Draft EIA report UltraTech Cement Limited – NCMW- SURAT Royal environment auditing & Consultancy Services, Rajkot 75 CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES Prediction of impacts is the most important step of environmental impact assessment. Superimposition of predicted impacts over baseline environmental scenario gives the ultimate environmental scenario. In the present study, baseline environmental scenario was established through environmental monitoring data for the period of September-2009 to November-2009. 4.1 IMPACTS & MEASURES As a first step, the entire process has been divided into a number of smaller sub activities for construction and operation phases. The probable impacts of each of these activities on various sectors of environment (such as air, water, socio-economic environment etc.) have been identified and listed. The lists various activities of construction phase and their probable impacts on various sectors of environment. The impacts are classified as long term impacts and short term impacts. The impacts are envisaged to be short term impacts, confined to construction period only (04 months). Further, the magnitude of the impacts is envisaged to be low, as the site and infrastructural facilities are fully developed. Mitigation measures for significant impacts are discussed in respective sections.

CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

  • Upload
    dothuy

  • View
    227

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 75

CHAPTER 4

ANTICIPATED ENVIRONMENTAL IMPACTS &

MITIGATION MEASURES Prediction of impacts is the most important step of environmental impact

assessment. Superimposition of predicted impacts over baseline

environmental scenario gives the ultimate environmental scenario. In the

present study, baseline environmental scenario was established through

environmental monitoring data for the period of September-2009 to

November-2009.

4.1 IMPACTS & MEASURES As a first step, the entire process has been divided into a number of smaller

sub activities for construction and operation phases. The probable impacts of

each of these activities on various sectors of environment (such as air, water,

socio-economic environment etc.) have been identified and listed.

The lists various activities of construction phase and their probable impacts on

various sectors of environment. The impacts are classified as long term

impacts and short term impacts.

The impacts are envisaged to be short term impacts, confined to

construction period only (04 months). Further, the magnitude of the impacts is

envisaged to be low, as the site and infrastructural facilities are fully

developed. Mitigation measures for significant impacts are discussed in

respective sections.

Page 2: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 76

TABLE: 4.1

Identification of Construction Activities and Probable

Impacts

Construction Activities

Sector Probable Impact

(A)LongTerm Impact Land Acquisition Socio–

Economics No displacement as proposed

project is within existing premises of the company.

(B) Short Term Impact

Air Fugitive Emission Noise/ Air Emissions from

construction equipment & machinery

Water Run-off from surface area

Site clearing and Leveling (cutting, stripping, excavation, earth movement, compaction) Ecology Topographic Transformations

Air Noise and Air Emissions from Vehicles

Fugitive Dust Emissions due to Traffic Movement

Spillage and fugitive emissions of construction materials

Water Spillage/ spread of debris material and flow into streams

Run-off from Disposal Areas Soil Spillage/ spread/ deposition of

debris Conversion of land into waste

land

Transportation and Storage of Construction Material/ Equipment

Public Utilities Increased flow of traffic Congestion on roads

Air Noise and Air Emissions from Construction Machinery

Fugitive Dust Emissions due to Movement of Traffic

Civil Construction Activities

Water Run-off from Construction Areas containing Constn. Material

Mech & Elect Erection Activities

Air Noise & Air Emissions from Machines/ activities

Water Run-off from Erection Areas containing Oils, Paints

Transportation & Disposal of

Air Noise and Air Emissions from Transport Vehicles

Page 3: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 77

Construction Debris Fugitive Dust Emissions due to Movement of Traffic

Spillage and fugitive emissions of debris materials

Water Spillage/ spread of debris material and flow into streams

Run-off from Disposal Areas Soil Spillage/ spread/ deposition of

debris Conversion of land into waste

land Below Table lists various activities of operation and maintenance phase and

their probable impacts on various sectors of environment. Most of these

impacts are long term impacts. However, the significance of most of these

impacts is envisaged to be low, as discussed in the following sections.

TABLE: 4.2 Identification of Operation and Maintenance Activities

and Probable Impacts

Operation & Maintenance Activities

Sector Probable Impacts

Transportation of Raw material Air Noise and Air Emissions from Vehicles

Fugitive Dust Emissions due to Traffic Movement

Spillage and fugitive emissions of oil

Public Utilities

Increased flow of traffic Congestion on roads

Domestic Use of Water Water Generation of sanitary effluents Process(Storage, dispatching, handling of product )

Air Fugitive Emission

Storage of hazardous chemicals in company premises

soil Spill of material

4.2 MITIGATION MEASURES 4.2.1 AIR POLLUTION

Cement being a precious product, it is transported with outmost care in

automatic process in covered containers. Any loss in Cement during

transportation will translate into direct financial loss.

Page 4: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 78

Loading and unloading of cement into trucks and silo will be carried out

through air tight ducts/hoses operated by automatic filling machines,

thereby minimizing the possibility of leakage into air environment to

abysmally low.

The company will do regular maintenance of the air ducts, pumps, ship

loaders etc to avoid financial loss due to escape of cement into air.

All the vehicles equipments and storage places used for transportation

and storage of cement are made waterproof to avoid solidification of

cement.

High efficiency bag filters will be used to reduce the dust emission from

transverse points.

4.2.2. NOISE POLLUTION

Provision of earmuffs/head gears to the construction workers.

Ear muffs shall be provided to the concerned personnel during the

operation stage.

It will be ensured that all construction equipment and vehicles are in good

working condition, properly lubricated and maintained to keep noise

within permissible limit.

The ship loader to be maintained properly to ensure best performance

with low level of noise.

4.2.3 WATER POLLUTION

No additional water required and no process waste water generation.

Domestic waste water will be disposed through soak pit system.

1. Storm water channel management:

We have prepared around 700.0 meter length, 1.0 meter width and 1.0

meter of depth, Storm water channel around the plant to avoid the

accumulation of rain water in the plant. Storm water channel prepared in

Page 5: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 79

such way that all surface water flows through storm water channel and

meets the nearby river’s water.

Storm water channel maintenance has been carried out as per planned

schedule. We kept it neat & cleaned by regular cleaning. We ensured

that it should be cleaned before starting of monsoon.

2. Surface run off management:

On the basis of natural ground level we have constructed network of drain

to take away the water flow from surface to drain. Service water is

recalculated through cooling tower for effective utilization without

wastage of water. RO- plant rejected water also utilized in garden.

Septic water connected to water sop-pits and its cleaning has been

carried out regularly.

Page 6: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 80

CHAPTER 5

ENVIRONMENTAL & OCCUPATIONAL

HEALTH MONITORING PROGRAMME Regular monitoring of critical environmental parameters is of immense

importance to assess the status of environment during plant operation.

The monitored data can serve as an indicator for any change in

environmental quality due to operation of the plant with respect to baseline

environmental conditions, so that suitable mitigatory steps could be taken in

time to safeguard the environment.

An environmental monitoring programmer based on the Impact Assessment

for M/s Narmada Cement Limited – Grinding Unit- Magdalla works, shall be

implemented at site. The monitoring plan has been drawn with the following

broad objectives:

1. Assess the changes in environmental conditions, if any, during

operation of the Project.

2. Monitor the effective implementation of mitigatory measures

envisaged for M/s Narmada Cement Ltd- Grinding unit- Magdalla

works. Limited.

3. Warning of any significant deterioration in environmental quality so that

additional mitigatory measures may be planned in advance.

Proposed pollution monitoring programmer is presented in Table 5.1.1. A brief

description of the plan is given in the following sections.

