Changes to ConsensusDocs Construction Contracts: What Lawyers Need to Know Default for Builder's Risk, Indemnification, Notice, Payment, Dispute Mitigation and Resolution, and Bond Penal Sum Today’s faculty features: 1pm Eastern | 12pm Central | 11am Mountain | 10am Pacific The audio portion of the conference may be accessed via the telephone or by using your computer's speakers. Please refer to the instructions emailed to registrants for additional information. If you have any questions, please contact Customer Service at 1-800-926-7926 ext. 1. TUESDAY, FEBRUARY 26, 2019 Presenting a live 90-minute webinar with interactive Q&A Ronald D. Ciotti, Partner, Hinckley Allen & Snyder, Manchester, N.H. Brian Perlberg, Senior Counsel, AGC of America and ConsensusDocs, Arlington, Va.

Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Changes to ConsensusDocs Construction

Contracts: What Lawyers Need to KnowDefault for Builder's Risk, Indemnification, Notice, Payment,

Dispute Mitigation and Resolution, and Bond Penal Sum

Today’s faculty features:

1pm Eastern | 12pm Central | 11am Mountain | 10am Pacific

The audio portion of the conference may be accessed via the telephone or by using your computer's speakers. Please refer to the instructions emailed to registrants for additional information. If you have any questions, please contact Customer Service at 1-800-926-7926 ext. 1.

TUESDAY, FEBRUARY 26, 2019

Presenting a live 90-minute webinar with interactive Q&A

Ronald D. Ciotti, Partner, Hinckley Allen & Snyder, Manchester, N.H.

Brian Perlberg, Senior Counsel, AGC of America and ConsensusDocs, Arlington, Va.

Page 2: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Tips for Optimal Quality

Sound Quality

If you are listening via your computer speakers, please note that the quality

of your sound will vary depending on the speed and quality of your internet

connection.

If the sound quality is not satisfactory, you may listen via the phone: dial

1-866-873-1442 and enter your PIN when prompted. Otherwise, please

send us a chat or e-mail [email protected] immediately so we can address

the problem.

If you dialed in and have any difficulties during the call, press *0 for assistance.

Viewing Quality

To maximize your screen, press the F11 key on your keyboard. To exit full screen,

press the F11 key again.

FOR LIVE EVENT ONLY

Page 3: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Continuing Education Credits

In order for us to process your continuing education credit, you must confirm your

participation in this webinar by completing and submitting the Attendance

Affirmation/Evaluation after the webinar.

A link to the Attendance Affirmation/Evaluation will be in the thank you email

that you will receive immediately following the program.

For additional information about continuing education, call us at 1-800-926-7926

ext. 2.

FOR LIVE EVENT ONLY

Page 4: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Program Materials

If you have not printed the conference materials for this program, please

complete the following steps:

• Click on the ^ symbol next to “Conference Materials” in the middle of the left-

hand column on your screen.

• Click on the tab labeled “Handouts” that appears, and there you will see a

PDF of the slides for today's program.

• Double click on the PDF and a separate page will open.

• Print the slides by clicking on the printer icon.

FOR LIVE EVENT ONLY

Page 5: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Leveraging the New ConsensusDocs Construction Contracts

Ron Ciotti, Esq.Hinkley [email protected]

5

Brian Perlberg, ConsensusDocs Executive Director AGC Senior Counsel703.837.5318 [email protected]

Page 6: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Why CDs? Inefficiency Struggles for Construction

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)6

Page 7: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• 5 EXCULPATORY CLAUSES INCREASES PRICE 8-20% • Site Conditions• Delays• Liquidated Damages• Indemnification • Sufficiency of Contract Docs

• Construction Industry Institute (CII) Study on contracts• Unnecessary Risk Contingencies• Best Contractors Seek the Best Owners • Worst contracts get worse results.

What Poor Contract Forms Can Do to Project Results

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)7

Page 8: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

8www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

The ConsensusDocs Coalition40 Construction Industry Associations

8

Page 9: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

9www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

ConsensusDocs 10+ Years

$1,000,000+ In donated free educational licenses.

11Years in business.

100+ Standard contract documents.

40Leading construction associations participating in the Coalition.

3,000+Subscribers.

1 GoalImprove the design and construction industry with best practice contracts that are fair to all parties.

4,000+Registrants in the ConsensusDocs Technology Platform.

DownloadA free sample!

9

Page 10: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

100+ Contracts

• 200 Series – General

Contracting

• 300 Series – Collaborative

• 400 Series – Design-Build

• 500 Series – Construction Management

• 700 Series – Subcontracting

• 800 Series – Program

Management

10www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)10

Page 11: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Active Owner vs passive + A/E authority matches responsibility

• Direct and positive communications rather than contractual silos

• Clearly written w/ integrated general conditions vs. legalese

• Track record = less reported case law + better project results • Fair works (get best contractors at their best prices)

• Best practices and industry firsts • IPD, IPD’ish, BIM, Lean, Design-Assist, Green, project financial

• Updated more often than once per decade.

