICIPATION
-No involvement in site selection, building design, landscaping or other areas of urban and town planning as the
villagers were illiterate.
-The conversations in such settings are generally carried out by NGOs and political parties. At the organizational
level, IHPC has tried to move away from resettlement colonies and hand it over to the government.
-Communities were more interested in money and the government machinery ineffective to mobilize the community.
Based on the local women’s requests a Self Help Group (SHG) was formed to help them in entrepreneurship.
IHPC authorities decided to involve local population in the construction activities. The maximum value of a project
was reduced to INR 5,00,000 from INR 100,00,000
-Low quality work and unethical practices compared to projects implemented by big contractors.
-On this front, the company also supported local community in buying vehicles and hired them for official use.
Source:
http://www.academia.edu/573578/CSR_Resettl
ement_and_urban_planning
LESSONS LEARNT
-Integration of community in R&R activities.
- Participation in the urban/ rural development
planning process require techniques of
communication and a change in the attitude of the
stakeholders.
- Large projects cannot grow and survive without
support from the community and this can be started
while planning for their R&R, by taking them into
confidence and using their socio-cultural reality as a
design construct.
-‘Inclusive growth’ can take place uniting corporatio
ns, governments and civic society
Road Construction at Mbinga
-The residents of Mbinga faced a very severe issue. The village did not have a direct road connectivity to the
immediate town.
- the residents had to undergo three days travel of 100 kilometers on a rutted, slippery road to reach the market
center in the regional capital.
- The Poor transportation infrastructure in Mbinga led to high commodity prices and, inversely, low income from
agricultural products.
-This simultaneously led to the farmers discouragement to expand the crop production.
- Poor transportation network also prohibited access to and delivery of health and education services.
- Thus a Resettlement Action Plan (RAP) was designed after meticulous planning, such that a road connectivity
could be established between the regional capital and Mbinga.
Source:
Road Construction Activities
Improve Lives of Mbinga Residents
Article published by MCA-Tanzania.
Thus, this particular example can be considered as a case of Infrastructure facilities that suffices the
requirements of all sections of the society. Thus, is was also observed that there were very few litigations
concerning land acquisition and the resettlement process, which was infact very peaceful.
-The pictures on the right indicate a
the drastic change in the lifestyle of
a shop owner brought about by the
construction of this road.
- many lives improved due to the
construction of the road and so did
the micro economy of Mbinga.
Migration: An after effect of changes in infrastructure
Rapid urbanization as a result of migration migration can have impact on the overall economic development of a country as a whole. Regarding the rapidness of such urbanization, the World Bank puts us in perspective by declaring that, about 90% of the world’s population will be living in urban areas by the year 2025. economists had earlier identified the difference between the income levels of urban and rural areas as the main driving force of migration. recent evidence shown by some studies suggests that migration may be due to other factors of which inadequate or unavailability of infrastructure in the form of amenities at the sending region one’s migration decisions may be based on the relative attractiveness of the receiving region in terms of the stock of infrastructure . As per World Bank Population Bulleting (2000) electricity accessibility is extraordinarily higher in the urban areas than in the rural areas in all the African countries shown.
It can be said that this disparity occurs as a result of the prourban development stance taken by many governments which makes the urban areas more attractive to potential migrants due to better infrastructure.
Utility difference between urban and rural areas and wage equalization alone cannot explain such migration.
lack of certain goods and services in the form of infrastructure in rural areas and their presence in urban areas contribute to such migration trend. Source:Do Migrants React to Infrastructure Difference between Urban and Rural Areas? - Development and Application of an Extended Harris-Todaro Model Ismail Issah, Tariq Y. Khan and Komei Sasaki. (Graduate School of Information Sciences, Tohoku University) October, 2003
Examples of change in urban infrastructure causing migration
Making the Most of Transit: Transit oriented development Definition of TOD: A transit-oriented development is generally defined as a mixed-use residential project that is located within a quarter mile (0.4 km) of a commuter transportation station (usually rail) and within walking distance of retail businesses, restaurants, and/or places of employment, allowing reduced car use through direct access to mass transit. Potentials:-
mixed-income housing at transit stations supporting transit ridership, promoting regional inclusiveness, and revitalizing underused or blighted areas.
patterns of real estate development are being transformed because of :
escalating gasoline prices, global warming, summer smog alerts, extensive traffic jams in major cities, changing housing preferences of younger people, and household deleveraging after the recession, among others.