Page 7: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 81

5.1 Monitoring of Environmental Parameters

5.1.1 Meteorology

A full fledged meteorological station shall be set-up at site to generate on-

site meteorological data as per Table 5.1.1

5.1.2 Ambient Air Quality

Ambient air quality shall be monitored at four locations around UltraTech

Cement Limited, Plant presented in Table 5.1

5.1.3 Stack Emissions

Stack emissions shall be monitored for SPM, SO2 and NOx. Provision for stack

monitoring shall be made by UltraTech Cement Limited.

5.1.4 Effluents Quality

There is no process effluents generated during process.

5.1.5 Noise

High noise areas inside the Plant; machineries, packers and cement mills.

Office premises areas, around the plant will be monitored with a frequency of

once in a quarter.

Page 8: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 82

Table 5.1

Proposed Environmental Monitoring Programmer for

UltraTech Cement Limited Area of Monitoring

Numbers of sampling stations

Frequency of Sampling

Parameter to be analyzed

Meteorology

One Continuous/Daily

Wind speed and direction, Max. and Min. Temperature, Humidity, Solar Insolation, Atm. Pressure, Rainfall

Ambient Air quality

08 station Monthly SPM, RPM, Sox, NOx

Noise 08 Quarterly Ambient Equivalent continuous Sound Pressure Levels (Leq) at day and Night time.

Stack Emission

All stacks Monthly SPM

Work Place Monitoring

04 station Monthly Total dust

5.2 Institutional Setup for Monitoring

As per the present set-up the environmental groups in UltraTech Cement

Limited, has a three-tier organization structure, as shown in Figure – 6.

Page 9: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 83

Figure – 5.1

ORGANIZATIONAL CHART

UltraTech Cement Limited, Magdalla

The responsibility of environmental management of an operating station lies

mainly with Environmental Management Groups at site, which acts as

coordinator for environmental matters.

This group acts as a nodal agency for various groups at project, regional

headquarters and corporate level as well as outside agencies like Gujarat

Pollution Control Board.

In charge [MATL]

Sr. Officer Supervisor [ADMN]

Security Officer Time

HOS COMMERCIAL

HOS HR& ADMIN

INCHARGE IT

OFFICER SAFETY

Unit Head

HOS [Process] HOS [E&I] HOS [QC] HOS [Packing] HOS [MECH]

In charge [Jetty]

Shift In charges

HOD TECH

Page 10: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 84

5.2.1 DETAILS OF INSTRUMENTS/EQUIPMENTS FOR ENVIRONEMNT

MONITORING The company have all the required instruments / equipments to measure ,

record and analyze workplace exposure including air, water quality, noise,

vibration, ventilation, illumination etc Details are as under.

Sr. No. Name of Instruments Purpose 1. Respirable Dust samplers

Ambient air quality monitoring

2. Respirable personal dust samplers

Work place monitoring

3. Spectrophotometer

Waster testing

4 Sound Level meter

Noise Monitoring

5. Lux Meter

Illumination monitoring

5.3 WORKERS OCCUPATIONAL HEALTH PROGRAMME

As per Company’s standard practice, General Medical check up of all

employees including workers & contract workmen is being done every year,

i.e. in the month of November. Medical check up is being done like – body

weight, length, heart beat, body check up etc.

Spirometery & Audiometery test is being conducted once in a year i.e. in the

month of May 2009 to the identified employees and workmen. Spirometery

test is being conducted for the employees and workmen who are engaged

in the dust zone like, gypsum yard cement silos etc. Audiometry test is being

conducted for the employees and workmen who are working in Mill area,

Packing plant area etc.

The identified employees are being checked and verified by the Recognized

doctor Dr. Ashok D Shah, M.B.B.S. , Radhika Hospital Surat and if any

abnormality is found, he may be refer for the further treatment.

Page 11: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 85

The following is table showing the employees’ medical test carried out in NC

Magdalla

Sr. No.

Year No. of employees were

Examined for Gen. Check up

Auditometry Spirometry

1 2007 138 10 42 2. 2008 138 23 22 3. 2009 138 51 51

For workers occupation health and safety, the company has appointed one

safety officer . Details of safety officer is as under.

Name: Mr. Darpan Bhatt

Designation: Assistant Officer Safety

Date of Birth: 04.04.1981

Date of Joining: 19/04/2010

Address:

212, Vrundavan complex, Nr. Ranchhodji Mandir

Waghodia Road,

Baroda-390019

The company will also look forward to appoint one Industrial Hygenist.

Page 12: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 86

CHAPTER 6

PROJECT BENEFITS

6.1 Improvement in supply of cement for Infrastructure

development Due to development of infrastructure across the country as well as

improvement in the growth rate, Market demand for cement is increased

substantially since last 3-4 years.

To bridge the demand and supply gap in southern Gujarat and to tap the

potential of the unit, the company has proposed for expansion of existing

Grinding unit at Magdalla from 0.72 MMTPA to 2.0 MMTPA by installing a roller

press, increasing the capacity of existing cement mill and clinker silo within a

company premises.

By commission of the proposed expansion will improve the supply of cement

for infrastructure in all over India.

6.2 Improvement in Infrastructure The company may take up some community welfare activities under

Corporate Social Responsibility. Presently company is doing following social

welfare activities.

Some of the CSR activities done by the company are listed below.

Community Initiatives

Medical Check-up camp for Ladies

UltraTech Cement Ltd., Unit: Narmada Cement, Magdalla Works in

association with Radhika Hospital & Policlinic, Surat arranged a Free Medical

Check-up camp for Ladies only for the period from 3.12.2007 to

Page 13: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 87

8.12.2007.Total 34 poor village- based [Magdalla , Gaviar ] ladies have taken

advantage of the Medical Check up camp

UltraTech Cement Ltd., Unit: Narmada Cement, Magdalla Works in

association with Radhika Hospital & Policlinic, Surat jointly organized an

Awareness Programmer regarding Diabetic & Hypertension and free Medical

Check-up camp held on 10.12.2007, venue at HRD Hall, Magdalla.

Page 14: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 88

150 persons have taken advantage of the Awareness programmer of

Diabetic & Hypertension & Medical Check up camp

UltraTech Cement Ltd., Unit: Narmada Cement, Magdalla Works in

association with Radhika Hospital & Policlinic jointly organized a free Medical

Check-up camp for all people residing in Dumas, Bhimpore, Gaviyar &

Magdalla villages on 16.12.2007 at Bhimpore village, Surat.

Page 15: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 89

Awareness programmer regarding HIV - AIDS at Truck Parking area for

truck-drivers, helpers & employees on 25.3.2008.

6.3 Employment Potential The company shall provide employment potential under unskilled, semi-skilled

and skilled categories. The employment potential shall increase with the start

of construction activities, reach a peak during construction phase and then

reduce with completion of construction activities.

During operation phase also there will be employment opportunities,

although its magnitude will be much less. The direct employment

Page 16: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 90

opportunities with the company are extremely limited and the opportunities

exist mainly with the contractors and sub-contractors. These agencies will be

persuaded to provide the jobs to local persons on a preferential basis

wherever feasible.

Page 17: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 91

CHAPTER 7

ENVIRONMENTAL MANAGEMENT PLAN

Environmental Management Plan (EMP) reviews the adequacy of various

pollution control measures envisaged for Narmada Cement Grinding Unit-

Magdalla works (presented in Chapter 2.0) in mitigating various

environmental impacts identified and assessed in Chapter 4.0. EMP has been

prepared separately for construction and operation phases.