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Top Advantages with ConsensusDocs Standard Contracts

11

Page 12: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

12

“Refinements addressing changes in case law, the

insurance market, technological advances, and terminology

refinements are being published”

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

5 Year Update Published Dec. 7th

12

Page 13: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

ConsensusDocs 200 – Owner/Constructor Agreement & Gen. Cond. (2016)

13

Page 14: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Payment- ConsensusDocs Improvements• Constructor is now paid in 15 Days instead of 20 Days

(CD 200 §9.2.1)

• No further retention at 50% project complete

• Retention now 150% vs 200% for final completion

• Owner, not A/E now approves payment app.

14

Page 15: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Retainage

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

ConsensusDocs 200 AIA 201

Once the entire work is 50% complete, Owner may not withhold additional retainage and shall pay Constructor the full amount of what is due on account of progress payments (9.2.4.1)

Even upon substantial completion of the entire work of the project, Owner may limit release of retainage to designated portions of work that are substantially complete(9.8.5)

Owner may release retainage for work of early finishing trades and subcontractors upon Owner’s acceptance of their work (9.2.4.3)

Result: Owner may withhold retainage as to early work that has been accepted, e.g., early finishing trades and subcontractor work, until substantial completion of the entire work of the project

15

Page 16: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Project Financing Info

• Failure to provide = Stop Work

• CD 290 and 290.1 financial questionnaire

• Beware of creating confusing standards to demonstrate what part of the of work is impacted.

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)16

Page 17: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Termination for Convenience

• Includes demobilization costs, insurance proceeds, and now reasonable attorney’s fees

• A Premium for Prime Agreement

• Subcontractors get lost profits for unperformed work (CD 750, §10.4).

17

Page 18: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Termination for Cause – Going Nuclear

• First notice is 7 days, second notice is now 3 days

• Improper termination for cause no longer automatically converts to a termination for convenience

• Use of terminated Constructor’s equipment requires written permission.

18

Page 19: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

19

• Now covers INTENTIONALY wrongful acts (CD 200 § 10.1 and 10.2)

• Indemnification doesn’t necessarily match insurance coverage (no insurance self sabotage).

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Indemnification

19

Page 20: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

20

• Builder now buys Builder’s Risk policy instead of Owner CD 200 §10.3

• 50% cheaper• Constructor must factor this into its pricing • Procuring party is responsible for deductible and co-insurance• Owner can purchase and give notice so price isn’t included

• Risk of Loss is now upon the Constructor in 750 & 751 Subcontracts.

(See CD 9.2.12 CD 751 11.6.2 of 2014 edition eliminated)

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Property Insurance, Builder’s Risk

20

Page 21: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

21

• Owner’s Liability Insurance and Business Income Insurance were both eliminated

• Pollution Liability Insurance (PLI) was added as a check-the-box option for projects

• Owner must provide owner info if it holds PLI

• ConsensusDocs insurance requirements in all agreements, including A/E 240, 245, and 420, provide detailed requirements with specific limits.

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Insurance

21

Page 22: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

“both primary and excess of Constructor and its Subcontractors shall be primary and non-contributory to any insurance available to AI”

• Additional Insurance at CD 200 §10.4.1.

• Horizontal = excess policy isn’t triggered until all primary and excess is exhausted

• Vertical = downstream parties pay b/f upstream.

22www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

ConsensusDocs Insurance Vertical, Not Horizontal Exhaustion

22

Page 23: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• ConsensusDocs recognizes that delegated design will be performed by more than one Sub and the General Contractor. The Architect of record has some design coordination responsibility

• PL insurance contains prior acts coverage with explicit self- insured retention maximum limits.

23www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Design Delegation Professional Liability Insurance

23

Page 24: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Interim Change, After giving notice, and Constructor stops work, Owner must now investigate and indicate if it agrees and provide written instructions through an interim directive

See CD 200 3.16.2

24www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Differing Site Conditions

24

Page 25: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Interim Directive Changes now =“Interim Directive”

• Include written instructions that don’t necessarily impact time or money

• Payment of 50% of disputed amount = now based on invoices (not Constructor’s estimate)

• CD innovative provision on changes helping Constructor cash flow remains

• Changes are to be memoralized in 7 days.

25www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

“And Now for Something Different”ConsensusDocs Article 8 Changes

25

Page 26: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Notice by any effective means• Automatic acceptance via email

• Section moved from preamble to 13.5

• Except for Termination, Party’s address

• Compare to AIA A201 changes claim vs non claim.

26www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Did You Notice the Revisions to Notice?