Example 1:Transit oriented development
Twin Cities metro area(Minneapolis–Saint Paul) Demographic shifts point toward more transit-oriented development In the Twin Cities metro area(Minneapolis–Saint Paul is the most populous urba area in the U.S. state of Minnesota), changing demographics, individual preferences and highway congestion are creating the potential market for more transit-oriented development (TOD) Reasons for demographic shift:
Reduced vehicle operation costs Reduced travel time Reduced traffic congestion Increased travel reliability Decreased costs for logistics and shipping Fewer harmful emissions Improved safety
Source:http://www.metrocouncil.org/newsletter/transit2012/TODForumJuly9.htm
The Dakotah, on Robert Street in St. Paul’s West Side
community, includes ground level-commercial space,
senior housing, underground parking, sidewalks and
easy access to transit.
Excelsior and Grand in St. Louis Park models a pedestrian-
friendly development, a mix of retail and services on the
ground floor of residential housing, with a large park
nearby, connected to bus routes.
Mirroring a national trend, the Twin Cities area is seeing population changes that are affecting the real estate market. Smaller homes close to amenities are becoming attractive to members of the aging baby boom generation who have graduated from child-rearing to empty-nest status.
Young adults conscious of sustainability, or who simply enjoy the ease and excitement of urban life, are choosing cities where car ownership isn’t necessary and transit is accessible from home to work and to cultural destinations. A way to develop thriving communities is by offering choices to accommodate the needs of all people. This could mean having smaller homes that reduce maintenance, or locating housing near stores and jobs with easy access to transit. pedestrian-friendly development, a mix of retail and services on the ground floor of residential housing, with a large park nearby, connected to bus routes.
Most construction of commuter-rail projects occurs on former cargo rail lines, and the rail stations are often located in former light-industrial areas—places where existing housing stock is older, as well as less desirable and less expensive due to its proximity to the rail lines and industrial uses.
The people living in these areas tend to be lower-income minority renters—the same demographic group much less likely to own a car and more likely to use mass transit, making them the core transit riders.
Elevated development costs require high rents, which push out people with lower incomes; the new residents have higher incomes, are less likely to be a member of a minority, and are more likely to own and use a car to commute.
Because lower-wage workers cannot afford to live in the new project, they find themselves forced to drive to their jobs, exacerbating traffic congestion and increasing the need for parking. Yet, gentrification also brings positive change: without new development, these inner-city and/or former industrial areas would remain blighted. The rail station becomes a catalyst for renewal, driving out mismanaged and poorly maintained properties and increasing tax revenues to support public works and underfunded school systems.
Example2:Urban Sprawl in the United States
Urban sprawl or suburban sprawl is a multifaceted concept centered around the expansion of auto-oriented, low-density development. Think of the city as a living organism. A slow moving blob that is constantly expanding outwards; consuming more land and more resources. As the city spreads, it spawns suburbs, subdivisions and auto-dependent residents. Advantages of Urban Sprawl
More single family residences on larger lots. Lower land prices. Less experience of noise and pollution. Suburban areas generally associated with “sprawl” tend to have lower crime and higher-quality schools. Perceived overwhelming consumer preference for sprawl-type developments.
Source: Wikipedia
urban-sprawl-in-united-states-eden-prairie-aerial-florida urban-sprawl-housing-subdivision-in-arizona-
aerial
housing-subdivision-aerial-in- Nevada-united-states urban-sprawl-in-california-deer-crest-
subdivision
Neighborhood quality in traditional neighborhoods the nearness of the workplace to retail and restaurant space that provides cafes and convenience stores with daytime customers is an essential component to the successful balance of urban life. the closeness of the workplace to homes also gives people the option of walking or riding a bicycle to work or school and that without this kind of interaction between the different components of life the urban pattern quickly falls apart. Consumer preference for sprawl Reasons cited include a preference towards lower-density development (for lower ambient noise and increased privacy), better schools, less crime, and a generally slower lifestyle than the urban one. Source:Wikipedia
References: 1.Wikipedia 2. Do Migrants React to Infrastructure Difference between Urban and Rural Areas? - Development and Application of an Extended Harris-Todaro Model Ismail Issah, Tariq Y. Khan and Komei Sasaki. (Graduate School of Information Sciences, Tohoku University) October, 2003 3.Source:http://www.metrocouncil.org/newsletter/transit2012/TODForumJuly9.htm
Management of Resettlement A few aspects concerning the entire process of Managing the Resettlement can be highlighted as:
1. A Reasonable estimate of the number of people that will be affected.
2. A Top-level commitment is essential for the successful proceeding of the projects.
3. Assessment of potential adverse impacts of projects prior to the project execution inorder to estimate
appropriate and precise projections and impacts of projects on the people and surroundings and a in dept
understanding of the tangible and intangible affects on society is a must.
4. Active participation of stakeholders and affected people should be taken into account while designing the
mechanism for resettlement.
5. Require time as well as financial commitment.
6. Vulnerable groups such as women or economically backward sections should be given special attention in the
planning and implementation of resettlement.
7. The Compensation is best paid in terms of long term results than simple cash payments.
8. An attempt must always be made for Income Restoration such that a scope for economy building of the
settlers is explored and their best interest always taken into consideration.
9. Establishment of Project resettlement units
10. The role of NGOs in Resettlement Implementation is very significant and needs to be integrated into the whole
process in an effective manner.
11. last but not the least, we should always Aim for Sustainable Resettlement.
From the point of view of the affected people, successful resettlement involves :
(a) a degree of involvement in the planning and implementation processes
(b) no use of force in moving to the new site
(c) no break up of the existing social group due to relocation
(d) housing and basic services at the new site to be in a fully operating condition
(e) availability of economic opportunities for improving the living conditions.
Lessons Learnt: Inferences
1. Need for a well prepared rehabilitation policy to be included in the project plans, which is to be adopted
uniformly.
2. Need for proper dialogue with the affected persons during the plan stage itself to prevent problems during
execution.
3. Need to have some flexibility in rehabilitation policies to allow changes as per local needs, and need for
quick decision making at the lowest practical level regarding such changes.
4. Need for political interventions if the process is not effectively in place.
5. The routine government style of obtaining funds for executing sensitive rehabilitation projects can lead to
resentment among the people resulting in law and order problems.
6. Decentralization of powers to the field level with speedy execution is imperative in such cases.
7. Need for cooperative institutions with representative of concerned government departments and displaced
people who have shifted to the rehabilitation site to address the grievances of the people in a proper manner.
35
Development benefits whom?
In the wake of massive development happening in the country, and the equally massive displacement that it leads to, one can no longer shy away from this question which is principally at the very foundations of all development.
Displacement of few for benefit of many
OR Displacement of few for
benefit of Fewer Still ?
Democracy, which was once an aspiration of the people, has now become a facade in the hands of multinational corporations; who use it to install into power, individuals who would yield to their corporate agendas. The govt is today like a land grabbing monster, acquiring it and giving it away to the giants of the globalizing world. It signs MOUs with them, which is never made public, and carries little or no regard for the people associated with the land in question. The tribals always find themselves on the losing side of the game because they are a marginalized group of people, who receive no compassion from the mainstream voter population. They are an unrepresented lot who have no ways to express their dissent, unless they have a strong leadership.
“Democracy and the Free Market have fused into a single predatory organism within a thin, constricted imagination that revolves almost entirely around the idea of maximizing profit?”
- Arundhati Roy in
Listening to Grasshoppers
36
• http://www.ambassadorsofhope.com/TheNeed.htm
• http://www.actionaid.org/2012/08/visiting-bawana-our-urban-poverty-project-delhi-india
• http://www.ccsindia.org/ccsindia/downloads/intern-papers-09/sheltering-delhis-slums-230.pdf
• http://www.indiatogether.org/2008/jun/ksh-sweptoff.htm
• http://www.thehindu.com/news/cities/Delhi/article3906451.ece?homepage=true
• http://www.thehindu.com/news/cities/Delhi/article3906452.ece
• http://www.thenational.ae/news/world/south-asia/we-made-them-criminals-the-failure-of-a-delhi-slum-
relocation#ixzz2K9CikbFL
Bibliography