It describes administrative aspects of ensuring that mitigatory measures are

implemented and their effectiveness is monitored. It also includes green belt

development plan. Environmental monitoring programmer has already been

presented in Chapter 5.0. Each of the mitigatory measure has been assessed

with respect to

Adoption of state of art technological measures

Identification of human resources for its effective implementation

Allocation of financial resources for its effective implementation and

Effectiveness of mitigatory measure in mitigation of impacts

EMP specifies various technological measures for pollution prevention, waste

minimization, etc. proposed to be undertaken to mitigate the environmental

impacts on each sector of environment during each phase of the project, i.e.

construction phase and operation phase.

The responsibility for implementation for all mitigatory measures rests with the

company. Most of the mitigatory measures are integral part of the main plant

package and are commissioned simultaneously with the commissioning of

the main plant packages. However, at this stage, it is not possible to give a

detailed physical and financial plan for individual measures.

Page 18: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 92

7.1 MITIGATION MEASURES FOR CONSTRUCTION PHASE The impacts of construction activities would be temporary in nature and will

reduce gradually with the completion of the construction activities. Various

mitigation measures proposed to be implemented during construction phase

are described in Table 7.1.1.

Table 7.1

Mitigation Measures proposed to be implemented during

Construction Phase

Mitigation Measures Proposed & Responsibility for Implementation

Regulation Targets to Achieve

Risks and Consequence of Failure, if any

AIR ENVIRONMENT Water sprinkling in vulnerable areas (UltraTech Cement Limited + Contractor)

MoEF Notification dated 03.01.1989

Control of fugitive dust from construction areas

Increase in SPM Emissions Impact on health of workers.

Proper maintenance of vehicles and construction equipment (UltraTech Cement Limited + Contractor)

Control of NOx Emissions

Nil

Transportation of construction material in covered trucks, wherever possible (UltraTech Cement Limited + Contractor)

Control of fugitive dust from construction areas

Increase in SPM Emissions

NOISE ENVIRONMENT

Proper maintenance of vehicles, equipment and

CPCB Guidelines

Control of ambient and inplant noise levels

Increase in noise Levels

Page 19: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 93

machinery (contractor) Provision of equipment and machinery, wherever possible (contractor)

Control of ambient and inplant noise levels

Increase in noise Levels

Provision of earmuffs/ earplugs to the workers in high noise areas and enforcement of its use (contractor).

Protection of workers

Health effects on individual workers.

WATER ENVIRONMENT Channelisation of effluents from construction area through existing network of drains (UltraTech Cement Limited)

MoEF Notification dated 19.05.1993

Control of suspended solids in effluents from construction area

Increase in total suspended solids in effluents

Construction of temporary sedimentation tanks for the effluents from construction area (UltraTech Cement Limited + contractor)

MoEF Notification dated 19.05.1993

Control of suspended solids in effluents from construction area

Increase in total suspended solids in Effluents

SOCIO-ECONOMIC ENVIRONMENT Provision of environmentally safe camping area for the migrant laborers (UltraTech Cement Limited/Contractor)

To provide clean & healthy living environment to work force

Unhealthy living conditions, spread of Diseases

Arrangements for water supply and sanitation (UltraTech Cement Limited / Contractor)

To reduce stress on surrounding population

Stress on existing utilities, conflicts with local people

SOLID WASTE MANAGEMENT Disposal of Control of Air/ Water

Page 20: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 94

construction Debris pollution Pollution Reclaiming of un built area with appropriate vegetation/land scalping

Create a good visual environment

Unpleasant Surroundings

7.2 MITIGATION MEASURES FOR OPERATION PHASE Table 7.2.1 describes various mitigation measures proposed to be

implemented during operation of UltraTech Cement Limited.

Table 7.2

Mode of Implementation and allocation of resources for Mitigation

Measures for Operation phase

Mitigation Measures

Mode of Implementation

Identification of Human Resources

Allocation of Financial Resources

AIR ENVIRONMENT High Efficiency Bag filter

Integral part of Main Plant Package

Bag filter maintenance group at site.

Adequate provisions of fund has been made in the project report

Water sprinkler New facilities to reduce fugitive emission

Civil group and Environment department

Adequate provision of fund.

WATER ENVIRONMENT No waste water generation during operation phase.

NOISE ENVIRONMENT Design of Equipment

Included in Technical Specification

-- --

Provision of personal protective equipments like ear plugs and ear muff

Ongoing HSE department Adequate provision of fund

Page 21: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 95

7.3 Institutional Set-up at UltraTech Cement Limited.

Institutional Set-up of UltraTech Cement Limited as shown in

Figure – 7.1

Figure – 7.1

Institutional Setup & Organogram of Environment management

cell UltraTech Cement Limited

Magdalla

In charge [MATL]

Sr. Officer Supervisor [ADMN]

Security Officer Time

HOS COMMERCIAL

HOS HR& ADMIN

INCHARGE IT

OFFICER SAFETY

Unit Head

HOS [Environment]

HOD TECH

Lab Chemist [Environment]

Page 22: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 96

7.4 AFFORESTATION AND GREEN BELT DEVELOPMENT Comprehensive afforestation is imperative for restoring ecodynamics. The

afforestation activities of the industrial region not only serve as foreground

and background landscape features resulting in harmonizing and

amalgamating the physical structures of projects with the surrounding

environment, but also contribute to the overall improvement in the

environment.

In addition to this, forests have an in-built mechanism to absorb a wide

variety of pollutants. As a policy, Ultratech Cement Ltd, Unit: Narmada

Cement Limited, magdalla works lays special emphasis on tree plantation in

the project areas and its surroundings. General Guidelines have been

evolved for afforestation at various project sites. Minimizing the destruction of

existing trees and undertaking of plantation since the beginning of

construction activities are certain.

The afforestation programmer are drawn to conform to natural climatic

conditions and adaptability of the species.

The company has independent horticulture departments at the projects

headed by experienced Horticulture Officers/Supervisors. A number of

workmen assist in the successful implementation of the afforestation

programmer.

Implementation of afforestation program is of paramount importance for any

industrial development. In addition to augmenting green cover, it also checks

soil erosion, makes the climate more conducive, restores water balance and

makes the ecosystem more complex and functionally more stable. The green

belt helps to capture the fugitive emissions and to attenuate the noise

generated in the plant, apart from improving the aesthetics of the plant site.

The main objective of the green belt is to provide a barrier between the plant

and the surrounding areas.

Page 23: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 97

7.4.1 Procedure for Plantation To undertake plantation on site, following steps are involved:

Collection of healthy seeds from middle aged trees from the existing

nursery

Filling up poly bags and root trainers with potting mixtures made up of soil,

sand and compost

Sowing of seeds in poly bags and root trainers for raising quality seedlings

in nursery;

Maintenance of raised seedlings in a nursery

Preparation of pits size 60cm X 60cm X 60 cm on site in the month of

March

Planting of seedlings in the month of July endings should be raised in

nurseries. Adequate number of surplus seedlings should be available

considering 10% mortality in seedlings. Healthy seedlings should be ready

for transfer to permanent location before rainy season. Recommendations

for preparation of pits and transfer of seedlings are as follows:

The plant to plant and road to row to row distance would depend on

crown of plant species and location

The pits should be filled using fertile soil from nearby areas, Farm yard

manure (FYM) and vermicompost

Rhizobium commercial preparation (1 kg/1000 kg);

BHC powder, if the soil inhabits white ants (in variable amount); and

Watering will be provided immediately after plantation and thereafter

The fly ash is deficient in plant nutrients like nitrogen. Therefore, amendment

of ash with suitable soil additives is essential. The properties of some soil

additives are presented in Table 7.3

Page 24: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 98

Table 7.3

Nutrient Contents of Some Organic Manure

Manure Type Nutrient Content (%) Organic Matter N P K (%) Farm yard manure

0.62 0.13 0.49 24

Pig slurry 0.21 0.1 0.18 5 Poultry manure 2.3 0.9 0.65 65 Sewage sludge 1.82 0.43 0.46 39 Mushroom compost

2.8 0.20 0.8 65

Domestic refuse 0.5 0.2 0.30 65 Straw 0.48 1.62 0.85 95

Mixing of farm yard manure or locally available soil additives in 1:4 proportion

has been found to be suitable.