26

Page 27: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Mitigate through mandatory direct Party communications• Project Level• Management Level

• Optional Project Neutral or Dispute Review Board (DRB)• Must visit the site and make finding w/in 5 days

• Mediation is required

• Parties decide – Arbitrate or Litigate • Current AAA rules for arbitration• Non-Prevailing party pays, including legal fees.

ConsensusDocs Dispute Mitigation and Resolution

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)27

Page 28: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• JAMS listed as a provider

• Defaults to AAA rules and administration

• Party-selected rules + provider is now listed

• DRB language clarified not to coordinate with ConsensusDocs 200.5 DRB addendum.

• ConsensusDocs has a track record of billions of construction put in place while keeping you out of court.

28www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

ConsensusDocs Mediation

28

Page 29: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Bolded + Caps language clarifies Parties’ intent to arbitrate • Based on NJ case law

• AAA Fast track rules for $250,000 in total claims to save time and money

• Single day of hearing and complete in 45 days• AAA rules sets the threshold at $75,000

• AAA rules and admin is default

• ConsensusDocs has prevailing party attorneys fees for arbitration and litigation.

29www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Arbitration

29

Page 30: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Consequential Damages & Liquidated Damages• ConsensusDocs measures conseq. damages to Substantial

Completion AND Final Completion

• Waiver is partial so the parties meaningfully discuss.

• Consequential damages include:• Lost of income and profits

• Owner's loss of use of the Project

• Rental expenses

• Project financing

• Insolvency

• Reputation

• LDs should NOT be punitive (or are unenforceable).

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)30

Page 31: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Positive Contract Commandments Thou Shall Incentivize Performance

• Pair Liquidated Damages = Incentives to Constructors

• Example of ConsensusDocs Incentives language in the Guidebook:

6.7 AWARD INCENTIVE. The maximum amount of incentive shall be ________. To receive an incentive award based upon early completion, the Constructor must provide the Owner a written no tice of its intent to achieve completion early no later than 60 days prior to the contract date of Substantial Completion. If achieved, the Contract Price shall be adjusted by Change Order to reflect the Constructor's incentive award. Incentive award payment will be made upon receipt of a proper application for final payment after execution of that Change Order.

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)31

Page 32: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

No automatic increase in penal sum after 10% increase in contract price

CD 200 §10.6.

32www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Bond-Penal Sum

32

Page 33: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Basic requirements of CPM schedule now required contractually CD 200 §8.3.4.

33www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Schedule

33

Page 34: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Design Professional must provide construction documents that provide all necessary info to bid and build the project

• Does not include fiduciary duty “covenants” or further the interest language

• Beware of design-build docs that include contractually created fiduciary duty.

34www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

ConsensusDocs 240/245 Architect Agreements

34

Page 35: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Subcontract Forms 750, 751, 752, 450, 455

• Pay-when-Paid

• Prompt pay

• No unconditional lien waivers

• Balanced indemnity provision

• If conflicts arise Subcontract Documents govern

• Optional AI or OCP.

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)35

Page 36: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Added, “Losses, expenses, or damages to the extent not compensated by insurance or otherwise, and the cost of corrective work before expiration of the one-year period following the Date of Substantial Completion, provided that such losses, expenses, damages, or corrective work did not arise from Constructor’s negligence.” CD 235, 8.12

• Language in ConsensusDocs 235, 410, 500.

36www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Cost of the Work, Corrective Work

36

Page 37: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Samples and Tools

• Download a sample by registering

at

www.consensusdocs.org/sample.

• Download our Standardized

Contracts: Streamlining Projects in

Today’s Fast-Paced Construction

Market white paper here.

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)37

Page 38: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

• Working Groups for new documents

• Lean Addendum and Design-Assist just published

• Master Subcontracts

• Prefab

• Residential

• Federal Purchase order

38www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Outlook

38

Page 39: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Microsoft Word

Version control

Document Comparison

Make Favorites

Finalize Documents

39www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)

Project Dashboard:

39

Page 40: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Proven Results for St of Iowa

Iowa DAS’ using AIA vs ConsensusDocs

Using AIA Using CDs

68 project/year 98 projects/year

$40M/ year $80M/year

Claim/s on EVERY PROJECT NO Formal CLAIMS on over $400M inconstruction

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)40

Page 41: Changes to ConsensusDocsConstruction Contracts: What ...media.straffordpub.com/products/changes-to... · •Fair works (get best contractors at their best prices) •Best practices

Leveraging the New ConsensusDocs Contracts

Questions?? Ron Ciotti, Esq.Hinkley [email protected]

Brian Perlberg, ConsensusDocs Executive Director AGC Senior Counsel703.837.5318 [email protected]

www.consensusdocs.org | [email protected] | 866.925.DOCS (3627)41