7.4.2 Selection of Tree Species The effectiveness of plants to control pollution depends upon the

physiological, morphological traits such as leaf epidermis, size, leaf

orientation, internal enzyme system, etc. Systematic screening of plants for

their ability to tolerate pollutant need be undertaken.

While making choice of plant species for cultivation in green belt, weightage

has to be given to the natural factor of bio climate. The tree species selected

for green belt should include the native species having multipurpose uses.

These trees should be planted in several rows with a tree density of 1500-2000

trees/ha. The interspaces should be planted with grasses, bushes and hedges.

For effective removal of pollutants it is necessary that

Plant grow under condition of adequate nutritional supply

Absence of water stress

Well exposed to atmospheric conditions of light and breeze.

Page 25: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 99

For absorption of Suspended particulate matters following characters of

plants to be considered.

1. Height and spread of crown

2. Leaves supported on firm petioles.

3. Abundance of surfaces on bark and foliage, through

4. Roughness of bark

5. Epidermal outgrowths on petioles

6. Abundance of axillary’s hairs,

7. Hairs or scales on laminar surfaces

8. Stomata protected (by wax, arches/ring/hairs etc)

The company has done very good plantation in its existing Grinding unit.

Details of plantation Till March-10 is given below.

Above plantation covers total 4802.36 sq. mtr area of the company premises. Planning for Green belt development for next five years is summarized below.

Name of Trees Total Trees till March-10

Saru 450

Neem 187

Badam 550

Kadamb 475

Total 1662

Sr. No. Year 10% area increase over existing (Sq Mtr)

1 2009-10 1170.48 2 2010-11 284.48 3 2011-12 395.50 4 2012-13 260 5 2013-2014 1225

TOTAL 3335.46

Page 26: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 100

The budget provision for year 2010 is Rs. 1,00,000/- for Green belt

development.

Following are the Photograph of Green Belt developed by the Company

Page 27: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 101

Plantation Programmer during World Environment Day

Page 28: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 102

RECOMMENDED TREE SPECIES FOR THIS AREA

(Source: GUIDELINES FOR DEVELOPING GREENBELT-BY CPCB) Sr. No. Botanical Name Other Name

1. Abutilon indicum Linn Kanghi 2 Acacia auriculiformis A. Cunn Astralian Wattle 3 Acacia Catchu wild Khair 4 Acacia dealbatalink Silver wattle 5 Acacia farnesiana wild Gandh 6 Acacia ferruginea DC Safed Khair 7 Acacia nilotica wild Babul 8 Acacia pennta wild Biswal 9 Acacia Senegal wild Kumta 10 Acacia sinuate Merrill Shikakai 11 Acacia tortilis Hayne The Umrella thorn tree 12 Achras sapota linn Chikoo 13 Adenanthera Pavoning linn Badigumehi 14 Aegle marmeloes correa Bili 15 Ailanthus excelsa Roxb Maharuk 16 Albizia lebbeck benth Pilosarasio 17 Albizia odoratissima Benth Kala siris 18 Albizia procera Benth White siris 19 Alstonia Scholaris R.Br. Chattiyan 20 Anona squamosa Linn Seetaphal 21 Anona reticulate Linn Raamaphal 22 Anogeissus latifolia Wall Dhavdo 23 Anthocephalus chinensis Kadamba 24 Aphanamixis polystachya parker Harin 25 Artocarpus heterophyllus Lamk Kathal 26 Artocarpus lacucha Buch Dahua 27 Azadirachta Indica A. Juss Nim 28 Balanites roxburghii planch Hingon 29 Bambusa arundinacia Roxb Kantabans 30 Bambusa vulgaris schrad The Golden bamboo 31 Barringtonia acutangula Gaertn Hijal 32 Bauhinia acuminate Linn Kanchan 33 Bauhinia purpurea Linn Khairwal 34 Bauhinia racemosa Lamk Astha 35 Bauhinia semla Wanderlin Semla

Page 29: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 103

36 Bahinia varigata Linn Kachnar 37 Bischofia javanica Blume Panialo 38 Bougainvillea spectabilis Wild Bougainvillea 39 Bridelia squamosa Lamk Khaja 40 Butea monosperma Lamk Kasmir Dhak 41 Callistemon citrinus stapf Bottle brush 42 Cclophyllum inophyllum linn Sultanachampa 43 Calotropis gigantean R.Br Gigantic swallow wort 44 Calotropis procera Ait Akada 45 Carissa spinarum Linn Karaunda 46 Dalbergia sisoo Roxb. Sisam 47 Deloxin regia Rafin Flameboyant 48 Dendracalamus strictus Nees Nakorvans

Page 30: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 104

CHAPTER 8

EMERGENCY PREPARDENESS AND

RESPONSE SYSTEM Section 41-B (4) of the Factories Act, 1948 requires that every occupier of a

factory shall prepare an ON-SITE emergency plan and detailed accident

control measures for the factory. Accordingly, the ON-SITE and OFF-SITE

emergency plan with details of accident control measures has been

prepared for the employees and general public living in the vicinity of the

factory. This plan gives the safety measures to be taken in the event of any

accident happening at the plant. The provisions of the proposed draft rules

and the following guidelines given by the Factory Inspectorate office are

kept in mind while preparing this plan.

1. Status relating to risk assessment and environment impact in case of

Toxic release and the measures taken for prevention of such accident.

2. Probabilities of possible hazard due to the failure of provided control

measures and equipment such as safety valve, pressure gauge,

temperature indicator etc. at different stages of process.

3. Provisions for all facilities and procedures for immediate control to

minimize the effect of such probabilities.

4. Arrangement for informing workers through emergency alarm and

public in vicinity and surrounding factories through telephone and loud

speakers in case of emergency at the factory.

5. Arrangement for evacuation of persons likely to be affected due to

emergency.

6. Arrangement for transporting affected persons to the hospital and

medical center through Car/Ambulance.

7. Arrangement for necessary treatment and availability of antidotes at

hospitals and at medical center.

Page 31: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 105

8. Organization Chart for fixation of responsibilities of managers, officers,

workers at different stages for handling emergency due to spillage, fire,

explosion etc.

9. Details regarding alert system like emergency alarm.

10. Provision for Training, rehearsals, mock drill etc. at regular intervals to

the personnel handling emergency

11. Notification of place of gathering of workers and staff at the time of

emergency.

12. Information in detail, regarding any disaster, which might have

occurred in factory.

13. Provisions of main control for 24 hours to use at the time of emergency.

14. Submission of material safety data sheet of chemicals.

15. Arrangement regarding maintenance of different equipment, control

measures and safe procedure of work so that they shall work

effectively.

16. A statement of all possible source of accidents involving fire, explosion

and plan of showing the place of above accidents with the facilities to

control the emergency near the place and at the control place

17. A statement of Quality, health and safety policy of factory.

18. OFF-SITE emergency services which a link is between ON-SITE and OFF-

SITE PLAN. While preparing this plan, the following documents have

been referred and thankful to those for their contribution.

a. Guidelines on preparation of ON-SITE and OFF-SITE plan prepared by Chief

Inspector of Factory, Gujarat State.

b. The guidelines given by Sr. Factory Inspector, Surat.

Based on above guidelines and guidance from Inspectorate office, Surat, 27

Annexure with useful information also given.

This plan is prepared covering all hazards like fire, explosion etc. and given

steps to prevent and minimize it.

Page 32: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 106

This plan is very useful to the operatives, employees working in factory, public

staying in the vicinity of the site to take the suitable steps at the time of any

emergency.

8.1 OBJECTIVES OF THE EMERGENCY PLAN Mention here the purposes of the plan. They are-

1. To define and assess emergency, including risk and environmental

impact assessment.

2. To control and contain incidents.

3. To safeguard employee and people in vicinity.

4. To minimize damage to property or/and the environment.

5. To inform employees, the general public and the authority on the

hazards/risks assessed, safeguards provided, residual risk if any and the

role to be played by them during emergency.

6. To effect rescue and treatment of casualties. To count injured.

7. To identify and list any dead.

8. To inform and help relatives.

9. To secure the safe rehabilitation of affected areas and to restore

normalcy.

10. To preserve records, equipments etc. and to organize investigation in

to the cause of the emergency and preventive measures to stop its

reoccurrence.

11. To ensure safety of works before personnel re-enter and resume work.

12. To work out a plan with all provisions to handle emergencies and to

provide for emergency preparedness and the periodical rehearsal of

the plan.

Emergency planning is not a substitute for good design, operating and

maintenance practice.

There fore, they must always be followed to avoid emergencies.

Page 33: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 107

8.2 RISK AND ENVIRONMENTAL IMPACT ASSESSMENT Identification, analysis, assessment of hazards and risk provide vital

information to risk management.

Objective of this plan is to assess the risk and to provide guidelines for facing

and controlling the emergency.

This Chapter contains the information of possible hazards and their effects on

workers, general public and environments.

Storage hazards and controls: -

Name of the Materials

Diesel

Major Hazards in Storage areas:

Fire

Explosion.

Heavy spillage

Control measures provided in storage tank area of Petroleum materials

and accordingly all tank farm areas/storage areas are separate from

each other.

The control measures are provided as under. : -

1. Petroleum liquid storage tank is mounted on cement concrete

foundation.

2. Dyke wall around tank farm area provided.

3. The tank is painted with the Name of Content, Capacity of Tanks

4. The liquid transfer is being done through pipeline.

5. The areas of solvent tank farm declared as "Fire Zone" and covered

with fencing/ wall with a gate having locking arrangement. "No-

Smoking" board is displayed.

6. Provisions of fire extinguishers of DCP/Foam type are kept near tanks

area.

7. Diesel tank & unloading pipeline are provided with ear-thing. The point

of ear-thing is also made available for connecting with tanker at the

time of unloading Diesel.

8. Provision of sand is made near tank area to cover spillage.

Page 34: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 108

9. Level of liquid in tank being recorded to avoid overflowing.

10. Personal protective like, Shoes, Safety Goggles, Helmet etc. are issued

to use at the time of unloading tankers to the person concerned.

SAFETY MEASUSES PROVIDED ON PROCESS: -

1. All Receivers are well designed to withstand the pressure, temperature

inside it.

2. All Receivers are provided with pressure gauges.

3. All pressure equipments are provided with safety valves.

4. All Receivers are hydraulically pressure tested and record is maintained

in Foam No. 11.

5. All the plants, departments are provided with fire extinguishers as per

requirement.

6. Workers/Supervisors/Officers/Executive working on process is well

trained in safe Operating procedures.

7. Provided eye washer.

8. Work Permit System is followed for any maintenance work in plant.

8.3 ENVIRONMENTAL IMPACT ASSESSMENT: -

TYPES OF RISK: -

1. Mainly three types of risks are possible: -

1. Earth quake: -

During such emergency, employees to gather at assembly points.

2. Lightening :-

To avoid this type of natural risk, the lightening arresters are placed on the

top of

high buildings.

3. Flood :-

There is risk of flood in the Tapi River.

Page 35: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 109

2. Technological and civil: -

Our main product is Cement. Considering use of Materials, load of vessel etc.

following steps taken.

1. All structure and other equipments are fabricated as per engineering

specifications laid down in appropriate specifications of international

and national Bodies on the subject.

2. Pressure Receivers are equipped with pressure gauges, safety valves

and

pressure tested as per factories Act.

3. Regular inspection carried out to maintain proper health of plant and

machinery

4. Thickness of the Receivers, pressure tests are to be carried out annually

and record maintained in form No. 11 as per Factories Act.

5. Constructions of building structures are as per standard practice.

Materials used are tested for its quality and suitability under guidance

of experts.

6. Inspection, maintenance, painting of plant/Machinery etc. carried out

regularly.

8.4 EMERGENCY ORGANISATION This deals with the procedures to be followed at the time of emergency by

the personnel at site. The Main Controller, Incident Controller, Key personnel,

Essential Personnel Team and Team Works Under Main Controller are

nominated with special responsibility according to the laid down procedures

and to make the best use of available resources.

DEFINITION

Emergency

An emergency is an abnormal event, which could result in danger to

personnel, property and environment. It could be due to fire, Explosion,

Heavy spillage of liquid, etc.

Page 36: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 110

Minor Emergency

Any incident that possess the potential to cause injuries to personnel &

damage to property in the vicinity of incident and which can be

controlled by plant personnel without outside help.

Major Emergency

Any incident that possess the potential to cause extensive damage

and to injure persons within or outside the site and which requires

outside help to control it.

The On-site emergency plan deals with, measures to prevent and

control emergencies within the factory and not affecting outside

public or Environment.

The Off-site emergency plan deals with, measures to prevent and

control emergencies affecting public and the environment outside the

premises.

The details of emergency organization are as under: -

1. ALARM RAISER: -

Any person who notices the abnormal incident of hazardous nature. His

responsibilities: -

As soon as he notices any incident of hazardous nature i.e. fire,

Explosion, Heavy spillage of liquid, he will first inform to his superior

and co-worker.

If the incident is minor, try to prevent by using internal resources like

fire extinguishers in case of fire, cover the spillage by sand / any

other neutralizing media in case of liquid spillage.

If the incident is major, the Main Controller / Respective Incident

Controller will order to raise the siren to Security officer. The security

officer on duty will inform security staff to raise the siren and rings the

manual bell loudly in case of failure of power supply.

Page 37: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 111

2. MAIN CONTROLLER: -

He is the head authority of the Emergency Organization. Unit Head /

Technical Head hold the responsibility of the Main Controller. He is having

over all responsibility for directing operation and calling for outside help

from Emergency Control Center.

Unit Head’s cabin is declare as a emergency control center (ECC) and

given in annexure – 15 of OEP. Emergency Control Center (ECC) is

equipped with necessary facilities.

On being informed about the emergency he will

i. To rush to the ECC to relieve the incident controller from

responsibilities for overall main control. On consultation with Incident

Controller and Key Personnel decide about the type of emergency

and activate on site / off site Emergency Plan if not activated.

ii. To ensure that key personnel are called in.

iii. After declaring the major emergency,

iv. To ensure about the out side emergency services are called.

v. To activate the off site plan.

vi. To continuously review and assess possible developments to

determine the most probable course of events.

vii. To direct the safe close down and evacuate the plant in

consultation with the incident controller and key person. If

necessary, arrange to evacuate the neighboring population.

viii. To ensure that the casualties are receiving adequate attention –

a. To arrange for hospitalization of victims.

b. To inform/ensure that the relatives are informed.

ix. To ensure that assembly point managing team reached on the

company assembly point(s) to take charge.

x. To ensure the accounting of personnel and rescue of missing

persons.

xi. To control traffic movement inside factory.

xii. To ensure canteen facilities, if the emergency is prolonged.

xiii. To issue authorized statement to the news media.

Page 38: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 112

xiv. To ensure preservation of evidence make arrangement for

photographs etc.

xv. To control rehabilitation of affected areas and victims on cessation

of emergency.

xvi. To instruct the Security office to raise “All Clear Siren” after ensures

that the emergency is controlled and over.

xvii. To ensure that the plant is not start unless inspected / investigated

by Joint Director (Industrial safety & Health) or Government

Authorities/ insurance surveyor.

2. INCIDENT CONTROLLER: -

Plant/Area in charge holds the responsibility of the Incident Controller, if

the incident is in their plant/area. On being informed of the emergency

and its location he will rush to the site and he will,

1. Assess the scale of emergency, if the emergency is minor, try to

prevent by using internal resources like fire extinguishers in case of fire,

and cover the spillage by sand in case of liquid spillage.

2. Assess the scale of emergency, if the emergency is major / unable to

prevent by using internal resources, he will start to activate on-site plan

by raising the siren through telephone office/security office. The

security officer on duty will inform Security staff for raise the siren. If fire

emergency is there and fire is major / unable to prevent by using

internal resources,

the incident controller will inform to local fire brigade through

telephone office.

3. Incident controller and in his absence, deputy incident controller shall

also have to take responsibilities of Main controller, till Main controller

take the charge of emergency control center (ECC).

4. As soon as sound of siren or bell is heard, Other Incident Controller on

duty will rush to site for help, at that time their deputy Incident

Page 39: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 113

Controller / other senior member will have to manage their respective

plants and

They should remain at the plant assembly point with their personnel

if safe to do so unless instructed by Main Controller/Incident

Controller.

Partial shutdown of plant should be followed by trained essential

person of the plant/area.

To carry out head count at plant/area assembly point.

As per the emergency, to send the essential person team member

will fully equip at incident place.

5. Incident controller shall depute one or two other’s area Incident

controller of other plant/area for his help in communication to Main

Controller.

6. To send telephonic message to Main Controller and key personnel or

send

messenger/runner to inform them about incident.

7. As per the incident, direct the respective team of essential personnel to

prevent it by using extinguishers in case of fire, by covering the liquid

spillage by sand or soil in case of liquid spillage by using the emergency

kit/ by adequate equipment, etc.

8. To ensure about the key personnel arrived and distribute their duties.

9. To Ensure that Fire fighting & Spill control, First aid & rescue and

engineering service team member reported at the site.

10. Establish a control point at a safe distance.

11. To set up a communication point and establish contact with the

emergency control center.

12. To ensure availability of the outside services like fire brigade etc.

through emergency control center.

13. Direct the safe shut down of the plant or part of the plant and

evacuate the plant or area to the safe company assembly point.

Page 40: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 114

14. Direct all operations within the affected areas with the following

priorities.

Secure the safety of personnel.

Minimum damage to plant, property and environment.

Minimize loss of material.

15. To search for causalities.

16. To give advice and as asked by the head of fire brigade and

emergency services.

17. To brief Main controller and keep informed of development of

situation.

18. To Inform the Main Controller/Security Officer after controlling the

emergency to raise all Clear siren.

19. To preserve evidences that will be necessary for subsequent inquiry into

the cause of Emergency and concluding preventive measures.

4. DEPUTY INCIDENT CONTROLLER: -

In the absence of Section incharge, Asst. Incharge / Resource person / Senior

shift supervisor / Shift Incharge holds the responsibility of the Deputy Incident

Controller, if the incident is in their plant/area as given above.

8.5 KEY PERSONNEL: On being informed of the emergency he will rush to the incident site and will

report to incident Controller & Main Controller at E.C.C. The responsibilities

and duties of key personnel are as follows.

8.5.1 Production, Engineering, Q.C. Manager 1. To keep in touch with Incident Controller & Main Controller in assessing/

controlling the emergency.

2. To guide essential personnel team.

3. To guide personnel for safe close down of the plant.

4. To guide transport for safe shifting of materials from one place to other.

5. To guide mutual aids services and the teams.

Page 41: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 115

6. To keep informed the Main controller about developments.

7. To make arrangement like emergency light, water etc.

8. To assess the emergency & evacuate the neighboring factory workers

and neighboring population through Main Controller.

9. To inform the effect of emergency and steps to be taken to avoid the

affects of a Fire Radiation etc.

8.5.2 Safety Officer: 1. To assist Main controller & incident controller in controlling emergency.

2. To help Main controller in communication.

3. To provide necessary equipments like FFE, PPE & RPE.

4. To guide the essential personnel team to control fire, spillage etc.

5. To make arrangement for evacuating workers from the place of

accident and guide non-essential workers towards company assembly

point.

6. To assist and guide fire brigade inside the premises about the raw

materials, fight fire etc.

7. To arrange for announcement of non-essential person to right

accessibly point.

8. To investigate the incident and draw up corrective and preventive

actions to prevent such type incident in future.

8.5.3 Security officer 1. To help incident controller & main controller at the time of emergency.

2. To cordon the area and inform incident controller or main controller

about the development of emergency.

3. To provide necessary equipments like FEE, PPE & RPE.

4. To fight the fire with available internal FFE.

5. To make arrangement for evacuating workers from the place of

accident and guide non- essential workers towards company assembly

point.

6. To search of missing persons.

Page 42: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 116

7. To ensure that the roadway to plant is clear for emergency vehicles.

Obtain assistance to keep roadway clear and to stop non-emergency

traffic from entering.

8. To direct there personnel for evacuation of non-essential workers &

Crowd control.

9. To blow emergency siren & all clear siren on receiving message from

Incident Controller /Main Controller through CCR Operator.

8.5.4 CCR Operator (Communication) 1. To take charge of Tel. Board/Telephone Section.

2. To call local fire brigade after receiving authentic instruction from

incident controller

3. After receiving authentic instruction to sound emergency siren/ all

clear siren from Incident Controller, Main Controller, they immediately

instruct security officer to do so.

4. To transmit message to key personnel, outside agencies as per the

instructions of the Main controller/Incident controller.

5. To maintain the record of outgoing and incoming messages in the

emergency call.

6. To keep constant touch with emergency control center.

8.6. ESSENTIAL PERSONNEL TEAM: - As soon as the essential personnel hear the emergency siren or any

emergency brought to the knowledge, they first report to incident controller

(After hand over their charge to other plant supervisor) with fully equipped

themselves. (For proper information all team member have to contact

immediately on telephone Number – 223, 237)

The team of the essential personnel trained in Fire Fighting & Spill control, First

aid & Rescue and Engineering Services team available in factory in all shifts.

Their responsibilities are as under: -

Page 43: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 117

8.6.1 Fire Fighting & Spill Control Team On hearing siren or any emergency brought to the knowledge, they first

report to incident controller.

1. To rush at the site for help with fully equipped. i.e . Fire fighting

equipment etc.

2. To decide line of action in consultation with incident controller & Key

personnel and take appropriate measures to extinguish the fire.

3. To fight fire till a fire brigade takes the charge.

4. To help to the fire brigade.

8.6.2 First aid & Rescue Team On hearing siren or any emergency brought to the knowledge, they first

report to incident controller.

1. To rush at the site for help with fully equipped First Aid kit etc.

2. To Rescue the injured person.

3. To decide line of action in consultation with incident controller & Key

personnel.

4. To provide first aid to the affected persons and if necessary, send them

to hospitals for treatment.

5. To take charge of first aid room.

6. To assist at casualties reception areas to record details of casualties.

8.6.3 Engineering Services Team

8.6.3.1 Electrical Black out & Power supply

1. On hearing the siren or any emergency brought to the knowledge, rush

to the incident place & report to incident controller.

2. To provide emergency power supply if required.

3. To take emergency Electrical black out if required.

4. To provide emergency searchlight if required.

Page 44: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 118

5. To remain near control point and await further instruction from Incident

Controller & Key Personnel.

8.6.3.2 Technical work force Team 1. On hearing the siren or any emergency brought to the knowledge,

reach at incident with fitters and toolbox for any mechanical

assistance.

2. To do emergency engineering work like isolation of equipments,

material, process, providing temporary by pass lines safe transfer of

materials, urgent repairs and replacement etc.

8.6.3.3 Arrangement of vehicle 1. On hearing the siren or any emergency brought to the knowledge,

arrange for vehicles for material handling like Tractor- trailer, tanker,

tempo etc. & keep ready them to cater the needs emergency as per

the instruction of Main Controller & Incident Controller.

2. To keep ready equipments at store to cater emergency requirement.

8.6.3.4 Civil Service On hearing the siren or any emergency brought to the knowledge, arrange

for

vehicles like JCB, scrapper etc. & keep ready them to cater the needs of

Main

Controller & Incident Controller Keep ready require quantity of dry sand or

dry clay.

8.6.3.5 Security 1. To ensure that the roadway to plant is clear for emergency vehicles

2. To stop non-emergency traffic from entering.

3. Prevent unauthorized entry in factory.

Page 45: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 119

4. To work as per the instruction/direction of Incident Controller, Key

Personnel, Main Controller.

5. To guide non- essential workers towards company assembly point.

6. To help assembly point managing team for assembly point managing

& counting the non- essential workers & reserved staff.

7. To help Fire Fighting & Spill control Team & First aid & Rescue Team.

8. To provide necessary equipments like FEE, PPE and RPE.

8.7 EMERGENCY CONTROL CENTRE Unit Head cabin is declared as Emergency Control Center (ECC). The

emergency control centre (or room) is the place from which the

operations to handle the emergency are directed and coordinated.

The main controller, key personnel and senior officers of the fire, police,

factory inspectorate, district authorities and emergency services will

attend it. The centre should be equipped to receive and transmit

information and directions from and to the incident controller and

areas of the works as well as outside. It should also have equipment for

logging the development of the incident to assist the controllers to

determine any necessary action. In addition to the means of

communication, the centre should be equipped with relevant data

and equipment which will assist those manning the centre to be

conversant with the developing situation and enable them to plan

accordingly.

It should be sited in an area of minimum risk and close to a road to

allow for ready access by a radio-equipped vehicle for use if other

systems fail or extra communication facilities are needed.

For large sites might be anticipated, consideration should be given to

setting up two control centers to ensure, so far as is possible, that one

will be available for use, should the other be disabled. If necessary the

police will assist to set up an emergency control center remote from

the works. The center should therefore contain:

1. An adequate number of internal telephones.

Page 46: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 120

2. An adequate number of external telephones. It is strongly

recommended that at least one should be ex-directory or capable of

use for outgoing calls only. This will avoid the telephone switchboard

being overloaded with calls from anxious relatives, the press etc. the

least telephone directories with a separate list of important numbers.

3. Plans of the factory to show:

a. Areas of Petroleum Storage tank.

b. Sources of sirens.

c. Site entrances and road system, updated at the time of the

emergency to indicate any road that is impossible.

d. Company assembly points and canteen.

e. Casualty treatment First Aid box location.

f. Parking points and visitors room.

g. Additional plans which may be marked up during the

emergency to show:

i. Areas affected or endangered within the factory.

ii. Areas where particular problems arise.

iii. Area evacuated and safe routes for escape

iv. Deployment of emergency vehicles and personnel.

v. Other relevant information.

4. Nominal roll of employees, work permits, gate entries and documents

for head count or access to this information. Employee's blood group

information and addresses will also be useful.

5. Note pads, pens, pencils, rubber and stationery to record all messages

received and sent by whatsoever means.

6. Note copies of this on-site emergency plan i.e. updated full text

including all annexure. From this, some vehicles and messengers

(runners) should be kept ready at the centre.

7. A tape-recorder and video to record the incident and evidences of

the cause and effect and actions to control the emergency.

8. Torches, umbrella, raincoats and some extra sets of personal protective

equipments.

Page 47: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 121

9. Torches, umbrella, raincoats and some extra sets of personal protective

equipments.

8.7.1 Communication system

8.7.2 OFF-SITE EMERGENCY PLAN If an accident takes place in Narmada Cement Grinding unit and its affects

are felt outside its premises, the situation thus created is called an “Off Site”

emergency. It no longer remains the concern of the factory management

alone but also becomes a concern for the general public living outside the

boundary premises of the factory or storage site

Major fire involving combustible materials like oil, and other facilities.

To meet such situations, Off Site Emergency Plan is to be prepared. Under the

Environmental Protection Act, the responsibility of preparation of OFF-SITE

Emergency Plan lies with the State Government. The Collector / Deputy

Collector are ordinarily nominated by State Government to plan OFF-SITE

Emergency Plan.

The District Collector or his nominated representative would be the team

leader of planning team, who shall conduct the planning task in a systematic

manner. The members of planning team for off site emergencies are

Collector / Deputy Collector, District Authorities In-charge of Fire Services and

Police and members drawn from Medical Services, Factory Inspectorate,

Pollution Control Board, Industries and Transport. In addition to these

members, there are Co-opted Members also from district authorities

concerned, Civil Defense, Publicity Department, and non officials such as

elected representative (MPs, MLAs, voluntary organization, Non-

Governmental Organizations etc) The basic elements (control room, key

personnel, communication system, warning system, public information

system, fire fighting system, mutual aid scheme, service support system,

evacuation etc.) of an Off Site Emergency Plan are the similar to an On Site

Emergency Plan, the only difference being in the responsibilities (State

Government instead of the owner of the premises) and the area covered

Page 48: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 122

under the plan (which includes the area outside the factory premises). A

schematic Off-site Emergency Plan has been suggested and submitted to

the Directorate of Factories and District Authorities

PURPOSE OF THE OFF SITE EMERGENCY PLAN: The main object of the off site plan is to create preparedness and to control

various types of emergencies/disaster.

The main purposes of the off-site emergency plan are:

i. To provide the local/district authorities, police, fire brigade, doctors,

surrounding industries and the public, the basic information of risk and

environmental impact assessment and to appraise them of the

consequences and the protection/prevention measures and control

plan and to seek their help to communicate with the public in case of

a major emergency. This information from every industry enables the

District Authorities to educate the public that what can go wrong, the

measures taken and to train them of their individual role in case of

emergency.

ii. To assist the local/District Authorities for preparing the off-site

emergency (contingency) plan for the district or particular area to

organize rehearsals from time to time and initiate corrective actions

based on the lessons learnt. This will include:

a. To prepare a site plan identifying industries, hazardous points,

control points, assembly points, hospitals, dispensaries, fire station,

police station, transport points, roads and all other requisite

details.

b. To verify the information given by the industries to comprehend

dangers and to arrange for adequate personal protective, fire

fighting and emergency equipment.

c. To establish command structure and to identify the respective

roles of the senior personnel of various service groups, toxicity

control and de-contamination squads and various authorities of

water, power, gas, health, labour, environment, revenue,

Page 49: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 123

explosive, pollution control, press, post, telephone, wireless,

railway, transport and social services etc. Necessary

representatives of employers and employees shall also be

incorporated. Various organizations, their duties, equipment,

implementation procedure and action onsite and off-site,

warning system, communication system, co-ordination system,

control centers, key personnel shall be prescribed.

d. Plan to carry out training programmer in safety, health and

environmental protection for the concerned parties. Necessary

publication will also be useful.

e. To maintain full liaison between all agencies to this plan,

industries, emergency services etc.

f. To plan for the antidotes, remedial medicines and equipment in

the hospitals and to carry out research for them for latest and

effective measures, Sufficient stock and mutual aid scheme will

be useful.

g. To provide for continuous monitoring system for essential

parameters of pollution to judge malfunctioning at the initial

stages and warning system at appropriate places.

Meteorological information regarding prevailing weather

conditions, wind velocity and direction, rain and flood data for

such data-collection.

h. To appoint a record keeper, historian and staff to collect

information on the causes of disaster and to maintain the record

thereof and also of the plan-proceedings.

i. To carry out mock drill and rehearsal of this plan to ensure its

efficacy, test and response, interaction and co-ordination of

operators, various service organizations, evaluate the

effectiveness and adequacy of the equipment and to gain

experience and confidence to implement the plan. The finalized

Disaster Plan shall be given to all concerned for implementation

and rehearsal.

Page 50: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 124

j. To operate this plan at the time of off site emergency by the

Chairman, i.e., the District Collector. Such operation shall include:

1. To contain, limit, localize and minimize the loss and damage to persons,

property and environment arisen from the accident on road or industry,

transport, storage or otherwise. To plan to decrease the potential of the

disaster.

2. To prevent the spread and re-happening of the disaster.

3. To inform people and surrounding about emergency and disaster if it is

likely to adversely affect them. Machinery will be established for this

purpose to guide the people in proper way.

4. To plan for rescue and recuperation of casualties and injuries. To plan

for relief and rehabilitation.

5. To plan for evacuation, safe assembly points and transportation

required.

6. To plan for prevention for harms, total loss and recurrence of disaster. It

will be ensured that absolute safety and security is achieved within the

shortest possible time.

Page 51: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 125

CHAPTER 9

DISCLOSURE OF CONSULTANTS

For the EIA study for UltraTech Cement Limited, M/s Royal Environment

Auditing and Consultancy Services, Rajkot, Gujarat was engaged as

consultant. A brief resume of the consultants is as follow.

Name of Firm : Royal Environment Auditing & Consultancy Services

Status : A partnership company, registered at Rajkot in 2008

under Indian Company Act(1956)

Registered Office : 6, Umakant Pandit Udyognagar,

Address Mavdi plot Main Road,

Rajkot - 360 004.

Telephone : 91-0281-236 06 95

Fax : 91-0281-236 81 33

Email : [email protected]

Nature of Consultancy : Environmental Monitoring, Secondary Data

Services rendered collection, Environmental Impact assessment ;

CRZ Clearance; Environmental Clearance (EC),

Liaison with GPCB; CPCB & MoEF; Environmental

Audit Reports.

Page 52: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 126

ANNEXURE I

Copy of CC & A

Page 53: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 127

ANNEXURE II COMPLIANCE OF EXISTING CC&A

Sr. no

Particulars Compiled with (Yes/No/NA)

Remarks

CONDITION UNDER THE AIR (PREVENTION AND CONTROL OF POLLUTION) ACT, 1981 1 The applicant shall install and

operate air pollution control system in order to achieve prescribed norms.

Yes All the process vents and stacks are attached with dust collectors and bag filters in order to achieve particulate emission <150 mg/Nm3 from each stack and vent. Monthly third party monitoring being done of all the stacks and vents and reports being sent to GPCB once in every month.

2 The concentration of SPM, Sox, Nox in ambient air within the premises of industry and a distance 10 mtrs from the source should not exceed the consent limit

Yes The concentration of SPM, Sox, NOx is well below the consent limit. Monthly third party monitoring being done at various location and reports being sent to GPCB once in month.

3 The applicants shall provide port, holes , ladders for monitoring of emission at each stack

Yes The company has provided port, holes and ladders at each and every stack and vent.

Page 54: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 128

4 The industry shall take adequate measures for control of noise level within a premises

Yes The company is regularly doing maintenance of rotary equipments inside the plant. Medical check up (Audiometry) of all the employees/workers being done once in a year.

CONDITION UNDER WATER ACT 5 The quantity of trade effluents from

the factory should be NIL Yes There is no process

effluent generated.

6 The quantity of sewage effluents shall not exceed 2000 litrs/day

Yes Sewage effluents never exceed 2000 ltrs/day.

7. Domestic effluent should be disposed through soak pit system

Yes The company has its own soak pit system.

CONDITIONS UNDER HAZARDEOUS WASTE 8 The applicants shall comply with

the provision of Environment Protection Act-1986 and rules made under

Yes All the rules being complied by the company.

9. The authorization shall be produced for inspection at the request of an officer of GPCB

Yes When ever it will be asked, the company will give a copy of authorization.

10 The company shall not rent, lend, sell, transfer or transport hazardous waste with prior permission of GPCB

Yes It is being complied. Pls refer Annexure-I.

11 Any unauthorized change in personnel, equipment or working condition as mentioned in authorization order by the person authorized shall constitute a breach of this authorization

Yes Shall be complied.

12 An application for authorization for renewal shall be made

Yes Authorization is valid up to 18/1/2011. Before the date of expiry

Page 55: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 129

renewal application will be done by the company.

13. The industry shall have to display relevant information with regards to hazardous waste as indicated in supreme court’s order no. 657 dated 14th Oct-2003

Yes Being complied.

14. The industry shall have to display online data outside the main factory gate with respect to quantity and nature of hazardous chemical being handled in the plant including waste water, air emission, and solid hazardous waste generated within the factory

Yes Being complied.

Page 56: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 130

ANNEXURE III

Details of Hazardous waste Generated, storage and

handling The company is producing only USED OIL as hazardous waste. Details of this

hazardous waste are given as under.

Sr. No.

Name of Hazardous waste

Storage Quantity Mode of Disposal

1. Used oil Collection and storage is being done in separate drum. These drums are kept at designated place having concrete flooring, lechate collection facility.

5.3 KL/Year

Will be sold to GPCB authorized recylers

The company is using CHEMICAL GYPSUM for manufacturing of cement. The

company is purchasing this CHEMCIAL GYPSUM from various dyes and

intermediate industries in surrounding area. Details are as under.

Sr. No.

Name of Hazardous waste

Storage Quantity Mode of Disposal

1. Chemical gypsum

Collection and storage is being done at designated place having concrete flooring, lechate collection facility and entire area is covered with roof.

32489 MT It is to be ground in the ball mill along with clinker for manufacturing cement.

Page 57: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 131

Annexure IV

Copy of Site Lay

Out Plant

Page 58: CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION ...gpcb.gov.in/pdf/Ultratech_Cement_Ltd_Magdalla_EIA_Report_Part_II.pdf · CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

Draft EIA report UltraTech Cement Limited – NCMW- SURAT

Royal environment auditing & Consultancy Services, Rajkot 132

Annexure V

Copy of TOR